S02-ATTACHMENT E -Floor plans - Boilers and HVAC catwalk level.pdf
PDF 2 MB Posted
- Solicitation number
- 36C25226Q0400
About this file
These are as-built drawings for the Physical Plant - Boiler facility at Edward Hines, Jr. Veterans Hospital in Hines, Illinois. The drawings document HVAC and boiler plant piping systems for the project numbered 578-11-007, prepared by Hammel, Green and Abrahamson, Inc. (HGA) and Paradigm/Sigma Engineers and Constructors.
The documents include multiple detailed floor plans and catwalk plans showing the configuration of heating, ventilation, and air conditioning (HVAC) systems with three air handling units (AHU-1, AHU-2, AHU-3), ductwork routing with specified CFM balancing requirements, dampers, and controls. The boiler plant piping plans illustrate hot water supply (HWS) and return (HWR) systems, condensate piping, fuel oil systems, natural gas piping, and associated equipment including boilers, pumps, heat exchangers, and control panels. Key specifications include pipe sizing ranging from 1" to 12" diameter, variable speed drives (VSDs) on selected equipment, manually balanced ducts to 6,600-13,400 CFM at 100% fan speed, and provisions for emergency generator fuel oil storage. The drawings incorporate revisions documented through RFIs (Request for Information), ASIs (Architectural/Engineering Supplemental Instructions), and were finalized as as-built drawings on February 7, 2020. The facility maintains coordination between HVAC supply routing under return ducts, 40" and 24" deep plenums with insulated panel blanking, and utility connections routed through trenches and catwalks.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
DN
DN
DN
DN
30x14 SUPPLY DUCT
DN.
SUPPLY ROUTED
UNDER RETURN DUCT.
60x60 UP
TO GRV-1
AHU-1
20x12
RETURN
DUCT DN
40" DEEP PLENUM
FULL HEIGHT AND
WIDTH OF
LOUVER
SECTIONS
SHOWN. BLANK
OFF UNUSED
SECTIONS OF
LOUVER WITH
INSULATED
PANEL.
24" DEEP PLENUM FULL
HEIGHT AND WIDTH OF
LOUVER SECTIONS SHOWN.
M 1
28x16
M 3
MOTORIZED DAMPER M-3
IN VERTICAL POSITION IN
30x18 RETURN DUCT
MANUALLY
BALANCE
24x40 DUCT
TO 6600 CFM
AT 100% FAN
SPEED
60x60 UP
TO GRV-2
60x60 UP
TO GRV-3
60x60 UP
TO GRV-4
STEEL MEMBER
PENETRATES PLENUM
(SEE NOTE ON MH111.1)
AHU-3
M
M 7
MANUALLY
BALANCE 24x40
DUCT TO 6600
CFM AT 100%
FAN SPEED
MANUALLY
BALANCE
70x28 TO
13400 CFM AT
100% FAN
SPEED
AHU-2
M
M 5
PROVIDE MINIMUM OUTDOOR AIR
DAMPER AND AIR FLOW MEASURING
STATION IN ADDITION TO
ECONOMIZER OUTDOOR AIR
DAMPER
SF-1
VSD
SF-2 VSD
SF-3
VSD
2 3 4 5 6
A
B
C
E
F
G
D
(2) 40x40 OPEN
(TYP OF 4)
3' - 1 29 /32"
MAINTAIN 36"
CLEAR, TYP.
M
M
M
M
DDC CONTROL
PANEL TO SERVE
AHUS
BLANK OFF UNUSED
SECTIONS OF LOUVER
WITH INSULATED
PANEL.
BLANK OFF UNUSED
SECTIONS OF LOUVER
WITH INSULATED
PANEL.
14x12 RETURN
DUCT DOWN
THROUGH DRY
WALL LID INTO
PLENUM CEILING
MH-200
MH-200
MH-200
MH-200
MH-200
x x
O P
E N
O P
E N x x
DA-1
B-1 B-2
B-3 B-4
AHU-1
6" HWS/R DN
4"4"
AHU-2 AHU-3
REFRIGERANT
PIPING UP TO CU-1
ON ROOF. PIPE
SIZE PER MFG
RECOMMENDATION.
2 3 4 5 6
A
B
C
E
F
G
D
2" HWS
2" HWR
6" HWS
6" HWR
4"
4"
MH-200
MH-200
MH-200
MH-200
MH-200
DA-1
B-1 B-2
B-3 B-4
PROVIDE 1/2" MESH SCREEN OVER SUPPLY AIR AND RETURN
AIR OPENINGS.
HVAC FLOOR PLAN KEYNOTES
1. DUCTWORK PENETRATING MASONRY WALLS SHALL BE
LOCATED ON MASONRY DIMENSIONS TO AVOID CUTTING
HVAC GENERAL NOTES
SEE DETAIL 9/MJ506.2
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
HINES, ILLINOIS
578-11-007
N/A
M i l w a u k e e , W i s c o n s i n U S A 5 3 2 0 2
3 3 3 E a s t E r i e S t r e e t
T e l e p h o n e 4 1 4 . 2 7 8 . 8 2 0 0 F a c s i m i l e 4 1 4 . 2 7 8 . 7 7 3 4
Hammel, Green and Abrahamson, Inc.
HGA Project Number
AS-BUILT DRAWINGS
MARCH 16, 2015
PHYSICAL PLANT - BOILER
EDWARD HINES, JR. VETERANS
HOSPITAL
MH112
HGA HGA
CATWALK PLAN HVAC AND HVAC PIPING
2606-009-00
1/8" = 1'-0"1
CATWALK PLAN HVAC
1/8" = 1'-0"2
CATWALK PLAN HVAC PIPING
RFI 03441 11/21/2017
ASI XXX2 10/03/2019
AS-BUILT DRAWINGS3 02/07/2020
MP200
MP201
MP200
MP201
MP203
MP203
MP203
MP202
MP203
MP203
DA-1
4" FWPD
BFP-1
BFP-2
BFP-3
CTP-2
CTP-3
BCP
BC
P
BCP
BCP
CTP-1
DA-1/CST-1/HR
CONTROL PANEL
FREE BLOW
DRAIN
DN(TYP OF 4)
HPS UP TO 26'-0"
AFF. INSTALL DRIP
AND TRAP AT
BOTTOM OF RISE.
REFER TO
MP112 FOR CONT.
2 2
2 2
2 2
LCV
LCV
SV
SV
SV
SV
LCV
LCV
LCV
LCV
F W
P D
BFP 1-3
VSD'S
CTP
VSD'S
2 1/2"FWPD2 1/2"FWPD
CHEMICAL
STORAGE
(TYP)
RV
RV
122A
SHOP
STORAGE
EMERGENCY
GENERATOR
DISCHARGE FROM ROTP-1
AND -2. SEE PL111 FOR
CONTINUATION.
FWPR TO DA-1.
REFER TO MP112
FOR CONT.
BOILER LAYUP MIXING TANK.
SEE 2/MJ503 FOR DETAIL.
1" RO
ES 8
ES 8
ES 8
ES8
GUI - 5 GUI - 6
6" G
G
G
6" G
G
6" G6" G
6" NG FROM METER.
METER, PRV AND
PRESSURE GAGES
PROVIDED BY
UTILITY. 160,000 MBH
AT 15 PSIG.
G
G
1" FWPD
1" RO DOWN TO 3-WAY
MIXING VALVE
CTM-1
CHEMICAL TANK MIXER (TYP.)
DISCHARGE DOWN TO MIXING VALVE SEE DETAILS 2/MJ2503
CO10
CO10
CO10
3/4" G
3/4" HPR
3/4" HPR
2" HPS
3/4" G
4" CPD
2 1/2"FWPD
8" HPS
F W
P D
G
1" HPS
/4
G 1" HPR
H P
S
/2 "F
W P
D
4" FWPD
/2 "F
W P
D
2 1/2"FWPD
12" HPS
8" CPD
C P
D
F W
P R
3" FWPR
F W
P R
/2 "F
W P
D
/4
H
P R
F W
P R
C P
D
C P
D
CST-1
8" HPS 8" HPS
UH-3
UH-6
UH-7
UH-1
F W
P R
DOWN TO
TRENCH
B-1 B-2
DOWN TO
TRENCH
UP TO
CATWALK
UP TO
CATWALK
UP TO
CATWALK
DOWN TO
TRENCH
/4
G
C P
D
F W
P D
1" HPR
8" CPD
2" BO
F W
P D
12" HPS
3/4" HPR
C P
D
5" FWPD
AS - 1
3/4" HPR
H P
S
C P
D
/4
G
UP TO
CATWALK
4" HRHW
2 1/2"FWPD
2 1/2"FWPD
1. PORTIONS OF WORK SHOWN ON THIS SHEET ARE PART OF
THE DEDUCT ALTERNATES LISTED FOR PROJECT.
CONTRACTOR SHALL REVIEW SPECIFICATION SECTION 012300
FOR SPECIFIC INFORMATION REGARDING DEDUCT
ALTERNATES.
PHASING GENERAL NOTES
FLOOR PLAN KEY NOTES:
1. 12" VENT UP THRU FLOOR AND EXTENDING THRU ROOF FROM
BLOWOFF TANK BOT-1 AND CONDENSATE RECEIVER CR-1. TERMINATE
IN GOOSENECK.
2. DASHED LINE REPRESENTS CLEARANCE AREA FOR SOOTBLOWER
LANCE PULL SPACE. REFER TO BOILER MFR INFORMATION FOR EXACT
REQUIREMENTS. DISTANCE LENTHWISE WITH EACH BOILER IS BASED
OFF OF WORST CASE MFR.
3. ROUTE ECONOMIZER SAFETY RELIEF VALVE DISCHARGE TO
BLOWDOWN TANK BOT-1 THROUGH FLOOR TRENCH.
4. REFER TO SHEET MP110 FOR PIPE ROUTING IN TRENCH
5. 6" CONDENSATE SURGE TANK VENT UP THRU ROOF
6. 1" FOS, 1" FOR, 2" BOTTOM BLOWDOWN, AND 1" SURFACE
BLOWDOWN ROUTED IN TRENCH BEHIND BOILER.
7. SEE SHEET MH111.2 FOR CONTINUATION OF HWS AND HWR.
8. EMERGENCY SAFETY SHUT OFF SWITCH
9. NATURAL GAS PIPING ROUTED HIGH WITH SHUTOFF VALVES
ACCESSIBLE FROM CATWALK.
10. CARBON MONOXIDE DETECTORS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
HINES, ILLINOIS
578-11-007
N/A
M i l w a u k e e , W i s c o n s i n U S A 5 3 2 0 2
3 3 3 E a s t E r i e S t r e e t
T e l e p h o n e 4 1 4 . 2 7 8 . 8 2 0 0 F a c s i m i l e 4 1 4 . 2 7 8 . 7 7 3 4
Hammel, Green and Abrahamson, Inc.
HGA Project Number
AS-BUILT DRAWINGS
MARCH 16, 2015
PHYSICAL PLANT - BOILER
EDWARD HINES, JR. VETERANS
HOSPITAL
MP111N
Checker Author
FIRST FLOOR PLAN NORTH BOILER PLANT PIPING -
ENLARGED
2606-009-00
1/4" = 1'-0"1
FIRST FLOOR PLAN BOILER PLANT PIPING - NORTH
1 SI 008 07/17/2017
2 SI 011 09/14/2017
3 RFI 0627 03/05/2019
4 AS-BUILT DRAWINGS 02/07/2020
UP DN
MP200
MP200
MP201
3 4 5 6 7 8
E
F
G
D
MP203
MP202
MP202
MP202
DA-1
BOILER
CONTROL
PANEL
(TYP. OF 4)
8" HPS, 2-1/2" FWPD, 1" FOS, 1" FOR, 4"
NG AND CA LINES @ 12'-0" AFF
MINIMUM. REFER TO PLUMBING FOR
COMPRESSED AIR SIZING. THESE
PIPES WILL CONNECT TO FUTURE
PIPES FROM AN EMERGENCY BOILER
OUTSIDE. ALIGN PIPES WITH PRE-
DRILLED HOLES IN AN ACCESS BOX.
HOLES MUST BE LARGE ENOUGH TO
SLEEVE THROUGH FLANGES ON
TEMPORARY PIPING.
EMERGENCY
GENERATOR FUEL OIL
STORAGE DAY TANK
VALVE AND CAP 1" FOS AND 1"
FOR
FOR EXTENSION TO FUTURE
EMERGENCY GENERATOR
FOS/R PIPING DN THRU
FLOOR SEE SHEET
MP110 FOR
CONTINUATION WASTE WATER DRUM
PIPED FROM OIL PURIFIER
LOCATED BELOW IN FUEL
OIL PUMP ROOM
4" FWPD
BCP
BCP
BCP
BCP
BCP
DA-1/CST-1/HR
CONTROL PANEL
HPS UP TO 26'-0"
AFF. INSTALL DRIP
AND TRAP AT
BOTTOM OF RISE.
REFER TO
MP112 FOR CONT.
2 2
2 2
SV
SV
SV
SV
LCV
LCV
LCV
LCV
1 1/2" FOS
1 1/2" FOR
CT-2
AS - 2
6" HWS
1 1/2" FOR
1 1/2" FOS
WHX-4
HRP &
HWP
VSD'S
2 1/2"FWPD2 1/2"FWPD
/2 "F
W P
D
ES
8 ES
8ES
ES
ES
8 ES
ES
TT-3
RV
RV
RV
FOP-6
GUI - 8 ANC - 3
GUI - 7
MASTER
CONTROL
PANEL
FWPR TO DA-1.
REFER TO MP112
FOR CONT.
MP111
ELECTRICAL
EMERGENCY
GENERATOR
LOADING
AREA
ES 8
ES 8
ES 8
MP110
MP110
HRP-1 HRP-2
BFP 1-3 VSD'S
G
6" G
6" G6" G
G
G
4" G
DOWN TO GAS
TRAIN (TYP OF 4)
PRV
PRV
INTERMEDIATE PIPE SUPPORTS ON
ALL PIPES.
MAINTAIN MINIMUM
12' AFF FOR ALL
PIPES IN THIS AREA
BACKPRESSURE VALVE BPV-3
CO10
CO10
/2 "F
W P
D
F W
P D
12" HPS
H W
R
H W
S
C P
D
H R
H W
H R
H W
F W
P R
6" HWS
6" HWS
4" HRHW
4" HRHW
4" HRHW4" HRHW
F W
P R
4" HRHW
4" HRHW
4" HRHW
4" HRHW
C P
D
2" HWR
2" HWR
/4
H
W S
/4
H
W R
H W
R 1
H W
S
1" FOS
1" FOR
H P
S
H P
S
12" HPS
/2 "F
W P
D
4" FWPD
C P
D
WHX-2WHX-4
WHX-3
WHX-1
H W
S
F W
P R
C P
D
SWHX-1
SWHX-2
SWHX-3
HWP-1 HWP-2
F W
P R
6" HWS AND HWR
UP TO CATWALK
B-3 B-3
/2 "F
W P
D
/2 "F
W P
D
12" HPS DOWN TO
UTILITY TUNNEL
6" CPD DOWN TO
UTILITY TUNNEL
3/4" G
C P
D
/4
G
2" HPS
G
G
G /4
G3
/4
G
C P
D
/2
F O
R
1" HPS
3/4" HPR
/4
G
DOWN TO TRENCH
UP TO CATWALK
UP TO CATWALK
3/4" HPR
V
UP THROUGH
ROOF
SV
V
MP203
1. PORTIONS OF WORK SHOWN ON THIS SHEET ARE PART OF
THE DEDUCT ALTERNATES LISTED FOR PROJECT.
CONTRACTOR SHALL REVIEW SPECIFICATION SECTION 012300
FOR SPECIFIC INFORMATION REGARDING DEDUCT
ALTERNATES.
PHASING GENERAL NOTES FLOOR PLAN KEY NOTES:
1. 12" VENT UP THRU FLOOR AND EXTENDING THRU ROOF FROM
BLOWOFF TANK BOT-1 AND CONDENSATE RECEIVER CR-1. TERMINATE
IN GOOSENECK.
2. DASHED LINE REPRESENTS CLEARANCE AREA FOR SOOTBLOWER
LANCE PULL SPACE. REFER TO BOILER MFR INFORMATION FOR EXACT
REQUIREMENTS. DISTANCE LENTHWISE WITH EACH BOILER IS BASED
OFF OF WORST CASE MFR.
3. ROUTE ECONOMIZER SAFETY RELIEF VALVE DISCHARGE TO
BLOWDOWN TANK BOT-1 THROUGH FLOOR TRENCH.
4. REFER TO SHEET MP110 FOR PIPE ROUTING IN TRENCH
5. 6" CONDENSATE SURGE TANK VENT UP THRU ROOF
6. 1" FOS, 1" FOR, 2" BOTTOM BLOWDOWN, AND 1" SURFACE
BLOWDOWN ROUTED IN TRENCH BEHIND BOILER.
7. SEE SHEET MH111.2 FOR CONTINUATION OF HWS AND HWR.
8. EMERGENCY SAFETY SHUT OFF SWITCH
9. NATURAL GAS PIPING ROUTED HIGH WITH SHUTOFF VALVES
ACCESSIBLE FROM CATWALK.
10. CARBON MONOXIDE DETECTORS
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
HINES, ILLINOIS
578-11-007
N/A
M i l w a u k e e , W i s c o n s i n U S A 5 3 2 0 2
3 3 3 E a s t E r i e S t r e e t
T e l e p h o n e 4 1 4 . 2 7 8 . 8 2 0 0 F a c s i m i l e 4 1 4 . 2 7 8 . 7 7 3 4
Hammel, Green and Abrahamson, Inc.
HGA Project Number
AS-BUILT DRAWINGS
MARCH 16, 2015
PHYSICAL PLANT - BOILER
EDWARD HINES, JR. VETERANS
HOSPITAL
MP111S
Checker Author
FIRST FLOOR PLAN SOUTH BOILER PLANT PIPING -
ENLARGED
2606-009-00
1 RFI 0204 06/26/2017
2 SI 011 09/14/2017
3 RFI 0627 03/05/2019
4 AS-BUILT DRAWINGS 02/07/2020
DN
SE-5
MP200
MP201
MP200
MP201
2 3 4 5 6
A
B
C
E
F
G
D
6' - 0"
MP203
MP203
MP203
MP202
MP202
MP203
H P
S
Ø 3 Ø
Ø
46Ø46Ø
Ø
MP202
MP203
MP202
MP111
H P
S
H P
S
H P
S
H P
S
8" HPS
8" CPD
8" CPD
Ø
42Ø
H P
S
F W
P R
8" HPS
H P
S
H P
S
H P
S
H P
R
H P
S
H P
S
H P
S
H P
S
H P
S
H P
R
DA-1
6" MPS
10" MPS
MP203
FLOOR GENERAL NOTES:
1. FLOOR PLAN SHOWS THE UPPER HALF OF
THE HIGH BAY SPACE BETWEEN GRIDLINES
3 & 6 FROM THE CATWALK LEVEL @ 18'-0"
AFF TO THE ROOF. REFER TO SHEET MP111
FOR OPERATING FLOOR LEVEL.
2. HYDRONIC SYSTEMS SHALL HAVE DRAINS
AT LOW POINTS AND AIR RELIEFS AT HIGH
POINTS.
3. ALL BOILER PLANT EQUIPMENT SHALL BE
INSTALLED IN ACCORDANCE WITH VA
SPECIFICATION SECTION 230812.
4. FLOOR PLAN SHOWS GENERAL LOCATION
OF MAJOR EQUIPMENT AND PIPING. SEE
SCHEMATICS AND DETAILS FOR
ADDITIONAL INFORMATION.
+X
+Z
GLOBAL COORDINATE SYSTEM
FOR PIPE SUPPORT DESIGN
+Y (OUT OF PAGE)
1. PORTIONS OF WORK SHOWN ON THIS SHEET ARE PART OF
THE DEDUCT ALTERNATES LISTED FOR PROJECT.
CONTRACTOR SHALL REVIEW SPECIFICATION SECTION 012300
FOR SPECIFIC INFORMATION REGARDING DEDUCT
ALTERNATES.
PHASING GENERAL NOTES
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
HINES, ILLINOIS
578-11-007
N/A
M i l w a u k e e , W i s c o n s i n U S A 5 3 2 0 2
3 3 3 E a s t E r i e S t r e e t
T e l e p h o n e 4 1 4 . 2 7 8 . 8 2 0 0 F a c s i m i l e 4 1 4 . 2 7 8 . 7 7 3 4
Hammel, Green and Abrahamson, Inc.
HGA Project Number
AS-BUILT DRAWINGS
MARCH 16, 2015
PHYSICAL PLANT - BOILER
EDWARD HINES, JR. VETERANS
HOSPITAL
MP112
HGA HGA
CATWALK PLAN BOILER PLANT PIPING
2606-009-00
1/8" = 1'-0"1
CATWALK PLAN BOILER PLANT PIPING
1 AS-BUILT DRAWINGS 02/07/2020