This document provides details for a federal contract solicitation to remodel specialty care and correct HVAC systems in Building 19 at the Martinez VA Medical Center in California. The contractor will be responsible for providing all labor, materials, equipment, supervision and other resources necessary to complete the construction project according to the specifications and drawings in the attachments. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. Contractors must have experience with remodeling and HVAC system work and will be expected to start work promptly upon award. The response deadline and anticipated award date are not specified in this document.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5 6 7
N
P
Q
R
S
T
U
V
1A
/A 350 SF
B130
BLOOD DRAW
LBVP1
/A 64 SF
B131
LAB/PC TOILET
TLTU1
/A 83 SF
B175
WS CONSULT
OFDC2
/A 116 SF
B143A
PC EXAM
EXPA1
/A 112 SF
B144A
PC Exam
EXPA1
/A 113 SF
B132
PC EXAM
EXPA1
/A 126 SF
B146
PC EXAM
EXPA1
/A 123 SF
B145
PC EXAM
EXPA1
/A 230 SF
B145B
TEAM ROOM
WRTM1
/A 117 SF
B144
PC EXAM
EXPA1
/A 121 SF
B143
PC EXAM
EXPA1
/A 56 SF
B174
WS TOILET
TLTU1
/A 225 SF
B171
WS
PROCEDURE
TRPR1
/A 117 SF
B173
WS EXAM
EXPA1
/A 47 SF
B180
HAC
JANC1
/A 82 SF
B170
WS WAITING
WRC01
/A 57 SF
B170A
RECEPTION/GREETER
RECP1
IN-04.03
IN-04.03
IN-04.03
IN-04.03IN-04.03
IN-04.03
IN-09.03
IN-07.01
IN-04.03
IN-04.03
IN-04.03
IN-04.03IN-14.07
IN-14.07
IN-14.07
IN-01.29
IN-04.03
IN-01.29
IN-09.03
IN-09.02
IN-04.03
/A 47 SF
B171A
WS TOILET
TLTB1/A 41 SF
B172
SOILED
UTILITY
USCL1
IN-04.03
/A 116 SF
B133
PC EXAM
EXPA1
IN-04.03
IN-01.31
IN-01.31
IN.01.02
IN.01.02
/A 118 SF
1074A
CORRIDOR
/A 100 SF
CORRIDOR
/A 99 SF
CORRIDOR
IN-04.03
R.2
IN-04.03
IN-13.01
IN-13.01
/A 255 SF
CORRIDOR
/A 252 SF
CORRIDOR
/A 102 SF
B145A
BREAKROOM
EX. CORRIDOR
(NO WORK)
IN-14.07
IN-04.03
IN-01.29
MAINT ID
MAINT ID
MAINT ID
MAINT ID
MAINT ID
MAINT ID
MAINT ID
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :4
P
M
AW101
ENLARGED PHASE 2 FIRST FLOOR
WAYFINDING PLAN - EAST
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
KEY PLAN
Floor 1
1. PARTIALLY-CONSTRUCTED WALLS HAVE BEEN FRAMED (FRAMING SIZE TO BE V.I.F.) AND BEEN TAGGED WITH PARTITION TYPE TAGS FOR REFERENCE ONLY. GC IS TO COORDINATE FINISHES BASED ON REFERENCED PARTITION TYPE. IT IS THE RESPONSIBILITY OF THE GC TO EVALUATE PARTIALLY-CONSTRUCTED PARTITIONS AND REPLACE
WALL COMPONENTS AS NEEDED.
2. CONTRACTOR SHALL FIELD VERIFY EXTENT OF ALL EXISTING PARTIALLY-CONSTRUCTED PARTITIONS PRIOR TO BEGINNING WORK. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO INSPECT SUCH PARTITIONS AND REPLACE
COMPONENTS AS NEEDED TO MATCH ILLUSTRATED PARTITION TYPES.
3. WHERE EXISTING GYP. BD. FINISH IS REMOVED FOR NEW CONSTRUCTION, PROVIDE NEW 5/8" GYP. BD. AS REQUIRED TO PATCH EXISTING PARTITIONS. INSTALL NEW GYP. BD. ON EXISTING STEEL STUDS, PROVIDE ADDITIONAL 16 GAUGE WIDTH TO MATCH EXISTING STUD WIDTH STEEL STUDS AS REQUIRED TO ACHIEVE STUD SPACING AT 16" O.C.
MAXIMUM. PATCH EXISTING INSULATION AS REQUIRED. PATCH WORK SHALL MATCH EXISTING ADJACENT AREA IN
CONSTRUCTION, MATERIAL, TYPE, AND FIRE RESISTIVE RATINGS.
4. ADJUST FURRING SPACE AS NECESSARY TO CLEAR ANY PIPES OR CONDUITS WITHIN THE FURRING SPACE. PROVIDE 1/2-INCH CLEAR MINIMUM CLEARANCE BETWEEN PIPES, CONDUITS AND THE BACK OF GYPSUM BOARD, UNLESS
OTHERWISE NOTED.
5. AT SOUND RATED PARTITION, PROVIDE 3 1/2" THICK ACOUSTICAL INSULATION, EXTEND SOUND INSULATION TO UNDERSIDE OF STRUCTURE, SOUND INSULATION SHALL BE CONTINUOUS BEHIND PANELS, FIXTURES AND OTHER WALL PENETRATIONS. AT NON-FIRE RATED PARTITION, EXTEND BOTH SIDES OF GYPSUM BOARD TO UNDERSIDE OF
STRUCTURE AND SEAL AIR TIGHT, TYPICAL, UNLESS OTHERWISE NOTED.
6. WHERE FLOOR FINISHES CHANGE BETWEEN ROOMS, TRANSITION SHALL OCCUR AT CENTER OF DOOR.
7. PROVIDE AND COORDINATE BACKING PLATES FOR ALL ACCESSORIES, CASEWORK, EQUIPMENT, ETC., SEE SHEET
AS502 FOR BACKING PLATE TYPES AND INTERIOR ELEVATIONS FOR LOCATIONS.
8. PATCH TO MATCH EXISTING PARTITIONS, CEILING AND FLOORING DAMAGED BY NEW CONSTRUCTION WORK WITHIN
OR OUTSIDE THE PROJECT AREA. PATCH WORK SHALL MATCH EXISTING ADJACENT AREA IN CONSTRUCTION, MATERIALS, COLORS, FIRE-RESISTIVE RATINGS AND FINISHES.
9. PROVIDE SUPPORTS AND BRACINGS AS REQUIRED FOR EXISTING UTILITIES, PIPES, CONDUITS, DUCTS, ETC., WHERE EXISTING SUPPORTS WERE REMOVED DUE TO WORK UNDER THIS CONTRACT. NEW SUPPORTS SHALL MEET
CURRENT CODE REQUIREMENTS.
10. IN ALL CONSTRUCTION AREAS, SEAL ALL EXISTING AND NEW PENETRATIONS SUCH AS DUCTS, CONDUITS, PIPES, ETC. THAT PENETRATE EXISTING, NEW FIRE-RATED AND ACOUSTIC PARTITIONS AND FLOOR/CEILING ASSEMBLIES, WHETHER SHOWN OR NOT. USE APPROPRIATE SEALANT TYPE AND FIRESTOPPING TO MAINTAIN PROPER FIRE RATING OF THE PENETRATED ASSEMBLIES. PENETRATIONS SHALL BE IN COMPLIANCE WITH IBC CHAPTER 7.
11. BEADBLAST EXISTING FLOORING TO REMOVE ALL GREASE, GLUE, ETC., FILL ALL EXISTING CRACKS, DEPRESSIONS, AND INSTALL LEVELING COMPOUND TO PROVIDE A CLEAN AND SMOOTH SUB-FLOOR FOR FINISHED FLOORING.
12. EXISTING COLUMN SPACINGS SHOWN ARE APPROXIMATE AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL
OBTAIN THESE DIMENSIONS BY FIELD MEASUREMENT.
13. FOR CABINET AND COUNTERTOP TYPE, SEE CASEWORK SECTIONS AND DETAILS ON SHEET AS503.
14. PATCH AND REPAIR EXISTING CONCRETE SLAB REMOVED OR DAMAGED BY NEW CONSTRUCTION WORK WITHIN OR
OUTSIDE THE PROJECT AREA. PATCH WORK SHALL MATCH EXISTING ADJACENT IN CONSTRUCTION, MATERIALS, BELOW SLAB VAPOR BARRIER, AGGREGATE BASE, SUB-BASE, COLORS, AND FINISHES.
GENERAL SIGNAGE AND WAYFINDING NOTES
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
1/4" = 1'-0"
ENLARGED PHASE 2 FIRST FLOOR WAYFINDING PLAN - EAST
Revisions: Date:
E
F
G
/A 164 SF
C201
CHARTING
IN-04.03
EX. HALLWAY
(NO WORK)
3 5
N
P
Q
R
S
T
U
V
/A 151 SF
B202
PRE-SCREENING/
EXAM 2
EYOT2
/A 165 SF
B203
PRE-SCREENING/
EXAM 3
EYOT2
/A 120 SF
B204
WAITING
WTG03
/A 159 SF
B224
(E) EXAM 3
/A 162 SF
B225
(E) EXAM 4
/A 167 SF
B226
PROCEDURE/
EXAM
/A 70 SF
B392
(E) HUDDLE
/A 125 SF
B227
RN/ PA OFFICE
/A 204 SF
B213
CATARACT
SURGERY
TESTING
/A 111 SF
B212
VISUAL FIELD
EYVF1
/A 132 SF
B209
EXAM/
TREATMENT 9
EYOT2
/A 132 SF
B210
EXAM/
TREATMENT 8
EYOT2
/A 141 SF
B223
(E) OFFICE /
EXAM
/A 113 SF
B205
(E) EXAM/
TREATMENT 5
/A 210 SF
B206
MD TECH
WKSTN
WRTM1/A 120 SF
B207
EXAM/
TREATMENT 7
EYOT2
/A 133 SF
B208
BREAK ROOM
SL001
/A 281 SF
CORRIDOR
/A 417 SF
B349
WAITING
/A 139 SF
B216A
RECEPTION -
EYE CLINIC
RCP1
M5016
4' - 8 5/8"
/8
IN-04.03 IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-14.07
/A 19 SF
B200
SOILED
/A 92 SF
B201
PRE-SCREENING/
EXAM 1
EYVS1
IN-01.29
IN-04.03
PHASE 1 CONSTRUCTION PHASE 2 CONSTRUCTION
IN.01.02
IN-01.31
IN-01.31
/A 334 SF
CORRIDOR
/A 334 SF
CORRIDOR
/A 387 SF
CORRIDOR
IN.01.02
/A 157 SF
B214B
EXAM
EXPA1
/A 155 SF
B214E
EXAM
EXPA1
/A 107 SF
B214C
OFFICE
OFA07
/A 105 SF
B214D
OFFICE
OFA07
/A 155 SF
B214G
EXAM
EXPA1
/A 107 SF
B214F
CLEAN UTILITY
/ OMNI
/A 207 SF
B214K
ENT EXAM
EXPA1
/A 237 SF
B214J
TEAM ROOM
WRTM1
/A 155 SF
B214I
EXAM
EXPA1
/A 58 SF
B214H
TOILET
TLTU1
/A 44 SF
B214L
SOILED
UTILITY
USCL1
/A 387 SF
CORRIDOR
/A 274 SF
B214A
PROCEDURE
TRPR1
/A 190 SF
B211
OCT
IMAGING/FUNDUS
PHOTO
EYVS1
IN-04.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03 IN-04.03
IN-04.03
IN-09.03
IN-04.03
IN-04.03
IN-04.03
IN-04.03
R.2
IN-04.03
IN-04.03
IN-13.01
IN-04.03IN-04.03
EX. CORRIDOR
(NO WORK)
IN-01.29MAINT ID
MAINT ID MAINT ID
MAINT ID
MAINT ID
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :5
P
M
AW102
ENLARGED PHASE 1 & 2 SECOND
FLOOR WAYFINDING PLANS
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
KEY PLAN
Floor 2
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
1/4" = 1'-0"
ENLARGED PHASE 1 SECOND FLOOR WAYFINDING PLAN - NORTH
1/4" = 1'-0"
ENLARGED PHASE 1 & 2 SECOND FLOOR WAYFINDING PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :5
P
M
AW103
SIGNAGE SCHEDULE & SIGNAGE
FINISHES
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
Signage Schedule
Sign ID Room #
Room: Name Sign Message Mounting
Height (Top) Sign
Height Sign Width Sign Type Sign Mounting Comments
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B214E CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B214F CORRIDOR CLEAN UTILITY 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B214G CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-09.03 - RESTROOM IDENTIFICATION B214H CORRIDOR RESTROOM 5' - 0" 1' - 0" 0' - 9" Interior Signs TAPE MOUNT With Graphic
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B214I CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B214J CORRIDOR TEAM ROOM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B214K CORRIDOR ENT EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B214L CORRIDOR SOILED 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B216A EX. CORRIDOR
(NO WORK)
RECEPTION-EYE CLINIC 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B349 WAITING MULTI-SPECIALTY 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B349 WAITING EYE CLINIC 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B349 WAITING WAITING 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT C201 EX. HALLWAY (NO
WORK)
CHARTING 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
Signage Schedule
Sign ID Room #
Room: Name Sign Message Mounting
Height (Top) Sign
Height Sign Width Sign Type Sign Mounting Comments
IN-14.07 - WALL DIRECTIONAL SIGN 1050 CORRIDOR (Symbol Arrow Left) PC Exam (Symbol Arrow Right) PC Exam
6' - 0" 2' - 6" 1' - 8" Interior Signs TAPE MOUNT
IN-01.02 - FIRE EQUIPMENT IDENTIFICATION 1050 CORRIDOR FIRE EQUIPMENT 6' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
TAPE MOUNT With Graphic
IN-01.29 - EXIT SIGN 3"x9" - VANCHCS 1074 CORRIDOR EXIT 6' - 8" 0' - 9" 0' - 9" Code and Life Safety Signs
TAPE MOUNT With Graphic
IN-01.31 - FIRE EQUIPMENT IDENTIFICATION (FLAG) 1074A CORRIDOR FIRE EQUIPMENT 7' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
FLAG With Graphic
IN-13.1 - PERPENDICULAR (FLAG) MOUNT 2 1074A CORRIDOR RESTROOM 7' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
FLAG With Graphic
IN-14.07 - WALL DIRECTIONAL SIGN 1074A-1 CORRIDOR (Symbol Arrow Left) Blood Draw (Symbol Arrow Right) Lab/PC Toilet, PC Exam
6' - 0" 2' - 6" 1' - 8" Interior Signs TAPE MOUNT
IN-01.29 - EXIT SIGN 3"x9" - VANCHCS 1075 CORRIDOR EXIT 6' - 8" 0' - 9" 0' - 9" Code and Life Safety Signs
TAPE MOUNT Vinyl Glass Backer
IN-14.07 - WALL DIRECTIONAL SIGN 1076 EX. CORRIDOR
(NO WORK)
Primary Care and Women Services
6' - 0" 2' - 6" 1' - 8" Interior Signs TAPE MOUNT
IN-14.07 - WALL DIRECTIONAL SIGN 1076 CORRIDOR (Symbol Arrow Right) WS Exam, WS Procedure, Reception/Greeter, WS Waiting (Symbol Arrow Left) WS Consult, WS Toilet, PC Exam
6' - 0" 2' - 6" 1' - 8" Interior Signs TAPE MOUNT
IN-01.29 - EXIT SIGN 3"x9" - VANCHCS 1076 CORRIDOR WS WAITING 6' - 8" 0' - 9" 0' - 9" Code and Life Safety Signs
TAPE MOUNT
IN-01.31 - FIRE EQUIPMENT IDENTIFICATION (FLAG) 1076 CORRIDOR FIRE EQUIPMENT 7' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
FLAG With Graphic
IN-01.02 - FIRE EQUIPMENT IDENTIFICATION 1076 CORRIDOR FIRE EQUIPMENT 6' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
TAPE MOUNT With Graphic
IN-13.1 - PERPENDICULAR (FLAG) MOUNT 2 1076 CORRIDOR RESTROOM 7' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
FLAG With Graphic
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B130 EX. CORRIDOR
(NO WORK)
BLOOD DRAW 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-09.03 - RESTROOM IDENTIFICATION B131 CORRIDOR RESTROOM 5' - 0" 1' - 0" 0' - 9" Interior Signs TAPE MOUNT With Graphic
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B132 CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B133 CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B143 CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B143A CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B144 CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B144A CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B145 CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B145A CORRIDOR STAFF LOUNGE 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B145B CORRIDOR TEAM ROOM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B146 CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B170 WS WAITING WS WAITING 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B170A RECEPTION/GREE
TER
RECEPTION 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B171 CORRIDOR PROCEDURE 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-09.02 - RESTROOM IDENTIFICATION B171A WS PROCEDURE RESTROOM 5' - 0" 1' - 0" 0' - 9" Interior Signs TAPE MOUNT With Graphic
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B172 CORRIDOR SOILED 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B173 CORRIDOR WS EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-09.03 - RESTROOM IDENTIFICATION B174 CORRIDOR RESTROOM 5' - 0" 1' - 0" 0' - 9" Interior Signs TAPE MOUNT With Graphic
IN-07.01 - CONFERENCE / CONSULT ROOM
IDENTIFICATION -VANCHCS
B175 CORRIDOR WS CONSULT 5' - 0" 1' - 0 1/4" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B180 EX. CORRIDOR
(NO WORK)
HAC 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-01.29 - EXIT SIGN 3"x9" - VANCHCS 2019 CORRIDOR WAITING 6' - 8" 0' - 9" 0' - 9" Code and Life Safety Signs
TAPE MOUNT
IN-01.31 - FIRE EQUIPMENT IDENTIFICATION (FLAG) 2019 CORRIDOR FIRE EQUIPMENT 7' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
FLAG With Graphic
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT 2019 CORRIDOR PROCEDURE 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-13.1 - PERPENDICULAR (FLAG) MOUNT 2 2019 CORRIDOR RESTROOM 7' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
FLAG With Graphic
IN-01.29 - EXIT SIGN 3"x9" - VANCHCS 2026 CORRIDOR EXIT 6' - 8" 0' - 9" 0' - 9" Code and Life Safety Signs
TAPE MOUNT
IN-01.31 - FIRE EQUIPMENT IDENTIFICATION (FLAG) 2026-2 CORRIDOR THIS WAY OUT 7' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
FLAG
IN-01.02 - FIRE EQUIPMENT IDENTIFICATION 2026-3 CORRIDOR FIRE EQUIPMENT 6' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
TAPE MOUNT With Graphic
IN-14.07 - WALL DIRECTIONAL SIGN 2027 CORRIDOR (Symbol Arrow Right) Exam Treatment 7, Exam Treatment 8, Exam Treatment 9, Toilet, ENT Exam
6' - 0" 2' - 6" 1' - 8" Interior Signs TAPE MOUNT
IN-01.02 - FIRE EQUIPMENT IDENTIFICATION 2027 CORRIDOR FIRE EQUIPMENT 6' - 0" 0' - 9" 0' - 9" Code and Life Safety Signs
TAPE MOUNT With Graphic
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B200 CORRIDOR SOILED 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B201 CORRIDOR PRE-SCREENING/EXAM 1 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B202 CORRIDOR PRE-SCREENING/EXAM 2 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B203 CORRIDOR PRE-SCREENING/EXAM 3 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B204 WAITING WAITING 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B206 CORRIDOR MD TECH 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B207 CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B208 CORRIDOR STAFF LOUNGE 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B209 CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B210 CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B211 CORRIDOR OCT IMAGING 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B212 CORRIDOR VISUAL FIELD 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B213 CORRIDOR CATARACT SURGERY
TESTING
5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B214B CORRIDOR EXAM 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B214C CORRIDOR OFFICE 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
IN-04.03 - PRIMARY ROOM IDENTIFCATION WITH INSERT B214D CORRIDOR OFFICE 5' - 0" 0' - 9" 0' - 9" Interior Signs TAPE MOUNT
NOTE:
Utilize VANCHCS signage standards package for signage requirements. Sign types not included in the VANCHCS signage standard, shall follow the TIL standard with VANCHCS shape and finishes.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :5
P
M
AW104
SIGN TYPE DETAILS
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :5
P
M
AW105
SIGN TYPE DETAILS
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :0
P
M
AW106
SIGN TYPE DETAILS
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :0
P
M
AW107
SIGN TYPE DETAILS
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
SYSTEM #W-L-1001 FOR UNINSULATED PIPE. SYSTEM
#W-L-5001 FOR INSULATED PIPE.
3M/CP 25W/B CAULK OR
3M/CP 25N/S CAULK ON
BOTH SIDES OF THE WALL.
DETAIL NOTES
PIPE INSULATION
(WHERE APPLICABLE)
FIRE RATED WALL
DAMMING MAT.
1. THE MAXIMUM ANNULAR SPACE TO BE FILLED IS 2". THE MINIMUM
ANNULAR SPACE IS 3/4". THE MAXIMUM PIPE SIZE IS A NOMINAL 4".
2. FOR SOLID CONCRETE WALLS, 3M/CP 25 CAULK MAY BE CENTERED
IN THE WALL WITH DAMMING MATERIAL ON BOTH SIDES OF CAULK.
3. USE CP 25S/L (SELF LEVELING) CAULK ON HORIZONTAL SURFACES
WHEN SEALING OPENING FROM ABOVE THE PENETRATION. USE
CP25N (NO SAG) CAULK ON VERTICAL SURFACES AND ON
HORIZONTAL SURFACES WHEN SEALING OPENINGS FROM BELOW.
USE CP 25WB CAULK ON EITHER APPLICATION.
4. SHRINKAGE OF CP CAULKS IS ACCEPTABLE AFTER INITIAL WET
DEPTH INSTALLATION.
5. THE DEPTH OF THE CP 25 CAULKS DEPENDS ON THE INSULATION
THICKNESS.
CAULK DEPTH (MIN.) INSULATION
1" 1" THICK
2" 2" - 3" THICK
6. IF WATER PIPE IS INSULATED, CAULK PIPE OUTSIDE OF PIPE
INSULATION.
SYSTEM #C-AJ-5017 FOR CONCRETE WALL/ FLOOR PENETRATIONS
DROP
SPRINKLER HEAD B OBSTRUCTION
A
DISTANCE FROM MAX. ALLOWANCE DISTANCE
SPRINKLERS TO SIDE OF
OBSTRUCTION
(A)
LESS THAN 1 FT.
1'-0" TO LESS THAN 1'-6"
1'-6" TO LESS THAN 2'-0"
2'-0" TO LESS THAN 2'-6"
2'-6" TO LESS THAN 3'-0"
3'-0" TO LESS THAN 3'-6"
3'-6" TO LESS THAN 4'-0"
4'-0" TO LESS THAN 4'-6"
4'-6" TO LESS THAN 5'-0"
5'-0" TO LESS THAN 5'-6"
5'-6" TO LESS THAN 6'-0"
6'-0" TO LESS THAN 6'-6"
6'-6" TO LESS THAN 7'-0"
7'-0" TO LESS THAN 7'-6"
OF DEFLECTOR ABOVE BOTTOM
OF OBSTRUCTION (IN.)
(B)
2-1/2
3-1/2
5-1/2
7-1/2
9-1/2
16-1/2
CONCRETE FILLED
HILTI "KWIK BOLT TZ"
CONCRETE EXPANSION
ANCHOR. 3/8"∅ W/ 2"
EMBEDMENT (ICC
ESR-1917)
3/8" ROD COUPLING
3/8" ALL THREADED ROD
TOLCO FIG. 100
"KWIK-BOLT TZ" ANCHOR, ROD, COUPLING AND RING
PIPE SIZE MAXIMUM SPACING
EXISTING
STRUCTURAL STEEL
NOTE:
A.
1" MIN.
3/8" ALL THREADED ROD
RESTRAINING STRAP (TYP.)
TOLCO FIG. 200
TOLCO FIG. 100
TOLCO FIG. 69/69R
PIPE RING HANGER
SPRINKLER PIPE PER PLAN
BEAM CLAMP, ROD, COUPLING AND RING
MAXIMUM SPACINGPIPE SIZE
1" & 1 1/4"
1 1/2" - 3" 15'-0"
12'-0"
PIPE HANGER TO STEEL
FOR STEEL PIPE, THE UNSUPPORTED HORIZONTAL LENGTH BETWEEN THE END
SPRINKLER AND THE LAST HANGER ON THE LINE SHALL BE AS FOLLOWS;
PIPE SIZE
1"
1 1/2" & LARGER
1 1/4"
HORIZONTAL LENGTH
NOT GREATER THAN 48"
NOT GREATER THAN 36"
NOT GREATER THAN 60" (NFPA 13, SEC. 17.4.3.4.1, 2019 EDITION)
SYMBOL
REVERSIBLE BEAM CLAMP
(TYPICAL) TOLCO FIG. 65
1" MIN.
1" & 1 1/4"
4" & LARGER
1 1/2" - 3" 15'-0"
12'-0"
10'-0"
PIPE HANGER TO CONCRETE
PIPE RING HANGER
TOLCO FIG. 200
SPRINKLER PIPE PER PLAN
TO
L
C O
T O L
C O
T O L
C O
METAL DECK
(2) #8 x 1/2" SELF-TAPPING
SCREWS
BARE METAL DECK
4 TIGHT TURNS
3" WIDE x 4" LONG, 12 GA. STEEL STRAP
SPLAYED SEISMIC BRACING WIRE
PER NFPA 13 2019, FIG. A.18.6.1(b)
SURGE RESTRAINER
TOLCO FIG. 25
5/16" DRILL-IN EXPANSION
ANCHOR
END OF BRANCH LINE SEISMIC RESTRAINT
(NFPA 13 2019, SECTION A.18.6.1)
CONCRETE
1" WIDE x 2" LONG, 12 GA. STEEL STRAP
4 TIGHT TURNS
SPLAYED SEISMIC BRACING WIRE
PER NFPA 13 2019, FIG. A18.6.1(a) NOTES:
1. THE END SPRINKLER ON A BRANCH LINE SHALL BE RESTRAINED
AGAINST EXCESSIVE VERTICAL OR LATERAL MOVEMENT
(NFPA 13, 18.6.3, 2019 EDITION.)
2.
3/8"∅ ALL-THREAD ROD
W/ RING HANGER AND
SURGE RESTRAINER
TOLCO FIG. 25
SURGE RESTRAINER
ALTERNATE END OF BRANCH LINE SEISMIC RESTRAINT
(NFPA 13 2019 SECTION A.18.6.1)
THE ABOVE DETAIL CAN ALSO BE USED WHERE THE UPWARD
OR LATERAL MOVEMENT OF THE SYSTEM PIPING WOULD RESULT
IN DAMAGE TO THE SPRINKLER THROUGH THE IMPACT AGAINST
THE BUILDING STRUCTURE, EQUIPMENT OR FINISH MATERIALS.
(NFPA 13, TABLE 18.6.4(a), 2019 EDITION.)
PIPE SIZE
1"
1 1/2"
1 1/4"
2"
MAXIMUM SPACING
27' INTERVALS
26' INTERVALS
29' INTERVALS
31' INTERVALS
DENOTES LINE RESTRAINT WITH SPLAY WIRE, SURGE
RESTRAINER, RING HANGER, HANGER ROD AND BEAM
CLAMP ASSEMBLY FIELD VERIFY WITH INSPECTOR FOR
ADDITION OR DELETION OF LINE RESTRAINTS AS REQUIRED
BY UNFORESEEN FIELD CONDITIONS.
No. 12, WIRE INSTALLED AT LEAST 45
DEGREES FROM THE VERTICAL PLANE
AND ANCHORED ON BOTH SIDES OF PIPE.
(209 LB. MAXIMUM LOAD)
1. BRANCH LINE PIPING
2. 1" SCH. 40
3. 1" 90 ELBOW
4. 1" x 1/2" REDUCING COUPLING
5. CEILING
6. 1/2" PENDANT SPRINKLER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
Gene Klow, AIA
(855) 521-1110
Alexandria, Virginia 22314
123 S Royal Street
Concourse Federal GroupCapital Consulting Engineers
Bryan Johnson, PE
(916) 851-3500
Rancho Cordova, California 95670
11020 Sun Center Drive, Suite 100
JS DG
L R e v it L o c a l F ile s \2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
\2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
D G re e r.
rv t
/3
/2
:0
:0
P
M
FP001
FIRE PROTECTION SYMBOLS,
NOTES AND ABBREVIATIONS
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/21
100% - BID SET
FIRE PROTECTION NOTES
1 A LICENSED (C-16) CONTRACTOR SHALL ROUTE AND SUPPORT AUTOMATIC SPRINKLER SYSTEM PER REQUIREMENTS OF NFPA 13
(2019), IBC CHAPTER 9 (2018), NFPA 25 (2019) AND ANY OTHER APPLICABLE CODE PER AHJ.
2 EXISTING WORK DAMAGED OR CUT INTO DURING CONSTRUCTION SHALL BE PATCHED OR REPAIRED, PAINTED AND FINISHED TO
MATCH EXISTING FINISHES.
3 NO HOLES SHALL BE DRILLED OR CUT IN OR THROUGH ANY STRUCTURAL ELEMENT.
4 SEE SPECIFICATION SECTION 21 13 13 FOR ADDITIONAL REQUIREMENTS.
5 ALL DEVICES AND COMPONENTS TO BE EITHER LISTED BY A NATIONALY RECOGNIZED TESTING LABORATORY FOR FIRE
PROTECTION SERVICE OR APPROVED BY THE VISN SAFETY ENGINEER.
6 THE FIRE SPRINKLER SYSTEM SHALL BE MONITORED BY AN APPROVED LISTED CENTRAL MONITORING STATION.
7 A SPARE SPINKLER CABINET SHALL BE INSTALLED NEAR THE RISER WITH THE QUANTITY OF SPARE SPRINKLERS REQUIRED PER
NFPA 13 SECTION 6.2.9.
8 PIPE SIZES SHOWN ON DRAWINGS ARE NOMINAL (NPS). LENGTHS OF PIPE ARE CENTER TO CENTER DIMENSIONS.
9 ITEMS SHOWN ON PLANS DESCRIBE GENERAL LAYOUT REQUIREMENTS, AND ARE NOT INTENDED TO SHOW A COMPLETE LAYOUT OF REQUIRED FIRE PROTECTION SYSTEM PIPING AND COMPONENTS. REFER TO ARCHITECTURAL, MECHANICAL AND PLUMBING SHEETS, FIRE PROTECTION SPECIFICATIONS, AS WELL AS OTHER PORTIONS OF THE CONTRACT DOCUMENTS FOR ADDITIONAL
COORDINATION REQUIREMENTS.
10 THE LAYOUT REQUIREMENTS DESCRIBED IN THESE PLANS SHALL BE ADHERED TO AS CLOSELY AS POSSIBLE BUT SHALL NOT SUPERSEDE CODE CONSTRAINTS AND/OR REQUIREMENTS OF AUTHORITIES HAVING JURISDICTION (AHJ'S). WHERE CODE OR AHJ REQUIREMENTS SUPERSEDE ITEMS SHOWN ON THIS PLAN, CONTRACTOR SHALL INCLUDE ALL ASSOCIATED PROVISIONS IN THE BID, AND SHALL MAKE THEM AT NO ADDITIONAL COST TO THE OWNER. PROPOSED DEVIATIONS FROM THIS PLAN SHALL BE
SUBJECT TO ENGINEER OF RECORD REVIEW AND APPROVAL PRIOR TO IMPLEMENTATION.
11 ALL AREAS OF THE BUILDING NOT COVERED BY NOTES HEREIN SHALL BE FULLY SPRINKLED IN ACCORDANCE WITH
SPECIFICATIONS AND NFPA 13
12 WHERE PLAN INDICATES EXPOSED FIRE SPRINKLER PIPING DIRECTION OF LAYOUT, ASSOCIATED CONNECTED FIRE SPRINKLER PIPING RUNNING IN PERPENDICULAR DIRECTIONS SHALL BE INSTALLED ONLY IN CONCEALED LOCATIONS UNLESS INDICATED
OTHERWISE.
13 INSTALLING CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS AND IS RESPONSIBLE FOR PREPARING A DESIGN TO
ACCOMODATE ALL EXISTING CONDITIONS.
14 EXPOSED FIRE SPRINKLER SYSTEM PIPING SHALL BE RUN STRAIGHT AND TIGHT TO UNDERSIDE OF STRUCTURAL MEMEBERS.
15 IF AT THE CONTRACTOR'S OPTION, PIPING IS NOT INSTALLED IN CONFORMANCE WITH THESE CONDITIONS, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS (1/4" = 1'-0") OF SEISMIC BRACING SYSTEM IN ACCORDANCE WITH SEISMIC RESTRAINTS
GUIDELINES FOR SUSPEND
16 THE STRUCTURAL ENGINEER OF RECORD SHALL BE RESPONSIBLE TO VERIFY THE ADEQUANCY OF THE STRUCTURE TO SUPPORT
THE HANGER AND BRACING LOADS.
17 THE CONTRACTOR SHALL SURVEY EXISTING FIELD CONDITIONS PRIOR TO BIDDING. IF AWARDED THE CONTRACT, THE CONTRACTOR SHALL SURVEY EXISTING FIELD CONDITIONS IN DETAIL AND COORDINATE THE WORK WITH EXISTING BUILDING
SYSTEMS.
18 ANY DAMAGE TO NEW BUILDING ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL SYSTEMS THAT OCCURS DURING THE WORK SHALL BE RESTORED TO THE ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE. IF LANDSCAPED AREAS INCLUDING NATURAL SPACES MUST BE USED FOR BUILDING ACCESS, THE LANDSCAPING SHALL BE RETURNED TO ITS ORIGINAL CONDITION. THE CONTRACTOR SHALL INCLUDE COSTS IN THE BID FOR THIS WORK IF THIS APPROACH IS USED. THE OWNER WILL NOT PAY ANY ADDITIONAL COSTS TO COVER DAMAGE TO THE BUILDING SYSTEMS, LANDSCAPING OR DRIVE AREAS.
19 COORDINATE THE FOLLOWING WITH ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL SRAWINGS AND
ELEMENTS AS INSTALLED, INCLUDING EXISTING BUILDING SYSTEMS:
A. EXACT LOCATION OF ALL EQUIPMENT.
B. ALL PENETRATIONS THRU ROOF, WALLS AND FLOORS.
C. EXACT SIZE AND ROUTING OF PIPING.
20 DRAWINGS INDICATE DIAGRAMMATICALLY THE ARRANGEMENT OF PRINCIPAL APPARATUS, PIPING, AND OTHER MATERIAL. FOLLOW DRAWING AS CLOSELY AS POSSIBLE, INORDER TO ACHIEVE A NEAT ARRANGEMENT OF PIPING AND EQUIPMENT WHILE STILL
OVERCOMING OBSTRUCTIONS.
21 THE LAYOUT REQUIREMENTS DESCRIBED IN THESE PLANS SHALL BE ADHERED TO AS CLOSELY AS POSSIBLE BUT SHALL NOT SUPERSEDE CODE CONSTRAINTS AND/OR REQUIREMENTS OF THE VISN SAFETY ENGINEER. WHERE CODE OR VISN SAFETY
ENGINEER REQUIREMENTS SUPERSEDE ITEMS SHOWN ON TH
22 ALL EXISTING FIRE PROTECTION SYSTEMS SHALL REMAIN IN OPERATION DURING PHASES OF CONTRUCTION. NO SYSTEMS ARE TO
BE SHUTDOWN WITHOUT AUTHORIZATION FROM THE VISN SAFETY ENGINEER.
23 THE LOCATION OF FIRE SPRINKLER HEADS SHALL BE COORDINATED WITH THE NEW CEILING LAYOUTS AND ALL OTHER TRADES FOR COMPLETE FIRE PROTECTION COVERAGE OF ALL AREAS. PROVIDE DETAILED PLANS FOR APPROVAL PRIOR TO INSTALLATION.
24 HEADS SHALL BE SYMMETRICALLY LOCATED IN CENTER OF CEILING PANELS. COORDINATE LAYOUT WITH CEILING OR SOFFIT LIGHT FIXTURES, AND HVAC DIFFUSERS,RETURNS, ETC. PROVIDE PENDENT AND/OR UPRIGHT TYPE SPRINKLER HEAD WHERE REQUIRED.
25 WORKMANSHIP:
ALL WORK SHALL BE DONE IN A NEAT AND WORKMANLIKE MANNER ACCORDING TO THE BEST TRADE PRACTICE BY THOSE SKILLED IN THE PARTICULAR TRADE. PIPES, EQUIPMENT, ETC., TO BE INSTALLED LEVEL, SQUARE OR CENTERED, ETC., TO GIVE A NEAT AND PLEASING APPEARANCE. ALL EQUIPMENT IS TO BE INSTALLED STRICTLY PER MANUFACTURER'S RECOMMENDATIONS. COORDINATE
ALL WORK WITH OTHER TRADES.
26 THE ANNULAR SPACE BETWEEN PIPE SLEEVESAND THE PIPE THEOUGH ALL RATED WALLS AND FLOORS SHALL BE FIRESTOPPED.
FIRESTOPPING OF ALL PIPE PENETRATIONS OF ALL PIPE PENETRATIONS SHALL COMPLY WITH U.L. REQUIREMENTS.
MANUFACTURER PREAPPROVED UL PENETRATION FOR PIPE MATERIAL AND SURFACE PENETRATED SHALL BE USED.
PENETRATIONS SHALL BE 3M, PROSET, OR APPROVED EQUAL. SUBMIT SHOP DRAWINGS.
27 BY OTHERS:
A. ELECTRICAL CONTRACTOR: ALL POWER AND ALARM WIRING, CONDUITS, DISCONNECTS, AND FINAL CONNECTIONS. NO FIELD SUPPLIED ELECTRICAL DEVICE SHALL BE MOUNTED ON PIPING AND NO RIGID ELECTRICAL CONNECTIONS SHALL BE MADE.
B. GENERAL CONTRACTOR: CUTTING, FRAMING, PATCHING, FURRING, AND PAINTING.
28 ALL MATERIALS AND EQUIPMENT INSTALLED UNDER THIS CONTRACT SHALL BE GUARANTEED FREE FROM ALL FIRE PROTECTION, ELECTRICAL AND WORKMANSHIP DEFECTS FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE. THE CONTRACTOR SHALL BE RESPOSIBLE FOR ALL DAMAGES TO THE PREMISES CAUSED BY LEAKS AND/OR BREAKS IN PIPES AND FIXTURES
INSTALLED UNDER THIS CONTRACT.
29 IT IS THE INTENTION OF THE PLANS AND SPECIFICATIONS TO COVER ALL THINGS REQUIRED TO PROVIDE COMPLETE AND OPERATIVE SYSTEMS. THE CONTRACTOR IS TO FURNISH ALL LABOR, MATERIALS, TRANSPORTATION, EQUIPMENT, MISCELLANEOUS SERVICES, ETC., REQUIRED TO NECESSARY PART OF THE INSTALLATION IS TO BEINCLUDED, WHETHER SPECIFICALLY SHOWN OR MENTIONED. THE ENGINEER WILL GIVE ANY INTERPRETATIONS NECESSARY FOR THE CONTRACTOR TO PROPERLY ESTIMATE THE
JOB.
30 IT IS THE CONTRACTORS' RESPONSIBILITY TO PROVIDE FABRICATION OR SHOP DRAWINGS. CAD FILES WILL NOT BE PROVIDED.
ABBREVIATIONS
(E) EXISTING
(N) NEW
ABBR ABBREVIATION
AFF ABOVE FINISHED FLOOR
AFSR AUTOMATIC FIRE SPRINKLER RISER
BFV BUTTERFLY VALVE
DCDA DOUBLE CHECK DETECTOR ASSEMBLY
DI DUCTILE IRON
DN DOWN
FACP FIRE ALARM CONTROL PANEL
FDC FIRE DEPARTMENT CONNECTION
FH FIRE HYDRANT
PIV POST INDICATOR VALVE
POC POINT OF CONNECTION
PVC POLYVINYL CHLORIDE
RN RISER NIPPLE
SSP STANDARD SPRAY PENDANT
SSU STANDARD SPRAY UPRIGHT
UG UNDERGROUND
BUILDING DATA
PROJECT OWNER: VETERANS ASSOCIATION
VA MARTINEZ HEALTHCARE SYSTEM
CONTACT: HENRY LAPIRA
PROJECT MANAGER | PROJECT DEVELOPMENT SECTION
OFFICE OF FACILITY PLANNING & DEVELOPMENT
PROJECT DESCRIPTION: RELOCATE SPRINKLER HEADS IN BLDG 19
1ST AND 2ND FLOOR RENOVATION AREAS
OCCUPANCY GROUP: GROUP B
CONSTRUCTION TYPE: TYPE II (000) FULLY SPRINKLED
STRUCTURAL FRAME: 2 HOURS
INTERIOR NON-BEARING PARTITION 0 HOURS
FLOORS 2 HOURS
ROOFS 1 HOURS
GROSS FLOOR AREAS: EXISTING
2 FLOORS
SPRINKLER DESIGN CRITERIA:
CLASSIFICATION OF OCCUPANCY: GROUP B
DESIGN DENSITY: 0.10 GPM/ SQ.FT.
DESIGN AREA MIN.: 1,500 SQ.FT.
AREA OF COVERAGE/ SP HEAD: 225 SQ.FT. MAX/ HEAD
SPRINKLER DESIGN CRITERIA: MECHANICAL, ELECTRICAL, TELECOM, CUSTODIAL,
STORAGE ROOMS
CLASSIFICATION OF OCCUPANCY: ORDINARY HAZARD I
DESIGN DENSITY: 0.20 GPM/ SQ.FT.
DESIGN AREA MIN.: 1,500 SQ.FT.
AREA OF COVERAGE/ SP HEAD: 130 SQ.FT. MAX/ HEAD
GOVERNING CODES:
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL FIRE CODE
2019 NFPA 13 AUTOMATIC SPRINKLER SYSTEMS
2019 NFPA 14 STANDPIPE SYSTEMS
2019 NFPA 72 NATIONAL FIRE ALARM CODE
2019 NFPA 80 FIRE DOORS AND OTHER OPENING PROTECTIVES
2015 VA FIRE PROTECTION DESIGN MANUAL
FIRE PROTECTION SHEET INDEX
FP001 FIRE PROTECTION SYMBOLS, NOTES AND ABBREVIATIONS
FP101 ENLARGED PHASE 2 FIRST FLOOR FIRE PROTECTION NEW PLAN EAST
FP201 ENLARGED PHASE 1 SECOND FLOOR FIRE PROTECTION NEW WORK PLAN
FP202 ENLARGED PHASE 2 SECOND FLOOR FIRE PROTECTION NEW WORK PLAN
FPD101 ENLARGED PHASE 2 FIRST FLOOR FIRE PROTECTION DEMOLITION PLAN EAST
FPD201 ENLARGED PHASE 1 SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN
FPD202 ENLARGED PHASE 2 SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN
SCALE: NONEFP001
1 PIPE THROUGH RATED WALL PENETRATION
SCALE: NONEFP001
2 OBSTRUCTION TABLE
SCALE: NONEFP001
3 PIPE HANGER DETAIL
SCALE: NONEFP001
4 BRANCH LINE RESTRAINT
SCALE:FP001 NONE
5 ARM OVER DETAIL
EXP 6/30/22
P
Q
R
S
T
U
V
AA
BB
CC
CC.1
CC.2
DD
DD.1
EE
EE.1
6.4
R.2
(E)
RECEPTION
151 SF
(E) EXAM
114 SF
(E) OFFICE
115 SF
(E) EXAM
97 SF
(E) EXAM
1062A
111 SF
(E) OFFICE
1062B
89 SF
(E) EXAM
137 SF
(E) EXAM
1---
120 SF
(E)
CORRIDOR
164 SF
TEAM
ROOM
B145B
230 SF
WS
WAITING
B170
82 SF
PC EXAM
B132
113 SF
PC EXAM
B133
116 SF
LAB/PC
TOILET
B131
64 SF
PC EXAM
B146
127 SF
PC EXAM
B145
124 SF
BLOOD
DRAW
B130
350 SF
PC Exam B144A
112 SF
PC EXAM
B143A
116 SF
WS
CONSULT
B175
83 SF
PC EXAM
B143
121 SF
PC EXAM
B144
117 SF
(E) ANTE
ROOM
VESTIBULE
B143E
87 SF
(E) AIRLOCK
B143G
51 SF
(E) CHEMO
HOOD
ROOM
B143H
62 SF
(E) IV
BUFFER
B143I
50 SF
(E) ANTE
ROOM
B143F
105 SF
RECEPTION/GREETER
B170A
57 SF
HAC
B180
47 SF
SOILED
UTILITY
B172
41 SF
WS
PROCEDURE
B171
225 SF
WS TOILET
B171A
47 SF
WS EXAM
B173
117 SF
WS TOILET
B174
56 SF
(E
1/
2" F
(E
1/
2" F
(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
1/
2" F
(E) 1 1/4" F
(E
1/
2" F
(E) 1 1/4" F
(E) 1 1/4" F
(E
1/
2" F
(E) 1 1/4" F 1 1/4" F
(E
1/
2" F
1/
2" F
(E) 1 1/4" F(E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F
1/
2" F
PHASE BOUNDARY
1" 6' -3
1" 1' -6
1" 1' -6
1" 1'-6"
1" 2' -4
1" 2' -0
" 1" 3'-0"
1" 1' -3
1" 3' -9
1" 3' -3
1" 2' -7
1" 6' -7
1" 3'-5"
1" 2' -6
1" 3' -1
1" 1' -8
1" 2'
-1
1" 3'-3"
1" 2' -2
1" 1' -2
1" 5"
1" 3' -4
1" 8"
1" 1'-8"
1"8"
1" 2' -9
1" 1'-2"
1" 4' -9
1" 4' -1
"1" 5' -4
1" 2' -5
1" 4'
-1
1" 1'-2"
1" 8' -1
"1" 7'
-1
1" 7" 1" 7" 1" 7" 1" 7"
1" 1' -5
1" 1' -5
1" 4"
1" 1' -5
1" 1'-4"
1" 1' -5
1" 7"
1" 3"
(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F
(E) 1 1/4" F
(E) 1 1/4" F
(E) 1 1/4" F
(E) 1 1/4" F
(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F
BREAKROOM
B145A
102 SF
(E) 1 1/4" F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
Gene Klow, AIA
(855) 521-1110
Alexandria, Virginia 22314
123 S Royal Street
Concourse Federal GroupCapital Consulting Engineers
Bryan Johnson, PE
(916) 851-3500
Rancho Cordova, California 95670
11020 Sun Center Drive, Suite 100
JS DG
L R e v it L o c a l F ile s \2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
\2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
D G re e r.
rv t
/3
/2
:0
:1
P
M
FP101
ENLARGED PHASE 2 FIRST FLOOR
FIRE PROTECTION NEW PLAN
EAST
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/21
100% - BID SET
SCALE:FP101 1/4" = 1'-0"
1 ENLARGED PHASE 2 FIRST FLOOR FP NEW PLAN EAST
KEY PLAN: FIRST FLOOR EAST
SHEET NOTES:
1. PENDANT FIRE SPRINKLERS ARE TO BE LOCATED IN THE
CENTERLINE OF THE CEILING TILE IN THE 2'-0" DIMENSION AND AT
12" INCREMENTS IN THE 4'-0" DIMENSION (TYP).
2. PROVIDE END OF LINE RESTAINTS AS REQUIRED PER
NFPA 13 2019 SEC. A.18.6.1
3. UNSUPPORTED ARM OVER LENGTHS SHALL BE LESS THAN 24" MAX.
4. IN LIGHT HAZARD OCCUPANCY ROOMS UNDER 800 SF HEADS MAY
BE SPACED PER NFPA 13 2019, TABLE 18.6.4(a)
5. ALL NEW LINES ARE TO BE 1" U.N.O.
6. EXISTING SPRINKLER LAYOUT IS A GRID TYPE SYSTEM.
7. PERFORM CROSS TRADE COORDINATION BETWEEN CONTRACTORS
TO PREVENT CLASHES.
8. CONCELAED SPACES OF NONCOMBUSTIBLE AND LIMITED
COMBUSTIBLE CONSTRUCTION WITH MINIMAL COMBUSTIBLE
LOADING HAVING NO ACCESS SHALL NOT REQUIRE SPRINKLER
PROTECTION PER NFPA 13 SEC. 9.2.1.1
9. ALL EXISITNG HANGERS & BRACING ON EXISTING LINES TO REMAIN.
10. ROOM B-172 IS ORDINARY HAZARD GROUP 2 (0.2 GPM/SF DENSITY)
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
PHASE BOUNDARY
EXAM
B214E
EXAM
B214B
SOILED
UTILITY
B214L
1" 1' -2
1" 1' -2
1" 1' -2
1" 1' -2
1" 1'
-1
1" 1'
-1
1" 5'
-1
1" 10
1" 1' -7
1" 5"
1" 1' -9
1" 4' -5
1" 2' -0
1" 4' -3
1" 2' -8
1" 2' -8
"1" 1' -6
1" 6"
1" 4' -0
1" 4' -0
1" 6' -0
"1" 2' -1
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F(E) 1 1/4" F (E) 1 1/4" F
(E
1/
2" F
(E) 2 1/2" F
(E
1/
2" F
(E) 2 1/2" F
(E
1/
2" F
(E) 1 1/4" F
(E
1/
2" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F
(E
1/
2" F
(E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F
(E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F(E) 1 1/4" F
(E
1/
2" F
(E
1/
2" F
(E) 1 1/4" F (E) 1 1/4" F(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F
(E) 1 1/4" F
ENT
PROCEDURE
B214A
274 SF
CORRIDOR
387 SF
OFFICE
B214C
107 SF
OFFICE
B214D
105 SF
EXAM
B214G
155 SF
CLEAN
UTILITY /
OMNI
B214F
110 SF
TOILET
B214H
58 SF
EXAM
B214I
155 SF
TEAM
ROOM
B214J
237 SF
ENT EXAM
B214K
207 SF
1" 2' -5
1" 2' -1
1" 1' -1
1" 1' -5
CHARTING
C201
(E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F(E) 1 1/4" F
(E) 1 1/4" F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
Gene Klow, AIA
(855) 521-1110
Alexandria, Virginia 22314
123 S Royal Street
Concourse Federal GroupCapital Consulting Engineers
Bryan Johnson, PE
(916) 851-3500
Rancho Cordova, California 95670
11020 Sun Center Drive, Suite 100
JS DG
L R e v it L o c a l F ile s \2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
\2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
D G re e r.
rv t
/3
/2
:0
:1
P
M
FP201
ENLARGED PHASE 1 SECOND
FLOOR FIRE PROTECTION NEW
WORK PLAN
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/21
100% - BID SET
SCALE:FP201 1/4" = 1'-0"
1 ENLARGED PHASE 1 SECOND FLOOR FP NEW PLAN
KEY PLAN: SECOND FLOOR
SHEET NOTES:
SCALE:FP201 1/4" = 1'-0"
2 ENLARGED PHASE 1 SECOND FLOOR FP NEW PLAN
1. PENDANT FIRE SPRINKLERS ARE TO BE LOCATED IN THE
CENTERLINE OF THE CEILING TILE IN THE 2'-0" DIMENSION AND AT
12" INCREMENTS IN THE 4'-0" DIMENSION (TYP).
2. PROVIDE END OF LINE RESTAINTS AS REQUIRED PER
NFPA 13 2019 SEC. A.18.6.1
3. UNSUPPORTED ARM OVER LENGTHS SHALL BE LESS THAN 24" MAX.
4. IN LIGHT HAZARD OCCUPANCY ROOMS UNDER 800 SF HEADS MAY
BE SPACED PER NFPA 13 2019, TABLE 18.6.4(a)
5. ALL NEW LINES ARE TO BE 1" U.N.O.
6. EXISTING SPRINKLER LAYOUT IS A GRID TYPE SYSTEM.
7. PERFORM CROSS TRADE COORDINATION BETWEEN CONTRACTORS
TO PREVENT CLASHES.
8. CONCELAED SPACES OF NONCOMBUSTIBLE AND LIMITED
COMBUSTIBLE CONSTRUCTION WITH MINIMAL COMBUSTIBLE
LOADING HAVING NO ACCESS SHALL NOT REQUIRE SPRINKLER
PROTECTION PER NFPA 13 SEC. 9.2.1.1
9. ALL EXISITNG HANGERS & BRACING ON EXISTING LINES TO REMAIN.
10 ROOM B-214 & B-214l ARE ORDINARY HAZARD GROUP 2 (0.2 GPM/SF
DENSITY)
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
3 4 5
P
Q
R
S
T
U
V
R.2
PHASE BOUNDARY
BREAK
ROOM
B208
133 SF
MD TECH
WKSTN
B206
210 SF
EXAM/
TREATMENT
B207
120 SF
CORRIDOR
281 SF
(E)
RECEPTION
B216
226 SF
RN/ PA
OFFICE
B227
125 SF
PROCEDURE/
EXAM
B226
167 SF
(E) EXAM 4
B225
162 SF
(E) EXAM 3
B224
159 SF
(E) EXAM/
TREATMENT
B205
113 SF
(E) OFFICE /
EXAM
B223
141 SF
(E)
CIRCULATION
386 SF
PRE-SCREENING/
EXAM 2
B202
151 SF
CATARACT
SURGERY
TESTING
B213
204 SF
EXAM/
TREATMENT
B209
132 SF
EXAM/
TREATMENT
B210
132 SF
VISUAL
FIELD
B212
111 SF
PRE-SCREENING/
EXAM 3
B203
165 SF
WAITING
B349
417 SF
RECEPTION
- EYE
CLINIC
B216A
139 SF
(E)
CIRCULATION
B391
67 SF
(E) HUDDLE
B392
70 SF
CORRIDOR
334 SF
WAITING
B204
120 SF
SOILED
B200
19 SF
PRE-SCREENING/
EXAM 1
B201
92 SF
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F
(E) 1 1/4" F(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F
1" 7" 1" 7" 1" 7" 1" 7"
1" 1'
-1
1" 1'
-1
1" 1'
-1
1" 1'
-1
1" 1'
-1
1" 11
1" 11
1" 1"1" 1"
1" 3' -3
1" 3' -3
1" 2' -5
1" 3' -6
1" 3' -6
1" 3' -1
1" 7' -7
1" 1' -9
1" 1' -6
1" 1' -6
"1" 3' -0
1" 3' -0
1" 3' -9
1" 3' -9
1" 1'
-1
1" 1' -9
1 " 2 '
-1
1" 2'
-1
1" 1'-7"
1" 4' -0
1" 2' -1
(E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F
(E) 1 1/4" F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
Gene Klow, AIA
(855) 521-1110
Alexandria, Virginia 22314
123 S Royal Street
Concourse Federal GroupCapital Consulting Engineers
Bryan Johnson, PE
(916) 851-3500
Rancho Cordova, California 95670
11020 Sun Center Drive, Suite 100
JS DG
L R e v it L o c a l F ile s \2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
\2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
D G re e r.
rv t
/3
/2
:0
:1
P
M
FP202
ENLARGED PHASE 2 SECOND
FLOOR FIRE PROTECTION NEW
WORK PLAN
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/21
100% - BID SET
SCALE:FP202 1/4" = 1'-0"
1 ENLARGED PHASE 2 SECOND FLOOR FP NEW PLAN
KEY PLAN: SECOND FLOOR
SHEET NOTES:
1. PENDANT FIRE SPRINKLERS ARE TO BE LOCATED IN THE
CENTERLINE OF THE CEILING TILE IN THE 2'-0" DIMENSION AND AT
12" INCREMENTS IN THE 4'-0" DIMENSION (TYP).
2. PROVIDE END OF LINE RESTAINTS AS REQUIRED PER
NFPA 13 2019 SEC. A.18.6.1
3. UNSUPPORTED ARM OVER LENGTHS SHALL BE LESS THAN 24" MAX.
4. IN LIGHT HAZARD OCCUPANCY ROOMS UNDER 800 SF HEADS MAY
BE SPACED PER NFPA 13 2019, TABLE 18.6.4(a)
5. ALL NEW LINES ARE TO BE 1" U.N.O.
6. EXISTING SPRINKLER LAYOUT IS A GRID TYPE SYSTEM.
7. PERFORM CROSS TRADE COORDINATION BETWEEN CONTRACTORS
TO PREVENT CLASHES.
8. CONCELAED SPACES OF NONCOMBUSTIBLE AND LIMITED
COMBUSTIBLE CONSTRUCTION WITH MINIMAL COMBUSTIBLE
LOADING HAVING NO ACCESS SHALL NOT REQUIRE SPRINKLER
PROTECTION PER NFPA 13 SEC. 9.2.1.1
9. ALL EXISITNG HANGERS & BRACING ON EXISTING LINES TO REMAIN.
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
P
Q
R
S
T
U
V
AA
BB
CC
CC.1
CC.2
DD
DD.1
EE
EE.1
6.4
R.2
PHASE BOUNDARY
HAC
B144
LAB
B130
EXAM ROOM
B132
EXAM ROOM
B133
EXAM ROOM
B146
EXAM ROOM
B145
OFFICE
B143B
STAFF
BREAKROOM
B143A
VACANT
HALLWAY
B143F
VACANT
OFFICE
B143E
(E) RECEPTION
B143D
TOILET
B193
(E) ANTE ROOM
VESTIBULE
B287
(E) AIRLOCK
B387
(E) CHEMO HOOD
ROOM
B388
(E) IV BUFFER
B389
(E) ANTE ROOM
B390
(E) RECEPTION
EXAM
OFFICE
EXAM
EXAM
EXAM
B147
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
Gene Klow, AIA
(855) 521-1110
Alexandria, Virginia 22314
123 S Royal Street
Concourse Federal GroupCapital Consulting Engineers
Bryan Johnson, PE
(916) 851-3500
Rancho Cordova, California 95670
11020 Sun Center Drive, Suite 100
JS DG
L R e v it L o c a l F ile s \2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
\2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
D G re e r.
rv t
/3
/2
:0
:2
P
M
FPD101
ENLARGED PHASE 2 FIRST FLOOR
FIRE PROTECTION DEMOLITION
PLAN EAST
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/21
100% - BID SET
SCALE:FPD101 1/4" = 1'-0"
1 ENLARGED PHASE 2 FIRST FLOOR FP DEMOLITION PLAN EAST
GENERAL NOTES:
1. EXISTING SPRINKLER PIPING SHOWN FOR REFERENCE ONLY.
2. ROUTING OF EXISTING PIPING AND SIZES SHALL BE CONFIRMED BY
SPRINKLER CONTRACTOR IN THE FIELD.
3. TEMPORARILY RELOCATE OR ADD SPRINKLER HEADS AS NEEDED
TO PROVIDE COVERAGE DURING CONSTRUCTION WHEN THE
CEILING IS REMOVED.
4. NO CHANGES TO EXISTING SPRINKLER MAINS HANGERS AND/OR
SEISMIC BRACING.
5. COMPLY WITH FIRE SAFETY DURING CONSTRUCTION AND
DEMOLITION PER CHAPTER 33, 2018 IFC.
6. ALL SPRINKLER HEADS IN SCOPE OF WORK TO BE DEMOLISHED.
KEY PLAN: FIRST FLOOR
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
1-1/4"1-1/4"
1-1/4"1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4" 1-1/4"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2-1/2"
2 3
P
Q
R
S
T
U
V
R.2
CONF
B209
SUPPLY LAB
B208
OFFICE
B214A
PHASE BOUNDARY
(E
1/
2" F
(E
1/
2" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F(E) 1 1/4" F
(E) 1 1/4" F
(E) 1 1/4" F(E) 1 1/4" F
(E
1/
2" F
(E
1/
2" F
(E
1/
2" F
(E
1/
2" F
(E
1/
2" F
(E
1/
2" F
(E) 2 1/2" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F(E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
E
F
G
(E) 1 1/4" F(E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F
1 1/4" F 1 1/4" F
1 1/4" F 1 1/4" F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
Gene Klow, AIA
(855) 521-1110
Alexandria, Virginia 22314
123 S Royal Street
Concourse Federal GroupCapital Consulting Engineers
Bryan Johnson, PE
(916) 851-3500
Rancho Cordova, California 95670
11020 Sun Center Drive, Suite 100
JS DG
L R e v it L o c a l F ile s \2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
\2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
D G re e r.
rv t
/3
/2
:0
:2
P
M
FPD201
ENLARGED PHASE 1 SECOND
FLOOR FIRE PROTECTION
DEMOLITION PLAN
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/21
100% - BID SET
KEY PLAN: SECOND FLOOR
SCALE:FPD201 1/4" = 1'-0"
1 ENLARGED PHASE 1SECOND FLOOR FP DEMOLITION PLAN WEST
GENERAL NOTES:
1. EXISTING SPRINKLER PIPING SHOWN FOR REFERENCE ONLY.
2. ROUTING OF EXISTING PIPING AND SIZES SHALL BE CONFIRMED BY
SPRINKLER CONTRACTOR IN THE FIELD.
3. TEMPORARILY RELOCATE OR ADD SPRINKLER HEADS AS NEEDED
TO PROVIDE COVERAGE DURING CONSTRUCTION WHEN THE
CEILING IS REMOVED.
4. NO CHANGES TO EXISTING SPRINKLER MAINS HANGERS AND/OR
SEISMIC BRACING.
5. COMPLY WITH FIRE SAFETY DURING CONSTRUCTION AND
DEMOLITION PER CHAPTER 33, 2018 IFC.
6. ALL SPRINKLER HEADS IN SCOPE OF WORK TO BE DEMOLISHED.
SCALE:FPD201 1/4" = 1'-0"
2 ENLARGED PHASE 1SECOND FLOOR FP DEMOLITION PLAN WEST
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
1-1/4"
4 5
P
Q
R
S
T
U
V
R.2
PHASE BOUNDARY
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F(E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F(E) 1 1/4" F (E) 1 1/4" F
(E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F (E) 1 1/4" F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
Gene Klow, AIA
(855) 521-1110
Alexandria, Virginia 22314
123 S Royal Street
Concourse Federal GroupCapital Consulting Engineers
Bryan Johnson, PE
(916) 851-3500
Rancho Cordova, California 95670
11020 Sun Center Drive, Suite 100
JS DG
L R e v it L o c a l F ile s \2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
\2
.0
V
A M a rt in e z S p e c ia lt y C a re
M
P
D G re e r.
rv t
/3
/2
:0
:2
P
M
FPD202
ENLARGED PHASE 2 SECOND
FLOOR FIRE PROTECTION
DEMOLITION PLAN
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/21
100% - BID SET
SCALE:FPD202 1/4" = 1'-0"
1 ENLARGED PHASE 2 SECOND FLOOR FP DEMOLITION PLAN WEST
GENERAL NOTES:
1. EXISTING SPRINKLER PIPING SHOWN FOR REFERENCE ONLY.
2. ROUTING OF EXISTING PIPING AND SIZES SHALL BE CONFIRMED BY
SPRINKLER CONTRACTOR IN THE FIELD.
3. TEMPORARILY RELOCATE OR ADD SPRINKLER HEADS AS NEEDED
TO PROVIDE COVERAGE DURING CONSTRUCTION WHEN THE
CEILING IS REMOVED.
4. NO CHANGES TO EXISTING SPRINKLER MAINS HANGERS AND/OR
SEISMIC BRACING.
5. COMPLY WITH FIRE SAFETY DURING CONSTRUCTION AND
DEMOLITION PER CHAPTER 33, 2018 IFC.
6. ALL SPRINKLER HEADS IN SCOPE OF WORK TO BE DEMOLISHED.
KEY PLAN: SECOND FLOOR
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
N
PLUMBING PIPE SYMBOLS LEGEND
SINGLE LINE DOUBLE LINE
ABBREVIATION DESCRIPTION
PLAN VIEW 3D VIEW PLAN VIEW
CIRCUIT SETTER VALVE
BALL VALVE
CHECK VALVE
GATE VALVE
BALANCING VALVE
DRAWING SYMBOLS
PLUMBING SYMBOLS LEGEND
ABBREVIATION DESCRIPTIONSYMBOL
--- ANCHOR
BFP, BP, DCW BACKFLOW PREVENTER, REDUCE PRESSURE, DOUBLE CHECKVALVE
--- BALANCING VALVE
--- BALL VALVE
--- BOTTOM CONNECTION
CBV CALIBRATED BALANCE VALVE
RD & OF ROOF AND OVERFLOW DRAIN
--- CHECK VALVE
--- CIRCUIT SETTER VALVE
CO CLEANOUT
FD FLOOR DRAIN
FS FLOOR SINK
--- FLOW ARROW
PLUMBING SYSTEMS LEGEND
ABBREVIATION DESCRIPTIONSYMBOL
TRAP PRIMER WATERTW
STORM DRAINSD
EQUIPMENT COMPRESSED AIRCA
DRAIND
TEMPERED DOMESTIC WATERTW
HOT DOMESTIC WATERHW
COLD DOMESTIC WATERCW
CONDENSATE DRAINCD
TW
SD
CA
D
TW
CD
(E) EXISTING---
FA, FB FROM ABOVE, FROM BELOW---
A.F.F. ABOVE FINISHED FLOOR---
PLUMBING GENERAL NOTES
1. CLOSELY COORDINATE ALL WORK WITH OTHER TRADES PRIOR TO TRENCHING OR INSTALLING…
This is the start of the file's text. The full file is on GovTribe.