This solicitation is for renovations to linen rooms in Building 5 at the Edward P. Boland VA Medical Center. The solicitation number is 36C24124B0007 and is seeking offers to renovate two basement linen rooms, including demolishing existing walls and ceilings, installing new walls and ceilings, and upgrading mechanical, electrical and plumbing systems. The architectural drawings provide details on the scope of demolition and new construction for the rooms. Offerors should carefully review the drawings and specifications to understand the requirements. The period of performance is 120 calendar days from NTP. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration VISN 1.

View the file

Other files

File Type Posted
S04_Sign In Roster B5 Renovate Linen Rooms 631-24-002.pdf PDF
36C24124B0007 0005.docx DOCX document
36C24124B0007 0004.docx DOCX document
36C24124B0007 0003.docx DOCX document
Pictures.pdf PDF
Combined Specs Renovate B5 Linen Rooms Project 631-24-002 V2.pdf PDF
Drawings.pdf PDF
36C24124B0007 0002.docx DOCX document
36C24124B0007 0001.docx DOCX document
S02 Combined Specs Renovate B5 Linen Rooms Project 631-24-002.pdf PDF
36C24124B0007_1.docx DOCX document
S02_Combined Attachments.pdf PDF
S02_WD_MA20230003_10.13.2023.pdf PDF
S02_SOW_Renovate B5 Linen Rms.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABBREVIATION TERM

& AND

@ AT

# NUMBER

ABV ABOVE

APPROX APPROXIMATE

ARCH ARCHITECTURAL

BB BACK TO BACK

BLDG BUILDING

BLK BLOCK

BRP BEARING PLATE

BOF BOTTOM OF FOOTING

BOTT BOTTOM

BS BACK SIDE

CL CENTERLINE

CLR CLEAR

CJ CONTROL JOINT

COL COLUMN

CONC CONCRETE

CONN CONNECTION

CONT CONTINUOUS

CORP CORPORATION

DEMO DEMOLITION

DIA DIAMETER

DWL DOWEL

EF EACH FACE

EJ EXPANSION JOINT

EMBED EMBEDMENT

EOD EDGE OF DECK

EOG EDGE OF GIRT

ES EACH SIDE

EW EACH WAY

FB FLANGE BRACE

FDN FOUNDATION

FTG FOOTING

FLG FLANGE

FS FAR SIDE

GA GAGE, GAUGE

GALV GALVANIZED

GEN GENERAL

GR GUARD RAIL

GRTG GRATING

HORIZ HORIZONTAL

HPT HIGH POINT

HSS HOLLOW STRUCTURAL SECTION

IJ ISOLATION JOINT

JT JOINT

JST JOIST

KB KNEE BRACE

LG LONG

LLH LONG LEG HORIZONTAL

LLV LONG LET VERTICAL

LSH LONG SIDE HORIZONTAL

LSV LONG SIDE VERTICAL

LPT LOW POINT

MAX MAXIMUM

MIN MINIMUM

MFR MANUFACTURER

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NS NEAR SIDE

NTS NOT TO SCALE

OC ON CENTER

OH OPPOSITE HAND

OPP OPPOSITE

PCP PRECAST HOLLOW CORE PLANK

PEMB PRE-ENGINEERED METAL BUILDING

PL PLATE

PMF PREMOLDED FILLER

PROJ PROJECTION

RECT RECTANGULAR

REQ'D REQUIRED

SCHED SCHEDULE

SECT SECTION

SHT SHEET

SIM SIMILAR

SPA SPACES

STD STANDARD

STIFF STIFFENER PLATE

STIRR STIRRUP

STL STEEL

T/G TONGUE AND GROOVE

THK THICK

TOF TOP OF FOOTING

TOS TOP OF STEEL

UN UNLESS NOTED

UNO UNLESS NOTED OTHERWISE

VERT VERTICAL

VB VERTICAL BRACE

W/ WITH

W/O WITHOUT

WP WORK POINT

WT WEIGHT

WWR WELDED WIRE REINFORCING

CENTER LINE

DETAIL INDICATOR

DIMENSION LINE

NEW DOOR OPENING

- SEE DOOR SCHEDULE, DETAILS AND

ELEVATIONS SHEET

DRAWING BLOCK TITLE, TYPICAL

CORRIDOR ELEVATION INDICATOR

BUILDING SECTION INDICATOR

TYPICAL DETAIL INDICATOR

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

EXISTING ROOM TAG - ROOM NAME AND NUMBER

COLUMN GRID

ARCHITECTURAL KEYNOTE TAG

WALL OR PARTITION TYPE

FIRE EXTINGUISHER CABINET

CORNER GUARD

NORTH ARROW

CG

FEC

X1234

DETAIL NUMBER

SHEET NUMBER

XX-XX

1"

XX-XX

CL

XX-XX

x'-x" SPOT ELEVATION

1 REVISION

BREAK LINE

DD ROOM TAG - ROOM NAME AND NUMBER

X

EXISTING DOOR OPENING

1 View Name 1/8" = 1'-0"

AE888

Room name

Room name

SD ROOM TAG - ROOM NAME AND AREA

Room name

SHEET NUMBERDETAIL

NUMBER

DETAIL

NUMBER

SHEET NUMBER

88 88

HW

-X

X

HARDWARE TAG

SEE SPECIFICATIONS

PLACE DOOR

TAG HERE

A101 BUILDING ELEVATION

SHEET NUMBERDETAIL

NUMBER

XXXXX

HRDW

XXXXX

HRDW

XXXXX EXISTING DOOR TAG

NEW DOOR TAG

N P N

LIFE SAFTEY ROOM TAG - ROOM NAME, NUMBER AND AREARoom name

REFLECTED CEILING KEYNOTE TAGX

WINDOW TYPE TAG#

RESTROOM ACCESSORY TAGX

INTERIOR SIGNAGE TAGS#

AREA GENERALLY NOT IN CONTRACT

1. THE CONTRACTOR SHALL COORDINATE WITH THE VA HOSPITAL'S JCAHO INSPECTION SCHEDULE WITH THE COR. NO CONTRACTOR WORK SHALL

BE PERFORMED DURING TWO WEEKS IN EACH YEAR DURING A JCAHO INSPECTION

2. PROJECT AREAS WILL BE OCCUPIED DURING PERFORMANCE OF WORK. IMMEDIATE AREAS OF ALTERATIONS WILL BE VACATED. ALL CONTRACTOR

WORK WILL BE PERFORMED DURING NORMAL DAYTIME WORKING HOURS

3. BEFORE STARTING WORK WITHIN AN OCCUPIED AREA, THE CONTRACTOR WILL BE RESPONSIBLE TO SET-UP TEMPORARY/PERMANENT CONSTRUCTION/ICRA BARRIERS WITH ANTEROOM AND MAINTAIN NEGATIVE PRESSURE. ALL TEMPORARY CONSTRUCTION BARRIERS OUTSIDE THE INDICATED CONSTRUCTION PHASE AREA WILL BE REMOVED AT THE CONCLUSION OF THE WORK SHIFT. THE CONTRACTOR WILL BE RESPONSIBLE TO CLEAN AND PREPARE THE AREA TO BE OCCUPIED BY MEDICAL CENTER STAFF AND RESIDENCE

4. DIMENSIONS SUPERSEDE DRAWINGS. DO NOT SCALE PLANS. DIMENSIONS ARE TO THE FACE OF EXISTING MATERIALS UNLESS OTHERWISE NOTED. DIMENSIONS AND ELEVATIONS SHALL BE VERIFIED AT THE SITE BEFORE PROCEEDING WITH THE WORK. NOTIFY THE ARCHITECT IMMEDIATELY OF ANY DISCREPANCIES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, AND MATERIALS REQUIRED FOR THE CONTRACTED WORK. REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATIONS AND ERECTION

5. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW ALL APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION. ALL CONSTRUCTION WORK SHALL BE PERFORMED IN CONTRACTOR'S RESPONSIBILITY TO DETERMINE CONSTRUCTION PROCEDURES AND SEQUENCE AND TO INSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING CONSTRUCTION SHALL PROVIDE ADEQUATE SHORING AND BRACING DURING DEMOLITION AND CONSTRUCTION TO SUPPORT LOADS. SUCH MATERIAL SHALL BE REMOVED AT THE COMPLETION OF WORK AND SHALL REMAIN THE CONTRACTOR'S PROPERTY AFTER THE COMPLETION OF THE PROJECT

6. DO NOT CUT AND PATCH STRUCTURAL ELEMENTS IN A MANNER THAT WOULD REDUCE THEIR LOAD CARRYING CAPACITY OR LOAD-DEFLECTION

RATIO

7. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. IS REQUIRED TO BE REMOVED, RESTORE EXPOSED FINISHES OF CUT AND PATCHED AREAS AND EXTEND FINISH RESTORATION INTO ADJOINING CONSTRUCTION IN A MANNER THAT WILL ELIMINATE EVIDENCE OF PATCHING AND REFINISHING. CUT EXISTING CONSTRUCTION USING METHODS LEAST LIKELY TO DAMAGE ELEMENTS TO BE RETAINED OR ADJOINING CONSTRUCTION. WHERE INDICATED TO REMOVE FINISHES, REMOVE SO TOTALLY, FROM PLANE TO PLANE, TREAT REMAINING SUBSURFACE TO

RECEIVE NEW FINISHES DESIGNATED

8. WHERE EXISTING CONSTRUCTION, EQUIPMENT, ETC. SHOWN TO BE RELOCATED SHALL BE COORDINATED BY THE CONTRACTOR WITH THE VA PRIOR TO START OF WORK IN EACH AREA. THE VA WILL REMOVE ALL ITEMS OF SALVAGEABLE VALUE, INCLUDING BUT NOT LIMITED TO DOORS, HARDWARE, MOVEABLE EQUIPMENT NOT ALREADY DESIGNATED FOR REINSTALLATION/REUSE, PRIOR TO CONTRACTOR COMMENCING WORK

9. WHERE EXISTING PARTITIONS HAVE BEEN REMOVED OR NEW SERVICES PENETRATE EXISTING SURFACES, THE OPENINGS SHALL BE PATCHED TO

MATCH THE EXISTING ADJACENT SURFACES FINISH, TEXTURE AND SHEEN

10. IN GENERAL, WHEREVER SERVICES ARE REMOVED, THE OPENINGS SHALL BE PATCHE3D TO MATCH THE EXISTING ADJACENT SURFACES FINISH TEXTURE AND SHEEN. WHERE REMOVAL OF EXISTING CONSTRUCTION, PIPING, DUCTWORK AND OTHER ITEMS CREATES OPENINGS IN THE WALLS, FLOORS OR CEILINGS, PATCH OPENINGS IMMEDIATELY WITH THE SAME MATERIALS AS ADJACENT CONSTRUCTION. MAINTAIN THE REQUIRED FIRE RATING. SEE MEP DRAWINGS FOR ADDITIONAL INFORMATION. FILL IN ALL EXISTING OPENINGS THAT ARE NOT TO REMAIN, UNLESS OTHERWISE

NOTED. FINISH TO MATCH FINISH OF ADJACENT SURFACE

11. A HAZARDOUS MATERIALS SURVEY WAS CONDUCTED, AND INCLUDED IN THE SPECIFICATIONS AND REPORTS.

12. AFTER COMPLETION OF DEMOLITION, SCHEDULE A WALK-THROUGH WITH THE COR FOR REVIEW OF EXISTING CONDITIONS

13. PATCH AND FIRE STOP AT ABANDONED PENETRATIONS THROUGH THE CONCRETE FLOORS, WALLS, AND ROOF DECK

1. DIMENSIONS TO EXISTING WORK SHALL BE TAKEN TO FACE OF FINISH SURFACE

2. DO NOT SCALE DRAWINGS. DRAWINGS ARE CONCEPTUAL PLANS

3. THE WORK OF THE CONTRACTOR SHALL INCLUDE ALL LABOR AND MATERIALS FOR ALL TRADES CONCERNED FOR COMPLETING THE

PROJECT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS

4. THE CONTRACTOR SHALL PROCURE, COMPLETE AND APPLY FOR ALL PERMITS AS REQUIRED TO CONSTRUCT THE PROJECT

5. THE CONTRACTOR SHALL BE FAMILIAR WITH THE CONTRACT DOCUMENTS AND MUST VISIT THE SITE AND BE ACQUAINTED WITH THE

CONDITIONS AFFECTING THE WORK

6. ALL WORKMANSHIP IS TO BE FIRST RATE, HIGH QUALITY, AND ACCOMPLISHED IN A WORKMANLIKE MANNER BY SKILLED CRAFTSMEN

USING ACCEPTED PRACTICES AND METHODS APPROPRIATE TO THE TRADE INVOLVED

7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY CLEANING UP OF THE WORK AREA. THE AREA SHALL BE CLEANED EACH DAY AND TRASH SHALL BE DISPOSED OF AT THE END OF EACH DAY. AT THE END OF THE PROJECT, THE CONTRACTOR SHALL CLEAN THE

WORK AREA THOROUGHLY

8. ALL WORK SHALL BE GUARANTEED FOR ONE YEAR FROM THE TIME OF ACCEPTANCE BY THE OWNER UNLESS OTHERWISE NOTED IN THE

SPECIFICATIONS

9. PRIOR TO START OF CONSTRUCTION, CONTRACTOR SHALL VERIFY ALL BUILDING CONDITIONS, COORDINATE ALL DIMENSIONS IN FIELD

AND VERIFY ALL LOCATIONS OF UTILITIES IN THE FIELD.

10. ALL PLUMBING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL PLUMBING CODE. INSTALL ALL WATER, WASTE AND VENT PIPING IN ACCORDANCE WITH ALL APPLICABLE CODES. REVIEW DRAWINGS AND PROVIDE ALL WORK FOR A COMPLETE AND OPERABLE SYSTEM, INCLUDING ALL INCIDENTALS, REQUIRED BY CODE AGENCIES AND LOCAL GOVERNING BODIES. CODES INCLUDE BUT

ARE NOT LIMITED TO:

VA PLUMBING DESIGN GUIDE - 2021

11. ALL HEATING, VENTILATING AND AIR CONDITIONING WORK SHALL CONFORM TO THE ADOPTED EDITION OF THE INTERNATIONAL MECHANICAL AND ENERGY CODES (AS APPLICABLE), STATE CODES, AND ANY REQUIREMENTS OF THE LOCAL AUTHORITIES HAVING

JURISDICTION. CODES INCLUDE, BUT ARE NOT LIMITED TO:

NFPA 101 - 2021

NFPA 70 - 2020

NFPA 90A - 2021

NFPA 99 - 2021

NFPA 101 - 2021

VA HVAC DESIGN GUIDE - 2021

13. THE COMPLETE ELECTRICAL SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL ELECTRICAL CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES. CODES INCLUDE, BUT ARE NOT

LIMITED TO:

NFPA 70 - 2021

NFPA 101 - 2021

VA ELECTRICAL DESIGN GUIDE - 2019

VA ELECTRICAL DESIGN MANUAL FOR REPLACEMENT HOSPITALS, CLINICAL ADDITIONS, ENERGY CENTERS, AND LABORATORY

BUILDINGS - 2015

VA LIGHTING DESIGN MANUAL - 2022

VA RADIOLOGY DESIGN MANUAL - 2008

VA PHYSICAL SECURITY DESIGN MANUAL FOR LIFE SAFETY PROTECTED FACILITIES - 2021

14. THE COMPLETE FIRE PROTECTION SYSTEM AND INSTALLATION SHALL COMPLY AND CONFORM TO ALL ADOPTED CODES, REGULATIONS OF THE NATIONAL FIRE PROTECTION CODE AS WELL AS TO ALL STATE AND LOCAL LAWS, ORDINANCES AND CODES. CODES INCLUDE, BUT ARE NOT LIMITED TO:

NFPA 101 - 2021

NFPA 13 - 2022

NFPA 72 - 2022

VA FIRE PROTECTION DESIGN GUIDE - 2021

15. PRIOT TO ANY EXISTING TELECOMMUNICATION ROOM BEING TAKEN OFF-LINE, THE FOLLOWING ITEMS MUST BE COMPLETE, FUNCTIONAL, AND TESTED:

A. THE COMPLETE SITE FIBER OPTIC LINE (FO) SYSTEM.

B. DATA CENTER (ADDITION TO BUIDLING 22)

C. NEW INDIVIDUAL BUILDING TELECOMMUNICATION ROOMS AND ADDITIONS (BUILDINGS 1, 8, AND 9).

1. REFER TO SPECIFICATIONS SECTION 02 41 19 - SELECTIVE DEMOLITION FOR ADDITIONAL REQUIREMENTS AND

INFORMATION.

2. PROJECT SCOPE LINE IS INDICATED FOR GENERAL INTENT ONLY. ADDITIONAL DEMOLITION WILL BE REQUIRED OUTSIDE OF THIS LINE. ARCHITECTURAL DEMOLITION DRAWINGS ARE FOR SCHEMATIC PURPOSES. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH THE ENTIRE SET OF CONTRACT DOCUMENTS FOR FULL SCOPE OF

DEMOLITION WORK REQUIRED FOR THE PROJECT.

3. EXISTING CONDITIONS SHOWN ON THESE DRAWINGS ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR THE CONTRACTED WORK.

REPORT ALL DISCREPANCIES TO ARCHITECT PRIOR TO FABRICATION, ERECTION AND/OR INSTALLATION.

4. COORDINATE ALL NEW PENETRATIONS AND/OR OPENINGS WITH OTHER ASSOCIATED TRADES.

5. THE OWNER MAY SELECT AND TAG ITEMS FOR DEMOLITION TO BE SALVAGED. THE CONTRACTOR SHALL REMOVE SELECTED ITEMS FROM SCOPE OF WORK AND DELIVER TO THE OWNER'S LOCATION WITHIN THE EXISTING FACILITY.

6. CONTRACTOR SHALL PROVIDE HEPA FILTERED NEGATIVE AIR MACHINE(S) TO MAINTAIN NEGATIVE PRESSURE TO SCOPE OF WORK AREA ENSURING NO DUST WILL BE TRANSFERRED TO OCCUPIED AREAS. PROVIDE VISUAL

PRESSURE MONITORING DEVICE AT DUST PROOF BARRICADE TO CONFIRM PRESSURE.

7. THE FACILITY'S EXISTING SMOKE AND FIRE SUPPRESSION SYSTEM SHALL REMAIN IN OPERATION DURING THE ENTIRE CONSTRUCTION PHASE. WHERE EXISTING CEILING IN THE NEW ROOMS IS BEING REMOVED, G.C. TO COORDINATE THE REPLACEMENT OR MODIFICATION OF SPRINKLER SYSTEM AT THE SAME TIME OF CEILING REMOVAL TO MAINTAIN

SPRINKLER PROTECTION.

8. ALL TEMPORARY BARRIERS ARE TO BE 1 HOUR FIRE BARRIERS WHERE CEILING TILES IN THE CORRIDORS CANNOT BE REPLACED AT THE END OF THE WORK SHIFT OR PROVIDE TEMPORARY UPRIGHT SPRINKLER HEAD FOR THE

DURATION OF THE WORK BEING PERFORMED IN THE CORRIDOR.

9. ALL DEMOLITION WORK BEING DONE OUTSIDE OF TEMPORARY PARTITIONS IS TO BE APPROPRIATELY SEALED OFF TO PREVENT THE TRANSMISSION OF DUST AND DEBRIS AND MINIMIZE DISRUPTION TO VISITORS, RESIDENTS AND STAFF.

COORDINATE LOCATION OF BARRIERS WITH OWNER.

10. REMOVE PARTITIONS INDICATED FROM THE FLOOR TO THE UNDERSIDE OF THE STRUCTURE ABOVE.

11. PREPARE ALL ADJACENT SURFACES TO RECEIVE NEW CONSTRUCTION AND SCHEDULED FINISH. EXISTING WALLS SHOWN TO BE REMOVED SHALL BE DEMOLISHED COMPLETELY. THIS INCLUDES THE REMOVAL OF REINFORCEMENT, SOFFITS, DOORS, WINDOWS, FRAMES AND OVERHEAD BRACING. COORDINATE WITH MECHANICAL AND ELECTRICAL FOR DISCONNECTION AND REMOVAL OF EXISTING UTILITIES AND DEVICES LOCATED WITHIN AREAS SCHEDULED TO

BE DEMOLISHED.

12. SOME ITEMS MAY BE INDICATED IN THE DEMOLITION DRAWINGS AND DEMOLITION NOTES WHICH ARE NOT NECESSARILY DEMOLITION WORK BUT ARE INCLUDED TO DESCRIBE THE OVERALL SCOPE OF THE PROJECT AND TO AID IN THE DEMOLITION COORDINATION. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK REQUIRED TO

COMPLETE THE INTENDED WORK OF THE OVERALL PROJECT.

13. REMOVE MISCELLANEOUS ITEMS WITHIN LIMITS OF DEMOLITION. COORDINATE WITH OWNER ANY ITEMS TO BE

SALVAGED.

14. DEMOLITION OF CEILINGS TO BE COORDINATED WITH ELECTRICAL WORK ON REMOVAL OF LIGHTS, CONDUIT, TIES, SUPPORTS AND RELATED WIRING. COORDINATE WITH MECHANICAL ON REMOVAL OF DIFFUSERS GRILLS, AND

RELATED DUCTWORK EQUIPMENT CONTAINED THEREIN.

15. ALL FIRE RATED ASSEMBLIES (COLUMNS, SHAFTS, WALLS, ETC.) SHALL BE MAINTAINED OR BE RELOCATED / PATCHED.

MATCH EXISTING FIRE RATING UNLESS NOTED OTHERWISE.

16. REMOVE EXISTING DOORS, FRAMES, SIDELIGHTS, ANCHORS, THRESHOLDS AND HARDWARE AS INDICATED WITHIN LIMITS OF CONSTRUCTION. PATCH AND REPAIR WALL AND FLOOR TO MATCH EXISTING. OWNER SHALL HAVE THE RIGHT TO SALVAGE ANY AND ALL DOORS AND HARDWARE. CONTRACTOR SHALL VERIFY DOORS FOR SALVAGE OR

RELOCATION PRIOR TO COMMENCING DEMOLITION.

17. WHERE NEW DOORS ARE INDICATED, CUT OPENINGS IN EXISTING WALL. PREPARE OPENINGS FOR NEW DOOR.

PATCH REQUIRED WALLS TO MATCH EXISTING. PROVIDE LINTELS AS REQUIRED FOR NEW OPENINGS. PREPARE

SURFACES FOR SCHEDULED FINISHES.

18. PROTECT EXISTING FINISHED WORK & EQUIPMENT WHICH IS TO REMAIN IN AREAS OF DEMOLITION WORK.

19. AFTER THE REMOVAL OF ICRA WALLS, CLEAN AND PATCH EXISTING WALLS AND CEILINGS EFFECTED BY

CONSTRUCTION AND MATCH EXISTING FINISHES.

20. REMOVE ALL PLUMBING FIXTURES AS INDICATED WITHIN THE LIMITS OF CONSTRUCTION. CAP ALL PLUMBING LINES

NOT REQUIRED BY NEW CONSTRUCTION.

21. GC TO PERFORM SURVEY OF EXISTING SERVICE LINES IN SCOPE OF WORK PRIOR TO START OF WORK. REPORT

FINDINGS TO COR AND ARCHITECT.

22. HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO ASBESTOS AND/OR LEAD HAVE BEEN IDENTIFIED IN BUILDINGS THROUGHOUT THE CAMPUS. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2 SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL

WORK AND NOTIFY THE COR IMMEDIATELY.

A. DO NOT SCALE DRAWINGS. CONTRACTOR(S) ARE TO VERIFY SITE DIMENSIONS AND CONDITIONS PRIOR TO WORK.

B. CONSTRUCTION SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE APPLICABLE CODES INCLUDING

ACCESSIBILITY STANDARDS AND THE REQUIREMENTS OF "AMERICANS WITH DISABILITIES ACT."

C. CONTRACTOR(S) SHALL VISIT THE SITE AND CORRELATE THE REQUIREMENTS OF THE DOCUMENTS WITH THE

EXISTING CONDITIONS.

D. DRAWINGS ARE DIAGRAMMATIC AND SINCE EXISTING CONDITIONS, INCLUDING AREAS ABOVE ACCESSIBLE

CEILINGS MAY AFFECT NEW WORK, THE CONTRACTOR SHALL COORDINATE AND ALTER NEW WORK TO PROPERLY FIT THE EXISTING CONDITIONS. THE WORK SHALL BE PERFORMED AT NO EXTRA COST. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SITE PRIOR TO THE START OF CONSTRUCTION. IF DISCREPANCIES ARE FOUND, THE ARCHITECT SHALL BE NOTIFIED FOR CLARIFICATION BEFORE COMMENCING

WITH THE WORK.

E. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE SHOWN. WHEN SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, CONSULT THE ARCHITECT BEFORE PROCEEDING WITH THE WORK.

F. SOME MASONRY AND LUMBER DIMENSIONS SHOWN ON THE DRAWINGS ARE NOMINAL DIMENSIONS.

CONTRACTOR(S) SHALL COORDINATE ACTUAL DIMENSIONS WITH THE JOB CONDITIONS. REPORT ALL

DISCREPANCIES TO THE ARCHITECT.

G. EXISTING CONDITIOPNS SHOWN ON THIS DRAWING ARE NOT GUARANTEED TO BE COMPLETE. THE CONTRACTOR(S) SHALL FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND MATERIALS REQUIRED FOR CONTRACTED WORK. REPORT ALL DISCREPANCIES TO THE ARCHITECT PRIOR TO FABRICATION AND ERECTION.

H. THE TERM 'PATCH TO MATCH' OR 'CUTTING AND PATCHING' DENOTES THAT REPAIR WORK IS NECESSARY TO CONSTRUCT A FLOOR, BASE, WAINSCOT, WALL OR CEILING TO MATCH THE EXISTING SURFACE FINISH, TEXTURE

AND SHEEN.

I. WHERE NEW OPENINGS OCCUR IN STRUCTURAL BEARING WALL, CONTRACTOR IS RESPONSIBLE FOR TEMPORARY

SUPPORTS AND / OR SHORING AS REQUIRED FOR INSTALLATION OF LINTELS.

J. WHERE EXISTING DOORWAYS ARE TO BE FILLED IN, CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING WALL

WIDTHS.

K. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ALL ACCESS DOORS, ACCESS PANELS AND FRAMES, INCLUDING, BUT NOT LIMITED TO THOSE SPECIFIC IN CONSTRUCTION DOCUMENTS AND FURNISHED BY OTHER CONTRACTORS. ALL ACCESS DOORS AND PANEL LOCATIONS TO BE COORDINATED AND APPROVED BY THE ARCHITECT PRIOR TO THE INSTALLATION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PAINTING ALL ACCESS PANELS AND ACCESS DOORS. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL PAINT

COLORS WITH THE ARCHITECT PRIOR TO COMMENCING WITH WORK.

L. WHEN POWER AND DATA RECEPTACLES ARE INTENDED TO BE ADJACENT, THEY SHOULD BE PLACED NO MORE

THAN 1'-0" APART.

FIRE RESISTANCE RATING

A. FIRE RATING INDICATED ON A WALL SHALL MEAN THE ENTIRE LENGTH AND HEIGHT OF WALL TO BE FIRE RATED.

B. ALL PIPING, DUCTS, CABINETS, ETC. THAT PENETRATE WALLS SHALL BE INSTALLED IN A MANNER THAT WILL

PRESERVE THE FIRE RESISTANCE RATING OF THAT WALL.

C. PRESERVE ALL FIRE RESISTANT RATINGS OF EXISTING WALL UNLESS NOTED OTHERWISE.

DIMENSIONING

A. INTERIOR PARTITIONS ARE DIMENSIONED TO FACE OF GYPSUM WALL BOARD EXCLUSIVE OF FINISH MATERIAL, SUCH AS CERAMIC TILE OR WOOD PANELING. THE CONTRACTOR SHALL COORDINATE FINISH DIMENSIONS AND FACE OF WALL DIMENSIONS WITH FINISH SCHEDULE WHEN CRITICAL TO THE INSTALLATION OF MILLWORK OR

EQUIPMENT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

LADO

Office of Construction and

Management

C :\U se rs

\V H

AN

H

M Au ga rL

\D oc um en ts \B

5_ R

_l ib by .a ug ar te nA

A9 A4

.rv t

9/

/2

1:

:0

PM

A-000

BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND

DRAWING INDEX

06/06/2023

Edward P. Boland VA Medical Center

###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW

Revisions: Date:

Sheet List No. NAME

A-000 BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX

A-101 BUILDING 5 BASEMENT KEY PLANS

A-402 BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS

A-403 BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS

A-404 BUILDING 5 BASEMENT ELECTRICAL PLAN

ABBREVIATION TABLE ARCHITECTURAL SYMBOLS GENERAL CONDITION NOTES

GENERAL CONSTRUCTION NOTES

GENERAL DEMOLITION NOTES

GENERAL NOTES

DN

U P

D N

D N

UP

U P

Hatchway

DN

U P

D N

D N

UP

U P

Hatchway

BUILDING 5

NORTHAMPTON

T11

13S

9A 30

N

A-401

014A

CRAWL SPACE

015HALF DOOR

HALF DOORCRAWL SPACE016

011 ENG

ENG

019020 021022

004 006

HK

003002

EL

A-404A-403

014A

CRAWL SPACE

015HALF DOOR

HALF DOORCRAWL SPACE016

011 ENG

ENG

019020 021022

004 006

HK

003002

EL

A-402

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

LADO

Office of Construction and

Management

C :\U se rs

\V H

AN

H

M Au ga rL

\D oc um en ts \B

5_ R

_l ib by .a ug ar te nA

A9 A4

.rv t

9/

/2

1:

:0

PM

A-101

BUILDING 5 BASEMENT KEY PLANS

06/06/2023

Edward P. Boland VA Medical Center

###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW

FULLY SPRINKLERED

SITE KEY PLAN

3/32" = 1'-0"1 BASEMENT PLAN N

P N

3/32" = 1'-0"2 BASEMENT REFLECTED CEILING PLAN N

P N

Revisions: Date:

GENERAL AREA OF WORK

N

P N

PANEL

ABOVE

NEW FURRED WALL TO

RECEIVE NEW FINISHES;

1 LAYER 5/8" GYPSUM

WALL BOARD ON 3-5/8"

METAL STUDS.

FURRED WALL WITH COR

VERIFY LOCATION OF NEW

FURRED WALL WITH COR

VERIFY LOCATION OF NEW

1V.

I.F

FR

AM

E

V.I.F.

FRAME

FEC-S

(n)

FEC-R

(n)

VERIFY LOCATION WITH COR

VERIFY LOCATION WITH COR

017A

NEW ROOF PENETRATIONS REQUIRED TO

ACOMMODATE NEW INTAKE/EXHAUST DUCT.

PATCH/REPAIR ROOF AS NEEDED.

EXISTING CONSTRUCTION TO REMAIN. PATCH AS

REQUIRED FOR NEW FINISHES IF INDICATED ON

FINISH SCHEDULE.

NEW CONSTRUCTION

EXISTING CONSTRUCTION TO REMAIN. PATCH AS

REQUIRED BY THE SPECIFICATIONS WITHIN THE

CONTRACT AREA.

EXISTING WALL CONSTRUCTION SHOWN HATCHED TO BE

DEMOLISHED AND REMOVED IN ITS ENTIRETY

EXISTING DOOR, HARDWARE AND HM FRAME SHOWN AS

HATCHED TO BE REMOVED IN ITS ENTIRETY

DEMOLISHED MATERIAL NOTE

ALL DEMOLISHED PLUMBING FIXTURES, PIPING, FITTINGS & ALL ASSOCIATED HARDWARE SHALL

BECOME THE PROPERTY OF THE PLUMBING CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS

OTHERWISE INSTRUCTED BY VA CORE.

1. APPLY FRP FINISH TO ALL WALLS IN SPACE, FLOOR TO CEILING IN ROOM 020.

2. ALL WALL FINISHES IN 017 TO REMAIN.

3. ALL FINISHES DISTURBED FOR DEMOLITION TO BE REPLACED TO MATCH EXISTING.

4. NEW DOOR TO BE SUPPLIED WITH AUTO OPERATOR, CARD READER, ELECTRIC STRIKE,

PUSH BUTTONS AND VISION LITES. COORDINATE LOCATION OF WALL MOUNTED DEVICES

WITH VA.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

LADO

Office of Construction and

Management

C :\U se rs

\V H

AN

H

M Au ga rL

\D oc um en ts \B

5_ R

_l ib by .a ug ar te nA

A9 A4

.rv t

9/

/2

1:

:1

PM

A-401

BUILDING 5 BASEMENT ENLARGED PLANS

06/06/2023

Edward P. Boland VA Medical Center

###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW

FULLY SPRINKLERED

BASEMENT - PINE BUILDING

1/4" = 1'-0"2 BASEMENT FLOOR PLAN - NEW WORK

1/4" = 1'-0"1 BASEMENT FLOOR PLAN - DEMO

SYMBOL LEGEND

NOTE:

THIS AREA MAY CONTAIN HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO

ASBESTOS AND/OR LEAD. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2

SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT

REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS

PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND

THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL WORK

AND NOTIFY THE COR IMMEDIATELY.

Revisions: Date:

KEYNOTES

MARK DESCRIPTION

1 REMOVE EXISTING DEVICES (CAST IN PLACE OR SURFACE MOUNTED) TO BE

REPLACED/REUSED IN NEW WALLS

2 DEMO EXISTING AIR DRYER, REMOVE PIPING BACK TO SOURCE.

3 DEMO, CUT/CAP ALL ABANDONED PIPING BACK TO SOURCE, INCLUDING ANY EXISTING

ABANDONED PIPING.

4 DEMO EXISTING DOOR AND ADJACENT FRAMING. TO BE REPLACED WITH NEW 1 HR

PARTITION AND 45 MIN. RATED DOOR AND FRAME.

SYMBOL LEGEND

NOTE:

THIS AREA MAY CONTAIN HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO

ASBESTOS AND/OR LEAD. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2

SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT

REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS

PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND

THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL WORK

AND NOTIFY THE COR IMMEDIATELY.

