S02-ATTACHMENT E -Floor plans - Boilers and HVAC catwalk level.pdf

PDF 2 MB Posted

Attached to
J045--Maintenance, Inspection and Calibration of Boiler system for the Edward Hines JR VAMC located in Chicago IL
Solicitation number
36C25226Q0400
Issued by

About this file

These are as-built drawings for the Physical Plant - Boiler facility at Edward Hines, Jr. Veterans Hospital in Hines, Illinois. The drawings document HVAC and boiler plant piping systems for the project numbered 578-11-007, prepared by Hammel, Green and Abrahamson, Inc. (HGA) and Paradigm/Sigma Engineers and Constructors.

The documents include multiple detailed floor plans and catwalk plans showing the configuration of heating, ventilation, and air conditioning (HVAC) systems with three air handling units (AHU-1, AHU-2, AHU-3), ductwork routing with specified CFM balancing requirements, dampers, and controls. The boiler plant piping plans illustrate hot water supply (HWS) and return (HWR) systems, condensate piping, fuel oil systems, natural gas piping, and associated equipment including boilers, pumps, heat exchangers, and control panels. Key specifications include pipe sizing ranging from 1" to 12" diameter, variable speed drives (VSDs) on selected equipment, manually balanced ducts to 6,600-13,400 CFM at 100% fan speed, and provisions for emergency generator fuel oil storage. The drawings incorporate revisions documented through RFIs (Request for Information), ASIs (Architectural/Engineering Supplemental Instructions), and were finalized as as-built drawings on February 7, 2020. The facility maintains coordination between HVAC supply routing under return ducts, 40" and 24" deep plenums with insulated panel blanking, and utility connections routed through trenches and catwalks.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DN

DN

DN

DN

DN

30x14 SUPPLY DUCT

DN.

SUPPLY ROUTED

UNDER RETURN DUCT.

60x60 UP

TO GRV-1

AHU-1

20x12

RETURN

DUCT DN

40" DEEP PLENUM

FULL HEIGHT AND

WIDTH OF

LOUVER

SECTIONS

SHOWN. BLANK

OFF UNUSED

SECTIONS OF

LOUVER WITH

INSULATED

PANEL.

24" DEEP PLENUM FULL

HEIGHT AND WIDTH OF

LOUVER SECTIONS SHOWN.

M 1

28x16

M 3

MOTORIZED DAMPER M-3

IN VERTICAL POSITION IN

30x18 RETURN DUCT

MANUALLY

BALANCE

24x40 DUCT

TO 6600 CFM

AT 100% FAN

SPEED

60x60 UP

TO GRV-2

60x60 UP

TO GRV-3

60x60 UP

TO GRV-4

STEEL MEMBER

PENETRATES PLENUM

(SEE NOTE ON MH111.1)

AHU-3

M

M 7

MANUALLY

BALANCE 24x40

DUCT TO 6600

CFM AT 100%

FAN SPEED

MANUALLY

BALANCE

70x28 TO

13400 CFM AT

100% FAN

SPEED

AHU-2

M

M 5

PROVIDE MINIMUM OUTDOOR AIR

DAMPER AND AIR FLOW MEASURING

STATION IN ADDITION TO

ECONOMIZER OUTDOOR AIR

DAMPER

SF-1

VSD

SF-2 VSD

SF-3

VSD

2 3 4 5 6

A

B

C

E

F

G

D

(2) 40x40 OPEN

(TYP OF 4)

3' - 1 29 /32"

MAINTAIN 36"

CLEAR, TYP.

M

M

M

M

DDC CONTROL

PANEL TO SERVE

AHUS

BLANK OFF UNUSED

SECTIONS OF LOUVER

WITH INSULATED

PANEL.

BLANK OFF UNUSED

SECTIONS OF LOUVER

WITH INSULATED

PANEL.

14x12 RETURN

DUCT DOWN

THROUGH DRY

WALL LID INTO

PLENUM CEILING

MH-200

MH-200

MH-200

MH-200

MH-200

x x

O P

E N

O P

E N x x

DA-1

B-1 B-2

B-3 B-4

AHU-1

6" HWS/R DN

4"4"

AHU-2 AHU-3

REFRIGERANT

PIPING UP TO CU-1

ON ROOF. PIPE

SIZE PER MFG

RECOMMENDATION.

2 3 4 5 6

A

B

C

E

F

G

D

2" HWS

2" HWR

6" HWS

6" HWR

4"

4"

MH-200

MH-200

MH-200

MH-200

MH-200

DA-1

B-1 B-2

B-3 B-4

PROVIDE 1/2" MESH SCREEN OVER SUPPLY AIR AND RETURN

AIR OPENINGS.

HVAC FLOOR PLAN KEYNOTES

1. DUCTWORK PENETRATING MASONRY WALLS SHALL BE

LOCATED ON MASONRY DIMENSIONS TO AVOID CUTTING

HVAC GENERAL NOTES

SEE DETAIL 9/MJ506.2

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

HINES, ILLINOIS

578-11-007

N/A

M i l w a u k e e , W i s c o n s i n U S A 5 3 2 0 2

3 3 3 E a s t E r i e S t r e e t

T e l e p h o n e 4 1 4 . 2 7 8 . 8 2 0 0 F a c s i m i l e 4 1 4 . 2 7 8 . 7 7 3 4

Hammel, Green and Abrahamson, Inc.

HGA Project Number

AS-BUILT DRAWINGS

MARCH 16, 2015

PHYSICAL PLANT - BOILER

EDWARD HINES, JR. VETERANS

HOSPITAL

MH112

HGA HGA

CATWALK PLAN HVAC AND HVAC PIPING

2606-009-00

1/8" = 1'-0"1

CATWALK PLAN HVAC

1/8" = 1'-0"2

CATWALK PLAN HVAC PIPING

RFI 03441 11/21/2017

ASI XXX2 10/03/2019

AS-BUILT DRAWINGS3 02/07/2020

MP200

MP201

MP200

MP201

MP203

MP203

MP203

MP202

MP203

MP203

DA-1

4" FWPD

BFP-1

BFP-2

BFP-3

CTP-2

CTP-3

BCP

BC

P

BCP

BCP

CTP-1

DA-1/CST-1/HR

CONTROL PANEL

FREE BLOW

DRAIN

DN(TYP OF 4)

HPS UP TO 26'-0"

AFF. INSTALL DRIP

AND TRAP AT

BOTTOM OF RISE.

REFER TO

MP112 FOR CONT.

2 2

2 2

2 2

LCV

LCV

SV

SV

SV

SV

LCV

LCV

LCV

LCV

F W

P D

BFP 1-3

VSD'S

CTP

VSD'S

2 1/2"FWPD2 1/2"FWPD

CHEMICAL

STORAGE

(TYP)

RV

RV

122A

SHOP

STORAGE

EMERGENCY

GENERATOR

DISCHARGE FROM ROTP-1

AND -2. SEE PL111 FOR

CONTINUATION.

FWPR TO DA-1.

REFER TO MP112

FOR CONT.

BOILER LAYUP MIXING TANK.

SEE 2/MJ503 FOR DETAIL.

1" RO

ES 8

ES 8

ES 8

ES8

GUI - 5 GUI - 6

6" G

G

G

6" G

G

6" G6" G

6" NG FROM METER.

METER, PRV AND

PRESSURE GAGES

PROVIDED BY

UTILITY. 160,000 MBH

AT 15 PSIG.

G

G

1" FWPD

1" RO DOWN TO 3-WAY

MIXING VALVE

CTM-1

CHEMICAL TANK MIXER (TYP.)

DISCHARGE DOWN TO MIXING VALVE SEE DETAILS 2/MJ2503

CO10

CO10

CO10

3/4" G

3/4" HPR

3/4" HPR

2" HPS

3/4" G

4" CPD

2 1/2"FWPD

8" HPS

F W

P D

G

1" HPS

/4

G 1" HPR

H P

S

/2 "F

W P

D

4" FWPD

/2 "F

W P

D

2 1/2"FWPD

12" HPS

8" CPD

C P

D

F W

P R

3" FWPR

F W

P R

/2 "F

W P

D

/4

H

P R

F W

P R

C P

D

C P

D

CST-1

8" HPS 8" HPS

UH-3

UH-6

UH-7

UH-1

F W

P R

DOWN TO

TRENCH

B-1 B-2

DOWN TO

TRENCH

UP TO

CATWALK

UP TO

CATWALK

UP TO

CATWALK

DOWN TO

TRENCH

/4

G

C P

D

F W

P D

1" HPR

8" CPD

2" BO

F W

P D

12" HPS

3/4" HPR

C P

D

5" FWPD

AS - 1

3/4" HPR

H P

S

C P

D

/4

G

UP TO

CATWALK

4" HRHW

2 1/2"FWPD

2 1/2"FWPD

1. PORTIONS OF WORK SHOWN ON THIS SHEET ARE PART OF

THE DEDUCT ALTERNATES LISTED FOR PROJECT.

CONTRACTOR SHALL REVIEW SPECIFICATION SECTION 012300

FOR SPECIFIC INFORMATION REGARDING DEDUCT

ALTERNATES.

PHASING GENERAL NOTES

FLOOR PLAN KEY NOTES:

1. 12" VENT UP THRU FLOOR AND EXTENDING THRU ROOF FROM

BLOWOFF TANK BOT-1 AND CONDENSATE RECEIVER CR-1. TERMINATE

IN GOOSENECK.

2. DASHED LINE REPRESENTS CLEARANCE AREA FOR SOOTBLOWER

LANCE PULL SPACE. REFER TO BOILER MFR INFORMATION FOR EXACT

REQUIREMENTS. DISTANCE LENTHWISE WITH EACH BOILER IS BASED

OFF OF WORST CASE MFR.

3. ROUTE ECONOMIZER SAFETY RELIEF VALVE DISCHARGE TO

BLOWDOWN TANK BOT-1 THROUGH FLOOR TRENCH.

4. REFER TO SHEET MP110 FOR PIPE ROUTING IN TRENCH

5. 6" CONDENSATE SURGE TANK VENT UP THRU ROOF

6. 1" FOS, 1" FOR, 2" BOTTOM BLOWDOWN, AND 1" SURFACE

BLOWDOWN ROUTED IN TRENCH BEHIND BOILER.

7. SEE SHEET MH111.2 FOR CONTINUATION OF HWS AND HWR.

8. EMERGENCY SAFETY SHUT OFF SWITCH

9. NATURAL GAS PIPING ROUTED HIGH WITH SHUTOFF VALVES

ACCESSIBLE FROM CATWALK.

10. CARBON MONOXIDE DETECTORS

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

HINES, ILLINOIS

578-11-007

N/A

M i l w a u k e e , W i s c o n s i n U S A 5 3 2 0 2

3 3 3 E a s t E r i e S t r e e t

T e l e p h o n e 4 1 4 . 2 7 8 . 8 2 0 0 F a c s i m i l e 4 1 4 . 2 7 8 . 7 7 3 4

Hammel, Green and Abrahamson, Inc.

HGA Project Number

AS-BUILT DRAWINGS

MARCH 16, 2015

PHYSICAL PLANT - BOILER

EDWARD HINES, JR. VETERANS

HOSPITAL

MP111N

Checker Author

FIRST FLOOR PLAN NORTH BOILER PLANT PIPING -

ENLARGED

2606-009-00

1/4" = 1'-0"1

FIRST FLOOR PLAN BOILER PLANT PIPING - NORTH

1 SI 008 07/17/2017

2 SI 011 09/14/2017

3 RFI 0627 03/05/2019

4 AS-BUILT DRAWINGS 02/07/2020

UP DN

MP200

MP200

MP201

3 4 5 6 7 8

E

F

G

D

MP203

MP202

MP202

MP202

DA-1

BOILER

CONTROL

PANEL

(TYP. OF 4)

8" HPS, 2-1/2" FWPD, 1" FOS, 1" FOR, 4"

NG AND CA LINES @ 12'-0" AFF

MINIMUM. REFER TO PLUMBING FOR

COMPRESSED AIR SIZING. THESE

PIPES WILL CONNECT TO FUTURE

PIPES FROM AN EMERGENCY BOILER

OUTSIDE. ALIGN PIPES WITH PRE-

DRILLED HOLES IN AN ACCESS BOX.

HOLES MUST BE LARGE ENOUGH TO

SLEEVE THROUGH FLANGES ON

TEMPORARY PIPING.

EMERGENCY

GENERATOR FUEL OIL

STORAGE DAY TANK

VALVE AND CAP 1" FOS AND 1"

FOR

FOR EXTENSION TO FUTURE

EMERGENCY GENERATOR

FOS/R PIPING DN THRU

FLOOR SEE SHEET

MP110 FOR

CONTINUATION WASTE WATER DRUM

PIPED FROM OIL PURIFIER

LOCATED BELOW IN FUEL

OIL PUMP ROOM

4" FWPD

BCP

BCP

BCP

BCP

BCP

DA-1/CST-1/HR

CONTROL PANEL

HPS UP TO 26'-0"

AFF. INSTALL DRIP

AND TRAP AT

BOTTOM OF RISE.

REFER TO

MP112 FOR CONT.

2 2

2 2

SV

SV

SV

SV

LCV

LCV

LCV

LCV

1 1/2" FOS

1 1/2" FOR

CT-2

AS - 2

6" HWS

1 1/2" FOR

1 1/2" FOS

WHX-4

HRP &

HWP

VSD'S

2 1/2"FWPD2 1/2"FWPD

/2 "F

W P

D

ES

8 ES

8ES

ES

ES

8 ES

ES

TT-3

RV

RV

RV

FOP-6

GUI - 8 ANC - 3

GUI - 7

MASTER

CONTROL

PANEL

FWPR TO DA-1.

REFER TO MP112

FOR CONT.

MP111

ELECTRICAL

EMERGENCY

GENERATOR

LOADING

AREA

ES 8

ES 8

ES 8

MP110

MP110

HRP-1 HRP-2

BFP 1-3 VSD'S

G

6" G

6" G6" G

G

G

4" G

DOWN TO GAS

TRAIN (TYP OF 4)

PRV

PRV

INTERMEDIATE PIPE SUPPORTS ON

ALL PIPES.

MAINTAIN MINIMUM

12' AFF FOR ALL

PIPES IN THIS AREA

BACKPRESSURE VALVE BPV-3

CO10

CO10

/2 "F

W P

D

F W

P D

12" HPS

H W

R

H W

S

C P

D

H R

H W

H R

H W

F W

P R

6" HWS

6" HWS

4" HRHW

4" HRHW

4" HRHW4" HRHW

F W

P R

4" HRHW

4" HRHW

4" HRHW

4" HRHW

C P

D

2" HWR

2" HWR

/4

H

W S

/4

H

W R

H W

R 1

H W

S

1" FOS

1" FOR

H P

S

H P

S

12" HPS

/2 "F

W P

D

4" FWPD

C P

D

WHX-2WHX-4

WHX-3

WHX-1

H W

S

F W

P R

C P

D

SWHX-1

SWHX-2

SWHX-3

HWP-1 HWP-2

F W

P R

6" HWS AND HWR

UP TO CATWALK

B-3 B-3

/2 "F

W P

D

/2 "F

W P

D

12" HPS DOWN TO

UTILITY TUNNEL

6" CPD DOWN TO

UTILITY TUNNEL

3/4" G

C P

D

/4

G

2" HPS

G

G

G /4

G3

/4

G

C P

D

/2

F O

R

1" HPS

3/4" HPR

/4

G

DOWN TO TRENCH

UP TO CATWALK

UP TO CATWALK

3/4" HPR

V

UP THROUGH

ROOF

SV

V

MP203

1. PORTIONS OF WORK SHOWN ON THIS SHEET ARE PART OF

THE DEDUCT ALTERNATES LISTED FOR PROJECT.

CONTRACTOR SHALL REVIEW SPECIFICATION SECTION 012300

FOR SPECIFIC INFORMATION REGARDING DEDUCT

ALTERNATES.

PHASING GENERAL NOTES FLOOR PLAN KEY NOTES:

1. 12" VENT UP THRU FLOOR AND EXTENDING THRU ROOF FROM

BLOWOFF TANK BOT-1 AND CONDENSATE RECEIVER CR-1. TERMINATE

IN GOOSENECK.

2. DASHED LINE REPRESENTS CLEARANCE AREA FOR SOOTBLOWER

LANCE PULL SPACE. REFER TO BOILER MFR INFORMATION FOR EXACT

REQUIREMENTS. DISTANCE LENTHWISE WITH EACH BOILER IS BASED

OFF OF WORST CASE MFR.

3. ROUTE ECONOMIZER SAFETY RELIEF VALVE DISCHARGE TO

BLOWDOWN TANK BOT-1 THROUGH FLOOR TRENCH.

4. REFER TO SHEET MP110 FOR PIPE ROUTING IN TRENCH

5. 6" CONDENSATE SURGE TANK VENT UP THRU ROOF

6. 1" FOS, 1" FOR, 2" BOTTOM BLOWDOWN, AND 1" SURFACE

BLOWDOWN ROUTED IN TRENCH BEHIND BOILER.

7. SEE SHEET MH111.2 FOR CONTINUATION OF HWS AND HWR.

8. EMERGENCY SAFETY SHUT OFF SWITCH

9. NATURAL GAS PIPING ROUTED HIGH WITH SHUTOFF VALVES

ACCESSIBLE FROM CATWALK.

10. CARBON MONOXIDE DETECTORS

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

HINES, ILLINOIS

578-11-007

N/A

M i l w a u k e e , W i s c o n s i n U S A 5 3 2 0 2

3 3 3 E a s t E r i e S t r e e t

T e l e p h o n e 4 1 4 . 2 7 8 . 8 2 0 0 F a c s i m i l e 4 1 4 . 2 7 8 . 7 7 3 4

Hammel, Green and Abrahamson, Inc.

HGA Project Number

AS-BUILT DRAWINGS

MARCH 16, 2015

PHYSICAL PLANT - BOILER

EDWARD HINES, JR. VETERANS

HOSPITAL

MP111S

Checker Author

FIRST FLOOR PLAN SOUTH BOILER PLANT PIPING -

ENLARGED

2606-009-00

1 RFI 0204 06/26/2017

2 SI 011 09/14/2017

3 RFI 0627 03/05/2019

4 AS-BUILT DRAWINGS 02/07/2020

DN

SE-5

MP200

MP201

MP200

MP201

2 3 4 5 6

A

B

C

E

F

G

D

6' - 0"

MP203

MP203

MP203

MP202

MP202

MP203

H P

S

Ø 3 Ø

Ø

46Ø46Ø

Ø

MP202

MP203

MP202

MP111

H P

S

H P

S

H P

S

H P

S

8" HPS

8" CPD

8" CPD

Ø

42Ø

H P

S

F W

P R

8" HPS

H P

S

H P

S

H P

S

H P

R

H P

S

H P

S

H P

S

H P

S

H P

S

H P

R

DA-1

6" MPS

10" MPS

MP203

FLOOR GENERAL NOTES:

1. FLOOR PLAN SHOWS THE UPPER HALF OF

THE HIGH BAY SPACE BETWEEN GRIDLINES

3 & 6 FROM THE CATWALK LEVEL @ 18'-0"

AFF TO THE ROOF. REFER TO SHEET MP111

FOR OPERATING FLOOR LEVEL.

2. HYDRONIC SYSTEMS SHALL HAVE DRAINS

AT LOW POINTS AND AIR RELIEFS AT HIGH

POINTS.

3. ALL BOILER PLANT EQUIPMENT SHALL BE

INSTALLED IN ACCORDANCE WITH VA

SPECIFICATION SECTION 230812.

4. FLOOR PLAN SHOWS GENERAL LOCATION

OF MAJOR EQUIPMENT AND PIPING. SEE

SCHEMATICS AND DETAILS FOR

ADDITIONAL INFORMATION.

+X

+Z

GLOBAL COORDINATE SYSTEM

FOR PIPE SUPPORT DESIGN

+Y (OUT OF PAGE)

1. PORTIONS OF WORK SHOWN ON THIS SHEET ARE PART OF

THE DEDUCT ALTERNATES LISTED FOR PROJECT.

CONTRACTOR SHALL REVIEW SPECIFICATION SECTION 012300

FOR SPECIFIC INFORMATION REGARDING DEDUCT

ALTERNATES.

PHASING GENERAL NOTES

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

HINES, ILLINOIS

578-11-007

N/A

M i l w a u k e e , W i s c o n s i n U S A 5 3 2 0 2

3 3 3 E a s t E r i e S t r e e t

T e l e p h o n e 4 1 4 . 2 7 8 . 8 2 0 0 F a c s i m i l e 4 1 4 . 2 7 8 . 7 7 3 4

Hammel, Green and Abrahamson, Inc.

HGA Project Number

AS-BUILT DRAWINGS

MARCH 16, 2015

PHYSICAL PLANT - BOILER

EDWARD HINES, JR. VETERANS

HOSPITAL

MP112

HGA HGA

CATWALK PLAN BOILER PLANT PIPING

2606-009-00

1/8" = 1'-0"1

CATWALK PLAN BOILER PLANT PIPING

1 AS-BUILT DRAWINGS 02/07/2020

File details come from the government source that posted it. Updated .