This document is an amendment to a solicitation for a new cemetery development project in Cedar City, Utah. The amendment extends the bid opening date from July 9, 2020 to July 16, 2020 at 10:00 AM Mountain Time and provides responses to contractor questions about specifications. The National Cemetery Administration within the Department of Veterans Affairs is seeking bids for the Rural Initiative in Cedar City project numbered 942CM3001. Services required include construction of a new cemetery and fill material meeting General Fill specifications for the cremains section to a depth of 3.5 feet below finished grade. Manufacturers confirmed the ability to design a prefabricated building with a sloped floor and blockouts for utilities as required. The amendment addresses contractor questions about allowable fill material, building specifications, and clarifies the presence of subsurface boulders on site.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0002 06-25-2020 942CM3001

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

To all Offerors/Bidders

36C78620B0017

X

X X

Virtual Bid Opening 7-16-20, 10:00 am MT

X 1

See Continuation Page for GOV responses to contractor questions. RFI/ Q&A period has ended.

JERRY L. HODSON JR.

Contracting Officer

AMENDMENT-0002, IFB Solicitation 36C78620B0017

CEDAR CITY_ Rural Initiative – New Cemetery Development Contractor Questions & GOV Responses

65. The Bid opening is extended from 7-9-20 to 7-16-20. The call in number and code for the virtual bid opening is still: Call Line: 844-376-0278 Code: 195 459 2452#

66. The CXT rep’s email below states they do not offer the sloped floor that you say they do. See below:

Johnathan, A couple of things I noticed.

It looks like 3 blockouts 1 floor drain and 2 for pipes on opposite sides of the building It also looks like they want the floor to slope to the center. We cannot do that with this building. All parts of the building are prebuilt forms.

66. GOV Response: . The manufacturer stated that his engineer could do the sloped floor, and the blockouts for all of the utilities. Also need to add a mini-split for heating and cooling. He said his designer would design the size. He will get all of the numbers put together and send it to the contractors. ‘Add mini-split heating/cooling unit as required for the size of the building and the Cedar City climate.’

67. So any basalt selves are considered boulders? The rock spec is not clear.

67. GOV Response: The geo technical stated that there are both a large exposed boulder on the surface and large subsurface boulders on the site.

68. There is nothing in the spec or on the plans that calls out the fill material for the cremains section.

68. GOV Response: Contractor shall provide fill material for the cremains section to a depth of

3.5 feet below finished grade. This fill material shall meet the requirements of “General Fill” per Part 2.1 of spec section 31 20 00 - Earth Moving.

The RFI/Q&A period has ended.