S02_Construction Drawings bk 11.pdf
PDF 10 MB Posted
- Solicitation number
- 36C78626R0008
About this file
This document comprises bid documents for the Alabama National Cemetery Gravesite Expansion Phase 3 project located in Montevallo, Alabama. The project is managed by the U.S. Department of Veterans Affairs, Office of Design and Construction Service, with Integrity Federal Services and The LA Group serving as the Architect/Engineer of Record.
The project involves construction of multiple columbarium walls (Walls 4-10 for base bid and Walls 11-18 for bid option) containing approximately 1,000 niches each for the base option. Key construction components include precast reinforced concrete niche units, Alabama Stone Silver Shadow limestone veneer facing, limestone base stones and cap stones, concrete pier cores and foundations, TPO flashing systems, and associated site improvements including landscape plantings, concrete pavement, drainage systems, and truncated dome paver accessibility features. The columbarium walls are 36'-9" tall with 5-niche-high precast units arranged in 8, 9, or mixed column configurations. Critical specifications require government-provided marble niche covers (8-week lead time) to be contractor-installed, mockup approval prior to full construction, sack-rub concrete finishes with waterproof coatings, sealant joint installation per manufacturer specifications, and allowable tolerances of ±1/8" for columbarium work and ±1/4" for foundations. The landscape plan includes deciduous and evergreen trees, native shrubs, ground covers, geoweb slope protection systems, and sod installation. The drawings indicate multiple landscape zones with detailed plant lists specifying quantities and spacing for base bid and bid option configurations.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
ALL 1: CO
LUM
NS 1-25; RO
W S A-E W
AL
L
2:
C
O
LU
M
NS
-2
5;
R
O W
S A-
E
W
ALL 3: CO
LUM
NS 1-25; RO
W S A-E W
AL
L
4:
C
O
LU
M
NS
-2
5;
R
O W
S A-
E
W
ALL 5: CO
LUM
NS 1-25; RO
W S A-E W
AL
L
6:
C
O
LU
M
NS
-2
5;
R
O W
S A-
E W
ALL 7: CO
LUM
NS 1-25; RO
W S A-E
W
AL
L 8:
C O
LU
M
NS
-2 5;
R O
W S
A- E
W
ALL 9: CO
LUM
NS 1-25; RO
W S A-E
W
AL
L
: C O
LU
M
NS
-2 5;
R O
W S
A- E
W
ALL 11: CO
LUM
NS 1-22; RO
W S A-E W
AL
L
: C
O
LU
M
NS
-2
2;
R
O W
S A-
E
W
ALL 13: CO
LUM
NS 1-22; RO
W S A-E W
AL
L
: C
O
LU
M
NS
-2
2;
R
O W
S A-
E W
ALL 15: CO
LUM
NS 1-22; RO
W S A-E
W
AL
L
: C O
LU
M
NS
-2 2;
R O
W S
A- E
W
ALL 17: CO
LUM
NS 1-22; RO
W S A-E
W
AL
L
: C O
LU
M
NS
-2 2;
R O
W S
A- E
BID OPTION 1
(1,000 NICHES);
ITEMS WITHIN
THIS
BOUNDARY
CI703
CI703
CI703
CI703
CI703
CI703
CI703 2
CI703 1
CI703 2
CI703
CI704
CI704
CI704
CI704
CI704
CI704 1
CI704 2
CI704
SIM.
SIM. SIM. SIM. SIM.
SIM.
SIM.
SIM.
SIM. SIM. SIM. SIM.
SIM.
SIM.
B
B
B B
B
B
B
BB
B
B B
B
B
B
BB
B
3 4 5 6 7 8
16151413
3 4 5 6 7 8
17 18
16151413
11 12
COLUMBARIUM I.D., TYP.
COLUMBARIUM
WALL NUMBER, TYP.
BENCH W/ BACK,
TYP.
FLOWER WATERING
STATION, TYP.
BACKLESS
BENCH, TYP.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
J-2
3\2
_V
AN
CA
ID
IQ
E_
AL
AB
AM
A_
NA
TI
ON
AL
_C
EM
ET
ER
Y_
PH
3\2
CA
D\
7C
M3
3.C I70
1.0 .20
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 163
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
CI701
COLUMBARIUM NUMBERING
PLAN
DLM JDB
LEGEND
FLOWER WATERING STATION
BACKLESS BENCH
BENCH W/ BACK
CI512
CI512
CI510
NOTES
1. SEE DETAILS. THIS DRAWING DEPICTS THE
LOCATION AND NUMBERING OF INDIVIDUAL
COLUMBARIUM WALLS. THE ROW AND COLUMN
IDENTIFICATIONS SHALL BE AS DEPICTED ON THE
TYPICAL COLUMBARIUM ELEVATION (2/CI702).
2. COLUMN NUMBERING SHALL INCREASE FROM LEFT
TO RIGHT WHEN FACING WALL.
NORTH
0 5'3'1'
SCALE: 3/16" = 1'
121 163
A
B
C
D
E
1 5
ALABAMA STONE SILVER
SHADOW, VEINE CUT, LIMESTONE
VENEER, SMOOTH FINISH ALL
EXPOSED FACES, TYP.
6" HT. ENGRAVED WALL NUMBER AT
END PIERS ONLY; CENTER
HORIZONTALLY ON PIER AND
VERTICALLY ON VENEER PANEL, TYP.
2" HT. ENGRAVED ROW LETTER;
CENTER HORIZONTALLY ON FILLER
STRIP AND VERTICALLY ON NICHE
COVER, TYP.
2" HT. ENGRAVED COLUMN NUMBER;
CENTER VERTICALLY ON FACE OF
CAP AND HORIZONTALLY ON NICHE
COVER BELOW
GOVERNMENT PROVIDED
MARBLE NICHE COVER, TYP.
ALABAMA STONE SILVER
SHADOW, VEINE CUT, LIMESTONE
BASE STONE AT PIER, SMOOTH
FINISH ALL EXPOSED FACES, TYP.
ALABAMA STONE SILVER SHADOW,
VEINE CUT, LIMESTONE FILLER
STRIP, SMOOTH FINISH ALL
EXPOSED FACES, TYP.
ALABAMA STONE SILVER
SHADOW, VEINE CUT,
LIMESTONE PIER AND WALL CAP,
SMOOTH FINISH ALL EXPOSED
FACES, SEE CAP PLAN, TYP.
FINISHED
GRADE, TYP.
4" M
IN
8" M
AX
TY
P.
SACK RUB CONCRETE FINISH ON
FOUNDATION MINIMUM 6" BELOW
FINISH GRADE, TYP.
CI702
CI702
THIS AREA REQUIRES FULL-SIZE,
COMPLETE, MOCK-UP FOR REVIEW
AND APPROVAL PRIOR TO
CONSTRUCTION OF COLUMBARIUM
3/8" JOINT BETWEEN
CAPS, SEE CAP
SETTING DETAIL, TYP.
CI708
CI706
CI706
CI707 PRECAST NICHE UNIT
CONTRACTOR PROVIDED
AND INSTALLED ROSETTES
CI707
3/8" SEALANT JOINT WITH BACKER
ROD TOP OF WALL, TYP.
SEALANT JOINT BETWEEN NICHE UNIT
AND FILLER STRIP AND BASE STONES
ALABAMA STONE SILVER SHADOW,
VEINE CUT, LIMESTONE BASE
STONE AT WALL, SMOOTH FINISH
ALL EXPOSED FACES, TYP.
CI711
CI710
CI709
CI711
CI710
CI711
CI710
8"
CI710
B
4'-13 4"
ALABAMA STONE SILVER
SHADOW, VEINE CUT,
LIMESTONE VENEER TO
MATCH EXISTING, TYP.
6" HT. ENGRAVED WALL
NUMBER; CENTER
HORIZONTALLY ON PIER
AND VERTICALLY ON
VENEER PANEL, TYP.
ALABAMA STONE SILVER
SHADOW, VEINE CUT,
LIMESTONE BASE STONE
AT PIER, TYP.
ALABAMA STONE SILVER
SHADOW, VEINE CUT,
LIMESTONE PIER CAP, SEE
CAP PLAN, TYP.
FINISHED GRADE, TYP.
2'-07 8" 2'-07
8" C.L.
2'-3" 2'-3"
4'-6"
SACK RUB CONCRETE FINISH ON
FOUNDATION MINIMUM 6" BELOW
FINISH GRADE, TYP.
CI710
CI709
CI710
C.L.
9" 1'-
5" 9"
4'- 6"
6'- 0"
8" 113 4" 2'-3"
8"
3'-51 8"
FACE OF SHELF
FOUNDATION
BELOW, TYP.
FACE OF
FOUNDATION
BELOW, TYP.
S.S. RECESSED
WELD PLATES,
TYP.
WALL BASE
STONE, TYP.
3/8" SEALANT AND
BACKER ROD JOINT, TYP.
STONE FILLER STRIP, TYP.
3/8" TYPE N MORTAR JOINT, TYP.
LIMESTONE VENEER, TYP.
PIER BASE STONE, TYP.CAVITY BEHIND
VENEER W/DRAINAGE
MESH, TYP.
REINFORCED CONCRETE PIER
CORE, SEE STRUCTURAL
DRAWINGS, TYP.
FACE OF CONCRETE
FOUNDATION (BELOW), SEE
STRUCTURAL DRAWINGS, TYP.
EDGE OF
CONC. PVMNT,
TYP.
ROUNDED WASHED
GRAVEL FOR FLOWER
VASES, MATCH
EXISTING, TYP.
4"
1'- 5"
ANCHOR AT VERTICAL
CENTER OF FILLER STRIP;
BASIS OF DESIGN HB #431,
SEE STRUCTURAL
DETAILS
90.00°TYP.
LAYOUT POINT
LAYOUT LINE
NOTE:
REFER TO STRUCTURAL
DRAWINGS FOR REINFORCING
INFORMATION.
7'-0" 2'-2"
4" 13
4"
4" 1
4"
11" 11"
1'-10"
1'- 5"
1'- 5"
51 4" 51 4"
43 4" 43 4"
3'- 81 2"
4'- 6"
REINFORCED CONCRETE PIER
CORE, SEE STRUCTURAL
DRAWINGS, TYP.
FACE OF CONCRETE
FOUNDATION (BELOW), SEE
STRUCTURAL DRAWINGS, TYP.
3/8" SEALANT AND
BACKER ROD JOINT, TYP.
S.S. RECESSED
WELD PLATES,
TYP.
STONE FILLER STRIP, TYP.
3/8" TYPE N MORTAR JOINT, TYP.
LIMESTONE VENEER, TYP.
PIER BASE STONE, TYP.
CAVITY BEHIND VENEER
W/DRAINAGE MESH, TYP.
ANCHOR AT VERTICAL
CENTER OF FILLER STRIP;
BASIS OF DESIGN HB #431,
SEE STRUCTURAL
DETAILS
A
B
C
D
E
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
J-2
3\2
_V
AN
CA
ID
IQ
E_
AL
AB
AM
A_
NA
TI
ON
AL
_C
EM
ET
ER
Y_
PH
3\2
CA
D\
7C
M3
3.C I70
2.0 .20
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 163
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
CI702
COLUMBARIUM DETAILS 1
1" = 1'-0"
TYPICAL COLUMBARIUM PIER END ELEVATION1 1'0 6"3"1" = 1'-0"
TYPICAL COLUMBARIUM WALL ELEVATION2
1. COLUMBARIUM NOTES:
2. SEE GEOTECHNICAL REPORT. CONTRACTOR'S BID TO ASSUME
SOILS FROM EXISTING GRADE TO BELOW COLUMBARIUM
FOOTINGS. IMPORTED FILL MATERIAL REQUIRED BELOW
FOOTINGS. SEE DETAILS AND SPECIFICATIONS.
3. COLUMBARIUM NICHE COLUMNS SHALL BE IDENTIFIED, FIRST
NICHE COLUMN THEN INCREASING EVERY 5TH COLUMN.
COLUMN NUMBERING INCREASES FROM LEFT TO RIGHT WHEN
FACING WALL.
4. PROVIDE FREE STANDING COLUMBARIUM MOCK-UP IN
PROXIMITY TO COLUMBARIUM B. MOCK-UP IN PLACE SHALL
SHALL NOT BE ALLOWED. THE APPROVED COLUMBARIUM
MOCK-UP SHALL ESTABLISH THE ACCEPTABLE LEVEL OF WORK.
THE PURPOSE OF MOCKUPS ARE TO DEMONSTRATE THE
AESTHETIC AND ESTABLISH QUALITY STANDARDS FOR THIS
PROJECT. MOCKUPS SHALL BE REVIEWED AND APPROVED BY
THE COR AND AE OF RECORD BEFORE PROCEEDING WITH
INSTALLATION OF THE REMAINING COLUMBARIUM WALLS.
CONTRACTOR SHALL SUBMIT STAMPED CERTIFIED SURVEYS OF
FOUNDATIONS PRIOR TO APPROVAL OF CUT STONE
ASSEMBLIES.
5. ANGLES ARE FOR REFERENCE ONLY. USE COORDINATES AND
LAYOUT LINES FOR SITE LAYOUT.
6. DIMENSIONS SHOWN ARE FOR CONCRETE FOUNDATIONS
UNLESS OTHERWISE INDICATED.
7. ALLOWABLE TOLERANCES OF THE COLUMBARIUM WORK IS ±1/8",
UNLESS NOTED OTHERWISE. THE EXCEPTION TO THE
ALLOWABLE TOLERANCES NOTED ABOVE ARE FOUNDATIONS.
FOUNDATIONS ALLOWABLE TOLERANCES ARE ± 1/4". WORK
CONSTRUCTED OUTSIDE OF THE ALLOWABLE TOLERANCES
SHALL BE REWORKED AT NO EXPENSE TO THE GOVERNMENT.
THESE COLUMBARIUM WALLS ARE TO BE NATIONAL SHRINES.
REWORKING OF THE WALLS WILL BE EVALUATED ON A CASE BY
CASE BASIS. CONTRACTORS' BIDS SHALL INCLUDE THE COSTS
OF REMOVING AND REPLACING DEFICIENT WORK IN ENTIRETY
AND AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. FOR CONCRETE REINFORCING SEE STRUCTURAL DRAWINGS.
9. ALL EXPOSED CONCRETE (INCLUDING BUT NOT LIMITED TO
NICHE FRONTS) SHALL BE GROUND OR PATCHED SMOOTH;
APPLY WATERBORNE, HIGH-BUILD, MODIFIED ACRYLIC
WATERPROOF COLOR COATING AS SPECIFIED PRIOR TO NICHE
COVER INSTALLATION. PROVIDE SUBMITTAL. BASIS OF DESIGN
SIKA MASTERPROTECT HB300. MASK ITEMS NOT RECEIVING
COATING. CUSTOM COLOR TO MATCH COLOR OF CONCRETE.
10. RECESS WELD PLATES SIZE, NUMBER, AND ATTACHMENT
LOCATION SHALL BE AS PER NICHE MANUFACTURER'S
RECOMMENDATION. PROVIDE SHOP DRAWINGS FOR APPROVAL.
11. GOVERNMENT (DVA) PROVIDED MARBLE NICHE COVERS,
CONTRACTOR INSTALLED. CONTRACTOR IS REQUIRED TO
REQUEST THE NICHE COVERS FROM THE GOVERNMENT.
MINIMUM EIGHT WEEK LEAD TIME FOR NICHE COVERS.
12. SEE SPECIFICATIONS FOR CONTRACTOR PROVIDED AND
INSTALLED NICHE COVER ATTACHMENT HARDWARE.
13. THOROUGHLY CLEAN TOP OF PRECAST NICHE UNITS. PROVIDE
SHIMS AND GROUT AT MAXIMUM SPACING SHOWN. EPDM
MEMBRANE (45MIL) OVER ENTIRE TOP OF PRECAST NICHE UNITS
AND PIERS.
14. ALL STONE DIMENSIONS REQUIRED TO BE VERIFIED IN FIELD
PRIOR TO FABRICATION AND VERIFIED AGAIN PRIOR TO
INSTALLATION. CONTRACTOR REQUIRED TO SUBMIT CERTIFIED
SURVEYS OF CONCRETE FOOTINGS, FOUNDATIONS, PIER
CORES, AND SHELVES. SEE SPECIFICATION SECTION 01 00 02
GENERAL REQUIREMENTS.
15. ALL VISIBLE FACES OF CUT STONE ASSEMBLIES EXCEPT NICHE
COVERS TO BE SEALED WITH SILICONE RUBBER PENETRATION
WATERPROOFING SEALER PRIOR TO INSTALLATION. BASIS OF
DESIGN: LIFETIME WATERPROOFING SEALANT SYSTEM.
16. ALL NON-VISIBLE FACES OF CUT STONE ASSEMBLIES EXCEPT
NICHE COVERS TO BE COATED WITH NON-STAINING
CEMENTITIOUS DAMP PROOFING. BASIS OF DESIGN:
THOROSEAL OR TAMOSEAL.
17. ALIGN VERTICAL BASE STONE JOINTS WITH VERTICAL CAP
STONE JOINTS WHERE INDICATED. JOINTS SHALL BE CENTERED
ON CENTERLINE OF NICHE WEBS. WEEP VENTS (COLOR
DETERMINED IN MOCKUP) SHALL BE PLACED AT EACH VERTICAL
CAP JOINT AND VERTICAL BASE STONE JOINT.
18. ALL JOINTS ARE TO BE PROFESSIONALLY INSTALLED BY
QUALIFIED INDIVIDUALS. SUBMITTAL REQUIRED.
19. SEALANT JOINT INSTALLATION SHALL BE PER SEALANT
MANUFACTURER'S RECOMMENDATIONS. BASIS OF DESIGN:
TREMCO DYMONIC 100 POLYURETHANE SEALANT.
20. JOINTS SHALL BE CLEANED AND PRIMED PRIOR TO APPLYING
SEALANT PER THE SEALANT MANUFACTURER'S
RECOMMENDATIONS.
21. APPLY APPROVED JOINT PRIMER IMMEDIATELY PRIOR TO
SEALANT APPLICATION FOLLOWING CLEANING WHICH IS TO BE
IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.
DEPTH OF SEALANT SHALL BE EQUAL TO WIDTH OF JOINT
+/-1/16" TYPICAL. BACKER ROD NOT IN COMPLIANCE SHALL BE
REMOVED AND RESET BEFORE APPLYING SEALANT.
22. MANUFACTURERS' RECOMMENDATIONS GOVERN.
23. TOF - TOP OF FOUNDATION.
24. FG - FINISH GRADE.
25. VIF - VERIFY IN FIELD.
26. ENGRAVING DEPTH OF NICHE ROW AND COLUMN I.D. TO BE
DETERMINED VIA SAMPLES. ENGRAVING SHALL BE VISIBLE IN
SUN AND SHADE. MINIMUM ENGRAVING DEPTH SHALL BE AT
LEAST 3/8" DEEP. ENGRAVING STYLE SHALL BE "V-CUT".
27. THIS CONSTRUCTION PROJECT IS TO ENSURE EXCELLENT
QUALITY AND CONSISTENCY FOR THIS NATIONAL CEMETERY.
OUR NATIONAL CEMETERIES ARE OF SIGNIFICANT IMPORTANCE
TO OUR NATION. THIS CEMETERY IS TO HONOR VETERANS AND
THEIR ELIGIBLE FAMILY MEMBERS BY PROVIDING FINAL RESTING
PLACES IN NATIONAL SHRINES. QUALITY IS IMPORTANT.
1" = 1'-0"
COLUMBARIUM PLAN SECTION A3
1'0 6"3"
1'0 6"3"
DLM JDB 122
36'-9"
TOP OF WALL
SHELF
(TOS)
TOP OF
FOUNDATION
(TOF)
TOP OF WALL /
PRECAST NICHES
(TOW)
BOTTOM OF
FOOTING
(BF) SEE STRUCT.
TOP OF FOOTING
(TF) SEE STRUCT.
8 COLUMN CLOSED END NICHE UNIT(8'-11
2" ) 9 COLUMN CLOSED END NICHE UNIT(9'-11
2" )
3'-2"
8"
8'-21
4" (INCLUDES (2) 3/8" JOINTS)
2"
1'-10"
2"
9'-21
4" (INCLUDES (2) 3/8" JOINTS)
CI705
CI706
CI705
A
B
C
D
E
A
B
C
D
E
1 5 15 2510 20
8 COLUMN CLOSED END NICHE UNIT(8'-11
2" )
3'-2"
8"
8'-21
4" (INCLUDES (2) 3/8" JOINTS)
2"
1'-10"
2"
A B A A AC B AA
36'-9"
TOP OF WALL
SHELF
(TOS)
TOP OF
FOUNDATION
(TOF)
TOP OF WALL /
PRECAST NICHES
(TOW)
BOTTOM OF
FOOTING
(BF) SEE STRUCT.
TOP OF FOOTING
(TF) SEE STRUCT.
8 COLUMN CLOSED END NICHE UNIT(8'-11
2" ) 9 COLUMN CLOSED END NICHE UNIT(9'-11
2" )
3'-2"
8"
8'-21
4" (INCLUDES (2) 3/8" JOINTS)
2"
1'-10"
2"
9'-21
4" (INCLUDES (2) 3/8" JOINTS)
CI705
CI706
CI705
A
B
C
D
E
A
B
C
D
E
8 COLUMN CLOSED END NICHE UNIT(8'-11
2" )
3'-2"
8"
8'-21
4" (INCLUDES (2) 3/8" JOINTS)
2"
1'-10"
2"
1 5 15 2510 20
A AC B AAB AA
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
J-2
3\2
_V
AN
CA
ID
IQ
E_
AL
AB
AM
A_
NA
TI
ON
AL
_C
EM
ET
ER
Y_
PH
3\2
CA
D\
7C
M3
3.C I70
2.0 .20
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 163
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
CI703
COLUMBARIUM DETAILS 2
1/2" = 1'-0"
COLUMBARIUM ELEVATION (WALLS 1, 3, 5, 7, 9)1 0 1' 2'6"
DLM JDB
1/2" = 1'-0"
COLUMBARIUM ELEVATION (WALLS 2, 4, 6, 8, 10)2 0 1' 2'6"
A DENOTES BASE STONE TYPE, SEE
CI710 FOR BASE STONE DETAILS
NOTES:
COLUMBARIUM WALL ELEVATIONS
WALL NUMBER TOP OF NICHE UNIT TOP OF SHELF TOP OF FOUNDATION TOP OF FOOTING BOTTOM OF FOOTING
1 / 2 472.14 465.10 464.74 462.38 460.88 3 / 4 472.42 465.39 465.02 462.64 461.14 5 / 6 472.66 465.63 465.26 462.89 461.39 7 / 8 472.92 465.89 465.53 463.16 461.66 9 / 10 473.09 466.06 465.70 463.42 461.92
SEE CI709 FOR CAP STONE TYPE DETAILS
36'-9"
TOP OF WALL
SHELF
(TOS)
TOP OF
FOUNDATION
(TOF)
TOP OF WALL /
PRECAST NICHES
(TOW)
BOTTOM OF
FOOTING
(BF) SEE STRUCT.
TOP OF FOOTING
(TF) SEE STRUCT.
8 COLUMN CLOSED END NICHE UNIT(8'-11
2" ) 9 COLUMN CLOSED END NICHE UNIT(9'-11
2" )
3'-2"
8"
8'-21
4" (INCLUDES (2) 3/8" JOINTS)
2"
1'-10"
2"
9'-21
4" (INCLUDES (2) 3/8" JOINTS)
CI705
CI706
CI705
A
B
C
D
E
A
B
C
D
E
1 5 15 2510 20
8 COLUMN CLOSED END NICHE UNIT(8'-11
2" )
3'-2"
8"
8'-21
4" (INCLUDES (2) 3/8" JOINTS)
2"
1'-10"
2"
A B A A AC B AA
36'-9"
TOP OF WALL
SHELF
(TOS)
TOP OF
FOUNDATION
(TOF)
TOP OF WALL /
PRECAST NICHES
(TOW)
BOTTOM OF
FOOTING
(BF) SEE STRUCT.
TOP OF FOOTING
(TF) SEE STRUCT.
8 COLUMN CLOSED END NICHE UNIT(8'-11
2" ) 9 COLUMN CLOSED END NICHE UNIT(9'-11
2" )
3'-2"
8"
8'-21
4" (INCLUDES (2) 3/8" JOINTS)
2"
1'-10"
2"
9'-21
4" (INCLUDES (2) 3/8" JOINTS)
CI705
CI706
CI705
A
B
C
D
E
A
B
C
D
E
8 COLUMN CLOSED END NICHE UNIT(8'-11
2" )
3'-2"
8"
8'-21
4" (INCLUDES (2) 3/8" JOINTS)
2"
1'-10"
2"
1 5 15 2510 20
A AC B AAB AA
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
J-2
3\2
_V
AN
CA
ID
IQ
E_
AL
AB
AM
A_
NA
TI
ON
AL
_C
EM
ET
ER
Y_
PH
3\2
CA
D\
7C
M3
3.C I70
2.0 .20
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 163
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
CI704
COLUMBARIUM DETAILS 3
1/2" = 1'-0"
BID OPTION: COLUMBARIUM ELEVATION (WALLS 11, 13, 15, 17)1 0 1' 2'6"
DLM JDB
1/2" = 1'-0"
BID OPTION: COLUMBARIUM ELEVATION (WALLS 12, 14, 16, 18)2 0 1' 2'6"
COLUMBARIUM WALL ELEVATIONS
WALL NUMBER TOP OF NICHE UNIT TOP OF SHELF TOP OF FOUNDATION TOP OF FOOTING BOTTOM OF FOOTING
11 / 12 472.12 465.09 464.73 462.43 460.93
13 / 14 472.39 465.36 465.00 462.66 461.16 15 / 16 472.58 465.55 465.19 462.84 461.34 17 / 18 472.82 465.79 465.43 463.07 461.57
A DENOTES BASE STONE TYPE, SEE
CI710 FOR BASE STONE DETAILS
NOTES:
SEE CI709 FOR CAP STONE TYPE DETAILS
ALABAMA STONE SILVER SHADOW, VEINE CUT,
LIMESTONE VENEER, TYP.
ALABAMA STONE SILVER
SHADOW, VEINE CUT,
LIMESTONE PIER CAP, TYP.
FINISHED GRADE, TYP.
2'-3" 2'-3"
4'-6"
SACK RUB CONCRETE FINISH ON
FOUNDATION MINIMUM 6" BELOW
FINISH GRADE, TYP.
CI708
UNDERCUT SOFTENED SOIL AND
REPLACE WITH APPROPRIATE
FILL MATERIAL(S) TO 4' DEPTH
PER GEOTECHNICAL ENGINEER'S
RECOMMENDATIONS, TYP.
TOP OF FOOTING
VARIES
BOTTOM OF
FOOTING VARIES
CONTINUOUS DRIP SLOT, TYP.
3/8" BACKER ROD AND SEALANT JOINT; COLOR TO BE
DETERMINED DURING MOCK-UP REVIEW, TYP.
EPDM MEMBRANE (45 MIL) OVER ENTIRE TOP OF PIER WRAP
OVER SIDES OF PIER CORE MIN. 8", TYP.
AIR CAVITY W/EXTRUDED POLYMER MATRIX DRAINAGE MESH
HEAT LAMINATED TO A PERMEABLE FILTER FABRIC; BASIS
OF DESIGN: CAV-AIR-ATOR BY KEENE. ATTACH DRAINAGE
MESH TO CIP CONCRETE PIER CORE WITH ADHESIVE, TYP.
REINFORCED CONCRETE PIER CORE, SEE STRUCTURAL
DRAWINGS, TYP.
S.S. MASONRY ANCHOR; BASIS OF DESIGN: HB 433, 16" MAX.
VERTICAL AND HORIZONTAL SPACING, TYP.
3/8" TYPE N MORTAR JOINT, COLOR TO MATCH EXISTING, TYP.
APPLY WATER PROOF MEMBRANE
AND DIMPLE DRAINAGE BOARD
SYSTEM BELOW GRADE ON
FOUNDATION AND FOOTING, TYP.
CONC. PAVEMENT WITH
THICKENED EDGE, TYP.
REINFORCED CONCRETE
FOUNDATION AND FOOTING,
SEE STRUCTURAL DRAWING,
TYP,
BASE STONE AND
FLASHING ENLARGEMENT
DRAINAGE STONE BACKFILL
(AASHTO #57 STONE) WRAPPED IN
FILTER FABRIC WITH PERF.
FOOTING DRAIN, HOLES DOWN,
W/F.F. SOCK, TYP. SEE DRAINAGE
PLANS
COMPACTED SUBGRADE
PARTIAL TYPE N MORTAR BED, TYP.
CI705
4/5
CI708
8"
TYP.
TOP OF
FOUNDATION (TOF)
VARIES
FINISH GRADE
VARIES
TOP OF PIER
(TOP) VARIES
EQUAL TO
ADJACENT TOP OF
PRECAST NICHE
UNITS (TOW)
3 8" TY
P.
10" 1'-5" 10"1'-5"
CL LAYOUT LINE
DECORATIVE GRAVEL
STRIP, TYP.
CI709
RECESSED S.S. WELD PLATES,
MIN. 2 PER NICHE UNIT, TYP.
CI707
WELD PLATE AND STONE ANCHOR AT TOP OF PIER 2
CI705
8"
1' 1'
4" FOOTING DRAIN PIPE
TPO FLASHING WITH MORTAR NET,
WEEPS, TERMINATION BAR, MASTIC,
AND CORNER BOOTS. BASIS OF
DESIGN MORTAR NET SOLUTIONS
TOTAL FLASH CAVITY WALL
DRAINAGE SOLUTION,
THERMOPLASTIC POLYOLEFIN
(TPO), 18" SIZE, MORTAR NET
SOLUTIONS CORNER BOOTS AND
CORNER S.S. FLASHING, INSTALL
PER MANUFACTURERS'
RECOMMENDATIONS, TYP.
S.S. DRIP EDGE, TYP.
S.S. TERMINATION BAR WITH LIP
MASTIC
1" AIR CAVITY W/EXTRUDED
POLYMER MATRIX DRAINAGE MESH
HEAT LAMINATED TO A PERMEABLE
FILTER FABRIC; BASIS OF DESIGN
CAV-AIR-ATOR BY KEENE. ATTACH
DRAINAGE MESH TO CIP CONCRETE
PIER CORE WITH ADHESIVE, TYP.
LIMESTONE PANELS
CONCRETE FOUNDATION,
SACK RUB CONCRETE FINISH
ON FOUNDATION MINIMUM 6"
BELOW FINISH GRADE, TYP.
DECORATIVE GRAVEL STRIP
LIMESTONE BASE STONE
3/8" MORTAR JOINT, TYP.
STONE ANCHOR, BASIS OF DESIGN
HB #433 STONE ANCHOR, SEE
STRUCTURAL DETAILS, TYP.
MORTAR, TYP.
(2) ANCHORS PER BASE STONE;
BASIS OF DESIGN SHALL BE HB
#431, SEE STRUCTURAL DETAILS
3/8" SEALANT AND BACKER ROD
JOINT BETWEEN STONES, TYP.
S.S. ANCHOR, BASIS OF DESIGN HB
#452, SEE STRUCTURAL DRAWINGS
FOR ANCHOR AND ATTACHMENT, TYP.
LIMESTONE VENEER, TYP.
KERF IN STONE PANEL TO RECEIVE
ANCHOR, EPOXY IN PLACE
LIMESTONE CAP
CONCRETE PIER CORE, TYP.
1" MIN.
TYP. 6 5/8" TYP.
1 1/2" MIN.
CLEAR
PLASTIC SHIM BEYOND, TYP.
RECESSED WELD PLATE, TYP.
TPO FLASHING WITH MORTAR NET,
WEEPS, TERMINATION BAR, MASTIC,
AND CORNER BOOTS. BASIS OF
DESIGN MORTAR NET SOLUTIONS
TOTAL FLASH CAVITY WALL
DRAINAGE SOLUTION,
THERMOPLASTIC POLYOLEFIN
(TPO), 18" SIZE, MORTAR NET
SOLUTIONS CORNER BOOTS AND
CORNER S.S. FLASHING, INSTALL
PER MANUFACTURERS'
RECOMMENDATIONS, TYP.
S.S. DRIP EDGE, TYP.
S.S. TERMINATION BAR
WITH LIP
MASTIC
1" AIR CAVITY W/EXTRUDED
POLYMER MATRIX DRAINAGE MESH
HEAT LAMINATED TO A PERMEABLE
FILTER FABRIC; BASIS OF DESIGN
CAV-AIR-ATOR BY KEENE. ATTACH
DRAINAGE MESH TO CIP
CONCRETE PIER CORE WITH
ADHESIVE, TYP.
LIMESTONE FILLER STRIP
CONCRETE FOUNDATION,
SACK RUB CONCRETE FINISH
ON FOUNDATION MINIMUM 6"
BELOW FINISH GRADE, TYP.
DECORATIVE GRAVEL STRIP
(1) ANCHOR PER FILLER STRIP; BASIS
OF DESIGN SHALL BE HB #431, SEE
STRUCTURAL DETAILS
EQ. EQ.
MORTAR, TYP.
ALABAMA STONE SILVER SHADOW, VEINE CUT,
LIMESTONE FILLER STRIP, TYP.
PIER BEYOND, TYP.
ALABAMA STONE SILVER
SHADOW, VEINE CUT,
LIMESTONE CAP, TYP.
FINISHED GRADE, TYP.
1'-101 4" 1'-101
4"
3'-81 2"
UNDERCUT SOFTENED SOIL AND
REPLACE WITH APPROPRIATE
FILL MATERIAL(S) TO 4' DEPTH
PER GEOTECHNICAL ENGINEER'S
RECOMMENDATIONS, TYP.
TOP OF FOOTING
VARIES
BOTTOM OF
FOOTING VARIES
CONTINUOUS DRIP SLOT, TYP.
3/8" BACKER ROD AND SEALANT JOINT; COLOR TO BE
DETERMINED DURING MOCK-UP REVIEW, TYP.
EPDM MEMBRANE (45 MIL) OVER ENTIRE TOP OF PIER WRAP
OVER SIDES OF PIER CORE MIN. 8", TYP.
AIR CAVITY W/EXTRUDED POLYMER MATRIX DRAINAGE MESH
HEAT LAMINATED TO A PERMEABLE FILTER FABRIC; BASIS
OF DESIGN: CAV-AIR-ATOR BY KEENE. ATTACH DRAINAGE
MESH TO CIP CONCRETE PIER CORE WITH ADHESIVE, TYP.
REINFORCED CONCRETE PIER CORE, SEE STRUCTURAL
DRAWINGS, TYP.
3/8" TYPE N MORTAR JOINT, COLOR TO MATCH EXISTING, TYP.
APPLY WATER PROOF MEMBRANE
AND DIMPLE DRAINAGE BOARD
SYSTEM BELOW GRADE ON
FOUNDATION AND FOOTING, TYP.
CONC. PAVEMENT WITH
THICKENED EDGE, TYP.
DECORATIVE GRAVEL
STRIP, TYP.
REINFORCED CONCRETE
FOUNDATION AND FOOTING,
SEE STRUCTURAL DRAWING,
TYP,
BASE STONE AND
FLASHING ENLARGEMENT
DRAINAGE STONE BACKFILL
(AASHTO #57 STONE) WRAPPED IN
FILTER FABRIC WITH PERF.
FOOTING DRAIN, HOLES DOWN,
W/F.F. SOCK, TYP. SEE DRAINAGE
PLANS
COMPACTED SUBGRADE
PARTIAL TYPE N MORTAR BED, TYP.
CI705
4"
TYP.
TOP OF
FOUNDATION (TOF)
VARIES
FINISH GRADE
VARIES
TOP OF PIER
(TOP) VARIES
EQUAL TO
ADJACENT TOP OF
PRECAST NICHE
UNITS (TOW)
3 8"
4" 1'-5" 51
4"1'-5"
CL LAYOUT LINE
1'-101 4" 1'-101
4"
CI708
CI709
4/5
CI708
RECESSED S.S. WELD PLATES BETWEEN
PIER AND NICHE UNITS, TYP.
CI707
WELD PLATE AND STONE ANCHOR AT TOP OF PIER
CI705
8"
1' 1'
4" FOOTING DRAIN PIPE
3/8" SEALANT AND BACKER ROD
JOINT BETWEEN STONES, TYP.
S.S. ANCHOR, BASIS OF DESIGN HB
#452, SEE STRUCTURAL DRAWINGS
FOR ANCHOR AND ATTACHMENT, TYP.
LIMESTONE FILLER STRIP, TYP.
KERF IN STONE PANEL TO RECEIVE
ANCHOR, EPOXY IN PLACE
LIMESTONE CAP
CONCRETE PIER CORE, TYP.
1" MIN.
TYP. 4" TYP.
1 1/2" MIN.
PLASTIC SHIM BEYOND, TYP.
RECESSED WELD PLATE, TYP.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
J-2
3\2
_V
AN
CA
ID
IQ
E_
AL
AB
AM
A_
NA
TI
ON
AL
_C
EM
ET
ER
Y_
PH
3\2
CA
D\
7C
M3
3.C I70
2.0 .20
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 163
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
CI705
COLUMBARIUM DETAILS 4
1" = 1'-0"
COLUMBARIUM PIER SECTION1 1'0 6"3"
DLM JDB
1" = 1'-0"
COLUMBARIUM SECTION AT FILLER STRIP3 1'0 6"3"
1" = 1'-0"
STONE VENEER ATTACHMENT AT TOP OF PIER2 1'0 6"3" 1" = 1'-0"
STONE FILLER STRIP ATTACHMENT AT TOP OF WALL4 1'0 6"3"
1" = 1'-0"
FLASHING AT COLUMBARIUM PIER BASE STONE5 1'0 6"3"
1" = 1'-0"
FLASHING AT COLUMBARIUM FILLER STRIP6 1'0 6"3"
2'- 3"
9" 2'-
3" 9"
4'- 6"
6'- 0"
90.00°TYP.
8"
9"
2'-5"
4"
2'-53 4"
3'-23 4"
8"
FACE OF WALL
SHELF, TYP.
FACE OF
FOUNDATION
BELOW, TYP.
3/8" SEALANT AND
BACKER ROD JOINT, TYP.
STONE FILLER STRIP, TYP.
PIER BASE STONE, TYP.
CAVITY BEHIND
VENEER
W/DRAINAGE
MESH, TYP.
REINFORCED CONCRETE PIER
CORE, SEE STRUCTURAL
DRAWINGS, TYP.
FACE OF CONCRETE
FOUNDATION (BELOW), SEE
EDGE OF
CONC. PVMNT,
TYP.
1'- 5"
1'- 5"
LIMIT OF REINFORCED CONCRETE
FOOTING BELOW, SEE
STRUCTURAL DRAWINGS, TYP.
2'-2"
4" 13
4"
4" 1
4"
11" 11"
1'-10"
1'- 5"
1'- 5"
51 4" 51 4"
43 4" 43 4"
3'- 81 2"
4'- 6"
REINFORCED CONCRETE PIER
CORE, SEE STRUCTURAL
DRAWINGS, TYP.
FACE OF CONCRETE
FOUNDATION (BELOW), SEE
STRUCTURAL DRAWINGS, TYP.
3/8" SEALANT AND
BACKER ROD JOINT, TYP.
STONE FILLER STRIP, TYP.
PIER BASE STONE, TYP.
CAVITY BEHIND
VENEER W/DRAINAGE
MESH, TYP.
WALL BASE
STONE, TYP.
1'- 4"
1'- 4"
LAYOUT POINT
LAYOUT LINE
NOTE:
REFER TO STRUCTURAL
DRAWINGS FOR REINFORCING
INFORMATION.
7'-0"
LAYOUT POINT
LAYOUT LINE
NOTE:
REFER TO STRUCTURAL
DRAWINGS FOR REINFORCING
INFORMATION.
7'-0"
2'- 3"
2'- 3"
8"
3'-51 8" 2'-2"
2" 2" 11" 11"
1'-10"
43 4" 43 4"
3'- 4"
4'- 6"
FACE OF REINFORCED
CONCRETE FOUNDATION,
SEE STRUCTURAL
DRAWINGS, TYP.
FACE OF REINFORCED
CONCRETE FOUNDATION, SEE
STRUCTURAL DRAWINGS, TYP.
4'- 6"
3'-2"
21 4"
43 4"
21 4"
43 4" 21 4" 21 4"
LIMIT OF REINFORCED CONCRETE
FOOTING BELOW, SEE
STRUCTURAL DRAWINGS, TYP.
1'- 8"
1'- 8"
LIMIT OF REINFORCED CONCRETE
FOOTING BELOW, SEE
STRUCTURAL DRAWINGS, TYP.
CONCRETE JOINT,
SEE STRUCTURAL
DRAWINGS, TYP.
EXTEND HORIZONTAL
REINFORCEMENT THROUGH
CONSTRUCTION JOINT, TYP.
90.00°TYP.
CL
NICHE COVER ATTACHMENT (MOUNTING
BRACKET & ROSETTES), TYP.
C1705
TOP OF FOOTING
VARIES
BOTTOM OF
FOOTING VARIES
TOP OF
FOUNDATION (TOF)
VARIES
FINISH GRADE
VARIES
TOP OF PRECAST
NICHE UNITS (TOW)
TOP OF SHELF
VARIES
APPLY WATER PROOF MEMBRANE
AND DIMPLE DRAINAGE BOARD
SYSTEM BELOW GRADE ON
FOUNDATION AND FOOTING, TYP.
CONC. PAVEMENT WITH
THICKENED EDGE, TYP.
COAT NON-VISIBLE FACES OF CONCRETE FOUNDATION
WITH CEMENTITIOUS DAMP PROOFING, TYP.
LAYOUT LINE
CONTINUOUS DRIP SLOT, TYP.
BACKER ROD AND SEALANT JOINTS ALL AROUND NICHE
UNITS, TYP.
1/2" X 5" S.S. PINS INSTALL NON-SHRINK GROUT INTO TOP
WEB AND LOOSE FIT INTO CAP, (2) PINS PER CAP, TYP.
EPDM MEMBRANE (45 MIL) OVER ENTIRE
TOP OF PRECAST NICHE UNITS, TYP.
RECESSED S.S. WELD PLATES,
MIN. 2 PER NICHE UNIT, TYP.
GOVERNMENT PROVIDED AND CONTRACTOR
INSTALLED MARBLE NICHE COVER, TYP.
FIELD DRILL HOLE IN COLUMBARIUM NICHE FLOOR TO
ACCEPT 1/2" DIA. X 6" TYPE 316 S.S. PIN. PROVIDE 2
PER PRECAST NICHE UNIT; PATCH WITH TYPE S
MORTAR, FLUSH ON INSIDE. HOLES SHALL BE AS
SHOWN ON DETAIL, TYP.
3/8" BACKER ROD AND SEALANT JOINT AT TOP,
BOTTOM, & SIDES OF PRECAST NICHES, TYP.
LIMESTONE BASE STONE, MORTAR
SOLID, TYPE N MORTAR, TYP.
PRECAST COLUMBARIUM NICHE UNIT,
TYP.; 12" NOM. SETTING GAP BETWEEN
UNITS; SET UNITS SO FACE TO FACE
DISTANCE IS AS INDICTED
REINFORCED CONCRETE
FOUNDATION AND FOOTING,
SEE STRUCTURAL DRAWINGS,
TYP.
DRAINAGE STONE BACKFILL
(AASHTO #57 STONE) WRAPPED IN
FILTER FABRIC WITH PERF.
FOOTING DRAIN, HOLES DOWN,
W/F.F. SOCK, TYP. SEE DRAINAGE
PLANS
PARTIAL TYPE N MORTAR BED, SEE
CAP SETTING DETAILS, TYP.
CI707
3'-4"
UNDERCUT SOFTENED SOIL AND
REPLACE WITH APPROPRIATE
FILL MATERIAL(S) TO 4' DEPTH
PER GEOTECHNICAL ENGINEER'S
RECOMMENDATIONS, TYP.
COMPACTED SUBGRADE
1'-8" 1'-8"
4" 4"1'-4" 1'-4"
DECORATIVE GRAVEL
STRIP, TYP.
CI708
CI709
CI707
CI707
3'-81 2"
8"
1' 1'
4" FOOTING DRAIN PIPE
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
J-2
3\2
_V
AN
CA
ID
IQ
E_
AL
AB
AM
A_
NA
TI
ON
AL
_C
EM
ET
ER
Y_
PH
3\2
CA
D\
7C
M3
3.C I70
2.0 .20
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 163
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
CI706
COLUMBARIUM DETAILS 5
DLM JDB
1" = 1'-0"
COLUMBARIUM PLAN SECTION B2
1" = 1'-0"
COLUMBARIUM PLAN SECTION C3 1'0 6"3"
1'0 6"3"
1" = 1'-0"
DOUBLE-SIDED COLUMBARIUM WALL SECTION1 1'0 6"3"
2" 1'-10"
1'- 21 2"
AT
B
AC
K, TY
P. 1'-8" TYP.
11 2"
F
RO
NT
TY
P.
1'- 3"
F
RO
NT
TY
P.
FIELD DRILL
HOLE FOR 1/2" Ø
S.S. PIN (SEE
INSTALLATION
DETAILS), TYP.
1/4"Ø HOLE
CAST-IN-PLACE
(TYP.)
5 NICHE HIGH PRECAST
COLUMBARIUM UNIT
(SECTION)
FIELD DRILL
HOLE FOR 1/2"
Ø S.S. PIN (SEE
INSTALLATION
DETAILS), TYP.
HORIZONTAL
NICHE WEB (TYP.)
11 2"
FR
O
NT
7'- 0"
1'- 41 2"
TO
1'- 3"
F
RO
NT
11 2"
F
RO
NT
1'
℄ TO ℄
TYP.
11 2"
F
RO
NT
4"
CONDITION
@ END
2"
(2) RECESSED WELDPLATES AT
EA. JOINT; STAINLESS STEEL, 1/4"
MIN. THICKNESS; PROVIDE SHOP
DRAWINGS
NICHE COVER
ATTACHMENT; SEE
PRE-CAST CONC. COLUMBARIUM
UNIT: UNIT SHALL BE 5 NICHES
HIGH, SEE LAYOUT PLANS FOR
RESPECTIVE DETAILS
1'
℄ TO ℄
TYP.
5 NICHE HIGH PRECAST COLUMBARIUM UNIT
7, 8, OR 9 NICHE WIDE
(ELEVATION)
4" JNT. NICHE JOINT BETWEEN PRECAST
CONC. COLUMBARIUM UNITS;
PROVIDE BACKER ROD AND
SEALANT AT ALL EXPOSED
JOINTS (FRONT OF NICHE UNITS);
SEALANT COLOR SHALL BE
APPROVED BY THE OWNER'S
DESIGNATED REPRESENTATIVE.
NOTES:
1. ALL EXPOSED CONCRETE (NICHE
FRONTS) SHALL BE GROUND OR
PATCHED SMOOTH; APPLY NICHE FACE
COATING AS SPECIFIED PRIOR TO NICHE
COVER INSTALLATION. PROVIDE
SUBMITTAL.
2. RECESS WELD PLATES. SIZE, NUMBER, &
ATTACHMENT LOCATION SHALL BE AS
PER MANUFACTURER'S
RECOMMENDATION. PROVIDE SHOP
DRAWINGS FOR APPROVAL.
3. JOINTS BETWEEN UNITS WHERE
EXPOSED IN NICHE UNIT SHALL BE
SEALED, WITH BACKER ROD AND
SEALANT.
4. OWNER PROVIDED NICHE COVERS,
CONTRACTOR INSTALLED.
FA
CE
O F
PR
E-
CA
ST
CO
NC
. U
NI
T
CI707
VERTICAL NICHE WEB, TYP.
HORIZONTAL NICHE WEB, TYP.
RECESSED WELDPLATE;
STAINLESS STEEL, 1/4" MIN.
THICKNESS; ATTACH WITH WELD
PLATES SIDE TO SIDE, AND END
TO PIER; PROVIDE SHOP
DRAWINGS.
ALIGN WEB CENTERLINES ON BACK
TO BACK NICHE UNITS. (TYP.)
PRE-CAST CONC. COLUMBARIUM
UNIT (TYP.); (STEEL REINFORCING
NOT SHOWN FOR CLARITY);
CONTRACTOR SHALL SUBMIT SHOP
DRAWINGS FOR APPROVAL WITH
PRECAST AND CAST-IN-PLACE
ATTACHMENTS
1/4"Ø HOLE CAST-IN-PLACE (TYP.)
0'-11
2"
0'-13 4"
@ BACK
0'-2"
@ BACK,
TYP.
0'-07 8"
1'-0"
℄ TO ℄
TYP.0'-11
2"@
FRONT, TYP.
1'-
0'-10"
TYP. 0'-
2" 1'-
8"
5 NICHE HIGH PRECAST COLUMBARIUM UNIT
7, 8, OR 9 NICHE WIDE
(PLAN)
BACKER ROD AND SEALANT
JOINTS, TYP.
NICHE JOINT BETWEEN PRECAST
CONC. COLUMBARIUM UNITS;
*SPACING ACROSS JOINTS SHALL
BE MAINTAINED AS 1'-0" ℄ TO ℄
TYP.-GRIND ENDS IF NECESSARY;
PROVIDE BACKER ROD AND
SEALANT AT ALL EXPOSED JOINTS
(FRONT OF NICHE UNITS); SEALANT
COLOR SHALL BE APPROVED BY
THE OWNER'S DESIGNATED
REPRESENTATIVE.
FIELD DRILL
HOLES FOR
1/2" PINS,
RECESS AND
EPOXY GROUT
FLUSH WITH
INSIDE, TYP.
0'-101 2"@
FRONT
TYP.
90.0°
LAYOUT
LINE
VERTICAL NICHE
WEB CENTERLINE
(TYP.)
0'-
0'-13 4"
0'-
0'-13 4"
NOTE:
WASHER THICKNESS AS NECESSARY TO ENSURE EDGE OF
ROSETTE DOES NOT TOUCH NICHE COVER WHEN FULLY
TIGHTENED. ROSETTE CAN NOT BE MORE THAN 1/16" AWAY
FROM NICHE COVER WHEN FULLY TIGHTENED.
STAINLESS STEEL ROSETTE (VA STANDARD),
SATIN FINISH, PROVIDE PRODUCT LITERATURE.
1" Ø
3/4" TO 7/8" O.D. WHITE OR CLEAR
NEOPRENE OR SILICONE WASHER
10-24 X 1 3/4" LENGTH STAINLESS
STEEL TAMPER-PROOF BOLT,
(SNAKE-EYE) BUTTON HEAD
FRONT ELEV. SECTION
STAINLESS STEEL
THREADED SPRING-CLIP
TO RECEIVE ROSETTE
BOLT
11 4"
1 2"
1"
2"
2"
SIDE VIEW
PLAN VIEW
5/16" X 3/4"
SLOTS
4"
11 4"
3/32" THICK STAMPED
STAINLESS STEEL
ANGLE W/ (2) SLOTS
FRONT VIEW
11 2"
C L
4"1
4"
4"
5 16
TYP. CONDITION AT
TOP OF PRECAST UNIT
RECESSED HOLE
CAST-IN-PLACE TO
ACCOMMODATE CARRIAGE
BOLT FLUSH WITH TOP OF
PRECAST UNIT
S.S. CARRIAGE BOLT, LOCK
WASHER & HEX NUT 1/4" X 1
3/4"
HEAD OF
CARRIAGE BOLT
TO BE FLUSH
WITH TOP OF
PRECAST
SEE SPECIFICATIONS FOR
REQUIREMENTS FOR ROSETTE
SCREW ATTACHMENT AND
ALIGNMENT IN TOP ROW
1/
4"
TY
P.
TYP. CONDITION AT
INTERMEDIATE SHELVES
OF PRECAST UNIT
1/4" X 3" S.S. THREADED
ROD, LOCK WASHER &
HEX NUT (TYP.)
PLASTIC SHIMS, TYP.
1/4" Ø HOLE
CAST-IN-PLACE (TYP.)
MOUNTING
BRACKET (TYP.)
3/4" Ø
NEOPRENE
OR SILICONE
WASHER
(TYP.),
BEHIND
ROSETTE
ROSETTE &
SPANNER
HEAD BOLT
(TYP.)
OWNER PROVIDED
NICHE COVERS
W/ PRE-DRILLED
3/8" Ø HOLES TO
ACCEPT ROSETTE
& BOLT;
CONTRACTOR
INSTALLED
1"
TYP.
CI707
CI707
TYP. CONDITION AT
BOTTOM OF
PRECAST UNIT
1/4" X 1 3/4" S.S.
EXPANSION BOLT, LOCK
WASHER & HEX NUT (TYP.)
1/4" Ø HOLE
CAST-IN-PLACE
1/
4"
TY
P.
DOUBLE-SIDED COLUMBARIUM
WALL AT END PIER PLAN (TOP)
RECESS WELD
PLATE FOR FILLER
STRIP ANCHOR, TYP.
RECESS FOR FILLER STRIP
WELD PLATE AND ANCHOR
PRE-CAST NICHE UNIT,
TYP.
CONCRETE
PIER CORE
(2) 2"X6"X1/4" S.S. WELD
PLATES CAST INTO PRECAST
NICHE UNITS, TYP.
(1) 3"X9"X1/4" TOP S.S.
WELD PLATE, TYP.
(1) 4"X6"X1/4" S.S.
WELD PLATE CAST
INTO CONC. PIER
CORE, TYP.
8"
DOUBLE-SIDED COLUMBARIUM WALL
AT INTERMEDIATE PIER PLAN (TOP)
(1) 3"X9"X1/4" TOP S.S.
WELD PLATE, TYP.
PRE-CAST NICHE UNIT,
TYP.
(2) 2"X6"X1/4" S.S. WELD
PLATES CAST INTO
PRECAST NICHE UNITS,
TYP.
PRE-CAST NICHE
UNIT BACK, TYP.
FACE OF NICHE
WALL (WEB)
BELOW, TYP.
(1) 4"X6"X1/4" S.S. WELD
PLATE CAST INTO
CONC. PIER CORE, TYP.
CONCRETE
PIER CORE
RECESS WELD
PLATE FOR FILLER
STRIP ANCHOR, TYP.
SECTION (TOP)
AT NICHE UNITS
TOP WELD PLATE SHALL
BE FLUSH WITH
CONCRETE OR BELOW
CONCRETE SURFACE
TOP OF
NICHE UNIT
(1) TOP S.S. WELD PLATE.
CONTROLLED WELDING SHALL
BE USED TO PREVENT
OVERHEATING AND CRACKING
OF CONCRETE
2"X6"X1/4" S.S. WELD
PLATE CAST INTO
PRE-CAST UNIT
4" STUBS, MIN.
JOINT BETWEEN
PRE-CAST NICHE
UNITS OR NICHE UNIT
AND CIP STEM WALL
2"X6"X1/4" S.S. WELD
PLATE CAST INTO
PRE-CAST UNIT
3/16" FILLET WELD ALL
AROUND WELD PLATE,
TYP. TOP OF CONCRETE
PIER
S.S. STONE ANCHOR. WELD TO WELD
PLATE; CONTROLLED WELDING SHALL BE
USED TO PREVENT OVERHEATING AND
CRACKING OF CONCRETE
6"X1/4" S.S. WELD
PLATE CAST INTO
CONCRETE PIER;
LENGTH VARIES, SEE
PIER PLAN SECTION
4" STUBS, MIN.
EDGE OF
STONE PANEL
AIR CAVITY
BETWEEN PIER
AND STONE
PANEL
2" OVERLAP
MIN.
SECTION (TOP)
AT PIERS
2" WIDE CUSTOM BLACK
GRANITE TRUNCATED
DOME PAVERS
24" MIN.
FULL LENGTH OF
PARALLEL PARKING
8" PREFORMED EXPANSION
JOINT FILLER WITH SEALANT
TO TOP OF CONCRETE BASE,
TYP.
CONCRETE PAVING, TYP.
REVERSE FLOW MOUNTABLE
CONCRETE CURB, TYP.
ASPHALT
PAVEMENT, TYP.
8" LONG #4 STAINLESS STEEL
DOWELS AT 24" O.C. - GREASE
ONE END
5" CONCRETE BASE BENEATH
TRUNCATED DOMES
1" LIMESTONE SCREENING
SETTING BED1" CORE DRILLED WEEPS @ 3' O.C. IN CONCRETE
COURSE UNDER UNIT PAVERS. COVER TOP OF
WEEKS WITH CONTINUOUS FILTER FABRIC (PROVIDE
MINIMUM 6" OVERLAP BEYOND WEEP).
SWEEP JOINTS AROUND PAVERS
WITH LIMESTONE SCREENINGS; MIST
WITH WATER TO COMPACT; REPEAT
PROCESS AS NECESSARY TO ENSURE
JOINTS ARE FULL
5"
NOTES:
1. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR GRANITE PAVERS AFTER
VERIFYING THE CONSTRUCTED SITE CONDITION.
2. SIZE, SHAPE, AND SPACING OF CARVED TRUNCATED DOMES SHALL BE PER THE
ARCHITECTURAL BARRIERS ACT, SECTION 705.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
J-2
3\2
_V
AN
CA
ID
IQ
E_
AL
AB
AM
A_
NA
TI
ON
AL
_C
EM
ET
ER
Y_
PH
3\2
CA
D\
7C
M3
3.C I70
2.0 .20
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 163
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
CI707
COLUMBARIUM DETAILS 6
1" = 1'-0"
PRECAST COLUMBARIUM NICHE UNITS (5 NICHE HIGH)2 1'0 6"3"
DLM JDB
NTS
ROSETTES5NTS
MOUNTING BRACKET4NTS
NICHE COVER ATTACHMENT3
NTS
NICHE WELD PLATES1
NTS
TRUNCATED DOME PAVER DETAIL6
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
0'-10"
TYP.
CAP SHIMS (MIN. NUMBER
SHOWN), TYP.
TOP OF PRE-CAST
COLUMBARIUM UNIT, TYP.
NICHE COVER, TYP.
CAP ABOVE, TYP.
PARTIAL TYPE N MORTAR
BED FOR CAPS, ABOVE
NICHE WEBS, TYP.
NICHE WEBBING BELOW,
TYP.
FIELD DRILLED HOLE (TWO
(2) HOLES AND TWO (2)
PINS PER CAP SEGMENT)
TO RECEIVE S.S. PIN
(DRILLED AFTER CAPS
HAVE BEEN SET); TYP.
SEALANT JOINT WITH
BACKER ROD ON TOP,
BETWEEN PRECAST NICHE
UNITS, TYP.
SET CAP SHIMS BACK
FROM FACE OF PRECAST
NICHE UNITS TO AVOID
CONFLICT WITH BACKER
ROD, SEALANT, AND WEEP
VENTS AT CAPS JOINTS.
SHIMS TO ALIGN WITH
PRECAST NICHE UNIT
VERTICAL WEBS BELOW,
TYP.
NOTES:
THOROUGHLY CLEAN TOP
OF PRECAST NICHE UNITS.
PROVIDE SHIMS AND
MORTAR AT MAXIMUM
SPACING SHOWN (LESS
THAN 1'-0") REGARDLESS
OF WHETHER THE
SUBSTRATE BELOW IS
PRECAST NICHE OR PIERS.
0'- 13 4"M
AX
TY
P.
CAP SHIMS, TYP.
RECESSED WELD PLATES;
SEE WELD PLATE
ENLARGEMENT, TYP.
SEALANT JOINT WITH
BACKER ROD, TYP.
FIELD DRILLED HOLE TO
RECEIVE S.S. PIN IN
CONCRETE PIER CORE
TYP.
SEALED EDGE OF EPDM
MEMBRANE OVER ENTIRE
TOP OF PRECAST NICHE
UNITS AND CAST-IN-PLACE
CONCRETE PIER CORES.
MAINTAIN 1/4" FROM
EXPOSED EDGE OF
PRECAST UNIT. EPDM TO
WRAP AROUND TOP OF
PIER CORE AND EXTEND
DOWN THE VERTICAL
FACES. TYP.
APPROXIMATE EDGE OF
PAVEMENT BELOW, TYP.
FACE
OF CAP
FACE OF COLUMBARIUM NICHE COVER
PRECAST
COLUMBARIUM UNITFIELD-DRILLED HOLE TO ACCEPT S.S.
PINS (AFTER CAPS ARE SET); TWO (2)
PINS PER CAP; PIN IS LOOSE-FIT IN CAP;
PLUG HOLE END W/ NON-SHRINK GROUT,
FLUSH W/PRECAST NICHE SURFACE.
HOLE SHALL BE NOT GREATER THAN 1/8"
IN DIAMETER THAN PIN.
SETTING JOINT WITH BACK TO BACK UNITS.
RECESSED S.S.
WELD PLATES
FOR ALL CAP DRIP
SLOTS REFER TO
SPECIFICATIONS, TYP.
NICHE COVER ATTACHMENT, TYP.
EPDM MEMBRANE (45 MIL) OVER ENTIRE
TOP OF PRECAST UNITS & PIERS, TYP.
NOTES:
1. RECOMMEND CONTRACTOR USE TEMPORARY
PAINTERS' TAPE TO CREATE THE APPEARANCE
OF A UNIFORM JOINTS (CLEAN, STRAIGHT) EVEN
IF THERE IS A VARIATION IN THE ACTUAL GAP
BETWEEN THE BOTTOM OF THE CAP AND THE
TOP OF THE NICHE.
2. WELD PLATE AND WELDS SHALL BE FLUSH TO
1/8" MAX ABOVE THE TOP OF THE PRECAST
NICHE UNITS, TYP. WELD PLATES ARE BELOW
EPDM MEMBRANE.
3. ENSURE TO PLACE TYPE N MORTAR BLOBS
UNDER CAP AS SHOWN ON CAP SETTING PLAN
DETAIL.
3/ 8"
3/
SURFACE OF SEALANT TO BE CONCAVE
ENSURE CLEAN STRAIGHT LINE. RECOMMEND USE OF
PAINTERS TAPE 1/16" FROM EDGE AS A TEMPORARY
GUIDE. (USE AS RECOMMENDED BY MANUFACTURER)
0'-3/4"
TAPE
TAPE
WALL LAYOUT LINE
EXPOSED EDGE
OF PRECAST
UNIT
EPDM 45 MIL. MEMBRANE OVER ENTIRE TOP OF PRECAST UNITS AND
PIERS. MAINTAIN 1/4" FROM EXPOSED EDGE OF PRECAST UNIT
HONEYCOMB POLYPROPYLENE WEEP VENT; SURFACE OF VENT TO BE FLUSH
WITH NICHE FACE; SEE DETAIL 2 ON CI714 FOR ADDITIONAL INFORMATION.
PARTIAL TYPE N
MORTAR BED, TYP.
BACKER ROD & SEALANT; CONTINUOUS AT ALL EXPOSED JOINTS. SEALANT
JOINT DEPTH SHALL BE PER MANUFACTURER'S RECOMMENDATIONS, TYP.
PLASTIC SHIMS; 4 LOCATIONS EACH CAP. SET SHIMS CENTERED OVER
PRECAST NICHE UNITS VERTICAL WEBS, AND A MINIMUM OF 3/4" FROM
EXPOSED EDGE OF PRECAST NICHE UNIT
3/8"
3 8"
O F
NI
CH
E W
EB
CAP
3/4" WIDE CUSTOM WEEP
VENT CENTERED ON CAP
JOINT ENSURE CLEAN
STRAIGHT EDGES PER
APPROVED MOCKUP.
CONTRACTOR TO VERIFY
WEEP VENT IS NOT IN
CONFLICT WITH CAP SHIMS
BACKER ROD AND SEALANT AT ALL
EXPOSED JOINTS, TYP.
PLASTIC SHIMS BEHIND WEEP VENT; 4 LOCATIONS
EACH CAP MIN.; ALL SHIMS TO OCCUR OVER
PRECAST COLUMBARIUM VERTICAL WEBS
SEALANT CONTINUOUS UP
TO WEEP VENT, TYP.
PRECAST COLUMBARIUM
VERTICAL WEB
ENSURE CLEAN STRAIGHT LINE. RECOMMEND USE OF
PAINTERS TAPE 1/16" AS A TEMPORARY GUIDE (USE AS
RECOMMENDED BY MANUFACTURER)
SURFACE OF SEALANT TO
BE FLUSH, TYP.
BACKER ROD AT
CAP OVERHANG
NICHE COVER ATTACHMENT
ALIGN CENTER LINE OF CAP JOINT WITH CENTER LINE
OF PRE-CAST CONC. COLUMBARIUM UNIT NICHE WEB
OR ALIGN CENTER LINE OF CAP JOINT WITH CENTER
LINE OF COLUMBARIUM UNIT NICHE JOINT.
TEMPORARY TAPE, TYP.
TEMP. PAINTER'S TAPE TO CREATE UNIFORM JOINT
APPEARANCE (CLEAN, STRAIGHT)
NOTES:
1. ALIGN VERTICAL WALL BASE STONE JOINTS WITH VERTICAL CAP STONE JOINTS WHERE
SHOWN ON COLUMBARIUM ELEVATIONS. JOINTS SHALL BE CENTERED ON CENTERLINE
OF NICHE WEB. WEEP VENTS SHALL BE PLACED AT EACH VERTICAL CAP JOINT AND
VERTICAL BASE STONE SEALANT JOINTS.
2. ALL JOINTS SHALL BE CLEAN & PRIMED PRIOR TO APPLYING SEALANT. APPLY
APPROVED JOINT PRIMER IMMEDIATELY PRIOR TO SEALANT APPLICATION FOLLOWING
CLEANING WHICH IS TO BE IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS. DEPTH OF SEALANT SHALL BE EQUAL TO WIDTH OF JOINT ±1/16"
TYP. MANUFACTURER'S RECOMMENDATIONS GOVERN. BACKER ROD NOT MEETING
THIS TOLERANCE SHALL BE REMOVED AND RESET BEFORE APPLYING SEALANT.
EPDM MEMBRANE (45 MIL)
OVER ENTIRE TOP OF
PRECAST UNITS & PIERS
CI708
C L
CL
CAP ARRIS LINE
ADJACENT FINISHED GRADE 1/2" BELOW
WALK ELEVATION - SEE PLAN FOR
MATERIAL
6"X6" W2.1/2.1 WWM CENTERED IN SLAB,
USE ONLY SHEETS, NOT ROLLS, PLACE
MESH ON CHAIRS
#4 SLIP DOWELS @ 18" O.C. X 18" LONG
-GREASE AND CAP ONE END OR USE
SPEED DOWEL
TOOLED CONTROL JOINT - 1/6 SLAB DEPTH
3/8" WIDE EXPANSION JOINT WITH
PREMOLDED ASHPALTIC JOINT FILLER &
SEALANT, 1/4" RADIUS AT SLAB EDGES
REINFORCED CONCRETE PAVEMENT,
MEDIUM BROOM FINISH TO REMOVE TOOL
MARKS. 4,000 PSI CONCRETE AFTER 28
DAYS.
1/4" RADIUS AT ALL EXPOSED EDGES
ALDOT NO.610 DENSE GRADED
AGGREGATE BASE COMPACTED TO 98%
MODIFIED PROCTOR
*H .D
. 8
*L .D
. 4
*H .D
. 6
*L .D
. 3
VARIES
(SEE PLAN)
3" MIN.
3" MIN.
9"
MIN.
9"
MIN.
COMPACTED TOP TWO (2) FEET OF
SUBGRADE 98% STANDARD PROCTOR
*H.D. = HEAVY-DUTY
*L.D. = LIGHT-DUTY
3/8"
TOOLED JOINT W/ 1/4" RADIUS
EDGES AS SHOWN, TYP.
JOINT SEALANT & BACKER
ROD; SEE SPECIFICATIONS
PRE-MOLDED
ASPHALTIC JOINT
FILLER
CONCRETE PAVEMENT, TYP.
#4 SLIP DOWELS, TYP.
3"
24"
EXPANSION JOINT
EXPANSION JOINTS TO
OCCUR 60' O.C. MAX AT ALL
CURBS & WHERE SHOWN ON
PLANS AND OTHER DETAILS.
1/4"
1" D
EP
TH
TY
P.
TOOLED JOINT W/ 1/4" RADIUS
EDGES AS SHOWN, TYP.;
TOOLING SHALL ALSO OCCUR
AROUND PERIMETER OF
CONCRETE PAVEMENT, TYP.
CONCRETE PAVEMENT, TYP.
CONTROL JOINT
8" 3"
6"
3" CLEAR
(3) #5 CONTINUOUS BARS
#3 @ 18" O.C.; EXTEND 24" FROM
EDGE OF WALK AND 6" INTO
NON-THICKENED SLAB
COMPACTED SUBGRADE
5" THICK COMPACTED
SUBBASE COURSE
REINFORCED LIGHT DUTY
CONCRETE PAVEMENT
6"x6" W1.4 x 1.4WWM CENTERED IN
SLAB
1/4" RADIUS AT ALL EXPOSED
EDGES
6"
7"6"
FINISH GRADE; 1/4" BELOW
ADJACENT PAVEMENT UNLESS
OTHERWISE NOTED
" 3"
8"
3" CLEAR
(3) #5 CONTINUOUS BARS
#3 @ 18" O.C.; EXTEND 24" FROM
EDGE OF WALK AND 6" INTO
NON-THICKENED SLAB
COMPACTED SUBGRADE
5" THICK COMPACTED
SUBBASE COURSE
REINFORCED HEAVY DUTY
CONCRETE PAVEMENT
6"x6" W1.4 x 1.4WWM CENTERED IN
SLAB
1/4" RADIUS AT ALL EXPOSED
EDGES
6"
7"6"
FINISH GRADE; 1/4" BELOW
ADJACENT PAVEMENT UNLESS
OTHERWISE NOTED
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
J-2
3\2
_V
AN
CA
ID
IQ
E_
AL
AB
AM
A_
NA
TI
ON
AL
_C
EM
ET
ER
Y_
PH
3\2
CA
D\
7C
M3
3.C I70
2.0 .20
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 163
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
CI708
COLUMBARIUM DETAILS 7
DLM JDB
NTS
CAP SETTING PLAN3
NTS
CAP SETTING SECTION1
NTS
CAP JOINTING ELEVATION2 NTS
THICKENED CONCRETE EDGE5
NTS
CONCRETE PAVEMENT4
THICKENED EDGE AT HEAVY DUTY CONCRETE
THICKENED EDGE AT LIGHT DUTY CONCRETE
4" SOLID
PVC RISER
45° SWEEP
ELBOWS (2) MIN.
1'-0" MIN.
HDPE PERFORATED PIPE
(HOLES DOWN)
FOOTING DRAIN PIPE
CONCRETE
FOUNDATION
RECESSED
4" PVC
CLEANOUT
WITH PLUG
FINISH
GRADE
TOP OF
FOOTING
BOTTOM OF
FOOTING
2"
GASKETED PVC FITTING
MANUFACTURED FOR CONVERTING
FROM CORRUGATED HDPE PIPE TO
PVC. BASIS OF DESIGN NYLOPLAST
OR APPROVED EQUAL
TOP OF
FOUNDATION
D
E
" M
IN
CONCRETE SIDEWALK,
TYP.
FILTER FABRIC; HOLD FROM
FINISH SURFACE MIN 1"
VARIES,
SEE PLANS
NICHE COVER BEYOND, TYP.
PRE-CAST CONCRETE
COLUMBARIUM NICHE UNIT
3/8" ROUNDED WASHED GRAVEL; COLOR
TO MATCH EXISITNG, TYP.
LIMESTONE BASE STONE
FL
O
W
45°
WYE (SIZE AS
INDICATED)
PERFORATED HDPE
HEADER PIPE
45° OR 30° BEND AS
REQ'D
STORM PIPE
45° OR 30° BEND AS
REQ'D
SLOPE
ST (STORM PIPE) INVERT
AS INDICATED
HP (HEADER PIPE)
INVERT AS NOTED
12" PVC INLET DRAIN
STRUCTURE
BASIS OF DESIGN
MANUFACTURER: NYLOPLAST
MODEL: 2812AG
O.D. 1'-01 2"
6" M
IN
SU
M
P
6" M
IN
CRUSHED STONE
COMPACTED
SUBGRADE
1'- 6"
M
IN
CO
VE
R
FINISHED GRADE:
LANDSCAPE
ISLAND OR LAWN
PROVIDE EITHER PEDESTRIAN FRAME AND GRATE
OR SOLID COVER AS NOTED ON PLANS.
BASIS OF DESIGN FOR PEDESTRIAN FRAME AND
GRATE 12 99 CGP L BY NYLOPLAST. BASIS OF
DESIGN FOR SOLID COVER 12 99 CGC L BY
NYLOPLAST. BOTH GRATE AND SOLID COVERS
SHALL BE LOCKABLE AND BLACK IN COLOR.
CAP TYPE A CAP TYPE B
CAP
TYPE C CAP TYPE B
CAP
TYPE D CAP TYPE B CAP TYPE E CAP TYPE B
CAP
TYPE D CAP TYPE B
CAP
TYPE C CAP TYPE B CAP TYPE A (SIM.)
SEE DETAIL 9/CI709 FOR INDIVIDUAL CAP TYPE DETAILS
4'-
6" 1'-
1'-
6"
6" 1'-3" 1'-3" 71 8"
3'-71 8"
91 8" 91 8"
WASH
W
AS
H W
AS
H
WASH ARRIS LINE, TYP.
CONTINUOUS
DRIP SLOT
UNDERSIDE
OF CAP, TYP.
ALABAMA
LIMESTONE,
HONED FINISH
ALL FACES, TYP.
CAP A
CI709
90.00°TYP.
90.00°TYP.
CI709
CAP B
3'-0 9 16"
ARRIS LINE, TYP.
CONTINUOUS
DRIP SLOT
UNDERSIDE
OF CAP, TYP.
ALABAMA
LIMESTONE,
HONED FINISH
ALL FACES, TYP.
1'- 77 8"
1'- 77 8"
3'- 33 4"
63 8" 63 8"
4'- 41 2"
90.00°TYP.
CI709
CAP C
1'-115 8"
ARRIS LINE, TYP.
CONTINUOUS
DRIP SLOT
UNDERSIDE
OF CAP, TYP.
ALABAMA
LIMESTONE,
HONED FINISH
ALL FACES, TYP.
1'- 77 8"
1'- 77 8"
4'- 41 2"
3'- 33 4"
63 8" 63 8"
90.00°TYP.
CI709
CAP D
2'-2"
ARRIS LINE, TYP.
CONTINUOUS
DRIP SLOT
UNDERSIDE
OF CAP, TYP.
ALABAMA
LIMESTONE,
HONED FINISH
ALL FACES, TYP.
91 8"
1'- 77 8"
1'- 77 8"
3'- 33 4"
91 8"
4'-
31 8" 31 8"
8" 63
8"
CI709
90.00°TYP.
CI709
CAP E
2'-115 8"
ARRIS LINE, TYP.
CONTINUOUS
DRIP SLOT
UNDERSIDE
OF CAP, TYP.
ALABAMA
LIMESTONE,
HONED FINISH
ALL FACES, TYP.1'-
77 8" 1'-
77 8"
3'- 33 4"
63 8" 63 8"
4'- 41 2"
6" 6"1'-11" 1'-11" 4'-10"
3" 5"
6"
1 4"
1'- 2"
WASH WASH
WASH WASH
CONTINUOUS DRIP SLOT, TYP.
CI709
6" 4"
1"
8" 1'-77
8" 1'-77 8" 63
8"
CONTINUOUS DRIP SLOT, TYP.10
CI709
4'-41 2"
WASH
1 4"
WASH
WASH WASH
1" 2"
3 8"
8" 1
8"
4"
6" 4"
1"
6" 1'-11" 1'-11" 6"
CONTINUOUS DRIP SLOT, TYP.10
CI709
4'-10"
WASH
1 4"
WASH
WASH WASH
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
J-2
3\2
_V
AN
CA
ID
IQ
E_
AL
AB
AM
A_
NA
TI
ON
AL
_C
EM
ET
ER
Y_
PH
3\2
CA
D\
7C
M3
3.C I70
2.0 .20
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 163
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
CI709
COLUMBARIUM DETAILS 8
DLM JDB
1" = 1'-0"
FOOTING DRAIN CLEAN OUT AT COLUMBARIUM WALL1 1'0 6"3" NTS
DECORATIVE STONE STRIP AT COLUMBARIUM WALL2 NTS
WYE CONNECTION: STORM DRAIN TO HEADER PIPE3 NTS
YARD DRAIN4
1" = 1'-0"
COLUMBARIUM WALL CAP PLAN5 1'0 6"3" 1" = 1'-0"
END PIER CAP SECTION6 1'0 6"3" 1" = 1'-0"
WALL CAP SECTION7 1'0 6"3"
NTS
DRIP SLOT101" = 1'-0"
COLUMBARIUM CAP PLANS: CAP TYPES A-E9 1'0 6"3"
1" = 1'-0"
INTERMEDIATE PIER CAP SECTION8 1'0 6"3"
AutoCAD SHX Text C
L
B
PIER
PANEL A
PIER
PANEL B
PIER
PANEL B
PIER
PANEL B
PIER
PANEL C
END-PIER
BASE STONE B
(SIM.)
END-PIER BASE
STONE A
END-PIER
BASE STONE B
PIER CAP,
SEE CAP
PLAN
CI709
A
B
C
D
E
PIER
PANEL D
PIER
PANEL E
PIER
PANEL E
PIER
PANEL E
PIER
PANEL F
END-PIER
BASE STONE B
END-PIER
FILLER
STRIP, TYP.
PIER CAP,
SEE CAP
PLAN
CI709
2'-1134"
65 8"
2'-1134"
1' -5
1 16
KERFS TO RECEIVE
ANCHOR PINS, TYP.
A
2'-1134"
1' -41 8"
KERFS TO RECEIVE
ANCHOR PINS, TYP.
A 2'-1134"
93 16
KERFS TO RECEIVE
ANCHOR PINS, TYP.
A
2'-6"
1' -5
1 16
KERFS TO RECEIVE
ANCHOR PINS, TYP.
B
2'-6"
1' -41 8"
KERFS TO RECEIVE
ANCHOR PINS, TYP.
B 2'-6"
93 16
KERFS TO RECEIVE
ANCHOR PINS, TYP.
B
2'-6"
65 8"
7 8"
8" 27
8"
2"
1"
4" 3'-2"
1" 8"
2'-714"
8"
1"
1" 61 2"
1" 33 8"
7 8"
7 8"
7 8"
4"
2"
1"
4"
4"
2"
1"
7 8"
4"
1"
61 2"
1"
33 8"
4" 2'-10"
43 8" 43 8"83 4"
1" 23 8"
2'-714"
8" 1"
A B
ELEVATION A ELEVATION BFRONT ELEVATION
PLAN
SECTION C
C
71 4"
1 2" 1"
1" 61 2"
1"
33 8"
2'-1134"
7 8"
4"
8"
1"
1"
61 2"
1"
33 8"
2'-1134"
71 4"
23 8" 1"
5 8"
7 8"
A
SECTION A
FRONT ELEVATION
PLAN
1058"
4"
3'-09 16"
A
4"
1'-1158" A
4"
2'-1158" A 3"
4"
7' -43 8"
4"
4"
4"
KERF TO RECEIVE
ANCHOR PINS AT
TOP OF PANEL, TYP.
FRONT ELEVATION
SECTION A
A
KERF TO RECEIVE
ANCHOR AT
BOTTOM OF PANEL,
TYP.
KERF TO RECEIVE
ANCHOR AT
CENTER OF PANEL,
SIDE AS SHOWN ON
PLAN SECTIONS,
TYP.
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTEVALLO, ALABAMA
927CM3003
OCTOBER 25, 2024 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building NumberBID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
ALABAMA NATIONAL CEMETERY
GRAVESITE EXPANSION PHASE 3
Fil e P ath : G
:\P
RO
J-2
3\2
_V
AN
CA
ID
IQ
E_
AL
AB
AM
A_
NA
TI
ON
AL
_C
EM
ET
ER
Y_
PH
3\2
CA
D\
7C
M3
3.C I70
2.0 .20
.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456 163
Above Group
(321) 345-9026
Modjeski and Masters
(717) 790-9565
Aqua Engineering
(970) 372-6104
The LA Group
(518) 587-8100
Integrity Federal Services
(304) 725-8456
CI710
COLUMBARIUM DETAILS 9
DLM JDB
NTS
COLUMBARIUM END PIER STONE DETAILS2
END PIER BASE STONE B
END PIER FRONT ELEVATION END PIER SIDE ELEVATION
END PIER BASE STONE A
PIER PANEL A PIER PANEL B PIER PANEL C
PIER PANEL C PIER PANEL D PIER PANEL E
PIER PANEL SECTION 'A' PIER PANEL SECTION 'B'
END PIER FILLER STRIP
NTS
COLUMBARIUM BASE STONES AT NICHE UNITS1
BASE STONE A BASE STONE B BASE STONE C BASE STONE SECTION 'A'
MID-PIER
FILLER
STRIP, TYP.
PIER
PANEL G
PIER
PANEL H
PIER
PANEL H
PIER
PANEL H
MID-PIER
FILLER
STRIP, TYP.
PIER CAP,
SEE CAP
PLAN
MID-PIER
BASE STONE
CI709
PIER
PANEL J
1'-2"
1'-
1 16
KERFS TO RECEIVE
ANCHOR PINS, TYP.
C
1'-2"
1'- 41 8"
KERFS TO RECEIVE
ANCHOR PINS, TYP.
C
1'-2"
3 16
KERFS TO RECEIVE
ANCHOR PINS, TYP.
C 1'-2"
65 8"
7 8"
8" 27
8"
2"
1"
4"
ELEVATION A
7 8"
8"27
8"
2" 1"
4"
ELEVATION B
1" 8"
1'-31 4"
8"
1"
1" 61 2"
1" 33 8"
7 8"
4" 1'-2" 4"
43 8" 43 8"83 4"
1" 23 8"
1'-31 4"
8" 1"
1" 1 2"27 8"
FRONT ELEVATION
C
1'-10"
PLAN
4"
2"
1"
7 8"
4"
1"
61 2"
1"
33 8"
SECTION C
A B
7'- 43 8"
8"
4"
8"
KERF TO RECEIVE
ANCHOR PINS AT
TOP OF PANEL, TYP.
FRONT ELEVATION
SECTION A
A
KERF TO RECEIVE
ANCHOR AT
BOTTOM OF PANEL,
TYP.
KERF TO RECEIVE
ANCHOR AT
CENTER OF PANEL,
SIDE AS SHOWN ON
PLAN SECTIONS,
TYP.
EX
PA
NS
IO
N
JO
IN
T
1'-0" MIN. 1'-0" MIN.
EQ.EQ.
CO
NT
RO
L
JO
IN
T
TO
P O
F
RA
M P
CO
NT
RO
L
JO
IN
T
BO
TT
O
M O
F
RA
M P
EX
PA
NS
IO
N
JO
IN
T
6'-6"1'-9" 1'-9"
EMBED POSTS IN
CONCRETE PAVEMENT,
PROVIDE FLANGE, TYP.
CI711
CONCRETE WALK,
FINISH GRADE, TYP.
1.9" O.D. SCHED. 40 POWDER COATED
OVER GALVANIZED STEEL RAILING.
ENSURE SMOOTH FINISH, TYP.
FISH-MOUTH JOINT,
TYP.; FULL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .