This document is a federal contract submittal for air handling units (AHUs) at the Hines VA Physical Plant Boiler project. The submittal, prepared by Trane U.S. Inc. on February 16, 2017, covers three Performance Climate Changer units (CSAA008UA for AHU-1 and CSAA040UA for AHU-2 and AHU-3) specified under Section 23 73 00 (Indoor Central-Station Air-Handling Units) of the contract specifications. The units are designed for variable volume air handling with capacities of 3,930 cfm for AHU-1 and 20,000 cfm for AHU-2 and AHU-3, all operating at 460/3/60 voltage with premium efficiency NEMA-compliant motors suitable for variable frequency drive applications.

The submittal includes comprehensive technical documentation covering unit construction, performance data, mechanical specifications, as-built drawings, fan curves, wiring details, and accessory schedules. All units feature 2-inch double-wall foam insulation with galvanized steel construction, stainless steel drain pans, access doors with thermal windows and marine LED lighting, and 2-inch pleated media filters rated MERV 8. The AHUs incorporate factory-installed coils (cooling and heating), are fully assembled and tested before shipment in sections to accommodate job site rigging requirements, and include external junction boxes for field-supplied VFD wiring. Drainage calculations, filter sizing, and electrical requirements (MCA/MOP schedules) are specified, with AHU-1 requiring 15-amp overcurrent protection and AHU-2/AHU-3 requiring 40-amp protection for supply fan motors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR

MANUFACTURER'S CERTIFICATES OF COMPLIANCE

For use of this form, see ER 415-1-10; the proponent agency is CECW-CE.

SECTION I - REQUEST FOR APPROVAL OF THE FOLLOWING ITEMS (This section will be initiated by the contractor)

DATE TRANSMITTAL NO.

TO: FROM: CONTRACT NO. CHECK ONE:

THIS IS A NEW TRANSMITTAL

THIS IS A RESUBMITTAL OF

TRANSMITTAL ___________

SPECIFICATION SEC. NO. (Cover only one section with each transmittal) PROJECT TITLE AND LOCATION 01-Main Register THIS TRANSMITTAL IS FOR: (Check one)

FIO GA DA CR DA/CR DA/GA

ITEM

NO.

(See Note 3) a.

DESCRIPTION OF SUBMITTAL ITEM

(Type size, model number/etc.)

b.

SUBMITTAL

TYPE CODE

(See Note 8) c.

NO.

OF

COPIES

d.

CONTRACT REFERENCE

DOCUMENT

SPEC.

PARA. NO.

e.

DRAWING

SHEET NO.

f.

CONTRACTOR

REVIEW

CODE

g.

VARIATION

Enter "Y" if requesting a variation

(See Note 6) h.

USACE

ACTION

CODE

(Note 9) i.

REMARKS I certify that the above submitted items have been reviewed in detail and are correct and in the strict conformance with the contract drawings and specifications except as otherwise stated.

NAME AND SIGNATURE OF CONTRACTOR

SECTION II - APPROVAL ACTION

ENCLOSURES RETURNED (List by item No.) NAME, TITLE AND SIGNATURE OF APPROVING AUTHORITY DATE

ENG FORM 4025-R, MAR 2012 REPLACES EDITION OF MAR 95, WHICH IS OBSOLETE.

03/16/2017 23 73 00-1

23 73 00

W912QR-16-C-0020 NA

Illinois Resident Office

1 Rock Island Arsenal, Bldg 110

Rock Island, Illinois 61204-2004

Walsh Federal JV

929 West Adams Street

Chicago, IL 60607

Hines VA Boiler Plant Hines VA Hospital

X

X

1 Air Handling Units SD-02 4 2.1 A

2 Air Handling Units SD-03 4 2.1 A

3 Air Handling Units SD-05 4 2.1 A

����������������
��

Jamie Surber

HGA

Jim Bradburn

3/23/2017

APPROVED.

No exceptions noted.

CONDITIONALLY APPROVED.

Exceptions noted, resubmission not required.

NOT APPROVED.

Completed and/or make corrections noted and RESUBMIT.

RECEIVED.

For information only.

NOT REVIEWED.

Not a required submittal.

OTHER ____________________________________

ACTION BY DATE RECEIVED DATE ACTED_____________ _____________ _____________

REVIEWED, APPROVED OR ACTED UPON ONLY FOR CONFORMANCE WITH THE

INFORMATION GIVEN AND THE DESIGN CONCEPT AS EXPRESSED IN THE CONTRACT

DOCUMENTS. NOT REVIEWED FOR SUBMISSION FOR, OR DEVIATION FROM, THE

REQUIREMENTS OF THE CONTRACT DOCUMENTS, OR FOR DETERMINING THE

ACCURACY AND COMPLETENESS OF OTHER INFORMATION SUCH AS DIMENSIONS

(INCLUDING FIELD MEASUREMENTS), QUANTITIES OR INSTALLATION, FABRICATION, OR

PERFORMANCE OF EQUIPMENT OR SYSTEMS.

3/21/2017 3/23.2017

Heating water fluid is 50% PG. AHU-1 heating CFM is 3,300 cfm.

Reselect HW coils and resubmit.

P2# 457861 New Boiler Plant

SECTION 23 73 00 - Page 1

READY TO ADVERTISE

SECTION 23 73 00

INDOOR CENTRAL-STATION AIR-HANDLING UNITS

PART 1 - GENERAL

1.1 DESCRIPTION

A. Air handling units including integral components specified herein.

B. Definitions: Air Handling Unit (AHU): A factory fabricated and tested assembly of modular sections consisting of housed-centrifugal fan with

V-belt drive, coils, filters, and other necessary equipment to perform one or more of the following functions of circulating, cleaning, heating, cooling, humidifying, dehumidifying, and mixing of air. Design capacities of units shall be as scheduled on the drawings.

1.2 RELATED WORK

A. Seismic restraints for equipment: Section 13 05 41, SEISMIC RESTRAINT

REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS.

B. General mechanical requirements and items, which are common to more than one section of Division 23: Section 23 05 10, COMMON WORK RESULTS FOR

BOILER PLANT AND STEAM GENERATION.

C. Sound and vibration requirements: Section 23 05 41, NOISE AND VIBRATION

CONTROL FOR HVAC PIPING AND EQUIPMENT.

D. Piping and duct insulation: Section 23 07 11, HVAC, PLUMBING, AND BOILER

PLANT INSULATION.

E. Piping and valves: Section 23 21 13 HYDRONIC PIPING.

F. Heating and cooling coils and pressure requirements: Section 23 82 16, AIR COILS.

G. Return and exhaust fans: Section 23 34 00, HVAC FANS.

H. Requirements for flexible duct connectors, sound attenuators and sound absorbing duct lining, and air leakage: Section 23 31 00, HVAC DUCTS and

CASINGS.

I. Air filters and filters' efficiency: Section 23 40 00, HVAC AIR CLEANING

DEVICES.

J. HVAC controls: Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.

K. Testing, adjusting and balancing of air and water flows: Section 23 05

93, TESTING, ADJUSTING, AND BALANCING FOR HVAC.

L. Types of motors: Section 23 05 12, GENERAL MOTOR REQUIREMENTS FOR HVAC

AND STEAM GENERATION EQUIPMENT.

M. Motor Starters and Variable Speed Drives: Section 26 29 11, MOTOR

STARTERS.

N. General Commissioning: Section 01 91 00, GENERAL COMMISSIONING

REQUIREMENTS.

O. HVAC Commissioning: Section 23 08 00, COMMISSIONING OF HVAC SYSTEMS.

W912QR16R0030-0000

SECTION 23 73 00 - Page 2

1.3 QUALITY ASSURANCE

A. Refer to Article, Quality Assurance, in Section 23 05 10, COMMON WORK

RESULTS FOR BOILER PLANT AND STEAM GENERATION.

B. Air Handling Units Certification:

1. Air Handling Units with Housed Centrifugal Fans: The air handling units shall be certified in accordance with AHRI 430 and tested/rated in accordance with AHRI 260.

C. Heating, Cooling, and Air Handling Capacity and Performance Standards:

AHRI 430, AHRI 410, ASHRAE 51, and AMCA 210.

D. Performance Criteria:

1. The fan BHP shall include all system effects for all fans and v-belt drive losses for housed centrifugal fans.

2. The fan motor shall be selected within the rated nameplate capacity, without relying upon NEMA Standard Service Factor.

3. Select the fan operating point as follows:

a. Forward Curve and Axial Flow Fans: Right hand side of peak pressure point.

b. Air Foil, Backward Inclined, or Tubular Fans Including Plenum

Fans: At or near the peak static efficiency but at an appropriate distance from the stall line.

4. Operating Limits: AMCA 99 and Manufacturer’s Recommendations.

E. Units shall be factory-fabricated, assembled, and tested by a manufacturer, in business of manufacturing similar air-handling units for at least five (5) years.

1.4 SUBMITTALS

A. The contractor shall, in accordance with Section 01 33 00, SUBMITTAL

PROCEDURES, furnish a complete submission for all air handling units covered in the project. The submission shall include all information listed below. Partial and incomplete submissions shall be rejected without reviews.

B. Manufacturer's Literature and Data:

1. Submittals for AHUs shall include fans, drives, motors, coils, sound attenuators, mixing box with outside/return air dampers, filter housings, blender sections, and all other related accessories. The contractor shall provide custom drawings showing total air handling unit assembly including dimensions, operating weight, access sections, flexible connections, door swings, controls penetrations, electrical disconnect, lights, duplex receptacles, switches, wiring, utility connection points, unit support system, vibration isolators, drain pan, pressure drops through each component (filter, coil etc.).

Comply

SECTION 23 73 00 - Page 3

2. Submittal drawings of section or component only will not be acceptable. Contractor shall also submit performance data including performance test results, charts, curves or certified computer selection data; data sheets; fabrication and insulation details. If the unit cannot be shipped in one piece, the contractor shall indicate the number of pieces that each unit will have to be broken into to meet shipping and job site rigging requirements. This data shall be submitted in hard copies and in electronic version compatible to AutoCAD version used by the VA at the time of submission.

3. Submit sound power levels in each octave band for the inlet and discharge of the fan and at entrance and discharge of AHUs at scheduled conditions. In absence of sound power ratings refer to

Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND

EQUIPMENT.

4. Provide fan curves showing Liters/Second (cubic feet per minute), static pressure, efficiency, and horsepower for design point of operation and at maximum design Liters/Second (cubic feet per minute).

5. Submit total fan static pressure, external static pressure, for AHU including total, inlet and discharge pressures, and itemized specified internal losses and unspecified internal losses. Refer to air handling unit schedule on drawings.

C. Maintenance and operating manuals in accordance with Section 00 80

00.06, SPECIAL PROVISIONS. Include instructions for lubrication, filter replacement, motor and drive replacement, spare part lists, and wiring diagrams.

D. Submit written test procedures two weeks prior to factory testing.

Submit written results of factory tests for approval prior to shipping.

E. Submit shipping information that clearly indicates how the units will be shipped in compliance with the descriptions below.

1. Units shall be shipped in one (1) piece where possible and in shrink wrapping to protect the unit from dirt, moisture and/or road salt.

2. If not shipped in one (1) piece, provide manufacturer approved shipping splits where required for installation or to meet shipping and/or job site rigging requirements in modular sections. Indicate clearly that the shipping splits shown in the submittals have been verified to accommodate the construction constraints for rigging as required to complete installation and removal of any section for

SECTION 23 73 00 - Page 4 replacement through available access without adversely affecting other sections.

3. If shipping splits are provided, each component shall be individually shrink wrapped to protect the unit and all necessary hardware (e.g.

bolts, gaskets etc.) will be included to assemble unit on site (see section 2.1.A4).

4. Lifting lugs will be provided to facilitate rigging on shipping splits and joining of segments. If the unit cannot be shipped in one piece, the contractor shall indicate the number of pieces that each unit will have to be broken into to meet shipping and job site rigging requirements.

1.5 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. Air-Conditioning, Heating, and Refrigeration Institute (AHRI)/(ARI):

410-01..................Standard for Forced-Circulation Air-Heating and

Air-Cooling Coils

430-09..................Central Station Air Handling Units

C. Air Movement and Control Association International, Inc. (AMCA):

210-07..................Laboratory Methods of Testing Fans for Rating

D. American Society of Heating, Refrigerating and Air-conditioning

Engineers, Inc. (ASHRAE):

170-2008................Ventilation of Health Care Facilities

E. American Society for Testing and Materials (ASTM):

ASTM B117-07a...........Standard Practice for Operating Salt Spray (Fog)

Apparatus

ASTM D1654-08...........Standard Test Method for Evaluation of Painted or Coated Specimens Subjected to Corrosive

Environments

ASTM D1735-08...........Standard Practice for Testing Water Resistance of Coatings Using Water Fog Apparatus

ASTM D3359-08...........Standard Test Methods for Measuring Adhesion by

Tape Test

F. Military Specifications (Mil. Spec.):

MIL-P-21035B-2003.......Paint, High Zinc Dust Content, Galvanizing

Repair (Metric)

G. National Fire Protection Association (NFPA):

NFPA 90A................Standard for Installation of Air Conditioning and Ventilating Systems, 2009

SECTION 23 73 00 - Page 5

H. Energy Policy Act of 2005 (P.L.109-58)

PART 2 - PRODUCTS

2.1 AIR HANDLING UNITS

A. General:

1. AHUs shall be fabricated from insulated, solid double-wall galvanized steel without any perforations in draw-through configuration. Casing shall be fabricated as specified in section 2.1.C.2. Galvanizing shall be hot dipped conforming to ASTM A525 and shall provide a minimum of 0.275 kg of zinc per square meter (0.90 oz. of zinc per square foot) (G90). Aluminum constructed units, subject to VA approval, may be used in place of galvanized steel. The unit manufacturer shall provide published documentation confirming that the structural rigidity of aluminum air-handling units is equal or greater than the specified galvanized steel.

2. The contractor and the AHU manufacturer shall be responsible for ensuring that the unit will not exceed the allocated space shown on the drawings, including required clearances for service and future overhaul or removal of unit components. All structural, piping, wiring, and ductwork alterations of units, which are dimensionally different than those specified, shall be the responsibility of the contractor at no additional cost to the government.

3. AHUs shall be fully assembled by the manufacturer in the factory in accordance with the arrangement shown on the drawings. The unit shall be assembled into the largest sections possible subject to shipping and rigging restrictions. The correct fit of all components and casing sections shall be verified in the factory for all units prior to shipment. All units shall be fully assembled, tested, and then split to accommodate shipment and job site rigging. On units not shipped fully assembled, the manufacturer shall tag each section and include air flow direction to facilitate assembly at the job site.

Lifting lugs or shipping skids shall be provided for each section to allow for field rigging and final placement of unit.

4. The AHU manufacturer shall provide the necessary gasketing, caulking, and all screws, nuts, and bolts required for assembly. The manufacturer shall provide a factory-trained and qualified local representative at the job site to supervise the assembly and to assure that the units are assembled to meet manufacturer's recommendations and requirements noted on the drawings. Provide documentation to the Contracting Officer that the local representative has provided services of similar magnitude and

W912QR16R0030-0000

Comply

Comply Verification for Clearance

SECTION 23 73 00 - Page 6 complexity on jobs of comparable size. If a local representative cannot be provided, the manufacturer shall provide a factory representative.

5. Gaskets: All door and casing and panel gaskets and gaskets between air handling unit components, if joined in the field, shall be high quality which seal air tight and retain their structural integrity and sealing capability after repeated assembly and disassembly of bolted panels and opening and closing of hinged components. Bolted sections may use a more permanent gasketing method provided they are not disassembled.

6. Structural Rigidity: Provide structural reinforcement when required by span or loading so that the deflection of the assembled structure shall not exceed 1/200 of the span based on a differential static pressure of 1991 PA (8 inch WG) or higher.

B. Base:

1. Provide a heavy duty steel base for supporting all major AHU components. Bases shall be constructed of wide-flange steel I-beams, channels, or minimum 125 mm (5 inch) high 3.5 mm (10 Gauge) steel base rails. Welded or bolted cross members shall be provided as required for lateral stability. Contractor shall provide supplemental steel supports as required to obtain proper operation heights for cooling coil condensate drain trap as shown on drawings.

2. AHUs shall be completely self-supporting for installation on concrete housekeeping pad, steel support pedestals, or suspended as shown on drawings.

3. The AHU bases not constructed of galvanized steel shall be cleaned, primed with a rust inhibiting primer, and finished with rust inhibiting exterior enamel.

C. Casing (including wall, floor and roof):

1. General: AHU casing shall be constructed as solid double wall, galvanized steel insulated panels without any perforations, integral of or attached to a structural frame. The thickness of insulation, mode of application and thermal breaks shall be such that there is no visible condensation on the exterior panels of the AHU located in the non-conditioned spaces.

2. Casing Construction:

Table 2.1.C.2

Outer Panel 0.8 mm (22 Gage) Minimum

Inner Panel 0.8 mm (22 Gage) Minimum

Insulation Foam

W912QR16R0030-0000

Comply

Comply

Comply

Comply

Comply 6" Provided

SECTION 23 73 00 - Page 7

Thickness

Density

50 mm (2 inch) Minimum

48 kg/m3 (3.0 lb/ft3) Minimum

Total R Value 2.3 m2.K/W (13.0 ft2.OF.hr/Btu)

Minimum

3. Casing Construction (Contractor’s Option):

Table 2.1.C.3

Outer Panel 1.3 mm (18 Gage) Minimum

Inner Panel 1.0 mm (20 Gage) Minimum

Insulation

Thickness

Density

Fiberglass

50 mm (2 inch) Minimum

24 kg/m3 (1.5 lb/ft3) Minimum

Total R Value 1.4 m2.K/W (8.0 ft2.OF.hr/Btu)

Minimum

4. Blank-Off: Provide blank-offs as required to prevent air bypass between the AHU sections, around coils, and filters.

5. Casing panels shall be secured to the support structure with stainless steel or zinc-chromate plated screws and gaskets installed around the panel perimeter. Panels shall be completely removable to allow removal of fan, coils, and other internal components for future maintenance, repair, or modifications. Welded exterior panels are not acceptable.

6. Access Doors: Provide in each access section and where shown on drawings. Show single-sided and double-sided access doors with door swings on the floor plans. Doors shall be a minimum of 50 mm (2 inch) thick with same double wall construction as the unit casing.

Doors shall be a minimum of 600 mm (24 inches) wide, unless shown of different size on drawings, and shall be the full casing height up to a maximum of 1850 mm (6 feet). Doors shall be gasketed, hinged, and latched to provide an airtight seal. The access doors for fan section, mixing box, coil section shall include a minimum 150 mm x

150 mm (6 inch x 6 inch) double thickness, with air space between the glass panes tightly sealed, reinforced glass or Plexiglas window in a gasketed frame.

a. Hinges: Manufacturers standard, designed for door size, weight and pressure classifications. Hinges shall hold door completely rigid with minimum 45 kg (100 lb) weight hung on latch side of door.

b. Latches: Non-corrosive alloy construction, with operating levers for positive cam action, operable from either inside or outside.

W912QR16R0030-0000

Comply

Comply

N/A

SECTION 23 73 00 - Page 8

Doors that do not open against unit operating pressure shall allow the door to ajar and then require approximately 0.785 radian (45 degrees) further movement of the handle for complete opening.

Latch shall be capable of restraining explosive opening of door with a force not less than 1991 Pa (8 inch WG).

c. Gaskets: Neoprene, continuous around door, positioned for direct compression with no sliding action between the door and gasket.

Secure with high quality mastic to eliminate possibility of gasket slipping or coming loose.

7. Provide sealed sleeves, metal or plastic escutcheons or grommets for penetrations through casing for power and temperature control wiring and pneumatic tubing. Coordinate with electrical and temperature control subcontractors for number and location of penetrations.

Coordinate lights, switches, and duplex receptacles and disconnect switch location and mounting. All penetrations and equipment mounting may be provided in the factory or in the field. All field penetrations shall be performed neatly by drilling or saw cutting. No cutting by torches will be allowed. Neatly seal all openings airtight.

D. Floor:

1. Unit floor shall be level without offset space or gap and designed to support a minimum of 488 kg/square meter (100 lbs per square foot) distributed load without permanent deformation or crushing of internal insulation. Provide adequate structural base members beneath floor in service access sections to support typical service foot traffic and to prevent damage to unit floor or internal insulation.

Unit floors in casing sections, which may contain water or condensate, shall be watertight with drain pan.

2. Where indicated, furnish and install floor drains, flush with the floor, with nonferrous grate cover and stub through floor for external connection.

E. Condensate Drain Pan: Drain pan shall be designed to extend entire length of cooling coils including headers and return bends. Depth of drain pan shall be at least 43 mm (1.7 inches) and shall handle all condensate without overflowing. Drain pan shall be double-wall, double sloping type, and fabricated from stainless (304) with at least 50 mm (2 inch) thick insulation sandwiched between the inner and outer surfaces.

Drain pan shall be continuous metal or welded watertight. No mastic sealing of joints exposed to water will be permitted. Drain pan shall be

W912QR16R0030-0000

Comply

Comply

SECTION 23 73 00 - Page 9 placed on top of casing floor or integrated into casing floor assembly.

Drain pan shall be pitched in all directions to drain line.

1. An intermediate, stainless-steel (304) condensate drip pan with copper downspouts shall be provided on stacked cooling coils. Use of intermediate condensate drain channel on upper casing of lower coil is permissible provided it is readily cleanable. Design of intermediate condensate drain shall prevent upper coil condensate from flowing across face of lower coil.

2. Drain pan shall be piped to the exterior of the unit. Drain pan shall be readily cleanable.

3. Installation, including frame, shall be designed and sealed to prevent blow-by.

F. Housed Centrifugal Fan Sections:

1. Fans shall be minimum Class II construction, double width, double inlet centrifugal, air foil or backward inclined or forward curved type as indicated on drawings, factory balanced and rated in accordance with AMCA 210 or ASHRAE 51. Provide self-aligning, pillow block, regreasable ball-type bearings selected for a B (10) life of not less than 50,000 hours and an L (50) average fatigue life of

200,000 hours per AFBMA Standard 9. Extend bearing grease lines to motor and drive side of fan section. Fan shall be located in airstream to assure proper air flow.

2. Provide internally vibration isolated fan, motor and drive, mounted on a common integral bolted or welded structural steel base with adjustable motor slide rail with locking device. Provide vibration isolators and flexible duct connections at fan discharge to completely isolate fan assembly. Refer to Section 23 05 41, NOISE AND

VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT, for additional requirements.

3. Allowable vibration tolerances for fan shall not exceed a self-excited vibration maximum velocity of 0.005 m/s (0.20 inch per second) RMS, filter in, when measured with a vibration meter on bearing caps of machine in vertical, horizontal and axial directions or measured at equipment mounting feet if bearings are concealed.

After field installation, compliance to this requirement shall be demonstrated with field test in accordance with Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT, and

Section 23 05 93, TESTING, ADJUSTING, AND BALANCING FOR HVAC.

Following fan assembly, the complete fan assembly balance shall be tested using an electronic balance analyzer with a tunable filter and

W912QR16R0030-0000

Comply

Comply

N/A

Comply

Comply

Field Vibration Testing by Others

SECTION 23 73 00 - Page 10 stroboscope. Vibration measurements shall be taken on each motor bearing housing in the vertical, horizontal, and axial planes (5 total measurements, 2 each motor bearing and 1 axial).

G. Fan Motor, Drive, and Mounting Assembly (Housed Centrifugal Fans):

1. Fan Motor and Drive: Motors shall be premium energy efficient type, as mandated by the Energy Policy Act of 2005, with efficiencies as shown in the Specifications Section 23 05 12, General Motor

Requirements for HVAC and Steam Equipment, on drawings and suitable for use in variable frequency drive applications on AHUs where this type of drive is indicated. Refer to Section 23 05 10, COMMON WORK

RESULTS FOR BOILER PLANT AND STEAM GENERATION, for additional motor and drive specifications. Refer to Specification Section 26 29 11, MOTOR STARTERS.

2. Fan drive and belts shall be factory mounted with final alignment and belt adjustment to be made by the Contractor after installation.

Drive and belts shall be as specified in Section 23 05 10, COMMON

WORK RESULTS FOR BOILER PLANT AND STEAM GENERATION. Provide additional drive(s) if required during balancing, to achieve desired airflow.

H. Filter Section: Refer to Section 23 40 00, HVAC AIR CLEANING DEVICES, for filter requirements.

1. Filters including one complete set for temporary use at site shall be provided independent of the AHU. The AHU manufacturer shall install filter housings and racks in filter section compatible with filters furnished. The AHU manufacturer shall be responsible for furnishing temporary filters (pre-filters and after-filters, as shown on drawings) required for AHU testing.

2. Factory-fabricated filter section shall be of the same construction and finish as the AHU casing including filter racks and hinged double wall access doors. Filter housings shall be constructed in accordance with side service or holding frame housing requirements in Section 23

40 00, HVAC AIR CLEANING DEVICES.

I. Coils: Coils shall be mounted on hot dipped galvanized steel supports to assure proper anchoring of coil and future maintenance. Coils shall be face or side removable for future replacement thru the access doors or removable panels. Each coil shall be removable without disturbing adjacent coil. Glycol-water exhaust heat recovery coils shall be designed and installed to insure no condensate carry over. Provide factory installed extended supply, return, drain, and vent piping

W912QR16R0030-0000

Comply

Comply

Comply

SECTION 23 73 00 - Page 11 connections. Refer to Drawings and Section 23 82 16, AIR COILS, for additional coil requirements.

1. Water Coils, Including Glycol-Water.

J. Discharge Section:

Provide aerodynamically designed framed discharge openings or spun bellmouth fittings to minimize pressure loss.

K. Electrical and Lighting: Wiring and equipment specifications shall conform to Division 26, ELECTRICAL.

1. Vapor-proof lights using cast aluminum base style with glass globe and cast aluminum guard shall be installed in access sections for fan, mixing box, and any section over 300 mm (12 inch) wide. A switch shall control the lights in each compartment with pilot light mounted outside the respective compartment access door. Wiring between switches and lights shall be factory installed. All wiring shall run in neatly installed electrical conduits and terminate in a junction box for field connection to the building system. Provide single point

115 volt - one phase connection at junction box.

2. Install compatible 100 watt bulb in each light fixture.

3. Provide a convenience duplex receptacle next to the light switch.

4. Disconnect switch and power wiring: Provide factory or field mounted disconnect switch. Coordinate with Division 26, ELECTRICAL.

PART 3 – EXECUTION

3.1 INSTALLATION

A. Install air handling unit in conformance with ARI 435.

B. Assemble air handling unit components following manufacturer's instruc-tions for handling, testing and operation. Repair damaged galvanized areas with paint in accordance with Military Spec. DOD-P-21035. Repair painted units by touch up of all scratches with finish paint material.

Vacuum the interior of air handling units clean prior to operation.

C. Install seismic restraints for roof top units. Refer to specification

Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL

COMPONENTS.

D. Leakage and test requirements for air handling units shall be the same as specified for ductwork in Specification Section 23 31 00, HVAC DUCTS

AND CASINGS except leakage shall not exceed Leakage Class (CL) 12 listed in SMACNA HVAC Air Duct Leakage Test Manual when tested at 1.5 times the design static pressure. Repair casing air leaks that can be heard or felt during normal operation and to meet test requirements.

W912QR16R0030-0000

Comply

SECTION 23 73 00 - Page 12

E. Perform field mechanical (vibration) balancing in accordance with

Section 23 05 41, NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND

EQUIPMENT.

F. Seal and/or fill all openings between the casing and AHU components and utility connections to prevent air leakage or bypass.

3.2 STARTUP SERVICES

A. The air handling unit shall not be operated for any purpose, temporary or permanent, until ductwork is clean, filters are in place, bearings are lubricated and fan has been test run under observation.

B. After the air handling unit is installed and tested, provide startup and operating instructions to VA personnel.

C. An authorized factory representative should start up, test and certify the final installation and application specific calibration of control components. Items to be verified include fan performance over entire operating range, noise and vibration testing, verification of proper alignment, overall inspection of the installation, Owner/Operator training, etc.

3.3 COMMISSIONING

A. Provide commissioning documentation in accordance with the requirements of Section 23 08 00 – COMMISSIONING OF HVAC SYSTEMS, for all inspection, startup, and Contractor testing required above and required by the

System Readiness Checklist provided by the Commissioning Agent.

B. Components provided under this section of the specification will be tested as part of a larger system. Refer to Section 23 08 00 –

COMMISSIONING OF HVAC SYSTEMS, and related sections, for Contractor responsibilities for system commissioning.

- - - E N D - - -

W912QR16R0030-0000

Comply

Comply

Noise and Vibration Testing by Others

Start-up and Log Sheets Provided

Prepared For:

Mechanical Inc.

Date: February 16, 2017

Job Name:

Hines VA Physical Plant Boiler

Trane U.S. Inc. is pleased to provide the enclosed submittal for your review and approval.

Product Summary

Qty Product Tags Spec Section 3 Performance Climate Changer AHU-1 – AHU-3 23 73 00

SUBMITTAL NOTES

CONNECTION SIDES TO BE CONFIRMED

VARIABLE FREQUENCY DRIVES PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR

Craig Carey Trane 5302 Voges Road Madison, WI 53718 Phone: (608) 838-8200 Cell: (608) 219-6802 Fax: (608) 838-6015

The attached information describes the equipment we propose to furnish for this project, and is submitted for your approval.

Product performance and submittal data is valid for a period of 6 months from the date of submittal generation. If six months or more has elapsed between submittal generation and equipment release, the product performance and submittal data will need to be verified. It is the customer’s responsibility to obtain such verification.

Submittal

J:\JOBS\102\54545\5\Hines VA Physical Plant Boiler AHU SR2 2-16-17.doc

Table Of Contents

Product Summary

Performance Climate Changer (Items A1, A2) Tag Data Product Data Performance Data Mechanical Specifications As-Built Fan Curve Accessory Field Wiring

Field Installed Options - Part/Order Number Summary Performance Climate Changer

Hines VA Physical Plant Boiler February 16, 2017

FLD = Furnished by Trane U.S. Inc. / Installed by Others

Equipment Submittal Page 3 of 46

Tag Data - Performance Climate Changer (Qty: 3)

Item Tag(s) Qty Description Model Number

A1 AHU-1 1 Performance Climate Changer (CSAA) CSAA008UA A2 AHU-2, AHU-3 2 Performance Climate Changer (CSAA) CSAA040UA

Product Data - Performance Climate Changer

Item: A1 Qty: 1 Tag(s): AHU-1 Unit level options

Indoor unit Unit size 8 6in. integral base frame UL listed unit Multiple composite handles/latches

130.63 Unit length

Field Provided (controls)

Controls and VFD/starter Supply ext junc box, field provided NEMA

Warranty Standard warranty only

Air mixing section (Pos #1) Air mixing section Mixing box w/filter Door- right side Marine LED light Back rectangular opening Front full face opening 2in. filter frame Pleated media - run set (Fld)

Coil section (Pos #2) Horizontal coil Medium Door- none Stainless steel drain pan Right side - drain connection Right side - coil supply Service panel opposite connection side Unit coil height Cooling coil Refrigerant Type "3F" coil 4 rows 106 fins per foot nominal fin spacing Aluminum fins Omega flo H (Hi efficient) Internally enhanced Cu .0132" 3/8in. tube diameter (9.5 mm) Galvanized steel coil casing

Access section (Pos #3) Access/blank/turning section Medium large Door- right side Thermal window - right side Marine LED light

Coil section (Pos #4) Horizontal coil Small Door- none Stainless steel drain pan Right side - drain connection Right side - coil supply Service panel opposite connection side Unit coil height

Others

Equipment Submittal Page 4 of 46

Heating coil Hot water Type "UW" coil 2 rows 80 fins per foot nominal fin spacing Aluminum fins Delta flo E (energy efficient) .016" copper tubes ½” tube diameter Galvanized steel coil casing Turbulators

Fan section (Pos #5) Fan section Supply fan Door- right side Outward swing Thermal window - right side 12in. diameter AF, L press Top-back discharge Right side drive NEMA premium compliant TEFC Voltage 460/3 5 max applied hp

1800 RPM

Inverter balance with SGR Marine LED light Motor wiring conduit External junction box

Item: A2 Qty: 2 Tag(s): AHU-2, AHU-3 Unit level options

Indoor unit Unit size 40 6in. integral base frame UL listed unit Multiple composite handles/latches

144.13 Unit length

63.75 Second level length

Field Provided (controls)

Controls and VFD/starter Supply ext junc box, field provided NEMA

Warranty Standard warranty only

Air mixing section (Pos #1) Air mixing section Mixing box w/filter Door- right side Marine LED light Front full face opening Top rectangular opening 2in. filter frame Pleated media - run set (Fld)

Access section (Pos #2) Access/blank/turning section Large Door- right side Thermal window - right side Marine LED light

Coil section (Pos #3) Vertical coil Large Door- right side Thermal window - right side

Others

Equipment Submittal Page 5 of 46

Stainless steel drain pan Right side - drain connection Right side - coil supply Service panel opposite connection side Unit coil height Heating coil Hot water Type "UU" coil 4 rows 80 fins per foot nominal fin spacing Aluminum fins Delta flo E (energy efficient) .016" copper tubes ½” tube diameter Galvanized steel coil casing

Fan section (Pos #4) Fan section Supply fan Door- right side Outward swing Thermal window - right side 25in. diameter AF, M press Top-back discharge Right side drive NEMA premium compliant TEFC Voltage 460/3 15 max applied hp

1800 RPM

Inverter balance with SGR Marine LED light Motor wiring conduit External junction box

Others

Equipment Submittal Page 6 of 46

Performance Data - Performance Climate Changer

Tags AHU-1 AHU-2, AHU-3

Unit level options

Position

Length (in) 130.625 144.125 Width (in) 50.500 112.500 Height (in) 41.250 138.000 Rigging weight (lb) 1389.0 4787.9 Installed weight (lb) 1409.4 4934.7 Roof curb weight (lb) 0.0 0.0 Actual airflow (cfm) 3930 20000 Unit elevation (ft) 0.00 0.00 Shipping split 1 weight (lb) 768.5 1424.9 Shipping split 2 weight (lb) 640.9 1225.8 Shipping split 3 weight (lb) - 2249.0 Fan section

Position #5 #4

Section length (in) 44.000 63.750 Section weight (lb) 640.9 2251.0 Fan airflow (cfm) 3930 20000 Elevation (ft) 0.00 0.00 Overall ESP (in H2O) 1.650 0.500 Total static pressure (in H2O) 2.900 1.350 Fan discharge loss pressure drop (in H2O) 0.000 0.000 Fan pressure drop (in H2O) 1.650 0.500 Fan outlet velocity (ft/min) 2683 2880 Speed (rpm) 2828 1329 Total brake horsepower (hp) 3.925 12.120 Unit static efficiency (%) 45.78 35.12 Outlet area (sq ft) 1.46 6.95 Motor hertz (Hz) 60 60 Access section

Position #3 #2

Section length (in) 26.500 48.000 Section weight (lb) 141.4 589.9 Coil section

Position #2 #4 #3

Section length (in) 14.000 10.000 48.000 Section weight (lb) 183.1 178.6 1225.8 Coil performance airflow (cfm) 3930 3930 20000 Unit airflow (cfm) 3930 3930 20000 Coil face area (sq ft) 7.58 7.99 39.93 Coil face velocity (ft/min) 518 492 501 Air pressure drop (in H2O) 0.521 0.136 0.281 Coil section pressure drop (in H2O) 0.521 0.136 0.281 Coil rigging weight (lb) 75.7 61.1 353.3 Coil installed weight (lb) - 81.5 500.1 Top or single coil dry weight (lb) 75.7 61.1 353.3 Leaving dry bulb (F) 58.00 70.28 60.00 Leaving wet bulb (F) 55.73 - - Entering dry bulb (F) 80.00 29.00 -20.00 Entering wet bulb (F) 65.00 - - Fluid type - Water Water Coil fluid percentage (%) - 100.00 100.00 Entering fluid temperature (F) - 140.00 140.00 Leaving fluid temperature (F) - 120.00 80.78

72.0

PG

50% 50%

PG

Others

Equipment Submittal Page 7 of 46

Tags AHU-1 AHU-2, AHU-3

Fluid temperature drop (F) - 20.00 59.22 Standard fluid flow rate (gpm) - 17.63 58.75 Fluid pressure drop (ft H2O) - 1.16 1.21 Fluid velocity (ft/s) - 1.37 1.12 Fluid volume (gal) 2.72 2.45 17.63 Liquid temp entering TXV (F) 115.00 - - Saturated suction temperature (F) 47.00 - - Suction superheat (F) 8.00 - - Sensible capacity (MBh) 94.92 - - Total capacity (MBh) 111.00 175.94 1735.20 Air mixing section

Position #1 #1

Section length (in) 36.000 48.000 Section weight (lb) 265.4 867.9 Opening 1 back - airflow (cfm) 3930 - Opening 1 front - airflow (cfm) 3930 20000 Opening 1 top - airflow (cfm) - 20000 Opening 1 back - area (sq ft) 3.50 - Opening 1 front - area (sq ft) 10.09 45.77 Opening 1 top - area (sq ft) - 14.85 Opening 1 back - face velocity (ft/min) 1123 - Opening 1 top - face velocity (ft/min) - 1347 Opening 1 back - pressure drop (in H2O) 0.000 - Opening 1 top - pressure drop (in H2O) - 0.000 Opening 1 back total pressure drop (in H2O) 0.000 - Opening 1 top total pressure drop (in H2O) - 0.000 Back inlet type Ducted - Top inlet type - Ducted Greatest entry PD (in H2O) 0.000 0.000 Filter condition Mid-life Mid-life Filter airflow (cfm) 3930 20000 Filter area (sq ft) 11.11 70.00 Filter face velocity (ft/min) 354 286 Filter pressure drop (in H2O) 0.593 0.569 Total mixing section pressure drop (in H2O) 0.593 0.569 Front total pressure drop (in H2O) 0.000 0.000 Back total pressure drop (in H2O) 0.000 0.000 Top total pressure drop (in H2O) 0.000 0.000 Bottom total pressure drop (in H2O) 0.000 0.000 Right side total pressure drop (in H2O) 0.000 0.000 Left side total pressure drop (in H2O) 0.000 0.000

22.5

186.4

Others

Equipment Submittal Page 8 of 46

Mechanical Specifications - Performance Climate Changer Item: A1, A2 Qty: 3 Tag(s): AHU-1, AHU-2, AHU-3

General Per ASHRAE 62.1 recommendation, indoor air handling units will be shipped stretch-wrapped to protect unit from in-transit rain and debris.

Installing contractor is responsible for long term storage in accordance with the Installation, Operation, and Maintenance manual (CLCH-SVX07B-EN).

Unit shall be UL and C-UL Listed.

Supply fans within the scope of AHRI Standard 430 shall be certified in accordance with AHRI Standard 430.

Unit sound performance data shall be provided using AHRI Standard 260 test methods and reported as sound power.

Trane, in providing this program and data, does not certify or warrant NC levels. These levels are affected by factors specific to each application and/or installation and therefore unable to be predicted or certified by Trane. Refer to product data for specific fan footnote references.

- Footnote 4: Sound Power Levels are in accordance with AHRI 260.

Unit Construction All unit panels shall be 2" solid, double-wall construction to facilitate cleaning of unit interior. Unit panels shall be provided with a mid-span, no-through-metal, internal thermal break. Casing thermal performance shall be such that under 55°F supply air temperature and design conditions on the exterior of the unit of 81°F dry bulb and 73°F wet bulb, condensation shall not form on the casing exterior.

All exterior and interior indoor AHU panels will be made of galvanized steel.

Unit Paint Unit to ship unpainted from factory. Unit to be painted by 3rd party finisher, or by painting contractor at job site.

Casing Deflection The casing shall not exceed 0.0042 inch deflection per inch of panel span at 1.00 times design static pressure.

Maximum design static shall not exceed +8 inches w.g. in all positive pressure sections and -8 inches w.g. in all negative pressure sections.

Floor Construction The unit floor shall be of sufficient strength to support a 300.0 lb load during maintenance activities and shall deflect no more than 0.0042 inch per inch of panel span.

Unit base Manufacturer to provide a full perimeter integral base frame for either ceiling suspension of units or to support and raise all sections of the unit for proper trapping. Indoor unit base frame will either be bolted construction or welded construction. All outdoor unit base frames shall be welded construction. For indoor units, refer to schedule for base height and construction type. Contractor will be responsible for providing a housekeeping pad when unit base frame is not of sufficient height to properly trap unit. Unit base frames not constructed of galvanized steel shall be chemically cleaned and coated with both a rust-inhibiting primer and finished coat of rust-inhibiting enamel. Unit base height to be included in total height required for proper trap height.

Insulation Panel insulation shall provide a minimum thermal resistance (R) value of 13 ft²-h-ºF/Btu throughout the entire unit.

Insulation shall completely fill the panel cavities in all directions so that no voids exist and settling of insulation is prevented. Panel insulation shall comply with NFPA 90A.

Drain Pan In sections provided with a drain pan, the drain pan shall be designed in accordance with ASHRAE 62.1. To address indoor air quality (IAQ) the drain pan shall be sloped in two planes promoting positive drainage to eliminate stagnant water conditions. Drain pan shall be insulated, and of double wall construction. The outlet shall be the lowest point on the pan, and shall be of sufficient diameter to preclude drain pan overflow under normally expected operating conditions. All drain pans connections shall have a threaded connection, extending a minimum of 2-1/2" beyond the unit base, and shall be made from the same material as the drain pan. Drain pan located under a cooling coil shall be of sufficient size to collect all condensate produced from the coil.

Others

Equipment Submittal Page 9 of 46

Refer to Product Data for specific information on which sections are supplied with a drain pan, the drain pan material and connection location.

Access Door Construction Access doors shall be 2" double wall construction. Interior and exterior door panels shall be of the same construction as the interior and exterior wall panels respectively. All doors shall be provided with a thermal break construction of door panel and door frame. Gasketing shall be provided around the full perimeter of the doors to prevent air leakage. Surface mounted handles shall be provided to allow quick access to the interior of the functional section and to prevent through cabinet penetrations that could likely weaken the casing leakage and thermal performance. Handle hardware shall be designed to prevent unintended closure. Access doors shall be hinged and removable for quick easy access. Hinges shall be interchangeable with the door handle hardware to allow for alternating door swing in the field to minimize access interference due to unforeseen job site obstructions. Door handle hardware shall be adjustable and visually indicate locking position of door latch external to the section. Door hinges shall be galvanized.

All doors shall be a minimum of 60" high when sufficient height is available or the maximum height allowed by the unit height.

Door handles shall be provided for each latching point of the door necessary to maintain the specified air leakage integrity of the unit. Optionally for indoor AHUs and as standard on outdoor AHUs, outward swing doors are provided with a single handle linked to multiple latching points. An optional shatterproof window shall be provided in access doors where indicated on the plans. Window shall either be single pane, or thermal dual pane, as defined on schedule.

Window shall be capable of withstanding unit operating pressures and shall be safe for viewing UV-C lamps.

Refer to Product Data for specific information on which sections are supplied with an access door, the door location, a single handle and a window.

Marine Light A factory-mounted, weather resistant (enclosed and gasketed to prevent water and dust intrusion), light emitting diode (LED) fixture shall be provided in sections of the unit as specified for maintenance and service visibility. Fixture shall be complete with aluminum die cast housing, polycarbonate lens designed for maximum light output, and LEDs wired to a single switch within a factory provided service module. LED lighting shall provide instant-on "white" light and have a minimum 50,000 hour life. Fixtures shall be designed for flexible positioning during maintenance and service activities for optimal location. All lights within the unit shall be wired to a single switch within the factory provided service module.

The service module shall include a GFCI receptacle separate from the load side of the equipment. Electrical contractor shall be required to provide a 120V supply to the factory-mounted service module for the marine light circuit (unless single-point power is provided) and for the GFCI receptacle circuit per NEC.

Service module shall be provided on the fan section.

Refer to the Product Data section of the submittal for sections with marine lights.

Mixing Section A mixing section shall be provided to support the damper assembly for outdoor, return, and/or exhaust air.

The following specifications apply only to units with outside air and return air dampers, with actuators. The 5 year warranty applies only to these items.

This unit contains Economizer that meets or exceeds all mandatory requirements prescribed by Title 24, including but not limited to:

- 5 yr parts only warranty

- Successfully tested to 60,000 Actuations

- Less than 10 cfm/sq.ft. of damper leakage at 1" WG per AMCA 500L

Filters Mixing sections shall be provided with a filter rack as indicated in the Product Data and As-Built sections of the submittal.

2-inch pleated media filters made with 100% synthetic fibers that are continuously laminated to a supported steel-wire grid with water repellent adhesive shall be provided. Filters shall be capable of operating up to 625 fpm face velocity without loss of filter efficiency and holding capacity. The filters shall have a MERV 8 rating when tested in accordance with the ANSI/ASHRAE Standard 52.2.

Coil Section with Factory Installed Coil The coil section shall be provided complete with coil and coil holding frame. The coils shall be installed such that headers and return bends are enclosed by unit casings. If two or more cooling coils are stacked in the unit, an intermediate drain pan shall be installed between each coil and be of the same material as the primary drain pan. Like the primary drain pan, the intermediate drain pan shall be designed being of sufficient size to collect all condensation produced from the coil and sloped to promote positive drainage to eliminate stagnant water conditions. The

Others

Equipment Submittal Page 10 of 46 intermediate pan shall begin at the leading face of the water-producing device and be of sufficient length extending downstream to prevent condensate from passing through the air stream of the lower coil. Intermediate drain pan shall include downspouts to direct condensate to the primary drain pan. The outlet shall be located at the lowest point of the pan and shall be sufficient diameter to preclude drain pan overflow under any normally expected operating condition.

Coil with Inspection The coil section shall include an inspection section complete with a double-wall, removable door downstream of the coil for inspection, cleaning, and maintenance. Interior and exterior door panels shall be of the same construction as the interior and exterior wall panels, respectively. All doors shall be provided with a thermal break construction of door panel and door frame.

In lieu of a door, an easily removable service panel shall be provided in sections as specified, to facilitate access to unit for periodic servicing, or for removal and replacement of coils. Removal of service panel will not impact the structural integrity of the unit.

Hydronic coils shall be supplied with factory installed drain and vent piping to unit casing exterior. Piping is to facilitate field installation of automatic venting or drain valves on coils, which are not supplied with unit. Refer to the Product Data section of the submittal for the units and/or coils supplied with drain and vent piping.

No casing penetrations supplied for hydronic drain and vents. If required, piping contractor will need to drill drain and vent penetrations using factory located features provided in coil panel.

Refrigerant Cooling Coils The coils shall have aluminum fins and seamless copper tubes. The fins shall have collars drawn, belled, and firmly bonded to tubes by mechanical expansion of the tubes. Suction and liquid line connections shall extend to the unit exterior. The coil casing may be galvanized or stainless steel. Refer to the Product Data section of the submittal for the coil casing material.

The coils shall be proof-tested to 450 psig and leak-tested to 300 psig air pressure under water. After testing, the inside of the coils shall be dried, all connections shall be sealed, and the coil shall be shipped with a charge of dry air.

Suction headers and liquid connections shall be constructed of copper tubing with connections penetrating unit casings to permit sweat connections to refrigerant lines. The coils shall have equalizing vertical distributors sized according to the capacities of the coils. Coils are certified in accordance with the AHRI Forced-Circulation Air-Cooling and Air-Heating Coils Certification Program which is based on AHRI Standard 410 within the Range of Standard Rating Conditions listed in Table 1 of the Standard. Certified units may be found in the AHRI Directory at www.ahridirectory.org.

Tubes are 3/8" [9.5 mm] OD 0.0132" [0.335 mm] thick copper.

Water Coils (UW, UU, UA, 3W, 3U, W, 5W, 5A, WD, 5D, D1, D2, P, or TT) The coils shall have aluminum fins and seamless copper tubes. Copper fins may be applied to coils with 5/8-inch tubes.

Fins shall have collars drawn, belled, and firmly bonded to tubes by…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .