36C24124B0007 0002.docx
DOCX document 29 KB Posted
- Attached to
- Z2DZ--631-24-002_Renovate B5 Linen Rooms
- Solicitation number
- 36C24124B0007
About this file
This document contains responses to requests for information (RFIs) regarding solicitation number 36C24124B0007 for the renovation of linen rooms at a Veterans Affairs medical center. Key project details include refurbishing room 020 with FRP on all walls from floor to ceiling except where a new door will be installed, adding approximately 10 new electrical outlets, installing a new electrical panel in room 017 tied to an existing panel in room 027, adding smoke detectors in each room, and using RAB EZPANFA 2x4/D10 or Lithonia Lighting CPANL 2X4 AL06SWW7M2 light fixtures. The solicitation responses clarify contractor questions around proprietary fire alarms, room clearances, warranties, and panel specifications. The related federal contract opportunity provides additional context that the solicitation type is for number 36C24124B0007 to renovate the B5 linen rooms issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04_Sign In Roster B5 Renovate Linen Rooms 631-24-002.pdf | ||
| 36C24124B0007 0005.docx | DOCX document | |
| 36C24124B0007 0004.docx | DOCX document | |
| 36C24124B0007 0003.docx | DOCX document | |
| Pictures.pdf | ||
| Combined Specs Renovate B5 Linen Rooms Project 631-24-002 V2.pdf | ||
| Drawings.pdf | ||
| 36C24124B0007 0001.docx | DOCX document | |
| S02_631-24-002 Drawings.pdf | ||
| S02 Combined Specs Renovate B5 Linen Rooms Project 631-24-002.pdf | ||
| 36C24124B0007_1.docx | DOCX document | |
| S02_Combined Attachments.pdf | ||
| S02_WD_MA20230003_10.13.2023.pdf | ||
| S02_SOW_Renovate B5 Linen Rms.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 631-24-002 36C241 Department of Veterans Affairs Network Contracting Office 1 VA Central Western Massachusetts HCS 421 North Main Street Leeds MA 01053 Department of Veterans Affairs VAMC Manchester 718 Smyth Road Manchester NH 03104 To all Offerors/Bidders
36C24124B0007 12-05-2023
X X
See CONTINUATION Page X The purpose of this amendment is to answer all RFI's and post, drawings and pictures with updated specifications.
All other terms and conditions of solicitation 36C24124B0007 remain in effect, and are unchange d.
Chelsea Rodrigue Contracting Officer
VA-VHA-RPOE-2023-0029
CONTINUATION PAGE
RFI’s: 631-24-002 Renovate B5 Linen Rooms Technical Questions 12/05/2023
1. Please advise who the proprietary fire alarm contractor is.
A: NEIS is the programmer, VA owns the fire alarm.
2. Please provide the location of the exiting distribution panel that new electrical panel will be tied into.
A: New electrical panel will be located in room 017, and will tie into existing distribution panel in the Electrical room 027, labeled 5-MDP-2 (pg 1). See Drawings document for location of new electrical panel and 5-MDP-2 (pg 3).
3. At the site visit it was noticed that room 20 was full of equipment, boxes, and furniture. Please confirm that room 20 will be emptied by the VA before construction starts.
A: Correct, room 20 will be emptied by the VA before construction starts.
4. Please advise if the roof warranty is still active. If so, please advise who holds the current warranty for the roof.
A: Warranty is still active, it has a 30 year warranty. Firestone is the original name of the company, however they recently changed the name to Elevate.
5. Please advise what the existing roofing material is.
A: Current roofing material is a Firestone EPDM. Roofing system is comprised of Firestone: Vapor Barrier, Isoguard GL Insulation, Isoguard HD Cover Board, and Rubber Guard.
6. Please confirm the SSHO and Superintendent be the same person.
A: SSHO and superintendent can be the same person.
7. Please confirm the QC manager must be a separate person from the SSHO and Superintendent.
A: Superintendent can have SSHO and QC Manager duties. Specification 01 00 00 section 1.4 will be amended to reflect the above information.
8. Where is 5-MDP located and what is the distance between 5-MDP and the location of the new panel?
A: 5-MDP will NOT be used; New electrical panel will be located in room 017, and will tie into existing distribution panel in the Electrical room 027, labeled 5-MDP-2. See Drawing document (pg 3) for location of new electrical panel and 5-MDP-2 (pg 1). Distance between panels will have to be verified in the field; approximately 112 ft (distance will vary depending on path taken; will need to coordinate with COR).
9. What brand panel is 5-MDP and what type of breaker does it take?
A: This contract will NOT be using 5-MDP panel. This contract will use 5-MDP-2; brand of the panel is General Electric, Spectra Series. See Picture document for current breakers being used and panel information.
10. What will the AIC rating need to be for the new breaker to be installed in 5-MDP?
A: AIC rating is 65 Ka, reference Picture document for current breakers being used.
11. Our lighting vendors have said the part number given for the 2x4 basis of design (acp-xpnl-300730) on drawing A-404, is a flood light, not a 2x4. Please confirm that is the correct part number.
A: Preferred light fixtures are RAB EZPANFA 2x4/D10. Lithonia Lighting catalog number CPANL 2X4 AL06SWW7M2 is acceptable.
12. No smoke detectors are shown to be existing or added on the reflected ceiling plan for room 20 (drawing A-402). Please confirm we will not need to add smoke detectors in this room.
A: Smoke detector will be required in each room. Add smoke detector to center of each room.
13. We need some more guidance on this project please. The spec has FRP, Inpro and Acrovyn but there are only 6 drawings in the bid set and no indication of where the WP must be installed. Please advise.
A: This contract requires room 020 to have FRP on all the walls, floor to ceiling. Except where the new door will be installed.
14. Please confirm that panel E5EB-B2 is an existing to remain panel and that all breakers inside E5EB-B2 are existing. If it is expected that E5EB-B2 is a new panel provided as part of this contract, please confirm a source of power to feed panel E5EB-B2.
A: NEW panel fed from 5-MDP, located on same floor
15. How many outlets in Rm 20 must be removed and reinstalled?
A: Assume 10
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| _________________ |
| ________________ |
631-24-002_Renovate B5 Linen Rooms
The purpose of this amendment is to answer all RFI's and post, drawings and pictures with updated specifications.
All other terms and conditions of solicitation 36C24124B0007 remain in effect, and are unchanged.
| GRAND TOTAL |
| ________________ |
See attached document: Combined Specs Renovate B5 Linen Rooms Project 631-24-002 V2.
See attached document: Drawings.
See attached document: Pictures.
File details come from the government source that posted it. Updated .