S02 - ATTACHMENT 3 - Drawings Vol. 1 of 3.pdf
PDF 16 MB Posted
- Solicitation number
- 36C77621B0021
About this file
This federal contract opportunity solicitation seeks a contractor to remodel specialty care and correct HVAC systems in Building 19 at the Martinez Veterans Affairs Medical Center. The selected contractor will be responsible for providing all labor, materials, equipment, supervision and other resources necessary to complete the construction project according to the specifications and drawings in Attachment 3 of the solicitation documentation. The solicitation was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. Interested parties should respond with pricing and qualification information by the response date listed to be considered for the award scheduled on the date provided.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :0
P
M
GI001
COVER SHEET
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
SHEET INDEX
VA NORTHERN CALIFORNIA HEALTH CARE SYSTEM
REMODEL SPECIALTY CARE - BUILDING 19
CONSTRUCTION DOCUMENTS - 100% BID SET
MARCH 26, 2021
150 MUIR ROAD, MARTINEZ, CALIFORNIA 94553
PROJECT 612-18-329
DESIGN TEAM
OWNER
ARCHITECT / CONTRACT PRIME
STRUCTURAL ENGINEER
ELECTRICAL ENGINEER
MECHANICAL / PLUMBING
ENGINEER / FIRE PROTECTION
Veterans Association VA Northern California Healthcare System 150 Muir Road, Martinez, CA 94553 Contact: Henry Lapira
Concourse Federal Group 123 South Royal Street Alexandria, Virginia 22314 Contact: Matt Shuba, AIA mshuba@concoursefederal.com
(202) 304-9784
Gregory P. Luth & Associates 3350 Scott Boulevard, Building 48 Santa Clara, California 95054 Contact: Greg Luth, PE greg@gplainc.com
(408) 654-0475
F.W. Associates, Inc.
520 3rd Street, Suite 206 Oakland, California 94607 Contact: Munson Fong mfong@fwa-inc.com
(510) 763-7475
Capital Engineering Consultants 11020 Sun Center Drive, Suite 100 Rancho Cordova, California 95670 Contact: Bryan Johnson bjohnson@capital-engineering.com
(916) 851-3500
12 - PLUMBING
P001 PLUMBING SYMBOLS NOTES & LEGENDS
P002 PLUMBING SCHEDULES & FIXTURES
P500 PLUMBING DETAILS
PL101 ENLARGED PHASE 2 FIRST FLOOR UNDERGROUND PLAN EAST
PL102 ENLARGED PHASE2 FIRST FLOOR VENT PLAN EAST
PL201 ENLARGED PHASE 1 SECOND FLOOR WASTE PLAN
PL202 ENLARGED PHASE 2 FIRST FLOOR SS NEW PLAN
PL203 ENLARGED PHASE 1 SECOND FLOOR VENT PLAN
PL204 ENLARGED PHASE 2 SECOND FLOOR VENT NEW WORK PLAN
PLD100 ENLARGED PHASE 2 FOUNDATION SS DEMOLITION PLAN EAST
PLD201 ENLARGED PHASE 1 SECOND FLOOR SS DEMOLTION PLAN
PLD202 ENLARGED PHASE 2 SECOND FLOOR SS DEMOLITION PLAN
PP101 ENLARGED PHASE 2 FIRST FLOOR H&CW NEW PLAN EAST
PP102 ENLARGED PHASE 1 FIRST FLOOR H&CW NEW PLAN WEST
PP201 ENLARGED PHASE 1 SECOND FLOOR H&CW NEW PLAN
PP202 ENLARGED PHASE 2 SECOND FLOOR H&CW NEW PLAN
PPD101 ENLARGED PHASE 2 FIRST FLOOR H&CW DEMOLITION PLAN EAST
14 - ELECTRICAL
ES0-1 ELECTRICAL SYMBOL LEGEND, ABBREVIATIONS, GENERAL NOTES
ES0-2 FIRST FLOOR REFERENCE PLAN - ELECTRICAL
ES0-3 SECOND FLOOR REFERENCE PLAN - ELECTRICAL
ES1-1 PHASE 2 FIRST FLOOR - DEMOLITION ELECTRICAL
ES1-2 PHASE 1 SECOND FLOOR - DEMOLITION ELECTRICAL
ES1-3 PHASE 2 SECOND FLOOR - DEMOLITION ELECTRICAL
ES2-1 PHASE 2 FIRST FLOOR - LIGHTING
ES2-2 PHASE 1 SECOND FLOOR - LIGHTING
ES2-3 PHASE 2 SECOND FLOOR - LIGHTING
ES3-1 PHASE 2 FIRST FLOOR - POWER
ES3-2 PHASE 1 SECOND FLOOR - POWER
ES3-3 PHASE 2 SECOND FLOOR - POWER
ES3-4 ROOF PLAN - ELECTRICAL
ES4-1 PHASE 2 FIRST FLOOR - FIRE ALARM
ES4-2 PHASE 1 SECOND FLOOR - FIRE ALARM
ES4-3 PHASE 2 SECOND FLOOR - FIRE ALARM
ES5-1 SINGLE LINE DIAGRAM FOR REFERENCE
ES6-1 PANEL SCHEDULE
ES7-1 DETAILS AND DIAGRAMS
ES7-2 TELECOM POWER DETAILS AND DIAGRAMS
ES7-3 TELECOM DETAILS AND DIAGRAMS
14 - MECHANICAL
M001 MECHANICAL SYMBOLS NOTES & LEGENDS
M002 MECHANICAL SCHEDULES
M003 MECHANICAL AIRFLOW
M100 ENLARGED PHASE 1 FIRST FLOOR EXHAUST RISER NEW WORK PLAN
M101 ENLARGED PHASE 2 FIRST FLOOR HVAC NEW WORK PLAN EAST
M201 ENLARGED PHASE 1 SECOND FLOOR HVAC NEW WORK NORTH
M202 ENLARGED PHASE 1 SECOND FLOOR HVAC NEW WORK PLAN
M203 ENLARGED PHASE 2 SECOND FLOOR HVAC NEW WORK PLAN
M300 ENLARGED ROOF HVAC NEW WORK PLAN
M500 MECHANICAL DETAILS
M501 MECHANICAL DETAILS
M600 MECHANICAL CONTROLS
M601 MECHANICAL CONTROLS
MA100 ENLARGED FIRST FLOOR AIR BALANCE PLAN
MA200 ENLARGED SECOND FLOOR AIR BALANCE PLAN
MD101 ENLARGED PHASE 2 FIRST FLOOR HVAC DEMOLITION PLAN EAST
MD201 ENLARGED PHASE 1 SECOND FLOOR HVAC DEMOLITION PLAN NORTH
MD202 ENLARGED PHASE 1 SECOND FLOOR HVAC DEMOLITION PLAN
MD203 ENLARGED PHASE 2 SECOND FLOOR HVAC DEMOLITION PLAN
MD300 ENLARGED ROOF HVAC DEMOLITION PLAN
MP101 ENLARGED PHASE 1 FIRST FLOOR MECH PIPING NEW WORK PLAN EAST
MP201 ENLARGED PHASE 1 SECOND FLOOR MECH PIPING NEW WORK PLAN
MP202 ENLARGED PHASE 2 SECOND FLOOR MECH PIPING NEW WORK PLAN
MPD101 ENLARGED PHASE 2 FIRST FLOOR MECH PIPING DEMOLITION PLAN EAST
MPD201 ENLARGED PHASE 1 SECOND FLOOR MECH PIPING DEMOLITION PLAN
MPD202 ENLARGED PHASE 2 SECOND FLOOR MECH PIPING DEMOLITION PLAN
MZ100 FIRST FLOOR AHU ZONING PLAN
MZ101 FIRST FLOOR TERMINAL UNIT ZONING PLAN
MZ102 FIRST FLOOR EXHAUST ZONING PLAN
MZ200 SECOND FLOOR AHU ZONING PLAN
MZ201 SECOND FLOOR TERMINAL UNIT ZONING PLAN
MZ202 SECOND FLOOR EXHAUST ZONING PLAN
01 - GENERAL
GI002 PROJECT TEAM, PROJECT DATA, ABBREVIATIONS, SYMBOLS AND MATERIALS
GI003 FLOOR 1 FIRE AND SAFETY INFORMATION
GI004 FLOOR 2 FIRE AND SAFETY INFORMATION
GI005 FIRST FLOOR PHASING PLAN
GI006 SECOND FLOOR PHASING PLAN
GI100 ADA CLEARANCES AND TYPICAL MOUNTING HEIGHTS
07 - STRUCTURAL
SE103 ENLARGED PHASE 2 SECOND FLOOR PLAN
08 - ARCHITECTURE
AW107 SIGN TYPE DETAILS
AD101 ENLARGED PHASE 2 FIRST FLOOR DEMOLITION PLAN - EAST
AD102 ENLARGED PHASE 1 SECOND FLOOR DEMOLITION PLANS
AD103 ENLARGED PHASE 2 SECOND FLOOR DEMOLITION PLAN
AD111 ENLARGED PHASE 2 FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN - EAST
AD112 ENLARGED PHASE 1 SECOND FLOOR REFLECTED CEILING DEMOLITION PLANS
AD113 ENLARGED PHASE 2 SECOND FLOOR REFLECTED CEILING DEMOLITION PLAN
AD401 ENLARGED SECOND FLOOR EOS DEMOLITION PLANS
AE101 ENLARGED PHASE 2 FIRST FLOOR PLAN - EAST
AE102 ENLARGED PHASE 1 SECOND FLOOR PLANS
AE103 ENLARGED PHASE 2 SECOND FLOOR PLAN
AE201 ENLARGED PHASE 2 FIRST FLOOR REFLECTED CEILING PLAN - EAST
AE202 ENLARGED PHASE 1 SECOND FLOOR REFLECTED CEILING PLANS
AE203 ENLARGED PHASE 2 SECOND FLOOR REFLECTED CEILING PLAN
AE301 INTERIOR ELEVATIONS
AE302 INTERIOR ELEVATIONS
AE303 INTERIOR ELEVATIONS
AE400 PERSPECTIVES - 1ST FLOOR
AE401 PERSPECTIVES - 2ND FLOOR
AE501 INTERIOR PLAN DETAILS
AE502 INTERIOR DETAILS
AE503 CEILING AND SOFFIT DETAILS
AE504 CASEWORK DETAILS
AE601 DOOR AND WINDOW SCHEDULES
AE602 EQUIPMENT SCHEDULE
AE603 EQUIPMENT SCHEDULE
AE604 EQUIPMENT SCHEDULE
AE605 PARTITION TYPES
AE606 PARTITION HEAD DETAILS AND HORIZONTAL RATED ENCLOSURE
AE701 PARTITION DETAILS
AE702 BACKING PLATE SCHEDULE AND WALL PROTECTION DETAILS
AE703 DOOR AND WINDOW DETAILS
AF101 ENLARGED PHASE 2 FIRST FLOOR FINISH PLAN - EAST
AF102 ENLARGED PHASE 1 & 2 SECOND FLOOR FINISH PLANS
AI101 ENLARGED PHASE 2 FIRST FLOOR FURNITURE / EQUIPMENT PLAN - EAST
AI102 ENLARGED PHASE 1 & 2 SECOND FLOOR FURNITURE / EQUIPMENT PLANS
AW101 ENLARGED PHASE 2 FIRST FLOOR WAYFINDING PLAN - EAST
AW102 ENLARGED PHASE 1 & 2 SECOND FLOOR WAYFINDING PLANS
AW103 SIGNAGE SCHEDULE & SIGNAGE FINISHES
AW104 SIGN TYPE DETAILS
AW105 SIGN TYPE DETAILS
AW106 SIGN TYPE DETAILS
11 - FIRE PROTECTION
FP001 FIRE PROTECTION SYMBOLS, NOTES AND ABBREVIATIONS
FP101 ENLARGED PHASE 2 FIRST FLOOR FIRE PROTECTION NEW PLAN EAST
FP201 ENLARGED PHASE 1 SECOND FLOOR FIRE PROTECTION NEW WORK PLAN
FP202 ENLARGED PHASE 2 SECOND FLOOR FIRE PROTECTION NEW WORK PLAN
FPD101 ENLARGED PHASE 2 FIRST FLOOR FIRE PROTECTION DEMOLTION PLAN EAST
FPD201 ENLARGED PHASE 1 SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN
FPD202 ENLARGED PHASE 2 SECOND FLOOR FIRE PROTECTION DEMOLITION PLAN
ARCHITECT / CONSULTANT
MEI ARCHITECTS
949 Grant Avenue San Francisco, CA 94108 Contact: Steven J. Juergens, AIA, NCARB, LEED AP sjuergens@meiarchitects.com
(628) 201-4022
Building 19 Outpatient Clinic
VA Martinez
SITE MAP
Revisions: Date:
CONCRETE
EARTH
GYPSUM BOARD
BATT OR ACOUSTICAL
INSULATION AS NOTED
RIGID INSULATION
MEDIUM DENSITY FIBERBOARD
ALUMINUM
STUCCO
PLYWOOD
PORCELAIN
PLASTER
STEEL
D
OFFICE
OFFICE
AS2-1
A
SYMBOLS
INTERIOR ELEVATION(S)
ROOM NAME
NOT SHOWN.)
ROOM IDENTIFICATION, TYPE 1
CEILING
WALLS/WAINSCOT
ROOM MATERIAL CODES
SHEET WHERE ELEVATION IS
NO ARROWS MEANS ELEVATION
(UNFOLD ELEVATIONS CLOCKWISE
ELEVATION IDENTIFICATION
DRAWN.
DOOR SYMBOL
DOOR MARK
DRAWING NUMBER
DISCIPLINE PREFIX
SHEET WHERE DETAIL IS DRAWN.
DETAIL IDENTIFICATION
HARDWARE GROUP
DETAIL
ROOM IDENTIFICATION, TYPE 2
B12
5-1
9-1
B12
1A1
ROOM NUMBER
ROOM NAME
ROOM NUMBER
(E) COLUMN LINE W/
COLUMN DESIGNATIONS
REVISION
CLOUD AROUND REVISION
DIMENSION LINES
CENTERLINE OF
COLUMN OR STUD
CENTERLINE OF OPENING
FACE OF FINISH
SPRINKLER HEAD
SMOKE DETECTOR
OPTIONAL
B1
TYPICAL FURRING OR
PARTITION TYPE, SEE DWG.
A9-1
U.O.N.
GROUP NUMBER
1.1 WINDOW TYPE
3-1
SHEET WHERE DETAIL IS DRAWN.
SECTION IDENTIFICATION
SECTION
CENTERLINE OF OPENING
TYPICAL PARTITION
LIGHTING FIXTURE
24" X 48", TYPE A2
WALLS BASE
MECHANICAL CEILING RETURN /
EXHAUST REGISTER
EXISTING WALL / PARTITION /
FURRING TO REMAIN
AREA NOT IN SCOPE OF
WORK
A
(N) COLUMN LINE W/
COLUMN DESIGNATIONS
(N) ONE-HOUR FIRE RATED
RESISTING WALL OR PARTITION
LIGHTING FIXTURE
24" X 48", TYPE A
LIGHTING FIXTURE
24" X 24"
LIGHTING FIXTURE
12" X 48"
CORNER GUARD
SOUND INSULATION
EXISTING WALL OR
PARTITION TO BE REMOVED
(E) ONE-HOUR FIRE RATED
RESISTING WALL OR PARTITION
EXISTING WALL FINISHES OR
CLADDING TO BE REMOVED,
STRUCTURE OF WALL TO
REMAIN
DOOR TO BE DEMOLISHED
(E) DOOR TO REMAIN
(N) DOOR
(E) COLUMN TO HAVE
FURRING REMOVED FOR
(N) CONNECTIONS,
COLUMN TO REMAIN
EXIT SIGN
(E) COLUMN AND (E)
FURRING TO REMAIN
DOWNLIGHT FIXTURE
SPOT ELEVATION
MECHANICAL CEILING
DIFFUSER / SUPPLY
SECURITY METAL MESH IN PARTITION
ABBREVIATIONS
TYP.
THRES.
S.
RM.
R.H.
REINF.
REQ.
REF.
STD.
SIM.
SHR.
THK.
T.B.
T.C.
TEL.
STOR.
STRL.
STL.
N.I.C.
NO. or #
N.T.S.
N.R.
OPNG.
OPP.
O.F.C.I
O.A.
O.C.
PLYWD.
PT.
PL.
QTY.
PTN.
VERT.
V.I.F.
W.C.
WD.
W/O
W.
W/
WP.
N.
U.O.N.
CEM.
DWG(S).
CONC.
CONT.
CORR.
CPT.
CTSK.
CNTR.
CLG.
CLO.
CLR.
CER.
DET.
DIA.
DIM.
DN.
DR.
CTR.
ADJ.
A.F.F.
ARCH.
(N)
A.B.
ADD.
(E)
BLKG.
BM.
BOT.
CAB.
BD.
BLDG.
MTD.
INC.
INFO.
HGT.
INT.
JT.
INSUL.
H.C.
MIN.
MISC.
MAX.
KIT.
LAB.
or H.
EA.
EQ.
EXT.
F.A.
F.D.
FDN.
FIN.
FIXT.
EL.
FPRF.
FLUOR.
F.O.F.
F.O.S.
FL.
E.
L
ACOUST.
A.P.
BKG.
BLK.
C.G.
C.L.
COL.
CONSTR.
DISP.
E.J.
ELEC.
ELEV.
ENCL.
ENGR.
E.P.B.
EQPT.
EXP.
E.W.C.
F.E.
F.E.C.
F.H.C.
FT.
F.S.
HDWD.
H.M.
HORIZ.
HR.
I.D.
LAM.
LT.
MAT.
MECH.
MET.
MFR.
NOM.
O.D.
OFF.
O.H.
P. LAM.
PR.
P.T.D.
R.C.P.
REFR.
RGTR.
RESIL.
R.O.
SCHED.
SECT.
SHT.
S.C.
SPEC.
SQ.
S.ST.
SUSP.
T.P.B.
VEST.
W.O.
WT.
W.R.
M.D.F.
(RL)
C.O.
E.B.
EMER.
EXST.
HDWE.
GYP.
GA.
GALV.
G.B.
GL.
DVA
Vertical
Noted
Wood
West
With
Unless Otherwise
Verify In Field
Without
Water Closet
Waterproof
Typical
Threshold
Robe Hook
Top of Curb
Reinforced
Required
Room
Reference
Standard
Similar
Shower
South
Storage
Towel Bar
Telephone
Structural
Thick
Steel
Not In Contract
Not To Scale
Owner Furnished Contractor Installed
Number
On Center
Opening
Opposite
Overall
Non Rated
Plywood
Partition
Quantity
Point
Plate
North
Cement
Drawing(s) Mounted
Ceiling
Closet
Clear
Concrete
Continuous
Corridor
Ceramic
Carpet
Countersunk
Counter
Detail
Diameter
Dimension
Down
Door
Center
Insulation
Height
Incandescent
Information
Hollow Core
Interior
Joint
Maximum
Minimum
Kitchen
Laboratory
Miscellaneous
Each
At
Centerline
Existing
New
Adjustable
Architectural
Board
Building
Blocking
Beam
Anchor Bolt
Additional
Bottom
Cabinet
Above Finished Floor
Equal
Exterior
Elevation
Finish
Fixture
Fire Alarm
Floor Drain
Foundation
Fluorescent
Face of Finish
Face of Studs
Fireproof
Floor
And
East
Diameter
Angle
Acoustical
Access Panel
Backing
Block
Corner Guard
Center Line
Column
Construction
Dispenser
Expansion Joint
Electrical
Elevator
Enclosure
Engineer
Electrical Panelboard
Equipment
Expansion
Electric Water Cooler
Fire Extinguisher
Fire Extinguisher
Fire Hose Cabinet
Foot or Feet
Floor Sink
Hardwood
Hollow Metal
Horizontal
Hour
Inside Diameter
Laminate
Light
Material
Mechanical
Metal
Manufacturer
Nominal
Overflow Drain
Office
Opposite Hand
Plastic Laminate
Pair
Paper Towel
Reflective Ceiling Plan
Refrigerator
Register
Resilient
Rough Opening
Schedule
Section
Sheet
Solid Core
Specification
Square
Stainless Steel
Suspended
Telephone
Vestibule
Where Occurs
Weight
Water Resistant
Medium Density
Relocated Existing
Pound or Number
Cased Opening
Expansion Bolt
Emergency
Existing
Hardware
Gypsum
Gauge
Galvanized
Grab bar
Glass
Cabinet
Fiberboard
Dispenser
Panelboard
Department of Veterans Affairs
MATERIALS U.O.N. GENERAL NOTES
1.
LOCATIONS OF ALL UTILITY LINES (DUCTS, PIPES, CONDUITS, AND OTHER OVERHEAD OBSTRUCTIONS) SHOWN ARE APPROXIMATE. COORDINATE ALL SUPPORT SYSTEMS SO AS NOT TO INTERFERE WITH EACH OTHER. PROVIDE ADDITIONAL BRACING AS NECESSARY TO COMPLETE THE INSTALLATION AT NO
INCREASE TO THE CONTRACT SUM.
PROVIDE SEPARATE SHOP DRAWINGS FOR FIRE SPRINKLER SYSTEM, SUBMIT SPRINKLER SYSTEM
SUBMITTAL INCLUDING SHOP DRAWINGS, PRODUCT DATA, HYDRAULIC CALCULATIONS, ETC. TO
DEPARTMENT OF VETERANS AFFAIRS FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION.
SPRINKLER SYSTEM SHALL BE DESIGNED IN ACCORDANCE WITH TITLE 24, CCR PART 2, CHAPTER 38
AND NFPA 13, 2019 EDITION. AT ACOUSTICAL CEILING TILE LOCATIONS, LOCATE ALL SPRINKLER
HEADS AT CENTER OF CEILING TILES, UNLESS OTHERWISE NOTED.
2.
IN ALL BUILDING CONSTRUCTION AREAS, SEAL ALL PENETRATIONS SUCH AS DUCTS, CONDUITS, PIPES, ETC. AT FIRE RESISTIVE RATED PARTITIONS AND FLOOR/CEILING ASSEMBLIES, WHETHER SHOWN OR NOT AT NO CHANGE TO THE CONTRACT SUM. USE SEALANT TYPE TO MAINTAIN PROPER FIRE RESISTIVE RATING OF THE PENETRATED ASSEMBLIES. ALL PENETRATIONS AT FIRE RESISTIVE RATED PARTITIONS OR FLOOR/CEILING ASSEMBLIES SHALL BE IN ACCORDANCE WITH THE APPROPRIATE U.L. LISTED
APPROVED SYSTEMS.
3.
IF CONTRACTOR PROPOSED ALTERNATE CONSTRUCTION DETAILS AND ARE REVIEWED BY DEPARTMENT OF VETERANS AFFAIRS, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS AND TIME DELAYS
RESULTING FROM CONTRACTOR'S PROPOSED ALTERNATE CONSTRUCTION DETAILS WHICH AFFECT
OTHER PARTS OF THE WORK OR THE WORK OF SEPARATE CONTRACTORS.
4.
FIRE PROTECTION AT FIRE RESISTIVE RATED WALLS AND PARTITIONS:
A. NO ELECTRICAL BOXES SHALL BE LOCATED BACK TO BACK WITHIN 2'-0" MEASURED
HORIZONTALLY, ON FIRE RESISTIVE RATED PARTITION. IF LOCATED WITHIN 2'-0" EACH
ELECTRICAL BOX SHALL BE SEPARATED WITH FIRE RESISTIVE RATED GYPSUM BOARD
AROUND FIVE SIDES.
B. ANY ELECTRICAL BOX LARGER THAN 16 SQUARE INCHES SHALL BE PROTECTED WITH FIRE
RESISTIVE RATED GYPSUM BOARD AROUND FIVE SIDES.
C. FOR ANY 100 SQUARE FEET OF FIRE RESISTIVE RATED PARTITION AREA, THE ALLOWABLE
AGGREGATED AREA FOR UTILITY BOXES SHALL NOT EXCEED 100 SQUARE INCHES.
PROVIDE SEPARATE SHOP DRAWINGS FOR FIRE ALARM SYSTEM, SUBMIT FIRE ALARM SUBMITTAL
INCLUDING SHOP DRAWINGS AND PRODUCT DATA TO DEPARTMENT OF VETERAN AFFAIRS FOR
REVIEW AND APPROVAL PRIOR TO INSTALLATION. PROVIDE LISTING NUMBER FOR ALL COMPONENTS
IN SUBMITTAL.
PROJECT DATA
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL).
2018 INTERNATIONAL BUILDING CODE (IBC)
VA SEISMIC DESIGN REQUIREMENTS, H-18-8
NFPA 101 LIFE SAFETY CODE 2018 EDITION
OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA)
STANDARDS
NATIONAL ELECTRICAL CODE (NEC)
NATIONAL STANDARD PLUMBING CODE (NSPC)
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS)
INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE
NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000
AND NFPA 900
OCCUPANCY
CLASSIFICATION: GROUP B
1st FLOOR 3,645 SQUARE FEETPROJECT GROSS AREA:
FIRE PROTECTION: FULLY SPRINKLERED
2nd FLOOR 5,503 SQUARE FEET
APPLICABLE BUILDING CODES:
SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN
SOCIETY OF MECHANICAL ENGINEERS (ASME) A17.1.
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1- 2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 - 2007
EXISTING BUILDING DATA
OCCUPANCY TYPE:
CONSTRUCTION TYPE:
FIRE PROTECTION:
NO. OF STORIES:
AMBULALTORY CARE
TYPE II-000
FULLY SPRINKLERED
TWO STORIES
EXISTING BUILDING
GROSS FLOOR AREA:
MINIMUM FIRE RESISTIVE REQUIRMENTS:
ELEMENT RATING
BEARING WALLS, EXTERIOR 0-HOUR
BEARING WALLS, INTERIOR 0-HOUR
NON-BEARING WALLS, INTERIOR 0-HOUR
STRUCTURAL FRAME 0-HOUR
STRUCTURAL FRAME, ROOF ONLY 0-HOUR
SHAFT ENCLOSURES 0-HOUR
FLOORS AND FLOOR/CEILINGS 0-HOUR
ROOFS AND ROOF/CELINGS 0-HOUR
HORIZONTAL EXIT 0-HOUR
HAZARDOUS AREA SEPARATIONS
SOILED LINEN AREAS 1-HOUR
STORAGE ROOM >100 FT 1-HOUR
MAXIMUM TRAVEL DISTANCE TO EXITS
(NFPA 101, CHAPTER 21)
DEAD-END CORRIDORS (21.2.5.2) 50 FT
COMMON PATH OF TRAVEL (21.2.5.3.1) 100 FT
OVERALL DISTANCE TO EXIT (21.2.6.2) 200 FT
91,684 SQUARE FEET
T.B.R. To Be Removed
U.O.N.
MARTINEZ B19 SPECIALTY CARE INTERIOR REMODEL:
A.H.U. Air Handling Unit
L.P. Low Point
H.P. High Point
S.S.D.
See Structural Drawing
5.
THE CONSTRUCTION HOURS SHALL BE MONDAY THROUGH FRIDAY FROM 5:00 PM TO 6:00 AM,
SATURDAY AND SUNDAY ALL DAY UNLESS OTHERWISE NOTED. VA STAFF TO BE PRESENT AT ALL
TIMES.
6.
7.
CONF. Conference
MEMB. Membrane
R.D. Roof Drain
S.O.G. Slab On Grade
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :0
P
M
GI002
PROJECT TEAM, PROJECT DATA,
ABBREVIATIONS, SYMBOLS AND
MATERIALS
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
DESIGN NARRATIVE
Project scope consists of developing construction documents for the renovation of existing building space for specialty care services at Martinez, Building 19. Scope will include expanding specialty clinical services by renovating existing space vacated by Hematology/Oncology and Pharmacy Services who have moved to a newly renovated space within Building 19.
The work presented herein is to be constructed in two distinct phases. Specifically, all construction noted as "Phase 1" in these documents must be completed, operational and approved by the COR prior to the start of any work described in these documents as "Phase 2."
E.O.S. Edge Of Slab
RAD. Radius
PERP. Perpendicular
C.J. Construction Joint
(E) ELEV 2
(E) ELEV 1
TEAM ROOM
B145B
WS WAITING
B170
PC EXAM
B132
PC EXAM
B133
LAB/PC TOILET
B131
PC EXAM
B146
PC EXAM
B145
BLOOD DRAW
B130
PC Exam B144A
PC EXAM
B143A
WS CONSULT
B175
PC EXAM
B143
PC EXAM
B144
RECEPTION/GREETER
B170A
WS EXAM
B173
WS TOILET
B174
HAC
B180
WS TOILET
B171A
EXTERIOR
COURTYARD
TO
TA
L D
IS
TA
N C
E T
O E
X
IT
: 1
'-0
TO
TA
L D
IS
TA
N C
E T
O E
X
IT
: 2
'-4
POINT A
WS PROCEDURE
B171
SOILED UTILITY
B172
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
BREAKROOM
B145A
FEC
FEC
FEC
FIRE EXTINGUISHER CABINET
EXIT PATH
EXIT W/ NO. OF OCCUPANTS
1-HOUR SMOKE PARTITION
1-HOUR FIRE PARTITION
2-HOUR FIRE PARTITION
NOT IN SCOPE OF WORK
ASSEMBLY USE GROUP
15 SF PER OCCUPANT
AMBULATORY CARE DEPARTMENTS
150 SF PER OCCUPANT
DIRECTION OF TRAVEL
3/32" = 1'-0"
FIRST FLOOR FIRE SAFETY, EXIT PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :1
P
M
GI003
FLOOR 1 FIRE AND SAFETY
INFORMATION
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
EGRESS LEGEND
CODE ANALYSIS
EXIT DISCHARGE A
EXIT
DISCHARGE B
1. AREA OF WORK IS FULLY SPRINKLERED PER NFPA 13.
SEE FIRE PROTECTION SHEET FP001 FOR MORE
INFORMATION.
2. AREA OF WORK IS FULLY ALARMED PER NFPA 72. SEE
FIRE PROTECTION SHEET FP001 FOR MORE
INFORMATION AND EF1-1 FOR ALARM LOCATIONS.
3. ALL INFORMATION RELATING TO FIRE RATED
CONSTRUCTION, AND EXITING WERE BASED ON
EXISTING DRAWINGS PROVIDED BY DEPARTMENT OF
VETERAN AFFAIRS. THE ARCHITECT WILL NOT BE
RESPONSIBLE FOR ACCURACY OR FOR
INTERPRETATION OF INFORMATION ON PREVIOUS
DRAWINGS.
4. SEE SHEET ES2-1, ES2-2, AND ES2-3 FOR EXIT SIGN
LOCATIONS.
CODE NOTES
N
KEY PLAN
Floor 1
PROPOSED OCCUPANCY EXISTING OCCUPANCY
AMBULATORY CARE AND ASSEMBLY USE AMBULATORY CARE AND ASSEMBLY USE
AMBULATORY CARE USE: AMBULATORY CARE USE:
4376 SQUARE FEET AT 150 SF / OCCUPANT 4776 SQUARE FEET AT 150 SF / OCCUPANT
30 OCCUPANTS 32 OCCUPANTS
ASSEMBLY USE: ASSEMBLY USE:
480 SQUARE FEET AT 15 SF / OCCUPANT 440 SQUARE FEET AT 15 SF / OCCUPANT
32 OCCUPANTS 30 OCCUPANTS
TOTAL OCCUPANT LOAD 62 OCCUPANTS (NFPA 101 TABLE 7.3.1.2) TOTAL OCCUPANT LOAD 62 OCCUPANTS
NO CHANGE IN OCCUPANCY
EGRESS
PRIMARY EXIT DISCHARGES FOR AREA OF WORK ARE 'EXIT DISCHARGE A' AND 'EXIT DISCHARGE B.'
EXIT DISCHARGE A:
DOOR: 6'-4" WIDE, 380 CAPACITY
CORRIDOR: 6'-1" WIDE, 365 CAPACITY
EXIT DISCHARGE B:
DOOR: 5'-4" WIDE, 320 CAPACITY
CORRIDOR: 14'-3" WIDE, 855 CAPACITY (NFPA 101 TABLE 7.3.3.1)
COMMON PATH OF TRAVEL FROM POINT A: 39' - 0"
MAXIMUM COMMON PATH OF TRAVEL: 100 FT (NFPA 101 21.2.5..3.1)
ELEV 2
CHARTING
C201
BREAK ROOM
B208
MD TECH WKSTN
B206
EXAM/ TREATMENT 7
B207
CORRIDOR
PRE-SCREENING/ EXAM 2
B202
CATARACT SURGERY
TESTING
B213
EXAM/ TREATMENT 9
B209
EXAM/ TREATMENT 8
B210
VISUAL FIELD
B212
PRE-SCREENING/ EXAM 3
B203
WAITING
B349
RECEPTION - EYE CLINIC
B216A
WAITING
B204
PRE-SCREENING/ EXAM 1
B201
POINT A
POINT B
ST-2
ST-3
PROCEDURE
B214A
EXAM
B214B
EXAM
B214E
EXAM
B214G
EXAM
B214I
TEAM ROOM
B214J
ENT EXAM
B214K
OCT IMAGING/FUNDUS
PHOTO
B211
CLEAN UTILITY / OMNI
B214F
TOILET
B214H
SOILED UTILITY
B214L
OFFICE
B214D
OFFICE
B214C
CORRIDOR
CORRIDOR
CORRIDOR
5 5 10 15 20 25 30
3/32" = 1'-0"
FEETSCALE
FEC
FEC
FEC
FIRE EXTINGUISHER CABINET
EXIT PATH
EXIT W/ NO. OF OCCUPANTS
1-HOUR SMOKE PARTITION
1-HOUR FIRE PARTITION
2-HOUR FIRE PARTITION
NOT IN SCOPE OF WORK
ASSEMBLY USE GROUP
15 SF PER OCCUPANT
AMBULATORY CARE DEPARTMENTS
150 SF PER OCCUPANT
DIRECTION OF TRAVEL
3/32" = 1'-0"
SECOND FLOOR FIRE SAFETY, EXIT PLAN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :2
P
M
GI004
FLOOR 2 FIRE AND SAFETY
INFORMATION
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
EGRESS LEGEND
CODE ANALYSIS
PROPOSED OCCUPANCY EXISTING OCCUPANCY
AMBULATORY CARE AND ASSEMBLY USE AMBULATORY CARE AND ASSEMBLY USE
AMBULATORY CARE USE: AMBULATORY CARE USE:
5135 SQUARE FEET AT 150 SF / OCCUPANT 5383 SQUARE FEET AT 150 SF / OCCUPANT
35 OCCUPANTS 36 OCCUPANTS
ASSEMBLY USE: ASSEMBLY USE:
502 SQUARE FEET AT 15 SF / OCCUPANT 254 SQUARE FEET AT 15 SF / OCCUPANT
35 OCCUPANTS 17 OCCUPANTS
TOTAL OCCUPANT LOAD 70 OCCUPANTS (NFPA 101 TABLE 7.3.1.2) TOTAL OCCUPANT LOAD 53 OCCUPANTS
INCREASE OF 17 OCCUPANTS
EGRESS
PRIMARY EXITS FOR AREA OF WORK ARE STAIRWAYS ST-2 AND ST-3
EXIT A:
DOOR ST-3: 36" WIDE, 180 CAPACITY
STAIRWAY ST-3: 3'-4" WIDE, 133 CAPACITY
EXIT B:
STAIRWAY ST-2: 3'-8" WIDE, 146 CAPACITY (NFPA 101 TABLE 7.3.3.1)
COMMON PATH OF TRAVEL FROM POINT A: 24' - 0"
COMMON PATH OF TRAVEL FROM POINT B: 95' - 0"
MAXIMUM COMMON PATH OF TRAVEL: 100 FT (NFPA 101 21.2.5..3.1)
1. AREA OF WORK IS FULLY SPRINKLERED PER NFPA 13. SEE FIRE PROTECTION SHEET
FP001 FOR MORE INFORMATION.
2. AREA OF WORK IS FULLY ALARMED PER NFPA 72. SEE FIRE PROTECTION SHEET FP001
FOR MORE INFORMATION AND EF1-1 FOR ALARM LOCATIONS.
3. ALL INFORMATION RELATING TO FIRE RATED CONSTRUCTION, AND EXITING WERE BASED
ON EXISTING DRAWINGS PROVIDED BY DEPARTMENT OF VETERAN AFFAIRS. THE
ARCHITECT WILL NOT BE RESPONSIBLE FOR ACCURACY OR FOR INTERPRETATION OF
INFORMATION ON PREVIOUS DRAWINGS.
4. SEE SHEET ES2-1, ES-2, AND ES2-3 FOR EXIT SIGN LOCATIONS.
CODE NOTES
STAIR 1
N
KEY PLAN
Floor 2
5 6 7
N
P
Q
R
S
T
U
V
1A
(E)
DUMBWAITER
R.2
177 SF
B130
(E) LAB
137 SF
(E) VESTIBULE
44 SF
B193
(E) TOILET
114 SF
B132
(E) EXAM
ROOM
115 SF
B133
(E) EXAM
ROOM
126 SF
B146
(E) EXAM
ROOM
116 SF
B145
(E) EXAM
ROOM
129 SF
B143B
(E) OFFICE
229 SF
B143A
(E) KITCHEN
102 SF
(E) VACANT
1139 SF
(E) VACANT
113 SF
(E) OFFICE
47 SF
(E) HAC
87 SF
(E) ANTE
ROOM
VESTIBULE
51 SF
(E) AIRLOCK
62 SF
Room
50 SF
Room
105 SF
Room
PHASE 2
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :3
P
M
GI005
FIRST FLOOR PHASING PLAN
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
1/4" = 1'-0"
FIRST FLOOR PHASE 2 PLAN
N
KEY PLAN
Floor 1
CONSTRUCTION
FIRE BARRIER
2 3 4 5
P
Q
R
S
T
U
V
167 SF
B226
(E) OCT /
PHOTOGRAPHY
ANGIOGRAPHY
/ STORAGE
162 SF
B225
(E) EXAM
159 SF
B224
(E) EXAM
125 SF
B227
(E) TECH
WORK AREA
682 SF
B216
(E)
RECEPTION
Redundant Room
CORRIDOR
141 SF
B223
(E)
OFFICE/EXAM
113 SF
B205
(E) LASER
336 SF
B214C
(E)
TREATMENT
111 SF
B214D
(E) EXAM
103 SF
B214A
(E) OFFICE
124 SF
B214E
(E) EXAM
104 SF
B214G
(E) EXAM
51 SF
B214I
(E) STORAGE
129 SF
B214J
(E) EXAM
126 SF
B214K
(E) EXAM
132 SF
B214L
(E) EXAM
100 SF
B214M
(E) EXAM
106 SF
B214H
(E) EXAM
109 SF
B214F
(E) EXAM
96 SF
B214N
(E) EXAM
81 SF
B214O
(E) TOILET
165 SF
B214P
(E) EXAM
586 SF
(E) CORRIDOR
50 SF
B214B
(E) TOILET
120 SF
B210
(E) EXAM
254 SF
B209
(E) CONF
145 SF
B208
(E) EXAM
113 SF
B214A
(E) OFFICE
160 SF
B207
(E) OFFICE
161 SF
B206
(E) OFFICE
90 SF
B202
(E) OFFICE
446 SF
(E) CORRIDOR
48 SF
B214Q
(E) CONTROL
ROOM
46 SF
B214R
(E) EXAM
48 SF
B214T
(E) CONTROL
ROOM
46 SF
B214V
(E) EXAM
105 SF
B214
(E) SOUND
ROOM
91 SF
B203
(E) SOUND
ROOM
Redundant Room
(E) CORRIDOR
PHASE 1 PHASE 2
R.2
E
F
G
88 SF
C201
OFFICE
144 SF
C204
CORRIDOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :3
P
M
GI006
SECOND FLOOR PHASING PLAN
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
1/4" = 1'-0"
SECOND FLOOR PHASE 1 AND PHASE 2 PLAN
1/4" = 1'-0"
SECOND FLOOR NORTH PHASE 1 PLAN
N
KEY PLAN
Floor 2
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
CONSTRUCTION
FIRE BARRIER
M A
X
C L R
COAT HOOK (OFCI)
CL
O
P E
R A
T
IN
G
D E
V
IC
E F
O R
A
C C
E S
S
IB
L E
U N
IT
SURFACE
MOUNTED SOAP
DISPENSER
(OFCI)
O
P E
R A
T
IN
G
D
V
IC
E
6"
M A
X
MOTION SENSOR
PAPER TOWEL
DISPENSER (OFCI)
LIGHT SWITCH
WALL MOUNTED
ACCESSIBLE RESTROOM
SIGN
DOOR MOUNTED
ACCESSIBLE
RESTROOM SIGN
DOOR/EXIT
LIGHT W.O.
EQ EQ
2"
4"
2"
THERMOSTAT
FINISH FLOOR
GRAB BAR
LAVATORY -
WITH ADA
COMPLIANT PIPE
PROTECTOR
MIN.
1' - 4"
NURSE CALL
WITH PULL CORD
MIRROR
CL
IN
F
U S
IO
N
C H
A
IR
A T
C O
U N
T E
R
F O
R A
B O
V
M
IN
ACCESSIBLE
TOILET
TOILET PAPER
DISPENSER (OFCI)
2" 2"
T Y
P
ELEC. RECEPTACLE/ DATA OUTLET /
TELEPHONE OUTLET/ JUNCTION BOX
DATA OUTLET
MED. GASES OUTLET
NURSE CALL
O P
E R
A T
IN
G
D E
V I C
E
A T
FIRE ALARM MANUAL
PULL STATION
FIRE ALARM STROBE
LIGHT / HORN
H
A N
D L E
F.E.C.
CL
CL
"2"
4"
1' - 2"
8"
TOILET SEAT COVER
DISPENSER (OFCI)
MIN
1' - 4"
M A
X
ACCESSIBLE
URINAL
1' - 1"
NOTE:
THE 30" X 48" WHEELCHAIR CLEAR FLOOR SPACE IS
LOCATED A MAX 10" FROM THE WALL
NOTE:
IF THE DEPTH OF THE OBSTRUCTION IS 24" AND
THE MAXIMUM HEIGHT OF THE OBSTRUCTION IN
34", THE MAXIMUM HIGH SIDE REACH OVER THE
OBSTRUCTION IS 46".
NOTE:
THE 30" X 48" WHEELCHAIR CLEAR FLOOR SPACE IS
LOCATED A MAX 10" FROM THE WALL
NOTE:
X SHALL BE ≤ 25"; Z SHALL BE > X, WHEN X < 20", THEN Y SHALL BE 48" MAXIMUM.
WHEN X IS 20-25", THEN Y SHALL BE 44" MAXIMUM.
THE MAXIMUM LEVEL FORWARD REACH OVER AN OBSTRUCTION WITH KNEE SPACE BELOW IS 25".
WHEN THE OBSTRUCTION IS LESS THAN 20" DEEP, THE MAXIMUM HIGH FORWARD REACH IS 48".
WHEN THE OBSTRUCTION PROJECTS 20-25", THE MAXIMUM HIGH FORWARD REACH IS 44".
Z
X =
Y
Z
X
Y
10" MAX30"
FACE OF SWITCH OR
RECEPTACLE COVER PLATE
FACE OF SWITCH OR
RECEPTACLE COVER PLATE
30" 10" MAX
FACE OF SWITCH OR
RECEPTACLE COVER PLATE
30" > 10-24" MAX
FACE OF SWITCH OR
RECEPTACLE COVER PLATE
FACE OF SWITCH OR
RECEPTACLE COVER PLATE
48" 48"
16" MIN
30" MIN.
M
IN
16"−18"
SIZE OF CLEARANCE AT WATER
CLOSET PER PG 18-13 VA BARRIER
FREE DESIGN STANDARD
SIZE OF CLEARANCE
AT SINK PER 305;
ALSO REFERENCE 306
16" MIN
30" MIN.
M
IN
SIZE OF CLEARANCE
AT URINAL PER 305
M
IN
72" MIN.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:5 :4
P
M
GI100
ADA CLEARANCES AND TYPICAL
MOUNTING HEIGHTS
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
1/2" = 1'-0"
TYPICAL MOUNTING HEIGHT
3/8" = 1'-0"
MANEUVERING CLEARANCES AT MANUAL SWINGING DOORS
3/8" = 1'-0"
MAXIMUM REACH HEIGHTS
3/8" = 1'-0"
MANUEVERING CLEARANCE APPROACHES
3/8" = 1'-0"
CLEARANCE AT PLUMBING FIXTURES
P
Q
R
S
T
U
V
1A
(E)
DUMBWAITER
B144
HAC
B130
LAB
B132
EXAM ROOM
B133
EXAM ROOM
B146
EXAM ROOM
B145
EXAM ROOM
B143B
OFFICE
B143A
STAFF
BREAKROOM
VACANT
B143F
HALLWAY
VACANT
B143E
OFFICE
B143D
(E)
RECEPTION
B193
TOILET
(E)
PRESCRIPTION
RECEIVING
(E)
PRESCRIPTION
RECEIVING
(E) OFFICE
(E) OFFICE,
SUPERVISORY
PHARMACIST
(E)
DISPENSING
B287
(E) ANTE
ROOM
VESTIBULE
B387
(E) AIRLOCK
B388
(E) CHEMO
HOOD ROOM
B389
(E) IV BUFFER
B390
(E) ANTE
ROOM
(E)
RECEPTION
/A 114 SF
EXAM
/A 115 SF
OFFICE
/A 97 SF
EXAM
137 SF
EXAM
/A 120 SF
B147
EXAM
(E) STORAGE,
CONTROLLED
SUBSTANCES,
SECURED
DISPENSING
REMOVE EXISTING PLUMBING FIXTURES;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING PLUMBING
FIXTURE; ALSO SEE PLUMBING DWGS
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING DOORS,
FRAMES AND HARDWARE
REMOVE PORTION
OF EXISTING WALL
AS SHOWN
REMOVE PASS-THRU;
TYP. OF SIX (6) AND
MILLWORK ABOVE.
REMOVE EXISTING DOOR,
FRAME AND HARDWARE
REMOVE
EXISTING
WALL
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING DOOR,
FRAME AND HARDWARE
REMOVE EXISTING DOOR,
FRAME AND HARDWARE
REMOVE EXISTING
WALL
REMOVE EXISTING DOORS,
FRAME AND HARDWARE
REMOVE EXISTING MILLWORK,
TYP OF FOUR (4)
REMOVE EXISTING
MILLWORK
REMOVE EXISTING PASS-THRU,
PREPARE WALL FOR NEW PASS-
THRU; GC TO COORDINATE
REMOVE EXISTING GLAZING
AND HARDWARE
REMOVE
EXISTING BARN
DOOR, FRAME
AND HARDWARE
REMOVE EXISTING GRAB BARS
REMOVE EXISTING MILLWORK
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING WALLS,
TYP OF THREE (3)
REMOVE EXISTING
TILE FROM FLOOR
EXISTING DUMBWAITER TO REMAIN; SEE ELECTRICAL
DWGS FOR RELOCATION OF CONTROLS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING
TEMPORARY WALL
REMOVE EXISTING TILE FLOOR
AND WAINSCOT
REMOVE EXISTING MONITOR /
DISPLAY AND RETURN TO OWNER
REMOVE EXISTING
WOOD SHELF
REMOVE EXISTING OVERHEAD
COILING DOOR AND ALL HARDWARE
REMOVE EXISTING WALLS
REMOVE EXISTING MILLWORK
CAREFULLY REMOVE EXISTING
GYP BD TO INVESTIGATE IF CHASES
HAVE BUILDING SYSTEMS WITHIN. IF
SO CONTACT ARCH. REP. ON SITE.
IF NOT REMOVE EXISTING WALLS.
REMOVE EXISTING WALL
AND BULKHEAD
REMOVE EXISTING PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK,
REMOVE EXISTING MILLWORK
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING
MILLWORK
REMOVE EXISTING
MILLWORK
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING
WOOD SHELFS
REMOVE EXISTING MILLWORK
REMOVE EXISTING DOOR,
FRAME AND HARDWARE
REMOVE EXISTING
DOOR, FRAME AND
HARDWARE; TYP
REMOVE EXISTING DOOR,
FRAME AND HARDWARE; TYP
REMOVE EXISTING
DOOR , FRAME,
SIDELIGHT AND
HARDWARE.
REMOVE EXISTING DOOR,
FRAME AND HARDWARE;TYP
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING
RECESSED FIRE
EXTINGUISHER
CABINET
EXISTING WALL AND ACOUSTICAL
SEPARATION TO REMAIN
EXISTING STRUCTURAL
BRACE FURRING TO REMAIN
REMOVE EXISTING
WALL
R.2
EXISTING DOOR TO REMAIN
CONSTUCT TEMPORARY CONSTRUCTION BARRIER;
TO BE REMOVED AFTER CONSTRUCTION
CONSTRUCT TEMPORARY
CONSTRUCTION BARRIER;
TO BE REMOVED AFTER CONSTRUCTION
REMOVE EXISTING DOOR,
FRAME AND HARDWARE; TYP
EXISTING BLOOD DRAW
KIOSK. GC TO COORDINATE
TEMPORARY LOCATION
DURING CONSTRUCTION. SEE
ELEC DRAWINGS AND AI101
FOR FINAL LOCATION
EXISTING PHARMACY KIOSK. GC TO
RELOCATE DURING CONSTRUCTION. WORK
WITH TO COORDINATE FINAL LOCATION.
FOR WORK IN THIS AREA,
REF: DRAWING AD111
EXISTING WALL / PARTITION /
FURRING TO REMAIN
EXISTING WALL OR PARTITION TO BE
REMOVED
LEGEND
AREA NOT IN SCOPE OF WORK
EXISTING DOOR, FRAME AND
HARDWARE TO BE REMOVED
EXISTING DOOR, FRAME AND
HARDWARE TO REMAIN
EXISTING WINDOW, HARDWARE
AND/OR WINDOW TREATMENT
TO BE REMOVED
CONSTRUCTION BARRIER,
TO BE REMOVED
AFTER CONSTRUCTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:4 :1
P
M
AD101
ENLARGED PHASE 2 FIRST FLOOR
DEMOLITION PLAN - EAST
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
1/4" = 1'-0"
ENLARGED PHASE 2 FIRST FLOOR DEMOLITION PLAN - EAST
N
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
KEY PLAN
Floor 1
1. THIS DRAWING IS ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION WORK AND IS NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL REMOVE ALL EXISTING ITEMS AS REQUIRED TO COMPLETE THE JOB.
2. CONTRACTOR TO PROVIDE TEMPORARY BARRIER AROUND ALL AREAS OF WORK THAT SHALL PROTECT THE
FUNCTIONING SURROUNDING AREAS FREE OF DUST.
3. CONSTRUCTION BARRIER, DOORS AND OTHER MATERIAL TO BE REMOVED AFTER CONSTRUCTION HAS BEEN
COMPLETED AND SIGNED OFF.
4. REFER TO MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR EXTENT OF DEMOLITION TO THOSE SYSTEMS.
5. PROTECT ALL EXISTING STRUCTURE, SYSTEMS AND GENERAL CONSTRUCTION THAT ARE TO REMAIN THROUGHOUT
THE COURSE OF THE WORK TO PREVENT DAMAGE OR LOSS.
6. PROVIDE STRICT CONTROL OF JOB CLEANING AND PREVENT DUST AND DEBRIS FROM EMANATING FROM
DEMOLITION / CONSTRUCTION AREA. PROVIDE TEMPORARY PARTITIONS / BARRIERS AS REQUIRED.
7. DEMOLITION IS TO BE DONE IN A CAREFUL AND ORDERLY MANNER SO AS NOT TO DAMAGE FINISHES OR EQUIPMENT
TO REMAIN.
8. ALL WORK WILL BE PERFORMED IN THE BEST WORKMANSHIP POSSIBLE IN ACCORDANCE WITH THAT TRADE'S BEST
INDUSTRY STANDARDS.
9. WASTE MATERIAL AND RUBBISH FROM THE DEMOLITION OPERATION SHALL BE REMOVED FROM SITE AS RAPIDLY AS
POSSIBLE AND SHALL NOT BE ALLOWED TO ACCUMULATE ON PREMISES.
10. CONTRACTOR SHALL CHECK AND VERIFY ALL NOTES AND DIMENSIONS BEFORE PROCEEDING WITH WORK.
11. DO NOT SCALE DRAWINGS TO OBTAIN DIMENSIONS. USE WRITTEN DIMENSIONS ONLY AND VERIFY IN FIELD.
12. CONTRACTOR SHALL EXERCISE EXTREME CARE WHEN REMOVING EXISTING ITEMS THAT ARE SCHEDULED TO BE
RELOCATED AND/OR REUSED. PROTECT AND STORE THESE ITEMS ON SITE.
13. PATCH AND REPAIR EXISTING CONCRETE SLAB REMOVED OR DAMAGED BY NEW CONSTRUCTION WORK WITHIN OR
OUTSIDE THE PROJECT AREA. PATCH WORK SHALL MATCH EXISTING ADJACENT IN CONSTRUCTION, MATERIALS, BELOW SLAB VAPOR BARRIER, AGGREGATE BASE, SUB-BASE, COLORS, AND FINISHES.
14. EXISTING CONCRETE FLOOR SLABS AND / OR SURFACES SHALL BE PREPARED SO AS TO REMOVE ALL GREASE, BLUE, ETC., FILL ALL EXISTING CRACKS, DEPRESSIONS, AND INSTALL LEVELING COMPOUND TO PROVIDE A CLEAN AND
SMOOTH SUB-FLOOR FOR FINISHED FLOORING.
15. PATCH ALL FINISHES TO MATCH EXISTING, INCLUDING BUT NOT LIMITED, GYPSUM BOARD, PLASTER ACOUSTIC SYSTEMS, WOOD TRIM, COVERS, BASE AND RAILS. VERIFY MATCH OF NEW FINISHES TO EXISTING IN COLOR
TEXTURE, THICKNESS, CUT, ETC...TO SATISFACTION OF OWNER PRIOR TO INSTALLATIONS
GENERAL DEMOLITION NOTES
DEMOLITION NOTES
1. REMOVE ALL EXISTING SURFACE MOUNTED MIRRORS, PAPER TOWEL DISPENSERS, SOAP / LOTION DISPENSERS, TOILET PAPER HOLDERS AND SANITRY TOILET SEAT DISPENSERS.
2. REMOVE ALL EXISTING RECESSED PAPER TOWEL DISPENSERS AND TRASH RECEPTACLE
3. REMOVE ALL EXISTING WINDOW TREATMENTS AND HARDWARE
4. EXPANSION OF ROUGH OPENINGS FOR 42" DOORS AT EXAM ROOMS B132 AND B133 TO BE COORDINATED WITH THE
COR TO MINIMIZE DOWNTIME TO THOSE CLINICAL SPACES.
P
Q
R
S
T
U
V
B214B
TOILET
B214A
TREATMENT
B214C
OFFICE
B214D
EXAM
B214E
EXAM
B214F
EXAM
B214P
OFFICE
B214O
TOILET
B214N
LACTATION
B214M
EXAM
B214H
EXAM
B214G
EXAM
B214I
STORAGE
B214J
EXAM
B214K
EXAM
/A 120 SF
B210
AUDIOLOGY
TECHS
/A 254 SF
B209
CONF
/A 145 SF
B208
SUPPLY LAB
B214L
EXAM
/A 113 SF
B214A
OFFICE
/A 160 SF
B207
OFFICE
/A 161 SF
B206
OFFICE
/A Not Enclosed
B216A
RECEPTION
/A 90 SF
B202
AUDIOLOGY
ADMIN ASST
/A 91 SF
B203
AUDIOLOGY
LAB 1
/A 48 SF
B214Q
CONTROL
/A 46 SF
B214R
AUDIO BOOTH
/A 48 SF
B214T
CONTROL
/A 46 SF
B214V
AUDIO BOOTH
/A 105 SF
B204
AUDIOLOGY
LAB 2
/A 226 SF
B216
(E)
RECEPTION
/A 125 SF
B227
TECH WORK
/A 167 SF
B226
(E) OCT/
PHOTO/ ANGIO
/A 162 SF
B225
(E) EXAM
/A 159 SF
B224
(E) EXAM
B205
(E) OFFICE B223
(E) OFFICE /
EXAM
/A 70 SF
B392
(E) HUDDLE
(E)
CIRCULATION
LEAVE EXISTING COLUMN AND
BRACING FURRING WALLS.
LEAVE EXISTING COLUMN AND
BRACING FURRING WALLS.
LEAVE BRACING
FURRING.
LEAVE BRACING FURRING.
LEAVE EXISTING COLUMN AND
BRACING FURRING WALLS.
REMOVE EXISTING PLUMBING FIXTURES;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING PLUMBING FIXTURES;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
REMOVE EXISTING MILLWORK
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING WALL MOUNTED
DISPLAY SCREEN, IF PRESENT AND
RETURN TO OWNER
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING GRAB BARS
REMOVE EXISTING MILLWORK
REMOVE PORTION OF EXISTING
WALL, PREPARE FRAMING TO
RECEIVE NEW GWB; REF. 1/AE103
REMOVE
EXISTING
WALLS
REMOVE EXISTING DOOR,
FRAME AND HARDWARE
REMOVE EXISTING DOOR,
FRAME AND HARDWARE
REMOVE EXISTING
RECESSED FIRE
EXTINGUISHER CABINET
REMOVE EXISTING DOOR,
FRAME AND HARDWARE
REMOVE EXISTING WALL
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING
WINDOW
REMOVE EXISTING
MILLWORK
REMOVE EXISTING DOOR,
FRAME AND HARDWARE;
SHOWN DASHED, TYP
REMOVE EXISTING GRAB BARS
PHASE 1 DEMOLITION PHASE 2 DEMOLITION
PHASE 2 DEMOLITION
/A 238 SF
CORRIDOR
/A 208 SF
CORRIDOR
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING TILE
FLOORING AND WAINSCOT
REMOVE EXISTING DOOR,
FRAME AND HARDWARE;
SHOWN DASHED, TYP
REMOVE EXISTING DOOR,
FRAME AND HARDWARE;
SHOWN DASHED, TYP
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING DOOR,
FRAME AND HARDWARE;
SHOWN DASHED, TYP
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING DOOR,
FRAME AND HARDWARE
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING
FRAMING AROUND COLUMN
REMOVE EXISTING
FRAMING AROUND COLUMN
R.2
CONSTRUCT TEMPORARY CONSTRUCTION BARRIER;
TO BE REMOVED AFTER CONSTRUCTION
BEFORE COMMENCING PHASE ONE
DEMOLITION, INSTALL TEMPORARY
SIGNAGE WARNING OF CONSTRUCTION
AREA ON FACE OF DOOR
PROVIDE POLY ATTACHED TO THE
STRUCTURE ABOVE AND AFFIXED
TO THE FACE OF THE (E) WALL
(MIN. 2'-0" BELOW T.O.W.) ENTIRE PERIMETER;
TO CONTROL DUST FROM MIGRATING INTO
ADJOINING OCCUPIED SPACES.
PROVIDE POLY ATTACHED TO THE
STRUCTURE ABOVE AND AFFIXED
TO THE FACE OF THE (E) WALL
(MIN. 2'-0" BELOW T.O.W.) ENTIRE PERIMETER;
TO CONTROL DUST FROM MIGRATING INTO
ADJOINING OCCUPIED SPACES.
E
F
G
REMOVE EXISTING DOOR
AND HARDWARE
C201
SURGERYOFFICE
REMOVE EXISTING
PARTITIONS
REMOVE EXISTING PARTITIONS
REMOVE EXISTING
MILLWORK
REMOVE EXISTING LOCKERS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:4 :1
P
M
AD102
ENLARGED PHASE 1 SECOND
FLOOR DEMOLITION PLANS
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
1/4" = 1'-0"
ENLARGED PHASE 1 SECOND FLOOR DEMOLITION PLAN
1/4" = 1'-0"
ENLARGED PHASE 1 SECOND FLOOR
DEMOLITION PLAN - NORTH
N
KEY PLAN
Floor 2
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
1. THIS DRAWING IS ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION WORK AND IS NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL REMOVE ALL EXISTING ITEMS AS REQUIRED TO COMPLETE THE JOB.
2. CONTRACTOR TO PROVIDE TEMPORARY BARRIER AROUND ALL AREAS OF WORK THAT SHALL PROTECT THE
FUNCTIONING SURROUNDING AREAS FREE OF DUST.
3. CONSTRUCTION BARRIER, DOORS AND OTHER MATERIAL TO BE REMOVED AFTER CONSTRUCTION HAS BEEN
COMPLETED AND SIGNED OFF.
4. REFER TO MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR EXTENT OF DEMOLITION TO THOSE SYSTEMS.
5. PROTECT ALL EXISTING STRUCTURE, SYSTEMS AND GENERAL CONSTRUCTION THAT ARE TO REMAIN THROUGHOUT
THE COURSE OF THE WORK TO PREVENT DAMAGE OR LOSS.
6. PROVIDE STRICT CONTROL OF JOB CLEANING AND PREVENT DUST AND DEBRIS FROM EMANATING FROM
DEMOLITION / CONSTRUCTION AREA. PROVIDE TEMPORARY PARTITIONS / BARRIERS AS REQUIRED.
7. DEMOLITION IS TO BE DONE IN A CAREFUL AND ORDERLY MANNER SO AS NOT TO DAMAGE FINISHES OR EQUIPMENT
TO REMAIN.
8. ALL WORK WILL BE PERFORMED IN THE BEST WORKMANSHIP POSSIBLE IN ACCORDANCE WITH THAT TRADE'S BEST
INDUSTRY STANDARDS.
9. WASTE MATERIAL AND RUBBISH FROM THE DEMOLITION OPERATION SHALL BE REMOVED FROM SITE AS RAPIDLY AS
POSSIBLE AND SHALL NOT BE ALLOWED TO ACCUMULATE ON PREMISES.
10. CONTRACTOR SHALL CHECK AND VERIFY ALL NOTES AND DIMENSIONS BEFORE PROCEEDING WITH WORK.
11. DO NOT SCALE DRAWINGS TO OBTAIN DIMENSIONS. USE WRITTEN DIMENSIONS ONLY AND VERIFY IN FIELD.
12. CONTRACTOR SHALL EXERCISE EXTREME CARE WHEN REMOVING EXISTING ITEMS THAT ARE SCHEDULED TO BE
RELOCATED AND/OR REUSED. PROTECT AND STORE THESE ITEMS ON SITE.
13. PATCH AND REPAIR EXISTING CONCRETE SLAB REMOVED OR DAMAGED BY NEW CONSTRUCTION WORK WITHIN OR
OUTSIDE THE PROJECT AREA. PATCH WORK SHALL MATCH EXISTING ADJACENT IN CONSTRUCTION, MATERIALS, BELOW SLAB VAPOR BARRIER, AGGREGATE BASE, SUB-BASE, COLORS, AND FINISHES.
14. EXISTING CONCRETE FLOOR SLABS AND / OR SURFACES SHALL BE PREPARED SO AS TO REMOVE ALL GREASE, BLUE, ETC., FILL ALL EXISTING CRACKS, DEPRESSIONS, AND INSTALL LEVELING COMPOUND TO PROVIDE A CLEAN AND
SMOOTH SUB-FLOOR FOR FINISHED FLOORING.
15. PATCH ALL FINISHES TO MATCH EXISTING, INCLUDING BUT NOT LIMITED, GYPSUM BOARD, PLASTER ACOUSTIC SYSTEMS, WOOD TRIM, COVERS, BASE AND RAILS. VERIFY MATCH OF NEW FINISHES TO EXISTING IN COLOR
TEXTURE, THICKNESS, CUT, ETC...TO SATISFACTION OF OWNER PRIOR TO INSTALLATIONS
GENERAL DEMOLITION NOTES
DEMOLITION NOTES
1. REMOVE ALL EXISTING SURFACE MOUNTED MIRRORS, PAPER TOWEL DISPENSERS, SOAP / LOTION DISPENSERS, TOILET PAPER HOLDERS AND SANITARY TOILET SEAT DISPENSERS.
2. REMOVE ALL EXISTING RECESSED PAPER TOWEL DISPENSERS AND TRASH RECEPTACLE
3. REMOVE ALL EXISTING WINDOW TREATMENT AND HARDWARE
4. ALL PHASE 1 WORK TO BE COMPLETED, OPERATIONAL AND APPROVED BY THE COR PRIOR TO ANY PHASE 2
DEMOLITION COMMENCING.
P
Q
R
S
T
U
V
/A 226 SF
B216
(E)
RECEPTION
/A 125 SF
B227
RN/ PA OFFICE
/A 167 SF
B226
PROCEDURE/
EXAM
/A 162 SF
B225
(E) EXAM 4
/A 159 SF
B224
(E) EXAM 3
/A 113 SF
B205
(E) EXAM/
TREATMENT 5
/A 141 SF
B223
(E) OFFICE /
EXAM
/A 386 SF
(E)
CIRCULATION
/A 417 SF
B349
WAITING /A 139 SF
B216A
RECEPTION -
EYE CLINIC
RCP1
/A 67 SF
B391
(E)
CIRCULATION
/A 70 SF
B392
(E) HUDDLE
REMOVE EXISTING PLUMBING FIXTURES;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING PLUMBING FIXTURES;
ALSO SEE PLUMBING DWGS
REMOVE
EXISTING
WINDOW
REMOVE EXISTING PLUMBING FIXTURES;
ALSO SEE PLUMBING DWGS
CAREFULLY REMOVE EXISTING
ACOUSTICAL WALL FINISH
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
REMOVE EXISTING MILLWORK
REMOVE EXISTING
RECESSED FIRE
EXTINGUISHER CABINET
PHASE 1 COMPLETED
CONSTRUCTION
PHASE 2 DEMOLITION
AUDIOLOGY
TECHS
B210
A 120 SF /
CONF
B209
A 254 SF /
AUDIOLOGY
ADMIN ASST
B202
A 90 SF /
AUDIOLOGY
LAB 1
B203
A 91 SF /
SUPPLY LAB
B208
A 145 SF /
AUDIOLOGY
LAB 2
B204
A 105 SF /
CONTROL
B214T
A 48 SF /
CONTROL
B214Q
A 48 SF /
AUDIO BOOTH
B214R
A 46 SF /
AUDIO BOOTH
B214V
A 46 SF /
OFFICE
B214A
A 113 SF /
OFFICE
B207
A 160 SF /
OFFICE
B206
A 161 SF /
CORRIDOR
A 177 SF /
CORRIDOR
A 208 SF /
CAREFULLY REMOVE EXISTING
ACOUSTICAL WALL FINISH
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE ENTIRE AUDIO
BOOTH AND ALL IT'S
COMPONENTS
REMOVE ENTIRE AUDIO
BOOTH AND ALL IT'S
COMPONENTS
REMOVE EXISTING DOOR,
FRAME AND HARDWARE,
SHOWN DASHED; TYP
REMOVE EXISTING MILLWORK
(UPPER & LOWER CABINETS)
AND PLUMBING FIXTURE;
ALSO SEE PLUMBING DWGS
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING DOOR,
FRAME AND HARDWARE,
SHOWN DASHED; TYP
REMOVE EXISTING WALL,
SHOWN DASHED; TYP
REMOVE EXISTING DOOR,
FRAME AND HARDWARE,
SHOWN DASHED; TYP
REMOVE EXISTING DOOR,
FRAME AND HARDWARE,
SHOWN DASHED; TYP
REMOVE EXISTING
WALL, SHOWN
DASHED; TYP
R.2
CONSTRUCT TEMPORARY
CONSTRUCTION BARRIER;
TO BE REMOVED
AFTER CONSTRUCTION
BEFORE COMMENCING PHASE TWO DEMOLITION,
INSTALL TEMPORARY SIGNAGE WARNING OF
CONSTRUCTION AREA ON FACE OF DOOR
PROVIDE POLY ATTACHED TO THE
STRUCTURE ABOVE AND AFFIXED
TO THE FACE OF THE (E) WALL
(MIN. 2'-0" BELOW T.O.W.) ENTIRE PERIMETER;
TO CONTROL DUST FROM MIGRATING INTO
ADJOINING OCCUPIED SPACES.
THE GENERAL CONTRACTOR SHALL
PROVIDE ADEQUATE PROTECTION
TO ENSURE THAT NO DAMAGE
OCCURS TO FINISHED MATERIALS
THAT WERE INSTALLED DURING
PHASE 1.
COVER ANY PENETRATIONS
IN NEW PARTITION TO
CONTROL DUST FROM
MIGRATING INTO
ADJOINING OCCUPIED SPACES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
ARCHITECT OF RECORD
B
IM
/M a rt in e z B
/6
-1
-3
A
.r v t
/3
/2
:4 :2
P
M
AD103
ENLARGED PHASE 2 SECOND
FLOOR DEMOLITION PLAN
CONCOURSE FEDERAL GROUP
213 SOUTH ROYAL STREET
ALEXANDRIA, VA 22314
GENE KLOW
REMODEL SPECIALTY
CARE - BUILDING 19
VA MARTINEZ
612-18-329
03/26/2021
100% - BID SET
N
KEY PLAN
Floor 2
2 2 4 6 8 10
1/4" = 1'-0"
FEETSCALE
1/4" = 1'-0"
ENLARGED PHASE 2 SECOND FLOOR DEMOLITION PLAN
1. THIS DRAWING IS ONLY TO ASSIST IN SHOWING THE SCOPE OF DEMOLITION WORK AND IS NOT INTENDED TO INDICATE ALL DEMOLITION. CONTRACTOR SHALL REMOVE ALL EXISTING ITEMS AS REQUIRED TO COMPLETE THE JOB.
2. CONTRACTOR TO PROVIDE TEMPORARY BARRIER AROUND ALL AREAS OF WORK THAT SHALL PROTECT THE
FUNCTIONING SURROUNDING AREAS FREE OF DUST.
3. CONSTRUCTION BARRIER, DOORS AND OTHER MATERIAL TO BE REMOVED AFTER CONSTRUCTION HAS BEEN
COMPLETED AND SIGNED OFF.
4. REFER TO MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR EXTENT OF DEMOLITION TO THOSE SYSTEMS.
5. PROTECT ALL EXISTING STRUCTURE, SYSTEMS AND GENERAL CONSTRUCTION THAT ARE TO REMAIN THROUGHOUT
THE COURSE OF THE WORK TO PREVENT DAMAGE OR LOSS.
6. PROVIDE STRICT CONTROL OF JOB CLEANING AND PREVENT DUST AND DEBRIS FROM EMANATING FROM
DEMOLITION / CONSTRUCTION AREA. PROVIDE TEMPORARY PARTITIONS / BARRIERS AS REQUIRED.
7. DEMOLITION IS TO BE DONE IN A CAREFUL AND ORDERLY MANNER SO AS NOT TO DAMAGE FINISHES OR EQUIPMENT
TO REMAIN.
8. ALL WORK WILL BE PERFORMED IN THE BEST WORKMANSHIP POSSIBLE IN ACCORDANCE WITH THAT TRADE'S BEST
INDUSTRY STANDARDS.
9. WASTE MATERIAL AND RUBBISH FROM THE DEMOLITION OPERATION SHALL BE REMOVED FROM SITE AS RAPIDLY AS
POSSIBLE AND SHALL NOT BE ALLOWED TO ACCUMULATE ON PREMISES.
10. CONTRACTOR SHALL CHECK AND VERIFY ALL NOTES AND DIMENSIONS BEFORE PROCEEDING WITH WORK.
11. DO NOT SCALE DRAWINGS TO OBTAIN DIMENSIONS. USE WRITTEN DIMENSIONS ONLY AND VERIFY IN FIELD.
12. CONTRACTOR SHALL EXERCISE EXTREME CARE WHEN REMOVING EXISTING ITEMS THAT ARE SCHEDULED TO BE
RELOCATED AND/OR REUSED. PROTECT AND STORE THESE ITEMS ON SITE.
13. PATCH AND REPAIR EXISTING CONCRETE SLAB REMOVED OR DAMAGED BY NEW CONSTRUCTION WORK WITHIN OR
OUTSIDE THE PROJECT AREA. PATCH WORK SHALL MATCH EXISTING ADJACENT IN CONSTRUCTION, MATERIALS, BELOW SLAB VAPOR BARRIER, AGGREGATE BASE, SUB-BASE, COLORS, AND FINISHES.
14. EXISTING CONCRETE FLOOR SLABS AND / OR SURFACES SHALL BE PREPARED SO AS TO REMOVE ALL GREASE, BLUE, ETC., FILL ALL EXISTING CRACKS, DEPRESSIONS, AND INSTALL LEVELING COMPOUND TO PROVIDE A CLEAN AND
SMOOTH SUB-FLOOR FOR FINISHED FLOORING.
15. PATCH ALL FINISHES TO MATCH EXISTING, INCLUDING BUT NOT LIMITED, GYPSUM BOARD, PLASTER ACOUSTIC SYSTEMS, WOOD TRIM, COVERS, BASE AND RAILS. VERIFY MATCH OF NEW FINISHES TO EXISTING IN COLOR
TEXTURE, THICKNESS, CUT, ETC...TO SATISFACTION OF OWNER PRIOR TO INSTALLATIONS
GENERAL DEMOLITION NOTES
DEMOLITION NOTES
1. REMOVE ALL EXISTING SURFACE MOUNTED MIRRORS, PAPER TOWEL DISPENSERS, SOAP / LOTION DISPENSERS, TOILET PAPER HOLDERS AND SANITARY TOILET SEAT DISPENSERS.
2. REMOVE ALL EXISTING RECESSED PAPER TOWEL DISPENSERS AND TRASH RECEPTACLE
3. REMOVE ALL EXISTING WINDOW TREATMENT AND HARDWARE
4. EXPANSION OF ROUGH OPENINGS FOR 42" DOORS AT EXAM ROOMS B132 AND B133 TO BE COORDINATED WITH THE
COR TO MINIMIZE DOWNTIME TO THOSE CLINICAL SPACES.
5. ALL PHASE 1 WORK TO BE COMPLETED, OPERATIONAL AND APPROVED BY THE COR PRIOR TO ANY PHASE 2
DEMOLITION COMMENCING.
P
Q Q
R R
S
T
U
V V
1A
B144
HAC
B130
LAB
B132
EXAM ROOM
B133
EXAM ROOM
B146
EXAM ROOM
B145
EXAM ROOM
B143B
OFFICE
B143A
STAFF
BREAKROOM
VACANT
B143F
HALLWAY
VACANT
B143E
OFFICE
B143D
(E)
RECEPTION
B193
TOILET
/A 533 SF
(E)
PRESCRIPTION
RECEIVING
/A Redundant Room
(E)
PRESCRIPTION
RECEIVING
/A 121 SF
(E) OFFICE
/A 133 SF
(E) OFFICE,
SUPERVISORY
PHARMACIST
/A 172 SF
(E) STORAGE,
CONTROLLED
SUBSTANCES,
SECURED
DISPENSING
/A Not Enclosed
(E)
DISPENSING
/A 87 SF
B287
(E) ANTE
ROOM
VESTIBULE
/A 51 SF
B387
(E) AIRLOCK
/A 62 SF
B388
(E) CHEMO
HOOD ROOM
/A 50 SF
B389
(E) IV BUFFER
/A 105 SF
B390
(E) ANTE
ROOM
/A 151 SF
(E)
RECEPTI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .