S02_Combined Attachments.pdf

PDF 13 MB Posted

Attached to
Z2DZ--631-24-002_Renovate B5 Linen Rooms
Solicitation number
36C24124B0007
Issued by

About this file

This solicitation is for renovating linen rooms at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1 is seeking offers for project Solicitation Number 36C24124B0007 to renovate B5 linen rooms. Offerors should provide construction and design services to update the linen rooms in accordance with the requirements in the 13MB attachment. Proposals are due by the date specified in the solicitation document. The award will be granted to the responsible offeror whose offer follows the solicitation instructions and is determined most advantageous to the government considering price and other factors.

View the file

Other files

File Type Posted
S04_Sign In Roster B5 Renovate Linen Rooms 631-24-002.pdf PDF
36C24124B0007 0005.docx DOCX document
36C24124B0007 0004.docx DOCX document
36C24124B0007 0003.docx DOCX document
Pictures.pdf PDF
Combined Specs Renovate B5 Linen Rooms Project 631-24-002 V2.pdf PDF
Drawings.pdf PDF
36C24124B0007 0002.docx DOCX document
36C24124B0007 0001.docx DOCX document
S02_631-24-002 Drawings.pdf PDF
S02 Combined Specs Renovate B5 Linen Rooms Project 631-24-002.pdf PDF
36C24124B0007_1.docx DOCX document
S02_WD_MA20230003_10.13.2023.pdf PDF
S02_SOW_Renovate B5 Linen Rms.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A

PROJECT TITLE:

LOCATION:

CONTRACT NO.:

VA PROJECT NO.:

TO:

REQUEST SUBJECT:

Requested By:

Signed:

RESPONSE:

r

Edward P. Boland VA Medical Center VA Central Western Massachusetts Healthcare System

421 North Main Street

Leeds, MA 01053-9764

REQUEST FOR INFORMATION

NO.

DATE REQUIRED:

JOB:

CC:

Date:

This response does not constitute a change to the contract and is not an authorization to the contractor to proceed with any work that modifies the contract price or the time of performance. If the contractor believes that this response modifies any portion of the contract, the contractor shall make timely notice to the Contracting Officer and await the Contracting Officer's direction before proceeding with any work that the contractor believes is a modification to the contract.

r This response may constitute a change to the contract documents. Do not proceed with any work indicated in this response that changes the contract documents until directed in writing by the Contracting Officer.

Response By: Concur:

Signed:

Signed:

VA Project Manager

Date: Date:

Comments:

Complete Date and Time:

Location of Work:

HOT WORK PERMIT

THIS PERMIT IS REQUIRED FOR ANY TEMPORARY OPERATION INVOLVING OPEN FLAMES, HEAT, OR

SPARKS; SUCH AS" BRAZING, CUTTING, GRINDING OR WELDING (ANY TORCH USE).

INFORMATION

Safety personnel signing this permit must have valid 30 hour OSHA card and has verified, by his/her signature that all requirements located have been verified and completed.

REQUIRED PRECAUTIONS CHECKLIST

Available sprinklers, hose streams and

COR Final Check Name and Signature: Date:

Complete Date and Time:

Supervisor Name:

Supervisor's Signature:

Hot Work Technician VA Employee/Contractor Name:

Type of Hot Work to be Performed:

Start Date and Time:

Complete Date and Time:

HOT WORK PERMIT

THIS PERMIT IS REQUIRED FOR ANY TEMPORARY OPERATION INVOLVING OPEN FLAMES, HEAT, OR

SPARKS; SUCH AS" BRAZING, CUTTING, GRINDING OR WELDING (ANY TORCH USE).

INFORMATION REQUIRED PRECAUTIONS CHECKLIST

Available sprinklers, hose streams and extinguishers extinguishers are in service/operable? Safety personnel signing this permit must have valid 30 hour OSHA card and has verified, by his/her signature that all requirements located are in service/operable?

Hot work equipment inspected and in good repair?

Requirements within 35 ft. of work

Combustable floors wet down, covered with damp have been verified and completed.

Hot work equipment inspected and in good repair?

Hot Work Technician VA Employee/Contractor Name:

Requirements within 35 ft. of work

Combustable floors wet down, covered with damp sand or fire resistive sheets

Remove other combustables or cover with fire sand or fire resistive sheets

Remove other combustables or cover with fire blankets or curtains blankets or curtains

Wall and floor openings covered

Protect or shut down ducts that may carry sparks to Protect or shut down ducts that may carry sparks to

Location of Work: Wall and floor openings covered Work on walls, ceilings, or roofs combustable areas combustable areas

Type of Hot Work to be Performed: Work on walls, ceilings, or roofs

Construction is non-combustable Construction is non-combustable Combustables have been moved away

Work in enclosed equipment Enclosed permit quipment cleaned of all

Supervisor Name:

Supervisor's Signature:

Combustables have been moved away

Work in enclosed equipment Enclosed permit quipment cleaned of all combustables Containers purged of flammable liquids or vapors Start Date and Time: Containers purged of flammable liquids or vapors combustables Pressurized vessels/piping: isolated or vented Pressurized vessels/piping: isolated or vented Fire watch/monitoring of hot work area Complete Date and Time: Fire watch/monitoring of hot work area Fire watch shall be providedf 30 minutes after work Fire watch shall be providedf 30 minutes after work Fire watch shall be provided with extinguisher(s)

Fire watch is trained in the use of extinguishers and

Complete Date and Time: Fire watch shall be provided with extinguisher(s)

Fire watch is trained in the use of extinguishers and sounding alarm Fire watch may be required in adjoining areas to sounding alarm Complete Date and Time: Fire watch may be required in adjoining areas to Monitor hot work area for three hours after job is work work

Monitor hot work area for three hours after job is Safety Final Check and Approval Name and Signature: Date:

complete complete

Comments:

COR Final Check Name and Signature: Date:

Safety Final Check and Approval Name and Signature: Date:

VAMC Central Western Mass Environmental Health and Safety Leeds, MA 01053

Version 2/27/2018 Page 1 of 2

INTERM LIFE SAFETY MEASURES (ILSM) CHECKLIST

Project Name: __________________________ Project Number: ____________________

Project Start Date: ___________End Date: ___________ COR: __________________________

Yes No NA

Will any exits/means of egress be obstructed during construction such that alternate exits will have to be established?

If YES, then ensure that staff is notified/trained on alternate routes of exit and that proper signage is installed. Ensure that escape routes for construction workers are maintained at all times, and the means of exiting construction areas are inspected daily.

If NO, ensure that existing exit routes are free and unobstructed thru daily construction safety check.

Will access to emergency entrance be obstructed or will access by emergency forces (fire, police) be impaired?

If YES, ensure that alternate means of access or proper direction for emergency service personnel are provided

Will any fire alarm, detection or suppression system be impaired during this project?

If YES, provide temporary but equivalent system. Inspect temporary systems monthly.

If NO, ensure that they are in good working order.

Will temporary construction partitions be installed?

If YES, ensure that temporary construction partitions are smoke tight and built of noncombustible or limited combustible materials that will not contribute to the development or spread of fire. Ensure integrity of partitions during daily construction safety check.

Is additional fire-fighting equipment necessary?

If YES, ensure that they are provided and that staff are trained on their use.

Ensure that construction personnel are briefed on Medical Center’s “no smoking” policy and that “no smoking” signs are installed in and near the construction area.

Ensure that practices that reduce the building’s flammable and combustible fire load to the lowest feasible level are maintained and enforced (daily removal of debris, good housekeeping, and minimum storage of construction materials). This will be confirmed through daily construction checks and Medical Center staff's hazard surveillance.

If implementation of ILSMs is required, are 2 fire drills per shift per quarter required to be conducted?

If YES, ensure that fire dirll(s) are properly conducted and recorded/documented.

If implementation of ILSMs is required, then ensure that hazard surveillance of buildings, grounds, and equipment, with special attention to excavations, construction, areas, construction storage, and field offices, are conducted.

VAMC Central Western Mass Environmental Health and Safety Leeds, MA 01053

Version 2/27/2018 Page 2 of 2

Yes No NA

Are structural or compartmentalization features of fire safety impaired?

If YES, ensure that impacted staff are trained to compensate for impaired structural or compartmentalization features of fire safety.

Ensure that life safety building deficiencies, construction hazards, and ILSM for construction areas are announced in appropriate hospital communication channels.

General - Provide hospital wide safety education programs to promote awareness of life safety building deficiencies, construction hazards, and ILSM through the annual mandatory training.

COMMENTS:

COR Signature and Date Contractor Signature and Date

Safety Officer Signature and Date Fire Alarm Signature and Date

73 William Franks Drive

West Springfield. MA 01089 Telephone: (413) 781-0070 www: oneatlas.com

September 30, 2022

Mr. Daniel Witczak Acela Architects & Engineers 4969 Hamilton Blvd.

Allentown, PA 18106

RE: Asbestos & Lead Testing Report (Rev 1)

EHRM Infrastructure IT Upgrades Project Northampton Veteran’s Administration Medical Center VA Project #621-21-700 Leeds, Massachusetts

Dear Mr. Witczak:

Atlas Technical Consultants, LLC (ATLAS) was retained Acela Architects & Engineers to perform asbestos and lead paint testing as part of the forthcoming EHRM Infrastructure IT Upgrades Project at the Northampton Veterans Administration Medical Center located in Leeds, Massachusetts.

Specifically, ATLAS’s Scope of Work included:

1. Performance of an Asbestos Inspection for suspect asbestos-containing materials (ACM) to be disturbed as part of the forthcoming Building Foundation Repair Project to determine the type, location, condition, and quantity of ACM present.

2. Assessment as to the presence of lead-containing paint on architectural and structural components within areas to be renovated in the buildings.

3. Provide a written summary of on-site findings, including remediation requirements.

Limitations:

ATLAS’s survey only include the areas to be affected by the work at Buildings 1, 2, 3, 4, 5, 6, 7, 8, 9, 11, 12, 13, 14, 16, 22, 25 & 60, No other interior or exterior areas within each building were inspected by ATLAS.

ATC also utilized test results from Mabbett & Associates, Inc. “Asbestos-Containing Material & Lead Containing Paint Reports” for each building dated December 30, 2010 to confirm the presence of lead and/or asbestos-containing materials within areas subject to renovation work.

Outlined below is a summary of ATLAS’s findings:

I. ASBESTOS SURVEY

ATLAS's asbestos inspection included a visual assessment of accessible suspect asbestos-containing materials and subsequent bulk sampling and analysis was performed. The Asbestos inspection and bulk sampling was performed in accordance with the methods outlined in the U.S.

EPA guidance document titled, Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5-85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, Asbestos Hazard Emergency Response Act (AHERA) requirements for number of samples and types of asbestos materials to be sampled. According to these requirements, materials are classified as either surfacing (e.g., ceiling plaster, wall plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, wallboard).

Asbestos & Lead Testing Report (Rev 1) EHRM Infrastructure IT Upgrades Project

Northampton VA Medical Center

The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases.

All bulk samples were analyzed for asbestos content using Polarized Light Microscopy (PLM) with Dispersion Staining EPA Method 600/R-93/116 per 40 CFR 763. To qualify as asbestos containing, the material must be determined to contain greater than one percent (>1%) asbestos from a homogeneous material area set of samples.

Consequently, according to the EPA/AHERA criteria, all bulk samples from a homogeneous area must be found to contain less than or equal to one percent (<1%) asbestos in order to be classified as non-asbestos-containing.

Findings:

Asbestos-containing materials were detected at the site buildings (excluding Building 14).

In accordance with Massachusetts Department of Environmental Protection (DEP) and

EPA’s National Emission Standards for Hazardous Air Pollutants (NESHAP) Regulations, materials found to be asbestos-containing must be abated prior to renovation/demolition activities.

All asbestos abatement work shall be performed by a Massachusetts licensed asbestos abatement contractor in accordance with local, state and federal regulations.

Refer to Attachment A for Table 1.0 that summarizes materials confirmed to be asbestos-containing at each building.

Refer to Attachment B for the Asbestos Bulk Sample Analysis Laboratory Reports.

Refer to Attachment D for a summary of materials found to be non-asbestos at each building.

II. LEAD-CONTAINING PAINT SURVEY

ATLAS performed a random lead paint inspection of painted, stained or varnished architectural components located at areas subject to renovation work. All testing was performed utilizing a portable X-Ray Fluorescent (XRF) Analyzer.

For reporting, the areas subject to renovation work were divided into “testing combinations”.

Testing combinations are defined as types of painted building components that appear uniform in paint color and architectural feature.

A Niton XL-309 spectrum analyzer lead detector, serial number U10314364LY was used for all on-site XRF testing. The instrument adjusts the length of each reading based upon the substrate, until a 95% confidence level is achieved. All personnel who operated the portable XRF analyzer were trained by the manufacturer in safety measures and testing protocols.

In accordance with the Occupational Safety and Health Administration (OSHA), any detectable result of lead constitutes the material to be considered lead-containing and subject to the compliance with OSHA 29 CFR 1926.62 Regulations during construction.

Asbestos & Lead Testing Report (Rev 1) EHRM Infrastructure IT Upgrades Project

Findings:

1. Lead-containing paint was detected at each building.

2. In general, the results are above the OSHA threshold of 0.0 which will require the Contractor to comply with OSHA 29 CFR 1926.62 Regulations with regards to protection of employees during renovation/demolition activities.

3. The buildings are not considered residences where children under the age of six (6) would reside, therefore abatement of lead-containing components will not be required as per Massachusetts Department of Public Health (DPH) "Child Lead Poisoning and Prevention Regulations.

All demolition debris shall be subject to federal Environmental Protection Agency (EPA) Resource Conservation and Recovery Act (RCRA) and Massachusetts Department of Environmental Protection (DEP) Regulations with regards to disposal.

Refer to Refer to Attachment C for Table 2.0 that summarizes the lead testing results for each building.

If you have any questions regarding this report or require additional information, please give Derrick Wissman a call directly at (413) 664-6687.

ATLAS TECHNICAL CONSULTANTS, LLC

Derrick Wissman Brian Williams Senior Project Manager Area Manager derrick.wissman@oneatlas.com brian.williams@oneatlas.com

Limitations - This survey was limited to accessible areas and no destructive investigation techniques were used to access hidden materials or locations. Because ATLAS could not access these areas during the survey, hazardous materials may exist at inaccessible areas of the buildings. Additionally, the passage of time may result in a change in the environmental characteristics at this site. This report does not warrant against future operations or conditions that could affect the conclusions made in this report. The results, findings and conclusions expressed in this report are based only on conditions that were observed during ATLAS’s site visit. ATLAS provided these services consistent with a level of skill ordinarily exercised by members of the profession currently practicing under similar conditions. This statement is in lieu of other statements either expressed or implied. This report is intended for the sole use of Acela Architect & Engineers. The scope of services performed in execution of this evaluation may not be appropriate to satisfy the needs of other users, and use or re-use of this document, the findings, conclusions, or recommendations is at the risk of said user.

ATTACHMENT A

Asbestos & Lead Testing Report (Rev 1) EHRM Infrastructure IT Upgrades Project

SUMMARY OF CONFIRMED ACM

(TABLE 1.0)

TABLE 1.0

SUMMARY OF ASBESTOS-CONTAINING MATERIALS TO BE ABATED

09-30-2022

# BUILDING LOCATION MATERIAL AMOUNT UNIT NOTES/COMMENTS

1 1 1071 Black Foundation Coat 120 SF

2 1 1071 Gold Mastic on Plaster Wall 620 SF

3 1 1071 Window Caulking and Glazing Compound 1 EA

4 1 2101 Window Caulking and Glazing Compound 1 EA

5 1 2111 Black Foundation Coat 200 SF

6 1 1262 Bath Pipe & Fitting Insulation 30 LF Inside wall chases

7 1 1270 IT/Bath Black Foundation Coat 355 SF

8 1 1270 IT/Bath Pipe & Fitting Insulation 30 LF Inside wall chases

9 1 1270 IT/Bath Window Caulking and Glazing Compound 1 EA

10 1 1-2WC-28 Black Foundation Coat 300 SF

11 1 2103 Bath Floor Tile & Mastic 85 SF Includes multiple layers of flooring as ACM

12 1 2103 Bath Pipe & Fitting Insulation 60 LF Inside wall chases

13 1 2111, 2-TE-2 Server Closet Floor Tile & Mastic 52 SF Includes multiple layers of flooring as ACM

14 1 B017 (Barber Shop/Storage B) Floor Tile & Mastic 180 SF

15 1 B017 (Barber Shop/Storage B) Pipe & Fitting Insulation 30 LF Inside wall chases

16 1 B017 (Barber Shop/Storage B) Window Caulking and Glazing Compound 1 EA

17 1 B111 Pipe & Fitting Insulation 2 LF

18 1 B241 Gold Mastic on Plaster Wall 20 SF

19 1 B241 Window Caulking and Glazing Compound 1 EA

20 2 208 Floor Tile & Mastic 1000 SF

21 2 208 Fire Door 1 EA

22 2 213 Floor Tile & Mastic 900 SF Entrance & under raised floor

23 2 213 Glue Daubs associated with 1'x1' Ceiling Tiles 900 SF Above suspended ceiling tiles

24 2 213 Fire Door 1 EA

25 2 Room 113 Pipe & Fitting Insulation 20 LF Inside wall chases

26 2 Room 114 Pipe & Fitting Insulation 20 LF Inside wall chases

27 2 Room 115A Custodial Window Caulking and Glazing Compound 1 EA

28 2 Room 115C IT Window Caulking and Glazing Compound 1 EA

29 2 Room 116 Bath Window Caulking and Glazing Compound 2 EA

30 3 121 Men's Bath Mastic Under Ceramic Threshold 3 SF

31 3 121 Men's Bath Pipe & Fitting Insulation 50 LF Inside wall chases

32 3 124 Custodial Pipe & Fitting Insulation 50 LF Inside wall chases

33 3 124 Custodial Mastic Under Ceramic Threshold 3 SF

34 3 Room 120 Pipe & Fitting Insulation 50 LF Inside wall chases

35 3 Room 120 Pipe & Fitting Insulation 20 LF

36 3 Room 120 Window Caulking and Glazing Compound 1 EA

EA = Each

LF = Linear Foot

SF = Square Foot

09-30-2022

# BUILDING LOCATION MATERIAL AMOUNT UNIT NOTES/COMMENTS

37 3 Room 122 IT Floor Tile & Mastic 36 SF

38 3 Room 123 IT Floor Tile & Mastic 36 SF

39 3 Room 218 Flooring Materials (All Layers) 100 SF Includes floor tile/mastic and ceramic tile/mastic

40 3 Room 218 Window Caulking and Glazing Compound 1 EA

41 3 Room 221 Glue Daubs on Ceiling 40 SF

42 3 Room 221 Floor Tile & Mastic 36 SF

43 3 Room 222 Mastic Under Ceramic Threshold 3 SF

44 3 Room 222 Pipe & Fitting Insulation 50 LF

45 4 233 Office & Common Area Window Caulking and Glazing Compound 1 EA

46 4 Room 104 Office Window Caulking and Glazing Compound 1 EA

47 5 Room 17 Fire Door 1 EA

48 5 Room 17 Black Mastic on Wood Ceiling 505 SF

49 5 Room 17 Pipe & Fitting Insulation 35 LF Inside wall chases

50 6 Room 116 Pipe & Fitting Insulation 6 LF Above plaster ceiling

51 6 Room 116 Sprinkler Pipe Thread 1 LF

52 6 Room 117 Sprinkler Pipe Thread 1 LF

53 6 Room 117 Window Caulking and Glazing Compound 1 EA

54 6 Room 213/217 Sprinkler Pipe Thread 1 LF

55 6 Room 213/217 Window Caulking and Glazing Compound 1 EA

56 6 Room 213/217 Floor Tile & Mastic 310 SF

57 9 Basement Room 2 Storage Asbestos Debris in Gravel 400 SF Includes removal of all debris and materials as ACM

58 9 Basement Sprinkler Pipe Thread 100 LF

59 11 1071 Pipe & Fitting Insulation 60 LF Inside wall chases

60 11 B017 (Barber Shop/Storage B) Glue Daubs on Ceiling 10 SF

61 11 Room 105 Pipe & Fitting Insulation 20 LF Inside wall chases

62 11 Room 105 Window Caulking and Glazing Compound 1 EA

63 11 Room 210 Glue Daubs associated with 1'x1' Ceiling Tiles 160 SF

64 11 Room 210 Window Caulking and Glazing Compound 2 EA

65 11 Room 210 Floor Tile & Mastic 160 SF

66 11 Room 210A Floor Tile & Mastic 96 SF

67 11 Room 210A Glue Daubs associated with 1'x1' Ceiling Tiles 96 SF

68 11 Room 210A Pipe & Fitting Insulation 50 LF Inside wall chases

69 11 Room 210A Window Caulking and Glazing Compound 1 EA

70 11 Room B6 Locker Window Caulking and Glazing Compound 1 EA

71 11 Room B7 Pipe & Fitting Insulation 20 LF Inside wall chases

72 11 Room B7 Window Caulking and Glazing Compound 1 EA

EA = Each

LF = Linear Foot

SF = Square Foot

ATTACHMENT A

VHANHMCarlaJ Highlight

VHANHMCarlaJ Oval

09-30-2022

# BUILDING LOCATION MATERIAL AMOUNT UNIT NOTES/COMMENTS

73 11 Room B8 Window Caulking and Glazing Compound 1 EA

74 11 Room 002A Window Caulking and Glazing Compound 2 EA

75 12 Basement B009B Pipe & Fitting Insulation 30 LF

76 12 Room 146 Floor Tile & Mastic 100 SF Under carpeting

77 12 Room 147 Carpet Adhesive 100 SF

78 12 Room 255 Flooring Materials (All Layers) 180 SF Includes multiple layers of flooring as ACM

79 12 Room 255 Window Caulking and Glazing Compound 2 EA

80 12 Steam Tunnel Pipe Fittings on Fiberglass Lines 5 EA

81 13 Break Room Flex Connector 1 EA

82 13 Break Room Window Caulking and Glazing Compound 1 EA

83 16 B101/Renovation Area Sprinkler Pipe Thread 2 LF

84 16 Basement Bathroom Mirror Adhesive 1 EA

85 16 Basement Bathroom Sprinkler Pipe Thread 1 LF

86 16 Basement Bathroom Window Caulking and Glazing Compound 2 EA

87 22 Kitchen Flooring Materials (All Layers) 200 SF

88 22 Kitchen Cove Base and Mastic 10 LF At cabinet being removed

89 22 Kitchen Backsplash 15 SF At cabinet being removed

90 22 Kitchen Pipe & Fitting Insulation 20 LF Inside wall chases

91 22 Vestibule Flooring Materials (All Layers) 80 SF

92 22 Office Flooring Materials (All Layers) 180 SF

93 22 Laboratory - 1st Floor Flooring Materials (All Layers) 40 SF

94 22 Bathroom - 1st Floor Ceramic Flooring/Adhesive 15 SF

95 22 Bathroom 204 - 2nd Floor Flooring Materials (All Layers) 35 SF Includes ceramic tile/adhesive underneath

96 22 Exterior Roofing Material 760 SF

97 22 Exterior Window Caulking and Glazing Compound 13 EA Vestibule & Office Windows

98 22 Basement Pipe & Fitting Insulation 260 LF Includes all remaining ACM pipe in Basement

99 22 Basement Window Caulking and Glazing Compound 4 EA At Storage Room and Carport

100 25 Room 02 Pipe & Fitting Insulation 30 LF

101 25 Room 02 Sprinkler Pipe Thread 3 LF

102 25 Room 107 Pipe & Fitting Insulation 58 LF Inside wall chases

103 25 Room 107 Window Caulking and Glazing Compound 1 EA

104 25 Room 108 Pipe & Fitting Insulation 58 LF Inside wall chases

105 25 Room 108 Window Caulking and Glazing Compound 1 EA

106 25 Room 208 Window Caulking and Glazing Compound 1 EA

107 25 Room 209 Custodial Floor Tile & Mastic 20 SF

108 25 Room 210 Floor Tile & Mastic 25 SF

EA = Each

LF = Linear Foot

09-30-2022

# BUILDING LOCATION MATERIAL AMOUNT UNIT NOTES/COMMENTS

109 25 Room 210 Restroom Window Caulking and Glazing Compound 1 EA

110 25 Room 210 Restroom Pipe & Fitting Insulation 50 LF Inside wall chases

111 26 Basement IT Closet Window Caulking and Glazing Compound 1 EA

112 60 Exterior Window Caulking and Glazing Compound 2 EA

EA = Each

LF = Linear Foot

ATTACHMENT B

Asbestos & Lead Testing Report (Rev 1) EHRM Infrastructure IT Upgrades Project

ATTACHMENT B

PLM BULK ASBESTOS LABORATORY REPORTS

EMSL Analytical, Inc.

307 West 38th Street New York, NY 10018

Tel/Fax: (212) 290-0051 / (212) 290-0058 http://www.EMSL.com / manhattanlab@emsl.com

032204821EMSL Order:

ATC62Customer ID:

11-81-0030Customer PO:

Project ID:

Attention: Phone:Derrick Wissman (413) 781-0070

Fax:Atlas Technical (413) 781-3734

Received Date:73 William Franks Drive 03/31/2022 10:12 AM

Analysis Date:West Springfield, MA 01089 04/07/2022

Collected Date: 03/30/2022

Project: 183DW22028/ Northampton VA Building 1/ Leeds, MA

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous % Type

Non-Asbestos Asbestos

VA1-06A

032204821-0001

Room 1071 - Joint

Compound

White

Fibrous

Homogeneous

None DetectedCellulose

Glass

5%

3%

10%

45%

7%

15%

15.0%

Quartz

Ca Carbonate

Mica

Perlite

Non-fibrous (Other)

VA1-06B

032204821-0002

Room 2103 Bath - Joint

Compound

White

Non-Fibrous

Homogeneous

None Detected35%

50%

5%

10.0%

Ca Carbonate

Gypsum

Mica

Non-fibrous (Other)

VA1-07A

032204821-0003

Room 1071 - Gold

Mastic On Plaster Wall

Brown

Non-Fibrous

Homogeneous

Chrysotile15%5%

10%

70.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

VA1-07B

032204821-0004

Room 1071 - Gold

Mastic On Plaster Wall

Positive Stop

(Not Analyzed)

VA1-08A

032204821-0005

Room 1071 - 4" Tan

Cove Base

Tan

Non-Fibrous

Homogeneous

None Detected7%

65%

3%

25.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-08B

032204821-0006

Room 1071 - 4" Tan

Cove Base

Tan

Non-Fibrous

Homogeneous

None Detected15%

60%

5%

20.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-08C

032204821-0007

2nd Floor 2-TE-2 IT

Closet - 4" Tan Cove

Base

Tan

Non-Fibrous

Homogeneous

None Detected40%

60.0%

Ca Carbonate

Non-fibrous (Other)

VA1-09A

032204821-0008

Room 1071 - Mastic

Under 4" Tan Cove

Base

Brown

Non-Fibrous

Homogeneous

None Detected10%

25%

5%

60.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-09B

032204821-0009

Room 1071 - Mastic

Under 4" Tan Cove

Base

Brown

Non-Fibrous

Homogeneous

None Detected7%

30%

3%

60.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received. Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA

600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample.

Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. New York, NY AIHA-LAP, LLC--IHLAP Accredited #102581, NVLAP Lab Code 101048-9, NJ NY022, CT PH-0170, MA AA000170

Initial report from: 04/07/2022 18:02:56

ASB_PLMwSigs_0007_0001 Printed:4/7/2022 7:54:25PM Page 1 of 6

Tel/Fax: (212) 290-0051 / (212) 290-0058 http://www.EMSL.com / manhattanlab@emsl.com

032204821EMSL Order:

ATC62Customer ID:

11-81-0030Customer PO:

Project ID:

Attention: Phone:Derrick Wissman (413) 781-0070

Fax:Atlas Technical (413) 781-3734

Received Date:73 William Franks Drive 03/31/2022 10:12 AM

Analysis Date:West Springfield, MA 01089 04/07/2022

Collected Date: 03/30/2022

Project: 183DW22028/ Northampton VA Building 1/ Leeds, MA

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous % Type

Non-Asbestos Asbestos

VA1-09C

032204821-0010

2nd Floor 2-TE-2 IT

Closet - Mastic Under

4" Tan Cove Base

Brown

Non-Fibrous

Homogeneous

None Detected100.0% Non-fibrous (Other)

VA1-10A

032204821-0011

Room 1071 - Mastic

Under Self Adhesive

Carpet Tile

Various

Non-Fibrous

Homogeneous

None DetectedCellulose

Synthetic

3%

2%

25%

15%

5%

50.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-10B

032204821-0012

Room 2101 - Mastic

Under Self Adhesive

Carpet Tile

Yellow

Non-Fibrous

Homogeneous

None Detected25%

75.0%

Quartz

Non-fibrous (Other)

VA1-13A

032204821-0013

1262 Bath - 1'x1' Gray

Ceramic Floor Tile

Grout

Gray

Non-Fibrous

Homogeneous

None Detected20%

50%

5%

25.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-13B

032204821-0014

1262 Bath - 1'x1' Gray

Ceramic Floor Tile

Grout

Gray

Non-Fibrous

Homogeneous

None Detected65%

20%

15.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

VA1-14A

032204821-0015

1262 Bath - 1'x1' Gray

Ceramic Floor Tile

Mastic

Yellow

Non-Fibrous

Homogeneous

None Detected7%

15%

3%

75.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-14B

032204821-0016

1262 Bath - 1'x1' Gray

Ceramic Floor Tile

Mastic

Yellow

Non-Fibrous

Homogeneous

None Detected20%

80.0%

Ca Carbonate

Non-fibrous (Other)

VA1-16A

032204821-0017

1270 Bath - Black

Foundation Coat

Black

Non-Fibrous

Homogeneous

Chrysotile5%10%

15%

70.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

VA1-16B

032204821-0018

1270 Bath - Black

Foundation Coat

Positive Stop

(Not Analyzed)

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received. Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA

600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample.

Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. New York, NY AIHA-LAP, LLC--IHLAP Accredited #102581, NVLAP Lab Code 101048-9, NJ NY022, CT PH-0170, MA AA000170

ASB_PLMwSigs_0007_0001 Printed:4/7/2022 7:54:25PM Page 2 of 6

Tel/Fax: (212) 290-0051 / (212) 290-0058 http://www.EMSL.com / manhattanlab@emsl.com

032204821EMSL Order:

ATC62Customer ID:

11-81-0030Customer PO:

Project ID:

Attention: Phone:Derrick Wissman (413) 781-0070

Fax:Atlas Technical (413) 781-3734

Received Date:73 William Franks Drive 03/31/2022 10:12 AM

Analysis Date:West Springfield, MA 01089 04/07/2022

Collected Date: 03/30/2022

Project: 183DW22028/ Northampton VA Building 1/ Leeds, MA

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous % Type

Non-Asbestos Asbestos

VA1-17A

032204821-0019

1270 Bath - 4"x4"

Whiter Ceramic Wall

Tile Grout

Gray/White

Non-Fibrous

Homogeneous

None Detected3%

45%

2%

20%

30.0%

Quartz

Ca Carbonate

Mica

Perlite

Non-fibrous (Other)

VA1-17B

032204821-0020

1270 Bath - 4"x4"

Whiter Ceramic Wall

Tile Grout

White

Non-Fibrous

Homogeneous

None Detected70%

8%

22.0%

Ca Carbonate

Gypsum

Non-fibrous (Other)

VA1-18A

032204821-0021

1270 Bath - 4"x4"

Whiter Ceramic Wall

Tile Mastic

Gray

Non-Fibrous

Homogeneous

None Detected20%

45%

5%

30.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-18B

032204821-0022

1270 Bath - 4"x4"

Whiter Ceramic Wall

Tile Mastic

Gray

Non-Fibrous

Homogeneous

None Detected50%

35%

8%

7.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other) Sample material appears to be Ceramic Wall Tile Mortar.

VA1-19A

032204821-0023

1270 Bath - Brown

Ceramic Floor Tile

Grout

Gray

Non-Fibrous

Homogeneous

None Detected35%

40%

5%

20.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-19B

032204821-0024

1270 Bath - Brown

Ceramic Floor Tile

Grout

Gray

Non-Fibrous

Homogeneous

None Detected40%

45%

5%

10.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-20A

032204821-0025

1270 Bath - Brown

Ceramic Floor Tile

Mastic

Gray

Non-Fibrous

Homogeneous

None Detected25%

45%

5%

10%

15.0%

Quartz

Ca Carbonate

Mica

Perlite

Non-fibrous (Other)

VA1-20B

032204821-0026

1270 Bath - Brown

Ceramic Floor Tile

Mastic

Insufficient

Material

Sample bag contains Brown Ceramic Floor Tile only.

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received. Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA

600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample.

Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. New York, NY AIHA-LAP, LLC--IHLAP Accredited #102581, NVLAP Lab Code 101048-9, NJ NY022, CT PH-0170, MA AA000170

ASB_PLMwSigs_0007_0001 Printed:4/7/2022 7:54:25PM Page 3 of 6

Tel/Fax: (212) 290-0051 / (212) 290-0058 http://www.EMSL.com / manhattanlab@emsl.com

032204821EMSL Order:

ATC62Customer ID:

11-81-0030Customer PO:

Project ID:

Attention: Phone:Derrick Wissman (413) 781-0070

Fax:Atlas Technical (413) 781-3734

Received Date:73 William Franks Drive 03/31/2022 10:12 AM

Analysis Date:West Springfield, MA 01089 04/07/2022

Collected Date: 03/30/2022

Project: 183DW22028/ Northampton VA Building 1/ Leeds, MA

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous % Type

Non-Asbestos Asbestos

VA1-23A

032204821-0027

B017 Barbershop -

1'x1' White W/Black

Specks Floor Tile

Tan

Non-Fibrous

Homogeneous

Chrysotile3%10%

55%

32.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

VA1-23B

032204821-0028

B017 Barbershop -

1'x1' White W/Black

Specks Floor Tile

Positive Stop

(Not Analyzed)

VA1-24A

032204821-0029

B017 Barbershop -

Mastic 1'x1' White

W/Black Specks Floor

Tile

Black

Non-Fibrous

Homogeneous

None DetectedCellulose5% 7%

15%

3%

70.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-24B

032204821-0030

B017 Barbershop -

Mastic 1'x1' White

W/Black Specks Floor

Tile

Black

Non-Fibrous

Homogeneous

None Detected10%

90.0%

Ca Carbonate

Non-fibrous (Other)

VA1-25A

032204821-0031

B017 Barbershop - 4"

Old Black Cove Base

Brown/Black

Non-Fibrous

Homogeneous

None DetectedCellulose60% 5%

10%

25.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

VA1-25B

032204821-0032

B017 Barbershop - 4"

Old Black Cove Base

Brown/Black

Fibrous

Homogeneous

None DetectedCellulose85% 15.0% Non-fibrous (Other)

VA1-26A

032204821-0033

B017 Barbershop -

Mastic Under 4" Old

Black Cove Base

Brown

Non-Fibrous

Homogeneous

None DetectedCellulose80% 3%

5%

2%

10.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other) Inseparable paint / coating layer included in analysis.

VA1-26B

032204821-0034

B017 Barbershop -

Mastic Under 4" Old

Black Cove Base

Yellow

Non-Fibrous

Homogeneous

None DetectedCellulose5% 15%

80.0%

Ca Carbonate

Non-fibrous (Other)

VA1-27A

032204821-0035

Room 2103 Bath - 1'x1'

Gray W/White Specks

Floor Tile

Tan

Non-Fibrous

Homogeneous

None Detected10%

45%

45.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received. Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA

600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample.

Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. New York, NY AIHA-LAP, LLC--IHLAP Accredited #102581, NVLAP Lab Code 101048-9, NJ NY022, CT PH-0170, MA AA000170

ASB_PLMwSigs_0007_0001 Printed:4/7/2022 7:54:25PM Page 4 of 6

Tel/Fax: (212) 290-0051 / (212) 290-0058 http://www.EMSL.com / manhattanlab@emsl.com

032204821EMSL Order:

ATC62Customer ID:

11-81-0030Customer PO:

Project ID:

Attention: Phone:Derrick Wissman (413) 781-0070

Fax:Atlas Technical (413) 781-3734

Received Date:73 William Franks Drive 03/31/2022 10:12 AM

Analysis Date:West Springfield, MA 01089 04/07/2022

Collected Date: 03/30/2022

Project: 183DW22028/ Northampton VA Building 1/ Leeds, MA

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous % Type

Non-Asbestos Asbestos

VA1-27B

032204821-0036

2nd Floor 2-TE-2 IT

Closet - 1'x1' Gray

W/White Specks Floor

Tile

Insufficient

Material

Sample bag is empty.

VA1-28A

032204821-0037

Room 2103 Bath -

Mastic 1'x1' Gray

W/White Specks Floor

Tile

Black

Non-Fibrous

Homogeneous

Chrysotile10%5%

25%

60.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

VA1-28B

032204821-0038

2nd Floor 2-TE-2 IT

Closet - Mastic 1'x1'

Gray W/White Specks

Floor Tile

Positive Stop

(Not Analyzed)

VA1-29A

032204821-0039

Room 2103 Bath - 6"

Tan Cove Base

Beige

Non-Fibrous

Homogeneous

None Detected10%

70%

20.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

VA1-29B

032204821-0040

Room 2101 - 6" Tan

Cove Base

Tan

Non-Fibrous

Homogeneous

None Detected40%

10%

50.0%

Ca Carbonate

Gypsum

Non-fibrous (Other)

VA1-30A

032204821-0041

Room 2103 Bath -

Mastic Under 6" Tan

Cove Base

Brown

Non-Fibrous

Homogeneous

None Detected5%

10%

85.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

VA1-30B

032204821-0042

Room 2101 - Mastic

Under 6" Tan Cove

Base

Brown

Non-Fibrous

Homogeneous

None Detected20%

80.0%

Ca Carbonate

Non-fibrous (Other)

VA1-33A

032204821-0043

Room 2101 - 2'x2'

Smooth Ceiling Tile

Brown

Fibrous

Homogeneous

None DetectedCellulose

Glass

35%

30%

5%

15%

15.0%

Quartz

Perlite

Non-fibrous (Other)

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received. Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA

600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample.

Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. New York, NY AIHA-LAP, LLC--IHLAP Accredited #102581, NVLAP Lab Code 101048-9, NJ NY022, CT PH-0170, MA AA000170

ASB_PLMwSigs_0007_0001 Printed:4/7/2022 7:54:25PM Page 5 of 6

Tel/Fax: (212) 290-0051 / (212) 290-0058 http://www.EMSL.com / manhattanlab@emsl.com

032204821EMSL Order:

ATC62Customer ID:

11-81-0030Customer PO:

Project ID:

Attention: Phone:Derrick Wissman (413) 781-0070

Fax:Atlas Technical (413) 781-3734

Received Date:73 William Franks Drive 03/31/2022 10:12 AM

Analysis Date:West Springfield, MA 01089 04/07/2022

Collected Date: 03/30/2022

Project: 183DW22028/ Northampton VA Building 1/ Leeds, MA

The samples in this report were submitted to EMSL for analysis by Asbestos Analysis of Bulk materials via

EPA/600 (0513) Method using Polarized Light Microscopy. The reference number for these samples is the

EMSL Order ID above. Please use this reference number when calling about these samples.

Report Comments:

Sample Receipt Date:

Analysis Completed Date:

Sample Receipt Time:

Analysis Completed Time:

03/31/2022 10:12 AM

04/07/2022 5:17 PM

Analyst(s):

Christopher Cernansky PLM (14) Kerrie Gibson PLM (23)

Samples Reviewed and approved by:

Charles Johnson, Asbestos Laboratory Manager or other approved signatory

EMSL maintains liability limited to cost of analysis . Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . The report reflects the samples as received. Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA

600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government . Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample.

Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. New York, NY AIHA-LAP, LLC--IHLAP Accredited #102581, NVLAP Lab Code 101048-9, NJ NY022, CT PH-0170, MA AA000170

ASB_PLMwSigs_0007_0001 Printed:4/7/2022 7:54:25PM Page 6 of 6

OrderID: 032204821

Tel/Fax: (212) 290-0051 / (212) 290-0058 http://www.EMSL.com / manhattanlab@emsl.com

032215821EMSL Order:

ATC62Customer ID:

11-81-0030Customer PO:

Project ID:

Attention: Phone:Edward Kolodziej (413) 426-6819

Fax:Atlas Technical (413) 781-3734

Received Date:73 William Franks Drive 09/16/2022 12:25 PM

Analysis Date:West Springfield, MA 01089 09/20/2022

Collected Date: 09/09/2022

Project: ACELA Architects/ VA Medical Center, Leeds, MA - Building 1

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous % Type

Non-Asbestos Asbestos

VA1-01A

032215821-0001

2238 - Black Felt

Behind Concrete and

Terracotta

Black

Non-Fibrous

Homogeneous

None DetectedGlass35% 65.0% Non-fibrous (Other)

Inseparable

VA1-01B

032215821-0002

2238 - Black Felt

Behind Concrete and

Terracotta

Black

Fibrous

Homogeneous

None DetectedCellulose15% 85.0% Non-fibrous (Other)

VA1-02A

032215821-0003

2238 - Sprinkler Pipe

Thread

Tan

Non-Fibrous

Homogeneous

None Detected100.0% Non-fibrous (Other)

VA1-02B

032215821-0004

2233 - Sprinkler Pipe

Thread

Tan

Non-Fibrous

Homogeneous

None Detected100.0% Non-fibrous (Other)

VA1-02C

032215821-0005

2WA-21 - Sprinkler

Pipe Thread

Yellow

Non-Fibrous

Homogeneous

None Detected20%

80.0%

Ca Carbonate

Non-fibrous (Other)

VA1-02D

032215821-0006

2WA-18 - Sprinkler

Pipe Thread

Tan

Non-Fibrous

Homogeneous

None Detected100.0% Non-fibrous (Other)

VA1-02E

032215821-0007

2WC-38 - Sprinkler

Pipe Thread

Gray

Non-Fibrous

Homogeneous

None Detected10%

90.0%

Ca Carbonate

Non-fibrous (Other)

VA1-02F

032215821-0008

2103 - Sprinkler Pipe

Thread

Tan/White

Non-Fibrous

Homogeneous

None Detected5%

95.0%

Ca Carbonate

Non-fibrous (Other)

VA1-03A

032215821-0009

2103 - Floor Tile under

1'X1' Gray Mottled

Floor Tile

Gray

Non-Fibrous

Homogeneous

Chrysotile2%40%

58.0%

Ca Carbonate

Non-fibrous (Other)

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received. Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA

600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample.

Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. New York, NY AIHA-LAP, LLC--IHLAP Accredited #102581, NVLAP Lab Code 101048-9, NJ NY022, CT PH-0170, MA AA000170

Initial report from: 09/20/2022 16:21:32

ASB_PLMwSigs_0007_0001 Printed:9/20/2022 4:21:34PM Page 1 of 4

Tel/Fax: (212) 290-0051 / (212) 290-0058 http://www.EMSL.com / manhattanlab@emsl.com

032215821EMSL Order:

ATC62Customer ID:

11-81-0030Customer PO:

Project ID:

Attention: Phone:Edward Kolodziej (413) 426-6819

Fax:Atlas Technical (413) 781-3734

Received Date:73 William Franks Drive 09/16/2022 12:25 PM

Analysis Date:West Springfield, MA 01089 09/20/2022

Collected Date: 09/09/2022

Project: ACELA Architects/ VA Medical Center, Leeds, MA - Building 1

Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using

Polarized Light Microscopy

Sample Description Appearance % Fibrous % Non-Fibrous % Type

Non-Asbestos Asbestos

VA1-03B

032215821-0010

2103 - Floor Tile under

1'X1' Gray Mottled

Floor Tile

Positive Stop

(Not Analyzed)

VA1-04A

032215821-0011

2103 - Floor Tile Mastic

(Associated with

Sample 03A)

Black

Non-Fibrous

Homogeneous

Chrysotile5%95.0% Non-fibrous (Other)

VA1-04B

032215821-0012

2103 - Floor Tile Mastic

(Associated with

Sample 03A)

Positive Stop

(Not Analyzed)

VA1-05A

032215821-0013

2103 - Gray Floor

Leveler

Gray

Non-Fibrous

Homogeneous

None Detected45%

15%

3%

37.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-05B

032215821-0014

2103 - Gray Floor

Leveler

Brown/Black

Non-Fibrous

Homogeneous

None Detected40%

20%

40.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

VA1-06A

032215821-0015

2103 - Concrete Floor Gray

Non-Fibrous

Homogeneous

None Detected50%

20%

3%

27.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-06B

032215821-0016

2103 - Concrete Floor Gray

Non-Fibrous

Homogeneous

None Detected45%

20%

4%

31.0%

Quartz

Ca Carbonate

Mica

Non-fibrous (Other)

VA1-07A

032215821-0017

B111 - Push Pin

Adhesive

Black

Non-Fibrous

Homogeneous

None Detected10%

90.0%

Ca Carbonate

Non-fibrous (Other)

VA1-07B

032215821-0018

B111 - Push Pin

Adhesive

Tan/White

Non-Fibrous

Homogeneous

None Detected2%

15%

83.0%

Quartz

Ca Carbonate

Non-fibrous (Other)

Inseparable paint / coating layer included in analysis

EMSL maintains liability limited to cost of analysis. Interpretation and use of test results are the responsibility of the client. This report relates only to the samples reported above, and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. The report reflects the samples as received. Results are generated from the field sampling data (sampling volumes and areas, locations, etc.) provided by the client on the Chain of Custody. Samples are within quality control criteria and met method specifications unless otherwise noted. The above analyses were performed in general compliance with Appendix E to Subpart E of 40 CFR (previously EPA

600/M4-82-020 “Interim Method”) but augmented with procedures outlined in the 1993 (”final”) version of the method. This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the federal government. Non-friable organically bound materials present a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Unless requested by the client, building materials manufactured with multiple layers (i.e. linoleum, wallboard, etc.) are reported as a single sample.

Estimation of uncertainty is available on request.

Samples analyzed by EMSL Analytical, Inc. New York, NY AIHA-LAP, LLC--IHLAP Accredited #102581, NVLAP Lab Code 101048-9, NJ NY022, CT PH-0170, MA AA000170

ASB_PLMwSigs…