S02 Attachment 08_Base Offer Price Breakdown_1 Page_Excel Form.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
FY26: NRM (PROJ: 548-23-105) BB Upgrade Interior Signage and Wayfinding
Solicitation number
36C24826Q0483_2
Issued by

About this file

This is a pricing template form for submitting a base offer cost breakdown on a construction project. The Excel spreadsheet is structured to capture labor costs, material costs, and total costs organized by the 16 standard MasterFormat divisions used in construction (General Requirements, Concrete, Masonry, HVAC, Electrical, Plumbing, etc.), along with overhead, profit, and bond percentages. Offerors must enter detailed cost information for each division rather than submitting lump sum amounts, with the form automatically calculating subtotals for divisions, overhead and profit calculations, and the final total base offer cost.

This pricing form applies to solicitation 36C24826Q0483_2 for the VA Medical Center interior signage and wayfinding upgrade project (Project 548-23-105) at the Thomas H. Corey VA Medical Center in West Palm Beach, Florida. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8 is conducting this bid-build project with a mandatory site visit on April 23, 2026, requests for information due April 29, 2026, and proposals due May 19, 2026 at 10:00 AM EST. Contractors must provide all labor, tools, and materials necessary to redesign and upgrade existing interior wayfinding, identification, and regulatory signage in accordance with the Statement of Work.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis