S06 Attachment_ RFI Log 2 - Questions and Answers - 36C24826Q0483_2 pages.pdf
PDF 227 KB Posted
- Solicitation number
- 36C24826Q0483_2
About this file
This is an RFI Log documenting questions and VA responses for a federal contract solicitation regarding interior signage and wayfinding upgrades.
The solicitation (Number 36C24826Q0483) covers FY26 NRM Project 548-23-105, a Building B (BB) upgrade for interior signage and wayfinding at a VA facility. Seven RFIs were submitted between April 30 and May 13, 2026, with VA responses provided on May 18, 2026. Key clarifications include: (1) the contractor is responsible for demolition and removal of existing signage; (2) sign quantities and types are specified on pages 119-239 of the SOW; (3) detailed interior signage drawings must be obtained from the design team as they were not included in the solicitation package; (4) W1/W2 detail specifications are located on pages 82-85 of part 1 of the drawings; (5) sign message information is on pages 119-239; (6) contractors must verify which signs require replacement, with some areas already partially completed (7A, 6B, 1B, 1A, BC units fully replaced; 5A/5B 10 signs, 4B 2 signs, 2A 20 signs, 2B 10 signs, 2C 20 signs, BG 7 signs, BA 5 signs already installed); and (7) the newer 49UH5F-H model revision is acceptable as a substitute for the original 49UH5F-B model for W1/W2 components.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Log #2 – Additional Site Visit FY26 NRM (PROJ 548-23-105) BB Upgrade Interior Signage and Wayfinding
Solicitation Number 36C24826Q0483
RFI
Number
Question VA Response
Reference Sheet, Section of
Detail
Dated Received
1Q: Demolition Scope: Is removal of existing signage included in this package? Typically, demolition is handled by the General Contractor; however, since we are coordinating directly with the VA, we can include demo services if required. Please confirm.
04/30/2026
1R: VA Response: The contractor will be responsible for Demo and removal of old signs.
05/18/2026
2Q: Sign Quantities / Schedule: While we see significant effort put into sign programming and placement, we were unable to locate a signage schedule or key that provides total sign counts.
04/30/2026
2R: VA Response: Sign quantities and type are on pages 119-239.
05/18/2026
3Q: Signage Drawings: We do not see any detailed drawings for the interior signage. Could you advise where these documents can be obtained?
04/30/2026
3R: VA Response: The detailed interior signage drawings were not included in the documents issued. They must be obtained from the design team, as they are referenced in specifications but not provided with the package you received.
05/18/2026
4Q: W1/W2 Details (Ref: Page E-501): The artwork shown appears limited in detail. We were unable to find supporting drawings showing construction methods, internal components, or side/profile details. The specifications also appear fairly generic and do not provide enough clarity for accurate pricing.
04/30/2026
4R: VA Response: Details are on pages 82-85 of part 1 of the drawings.
05/18/2026
5Q: Missing the Sign Message Schedule excel document referenced in the file S02 Attachment 03_SOW Narrative_Redacted_242 Pages.pdf on pages 117 and 118. Please provide.
05/08/2026
5R: VA Response: Sign messages are located on pages 119-239.
05/18/2026
6Q: Please clarify which interior signs have already been installed and do not need to be manufactured.
05/13/2026
RFI Log #2 – Additional Site Visit FY26 NRM (PROJ 548-23-105) BB Upgrade Interior Signage and Wayfinding
Solicitation Number 36C24826Q0483
6R: VA Response: 7A,6B,1B,1A, BC full units have been replaced. 5A/5B- 10signs,4B 2 signs, 2A 20 signs, 2B 10 signs, 2C 20 signs, BG 7 signs, BA 5 signs. It will be contractors responsible for verifying what signs need to be replaced.
05/18/2026
7Q: Regarding W1/W2: The original 49UH5F-B model has largely been replaced by the newer
49UH5F-H revision. Is this acceptable?
05/13/2026
7R: VA Response: Yes 05/18/2026