S02_631-24-002 Drawings.pdf
PDF 640 KB Posted
- Attached to
- Z2DZ--631-24-002_Renovate B5 Linen Rooms
- Solicitation number
- 36C24124B0007
About this file
This solicitation is for renovations to linen rooms in Building 5 at the Edward P. Boland VA Medical Center. The solicitation number is 36C24124B0007 and is seeking offers to renovate two basement linen rooms, including demolishing existing walls and ceilings, installing new walls and ceilings, and upgrading mechanical, electrical and plumbing systems. The architectural drawings provide details on the scope of demolition and new construction for the rooms. Offerors should carefully review the drawings and specifications to understand the requirements. The period of performance is 120 calendar days from NTP. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration VISN 1.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04_Sign In Roster B5 Renovate Linen Rooms 631-24-002.pdf | ||
| 36C24124B0007 0005.docx | DOCX document | |
| 36C24124B0007 0004.docx | DOCX document | |
| 36C24124B0007 0003.docx | DOCX document | |
| Pictures.pdf | ||
| Combined Specs Renovate B5 Linen Rooms Project 631-24-002 V2.pdf | ||
| Drawings.pdf | ||
| 36C24124B0007 0002.docx | DOCX document | |
| 36C24124B0007 0001.docx | DOCX document | |
| S02 Combined Specs Renovate B5 Linen Rooms Project 631-24-002.pdf | ||
| 36C24124B0007_1.docx | DOCX document | |
| S02_Combined Attachments.pdf | ||
| S02_WD_MA20230003_10.13.2023.pdf | ||
| S02_SOW_Renovate B5 Linen Rms.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATION TERM
& AND
@ AT
# NUMBER
ABV ABOVE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
BB BACK TO BACK
BLDG BUILDING
BLK BLOCK
BRP BEARING PLATE
BOF BOTTOM OF FOOTING
BOTT BOTTOM
BS BACK SIDE
CL CENTERLINE
CLR CLEAR
CJ CONTROL JOINT
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
CORP CORPORATION
DEMO DEMOLITION
DIA DIAMETER
DWL DOWEL
EF EACH FACE
EJ EXPANSION JOINT
EMBED EMBEDMENT
EOD EDGE OF DECK
EOG EDGE OF GIRT
ES EACH SIDE
EW EACH WAY
FB FLANGE BRACE
FDN FOUNDATION
FTG FOOTING
FLG FLANGE
FS FAR SIDE
GA GAGE, GAUGE
GALV GALVANIZED
GEN GENERAL
GR GUARD RAIL
GRTG GRATING
HORIZ HORIZONTAL
HPT HIGH POINT
HSS HOLLOW STRUCTURAL SECTION
IJ ISOLATION JOINT
JT JOINT
JST JOIST
KB KNEE BRACE
LG LONG
LLH LONG LEG HORIZONTAL
LLV LONG LET VERTICAL
LSH LONG SIDE HORIZONTAL
LSV LONG SIDE VERTICAL
LPT LOW POINT
MAX MAXIMUM
MIN MINIMUM
MFR MANUFACTURER
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NS NEAR SIDE
NTS NOT TO SCALE
OC ON CENTER
OH OPPOSITE HAND
OPP OPPOSITE
PCP PRECAST HOLLOW CORE PLANK
PEMB PRE-ENGINEERED METAL BUILDING
PL PLATE
PMF PREMOLDED FILLER
PROJ PROJECTION
RECT RECTANGULAR
REQ'D REQUIRED
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
SPA SPACES
STD STANDARD
STIFF STIFFENER PLATE
STIRR STIRRUP
STL STEEL
T/G TONGUE AND GROOVE
THK THICK
TOF TOP OF FOOTING
TOS TOP OF STEEL
UN UNLESS NOTED
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VB VERTICAL BRACE
W/ WITH
W/O WITHOUT
WP WORK POINT
WT WEIGHT
WWR WELDED WIRE REINFORCING
CENTER LINE
DETAIL INDICATOR
DIMENSION LINE
NEW DOOR OPENING
- SEE DOOR SCHEDULE, DETAILS AND
ELEVATIONS SHEET
DRAWING BLOCK TITLE, TYPICAL
CORRIDOR ELEVATION INDICATOR
BUILDING SECTION INDICATOR
TYPICAL DETAIL INDICATOR
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
EXISTING ROOM TAG - ROOM NAME AND NUMBER
COLUMN GRID
ARCHITECTURAL KEYNOTE TAG
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
CORNER GUARD
NORTH ARROW
CG
FEC
X1234
DETAIL NUMBER
SHEET NUMBER
XX-XX
1"
XX-XX
CL
XX-XX
x'-x" SPOT ELEVATION
1 REVISION
BREAK LINE
DD ROOM TAG - ROOM NAME AND NUMBER
X
EXISTING DOOR OPENING
1 View Name 1/8" = 1'-0"
AE888
Room name
Room name
SD ROOM TAG - ROOM NAME AND AREA
Room name
SHEET NUMBERDETAIL
NUMBER
DETAIL
NUMBER
SHEET NUMBER
88 88
HW
-X
X
HARDWARE TAG
SEE SPECIFICATIONS
PLACE DOOR
TAG HERE
A101 BUILDING ELEVATION
SHEET NUMBERDETAIL
NUMBER
XXXXX
HRDW
XXXXX
HRDW
XXXXX EXISTING DOOR TAG
NEW DOOR TAG
N P N
LIFE SAFTEY ROOM TAG - ROOM NAME, NUMBER AND AREARoom name
REFLECTED CEILING KEYNOTE TAGX
WINDOW TYPE TAG#
RESTROOM ACCESSORY TAGX
INTERIOR SIGNAGE TAGS#
AREA GENERALLY NOT IN CONTRACT
1. THE CONTRACTOR SHALL COORDINATE WITH THE VA HOSPITAL'S JCAHO INSPECTION SCHEDULE WITH THE COR. NO CONTRACTOR WORK SHALL
BE PERFORMED DURING TWO WEEKS IN EACH YEAR DURING A JCAHO INSPECTION
2. PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR
WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS
3. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND RESIDENCE
4. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION
5. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT
6. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION
RATIO
7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO
RECEIVE NEW FINISHES DESIGNATED
8. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK
9. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED TO
MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN
10. IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHE3D TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE
NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE
11. A HAZARDOUS MATERIALS SURVEY WAS CONDUCTED, AND INCLUDED IN THE SPECIFICATIONS AND REPORTS.
12. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR FOR REVIEW OF EXISTING CONDITIONS
13. PATCH AND FIRE STOP AT ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS, WALLS, AND ROOF DECK
1. DIMENSIONS TO EXISTING WORK SHALL BE TAKEN TO FACE OF FINISH SURFACE
2. DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS
3. THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING THE
PROJECT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS
4. THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT
5. THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED WITH THE
CONDITIONS AFFECTING THE WORK
6. ALL WORKMANSHIP IS TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN
USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN THE
WORK AREA THOROUGHLY
8. ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE NOTED IN THE
SPECIFICATIONS
9. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL DIMENSIONS IN FIELD
AND VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.
10. ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL GOVERNING BODIES. CODES INCLUDE BUT
ARE NOT LIMITED TO:
VA PLUMBING DESIGN GUIDE - 2021
11. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING
JURISDICTION. CODES INCLUDE, BUT ARE NOT LIMITED TO:
NFPA 101 - 2021
NFPA 70 - 2020
NFPA 90A - 2021
NFPA 99 - 2021
NFPA 101 - 2021
VA HVAC DESIGN GUIDE - 2021
13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES. CODES INCLUDE, BUT ARE NOT
LIMITED TO:
NFPA 70 - 2021
NFPA 101 - 2021
VA ELECTRICAL DESIGN GUIDE - 2019
VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY
BUILDINGS - 2015
VA LIGHTING DESIGN MANUAL - 2022
VA RADIOLOGY DESIGN MANUAL - 2008
VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2021
14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES. CODES INCLUDE, BUT ARE NOT LIMITED TO:
NFPA 101 - 2021
NFPA 13 - 2022
NFPA 72 - 2022
VA FIRE PROTECTION DESIGN GUIDE - 2021
15. PRIOT TO ANY EXISTING TELECOMMUNICATION ROOM BEING TAKEN OFF-LINE, THE FOLLOWING ITEMS MUST BE COMPLETE, FUNCTIONAL, AND TESTED:
A. THE COMPLETE SITE FIBER OPTIC LINE (FO) SYSTEM.
B. DATA CENTER (ADDITION TO BUIDLING 22)
C. NEW INDIVIDUAL BUILDING TELECOMMUNICATION ROOMS AND ADDITIONS (BUILDINGS 1, 8, AND 9).
1. REFER TO SPECIFICATIONS SECTION 02 41 19 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND
INFORMATION.
2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION WILL BE REQUIRED OUTSIDE OF THIS LINE. ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF
DEMOLITION WORK REQUIRED FOR THE PROJECT.
3. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK.
REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION.
4. COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.
5. THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM SCOPE OF WORK AND DELIVER TO THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY.
6. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL
PRESSURE MONITORING DEVICE AT DUST PROOF BARRICADE TO CONFIRM PRESSURE.
7. THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE CONSTRUCTION PHASE. WHERE EXISTING CEILING IN THE NEW ROOMS IS BEING REMOVED, G.C. TO COORDINATE THE REPLACEMENT OR MODIFICATION OF SPRINKLER SYSTEM AT THE SAME TIME OF CEILING REMOVAL TO MAINTAIN
SPRINKLER PROTECTION.
8. ALL TEMPORARY BARRIERS ARE TO BE 1 HOUR FIRE BARRIERS WHERE CEILING TILES IN THE CORRIDORS CANNOT BE REPLACED AT THE END OF THE WORK SHIFT OR PROVIDE TEMPORARY UPRIGHT SPRINKLER HEAD FOR THE
DURATION OF THE WORK BEING PERFORMED IN THE CORRIDOR.
9. ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF.
COORDINATE LOCATION OF BARRIERS WITH OWNER.
10. REMOVE PARTITIONS INDICATED FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE ABOVE.
11. PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND DEVICES LOCATED WITHIN AREAS SCHEDULED TO
BE DEMOLISHED.
12. SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO
COMPLETE THE INTENDED WORK OF THE OVERALL PROJECT.
13. REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE
SALVAGED.
14. DEMOLITION OF CEILINGS TO BE COORDINATED WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL OF DIFFUSERS GRILLS, AND
RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN.
15. ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED.
MATCH EXISTING FIRE RATING UNLESS NOTED OTHERWISE.
16. REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION. PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR
RELOCATION PRIOR TO COMMENCING DEMOLITION.
17. WHERE NEW DOORS ARE INDICATED, CUT OPENINGS IN EXISTING WALL. PREPARE OPENINGS FOR NEW DOOR.
PATCH REQUIRED WALLS TO MATCH EXISTING. PROVIDE LINTELS AS REQUIRED FOR NEW OPENINGS. PREPARE
SURFACES FOR SCHEDULED FINISHES.
18. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.
19. AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY
CONSTRUCTION AND MATCH EXISTING FINISHES.
20. REMOVE ALL PLUMBING FIXTURES AS INDICATED WITHIN THE LIMITS OF CONSTRUCTION. CAP ALL PLUMBING LINES
NOT REQUIRED BY NEW CONSTRUCTION.
21. GC TO PERFORM SURVEY OF EXISTING SERVICE LINES IN SCOPE OF WORK PRIOR TO START OF WORK. REPORT
FINDINGS TO COR AND ARCHITECT.
22. HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD HAVE BEEN IDENTIFIED IN BUILDINGS THROUGHOUT THE CAMPUS. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2 SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL
WORK AND NOTIFY THE COR IMMEDIATELY.
A. DO NOT SCALE DRAWINGS. CONTRACTOR(S) ARE TO VERIFY SITE DIMENSIONS AND CONDITIONS PRIOR TO WORK.
B. CONSTRUCTION SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE APPLICABLE CODES INCLUDING
ACCESSIBILITY STANDARDS AND THE REQUIREMENTS OF "AMERICANS WITH DISABILITIES ACT."
C. CONTRACTOR(S) SHALL VISIT THE SITE AND CORRELATE THE REQUIREMENTS OF THE DOCUMENTS WITH THE
EXISTING CONDITIONS.
D. DRAWINGS ARE DIAGRAMMATIC AND SINCE EXISTING CONDITIONS, INCLUDING AREAS ABOVE ACCESSIBLE
CEILINGS MAY AFFECT NEW WORK, THE CONTRACTOR SHALL COORDINATE AND ALTER NEW WORK TO PROPERLY FIT THE EXISTING CONDITIONS. THE WORK SHALL BE PERFORMED AT NO EXTRA COST. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE PRIOR TO THE START OF CONSTRUCTION. IF DISCREPANCIES ARE FOUND, THE ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION BEFORE COMMENCING
WITH THE WORK.
E. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE SHOWN. WHEN SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, CONSULT THE ARCHITECT BEFORE PROCEEDING WITH THE WORK.
F. SOME MASONRY AND LUMBER DIMENSIONS SHOWN ON THE DRAWINGS ARE NOMINAL DIMENSIONS.
CONTRACTOR(S) SHALL COORDINATE ACTUAL DIMENSIONS WITH THE JOB CONDITIONS. REPORT ALL
DISCREPANCIES TO THE ARCHITECT.
G. EXISTING CONDITIOPNS SHOWN ON THIS DRAWING ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR(S) SHALL FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR CONTRACTED WORK. REPORT ALL DISCREPANCIES TO THE ARCHITECT PRIOR TO FABRICATION AND ERECTION.
H. THE TERM 'PATCH TO MATCH' OR 'CUTTING AND PATCHING' DENOTES THAT REPAIR WORK IS NECESSARY TO CONSTRUCT A FLOOR, BASE, WAINSCOT, WALL OR CEILING TO MATCH THE EXISTING SURFACE FINISH, TEXTURE
AND SHEEN.
I. WHERE NEW OPENINGS OCCUR IN STRUCTURAL BEARING WALL, CONTRACTOR IS RESPONSIBLE FOR TEMPORARY
SUPPORTS AND / OR SHORING AS REQUIRED FOR INSTALLATION OF LINTELS.
J. WHERE EXISTING DOORWAYS ARE TO BE FILLED IN, CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING WALL
WIDTHS.
K. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ALL ACCESS DOORS, ACCESS PANELS AND FRAMES, INCLUDING, BUT NOT LIMITED TO THOSE SPECIFIC IN CONSTRUCTION DOCUMENTS AND FURNISHED BY OTHER CONTRACTORS. ALL ACCESS DOORS AND PANEL LOCATIONS TO BE COORDINATED AND APPROVED BY THE ARCHITECT PRIOR TO THE INSTALLATION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PAINTING ALL ACCESS PANELS AND ACCESS DOORS. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL PAINT
COLORS WITH THE ARCHITECT PRIOR TO COMMENCING WITH WORK.
L. WHEN POWER AND DATA RECEPTACLES ARE INTENDED TO BE ADJACENT, THEY SHOULD BE PLACED NO MORE
THAN 1'-0" APART.
FIRE RESISTANCE RATING
A. FIRE RATING INDICATED ON A WALL SHALL MEAN THE ENTIRE LENGTH AND HEIGHT OF WALL TO BE FIRE RATED.
B. ALL PIPING, DUCTS, CABINETS, ETC. THAT PENETRATE WALLS SHALL BE INSTALLED IN A MANNER THAT WILL
PRESERVE THE FIRE RESISTANCE RATING OF THAT WALL.
C. PRESERVE ALL FIRE RESISTANT RATINGS OF EXISTING WALL UNLESS NOTED OTHERWISE.
DIMENSIONING
A. INTERIOR PARTITIONS ARE DIMENSIONED TO FACE OF GYPSUM WALL BOARD EXCLUSIVE OF FINISH MATERIAL, SUCH AS CERAMIC TILE OR WOOD PANELING. THE CONTRACTOR SHALL COORDINATE FINISH DIMENSIONS AND FACE OF WALL DIMENSIONS WITH FINISH SCHEDULE WHEN CRITICAL TO THE INSTALLATION OF MILLWORK OR
EQUIPMENT.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
LADO
Office of Construction and
Management
C :\U se rs
\V H
AN
H
M Au ga rL
\D oc um en ts \B
5_ R
_l ib by .a ug ar te nA
A9 A4
.rv t
9/
/2
1:
:0
PM
A-000
BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND
DRAWING INDEX
06/06/2023
Edward P. Boland VA Medical Center
###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW
Revisions: Date:
Sheet List No. NAME
A-000 BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX
A-101 BUILDING 5 BASEMENT KEY PLANS
A-402 BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS
A-403 BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS
A-404 BUILDING 5 BASEMENT ELECTRICAL PLAN
ABBREVIATION TABLE ARCHITECTURAL SYMBOLS GENERAL CONDITION NOTES
GENERAL CONSTRUCTION NOTES
GENERAL DEMOLITION NOTES
GENERAL NOTES
DN
U P
D N
D N
UP
U P
Hatchway
DN
U P
D N
D N
UP
U P
Hatchway
BUILDING 5
NORTHAMPTON
T11
13S
9A 30
N
A-401
014A
CRAWL SPACE
015HALF DOOR
HALF DOORCRAWL SPACE016
011 ENG
ENG
019020 021022
004 006
HK
003002
EL
A-404A-403
014A
CRAWL SPACE
015HALF DOOR
HALF DOORCRAWL SPACE016
011 ENG
ENG
019020 021022
004 006
HK
003002
EL
A-402
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
LADO
Office of Construction and
Management
C :\U se rs
\V H
AN
H
M Au ga rL
\D oc um en ts \B
5_ R
_l ib by .a ug ar te nA
A9 A4
.rv t
9/
/2
1:
:0
PM
A-101
BUILDING 5 BASEMENT KEY PLANS
06/06/2023
Edward P. Boland VA Medical Center
###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW
FULLY SPRINKLERED
SITE KEY PLAN
3/32" = 1'-0"1 BASEMENT PLAN N
P N
3/32" = 1'-0"2 BASEMENT REFLECTED CEILING PLAN N
P N
Revisions: Date:
GENERAL AREA OF WORK
N
P N
PANEL
ABOVE
NEW FURRED WALL TO
RECEIVE NEW FINISHES;
1 LAYER 5/8" GYPSUM
WALL BOARD ON 3-5/8"
METAL STUDS.
FURRED WALL WITH COR
VERIFY LOCATION OF NEW
FURRED WALL WITH COR
VERIFY LOCATION OF NEW
1V.
I.F
FR
AM
E
V.I.F.
FRAME
FEC-S
(n)
FEC-R
(n)
VERIFY LOCATION WITH COR
VERIFY LOCATION WITH COR
017A
NEW ROOF PENETRATIONS REQUIRED TO
ACOMMODATE NEW INTAKE/EXHAUST DUCT.
PATCH/REPAIR ROOF AS NEEDED.
EXISTING CONSTRUCTION TO REMAIN. PATCH AS
REQUIRED FOR NEW FINISHES IF INDICATED ON
FINISH SCHEDULE.
NEW CONSTRUCTION
EXISTING CONSTRUCTION TO REMAIN. PATCH AS
REQUIRED BY THE SPECIFICATIONS WITHIN THE
CONTRACT AREA.
EXISTING WALL CONSTRUCTION SHOWN HATCHED TO BE
DEMOLISHED AND REMOVED IN ITS ENTIRETY
EXISTING DOOR, HARDWARE AND HM FRAME SHOWN AS
HATCHED TO BE REMOVED IN ITS ENTIRETY
DEMOLISHED MATERIAL NOTE
ALL DEMOLISHED PLUMBING FIXTURES, PIPING, FITTINGS & ALL ASSOCIATED HARDWARE SHALL
BECOME THE PROPERTY OF THE PLUMBING CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS
OTHERWISE INSTRUCTED BY VA CORE.
1. APPLY FRP FINISH TO ALL WALLS IN SPACE, FLOOR TO CEILING IN ROOM 020.
2. ALL WALL FINISHES IN 017 TO REMAIN.
3. ALL FINISHES DISTURBED FOR DEMOLITION TO BE REPLACED TO MATCH EXISTING.
4. NEW DOOR TO BE SUPPLIED WITH AUTO OPERATOR, CARD READER, ELECTRIC STRIKE,
PUSH BUTTONS AND VISION LITES. COORDINATE LOCATION OF WALL MOUNTED DEVICES
WITH VA.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
LADO
Office of Construction and
Management
C :\U se rs
\V H
AN
H
M Au ga rL
\D oc um en ts \B
5_ R
_l ib by .a ug ar te nA
A9 A4
.rv t
9/
/2
1:
:1
PM
A-401
BUILDING 5 BASEMENT ENLARGED PLANS
06/06/2023
Edward P. Boland VA Medical Center
###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW
FULLY SPRINKLERED
BASEMENT - PINE BUILDING
1/4" = 1'-0"2 BASEMENT FLOOR PLAN - NEW WORK
1/4" = 1'-0"1 BASEMENT FLOOR PLAN - DEMO
SYMBOL LEGEND
NOTE:
THIS AREA MAY CONTAIN HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO
ASBESTOS AND/OR LEAD. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2
SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT
REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS
PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND
THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL WORK
AND NOTIFY THE COR IMMEDIATELY.
Revisions: Date:
KEYNOTES
MARK DESCRIPTION
1 REMOVE EXISTING DEVICES (CAST IN PLACE OR SURFACE MOUNTED) TO BE
REPLACED/REUSED IN NEW WALLS
2 DEMO EXISTING AIR DRYER, REMOVE PIPING BACK TO SOURCE.
3 DEMO, CUT/CAP ALL ABANDONED PIPING BACK TO SOURCE, INCLUDING ANY EXISTING
ABANDONED PIPING.
4 DEMO EXISTING DOOR AND ADJACENT FRAMING. TO BE REPLACED WITH NEW 1 HR
PARTITION AND 45 MIN. RATED DOOR AND FRAME.
SYMBOL LEGEND
NOTE:
THIS AREA MAY CONTAIN HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO
ASBESTOS AND/OR LEAD. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2
SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT
REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS
PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND
THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL WORK
AND NOTIFY THE COR IMMEDIATELY.
KEYNOTES
MARK DESCRIPTION
1 REINFORCE WALLS AND INSTALL NEW 45 MIN. FIRE RATED 4'-0"W X 7'-0"H DOOR AND 45
MIN. FIRE RATED FRAME.
2 GC TO PROTECT EXISITNG ELECTRICAL PANELS TO REMAIN DURING DEMOLITION AND
CONSTRUCTION. GC TO REINSTALL ANY EXISTING PANELS BACK IN THE SAME EXISTING
LOCATION AS REQUIRED. COORDINATE SERVICE INTERRUPTIONS WITH ELECTRICAL
CONTRACTOR AND COR
GENERAL NOTES
NEW WORK NOTES AND
LEGENDS - FLOOR PLAN
DEMOLITION NOTES AND
LEGENDS - FLOOR PLAN
EQUIPMENT LEGEND
MARK DESCRIPTION COUNT
FEC-R (n) FIRE EXTINGUISHER CABINET; SEMI-RECESSED; NEW 1 FEC-S (n) FIRE EXTINGUISHER CABINET; SURFACE MOUNTED; NEW 1
F
SD
F
F
GENERAL AREA OF WORK
N
P N
EXISTING SCONCE LIGHTING TO BE REMOVED
EXISTING WOOD CEILING TO BE REMOVED
WHERE EXISTING CEILING SYSTEM TO BE REMOVED.
COORDINATE REMOVAL OF CEILINGS WITH
REPLACEMENT OF EXISTING SPRINKLER HEADS WITH
NEW UPRIGHT SPRINKLER HEAD TO AVOID LOSS OF FIRE
PROTECTION IN THE CONSTRUCTION AREA.
SPRINKLER HEAD: MODIFY EXISTING FIRE PROTECTION
SYSTEM AS REQUIRED FOR NEW WORK
RELOCATE SPRINKLER HEADS TO CENTER OF NEW
CEILING TILE
B
A
017A
A
B
B
(E) WOOD CLG
@ 8'-2"
(E) WOOD CLG
@8'-2"
SP (n)
SP (n)SP (n)
SP (n)
A
375 CFM
A
375 CFM
B
425 CFM
B
425 CFM
OS (n)
L 2X4 (e)
L 2X4 (e)
L 2X4 (e)
L 2X4 (e)
L 2X4 (e)
L 2X4 (e)
L 2X4 (e)
L 2X4 (e)
L 2X4 (e)
L 2X4 (e)
L 2X4 (e)
L 2X4 (e)
OS (e)
OS (e)
SP (e) SP (e)
SP (e) SP (e)
SP (e) SP (e)
SP (e) SP (e)
SP (e)
SP (e)
(e)
(n)
WAP (n)
(e)
L 2x4 (n)
L 2x4 (n)
L 2x4 (n)
L 2x4 (n)
B
550 CFM
A
300 CFM
A
300 CFM
CEILING DEMOLITION NOTE
WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE BEING PERMANENTLY
REMOVED, THAT WORK SHALL BE COORDINATED TO OCCUR AT THE SAME TIME AS REPLACEMENT
OF THE EXISTING SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF SPRINKLER
PROTECTION IN THESE SCOPE OF WORK AREAS.
DEMOLISHED MATERIAL NOTE
ALL DEMOLISHED PLUMBING FIXTURES, PIPING, FITTINGS & ALL ASSOCIATED HARDWARE SHALL
BECOME THE PROPERTY OF THE PLUMBING CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS
OTHERWISE INSTRUCTED BY VA CORE.
1. RELOCATE EXISTING DEVICES TO CENTER OF TILE.
2. ADD SD'S AS REQUIRED.
3. PROVIDE (4) NEW 2X4 LED FIXTURES WITH OCCUPANCY SENSOR AND SWITCH IN ROOM
017. BASIS OF DESIGN FOR 2X4 FIXTURE: ACP-xpnl-300730.
4. INSTALL NEW 2X4 ACT CEILING IN ROOM 017
5. INSTALL NEW HORN/STROBE IN ROOM 017.
6. SEE MECHANICAL/ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
1. REMOVE AND REPLACE EXISTING ACT TILES TO BE REPLACED WITH NEW.
2. REMOVE AND REPLACE GRID AS NEEDED TO FACILITATE NEW WORK.
3. MAINTAIN EXISTING FIRE PROTECTION THROUGHOUT CONSTRUCTION.
4. MAINTAIN EXISTING LIGHTS, FIRE ALARMS, SENSORS AND CEILING MOUNTED DEVICES
THROUGHOUT CONSTRUCTION IN ROOM 020.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
LADO
Office of Construction and
Management
C :\U se rs
\V H
AN
H
M Au ga rL
\D oc um en ts \B
5_ R
_l ib by .a ug ar te nA
A9 A4
.rv t
9/
/2
1:
:1
PM
A-402
BUILDING 5 BASEMENT ENLARGED REFLECTED
CEILING PLANS
06/06/2023
Edward P. Boland VA Medical Center
###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW
BASEMENT - PINE BUILDING
SYMBOL LEGENDSYMBOL LEGEND
KEYNOTES
MARK DESCRIPTION
A EXISTING WOOD CEILING TO BE REMOVED IN ITS ENTIRETY
B REMOVE EXISTING SCONCE LIGHTING IN ITS ENTIRETY
1/4" = 1'-0"1 BASEMENT RCP - DEMO
1/4" = 1'-0"2 BASEMENT RCP - NEW WORK
Revisions: Date:
EQUIPMENT LEGEND
MARK DESCRIPTION COUNT
A 24x24 SUPPLY GRILLE/DIFFUSER; NEW 4 B 24x24 RETURN GRILLE/DIFFUSER; NEW 3 F (e) FIRE ALARM HORN/STROBE; EXISTING 2 F (n) FIRE ALARM HORN/STROBE; NEW 1 L 2X4 (e) 2x4 LIGHT FIXTURE; EXISTING 12 L 2x4 (n) 2x4 LIGHT FIXTURE; NEW 4 OS (e) OCCUPANCY SENSOR; EXISTING 2 OS (n) OCCUPANCY SENSOR; NEW 1
SD SMOKE DETECTOR 1
SP (e) SPRINKLER; PENDANT; FULLY RECESSED; EXISTING 10 SP (n) SPRINKLER; PENDANT; FULLY RECESSED; NEW 4 WAP (n) WIRELESS ACCESS POINT; NEW 1
NOTE:
THIS AREA MAY CONTAIN HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO
ASBESTOS AND/OR LEAD. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2
SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT
REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS
PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND
THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL WORK
AND NOTIFY THE COR IMMEDIATELY.
NOTE:
THIS AREA MAY CONTAIN HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO
ASBESTOS AND/OR LEAD. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2
SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT
REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS
PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND
THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL WORK
AND NOTIFY THE COR IMMEDIATELY.
NEW WORK NOTES AND
LEGENDS - RCP
DEMOLITION NOTES AND
LEGENDS - RCP
GENERAL NOTES:
ROOM
A
300 CFM
10"ø
12"ø
10"ø
ELECTRIC
DUCT HEATER
12"ø
ERV-5-2
A
300 CFM ROOM
5-017
B TITUS 350RL RETURN/
EXHAUST
24" x 24"
12" x 12"/10"�
12" x 12"/12"�
15" x 15"/14"�
6" x 6"
8" x 8"
10" x 10"
12" x 12"
14" x 14"
16" x 16" B
PRVIDE 2" THICKNESS ASTM C612
INSULATION FOR BOTH SUPPLY AND
EXHAUST DUCT TYPICAL FOR ALL
ERV DUCT WORK.
550 CFM PRVIDE 2" THICKNESS ASTM C612
INSULATION FOR BOTH SUPPLY AND
EXHAUST DUCT TYPICAL FOR ALL ERV
DUCT WORK.
INSTALL NEW CEILING
MOUNTED ERV. THE UNIT
ACCESS DOOR SHALL BE
INSTALLED TO BE
ACCESSIBLE FROM BELOW.
ERV-5-1
TAG
A TITUS
MFR
DIFFUSER, REGISTER AND GRILLE SCHEDULE
MODEL
TDC SUPPLY
TYPE FACE SIZE
24" x 24" 6" x 6" / 6"�
NECK SIZE
9" x 9" / 8"�
CFM RANGE
0 - 125
126 - 275
276 - 375
376 - 470
471 - 650
0 - 125
126 - 225
226 - 350
351 - 550
551 - 750
751 - 1,050
REMARKS:
1. PROVIDE SQUARE TO ROUND ADAPTER WHERE REQUIRED.
2. COORDINATE MOUNTING TYPE AND LOCATION WITH ARCHITECTURAL CEILING PLAN AND BUILDING PLANS.
3. PROVIDE MFR'S INLET AIRFLOW SENSOR, AIRFLOW ADJUSTMENT DAMPER AND INSULATED BACKPAN BLANKET.
4. PROVIDE MOUNTING SLEEVE WITH INSIDE DOOR FRAME.
INSTALL EA/RA DUCT UP TO
GOOSE NECK ON ROOF. PROVIDE
FIRE DAMPER THROUGH FLOORS.
CEILING
MOUNT
ELECTRIC
DUCT HEATER
STORAGE
5-017B C
250 CFM TR
5-017A
TAG
A
375 CFM
BASIS OF DESIGN
MANUF.
ERV-5-1 RENEWAIRE
ERV-5-2 RENEWAIRE
MODEL
HE 1XINH
HE 1XINH
CFM
FAN DATA
ENERGY RECOVERY VENTILATOR SCHEDULE
SUMMER/COOLING WINTER/HEATING
ESP
0.5
0.5
QTY/HP
2/0.75
2/0.75
FLA
9.0
9.0
O.A.
R.A.
S.A.
O.A.
REMARKS:
1. ERV-5-1 MUST BALANCED TO EXHAUST 860 CFM AND SUPPLY 700 CFM AS PER SCHEDULE.
2.PROVIDE ELECTRIC DUCT HEATER MODEL EK-010 ,3KW TO TEMPERSUPPLY AIR TO 71F.
3.ERV-5-2 MUST BALANCED TO SUPPLY 550 AND EXHAUST 600 CFM.
4.PROVIDE ELECTRIC DUCT HEATER MODEL EK-010, 4KW TO TEMPER SUPPLY AIR TO 73F
5. UNIT SHALL BE UL LISTED, WITH UNIT MOUNTED DISCONNECT SWITCH AND SINGLE POINT POWER CONNECTION.
3. PROVIDE ASSOCIATED OUTSIDE AIR INTAKE AND DISCHARGE DUCTWORK, LOUVERS PLENUMS AND DAMPERS.
4. REFER TO FLOOR PLAN FOR ASSOCIATED DUCTWORK AND ACCESSORIES.
5. SEQUENCE OF OPERATIONS: ENERGY RECOVERY VENTILATOR SHALL BE PER MANFACTURE WALL TIMER SCHEDULE..
6. COORDINATE ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR/DISCIPLINE.
7. INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS.
8. PROVIDE INTERFACE WITH ELECTRIC DUCT HEATING COIL AND CAMPUS/BUILDING BMS (BUILDING MANAGEMENT SYSTEM).
R.A.
S.A.
1. THE MECHANICAL CONTRACTOR DRAWINGS ARE DIAGRAMMATIC ARE INTENDED TO INDICATE
THE SCOPE AND THE GENERAL ARRANGEMENT OF THE SYSTEM. WHERE APPLICABLE THE
FOLLOWING NOTES SHALL APPLY TO ALL MECHANICAL SYSTEM.
V/PH
120/1
ELECTRICAL DATA
MCA
MOCP
120/1 20 25
RATING
MERV 8
FILTER DATA
TYPE
PLEATED
MERV 8 PLEATED
REMARKS
DEPTH
2"
2"
1 - 8
1 - 8
2. THOUGH SOME PIPING OFFSETS AND TRANSITIONS ARE INDICATED, IT IS NOT THE INTENT OF
THE DRAWINGS TO SHOW ALL OFFSETS AND TRANSITIONS. THE CONTRACTOR SHALL FULLY
COORDINATE THE MECHANICAL WORK WITHIN ITSELF AND WITH THE WORK OF ALL OTHER
TRADES TO PROVIDE COMPLETE AND OPERABLE SYSTEMS WITHOUT INTERFERENCES.
3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,
DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND
INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH
MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.
4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL
UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50% LOADING.
5. FOR TYPICAL WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT
DETAILS.
6. PROVIDE APPROVED FIRE STOPPING MATERIAL AROUND ALL PIPING PENETRATIONS (NEW
AND EXISTING) THROUGH FIRE RATED FLOORS AND WALLS.
7. SUPPORT ALL EQUIPMENT FROM STRUCTURE.
8. PATCH AND SEAL ALL REMAINING OPENINGS (NEW AND EXISTING) THROUGH FLOORS,
CEILING WALLS, AND ROOF RESULTING FROM DEMOLITION OR NEW WORK WITH MATERIALS
AND FINISHED TO MATCH EXISTING CONSTRUCTION AND FIRE RATING.
9. HVAC SHALL BE MAINTAINED TO ALL AREAS OUTSIDE OF THE CURRENT PHASE OF THE
RENOVATED AREA AT ALL TIMES. PROVIDE TEMPORARY CONNECTIONS AS REQUIRED.
MAX
S.P.D.
0.12
MAX
N.C.
REMARKS
1, 2, 3
10.DEMOLITION AND NEW WORK THAT WILL RESULT IN DOWN TIME OF SERVICES (HVAC,
PLUMBING , MEDICAL GASES...ETC)SHALL BE PERFORMED OFF HOURS, TO MINIMIZE DOWN TIME
TO ADJACENT SPACES.
11. MOUNT ALL THERMOSTATS AND SENSORS AS PER SPECIFICATION AND MANUFACTURE
REQUIREMENTS.
12. CONDENSATE DRAIN PIPING FROM COOLING COIL DRAIN PANS SHALL BE PITCHED DOWN IN
THE DIRECTION OF FLOW AT A MINIMUM OF 1/8" PER FOOT.
CEILING 0.10 25 1, 2
1 PARTIAL BASEMENT NEW WORK TR 5-017A
NTS
1" MESH STAINLESS STEEL
BIRDSCREEN
30°
Min. 18Ga. SEAMLESS WELDED
STAINLESS STEEL GOOSENECK
EXHAUST AIR HOOD. PROVIDE
INTERNAL BRACING AS REQ'D
DRIP FLASHING; FASTEN ALL
AROUND TO CURB.
SPECIFIED
DUCT SIZE
FIELD-BUILT WOODEN CURB
(BY ARCH. DIVISION)
FOR EXACT NATURE OF ROOF (SLOPPED OR FLAT)
CONST. CONSULT ARCH. DWGS.
OR CHECK ON-SITE
GOOSENECK INTAKE/EXHAUST DUCT DETAIL
P N
N
AREA OF WORK
ROOF - PINE BUILDING
PROVIDE ALUMINUM JACKETS FOR
ALL EXPOSED DUCT (TYPICAL).
P N
N
GENERAL AREA OF WORK
2 PARTIAL ROOF MECHANICAL NEW WORK
NTS
BASEMENT - PINE BUILDING
12"ø
12"ø
10"ø
12"ø
12"ø
12"ø
10"ø
12"ø
12"ø 12"ø
18 IN
C
H
ES (M
in.)
SPEC'D SIZE
+ 25%(FOR
INTAKE ONLY)
A
375 CFM
B
425 CFM
B
425 CFM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
LADO
Office of Construction and
Management
C :\U se rs
\V H
AN
H
M Au ga rL
\D oc um en ts \B
5_ R
_l ib by .a ug ar te nA
A9 A4
.rv t
9/
/2
1:
:1
PM
A-403
BUILDING 5 BASEMENT & ROOF ENLARGED
MECHANICAL PLANS
06/06/2023
Edward P. Boland VA Medical Center
###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW
Revisions: Date:
12" = 1'-0"1 B5 DUCTWORK PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
LADO
Office of Construction and
Management
C :\U se rs
\V H
AN
H
M Au ga rL
\D oc um en ts \B
5_ R
_l ib by .a ug ar te nA
A9 A4
.rv t
9/
/2
1:
:1
PM
A-404
BUILDING 5 BASEMENT ELECTRICAL PLAN
06/06/2023
Edward P. Boland VA Medical Center
###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW
Revisions: Date:
NTS
10. PROVIDE (4) NEW 2X4 LED FIXTURES WITH OCCUPANCY SENSOR AND SWITCH IN ROOM 017. MINIMUM OF (1) ONE LIGHT TO BE FED FROM EXISTING EMERGENCY PANEL IN BASEMENT ELECTRIC ROOM. COORDINATE WITH COR. BASIS OF DESIGN FOR 2X4 FIXTURE: ACP-xpnl-300730.
11. PROVIDE (2) TWO NEW SURFACE MOUNTED OUTLETS, (1) ONE NEXT TO PANEL AND (1) ONE NEXT TO DOOR
IN ROOM 017. CIRCUITS TO BE FED FROM NEW PANEL.
12. NEW PANEL TO BE FED FROM NORMAL POWER 5-MDP IN BASEMENT. COORDINATE WITH COR.
13. EXISTING OUTLETS RELOCATED IN NEW WALLS IN ROOM 020 TO BE RE-FED FROM EXISTING CIRCUITS.
14. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.
| B5_R2023_libby - Sheet - A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX |
| Sheets |
| A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX |
| A-101 - BUILDING 5 BASEMENT KEY PLANS |
| A-401 - BUILDING 5 BASEMENT ENLARGED PLANS |
| A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS |
| A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS |
| A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN |
| B5_R2023_libby - Sheet - A-101 - BUILDING 5 BASEMENT KEY PLANS |
| Sheets |
| A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX |
| A-101 - BUILDING 5 BASEMENT KEY PLANS |
| A-401 - BUILDING 5 BASEMENT ENLARGED PLANS |
| A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS |
| A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS |
| A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN |
| B5_R2023_libby - Sheet - A-401 - BUILDING 5 BASEMENT ENLARGED PLANS |
| Sheets |
| A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX |
| A-101 - BUILDING 5 BASEMENT KEY PLANS |
| A-401 - BUILDING 5 BASEMENT ENLARGED PLANS |
| A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS |
| A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS |
| A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN |
| B5_R2023_libby - Sheet - A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS |
| Sheets |
| A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX |
| A-101 - BUILDING 5 BASEMENT KEY PLANS |
| A-401 - BUILDING 5 BASEMENT ENLARGED PLANS |
| A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS |
| A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS |
| A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN |
| B5_R2023_libby - Sheet - A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS |
| Sheets |
| A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX |
| A-101 - BUILDING 5 BASEMENT KEY PLANS |
| A-401 - BUILDING 5 BASEMENT ENLARGED PLANS |
| A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS |
| A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS |
| A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN |
| B5_R2023_libby - Sheet - A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN |
| Sheets |
| A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX |
| A-101 - BUILDING 5 BASEMENT KEY PLANS |
| A-401 - BUILDING 5 BASEMENT ENLARGED PLANS |
| A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS |
| A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS |
| A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN |
File details come from the government source that posted it. Updated .