S02_B1 Abate and Upgrade Common Areas B1 drawing rev1_631-26-010.pdf
PDF 3 MB Posted
- Solicitation number
- 36C24126Q0357
About this file
This document is a set of architectural construction drawings for Building 1 Abate and Upgrade Common Areas at the Central Western Massachusetts Healthcare System (VA facility) located at 421 North Main Street, Leeds, MA, under Project 631-26-010. The drawings, issued on 03/20/2026, are fully sprinklered and prepared by the Office of Construction and Facilities Management of the U.S. Department of Veterans Affairs.
The project encompasses demolition, hazardous material abatement, and finish upgrades across multiple levels of the facility. Key work includes removal of vinyl wall coverings, flooring, and wall base containing asbestos in accordance with 02 82 11 Traditional Asbestos Abatement standards; abatement must extend to concrete. The contractor must verify and quantify total square footage of abatement areas for both wall and floor surfaces. Demolition work includes removal of signage, equipment (AEDs and fire extinguisher enclosures), outlet and switch plates, wall coverings, flooring, wall base, handrails, and wall bumpers. Finish work specifies multiple flooring types including luxury vinyl tile (LVT) in various patterns and colors, carpet tile (CPT), and terrazzo (TT), with finishes designated as Schedules A, B, B.1, C, C.1, D, and E as detailed on sheet ID601. Wall finishes include painted surfaces, vinyl wall protection with stainless steel or vinyl bumper rails (Monterey 0110, 9-foot height in White Sand), corner guards (full-height or 2-foot-2-inch sections in Snow White, 6-inch width), and quarter-round base trim. Interior dimensions are to face of finish unless otherwise noted, and all flooring must be level and meet ADA/ABA standards per 09 05 16 Subsurface Preparation. The drawings provide detailed floor plans for Levels 1 and 2, finish schedules, wall elevation details, and construction details for metal stud partitions, door frames, and wall assemblies incorporating Type X gypsum wallboard, deflection tracks, and sound attenuation blanket insulation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTRAL WESTERN MASSACHUSETTS HEALTHCARE SYSTEM
421 NORTH MAIN STREET, LEEDS, MA
PROJECT # 631-26-010
BUILDING 1 ABATE AND UPGRADE COMMON AREAS
SITE PLAN
SHEET # SHEET NAME IS
SU
AN
CE
D
AT
E
LA
TE
ST
R
EV
IS
IO
N
01 GI001 COVER PAGE 03/20/2026
02 GI002 GENERAL NOTES 03/20/2026
03 AD-HA101 DEMO & HAZMAT ABATEMENT PLANS 03/20/2026
04 AD-HA102 DEMO & HAZMAT ABATEMENT PLANS 03/20/2026
05 ID101 FINISH PLANS 03/20/2026
06 ID102 FINISH PLANS 03/20/2026
07 ID601 FINISH SCHEDULE 03/20/2026
08 ID701 DETAILS 03/20/2026
09 ID702 DETAILS 03/20/2026
BUILDING 1
SHEET LIST
DN.
UP
DN
UP
UP
UP
UP
DN
UP
DN.
UP
UP
DN
WORK AREA PLANS
SCALE:01 LEVEL 2
NTS
SCALE:02 LEVEL 1
NTS
ARCHITECTURAL SYMBOL LEGEND
ELEVATION TAG - EXTERIOR
KEY NOTE
DETAIL NUMBER
SHEET NUMBER
KEY NOTE NUMBER OR LETTER##
DETAIL NUMBER
SHEET NUMBER
DETAIL CALLOUT
SECTION TAG
DETAIL NUMBER
SHEET NUMBER
VIF VERIFY IN FIELD
BLDG BUILDING
C CENTER LINEL
OC ON CENTER
ABBREVIATIONS
CO CONTRACTING OFFICER
NIC / NIS NOT IN CONTRACT / NOT IN SCOPE
COR CONTRACTING OFFICER REPRESENTATIVE
EQPM EQUIPMENT
NTS NOT TO SCALE
LB/F POUNDS PER FOOT
TYP TYPICAL
VA CWM DEPARTMENT OF VETERAN'S AFFAIRS, CENTRAL WESTERN MASSACHUSETTS
SQ FT SQUARE FOOT/FEET
LF LINEAR FOOT/FEET
ELEVATION TAG - INTERIOR
DETAIL NUMBER
SHEET NUMBER
AFF ABOVE FINISHED FLOOR
XX
WALL TYPE TAG
WALL TYPE REFERENCE
WORK AREA
WORK AREA
WORK AREA
631-26-010
BUILLDING 1 ABATE AND
UPGRADE COMMON AREAS
VACWM
03/20/2026 HP/KF LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn GI001
Drawing Title
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
Approved Date:
Approved Title:
Approved Name:
REVISIONS / ISSUANCES: DATE:
PROJECT NORTH
TR
UE
N
OR
TH
COVER PAGE
5' PUBLIC SIDE
VA
RI
ES
CONSTRUCTION
SIDE
GENERAL TEMPORARY PARTION NOTES:
TEMPORARY WALL SHALL RESIST PASSAGE OF SMOKE PER NFPA 241. LOCATION OF TEMPORARY PARTITION IS GENERAL IN NATURE. GC TO LOCATE ALL TEMPORARY PARTITIONS AND DOORS AS REQUIRED TO PROTECT THE AREA UNDER CONSTRUCTION. FINAL BARRIER LOCATIONS TO BE COORDINATED WITH THE VA.
TEMPORARY PARTITION TO CARRY 1-HR FIRE RATING IF THE SPRINKLERS ARE TAKEN OFF LINE DURING CONSTRUCTION. MAINTAINING SPRINKLER COVERAGE OR CONSTRUCTION OF A 1-HR RATED PARTITION IS AT THE DISCRETION OF THE CONTRACTOR. IF 1-HR PARTITION IS TO BE PROVIDED, THE CONTRACTOR IS TO CONSTRUCT A PARTITION COMPLIANT WITH UL DESIGNATION U419 OR PROVIDE PREMANUFACTURED TEMPORARY CONTAINMENT PANELS THAT CARRY A 1- HR RATING.
IN-LIEU OF GYPSUM AND METAL STUD TEMPORARY PARTITIONS, THE CONTRACOTR MAY OPT TO PROVIDE A FIRE-RATED PRE-MANUFACTURED CONTAINMENT WALL & CEILING
SOLUTION (STARC SYSTEMS OR EQUAL).
IN LOCATIONS WHERE TEMPORARY PARTITIONS FALL ENTIRELY UNDER AN EXISTING GYPSUM CEILING, THE TEMPORARY PARTITIONS MAY BE SEALED TO THE EXISTING CEILING
RATHER THAN ADDING A NEW GYPSUM CEILING AS NOTED BELOW, WITH VA APPROVAL.
SEAL ALL JOINTS, TYP.
EXISTING STRUCTURAL DECK ABOVE
TEMPORARY PARTITION TO DECK WHERE FEASIBLE
WHERE EXISTING CONDITIONS ABOVE CEILING WILL NOT
ALLOW FOR PARTITION TO BE EXTENDED TO DECK,
PROVIDE NEW TYPE X GWB CEILING TO COVER EXISTING
APC CEILING FOR FULL EXTENT OF TEMPORARY
PARTITION ENCLOSURE, AS APPROVED BY VA
EXISTING APC CEILING
SEAL ALL JOINTS, TYP.
EXISTING PARTITION, TYP.
INSTALL NEW TEMPORARY PARTITION CONTINOUS TO THE
UNDERSIDE OF STRUCTURAL DECK ABOVE
· 5/8" TYPE X GWB ON BOTH SIDES OF PARTITION
SECURED TO CFMF STUDS.
· GWB TO BE PAINTED ON CORRIDOR SIDE
FLOOR SLAB BELOW
TEMP PARTITION TO BE1-HR RATED
(UL U419) WHEN NOTED ABOVE
GENERAL DEMOLITION NOTES
1. GENERAL CONTRACTOR (GC) SHALL FIELD VERIFY & REPORT EXISTING CONDITIONS
AND DIMENSIONS PRIOR TO REMOVALS. IF DISCREPANCIES ARE FOUND. GC TO NOTIFY
ARCHITECT FOR CLARIFICATION BEFORE COMMENCING WITH THE WORK.
2. REFER TO 02 41 00 DEMOLITION FOR ADDITIONAL REQUIREMENTS.
3. GC AND SUBCONTRACTORS (SC) FOR EACH TRADE ARE ADVISED THAT INFORMATION
PERTINENT TO THEIR WORK MAY BE INDICATED OR DESCRIBED IN OTHER PORTIONS OF
THE CONTRACT DOCUMENTS.
4. GC AND SC ARE RESPONSIBLE FOR PROVIDING ALL REMOVALS AND PATCHING
REQUIRED TO COMPLETE THEIR WORK IN ACCORDANCE WITH THE DESIGN INTENT.
5. GC SHALL PROTECT, REPLACE OR REPAIR ANY EXISTING CONSTRUCTION SCHEDULED
TO REMAIN WHICH IS DAMAGED DURING REMOVALS.
6. PATCH ALL FLOORS, WALLS, BASE AND CEILINGS WHERE PARTITIONS OR
MISCELLANEOUS ITEMS ARE REMOVED.
7. REMOVE EXISTING FLOORING WERE NEW FLOORING IS SCHEDULED IN THE ROOM
FINISH SCHEDULE. PREPARE EXISTING FLOOR SURFACES TO RECEIVE NEW FLOORING
IN ACCORDANCE WITH 09 05 16 SUBSURFACE PREPARATION.
8. CONTRACTOR SHALL VERIFY WITH THE OWNER THOSE REMOVED ITEMS TO BE TURNED
OVER TO THE OWNER.
9. ALL SIGNAGE, WALL ART, OULET COVERS AND ANY OTHER ITEMS CURRENTLY WITHIN
THE WORK AREA TO BE REMOVED AND RETURNED TO VA.
10. REFER TO HAZARDOUS MATERIALS REPORT FOR SURFACES SCHEDULED FOR
ABATEMENT INCLUDING, BUT NOT LIMITED TO, ASBESTOS REMOVAL.
11. VA SHALL BE RESPONSIBLE FOR MOVING AND PROTECTING FURNITURE AND OTHER
MOVEABLE ITEMS TO ACCOMMODATE CONSTRUCTION ACTIVITIES.
12. WHERE NEW FLOOR FINISHES ARE SCHEDULED, COMPLETELY REMOVE ALL EXISTING
FLOOR FINISHES AND WALL BASE. REMOVE ALL ADHESIVES AND PREPARE EXISTING
SUBSTRATE TO RECEIVE NEW FLOOR FINISHES AND BASE. REFER FINISH PLANS AND
SCHEULES FOR LOCATIONS AND TYPES OF NEW FINISHES.
13. 6” CAST-IN-PLACE TERRAZZO FLOORING IS PRESENT ALONG THE WALLS. TERRAZZO IS
TO BE REMOVED COMPLETELY TO BARE CONCRETE. PREPARE FLOOR FOR NEW
FLOORING IN ACCORDANCE WITH 09 05 16 SUBSURFACE PREPARATION.
14. ALL ITEMS DELIVERED TO THE VA FOR SALVAGE AND/ OR RE-USE SHALL BE MAINTAINED
IN ITS ORIGINAL/ REUSABLE CONDITION. GC OR SUBCONTRACTOR IS RESPONSIBLE TO
REPLACE ANY ITEMS DAMAGED OR DEEMED UNUSABLE IF NOT PROPERLY STORED OR
DELIVERED TO THE VA.
GENERAL HAZARDOUS MATERIAL NOTES
1. REFER TO HAZARDOUS MATERIALS REPORT FOR SURFACES SCHEDULED FOR
ABATEMENT INCLUDING, BUT NOT LIMITED TO ASBESTOS REMOVAL. G.C. TO
COORDINATE W/ ABATEMENT CONTRACTOR TO DETERMINE EXTENT AND TYPE OF
ABATEMENT. SEE 02 82 11 TRADITIONAL ASBESTOS ABATEMENT FOR ADDITIONAL
REQUIREMENTS.
2. SEE 02 82 11 TRADITIONAL ASBESTOS ABATEMENT FOR ADDITIONAL INFORMATION AND
REQUIREMENTS.
3. IT IS NOT THE VA'S INTENT TO REMOVE ALL LEAD PAINT ENCOUNTERED. SHOULD LEAD
PAINT BE ENCOUNTERED OSHA LEAD IN CONSTRUCTION GUIDELINES MUST BE
FOLLOWED. IF LEAD IS REMOVED AS PART OF THE CONSTRUCTION, PROCEDURES FOR
TESTING AND DISPOSING OF THE WASTE, AS OUTLINED IN THIS SPECIFICATION AND
DEP REGULATIONS, SHALL BE FOLLOWED.
4. OSHA LEAD REGULATIONS WILL APPLY TO ANY DEMOLITION OPERATION (I.E. SANDING,
SCRAPING, CUTTING, AND WELDING) THAT WOULD DISTURB PAINTED SURFACES WHICH
CONTAIN LEAD. OCCUPATIONAL EXPOSURE TO LEAD IS REGULATED BY OSHA (29 CFR
1910.1025) AS WELL AS APPLICABLE STATE REGULATIONS. DISPOSAL OF MATERIALS
COATED WITH PAINT CONTAINING LEAD IS SUBJECT TO THE USEPA RESOURCE
CONSERVATION AND RECOVERY ACT (RCRA) REGULATIONS. REFER TO
SPECIFICATIONS 02 83 33.13 FOR FURTHER INFORMATION.
5. ASBESTOS ABATEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH
APPLICABLE GOVERNMENT REGULATIONS. THE CONTRACTOR SHALL USE MANUAL WET
METHODS TO CONTROL THE RELEASE OF DUST WHEN PERFORMING THE REMOVAL OF
ALL ASBESTOS AND NON-ASBESTOS MATERIALS FROM THE WORK AREA. REFER TO
SPECIFICATION 02 82 11 FOR FURTHER INFORMATION. ADDITIONAL INFORMATION AND
REQUIREMENTS.
6. INTERIOR ASBESTOS REMOVAL WORK SHALL BE CONDUCTED WITHIN A NEGATIVE
PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT LEAST -0.02 INCHES OF
WATER COLUMN, AS MEASURED AT ANY WORK AREA PERIMETER LOCATION, SHALL BE
PROVIDED DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL BE CREATED
IN THE WORK AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO THE
OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT
LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK AREA. NEGATIVE AIR
PRESSURE IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED THROUGH THE
USE OF DIGITAL MANOMETERS POSTED OUTSIDE THE WORK AREA.
7. THE CONTRACTOR SHALL REMOVE HAZARDOUS MATERIALS THAT EXIST WITHIN WORK
AREAS PRIOR TO DISTURBANCE. REFER TO PROJECT DESIGN DOCUMENTS FOR
FURTHER INFORMATION. REFER TO SPECIFICATIONS FOR REMOVAL REQUIREMENTS.
8. SYMBOLS SHOWING LOCATIONS OF ASBESTOS CONTAINING MATERIALS ARE
APPROXIMATE AND NOT TO SCALE. THEY ARE FOR REFERENCE ONLY. REFER
HAZARDOUS MATERIALS REPORT.
9. IF SUSPECT MATERIALS ARE DISCOVERED WHICH HAVE NOT BEEN PREVIOUSLY
IDENTIFIED, THE CONTRACTOR SHALL NOT DISTURB THOSE MATERIALS AND SHALL
IMMEDIATELY NOTIFY THE COR.
GENERAL FINISH NOTES
1. DO NOT SCALE DRAWINGS, THE DRAWINGS ARE NOT NECESSARILY TO SCALE - USE
GIVEN DIMENSIONS. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT
THE JOB SITE PRIOR TO THE START OF CONSTRUCTION. IF DISCREPANCIES ARE FOUND,
NOTIFY COR FOR CLARIFICATION BEFORE COMMENCING THE WORK.
2. ALL DRAWINGS ARE OF EQUAL IMPORTANCE IN DEFINING THE WORK OF THE
CONTRACT DOCUMENTS. CONTRACTORS SHALL REVIEW ALL DRAWINGS BEFORE THE
INSTALLATION OF THEIR WORK. SHOULD THERE BE A DISCREPANCY WITHIN AND
BETWEEN THE DRAWINGS THAT WOULD CAUSE AN AWKWARD OR IMPROPER
INSTALLATION NOTIFY COR FOR CLARIFICATION PRIOR TO INSTALLATION OF SAID
WORK. ANY WORK INSTALLED IN CONFLICT WITH THE DRAWINGS AND CONTRACT
DOCUMENTS, SHALL BE CORRECTED BY CONTRACTOR AT THEIR EXPENSE AND AT NO
ADDITIONAL COST TO THE VA.
3. FLOORING TYPES ARE ANNOTATIVE AND NOT INTENTED INSTALLATION LAYOUT. SUBMIT
SHOP DRAWINGS FOR INTENDED INSTALLATION PATTERN.
4. DETAILS NOT SHOWN WHERE SPECIFIC DIMENSIONS, DETAILS, OR DESIGN INTENT
CANNOT BE DETERMINED CONSULT COR BEFORE PROCEEDING WITH THE WORK.
5. ALL INTERIOR DIMENSIONS SHOWN ARE TO FACE OF FINISH UNLESS SPECIFICALLY
NOTED OTHERWISE.
6. REFER TO SHEET ID701 FOR WALL ELEVATION INFORMATION.
7. WALL, FLOOR, AND BASE FINISH TRANSITIONS ARE TO OCCUR ON INSIDE CORNERS
UNO. VERIFY QUESTIONABLE FIELD CONDITIONS WITH COR.
8. REFER TO SPECIFICATION FOR FLOORING TRANSITION INFORMATION. INSTALL NEW
TRANSITION STRIPS WHERE NEW FLOORING MATERIAL ABUTS DISSIMILAR FLOORING
MATERIAL.
9. FLOORING CONTRACTOR TO VERIFY LOCATION AND STYLE OF FLOORING TRANSITION
STRIPS BEFORE INSTALLATION. SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH
SPECIFICATIONS.
10. FLOORING TRANSITIONS BETWEEN ROOMS TO OCCUR ON NON CORRIDOR SIDE OF
DOOR LEAF, UNO.
11. ALL FLOORING MUST BE LEVEL AND MEET ADA/ABA STANDARDS. SEE 09 05 16
SUBSURFACE PREPARATION FOR FLOOR FINISHES FOR ADDITIONAL REQUIREMENTS.
12. ALL WALLS MUST BE REPAIRED WITH APPROPRIATE PATCHING/ SKIM FINISHES TO
CREATE A MONOLITHIC FINISH. NO TRANSITION LINES ARE TO BE VISIBLE AFTER PATCH
WORK IS COMPLETE.
13. ENSURE FLOORING TO ELEVATOR MEETS ADA/ABA REQURIEMENTS. PREPARE
FLOORING IN ACCORDANCE WITH 09 05 16 SUBSURFACE PREPARATION AND TEST IN
ACCORDANCE WITH ASTM 1155.
14. TERRAZZO FLOORING TO BE INSTALLED MUST MATCH EXISTING PATTERN TO CREATE A
CONTIGUOUS PATTERN. SUBMIT SHOP DRAWINGS IN ACCORDANCE WITH
SPECIFICATIONS.
15. ELEVATOR FLOORING TO BE SLOPED TO MEET ABA AND VA BARRIER FREE DESIGN STANDARD
REQUIREMENTS, AND MAINTAIN A 1:50 OR 2% SLOPE
16. ALL NEW DOORS SHALL BE CENTERED BETWEEN WALLS FROM THE ADJACENT WALL TO
THE JAMB OPENING.
17. ALL NEW WALLS SHALL EXTEND FROM TOP OF SUB FLOOR TO BOTTOM OF STRUCTURE.
18. PROVIDE BLOCKING WHERE REQUIRED.
19. PROVIDE APPROPRIATE FLOOR TRANSITIONS AT ALL LOCATIONS WHERE MATERIAL
CHANGES OCCUR.
20. REPLACE EXISTING COVER PLATES FOR SWITCHES AND OUTLETS. DO NOT RELOCATE
UNLESS OTHERWISE NOTED.
21. MAINTAIN ALL EXIT SIGNS AT ALL DOORS. IF DISCREPANCIES ARE FOUND ON SITE,
COORDINATE WITH COR.
631-26-010
BUILLDING 1 ABATE AND
UPGRADE COMMON AREAS
VACWM
03/20/2026 HP/KF LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn GI002
Drawing Title
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
Approved Date:
Approved Title:
Approved Name:
REVISIONS / ISSUANCES: DATE:
PROJECT NORTH
TR
UE
N
OR
TH
GENERAL NOTES
SCALE:01 TEMPORARY PARTITION DETAIL (ICRA)
1/2"=1'-0"
X-RAY
TLT
2108A
CONTROL
FLUOROSCOPE
2108 2WA-2
2WA-1
STAIR
EL
EV
AT
ORTR ROOM
228 SF
210521092111
2-
TC
-221132115
EL
EV
AT
ORSTAIR
2116A 2116 2114
2-ME-2
WORK AREA: 1,200 SF
NIC
NIC
02 03 0401
KEY NOTES: DEMO & HAZMAT
GENERAL NOTES: DEMO & HAZMAT
DEMOLITION NOTES
1. REFER TO G1002 FOR ALL GENERAL DEMOLITION NOTES.
2. ALL GRAY AREAS NIC
3. ALL VINYL WALL COVERING WITHIN HIGHLIGHTED WORK AREA MUST BE
REMOVED IN ACCORDANCE WITH 02 83 33.13 LEAD BASED PAINT
REMOVAL.
4. REMOVE ALL SIGNAGE. PROTECT AND RETURN TO OWNER FOR
STORAGE.
5. REMOVE, PROTECT AND STORE EQUIPMENT INCLUDING BUT NOT
LIMITED TO AED'S AND FIRE EXTINGUISHER ENCLOSURES, AND
COORDINATE REINSTALLATION LOCATION WITH COR.
ABATEMENT NOTES
1. REFER TO G1002 FOR ALL GENERAL HAZARDOUS MATERIAL NOTES.
2. ALL GRAY AREAS NIC
3. ALL FLOORING AND WALL BASE WITHIN HIGHLIGHTED WORK AREA MUST
BE ABATED IN ACCORDANCE WITH 02 82 11 TRADITIONAL ASBESTOS
ABATEMENT.
4. FLOORING MUST BE ABATED TO CONCRETE.
5. CONTRACTOR TO VERIFY & QUANTIFY TOTAL SQUARE FOOTAGE OF
ABATEMENT AREA FOR BOTH WALL & FLOOR.
LINE TYPE LEGEND
EXISTING TO REMAIN
EXISTING TO REMOVE
REMOVE ALL OUTLET WALL PLATES AND SWITCH WALL PLATES.
REPLACE WITH NEW.
REMOVE ALL WALL COVERINGS.
REMOVE ALL FLOORING AND WALL BASE.
REMOVE AND DISCARD EXISTING HANDRAILS AND WALL
BUMPERS, MARK EXISTING BLOCKING LOCATIONS AND PREP
FOR INSTALL OF NEW HANDRAIL.
TR ROOM
235 SF
1071A
116 SF
90 SF
165 SF
124 SF
131 SF
38 SF
123 SF
138 SF
135 SF
178 SF
1-PC-5
129 SF
66 SF
1-PC-4
1-
PC
-3
1095A
118 SF
140 SF
CO
RR
ID
OR
C1
WORK AREA: 730 SF
NIC
NIC
NIC
631-26-010
BUILLDING 1 ABATE AND
UPGRADE COMMON AREAS
VACWM
03/20/2026 HP/KF LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn AD-HA101
Drawing Title
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
Approved Date:
Approved Title:
Approved Name:
REVISIONS / ISSUANCES: DATE:
PROJECT NORTH
TR
UE
N
OR
TH
DEMO & HAZMAT ABATEMENT
PLANS
SCALE:01 LEVEL 2 WORK AREA DEMO & HAZMAT ABATEMENT PLAN
1/8"=1'-0"
SCALE:02 LEVEL 1 WORK AREA DEMO & HAZMAT ABATEMENT PLAN
1/8"=1'-0"
DN.
UP
DN
UP
UP
UP
UP
DN
UP
DN.
UP
UP
DN
LEVEL 2 KEY PLAN
LEVEL 1 KEY PLAN
GENERAL NOTES: DEMO & HAZMAT
DEMOLITION NOTES
1. REFER TO G1002 FOR ALL GENERAL DEMOLITION NOTES.
2. ALL GRAY AREAS NIC
3. ALL VINYL WALL COVERING WITHIN HIGHLIGHTED WORK AREA MUST BE
REMOVED IN ACCORDANCE WITH 02 83 33.13 LEAD BASED PAINT
REMOVAL.
4. REMOVE ALL SIGNAGE. PROTECT AND RETURN TO OWNER FOR
STORAGE.
5. REMOVE, PROTECT AND STORE EQUIPMENT INCLUDING BUT NOT
LIMITED TO AED'S AND FIRE EXTINGUISHER ENCLOSURES, AND
COORDINATE REINSTALLATION LOCATION WITH COR.
ABATEMENT NOTES
1. REFER TO G1002 FOR ALL GENERAL HAZARDOUS MATERIAL NOTES.
2. ALL GRAY AREAS NIC
3. ALL FLOORING AND WALL BASE WITHIN HIGHLIGHTED WORK AREA MUST
BE ABATED IN ACCORDANCE WITH 02 82 11 TRADITIONAL ASBESTOS
ABATEMENT.
4. FLOORING MUST BE ABATED TO CONCRETE.
5. CONTRACTOR TO VERIFY & QUANTIFY TOTAL SQUARE FOOTAGE OF
ABATEMENT AREA FOR BOTH WALL & FLOOR.
LINE TYPE LEGEND
EXISTING TO REMAIN
EXISTING TO REMOVE
KEY NOTES: DEMO & HAZMAT
REMOVE ALL OUTLET WALL PLATES AND SWITCH WALL PLATES.
REPLACE WITH NEW.
REMOVE ALL WALL COVERINGS.
REMOVE ALL FLOORING AND WALL BASE.
REMOVE AND DISCARD EXISTING HANDRAILS AND WALL
BUMPERS, MARK EXISTING BLOCKING LOCATIONS AND PREP
FOR INSTALL OF NEW HANDRAIL.
EXISTING STOREFRONT DOOR AND ASSEMBLY TO BE REMOVED TO
GREATEST EXTENT POSSIBLE AND MAINTAIN INTEGRITY OF OPENING
AND CEILING. PREPARE OPENING TO RECEIVE NEW WALL, DOOR, AND
DOOR FRAME.
EXISTING STOREFRONT DOOR AND ASSEMBLY TO BE REMOVED TO
GREATEST EXTENT POSSIBLE AND MAINTAIN INTEGRITY OF OPENING
AND CEILING. REMOVE, PROTECT AND STORE TO BE REINSTALLED.
GARAGE
EXIST. ELEV.
M100
ELEC.
E100
1-PC-9
1-TC-3
1-FC-2
1-EL-3
1-PC-6
1218A
33 SF
1-PC-7
1265A
CREATIVE
THINKING RM
635 SF
GROUP RM
249 SF
WAITING RM
BREAK ROOM
250 SF
97 SF
144 SF
99 SF
80 SF
1265D
257 SF
177 SF
96 SF
148 SF
101 SF
1290A
155 SF
1290B
116 SF
119 SF
1277A
87 SF
129 SF
172 SF
94 SF
121 SF
116 SF
131 SF
163 SF
1272A
71 SF
121 SF
1270A
81 SF
1270B
61 SF
119 SF
122 SF
1-PC-10 1254A
23 SF
HK
73 SF
34 SF
36 SF
STAIR
RECEPTION
131 SF
114 SF
183 SF
1-MC-3
174 SF
87 SF
107 SF
153 SF
136 SF
225 SF
103 SF
153 SF
136 SF
225 SF
114 SF
80 SF
175 SF
77 SF
171 SF
110 SF
114 SF
124 SF CONSULT
1257A
107 SF
HALLWAY
1255A
58 SF
WAITING
AREA
106 SF
CO
RR
ID
OR
C1
CO
RR
ID
OR
C1
181 SF
159 SF
103 SF
164 SF
39 SF 1233A
42 SF
STAIR
1254B
12 SF
HSKPCHANGING
60 SF
DN
WORK AREA: 3,240 SF05
NIC
NIC
NIC
NIC
NICNICNICNIC
02 03 040102 03 0401
NIC
631-26-010
BUILLDING 1 ABATE AND
UPGRADE COMMON AREAS
VACWM
03/20/2026 HP/KF LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn AD-HA102
Drawing Title
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
Approved Date:
Approved Title:
Approved Name:
REVISIONS / ISSUANCES: DATE:
PROJECT NORTH
TR
UE
N
OR
TH
DEMO & HAZMAT ABATEMENT
PLANS
DN.
UP
DN
UP
UP
UP
UP
DN
UP
DN.
UP
UP
DN
LEVEL 1 KEY PLAN
SCALE:01 LEVEL 1 WORK AREA DEMO & HAZMAT ABATEMENT PLAN
1/8"=1'-0"
KEY NOTES: FINISH PLANS
REFERENCE FINISH SCHEDULE 'A' ON SHEET ID601A
GENERAL NOTES: FINISH PLANS
1. REFER TO G1002 FOR ALL GENERAL FINISH NOTES.
2. ALL GRAY AREAS NIC
3. ALL FLOORING MUST BE LEVEL AND MEET ADA/ABBA STANDARDS. SEE
09 05 16 SUBSURFACE PREPARATION FOR FLOOR FINISHES FOR
ADDITIONAL REQUIREMENTS.
4. REFER TO SHEET ID601 FOR FINISH SCHEDULE INFORMATION.
REFERENCE FINISH SCHEDULE 'B' ON SHEET ID601B
REFERENCE FINISH SCHEDULE 'C' ON SHEET ID601C
REFERENCE FINISH SCHEDULE 'D' ON SHEET ID601D
REFERENCE FINISH SCHEDULE 'E' ON SHEET ID601E
LVT-3
CPT-1
FINISH FLOOR PLAN LEGEND
LVT-1 LVT-2
TT
REFERENCE FINISH SCHEDULE 'C.1' ON SHEET ID601C.1
FLOOR SLOPE TO COMPLY WITH ADA AND VA BARRIER FREE
STANDARD - 1:50 OR 2%01
REFERENCE FINISH SCHEDULE 'B.1' ON SHEET ID601B.1
PROVIDE THRESHOLD AS REQUIRED. COORDINATE WITH COR ANY
UNIQUE EXISTING CONDITIONS.02
X-RAY
TLT
2108A
CONTROL
FLUOROSCOPE
2108 2WA-2
2WA-1
STAIR
EL
EV
AT
ORTR ROOM
228 SF
210521092111
2-
TC
-221132115
EL
EV
AT
ORSTAIR
2116A 2116 2114
2-ME-2
CC.1 C.1C C
NIC
NIC
TR ROOM
235 SF
1071A
116 SF
90 SF
165 SF
124 SF
131 SF
38 SF
123 SF
138 SF
135 SF
178 SF
1-PC-5
129 SF
66 SF
1-PC-4
1-
PC
-3
1095A
118 SF
140 SF
CO
RR
ID
OR
C1
134 SF
D
B
B
B.1
SL
DN
NIC
NIC
NIC
5'-6" 01
631-26-010
BUILLDING 1 ABATE AND
UPGRADE COMMON AREAS
VACWM
03/20/2026 HP/KF LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn ID101
Drawing Title
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
Approved Date:
Approved Title:
Approved Name:
REVISIONS / ISSUANCES: DATE:
PROJECT NORTH
TR
UE
N
OR
TH
FINISH PLANS
SCALE:01 LEVEL 2 WORK AREA FINISH PLAN
1/8"=1'-0"
SCALE:02 LEVEL 1 WORK AREA FINISH PLAN
1/8"=1'-0"
DN.
UP
DN
UP
UP
UP
UP
DN
UP
DN.
UP
UP
DN
LEVEL 2 KEY PLAN
LEVEL 1 KEY PLAN
LVT-3
CPT-1
FINISH FLOOR PLAN LEGEND
LVT-1 LVT-2
TT
GENERAL NOTES: FINISH PLANS
1. REFER TO G1002 FOR ALL GENERAL FINISH NOTES.
2. ALL GRAY AREAS NIC
3. ALL FLOORING MUST BE LEVEL AND MEET ADA/ABBA STANDARDS. SEE
09 05 16 SUBSURFACE PREPARATION FOR FLOOR FINISHES FOR
ADDITIONAL REQUIREMENTS.
4. REFER TO SHEET ID601 FOR FINISH SCHEDULE INFORMATION.
KEY NOTES: FINISH PLANS
REFERENCE FINISH SCHEDULE 'A' ON SHEET ID601A
REFERENCE FINISH SCHEDULE 'B' ON SHEET ID601B
REFERENCE FINISH SCHEDULE 'C' ON SHEET ID601C
REFERENCE FINISH SCHEDULE 'D' ON SHEET ID601D
REFERENCE FINISH SCHEDULE 'E' ON SHEET ID601E
REFERENCE FINISH SCHEDULE 'C.1' ON SHEET ID601C.1
FLOOR SLOPE TO COMPLY WITH ADA AND VA BARRIER FREE
STANDARD - 1:50 OR 2%01
REFERENCE FINISH SCHEDULE 'B.1' ON SHEET ID601B.1
PROVIDE THRESHOLD AS REQUIRED. COORDINATE WITH COR ANY
UNIQUE EXISTING CONDITIONS.02
REINSTALL RETAINED STOREFRONT.03
GARAGE
EXIST. ELEV.
M100
ELEC.
E100
1-PC-9
1-TC-3
1-FC-2
1-EL-3
1-PC-6
1218A
33 SF
1-PC-7
1265A
CREATIVE
THINKING RM
635 SF
GROUP RM
249 SF
WAITING RM
BREAK ROOM
250 SF
97 SF
144 SF
99 SF
80 SF
1265D
257 SF
177 SF
96 SF
148 SF
101 SF
1290A
155 SF
1290B
116 SF
119 SF
1277A
87 SF
129 SF
172 SF
94 SF
121 SF
116 SF
131 SF
163 SF
1272A
71 SF
121 SF
1270A
81 SF
1270B
61 SF
119 SF
122 SF
1-PC-10 1254A
23 SF
HK
73 SF
34 SF
36 SF
STAIR
RECEPTION
131 SF
114 SF
183 SF
1-MC-3
174 SF
87 SF
107 SF
153 SF
136 SF
225 SF
103 SF
153 SF
136 SF
225 SF
114 SF
80 SF
175 SF
77 SF
171 SF
110 SF
114 SF
124 SF CONSULT
1257A
107 SF
HALLWAY
1255A
58 SF
WAITING
AREA
106 SF
CO
RR
ID
OR
C1
CO
RR
ID
OR
C1
181 SF
159 SF
103 SF
164 SF
39 SF 1233A
42 SF
STAIR
1254B
12 SF
HSKPCHANGING
60 SF
DN
49 SF
WAITING RM
212 SF
1265A
10 SF
B
D
A
B
B B
B AA
B
SL DN
W1
W1
NIC
NIC
NIC
NIC
NICNICNICNIC
5'
NIC
631-26-010
BUILLDING 1 ABATE AND
UPGRADE COMMON AREAS
VACWM
03/20/2026 HP/KF LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn ID102
Drawing Title
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
Approved Date:
Approved Title:
Approved Name:
REVISIONS / ISSUANCES: DATE:
PROJECT NORTH
TR
UE
N
OR
TH
DN.
UP
DN
UP
UP
UP
UP
DN
UP
DN.
UP
UP
DN
LEVEL 1 KEY PLAN
SCALE:01 LEVEL 1 WORK AREA FINISHPLAN
1/8"=1'-0"
SCHEDULE A
SPEC SECTION FINISH DESIGNATION MATERIAL MANUFACTURER STYLE COLOR SIZE COMMENTS
09 65 13 PRB-1 Profile Base Tarkett Monarch Snow White 6" 09 66 16 TT Terrazzo Tile -Epoxy Nurazzo Crystal Collection C505 Pearl Luster with H20 applied 24" x 24" 10 26 00 RWC-1 IPC Rigid Wall Covering INPRO Fiber Fossil See specifications for wall protection accessories.
10 26 00 HND SS Handrail with integrated vinyl bumper rail INPRO 3500 SRV White Sand Vinyl Bumper Rail, Stainless Steel Rail 10 26 00 CG-1 Corner Guards INPRO 90/130 degree Monterey 0110 9'
SCHEDULE B
SPEC SECTION FINISH DESIGNATION MATERIAL MANUFACTURER STYLE COLOR SIZE COMMENTS
09 65 13 PRB-1 Profile Base Tarkett Monarch Snow White 6" 09 65 19 LVT-1 Luxury Vinyl Tile (LVT) Wood Look - 40MIL Wear Layer Thickness with Unbeveled Edge Pattern and Color to be selected by VA Interior Designer 6" x 36" 10 26 00 RWC-2 Flexible Wall Covering Pattern and Color to be selected by VA Interior Designer See specifications for additional details.
10 26 00 HND SS Handrail with integrated vinyl bumper rail INPRO 3500 SRV White Sand Vinyl Bumper Rail, Stainless Steel Rail 10 26 00 CG-1 Corner Guards INPRO 90/130 degree Monterey 0110 9'
SCHEDULE B.1: FLOOR PATTERN DETAIL
SPEC SECTION FINISH DESIGNATION MATERIAL MANUFACTURER STYLE COLOR SIZE COMMENTS
09 65 13 PRB-1 Profile Base Tarkett Monarch Snow White 6"
09 65 19 LVT-1 Luxury Vinyl Tile (LVT) Wood Look - 40MIL Wear Layer Thickness with Unbeveled Edge Color and finish to be selected by VA Interior Designer Custom floor pattern design where designated on drawing. Pattern design based on Amtico Laying Patterns "Gastby Large 2 Color", including framed border around pattern.One color LVT to be used for pattern.
SCHEDULE C
SPEC SECTION FINISH DESIGNATION MATERIAL MANUFACTURER STYLE COLOR SIZE COMMENTS
09 65 13 PRB-1 Profile Base Tarkett Monarch Snow White 6" 09 65 19 LVT-2 Luxury Vinyl Tile (LVT) Stone Pattern Color to be selected by VA Interior Designer 12"x24" 10 26 00 RWC-2 Flexible Wall Covering Pattern and Color to be selected by VA Interior Designer See specifications for additional details.
10 26 00 HND SS Handrail with integrated vinyl bumper rail INPRO 3500 SRV White Sand Vinyl Bumper Rail, Stainless Steel Rail 10 26 00 CG-2 Corner Guards INPRO 90/130 degree Monterey 0110 9'
SCHEDULE C.1: FLOOR PATTERN DETAIL
SPEC SECTION FINISH DESIGNATION MATERIAL MANUFACTURER STYLE COLOR SIZE COMMENTS
09 65 13 PRB-1 Profile Base Tarkett Monarch Snow White 6"
09 65 19 LVT-3 Luxury Vinyl Tile (LVT) Wood Look & Stone Look - 40MIL Wear Layer Thickness with Unbeveled Edge Color to be selected by VA Interior Designer There are 2 types of LVT for this finish. Custom floor pattern design where designated on drawing. Pattern design based on Amtico Laying Patterns "Gastby Large 2 Color", including framed border around pattern.
10 26 00 RWC-2 Flexible Wall Covering Color to be selected by VA Interior Designer See specifications for wall protection accessories 10 26 00 HND SS Handrail with integrated vinyl bumper rail INPRO 3500 SRV White Sand Vinyl Bumper Rail, Stainless Steel Rail 10 26 00 CG-2 Corner Guards INPRO 90/130 degree Monterey 0110 9'
SCHEDULE D
SPEC SECTION FINISH DESIGNATION MATERIAL MANUFACTURER STYLE COLOR SIZE COMMENTS
09 65 13 PRB-1 Profile Base Tarkett Monarch Snow White 6" 09 65 19 CPT-1 Carpet Tile Pattern and Color to be selected by VA Interior Designer 18"x36" Different colorways will be selected for each room
A.F.F.: Above Finished Floor AT: Acoustical Ceiling tile
C: Concrete CPT: Carpet Tile EFTR: Existing Finish to Remain EPY: Epoxy EX: Exisitng EXP: Exposed GL: Glass (Glazing) GWB: Gypsum Wallboard Systems HW: Hardware set ID: Interior Designer LVT: Luxury Vinyl Tile
P: Paint PRB: Profile Base RB: Resilient Base RWC: Flexible or Rigid Vinyl Wall Covering (Wall Protection - Roll or Sheet) TT: Terrazzo Tile (Epoxy Matrix)
SS: Stainless Steel VWC: Vinyl Wall Covering VA: Veterans Administration
ABBREVIATIONS
631-26-010
BUILLDING 1 ABATE AND
UPGRADE COMMON AREAS
VACWM
03/20/2026 HP/KF LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn ID601
Drawing Title
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
Approved Date:
Approved Title:
Approved Name:
REVISIONS / ISSUANCES: DATE:
FINISH SCHEDULE & DETAILS
STAIR DOOR OFFICE / EXAM DOOR
FEC
FINISHED FLOOR
FINISHED CEILING
ON / OFF
3/4" QUARTER ROUND BASE AS SCHEDULED
WALL BASE AS SCHEDULED
VINYL WALL PROTECTION AS SCHEDULED
HANDRAIL SYSTEM AS SCHEDULED
PAINT FINISH AS SCHEDULED
FULL HEIGHT CORNER GUARD AS SCHEDULED
DOOR FRAME FINISH AS SCHEDULEDDOOR FRAME FINISH AS SCHEDULED
2'-2"
FULL HEIGHT CORNER GUARD AS SCHEDULED
3'-6" 2"8"2"2"
4'-33 4"
1'-6"
4'-81 2"
3'-33 4"
EXPANSION JOINT
7'-33 4"
OUTLETS
ROOM
SIGNAGE
SWITCHCR
STAIR
SIGNAGE
FLAG
SIGNAGE
3'-6"
3' 2'-10"
631-26-010
BUILLDING 1 ABATE AND
UPGRADE COMMON AREAS
VACWM
03/20/2026 HP/KF LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn ID701
Drawing Title
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
Approved Date:
Approved Title:
Approved Name:
REVISIONS / ISSUANCES: DATE:
DETAILS
SCALE:01 GENERAL REFERENCE ELEVATION
1"=1'-0"
HEAD CONDITION
WALL TYPE STUD SIZE
METAL STUD SIZE SCHEDULE
W2 6"
W1 3 5/8"
PLAN CONDITION
ONE LAYER OF 5/8" TYPE "X"
GWB. ON BOTH SIDES OF 3
5/8" METAL STUD @ 16" O.C.
BASE CONDITION
SCHEDULED BASE
SCHEDULED FLOOR
3 1/2" UNFACED
MINERAL-WOOL BLANKET
INSULATION FRICTION FIT
FOR SOUND DEADENING
OUTLET BOX
COVER ALL SIDES OF ALL TEL. &
ELEC. OUTLETS WITH 1/4" THICK
ACOUSTICAL PUTTY BEFORE
APPLYING GWB. DO NOT INSTALL
OUTLETS BACK TO BACK. TO
MAINTAIN MAX. SPACING BETWEEN
OUTLETS ON SIDES OF
PARTITIONS.
ATTACH RUNNERS TO FLOOR @
24" O.C. AND WITHIN 1" OF ENDS.
SEE DETAIL 02/ID702.
HEAD CONDITION
PERPENDICULAR TO DECK
CONTINUOUS ACOUSTICAL
JOINT SEALANT BOTH SIDES
ONE LAYER OF 5/8" TYPE "X"
GWB ON BOTH SIDES OF
DEFLECTION TRACK
HEAD CONDITION
PARALLEL TO DECK
CONTINUOUS ACOUSTICAL
JOINT SEALANT BOTH SIDES
ONE LAYER OF 5/8" TYPE "X"
GWB ON BOTH SIDES OF
DEFLECTION TRACK
COPE GWB INTO RIBS OF
EXISTING CONCRETE DECK
AND AROUND BEAMS,
BRIDGING, PIPING, ETC...
ATTACH DEEP LEG
DEFLECTION TRACK TO
STRUCTURE AT 24" O.C.
AND WITHIN 1" OF END
UNFACED SOUND
ATTENUATION BLANKET
INSULATION. FRICTION FIT
FOR SOUND DEADENING.
PROVIDE "Z"-CLIP AS
REQUIRED FOR
DEFLECTION TRACK
ATTACHMENT
ATTACH DEEP LEG
DEFLECTION TRACK TO
STRUCTURE AT 24" O.C.
AND WITHIN 1" OF END
UNFACED SOUND
ATTENUATION BLANKET
INSULATION. FRICTION FIT
FOR SOUND DEADENING.
FASTEN AT BOTH ENDS WITH
MIN. 4 TAPPING SCREWS.
CUT HORIZONTAL FASTENER
FROM STUD
VERTICAL WALL STUDS.
REFER TO WALL TYPES FOR
SIZE & SPACING. OCCURS AT
BOTH NEW AND EXISTING
WALL TYPES.
HORIZONTAL
STUD BLOCKING
WALL FINISH. REFER TO WALL
TYPES & FINISH SCHEDULE.
COPE & BEND HORIZONTAL
STUD.
VERTICAL WALL STUDS. REFER TO WALL
TYPES FOR SIZE & SPACING. OCCURS AT BOTH
NEW AND EXISTING WALL TYPES. PLAN VIEW
ISOMETRIC VIEW
2"
8"
2"
REFER TO FLOOR PLAN AND WALL
TYPES FOR WALL CONSTRUCTION
WALL PROTECTION; REFER TO
FINISH SCHEDULE FOR LOCATIONS.
PERIMETER 'J' TRIM AT WALL
PROTECTION
NEW DOOR. REFER TO SPECIFICATIONS
FOR ADDITIONAL INFORMATION.
NEW PAINTED METAL DOOR
FRAME w/ WALL ANCHOR.
RETURN HANDRAIL & BUMPER
TO FACE OF WALL PROTECTION
WALL PROTECTION BELOW -
REFER TO ENLARGE PLAN & INT.
ELEV. FOR LOCATIONS.
CORRIDOR HANDRAIL;
REFER TO PLANS &
ELEVATIONS FOR
LOCATIONS.
VERTICAL WALL PROTECTION
TRIM BELOW TOP RAIL.
FILL DOOR FRAME w/ SOUND
ATTENUATING INSULATION.
INSTALL PRIOR TO INSTALLATION
OF DOOR FRAME.
G.C.TO CONFIRM FRAME
WIDTH W/ WALL ASSEMBLY.
6" 6"
6"
2'-6"
4'
NOTES:
G.C. SHALL FIELD VERIFY ALL DOOR OPENINGS AND
NOTIFY COR OF ANY DISCREPANCIES.
SS KICK PLATE
7'
2"
2" 2"DOOR WIDTH
631-26-010
BUILLDING 1 ABATE AND
UPGRADE COMMON AREAS
VACWM
03/20/2026 HP/KF LA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn ID702
Drawing Title
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
Approved Date:
Approved Title:
Approved Name:
REVISIONS / ISSUANCES: DATE:
DETAILS
SCALE:06 TYPICAL DOOR FRAME; SINGLE
1"=1'-0" SCALE:05 HALF LITE DOOR; SINGLE
1"=1'-0"
SCALE:04 DOOR JAMB AT NEW STUD WALL
3"=1'-0" SCALE:03 TYPICAL BLOCKING AT STUD WALLS
1"=1'-0" SCALE:02 TYPICAL WALL HEAD AT CONCRETE DECK
3"=1'-0" SCALE:01 METAL STUD PARTITION
3"=1'-0"
| Sheets and Views |
| GI001 |
| GI002 |
| AD-HA101 |
| AD-HA102 |
| ID101 |
| ID102 |
| ID601 |
| ID701 |
| ID702 |
File details come from the government source that posted it. Updated .