KEYNOTES

MARK DESCRIPTION

1 REINFORCE WALLS AND INSTALL NEW 45 MIN. FIRE RATED 4'-0"W X 7'-0"H DOOR AND 45

MIN. FIRE RATED FRAME.

2 GC TO PROTECT EXISITNG ELECTRICAL PANELS TO REMAIN DURING DEMOLITION AND

CONSTRUCTION. GC TO REINSTALL ANY EXISTING PANELS BACK IN THE SAME EXISTING

LOCATION AS REQUIRED. COORDINATE SERVICE INTERRUPTIONS WITH ELECTRICAL

CONTRACTOR AND COR

GENERAL NOTES

NEW WORK NOTES AND

LEGENDS - FLOOR PLAN

DEMOLITION NOTES AND

LEGENDS - FLOOR PLAN

EQUIPMENT LEGEND

MARK DESCRIPTION COUNT

FEC-R (n) FIRE EXTINGUISHER CABINET; SEMI-RECESSED; NEW 1 FEC-S (n) FIRE EXTINGUISHER CABINET; SURFACE MOUNTED; NEW 1

F

SD

F

F

GENERAL AREA OF WORK

N

P N

EXISTING SCONCE LIGHTING TO BE REMOVED

EXISTING WOOD CEILING TO BE REMOVED

WHERE EXISTING CEILING SYSTEM TO BE REMOVED.

COORDINATE REMOVAL OF CEILINGS WITH

REPLACEMENT OF EXISTING SPRINKLER HEADS WITH

NEW UPRIGHT SPRINKLER HEAD TO AVOID LOSS OF FIRE

PROTECTION IN THE CONSTRUCTION AREA.

SPRINKLER HEAD: MODIFY EXISTING FIRE PROTECTION

SYSTEM AS REQUIRED FOR NEW WORK

RELOCATE SPRINKLER HEADS TO CENTER OF NEW

CEILING TILE

B

A

017A

A

B

B

(E) WOOD CLG

@ 8'-2"

(E) WOOD CLG

@8'-2"

SP (n)

SP (n)SP (n)

SP (n)

A

375 CFM

A

375 CFM

B

425 CFM

B

425 CFM

OS (n)

L 2X4 (e)

L 2X4 (e)

L 2X4 (e)

L 2X4 (e)

L 2X4 (e)

L 2X4 (e)

L 2X4 (e)

L 2X4 (e)

L 2X4 (e)

L 2X4 (e)

L 2X4 (e)

L 2X4 (e)

OS (e)

OS (e)

SP (e) SP (e)

SP (e) SP (e)

SP (e) SP (e)

SP (e) SP (e)

SP (e)

SP (e)

(e)

(n)

WAP (n)

(e)

L 2x4 (n)

L 2x4 (n)

L 2x4 (n)

L 2x4 (n)

B

550 CFM

A

300 CFM

A

300 CFM

CEILING DEMOLITION NOTE

WHERE EXISTING CEILINGS IN THE NEW OR EXPANDED TR ROOMS ARE BEING PERMANENTLY

REMOVED, THAT WORK SHALL BE COORDINATED TO OCCUR AT THE SAME TIME AS REPLACEMENT

OF THE EXISTING SPRINKLER(S) WITH NEW UPRIGHT SPRINKLER(S) TO AVOID LOSS OF SPRINKLER

PROTECTION IN THESE SCOPE OF WORK AREAS.

DEMOLISHED MATERIAL NOTE

ALL DEMOLISHED PLUMBING FIXTURES, PIPING, FITTINGS & ALL ASSOCIATED HARDWARE SHALL

BECOME THE PROPERTY OF THE PLUMBING CONTRACTOR AND REMOVED FROM JOB SITE, UNLESS

OTHERWISE INSTRUCTED BY VA CORE.

1. RELOCATE EXISTING DEVICES TO CENTER OF TILE.

2. ADD SD'S AS REQUIRED.

3. PROVIDE (4) NEW 2X4 LED FIXTURES WITH OCCUPANCY SENSOR AND SWITCH IN ROOM

017. BASIS OF DESIGN FOR 2X4 FIXTURE: ACP-xpnl-300730.

4. INSTALL NEW 2X4 ACT CEILING IN ROOM 017

5. INSTALL NEW HORN/STROBE IN ROOM 017.

6. SEE MECHANICAL/ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.

1. REMOVE AND REPLACE EXISTING ACT TILES TO BE REPLACED WITH NEW.

2. REMOVE AND REPLACE GRID AS NEEDED TO FACILITATE NEW WORK.

3. MAINTAIN EXISTING FIRE PROTECTION THROUGHOUT CONSTRUCTION.

4. MAINTAIN EXISTING LIGHTS, FIRE ALARMS, SENSORS AND CEILING MOUNTED DEVICES

THROUGHOUT CONSTRUCTION IN ROOM 020.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

LADO

Office of Construction and

Management

C :\U se rs

\V H

AN

H

M Au ga rL

\D oc um en ts \B

5_ R

_l ib by .a ug ar te nA

A9 A4

.rv t

9/

/2

1:

:1

PM

A-402

BUILDING 5 BASEMENT ENLARGED REFLECTED

CEILING PLANS

06/06/2023

Edward P. Boland VA Medical Center

###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW

BASEMENT - PINE BUILDING

SYMBOL LEGENDSYMBOL LEGEND

KEYNOTES

MARK DESCRIPTION

A EXISTING WOOD CEILING TO BE REMOVED IN ITS ENTIRETY

B REMOVE EXISTING SCONCE LIGHTING IN ITS ENTIRETY

1/4" = 1'-0"1 BASEMENT RCP - DEMO

1/4" = 1'-0"2 BASEMENT RCP - NEW WORK

Revisions: Date:

EQUIPMENT LEGEND

MARK DESCRIPTION COUNT

A 24x24 SUPPLY GRILLE/DIFFUSER; NEW 4 B 24x24 RETURN GRILLE/DIFFUSER; NEW 3 F (e) FIRE ALARM HORN/STROBE; EXISTING 2 F (n) FIRE ALARM HORN/STROBE; NEW 1 L 2X4 (e) 2x4 LIGHT FIXTURE; EXISTING 12 L 2x4 (n) 2x4 LIGHT FIXTURE; NEW 4 OS (e) OCCUPANCY SENSOR; EXISTING 2 OS (n) OCCUPANCY SENSOR; NEW 1

SD SMOKE DETECTOR 1

SP (e) SPRINKLER; PENDANT; FULLY RECESSED; EXISTING 10 SP (n) SPRINKLER; PENDANT; FULLY RECESSED; NEW 4 WAP (n) WIRELESS ACCESS POINT; NEW 1

NOTE:

THIS AREA MAY CONTAIN HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO

ASBESTOS AND/OR LEAD. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2

SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT

REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS

PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND

THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL WORK

AND NOTIFY THE COR IMMEDIATELY.

NOTE:

THIS AREA MAY CONTAIN HAZARDOUS MATERIALS INCLUDING BUT NOT LIMITED TO

ASBESTOS AND/OR LEAD. REFER TO HAZARDOUS MATERIALS REPORT AND DIVISION 2

SPECIFICATION SECTIONS 02, 82, 11 (ASBESTOS ABATEMENT) AND 02, 83, 33.13 (LEAD PAINT

REMOVAL AND DISPOSAL), FOR INFORMATION PERTAINING TO THE EXTENT OF MATERIALS

PRESENT, AND THE REQUIRED ABATEMENT PROCESS. IF HAZARDOUS MATERIALS, BEYOND

THE SCOPE OF THE HAZARDOUS MATERIALS REPORT, ARE DISCOVERED STOP ALL WORK

AND NOTIFY THE COR IMMEDIATELY.

NEW WORK NOTES AND

LEGENDS - RCP

DEMOLITION NOTES AND

LEGENDS - RCP

GENERAL NOTES:

ROOM

A

300 CFM

10"ø

12"ø

10"ø

ELECTRIC

DUCT HEATER

12"ø

ERV-5-2

A

300 CFM ROOM

5-017

B TITUS 350RL RETURN/

EXHAUST

24" x 24"

12" x 12"/10"�

12" x 12"/12"�

15" x 15"/14"�

6" x 6"

8" x 8"

10" x 10"

12" x 12"

14" x 14"

16" x 16" B

PRVIDE 2" THICKNESS ASTM C612

INSULATION FOR BOTH SUPPLY AND

EXHAUST DUCT TYPICAL FOR ALL

ERV DUCT WORK.

550 CFM PRVIDE 2" THICKNESS ASTM C612

INSULATION FOR BOTH SUPPLY AND

EXHAUST DUCT TYPICAL FOR ALL ERV

DUCT WORK.

INSTALL NEW CEILING

MOUNTED ERV. THE UNIT

ACCESS DOOR SHALL BE

INSTALLED TO BE

ACCESSIBLE FROM BELOW.

ERV-5-1

TAG

A TITUS

MFR

DIFFUSER, REGISTER AND GRILLE SCHEDULE

MODEL

TDC SUPPLY

TYPE FACE SIZE

24" x 24" 6" x 6" / 6"�

NECK SIZE

9" x 9" / 8"�

CFM RANGE

0 - 125

126 - 275

276 - 375

376 - 470

471 - 650

0 - 125

126 - 225

226 - 350

351 - 550

551 - 750

751 - 1,050

REMARKS:

1. PROVIDE SQUARE TO ROUND ADAPTER WHERE REQUIRED.

2. COORDINATE MOUNTING TYPE AND LOCATION WITH ARCHITECTURAL CEILING PLAN AND BUILDING PLANS.

3. PROVIDE MFR'S INLET AIRFLOW SENSOR, AIRFLOW ADJUSTMENT DAMPER AND INSULATED BACKPAN BLANKET.

4. PROVIDE MOUNTING SLEEVE WITH INSIDE DOOR FRAME.

INSTALL EA/RA DUCT UP TO

GOOSE NECK ON ROOF. PROVIDE

FIRE DAMPER THROUGH FLOORS.

CEILING

MOUNT

ELECTRIC

DUCT HEATER

STORAGE

5-017B C

250 CFM TR

5-017A

TAG

A

375 CFM

BASIS OF DESIGN

MANUF.

ERV-5-1 RENEWAIRE

ERV-5-2 RENEWAIRE

MODEL

HE 1XINH

HE 1XINH

CFM

FAN DATA

ENERGY RECOVERY VENTILATOR SCHEDULE

SUMMER/COOLING WINTER/HEATING

ESP

0.5

0.5

QTY/HP

2/0.75

2/0.75

FLA

9.0

9.0

O.A.

R.A.

S.A.

O.A.

REMARKS:

1. ERV-5-1 MUST BALANCED TO EXHAUST 860 CFM AND SUPPLY 700 CFM AS PER SCHEDULE.

2.PROVIDE ELECTRIC DUCT HEATER MODEL EK-010 ,3KW TO TEMPERSUPPLY AIR TO 71F.

3.ERV-5-2 MUST BALANCED TO SUPPLY 550 AND EXHAUST 600 CFM.

4.PROVIDE ELECTRIC DUCT HEATER MODEL EK-010, 4KW TO TEMPER SUPPLY AIR TO 73F

5. UNIT SHALL BE UL LISTED, WITH UNIT MOUNTED DISCONNECT SWITCH AND SINGLE POINT POWER CONNECTION.

3. PROVIDE ASSOCIATED OUTSIDE AIR INTAKE AND DISCHARGE DUCTWORK, LOUVERS PLENUMS AND DAMPERS.

4. REFER TO FLOOR PLAN FOR ASSOCIATED DUCTWORK AND ACCESSORIES.

5. SEQUENCE OF OPERATIONS: ENERGY RECOVERY VENTILATOR SHALL BE PER MANFACTURE WALL TIMER SCHEDULE..

6. COORDINATE ELECTRICAL REQUIREMENTS WITH ELECTRICAL CONTRACTOR/DISCIPLINE.

7. INSTALL IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS.

8. PROVIDE INTERFACE WITH ELECTRIC DUCT HEATING COIL AND CAMPUS/BUILDING BMS (BUILDING MANAGEMENT SYSTEM).

R.A.

S.A.

1. THE MECHANICAL CONTRACTOR DRAWINGS ARE DIAGRAMMATIC ARE INTENDED TO INDICATE

THE SCOPE AND THE GENERAL ARRANGEMENT OF THE SYSTEM. WHERE APPLICABLE THE

FOLLOWING NOTES SHALL APPLY TO ALL MECHANICAL SYSTEM.

V/PH

120/1

ELECTRICAL DATA

MCA

MOCP

120/1 20 25

RATING

MERV 8

FILTER DATA

TYPE

PLEATED

MERV 8 PLEATED

REMARKS

DEPTH

2"

2"

1 - 8

1 - 8

2. THOUGH SOME PIPING OFFSETS AND TRANSITIONS ARE INDICATED, IT IS NOT THE INTENT OF

THE DRAWINGS TO SHOW ALL OFFSETS AND TRANSITIONS. THE CONTRACTOR SHALL FULLY

COORDINATE THE MECHANICAL WORK WITHIN ITSELF AND WITH THE WORK OF ALL OTHER

TRADES TO PROVIDE COMPLETE AND OPERABLE SYSTEMS WITHOUT INTERFERENCES.

3. ACCESS PANELS IN HARD SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS,

DAMPERS, CLEANOUTS, CONTROLS, ETC. ACCESS PANELS SHALL BE FURNISHED AND

INSTALLED UNDER THE ARCHITECTURAL SPECIFICATIONS. COORDINATE LOCATION WITH

MECHANICAL INSTALLATION AND DEMONSTRATE ACCESS TO EQUIPMENT SERVED.

4. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL

UNITS, FILTERS, COILS, ETC. LOSS FOR FILTERS SHALL BE FOR FILTERS AT 50% LOADING.

5. FOR TYPICAL WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT

DETAILS.

6. PROVIDE APPROVED FIRE STOPPING MATERIAL AROUND ALL PIPING PENETRATIONS (NEW

AND EXISTING) THROUGH FIRE RATED FLOORS AND WALLS.

7. SUPPORT ALL EQUIPMENT FROM STRUCTURE.

8. PATCH AND SEAL ALL REMAINING OPENINGS (NEW AND EXISTING) THROUGH FLOORS,

CEILING WALLS, AND ROOF RESULTING FROM DEMOLITION OR NEW WORK WITH MATERIALS

AND FINISHED TO MATCH EXISTING CONSTRUCTION AND FIRE RATING.

9. HVAC SHALL BE MAINTAINED TO ALL AREAS OUTSIDE OF THE CURRENT PHASE OF THE

RENOVATED AREA AT ALL TIMES. PROVIDE TEMPORARY CONNECTIONS AS REQUIRED.

MAX

S.P.D.

0.12

MAX

N.C.

REMARKS

1, 2, 3

10.DEMOLITION AND NEW WORK THAT WILL RESULT IN DOWN TIME OF SERVICES (HVAC,

PLUMBING , MEDICAL GASES...ETC)SHALL BE PERFORMED OFF HOURS, TO MINIMIZE DOWN TIME

TO ADJACENT SPACES.

11. MOUNT ALL THERMOSTATS AND SENSORS AS PER SPECIFICATION AND MANUFACTURE

REQUIREMENTS.

12. CONDENSATE DRAIN PIPING FROM COOLING COIL DRAIN PANS SHALL BE PITCHED DOWN IN

THE DIRECTION OF FLOW AT A MINIMUM OF 1/8" PER FOOT.

CEILING 0.10 25 1, 2

1 PARTIAL BASEMENT NEW WORK TR 5-017A

NTS

1" MESH STAINLESS STEEL

BIRDSCREEN

30°

Min. 18Ga. SEAMLESS WELDED

STAINLESS STEEL GOOSENECK

EXHAUST AIR HOOD. PROVIDE

INTERNAL BRACING AS REQ'D

DRIP FLASHING; FASTEN ALL

AROUND TO CURB.

SPECIFIED

DUCT SIZE

FIELD-BUILT WOODEN CURB

(BY ARCH. DIVISION)

FOR EXACT NATURE OF ROOF (SLOPPED OR FLAT)

CONST. CONSULT ARCH. DWGS.

OR CHECK ON-SITE

GOOSENECK INTAKE/EXHAUST DUCT DETAIL

P N

N

AREA OF WORK

ROOF - PINE BUILDING

PROVIDE ALUMINUM JACKETS FOR

ALL EXPOSED DUCT (TYPICAL).

P N

N

GENERAL AREA OF WORK

2 PARTIAL ROOF MECHANICAL NEW WORK

NTS

BASEMENT - PINE BUILDING

12"ø

12"ø

10"ø

12"ø

12"ø

12"ø

10"ø

12"ø

12"ø 12"ø

18 IN

C

H

ES (M

in.)

SPEC'D SIZE

+ 25%(FOR

INTAKE ONLY)

A

375 CFM

B

425 CFM

B

425 CFM

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

LADO

Office of Construction and

Management

C :\U se rs

\V H

AN

H

M Au ga rL

\D oc um en ts \B

5_ R

_l ib by .a ug ar te nA

A9 A4

.rv t

9/

/2

1:

:1

PM

A-403

BUILDING 5 BASEMENT & ROOF ENLARGED

MECHANICAL PLANS

06/06/2023

Edward P. Boland VA Medical Center

###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW

Revisions: Date:

12" = 1'-0"1 B5 DUCTWORK PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

LADO

Office of Construction and

Management

C :\U se rs

\V H

AN

H

M Au ga rL

\D oc um en ts \B

5_ R

_l ib by .a ug ar te nA

A9 A4

.rv t

9/

/2

1:

:1

PM

A-404

BUILDING 5 BASEMENT ELECTRICAL PLAN

06/06/2023

Edward P. Boland VA Medical Center

###-##-###BUILDING 5 UPGRADESISSUED FOR REVIEW

Revisions: Date:

NTS

10. PROVIDE (4) NEW 2X4 LED FIXTURES WITH OCCUPANCY SENSOR AND SWITCH IN ROOM 017. MINIMUM OF (1) ONE LIGHT TO BE FED FROM EXISTING EMERGENCY PANEL IN BASEMENT ELECTRIC ROOM. COORDINATE WITH COR. BASIS OF DESIGN FOR 2X4 FIXTURE: ACP-xpnl-300730.

11. PROVIDE (2) TWO NEW SURFACE MOUNTED OUTLETS, (1) ONE NEXT TO PANEL AND (1) ONE NEXT TO DOOR

IN ROOM 017. CIRCUITS TO BE FED FROM NEW PANEL.

12. NEW PANEL TO BE FED FROM NORMAL POWER 5-MDP IN BASEMENT. COORDINATE WITH COR.

13. EXISTING OUTLETS RELOCATED IN NEW WALLS IN ROOM 020 TO BE RE-FED FROM EXISTING CIRCUITS.

14. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

B5_R2023_libby - Sheet - A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX
Sheets
A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX
A-101 - BUILDING 5 BASEMENT KEY PLANS
A-401 - BUILDING 5 BASEMENT ENLARGED PLANS
A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS
A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS
A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN
B5_R2023_libby - Sheet - A-101 - BUILDING 5 BASEMENT KEY PLANS
Sheets
A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX
A-101 - BUILDING 5 BASEMENT KEY PLANS
A-401 - BUILDING 5 BASEMENT ENLARGED PLANS
A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS
A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS
A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN
B5_R2023_libby - Sheet - A-401 - BUILDING 5 BASEMENT ENLARGED PLANS
Sheets
A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX
A-101 - BUILDING 5 BASEMENT KEY PLANS
A-401 - BUILDING 5 BASEMENT ENLARGED PLANS
A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS
A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS
A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN
B5_R2023_libby - Sheet - A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS
Sheets
A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX
A-101 - BUILDING 5 BASEMENT KEY PLANS
A-401 - BUILDING 5 BASEMENT ENLARGED PLANS
A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS
A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS
A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN
B5_R2023_libby - Sheet - A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS
Sheets
A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX
A-101 - BUILDING 5 BASEMENT KEY PLANS
A-401 - BUILDING 5 BASEMENT ENLARGED PLANS
A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS
A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS
A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN
B5_R2023_libby - Sheet - A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN
Sheets
A-000 - BUILDING 5 GENERAL NOTES, ABBREVIATIONS AND DRAWING INDEX
A-101 - BUILDING 5 BASEMENT KEY PLANS
A-401 - BUILDING 5 BASEMENT ENLARGED PLANS
A-402 - BUILDING 5 BASEMENT ENLARGED REFLECTED CEILING PLANS
A-403 - BUILDING 5 BASEMENT & ROOF ENLARGED MECHANICAL PLANS
A-404 - BUILDING 5 BASEMENT ELECTRICAL PLAN