S02_Attachment-9_IFB Contractor Cost Estimate Worksheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Y1PZ--New Cemetery Development - Cedar City Rural Initiative in Cedar City, UT Project: 942CM3001
- Solicitation number
- 36C78620B0017
About this file
This document contains a contractor cost estimate worksheet template and information for a related federal contract opportunity. The cost estimate worksheet template includes line items for estimated costs by construction division that could be included in a project bid. Contractors are to provide lump sum cost estimates for any divisions that would be utilized on the project. The related federal contract opportunity is a solicitation from the Department of Veterans Affairs National Cemetery Administration for a new cemetery development project located in Cedar City, Utah, designated as project number 942CM3001. Responses to the solicitation are due based on the standard solicitation timeline and terms.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number |
| Project Name |
| Division | Base Bid | CLIN1 | CLIN 2 | CLIN3 | Total |
| Division 0 | |||||
| Special Sections | |||||
| Division 01 | |||||
| General Requirements | |||||
| Division 02 | |||||
| Existing Conditions | |||||
| Division 03 | |||||
| Concrete | |||||
| Division 04 | |||||
| Masonry | |||||
| Division 05 | |||||
| Metals | |||||
| Division 06 | |||||
| Wood, Plastic, and Composites | |||||
| Division 07 | |||||
| Thermal and Moisture Protection | |||||
| Division 08 | |||||
| Openings (Doors, Windows, etc...) | |||||
| Division 09 | |||||
| Finishes | |||||
| Division 10 | |||||
| Specialties | |||||
| Division 11 | |||||
| Equipment | |||||
| Division 12 | |||||
| Furnishings | |||||
| Division 13 | |||||
| Special Construction | |||||
| Division 14 | |||||
| Fire Suppression | |||||
| Division 22 | |||||
| Plumbing | |||||
| Division 23 | |||||
| Heat, Ventilating, and Air Conditioning | |||||
| Division 25 | |||||
| Integrated Automation | |||||
| Division 26 | |||||
| Electrical | |||||
| Division 27 | |||||
| Communications | |||||
| Division 28 | |||||
| Electronic Safety and Security | |||||
| Division 31 | |||||
| Earthwork | |||||
| Division 32 | |||||
| Exterior Improvements | |||||
| Division 33 | |||||
| Utilities | |||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $ $ $ $
File details come from the government source that posted it. Updated .