This Test & Balance Report documents the commissioning of the HVAC system for the VA Hospital's 5th Floor Electrophysiology Lab in Milwaukee, WI. The report, prepared by Accustar Air Balance, Inc. on 03/20/19, details the air handling unit (AHU-1) performance testing for the EP Lab and Control Room. The air change and room pressure test sheet shows the EP Lab (Room 5535) has a design supply airflow of 1,750 CFM (actual 1,874 CFM) and exhaust airflow of 1,500 CFM (actual 1,156 CFM), with a room volume of 4,850 cubic feet and 23.2 air changes per hour, maintaining a positive room pressure. The air distribution test sheet provides detailed measurements for 13 terminal units, including supply and exhaust air terminals with their respective sizes and airflow rates.

View the file

Other files

File Type Posted
36C25226Q0020 0003.docx DOCX document
36C25226Q0020 0002.docx DOCX document
S03- COPY OF ALL REPORTS ATTACHMENT.pdf PDF
36C25226Q0020 0001.docx DOCX document
S02-ATTACHMENT A - Room Data.xlsx XLSX spreadsheet
36C25226Q0020_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

T E S T & B A L A N C E R E P O R T

Project Name: VA Hospital – 5th Floor – Electrophysiology Lab Location: Milwaukee, WI Architect: N.A.

Engineer: PSJ Engineering Mechanical Contractor: N.A.

Project Number: 118-332

This is to certify that . has balanced the systems described herein to their optimum performance capabilities. The testing and balancing have been performed in accordance with TABB recommended procedures and principles and the results of these tests are herein recorded.

03/20/19 Dated

Randall Staron Accustar Air Balance, Inc.

TABB Supervisor

BB000051S

March 31, 2021 Printed: 02/18/2019

Date 03/20/19

Project Name: VA Hospital – 5th Floor – Electrophysiology Lab System Name: AHU-1 Floor Number 5th

A I R C H A N G E A N D R O O M P R E S S U R E T E S T S H E E T

Room Use Supply CFM Exhaust CFM Room Air Changes Per Hr Room Number Design Actual Design Actual Volume FT Design Actual Pressure

5535 EP Lab 1750 1874 1500 1156 4850 21.6 23.2 POS

Remarks

VHAMIWMaviS Text Box in.

w.c.

VHAMIWMaviS

List code and/or industry standard tested to (NFPA, FGI, etc.

Date 03/20/19

Project Name: VA Hospital – 5th Floor – Electrophysiology Lab System Name: AHU-1 Floor Number 5th

A I R D I S T R I B U T I O N T E S T S H E E T

Terminal Room Terminal Factor Design Test - FPM or CFM Final Number Number Type Size FPM CFM Test 1 Test 2 Test 3 FPM CFM

Supply 1750 1874

1 EP Lab SW 48” x 4” 1.0 - - 93 93

2 EP Lab SW 48” x 4” 1.0 - - 119 119

3 EP Lab SW 48” x 4” 1.0 - - 165 165

4 EP Lab SW 48” x 4” 1.0 - - 157 157

5 EP Lab SW 48” x 4” 1.0 - - 174 174

6 EP Lab SW 48” x 4” 1.0 - - 173 173

7 EP Lab CD 36” x 24” 1.0 - - 205 205

8 EP Lab CD 36” x 24” 1.0 - - 200 200

9 EP Lab CD 36” x 24” 1.0 - - 194 194

10 EP Lab CD 36” x 24” 1.0 - - 138 138

11 EP Lab CD 24” x 24” 1.0 - - 160 160

12 EP Lab CD 24” x 24” 1.0 - - 96 96

13 Control Rm CD 24” x 24” 1.0 - - 311 311

Exhaust

1 EP Lab LLE 24” x 12” 1.1 - - 502 552

2 EP Lab LLE 24” x 12” 1.1 - - 549 604

3 Control Rm EG 24” x 24” 1.1 - - 307 338

Remarks

VHAMIWMaviS

List code and/or industry standard tested to (NFPA, FGI, etc.

COVER with Logo
pg 01 AIR-CHANGE With Logo
pg 02 AIR-DIS With Logo