S02_Attachment 03 Water Tower Blueprint - 1 page.pdf
PDF 861 KB Posted
- Solicitation number
- 36C26324R0074
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to upgrade the water tower at the VA Sioux Falls Health Care System campus. The key requirements include: installing a construction fence, digging to access and potentially replace bypass valves, taking the elevated tank out of service and maintaining water services, installing new manways and a frost roof vent, replacing a section of cast iron fill pipe, installing a tank mixing system, repairing and coating the interior and exterior of the tank, and converting the navigation warning lights to LED. The contractor is required to provide a written plan for bringing the water tower back into potable water service, as well as all necessary certifications, testing results, and reports. The period of performance is 180 calendar days from the notice to proceed, and the contract will be awarded on a Lowest Price Technically Acceptable (LPTA) basis.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .