S02_Construction Drawings bk 7.pdf

PDF 13 MB Posted

Attached to
Alabama National Cemetery - Gravesite Expansion Phase 3
Solicitation number
36C78626R0008
Issued by

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

W

W

W

W

W

W

W

W

W

W

W

36" DIP

SW INLET

RIM 448.61

FL IN 443.42 N

FL IN 443.46 S FL OUT

443.15

18" RCP

" R

CP

24" RCP

FL 440.66

36" RCP

EX. CEMETERY LOOP ROAD

45545

18"

RCP CL III

C7

FG: 448.24

TL: 446.49

FG: 448.40

TL: 446.65

FG: 448.56

TL: 446.81

FG: 449.52

TL: 447.77

FG: 449.74

TL: 447.99

FG: 450.15

TL: 448.40

FG: 450.38

TL: 448.63

FG: 450.79

TL: 449.04

FG: 451.20

TL: 449.45

FG: 452.00

TL: 450.25

FG: 452.06

TL: 450.31

FG: 452.08

TL: 450.33

FG: 452.46

TL: 450.71

FG: 452.64

TL: 450.89

FG: 452.54

TL: 450.79

FG: 452.35

TL: 450.60

FG: 452.36

TL: 450.61

FG: 452.51

TL: 450.76

FG: 452.44

TL: 450.69

FG: 452.45

TL: 450.70

FG: 452.51

TL: 450.76

FG: 452.50

TL: 450.75 FG: 452.34

TL: 450.59

FG: 451.57

TL: 449.82

FG: 451.35

TL: 449.60

FG: 451.13

TL: 449.38

FG: 450.91

TL: 449.16

FG: 450.69

TL: 448.94

FG: 450.46

TL: 448.71

FG: 450.24

TL: 448.49

FG: 450.02

TL: 448.27

FG: 449.75

TL: 448.00

FG: 449.15

TL: 447.40

FG: 448.93

TL: 447.18

FG: 449.96

TL: 448.21

FG: 449.95

TL: 448.20

FG: 448.72

TL: 446.97

FG: 448.70

TL: 446.95

FG: 448.42

TL: 446.67

FG: 448.43

TL: 446.68

FG: 451.79

INV.: 443.71

FG: 452.53

INV.: 444.45

FG: 450.92

INV.: 442.84

FG: 449.99

INV.: 441.91

FG: 448.15

INV.: 440.07

FG: 448.94

INV.: 440.86

147'-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

202'-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

159'-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

FI

NI

SH

ED

G

RA

DE

PI

TC

H:

2.5

N2 5°

' 2

7" E

FI

NI

SH

ED

G

RA

DE

PI

TC

H:

2.5

N2 5°

' 2

7" E

12" HDPE

" H

DP

E

" H

DP

E

" H

DP

E

-4.3:1

-3.9:1

-4.

4:1

48 84

TOP

HP

49 73

INV

GS

52 57

GS

53 18

GS

IN-GROUND CREMAIN SITES

GRAVESITE GRID MONUMENT

PRE-PLACED CRYPTS

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (10' INTERVAL)

PROPOSED CONTOUR (2' INTERVAL)

INVERT OF STRUCTUREINV

CLEANOUT INVERT OUT AND FINISHED

GRADE ELEVATION LABEL

GRANITE SECTION MARKER

HEADSTONE FACE DIRECTION

STORM SEWER PIPE

CRYPT UNDERDRAIN CLEANOUT / UNDERDRAIN PIPE

CRYPT UNDERDRAIN HEADER PIPE CLEANOUT /

UNDERDRAIN HEADER PIPE

1. CONTRACTOR TO PROVIDE AMENDED SOILS ABOVE CRYPTS.

2. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

3. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE RE/COR THAT THE LID AND CRYPT NUMBERS MATCH

4. HORIZONTAL DATUM IS REFERENCED TO THE ALABAMA STATE PLANES, WEST ZONE

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

STORM STRUCTURES

FILTERRA INTERNAL BYPASS CURB INLET STRUCTURES

TRADITIONAL BURIAL SITES

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

LEGEND:

FG: 1136.90

TL: 1135.15

FG: 1137.50

INV.: 1129.25

2-INCH STEP BETWEEN CRYPTS

SEC

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C G1

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456 NOT FOR

CONSTRUCTION

CG111

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

BURIAL SECTION 4

1,056 PPC

(WITHIN 3'x7'-8" PLOTS)

BURIAL GRADING ENLARGEMENT

PLAN SECTION 4

KEY MAP

(NOT TO SCALE)

AutoCAD SHX Text

WM

AutoCAD SHX Text x

18" RCP

FL OUT 448.10

RIM 451.34

FL IN 445.15

FL OUT 445.01

EX. CEMETERY LOOP ROAD

452451

FG: 451.18

FG: 450.86

FG: 450.54

FG: 446.54

FG: 446.38

FG: 446.38

FG: 446.22

FG: 446.22

FG: 446.06

FG: 446.06

FG: 446.06 FG: 446.54

FG: 446.70

FG: 446.54

FG: 447.34

FG: 447.18 FG: 447.98

FG: 448.30

FG: 448.62

FG: 448.94

FG: 449.26

FG: 449.58

FG: 449.74

FG: 450.06

FG: 450.38

FG: 450.70

FG: 451.18

FG: 454.70

FG: 454.70

FG: 454.86

FG: 455.18FG: 454.86FG: 454.70

FG: 454.86FG: 452.62FG: 452.46

FG: 452.46

INV.: 448.63

FG: 454.69

INV.: 450.86

FG: 451.18

INV.: 447.35

FG: 446.51

INV.: 442.68

FG: 446.64

INV.: 438.56

FG: 446.00

INV.: 442.17

FG: 446.32

INV.: 442.49

FG: 446.46

INV.: 442.63

FG: 450.50

INV.: 446.67

FG: 447.98

INV.: 444.15

FG: 447.18

INV.: 443.35

FG: 450.70

INV.: 446.87

90'-4" HDPE PERFORATED

PIPE @

0.50%

MIN.

154'-4" HDPE PERFORATED

PIPE @

0.50%

MIN.

112'-4" HDPE PERFORATED

PIPE @

0.50%

MIN.

57'-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

43'-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

'-4

" H

DP

E P

ER

FO

RA

TE

D

PIP

E @

0.

% M

IN.

FINISHED GRADE

PITCH:5.7%

S5° 59' 49"E

12" HDPE

452 453

5.7%

5.7%

5.7%

-3.9:1

26+00 28+00

15" RCP CL III

15" RCP CL III

FG: 468.08

FG: 467.35

FG: 467.47

FG: 467.60

FG: 467.72

FG: 467.84 FG: 467.72

FG: 467.68

FG: 468.16

FG: 468.28

FG: 468.37

FG: 468.49

FG: 468.61

FG: 468.69

FG: 468.81

FG: 468.93

FG: 469.05 FG: 469.13

FG: 469.05

FG: 469.01

FG: 469.34

FG: 469.41

FG: 469.01

FG: 468.77

FG: 468.45

FG: 468.41

FG: 468.32

FG: 467.88

FG: 467.68

FG: 467.48

FG: 467.24

FG: 467.03

FG: 466.83

FG: 466.59 FG: 466.39

FG: 465.90

FG: 465.86 FG: 465.74

FG: 465.54

FG: 465.34

FG: 465.14

FG: 464.93

FG: 464.29

FG: 464.21

FG: 464.41FG: 464.45

FG: 464.29

FG: 464.29

FG: 464.41

FG: 464.53FG: 464.57FG: 465.13FG: 465.17

FG: 465.29

FG: 465.74

FG: 466.06

FG: 466.22

FG: 466.26

FG: 466.46

FG: 466.71

FG: 467.40

INV.: 463.57

FG: 466.61

INV.: 462.78

FG: 469.43

INV.: 465.60

FG: 469.12

INV.: 465.29

FG: 469.45

INV.: 465.62 FG: 469.01

INV.: 465.18

FG: 468.13

INV.: 464.30

FG: 464.99

INV.: 461.16

FG: 464.07

INV.: 460.24

FG: 463.67

INV.: 459.84

FG: 465.32

INV.: 461.49

FG: 466.00

INV.: 462.17

FINISHED GRADE

PITCH:4.2%

N55° 12' 21"E

FINISHED GRADE

PITCH:4.2%

N55° 12' 21"E

12"

HDPE

42-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

31-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

94-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

23-4" HDPE PERFORATED

PIPE @

0.50%

MIN.

27-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

94-4" H

DPE PERFORATED

PIPE @ 0.50% MIN.

-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

76-4" HDPE PERFORATEDPIPE @ 0.50% MIN. 137-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

35-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

65 63

TC 63 22

LP

-4.0 :1

-4.0:1

67 63

HP

63 45

TOP

63 45

TOP

IN-GROUND CREMAIN SITES

GRAVESITE GRID MONUMENT

GRANITE SECTION MARKER

HEADSTONE FACE DIRECTION

1. CONTRACTOR TO PROVIDE AMENDED SOILS ABOVE CRYPTS.

2. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

3. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE RE/COR THAT THE LID AND CRYPT NUMBERS MATCH

4. HORIZONTAL DATUM IS REFERENCED TO THE ALABAMA STATE PLANES, WEST ZONE

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

TRADITIONAL BURIAL SITES

SEC

PRE-PLACED CRYPTS

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (10' INTERVAL)

PROPOSED CONTOUR (2' INTERVAL)

INVERT OF STRUCTUREINV

CLEANOUT INVERT OUT AND FINISHED

GRADE ELEVATION LABEL

STORM SEWER PIPE

CRYPT UNDERDRAIN CLEANOUT / UNDERDRAIN PIPE

CRYPT UNDERDRAIN HEADER PIPE CLEANOUT /

UNDERDRAIN HEADER PIPE

STORM STRUCTURES

FILTERRA INTERNAL BYPASS CURB INLET STRUCTURES

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

LEGEND:

FG: 1136.90

TL: 1135.15

FG: 1137.50

INV.: 1129.25

2-INCH STEP BETWEEN CRYPTS

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C G1

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456 NOT FOR

CONSTRUCTION

CG112

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30 BURIAL SECTION 10

1,000 IGC

(WITHIN 4'x4' PLOTS)BURIAL SECTION 11

1,000 IGC

(WITHIN 4'x4' PLOTS)

BURIAL GRADING ENLARGEMENT

PLAN SECTION 10 & 11

KEY MAP

(NOT TO SCALE)

AutoCAD SHX Text

WM

AutoCAD SHX Text D

FG: 471.25

TL: 469.50

FG: 475.97

TL: 474.22

FG: 476.15

TL: 474.40

FG: 476.33

TL: 474.58

FG: 476.33

TL: 474.58

FG: 476.33

TL: 474.58

FG: 476.51

TL: 474.76

FG: 476.69

TL: 474.94

FG: 476.69

TL: 474.94

FG: 476.69

TL: 474.94

FG: 476.87

TL: 475.12

FG: 477.05

TL: 475.30

FG: 477.05

TL: 475.30

FG: 477.05

TL: 475.30

FG: 471.25

TL: 469.50

FG: 471.25

TL: 469.50

FG: 471.02

TL: 469.27

FG: 470.79

TL: 469.04

FG: 470.79

TL: 469.04FG: 470.79

TL: 469.04

FG: 470.79

TL: 469.04FG: 470.79

TL: 469.04

FG: 470.79

TL: 469.04

FG: 471.02

TL: 469.27

FG: 472.26

INV.: 464.18

FG: 474.13

INV.: 466.05

FG: 475.83

INV.: 467.75

FG: 477.02

INV.: 468.94

FG: 471.21

INV.: 463.13

FG: 470.79

INV.: 462.71

FG: 470.79

INV.: 462.71

281'-4" HDPE PERFORATEDPIPE @ 0.50% MIN.

233'-4" HDPE PERFORATEDPIPE @ 0.50% MIN.

191'-4" HDPE PERFORATEDPIPE @ 0.50% MIN.

179'-4" HDPE PERFORATED

PIPE @ 0.50% MIN.

FI

NI

SH

ED

G

RA

DE

PI

TC

H:

2.0

S0 ° 0

0'

"E

FI

NI

SH

ED

G

RA

DE

PI

TC

H:

2.0

S0 ° 0

0'

"E

3.0

2.4

3.0

2.4

2.4

'R

+0

34+

24"

RCP CL III

24"

RCP CL II

I

24"

RC

P C

L II

I

15" RCP CL III

15" RCP CL III

4A

3A

FG: 477.05

TL: 475.30

FG: 477.05

TL: 475.30

FG: 477.23

TL: 475.48

FG: 477.23

TL: 475.48

FG: 477.23

TL: 475.48

FG: 477.23

TL: 475.48

FG: 477.05

TL: 475.30

FG: 477.05

TL: 475.30

FG: 477.05

TL: 475.30

FG: 476.15

TL: 474.40

FG: 475.97

TL: 474.22

FG: 475.79

TL: 474.04

FG: 475.60

TL: 473.85

FG: 475.42

TL: 473.67FG: 475.42

TL: 473.67

FG: 475.42

TL: 473.67

FG: 475.24

TL: 473.49

FG: 475.06

TL: 473.31

FG: 474.88

TL: 473.13

FG: 474.70

TL: 472.95

FG: 474.52

TL: 472.77

FG: 474.34

TL: 472.59

FG: 474.16

TL: 472.41

FG: 473.98

TL: 472.23

FG: 473.98

TL: 472.23

FG: 473.98

TL: 472.23

FG: 473.61

TL: 471.86

FG: 473.43

TL: 471.68

FG: 473.25

TL: 471.50

FG: 472.86

TL: 471.11

FG: 472.63

TL: 470.88

FG: 472.17

TL: 470.42

FG: 471.94

TL: 470.19

FG: 471.25

TL: 469.50

FG: 471.25

TL: 469.50

FG: 476.06

INV.: 467.98

FG: 476.13

INV.: 468.05

FG: 474.58

INV.: 466.50

FG: 474.68

INV.: 466.60

FG: 474.19

INV.: 466.11

FG: 473.00

INV.: 464.92

FG: 473.19

INV.: 465.11

202'-4" HDPE PERFORATEDPIPE @ 0.50% MIN.

281'-4" HDPE PERFORATEDPIPE @ 0.50% MIN.

FI

NI

SH

ED

G

RA

DE

PI

TC

H:

2.0

S0 ° 0

0'

"E

" H

DP

E

" H

DP

E

12"

HDPE

12"

HDPE

2.4

2.4

2.4

-3.0:1

74 93

TOP

TOP

65 70

TOP

75 00

TOP

IN-GROUND CREMAIN SITES

GRAVESITE GRID MONUMENT

GRANITE SECTION MARKER

HEADSTONE FACE DIRECTION

1. CONTRACTOR TO PROVIDE AMENDED SOILS ABOVE CRYPTS.

2. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

3. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE RE/COR THAT THE LID AND CRYPT NUMBERS MATCH

4. HORIZONTAL DATUM IS REFERENCED TO THE ALABAMA STATE PLANES, WEST ZONE

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

TRADITIONAL BURIAL SITES

SEC

PRE-PLACED CRYPTS

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (10' INTERVAL)

PROPOSED CONTOUR (2' INTERVAL)

INVERT OF STRUCTUREINV

CLEANOUT INVERT OUT AND FINISHED

GRADE ELEVATION LABEL

STORM SEWER PIPE

CRYPT UNDERDRAIN CLEANOUT / UNDERDRAIN PIPE

CRYPT UNDERDRAIN HEADER PIPE CLEANOUT /

UNDERDRAIN HEADER PIPE

STORM STRUCTURES

FILTERRA INTERNAL BYPASS CURB INLET STRUCTURES

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

LEGEND:

FG: 1136.90

TL: 1135.15

FG: 1137.50

INV.: 1129.25

2-INCH STEP BETWEEN CRYPTS

30'R

+0

24" RCP CL III

FG: 471.25

TL: 469.50

FG: 471.25

TL: 469.50

FG: 471.25

TL: 469.50

FG: 471.02

TL: 469.27

FG: 470.79

TL: 469.04

FG: 471.36

INV.: 463.28

FG: 471.21

INV.: 463.13

12" HDPE

70 76

TC

TOP

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C G1

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456 NOT FOR

CONSTRUCTION

CG113

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

BURIAL SECTION 12

2,422 PPC

(WITHIN 3'x7'-8" PLOTS)

MA

TC

HL

IN

E

SE

E

TH

IS

S

HE

ET

MA

TC

HL

IN

E

SE

E

TH

IS

S

HE

ET

BURIAL GRADING ENLARGEMENT

PLAN SECTION 12

KEY MAP

(NOT TO SCALE)

MATCHLINE

SEE THIS SHEET

MATCHLINE

SEE THIS SHEET

12'

12'

12' 300'R

ROAD C 14+00

15+00

18" RCP CL III

15" RCP CL III

8A

FG: 468.37

TL: 466.62

FG: 467.80

TL: 466.05

FG: 467.73

TL: 465.98

FG: 467.70

TL: 465.95

FG: 467.44

TL: 465.69

FG: 467.17

TL: 465.42

FG: 466.90

TL: 465.15 FG: 466.56

TL: 464.81

FG: 466.51

TL: 464.76

FG: 466.47

TL: 464.72

FG: 466.31

TL: 464.56

FG: 466.16

TL: 464.41

FG: 465.90

TL: 464.15

FG: 465.74

TL: 463.99

FG: 465.48

TL: 463.73

FG: 465.25

TL: 463.50

FG: 465.19

TL: 463.44

FG: 465.08

TL: 463.33

FG: 464.74

TL: 462.99

FG: 464.66

TL: 462.91

FG: 464.58

TL: 462.83

FG: 464.51

TL: 462.76

FG: 464.32

TL: 462.57

FG: 464.24

TL: 462.49

FG: 464.32

TL: 462.57

FG: 464.26

TL: 462.51

FG: 464.03

TL: 462.28

FG: 463.96

TL: 462.21

FG: 463.88

TL: 462.13

FG: 463.81

TL: 462.06

FG: 463.73

TL: 461.98

FG: 463.66

TL: 461.91

FG: 463.58

TL: 461.83

FG: 463.58

TL: 461.83

FG: 463.70

TL: 461.95

FG: 463.93

TL: 462.18

FG: 463.96

TL: 462.21

FG: 464.76

TL: 463.01

FG: 464.82

TL: 463.07

FG: 465.20

TL: 463.45

FG: 465.88

TL: 464.13

FG: 465.94

TL: 464.19

FG: 466.43

TL: 464.68

FG: 467.00

TL: 465.25

FG: 467.06

TL: 465.31

FG: 468.09

TL: 466.34

FG: 468.14

TL: 466.39

FG: 468.71

TL: 466.96

FG: 466.72

TL: 464.97

FG: 467.12

TL: 465.37

FG: 467.19

TL: 465.44

FG: 468.40

TL: 466.65

FG: 468.47

TL: 466.72

FG: 467.94

TL: 466.19

FG: 467.93

TL: 466.18

FG: 467.48

TL: 465.73

FG: 466.92

TL: 465.17

FG: 466.66

TL: 464.91

FG: 466.76

TL: 465.01

FG: 466.67

TL: 464.92

FG: 466.31

TL: 464.56

FG: 466.26

TL: 464.51

FG: 468.04

INV.: 459.96

FG: 466.97

INV.: 458.89

FG: 465.92

INV.: 457.84

FG: 464.79

INV.: 456.71

FG: 463.70

INV.: 455.62

FG: 463.58

INV.: 455.50

FG: 463.58

INV.: 455.50

FG: 463.83

INV.: 455.75

FG: 464.17

INV.: 456.09

FG: 464.25

INV.: 456.17

FG: 464.74

INV.: 456.66

FG: 465.03

INV.: 456.95

FG: 466.46

INV.: 458.38

FG: 467.07

INV.: 458.99

FG: 467.17

INV.: 459.09

FG: 468.45

INV.: 460.37

FG: 467.91

INV.: 459.83

FG: 467.87

INV.: 459.79

FG: 466.76

INV.: 458.68

FG: 466.62

INV.: 458.54

FG: 466.52

INV.: 458.44

FG: 466.10

INV.: 458.02

43'-4" HDPE PERFORATED

PIPE @

0.50%

MIN.

65'-4" HDPE PERFORATED

PIPE @

0.50%

MIN.

5'-

4" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

7'-

4" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

4'-

4" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

FINISHED GRADEPITCH:2.0%S77° 24' 44"E

FINISHED GRADEPITCH:2.0%S77° 24' 44"E

FINISHED GRADE

PITCH:2.8%

N63° 02' 58"E

12" HDPE

12" HDPE

" H

DP

E

43'-4" HDPE PERFORATED

PIPE @

0.50%

MIN.

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12"

HDPE

12" HDPE

12" HDPE

467468

2.8%

3.0

2.0%

2.0%

2.0%

2.0%

2.0%

64 52

LP

-4.

0:1

-4.

0:1

-4.

0:1

-4.

0:1

-4.0:1

-4.0:1

-4.5:1

66 91

TOP

64 76

TOP

64 76

TOP

IN-GROUND CREMAIN SITES

GRAVESITE GRID MONUMENT

PRE-PLACED CRYPTS

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (10' INTERVAL)

PROPOSED CONTOUR (2' INTERVAL)

INVERT OF STRUCTUREINV

CLEANOUT INVERT OUT AND FINISHED

GRADE ELEVATION LABEL

GRANITE SECTION MARKER

HEADSTONE FACE DIRECTION

STORM SEWER PIPE

CRYPT UNDERDRAIN CLEANOUT / UNDERDRAIN PIPE

CRYPT UNDERDRAIN HEADER PIPE CLEANOUT /

UNDERDRAIN HEADER PIPE

1. CONTRACTOR TO PROVIDE AMENDED SOILS ABOVE CRYPTS.

2. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

3. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE RE/COR THAT THE LID AND CRYPT NUMBERS MATCH

4. HORIZONTAL DATUM IS REFERENCED TO THE ALABAMA STATE PLANES, WEST ZONE

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

STORM STRUCTURES

FILTERRA INTERNAL BYPASS CURB INLET STRUCTURES

TRADITIONAL BURIAL SITES

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

LEGEND:

FG: 1136.90

TL: 1135.15

FG: 1137.50

INV.: 1129.25

2-INCH STEP BETWEEN CRYPTS

SEC

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C G1

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456 NOT FOR

CONSTRUCTION

CG114

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

BURIAL GRADING ENLARGEMENT

PLAN SECTION 13

KEY MAP

(NOT TO SCALE)

MA

TC

HL

IN

E

SE

E

SH

EE

T

CG

BURIAL SECTION 13

1,104 PPC

(WITHIN 3'x7'-8" PLOTS)

30'R

11+0012+00 13+00

14+00

15" RCP CL III

15" RCP CL III

18" RCP CL III

" R

CP

C

L I

II

FG: 467.80

TL: 466.05

FG: 467.73

TL: 465.98

FG: 467.70

TL: 465.95

FG: 467.44

TL: 465.69

FG: 467.17

TL: 465.42

FG: 466.90

TL: 465.15

FG: 466.56

TL: 464.81

FG: 466.72

TL: 464.97

FG: 467.12

TL: 465.37

FG: 467.19

TL: 465.44

FG: 468.40

TL: 466.65

FG: 468.47

TL: 466.72

FG: 468.80

TL: 467.05

FG: 469.73

TL: 467.98

FG: 469.67

TL: 467.92

FG: 469.74

TL: 467.99

FG: 470.92

TL: 469.17

FG: 470.99

TL: 469.24

FG: 471.05

TL: 469.30

FG: 471.65

TL: 469.90

FG: 472.31

TL: 470.56

FG: 472.38

TL: 470.63

FG: 473.04

TL: 471.29

FG: 473.49

TL: 471.74

FG: 473.55

TL: 471.80

FG: 474.35

TL: 472.60

FG: 474.40

TL: 472.65

FG: 473.79

TL: 472.04

FG: 473.55

TL: 471.80

FG: 473.30

TL: 471.55

FG: 472.64

TL: 470.89

FG: 472.58

TL: 470.83

FG: 471.47

TL: 469.72

FG: 471.41

TL: 469.66

FG: 470.32

TL: 468.57

FG: 470.26

TL: 468.51

FG: 469.77

TL: 468.02

FG: 469.19

TL: 467.44

FG: 469.13

TL: 467.38

FG: 468.31

TL: 466.56

FG: 467.94

TL: 466.19

FG: 468.00

TL: 466.25

FG: 467.93

TL: 466.18

FG: 467.48

TL: 465.73

FG: 466.92

TL: 465.17

FG: 466.66

TL: 464.91

FG: 466.76

TL: 465.01

FG: 466.67

TL: 464.92

FG: 466.31

TL: 464.56

FG: 466.26

TL: 464.51

FG: 466.46

INV.: 458.38

FG: 467.07

INV.: 458.99

FG: 467.17

INV.: 459.09

FG: 468.45

INV.: 460.37

FG: 469.78

INV.: 461.70

FG: 471.05

INV.: 462.97

FG: 472.33

INV.: 464.25

FG: 473.56

INV.: 465.48

FG: 472.56

INV.: 464.48

FG: 471.40

INV.: 463.32

FG: 470.26

INV.: 462.18

FG: 468.99

INV.: 460.91

FG: 469.16

INV.: 461.08

FG: 467.91

INV.: 459.83

FG: 467.87

INV.: 459.79

FG: 466.76

INV.: 458.68

FG: 466.62

INV.: 458.54

FG: 466.52

INV.: 458.44

FG: 466.10

INV.: 458.02 43

'-4 " H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

FINISHED GRADE

PITCH:2.4%

N63° 09' 52"E

FINISHED GRADE

PITCH:2.4%

N67° 06' 39"E

FINISHED GRADE

PITCH:2.8%

N63° 02' 58"E

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

12" HDPE

12" HDPE

12" HDPE12" HDPE

12" HDPE

469 471 472 473

467 468 469

471 472 473 474

471 472 473

2.5%

2.4%

2.4%

2.3%

2.4%

2.8%

3.0

72 98

72 98

TC

-4.

0:1

-4.0:1

-4.0:1

72 90

TOP69 54

TOP

66 91

TOP

IN-GROUND CREMAIN SITES

GRAVESITE GRID MONUMENT

GRANITE SECTION MARKER

HEADSTONE FACE DIRECTION

1. CONTRACTOR TO PROVIDE AMENDED SOILS ABOVE CRYPTS.

2. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

3. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE RE/COR THAT THE LID AND CRYPT NUMBERS MATCH

4. HORIZONTAL DATUM IS REFERENCED TO THE ALABAMA STATE PLANES, WEST ZONE

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

TRADITIONAL BURIAL SITES

SEC

PRE-PLACED CRYPTS

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (10' INTERVAL)

PROPOSED CONTOUR (2' INTERVAL)

INVERT OF STRUCTUREINV

CLEANOUT INVERT OUT AND FINISHED

GRADE ELEVATION LABEL

STORM SEWER PIPE

CRYPT UNDERDRAIN CLEANOUT / UNDERDRAIN PIPE

CRYPT UNDERDRAIN HEADER PIPE CLEANOUT /

UNDERDRAIN HEADER PIPE

STORM STRUCTURES

FILTERRA INTERNAL BYPASS CURB INLET STRUCTURES

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

LEGEND:

FG: 1136.90

TL: 1135.15

FG: 1137.50

INV.: 1129.25

2-INCH STEP BETWEEN CRYPTS

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C G1

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456

CG115

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30BURIAL SECTION 14

1,034 PPC

(WITHIN 3'X7'-8" PLOTS)

BURIAL GRADING ENLARGEMENT

PLAN SECTION 14

KEY MAP

(NOT TO SCALE)

30'R

10+00 11+00 12+00 13+009+92

" R

CP

C

L I

II

10A

FG: 474.78

TL: 473.03

FG: 474.70

TL: 472.95

FG: 474.24

TL: 472.49

FG: 474.08

TL: 472.33

FG: 473.93

TL: 472.18 FG: 473.87

TL: 472.12 FG: 473.40

TL: 471.65

FG: 473.13

TL: 471.38

FG: 472.86

TL: 471.11

FG: 472.71

TL: 470.96

FG: 472.65

TL: 470.90

FG: 472.42

TL: 470.67

FG: 471.57

TL: 469.82

FG: 471.53

TL: 469.78

FG: 471.47

TL: 469.72

FG: 470.89

TL: 469.14

FG: 470.39

TL: 468.64

FG: 470.35

TL: 468.60

FG: 470.29

TL: 468.54

FG: 469.94

TL: 468.19

FG: 469.55

TL: 467.80

FG: 469.13

TL: 467.38

FG: 469.83

TL: 468.08

FG: 469.89

TL: 468.14

FG: 470.93

TL: 469.18

FG: 470.99

TL: 469.24

FG: 472.04

TL: 470.29

FG: 472.10

TL: 470.35

FG: 473.14

TL: 471.39

FG: 473.20

TL: 471.45

FG: 473.66

TL: 471.91

FG: 473.86

TL: 472.11

FG: 474.09

TL: 472.34

FG: 473.90

INV.: 465.82

FG: 472.68

INV.: 464.60

FG: 471.54

INV.: 463.46

FG: 470.35

INV.: 462.27

FG: 469.55

INV.: 461.47

FG: 468.92

INV.: 460.84

FG: 469.54

INV.: 461.46FG: 470.61

INV.: 462.53

FG: 471.73

INV.: 463.65

FG: 472.85

INV.: 464.77

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

4'-

4" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

9'-

4" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

8'-

4" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

1'-

4" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

FINISHED GRADEPITCH:2.0%S77° 41' 04"E

FINISHED GRADEPITCH:2.0%S77° 41' 04"E

12" HDPE 12" HDPE 12" HDPE 12" HDPE

12" HDPE

73 59

GS 470

469471472473

463464466467468469

470 469471472473

2.0%

2.0%

2.0%

2.0%

2.0%

72 98

TC

72 98

TC

73 36

TC

-4.0:1

-4.0:1

-4.

0:1

-4.

0:1

-4.

0:1

4 47

72 90

TOP 69 54

TOP

69 54

TOP

IN-GROUND CREMAIN SITES

GRAVESITE GRID MONUMENT

PRE-PLACED CRYPTS

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (10' INTERVAL)

PROPOSED CONTOUR (2' INTERVAL)

INVERT OF STRUCTUREINV

CLEANOUT INVERT OUT AND FINISHED

GRADE ELEVATION LABEL

GRANITE SECTION MARKER

HEADSTONE FACE DIRECTION

STORM SEWER PIPE

CRYPT UNDERDRAIN CLEANOUT / UNDERDRAIN PIPE

CRYPT UNDERDRAIN HEADER PIPE CLEANOUT /

UNDERDRAIN HEADER PIPE

1. CONTRACTOR TO PROVIDE AMENDED SOILS ABOVE CRYPTS.

2. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

3. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE RE/COR THAT THE LID AND CRYPT NUMBERS MATCH

4. HORIZONTAL DATUM IS REFERENCED TO THE ALABAMA STATE PLANES, WEST ZONE

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

STORM STRUCTURES

FILTERRA INTERNAL BYPASS CURB INLET STRUCTURES

TRADITIONAL BURIAL SITES

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

LEGEND:

FG: 1136.90

TL: 1135.15

FG: 1137.50

INV.: 1129.25

2-INCH STEP BETWEEN CRYPTS

SEC

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C G1

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456 NOT FOR

CONSTRUCTION

CG116

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

BURIAL GRADING ENLARGEMENT

PLAN SECTION 15

KEY MAP

(NOT TO SCALE)

BURIAL SECTION 15

1,258 PPC

(WITHIN 3'X7'-8" PLOTS)

MA

TC

HL

IN

E

SE

E

SH

EE

T

CG

FG: 477.41

TL: 475.66

FG: 477.68

TL: 475.93

FG: 477.84

TL: 476.09

FG: 478.11

TL: 476.36

FG: 478.26

TL: 476.51

FG: 478.59

TL: 476.84

FG: 478.75

TL: 477.00

FG: 478.90

TL: 477.15

FG: 479.06

TL: 477.31

FG: 479.33

TL: 477.58

FG: 479.48

TL: 477.73

FG: 478.50

TL: 476.75 FG: 478.55

TL: 476.80

FG: 479.63

TL: 477.88

FG: 479.87

TL: 478.12

FG: 479.93

TL: 478.18

FG: 481.73

TL: 479.98

FG: 481.80

TL: 480.05

FG: 481.96

TL: 480.21

FG: 481.88

TL: 480.13

FG: 481.94

TL: 480.19

FG: 482.18

TL: 480.43

FG: 482.25

TL: 480.50

FG: 482.33

TL: 480.58

FG: 482.37

TL: 480.62

FG: 482.45

TL: 480.70

FG: 482.49

TL: 480.74

FG: 482.49

TL: 480.74

FG: 482.53

TL: 480.78

FG: 482.15

TL: 480.40

FG: 482.00

TL: 480.25

FG: 481.84

TL: 480.09

FG: 481.69

TL: 479.94FG: 480.99

TL: 479.24

FG: 480.93

TL: 479.18

FG: 479.89

TL: 478.14

FG: 479.83

TL: 478.08

FG: 479.08

TL: 477.33

FG: 478.95

TL: 477.20

FG: 478.90

TL: 477.15

FG: 479.01

TL: 477.26FG: 478.95

TL: 477.20

FG: 478.72

TL: 476.97

FG: 478.68

TL: 476.93

FG: 478.60

TL: 476.85

FG: 478.52

TL: 476.77

FG: 478.45

TL: 476.70

FG: 478.25

TL: 476.50

FG: 478.17

TL: 476.42

FG: 478.21

TL: 476.46

FG: 478.15

TL: 476.40

FG: 477.57

TL: 475.82

FG: 477.26

TL: 475.51

FG: 477.25

INV.: 469.17

FG: 477.41

INV.: 469.33

FG: 478.57

INV.: 470.49

FG: 478.13

INV.: 470.05

FG: 478.85

INV.: 470.77

FG: 478.94

INV.: 470.86

FG: 478.96

INV.: 470.88

FG: 478.80

INV.: 470.72

FG: 479.92

INV.: 471.84 FG: 480.93

INV.: 472.85

FG: 481.52

INV.: 473.44

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

'-4

" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

7'-

4" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

4'-

4" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

3'-

4" H

DP

E

PE

RF

OR

AT

ED

PI

PE

0.

M

IN

15" RCP CL III

0'R

+0

+0

PC: 10+57.48

462 463

476 477

480478

480479

2.0%

2.0%

2.0%

2.0%

2.0%

-3.2:1

TOP

FINISHED GRADE

PITCH:2.0%

N31° 47' 41"E

FINISHED GRADE

PITCH:2.0%

N31° 47' 41"E

FINISHED GRADE

PITCH:2.0%

N31° 47' 41"E

12" HDPE 12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

12" HDPE

IN-GROUND CREMAIN SITES

GRAVESITE GRID MONUMENT

PRE-PLACED CRYPTS

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (10' INTERVAL)

PROPOSED CONTOUR (2' INTERVAL)

INVERT OF STRUCTUREINV

CLEANOUT INVERT OUT AND FINISHED

GRADE ELEVATION LABEL

GRANITE SECTION MARKER

HEADSTONE FACE DIRECTION

STORM SEWER PIPE

CRYPT UNDERDRAIN CLEANOUT / UNDERDRAIN PIPE

CRYPT UNDERDRAIN HEADER PIPE CLEANOUT /

UNDERDRAIN HEADER PIPE

1. CONTRACTOR TO PROVIDE AMENDED SOILS ABOVE CRYPTS.

2. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

3. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE RE THAT THE LID AND CRYPT NUMBERS MATCH

4. HORIZONTAL DATUM IS REFERENCED TO THE ALABAMA STATE PLANES, EAST ZONE

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

STORM STRUCTURES

FILTERRA INTERNAL BYPASS CURB INLET STRUCTURES

TRADITIONAL BURIAL SITES

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

LEGEND:

FG: 1136.90

TL: 1135.15

FG: 1137.50

INV.: 1129.25

2-INCH STEP BETWEEN CRYPTS

SEC

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C G1

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456 NOT FOR

CONSTRUCTION

CG117

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

MATCHLINE

SEE SHEET CG118

BURIAL GRADIONG ENLARGEMENT

PLAN SECTION 16-BID OPTION 3

KEY MAP

(NOT TO SCALE)

BURIAL SECTION 16

1,926 PPC

(WITHIN 3'X7'-8" PLOTS)

FG: 479.33

TL: 477.58

FG: 479.48

TL: 477.73

FG: 479.63

TL: 477.88

FG: 479.87

TL: 478.12

FG: 479.93

TL: 478.18

FG: 479.97

TL: 478.22

FG: 480.39

TL: 478.64

FG: 480.54

TL: 478.79

FG: 480.81

TL: 479.06

FG: 481.16

TL: 479.41

FG: 481.09

TL: 479.34

FG: 481.14

TL: 479.39

FG: 481.49

TL: 479.74

FG: 481.57

TL: 479.82

FG: 481.65

TL: 479.90

FG: 481.73

TL: 479.98

FG: 481.80

TL: 480.05

FG: 481.52

FG: 480.52

INV.: 472.44

FG: 479.92

INV.: 471.84

475 476

FINISHED GRADE

PITCH:2.0%

N31° 47' 41"E

IN-GROUND CREMAIN SITES

GRAVESITE GRID MONUMENT

PRE-PLACED CRYPTS

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (10' INTERVAL)

PROPOSED CONTOUR (2' INTERVAL)

INVERT OF STRUCTUREINV

CLEANOUT INVERT OUT AND FINISHED

GRADE ELEVATION LABEL

GRANITE SECTION MARKER

HEADSTONE FACE DIRECTION

STORM SEWER PIPE

CRYPT UNDERDRAIN CLEANOUT / UNDERDRAIN PIPE

CRYPT UNDERDRAIN HEADER PIPE CLEANOUT /

UNDERDRAIN HEADER PIPE

1. CONTRACTOR TO PROVIDE AMENDED SOILS ABOVE CRYPTS.

2. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

3. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE RE THAT THE LID AND CRYPT NUMBERS MATCH

4. HORIZONTAL DATUM IS REFERENCED TO THE ALABAMA STATE PLANES, EAST ZONE

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

STORM STRUCTURES

FILTERRA INTERNAL BYPASS CURB INLET STRUCTURES

TRADITIONAL BURIAL SITES

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

LEGEND:

FG: 1136.90

TL: 1135.15

FG: 1137.50

INV.: 1129.25

2-INCH STEP BETWEEN CRYPTS

SEC

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C G1

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456 NOT FOR

CONSTRUCTION

CG117

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

MATCHLINE

SEE SHEET CG117

BURIAL GRADIONG ENLARGEMENT

PLAN SECTION 16-BID OPTION 3

KEY MAP

(NOT TO SCALE)

BURIAL SECTION 16

1,926 PPC

(WITHIN 3'X7'-8" PLOTS)

465 470

47547

465 470

4.2%

STREAM 7 APPROXIMATE LOCATION

OF 500-YEAR FLOOD

PLAIN

24" RCP CL III

24" RCP CL III

24" RCP CL III

24" RCP CL III

30" RCP CL III

24" RCP CL III

24" RCP CL III

" R

CP

CL

III

" R

CP

CL

III

15" RCP CL III

15"

RCP CL II

I

15" RCP CL III 15" RCP CL III

15" RCP CL III

15" RCP CL III

15" RCP CL III

" R

CP

CL

III

BIO RETENTION

BOTTOM OF POND ELEV. = 454.00

CREST OF EMERGENCY SPILLWAY ELEV. = 455.00

TOP OF EMBANKMENT ELEV. = 456.00

4A

31A

3A32

29A

70 32

GS

77 38

GS

78 14

EP

468469471472473474476477478479481482483484486487488

5 46

465465466

460465

454456456457458459461462463464

469 471 472 473 474

6 45

7 45 8 45

477478479 481482483484

475 473

2.4%

3.0%

2.4%

2.4%

69 74

TC

69 75

TC

69 98

TC-HP

69 79

TC

70 76

TC

76 83

TC

76 68

TC77 08

TC-HP

63 42

TC

65 63

TC

63 22

LP

78 34

TC

78 34

TC

76 68

TC

63 26

TC

TC

63 53

TC63 63

TC

64 12

TC64 22

TC64 72

TC64 82

TC

465464

460461462463464

463463464

468469

482483

2.4%

466466467

468469 471472473474 476477478479 481482483484

-3.0:1

-3.0 :1

-3.

0:1

-4.0 :1

-4.0:1

-4.5:1

-4.0:1

-3.0:1

-4.0:1

-4.0:1

-3.

0:1

-3.0:1

-3.0:1

-4.

0:1

-4.

0:1

-4.

0:1

-4.0:1

-4.0:1

63 50

HP

67 63

HP

76 42

TOP

76 59

TOP

74 93

TOP

TOP

TOP

55 10

INV

69 59

TOP

TOP

65 70

TOP 75 00

TOP

63 45

TOP

63 45

TOP

62 91

TOP

INV

-4.0:1

72 31

TOP

67 21

TOP

67 21

TOP

INV

TOP

24' 22'

22' 24'

12'

30'R

30'R

30'R

30'R

375'R

500'R

31'33'ROAD A

ROAD A

ROAD A

ROAD C

PC: 25+53.67

PT: 27+55.94

PC: 29+12.84

PT: 16+70.02

22' 24'

M11(1)

M11(2)

BM11

26+00

27+00

28+00

29+00

30+00

31+00 32+00

33+00

34+00

35+00

35+69

18+00

18+31

+0

+0

+1

0+00

0+71

ROAD 'A' PROFILE

LP STA. = 27+92.86

LP ELEV. = 463.22

PVI STA. = 28+00

PVI ELEV. = 462.79'

A = 3.50 K = 28.57

100.00' VC

PV

C

ST

A.

= 2 7+

.00

PV

C

EL

EV

3.5 4'

PV

T S

TA

+5

0.0

PV

T E

LE

V.

= 4

.79

-1.50%

2.00%

PV

I: 3

5+

.52

8.1 6'

IN

: 2

.00

OU

T:

5.7

5.4

8.6

5.0

8.3

4.6

8.1

4.2

8.2

3.9

8.5

3.5

9.2

3.2

9.8

3.2

0.7

3.4

2.0

3.7

3.4

4.2

5.9

4.7

9.7

5.2

4.3

5.7

7.9

6.2

6.4

6.7

4.5

7.2

8.6

7.7

4.6

8.2

9.6

8.7

3.4

9.2

2.5

9.7

1.6

0.2

8.4

0.7

4.8

1.2

3.2

1.7

1.4

2.2

9.7

2.7

7.6

3.2

5.7

3.7

4.4

4.2

4.4

4.7

5.5

5.2

7.6

5.7

2.5

6.2

8.0

6.7

1.4

7.2

4.1

7.7

6.7

PR. GRADE @

ROAD C/L

EX. GRADE @

ROAD C/L

+9

7=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

9.0

+0

9=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

2.7

+1

6=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

9.4

+9

7=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

0.8

+9

0=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

7.9

+6

7.5 2=

EN

D

RO

AD

C

ON

ST

RU

CT

IO

N

EL

EV

.=4

.14

+7

6.4 0=

CL

IN

TX

. W

/ R

OA

D B

= S

TA

+8

4.5 2 -

R

OA

D B, EL

EV

.=4

.32

+2

9.6 8=

CL

IN

TX

. W

/ R

OA

D C

= S

TA

- 1 8+

.33

R

OA

D C, EL

EV

.=4

.38

COMPACTED STRUCTURAL

FILL PER GEOTECH REPORT

COMPACTED STRUCTURAL

FILL PER GEOTECH REPORT

COLUMBARIUM AREA

NORTH

GRAPHICAL SCALE: 1"=50'

50 25 0 50 100 150

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

CT202

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C T2

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456

MATCHLINE STA 26+00

SEE SHEET CT201

MA

TC

HL

IN

E

ST

A

+0 0 S

EE

S

HE

ET

C T2

TR

ROADWAY A PLAN & PROFILE-BASE

BID

24"

RC

P C

L II

I

30" RCP CL III

15"

RC

P C

L II

I

15" RCP CL III

24" RCP CL III 24

" R

CP

CL

III

24" RCP CL III 24" RCP CL III23

70 32

GS

471472473

471472473474476477478479481482483484486487488489 491492493494

472473

474 3.0

3.0

69 74

TC

69 75

TC

69 98

TC-HP

69 79

TC

70 76

TC

477478479

2.4

2.4

69 35

LP

-3.0:1

-3.

0:1 -3.

0:1

-3.

0:1

-3.0:1

75 83

GS

TC

75 67

TC-HP480

481482483484

TOP

TOP

72 81

TOP

72 81

TOP 69 59

TOP

69 58

TOP

TOP

73 47 73 65

73 81 73 84

73 7273 80 73 91

' 30'R

30'R

97.60'R 500'R

RO

AD

A

ROAD B

PT

: 1

4+

.02

PC

: 1

4+

.22

PT

: 1

6+

.02

50' R

30'R

M12(1)

M12(2)

BM12

+0

+0

33+

13+65

14+00 15+00 16+00

17+0017+1010+0011+00

12+

+0

13+59

47258

PR. GRADE @

ROAD C/L

EX. GRADE

@ROAD C/L

ROAD 'B' PROFILE

EX

. G

RA

DE

PR

. G

RA

DE

C

L.

5.5

7.1

4.7

8.8

3.9

0.2

3.2

1.9

2.4

2.3

1.6

1.2

0.9

1.1

0.1

3.3

9.6

4.9

9.3

5.1

9.3

4.1

9.6

1.7

0.1

7.6

7.1

LP STA. = 16+12.59

LP ELEV. = 469.35

PVI STA. = 16+00

PVI ELEV. = 468.63'

A = 5.07 K = 23.67

120.00' VC

PV

C

ST

A.

= 1 5+

.00

PV

C

EL

EV

0.4 7'

PV

T S

TA

+6

0.0

PV

T E

LE

V.

= 4

.83

-3.07%

2.00%

PV

I: 1

3+

.24

5.8 3'

IN

O

UT

: -3

.07

PV

I: 1

6+

.53

0.3 2'

IN

: 2

.00

OU

T:

+5

9.0 2=

CO

MM

ON

PO

IN

T W

/ B

ID

O

PT

IO

N

BE

GI

N

AN

D

EN

D

CU

L-D

E-

SA

C

UN

WR

AP

FO

R

RO

AD

B

CO

NT

IN

UA

TIO

N

SE

E B

ID

O

PT

IO

N

SH

EE

T C T2

EL

EV

.=4

.95

+8

4.5 3=

CL

IN

TX

. W

/ R

OA

D A

ST

A-

RO

AD

N

AM

E)

, E

LE

V.=

0.3

+6

5.2 4=

CE

NT

ER

O

F C

UL

-D E-

SA

C

EL

EV

.=4

.83

+7

1=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

6.4

+1

3=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

4.6

ROAD B CDS UNWRAP PROFILE

EX

. G

RA

DE

PR

. G

RA

DE

C

L.

3.07% -0.98%

PV

I: 1

0+

.00

2.5 8'

IN

O

UT

: 3

.07

PV

I: 1

0+

.18

5.2 6'

IN

: 3

.07

OU

T:

-0.

PV

I: 1

3+

.45

2.5 8'

IN

: -0

.98

OU

T:

COMPACTED STRUCTURAL

FILL PER GEOTECH REPORT

2.5

4.2

3.3

1.5

4.1

2.4

4.8

1.7

5.1

0.7

4.8

9.4

4.6

8.3

4.3

6.3

4.1

4.6

3.9

3.1

3.6

1.4

3.4

3.0

3.1

4.5

2.9

6.9

2.6

9.7

PR. GRADE @

ROAD C/L

EX. GRADE

@ROAD C/L

+0

0=

BE

GI

N

CU

L-D

E-

SA

C

UN

WR

AP

+5 9.0

2-R

OA

D- B)

, E

LE

V.=

2.5

+5

9.4 5=

EN

D

CU

L-D

E-

SA

C

UN

WR

AP

+5 9.0

2-R

OA

D B)

, E

LE

V.=

2.5

CT203

GRAPHICAL SCALE: 1"=50'

50 25 0 50 100 150

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C T2

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456

NORTH

ROADWAY B PLAN & PROFILE-BASE

4 45

45545 5 454

2.6%

35' STREAM SETBACK

STREAM 2

54"

CMP

15"

RC

P C

L II

I

15" RCP CL III 18" RCP CL III

24" RCP CL III

24" RCP CL III

24" RCP CL III

" R

CP

CL

III

15"

RCP CL II

I

" R

CP

CL

III

15" RCP CL III

C2

C1

10A

8A

7A

77 38

GS

73 59

GS

477 478 479 481 482 483 484

457458459

466467468469

471472473

463 464 466 467 468 469

471 472 473 474

461462

465470 462463464466467468469471472473

465465

467468

2.4%

2.5

2.4

2.4

2.3%

2.4%

2.8

3.0

2.0% 2.0%

2.0%

2.0%

2.0%

2.0%

2.0%

2.0%

76 83

TC

76 68

TC

77 08

TC-HP

64 52

LP

72 98

TC

72 98

TC

73 36

TC

73 36

TC

78 34

TC

78 34

TC

76 68

TC

74 61

TC-HP

74 14

GS

-4.0:1

-4.0 :1

-4.0:1

-4.0:1

-4.5:1

-3.0 :1

-3.0 :1

-3.0:1

-4.0:1

-4.0:1

-4.0:1

-5.

2:1

-3.0:1

-3.1:1

-4.0:1

-4.0:1

455 460 46 4454454455

54 32

INV

53 90

INV

73 64

TOP

72 90

TOP

69 54

TOP

66 91

TOP

64 76

TOP

67 24

TOP

76 42

TOP

76 59

TOP

TOP

64 76

TOP

69 54

TOP

12'

12'

'R

30'R

'R

30'R

300'R

ROAD C

ROAD C

ROAD C

PC

: 1

2+

.67

PT: 16

+02.

'R

22' 24'

M15(1)

M15(2)

M13(1)

M14(1)

M14(2)

BM15

BM13

BM14

24' 22'

35+

35+69

9+9210+00

11+00

12+00

13+00 14+00

15+00

16+00

17+00

18+00 18+31

10+00

11+00

+0

13+0013+1747256

0+00

0+71

ROAD 'C' PROFILE

EX

. G

RA

DE

PR

. G

RA

DE

C

L.

LP STA. = 14+96.60

LP ELEV. = 464.52

PVI STA. = 15+50

PVI ELEV. = 462.99'

A = 8.58 K = 23.30

200.00' VC

PV

C

ST

A.

= 1 4+

.00

PV

C

EL

EV

4.9 9'

PV

T S

TA

+5

0.0

PV

T E

LE

V.

= 4

.57

-2.00%

6.58%

2.00%

HP STA. = 17+90

HP ELEV. = 476.96

PVI STA. = 17+50

PVI ELEV. = 476.16'

A = -4.58 K = 17.45

80.00' VC

PV

C

ST

A.

= 1 7+

PV

C

EL

EV

3.5

2'

PV

T S

TA

+9

PV

T E

LE

V.

= 4

.96

3.9

5.7

3.4

4.8

2.9

4.4

2.4

3.7

1.9

2.7

1.4

2.3

0.9

1.5

0.4

1.0

9.9

0.8

9.4

0.1

8.9

9.0

8.4

8.3

7.9

7.5

7.4

7.1

6.9

6.8

6.4

6.7

5.9

6.4

5.4

5.9

4.9

5.8

4.6

5.9

4.5

5.7

4.7

5.6

5.1

6.0

5.8

6.4

6.8

7.2

8.0

7.5

9.5

1.4

1.2

2.8

2.8

5.6

4.4

8.5

5.7

1.7

6.5

7.5

7.1

2.6

6.5

PR. GRADE @

ROAD C/L

EX. GRADE

@ROAD C/L

COMPACTED STRUCTURAL

FILL PER GEOTECH REPORT

9+

.28 =C

EN

TE

R

OF

C

UL

-D E-

SA

C

EL

EV

.=4

.14

+1

1.3 3=

CL

IN

TX

. W

/ R

OA

D A

= S

TA

+2

9.6 8 -

R

OA

D A, EL

EV

.=4

.38

+3

4=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

5.4

+9

7=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

0.6

+0

3=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

3.1

+0

9=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

4.1

+6

9=

" S

TO

RM

SE

WE

R

X-

IN

G

IN

V.=

8.3

+6

0.3 7=

CO

MM

ON

PO

IN

T W

/ B

ID

O

PT

IO

N

BE

GI

N

AN

D

EN

D

CU

L-D

E-

SA

C

UN

WR

AP

FO

R

RO

AD

B

CO

NT

IN

UA

TIO

N

SE

E B

ID

O

PT

IO

N

SH

EE

T C T2

EL

EV

.=4

.78

ROAD C CDS UNWRAP PROFILE

EX

. G

RA

DE

PR

. G

RA

DE

C

L.

1.00% -1.00%

PV

I: 1

0+

.00

2.6 3'

IN

O

UT

: 1

.00

PV

I: 1

1+

.42

4.2 1'

IN

: 1

.00

OU

T:

-1.

PV

I: 1

3+

.83

2.6 3'

IN

: -1

.00

OU

T:

COMPACTED STRUCTURAL

FILL PER GEOTECH REPORT

2.6

4.1

2.8

4.2

3.1

4.6

3.3

5.7

3.6

6.3

3.8

6.9

4.1

7.2

4.0

6.8

3.8

6.2

3.5

5.7

3.3

5.5

3.0

4.7

2.8

4.5

EX. GRADE

@ROAD C/L

PR. GRADE @

ROAD C/L

+0

0=

BE

GI

N

CU

L-D

E-

SA

C

UN

WR

AP

+6 0.3

7-R

OA

D

RO

AD

C

), E

LE

V.=

2.6

+1

6.8 3=

EN

D

CU

L-D

E-

SA

C

UN

WR

AP

+6 0.3

7-R

OA

D C)

, E

LE

V.=

2.6

NORTH

GRAPHICAL SCALE: 1"=50'

50 25 0 50 100 150

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

CT204

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C T2

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456

ROADWAY C PLAN & PROFILE-BASE

3' (TYP.)

12'

30'R

30'R

97.60'R 500'R

RO

AD

A

ROAD B15+00 16+00

16+84.52

PT

: 1

4+

.02

PC

: 1

4+

.22

PT

: 1

6+

.02

+0

+0

+0

14+00

13+65

50' R

30'R

M12(1)

M12(2)

BM12

.37

(T

YP

57'

(TYP.)

70 32

GS

471472473

471472473474476477478479481482483484486487488489 491492493494

474 3.0

2.4

3.0

2.4

69 74

TC

69 75

TC

69 98

TC-HP

69 79

TC

70 76

TC

477478479

2.4

2.4

69 35

LP

-3.0:1

-3.

0:1

-3.

0:1

-3.

0:1

-3.0:1

75 83

GS

TC

75 67

TC-HP480

481482483484

TOP

70 12

TOP

72 81

TOP

72 81

TOP 69 59

TOP

69 58

TOP

TOP

73 47 73 65

73 81 73 84

73 7273 80 73 91

490500

24"

RC

P C

L II

I

30" RCP CL III

15"

RC

P C

L II

I

15" RCP CL III

24" RCP CL III 24

" R

CP

CL

III

24" RCP CL III 24" RCP CL III23

3'

(TYP.)

22'

24'

'R

30'R

400'R

ROAD D

ROAD B

10+

11+

10+20

11+00

12+00

13+00

14+00

PC: 10

+57.

PT

: 1

4+

.57

14+59.02

M16(1)

BM16

M16(2)

84.37'

(TYP.)

57'

(TYP.)

82 00

GS

473474476

477478

2.0

2.0

2.0

2.0

2.0

82 63

EP

82 83

TC

82 83

TC

82 42

TC

82 43

TC

TC

82 44

HP

480485490 478479481482483484486487488489491492493

-3.0:1

-3.0:1

-3.0 :1

-3.

0:1

-3.

0:1

-3.

0:1

TOP

82 48

TOP

80 50

TOP

22A

" R

CP

CL

III

15"

RCP CL II

I

15" RCP CL III

15" RCP CL III

10+

11+

10+00

11+00

12+00

13+00 14+00 14+59

PC: 10

+57.4

PT

: 1

4+

.57

48241 48200

ROAD 'B' PROFILE

EX

. G

RA

DE

PR

. G

RA

DE

C

L.

-2.00%1.50%

-3.07%

HP STA. = 10+99.28

HP ELEV. = 482.44

PVI STA. = 11+25

PVI ELEV. = 483.19'

A = -4.57 K = 32.85

150.00' VC

PV

C

ST

A.

= 1 0+

PV

C

EL

EV

2.0

7'

PV

T S

TA

+0

PV

T E

LE

V.

= 4

.89

5.4

1.9

6.4

2.0

7.6

2.3

8.6

2.4

0.4

2.3

2.3

2.0

4.0

1.5

5.8

0.8

5.0

0.1

3.3

9.3

3.0

8.5

1.3

7.8

0.0

7.0

0.0

6.2

9.1

5.5

0.2

4.7

0.9

3.9

0.9

3.2

2.0

PR. GRADE @

ROAD C/L

EX. GRADE

@ROAD C/L

COMPACTED STRUCTURAL

FILL PER GEOTECH REPORT

+2

0=

CL

IN

TX

. W / R

OA

D

D

ST

A 1

0+

.98

- R

OA

D

D, EL

EV

.=4

.00

+5

9.0 2=

CO

MM

ON

PO

IN

T W

/ B

AS

E B

ID

RE

MO

VE

C

UL

-D

E-

SA

C

BU

ILT

W

ITH

BA

SE

BI

D

FO

R

RO

AD

B

CO

NT

IN

UA

TIO

N

SE

E B

AS

E B

ID

SH

EE

T C

T2

EL

EV

.=4

.95

CT205

GRAPHICAL SCALE: 1"=50'

50 25 0 50 100 150

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C T2

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456

NORTH

ROADWAY B PLAN & PROFILE-BID

OPTION 3

3' (TYP.)

3' (TYP.)

12'

12'

45'

'R

30'R

'R

30'R

300'R

RO

AD

A

ROAD C

ROAD C

ROAD C

10+00

11+00

12+00

13+00 14+00

15+00

16+00

17+00

18+00 18+11.33

PC

: 1

2+

.67

PT: 16

+02.

35+

35+67.52

9+92

'R

22' 24'

M15(1)

M15(2)

M13(1)

M14(1)

M14(2)

BM15

BM13

BM14

.37

(T

YP

84.37'

(TYP.)

57'

(TYP.)

84.37'

(TYP.)

57'

(TYP.)

84.37'

(TYP.)

57'

(TYP.)

24' 22'

77 38

GS

78 14

EP

73 59

GS

477 478 479 481 482 483 484

486 487

457458459

466467468469

471472473

463 464 466 467 468 469

471 472 473 474

461462

465470 462463464466467468469471472473

465465

467468

2.4%

2.5

2.4

2.4

2.3%

2.4%

2.8

3.0

2.0% 2.0%

2.0%

2.0%

2.0%

2.0%

2.0%

2.0%

76 83

TC

76 68

TC

77 08

TC-HP

64 52

LP

72 98

TC

72 98

TC

73 36

TC

73 36

TC

78 34

TC

78 34

TC

76 68

TC

486487488489

74 61

TC-HP

GS

-4.0:1

-4.0 :1

-4.0:1

-4.0:1

-4.5:1

-3.0 :1

-3.0 :1

-3.0:1

-4.0:1

-4.0:1

-4.0:1

-5.

2:1

-3.0:1

-3.1:1

-4.0:1

-4.0:1

455 460 46 4454454455

54 32

INV

53 90

INV

73 64

TOP

72 90

TOP

69 54

TOP

66 91

TOP

64 76

TOP

67 24

TOP

76 42

TOP

76 59

TOP

67 13

TOP

64 76

TOP

69 54

TOP

4 45

45545 5 454

35' STREAM SETBACK

STREAM 2

54"

CMP

15"

RC

P C

L II

I

15" RCP CL III 18" RCP CL III

24" RCP CL III

24" RCP CL III

24" RCP CL III

" R

CP

CL

III

15"

RCP CL II

I

15"

RC

P C

L II

I

15" RCP CL III

C2

C1

10A

8A

7A

12'

'R

30'R

ROAD C

RO

AD

D

+0

+0

+6

2.5

10+20

10+60.37

73 59

GS

471 472 473 474

73 01

EP

73 20

TC

73 20

TC

72 98

TC

72 98

TC

74 37

TC

73 44

TC-HP

GS

65 74

GS

66 34

GS

66 84

HP

66 50

GS

66 00

GS

-3.0:1

-3.0:1

-3.0:1

INV

74 44

TOP

74 44

TOP

C5

15" RCP CL III

13 12

15" RCP CL III

15" RCP CL III

+0

16+00

16+64

10+00

10+61

ROAD 'C' PROFILE

EX

. G

RA

DE

PR

. G

RA

DE

C

L.

-2.00%

5.7

3.4

4.8

2.9

4.4

PR. GRADE @

ROAD C/L

EX. GRADE

@ROAD C/L

COMPACTED STRUCTURAL

FILL PER GEOTECH REPORT

+2

0=

CL

IN

TX

. W / R

OA

D

D = S

TA

+2 3.7

8 - R

OA

D

D, EL

EV

.=4

.59

+6

0.3 7=

CO

MM

ON

PO

IN

T W

/ B

AS

E B

ID

RE

MO

VE

C

UL

-D

E-

SA

C

BU

ILT

W

ITH

BA

SE

BI

D

FO

R

TH

E R

ES

T O F

RO

AD

C

SE

E B

AS

E B

ID

SH

EE

T C T2

EL

EV

.=4

.78

NORTH

GRAPHICAL SCALE: 1"=50'

50 25 0 50 100 150

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

CT206

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C T2

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

CDW 163RJP

Above Group

(321) 345-9026

Modjeski and Masters

(717) 790-9565

Aqua Engineering

(970) 372-6104

The LA Group

(518) 587-8100

Integrity Federal Services

(304) 725-8456

ROADWAY C PLAN & PROFILE-BID

12'

12'

30'R

30'R

ROAD C

10+00

11+00

12+00

PC: 12+36.67

9+92

50'R

22' 24'

M15(1)

M15(2)

M14(1)

BM15

57'

(TYP.)

84.37'

(TYP.)

57'

(TYP.)

73 59

GS

2.5% 2.4%

2.4%

2.3%

2.0

2.0

2.0

2.0 %2.0

72 98

TC72 98

TC

73 36

TC

73 36

TC

74 61

TC-HP

74 14

GS

-4.0:1

-4.0:1

-4.0:1

-4.0:1

-4.0:1

-4.0:1 -4.0:1

73 64

TOP

72 90

TOP

69 54

TOP

69 54

TOP

0 46

464 465 465

467 46

647747

482483

35' STREAM SETBACK

STREAM 1

STREAM 3

STREAM 4

STREAM 3

STREAM 1

STREAM 2

STREAM 2

15" RCP CL III

15" RCP CL III

10A

3' (TYP.)

12'

30'R

30'R

30'R

30'R

400'R

500'R

ROAD C

ROAD D

ROAD D

ROAD B

10+20

11+00

12+00

13+00 14+00

15+00

16+00

16+62.57

10+20

11+00

12+00

10+20

10+60.37

PC: 12+03.01

PC: 10+57.48

22' 24'

M16(1)

BM16

M16(2)

84.37'

(TYP.)

57'(TYP.)

73 59

GS

82 00

GS

480 473

477478

468469

471472473474 476477

470475480 471472473474476477478479

475480 474476477478479481482

473470

466467468469 471472473474

476477478

2.0%

2.0%

2.0%

82 63

EP

82 83

TC

82 83

TC

82 42

TC

82 43

TC

TC

73 01

EP

82 44

HP

73 20

TC

73 20

TC

72 98

TC72 98

TC

74 37

TC

73 44

TC-HP

65 00

GS

64 00

GS 64 16

INV6512

GS

65 74

GS

66 34

GS

66 84

HP

66 50

GS

66 00

GS

-3.0:1

-3.0:1

-3.

0:1

-3.

0:1

-3.

0:1

-3.

0:1

-3.0:1

-3.0:1

-3.2:1

-3.0:1

-3.0:1

60 69

INV

62 82

INV

INV

74 44

TOP

74 44

TOP

77 28

TOP

TOP

TOP

TOP82 48

TOP

C4 C6

C3 C5

42" RCP CL III

15" RCP CL III

15" RCP CL III

15" RCP CL III

" R

CP

CL

III

15" RCP CL III 15" RCP CL III

15" RCP CL III

10+19

11+00

12+00

13+00 14+00

15+00

16+00

16+64

PC

: 1

2+

.01

+0

+0

+0

PC: 10+57.48

10+00

10+61

48241

48200

ROAD 'D' PROFILE

EX

. G

RA

DE

PR

. G

RA

DE

C

L.

-1.50%

PV

I: 1

0+

.00

2.6 4'

IN

O

UT

: -1

.50

PV

I: 1

6+

.57

2.9 9'

IN

: -1

.50

OU

T:

2.5

8.5

2.1

7.1

1.8

5.3

1.4

3.6

1.0

2.4

0.6

2.2

0.3

1.2

9.9

0.6

9.5

9.9

9.1

9.3

8.8

8.7

8.4

8.6

8.0

7.8

7.6

6.7

7.3

2.0

6.9

4.0

6.5

3.7

6.1

4.7

5.8

5.2

5.4

4.4

5.0

5.0

4.6

5.4

4.3

5.3

3.9

4.8

3.5

5.0

3.2

5.2

PR. GRADE @

ROAD C/L

EX. GRADE

@ROAD C/L

+2

0=

BE

GI

N

RO

AD

C

ON

ST

RU

CT

IO

N

EL

EV

.=4

.63

+6

1.9 8=

CL

IN

TX

. W

/ R

OA

D B

= S

TA

+2

0 - R

OA

D

B, EL

EV

.=4

.00

COMPACTED STRUCTURAL

FILL PER GEOTECH REPORT

+2

3.7 8=

CL

IN

TX

. W

/ R

OA

D C

= S

TA

+2

0 - R

OA

D

C, EL

EV

.=4

.59

+6

2.5 7=

EN

D

OF

R

OA

D

CO

NS

TR

UC

TIO

N

EL

EV

.=4

.01

NORTH

GRAPHICAL SCALE: 1"=50'

50 25 0 50 100 150

VERTICAL SCALE: 1"=5'

0 2.5 5 10 15

CT207

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

MONTEVALLO, ALABAMA

927CM3003

OCTOBER 25, 2024 Dwg. of

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building NumberBID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

ALABAMA NATIONAL CEMETERY

GRAVESITE EXPANSION PHASE 3

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

A

LA

BA

MA

\E

NG

IN

\P

LA

NS

\C T2

.D

W G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .