S02_Attachment 10_IFB Contractor Cost Estimate Worksheet.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Y1PZ--CONS Natchez NC Expansion/Demo Mx Fac/Roads (866CN3029/866CM3030) (VA-23-00072411)
- Solicitation number
- 36C78624B0041
About this file
This document is an Invitation for Bid (IFB) Contractor Cost Estimate Worksheet for the Natchez National Cemetery Projects 866CM3029 and 866CM3030. The worksheet provides a Division List to be used for the lump sum pricing of various construction work, including Divisions 0 through 33. Bidders are required to provide lump sum pricing for each applicable Division, as well as separate line items for Bonds, Overhead, and Profit, to arrive at a Grand Total bid amount. The related federal contract opportunity is Solicitation Number 36C78624B0041, issued by the Department of Veterans Affairs National Cemetery Administration for the Natchez NC Expansion/Demolition/Maintenance Facility/Roads projects.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number |
| Project Name |
| Division | Base Bid | CLIN1 | CLIN 2 | CLIN3 | Total |
| Division 0 | |||||
| Special Sections | |||||
| Division 01 | |||||
| General Requirements | |||||
| Division 02 | |||||
| Existing Conditions | |||||
| Division 03 | |||||
| Concrete | |||||
| Division 04 | |||||
| Masonry | |||||
| Division 05 | |||||
| Metals | |||||
| Division 06 | |||||
| Wood, Plastic, and Composites | |||||
| Division 07 | |||||
| Thermal and Moisture Protection | |||||
| Division 08 | |||||
| Openings (Doors, Windows, etc...) | |||||
| Division 09 | |||||
| Finishes | |||||
| Division 10 | |||||
| Specialties | |||||
| Division 11 | |||||
| Equipment | |||||
| Division 12 | |||||
| Furnishings | |||||
| Division 13 | |||||
| Special Construction | |||||
| Division 14 | |||||
| Fire Suppression | |||||
| Division 22 | |||||
| Plumbing | |||||
| Division 23 | |||||
| Heat, Ventilating, and Air Conditioning | |||||
| Division 25 | |||||
| Integrated Automation | |||||
| Division 26 | |||||
| Electrical | |||||
| Division 27 | |||||
| Communications | |||||
| Division 28 | |||||
| Electronic Safety and Security | |||||
| Division 31 | |||||
| Earthwork | |||||
| Division 32 | |||||
| Exterior Improvements | |||||
| Division 33 | |||||
| Utilities | |||||
| Bonds |
Overhead
Profit
GRAND TOTALS $ $ $ $ $
File details come from the government source that posted it. Updated .