S02_Attachment 02 Drawings - 12 pages.pdf
PDF 13 MB Posted
- Solicitation number
- 36C26324R0074
About this file
This document is an attachment containing drawings for a federal contract opportunity issued by the Department of Veterans Affairs (VA) for the Upgrade Water Tower (SF) project at the VA Sioux Falls Health Care System (VASFHCS) in South Dakota.
The key details are: The VA requires construction services and oversight to complete updates and repairs to the water tower on the VASFHCS campus, including installing a construction fence, digging to access bypass valves, taking the elevated tank out of service and maintaining water services, installing new manways and a frost roof vent, replacing the fill pipe, installing a tank mixing system, repairing and coating the interior and exterior of the tank, converting the navigation warning lights to LED, and installing a new permanent security fence. The contractor will be required to provide a written plan for bringing the water tower back into potable water service, provide training to VA staff, and deliver final drawings. The period of performance is 180 calendar days from the notice to proceed. This is an SDVOSB open market (non-MATOC) procurement using the Lowest Price Technically Acceptable (LPTA) source selection process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAWING LIST
1i
0 GRID / COLUMN LINE DESIGNATOR
EQUIPMENT NUMBER
DOOR NUMBER
Ga5xFB1
WALL TYPE
WINDOW TYPE
ROOM NAME
ROOM NAME / NUMBER
REVISION TAG
PLAN NORTH
NORTH ARROW WITH TRUE
NORTH INDICATION
EGRESS ROUTE ID AND
SECTION LENGTH
ROOM
ROOM OCCUPANCY
150 SF
EGRESS : EGRESS ID
Egress Length
ROOM OCCUPANCY & AREA
ELEVATION NUMBER
SECTION
INTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
Name Elevation
FLOOR LEVEL &
NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
SHEET KEYNOTE
A101
SIM
EXTERIOR ELEVATION
A-101
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN INDEX OF DRAWINGS
DISCIPLINE:
G - GENERAL
C - CIVIL
SHEET TYPE
DESIGNATOR
VICINITY MAP
PROJECT TEAMBUILDING SUMMARY
PROJECT INFORMATION
THE EXISTING POTABLE WATER STORAGE TOWER IS LOCATED ON THE CAMPUS OF THE VA HOSPITAL IN SIOUX FALLS SOUTH DAKOTA. A THIRD PARTY INSPECTION REPORT OF THE TOWER CONDITION DATED NOVEMBER 4, 2020 WAS PERFORMED BY LIQUID ENGINEERING CORPORATION AND IDENTIFIES SEVERAL DEFICIENCIES THAT THE VA INTENDS WITH THIS PROJECT TO RECTIFY. THESE DEFICIENCIES INCLUDE ACCESS LADDER, RAILING HEIGHTS, ACCESS MANWAYS, INTERIOR ACCESS LADDER, ANCHOR BOLT CONNECTIONS, SEALING OF THE CONCRETE FOUNDATIONS, SCREENING OF THE OVERFLOW PIPE, ADJUSTMENT OF THE WINDAGE RODS, INSTALLATION OF A LEVEL INDICATOR, REPLACING OF THE ROOF VENT, REPLACING OF THE TANK DRAIN, INSTALLATION OF A MIXING SYSTEM, REPLACEMENT OF THE CATHODIC PROTECTION SYSTEM, AND PAINTING OF THE INTERIOR AND EXTERIOR SURFACES OF THE STRUCTURE. THIS TASK ORDER CHARGE IS TO EVALUATE THIS SCOPE, RECOMMEND REMEDIES AND PREPARE PLANS, SPECIFICATIONS, AND BIDDING DOCUMENTS FOR THE APPROVED REMEDIES.
ANNOTATION DRAWING SYMBOLSGENERAL NOTES
PROJECT NAME: AE UPGRADE WATER TOWER (SF)
PROJECT NUMBER: 438-23-350
PROJECT LOCATION: STATION 438 - SIOUX FALLS, SD
PROJECT PURPOSE/USE: THIS PROJECT IS TO ROUTE A TWO NEW 800A FEEDERS FROM THE PARALLELING SWITCHGEAR
50 IN BUILDING B50 AND CONNECT TO SWITCHBOARD SWBD-1 IN BUILDING 5, ROOM B66.
1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW
ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.
2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED BEFORE
SUBMITTING COST QUOTATIONS FOR WORK.
3. NOTIFY THE COR PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE
PROVIDED PRIOR TO CONTINUING WITH WORK.
4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE COR.
5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.
6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE.
7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.
8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE COR IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH RESPECT TO
DELIVERY DATE, QUALITY, OR COST.
9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S
MEANS AND METHODS OR FOR TEMPORARY STRUCTURES.
10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL
EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.
11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA
REGULATIONS DURING CONSTRUCTION.
12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE.
A101
A101
SCOPE OF WORK SUMMARY:
SHEET NUMBER
WITHIN SERIES
CS101
SIOUX FALLS VA MEDICAL CENTER
W 26TH ST
W 22nd ST
S G
A R
F
IE
L D
A V
EAREA OF
WORK
NORTH
Romanyk Consulting Focusing on what matters
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
8910 7 6 5 4 3 2 1
U.S. Department of Veterans Affairs
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Spinklered
Office of Construction and Facilities Management
01 12
R R o m a n y k C o n s u lt in g \R
C C
A E
C
V
IS
N \V
IS
N
\0
A c ti v e
P ro je c ts
\S F
S D
-4
C
-U p g ra d e W a te r T o w e r\
D e s ig n \0
M o d e ls
\S io u x F a lls
U p g ra d e
W a te r
T o w e r C
O V
E R
S H
E E
T v
.r v t
/1
/2
:4
:3
P
M
AE UPGRADE WATER TOWER (SF)
PROJECT NUMBER - 438-23-350
FINAL BIDDING DOCUMENTS
FEBRUARY 1, 2024
AW DAW
438-23-350
10-GI100
438 - SIOUX FALLS, SD
JANUARY 15, 2024
PROJECT COVER SHEET FINAL BIDDING
DOCUMENTS
AE UPGRADE WATER TOWER (SF)
CIVIL ENGINEER:
IMEG Corp.
1138 Columbus Street St. Louis, MO 63143
Jack Kusek, PE, PLS John.A.Kusek@imegcorp.com
815.770.5795 x35795
815.343.9014 cell
PROJECT MANAGER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com
855.424.3838 x324
319.721.4986 cell
OWNER:
Department of Veteran Affairs - Network Contracting Office NCO23 3600 30th Street Des Moines IA 50310
SHEET # SHEET TITLE
GENERAL
10-GI100 PROJECT COVER SHEET
10-GI101 NOTES & SCHEDULES
CIVIL
10-CS102 LOCATION MAP
10-CS103 SITE PLAN & TOWER IMPROVEMENTS
10-CS104 PIPE RACK DETAIL AND NOTES
10-CS105 FENCING & SIGNAGE
10-CS106 COMMUNICATION EQUIPMENT PROTECTION
10-CU107 GENERAL TOWER RENOVATION PLAN
10-CU108 DETAILS
10-CU109 FROST FREE ROOF VENT DETAILS
10-CU110 FILL PIPE & SIGNAGE DETAILS
10-CU111 WATER TOWER PLATFORM STRUCTURAL DETAILS
Grand total: 12
1410 WEST RUSSELL STREET
SIOUX FALLS, SD 57104
605-331-2505 www.imegcorp.com
CONTRACTING OFFICER REP. (COR):
VA Sioux Falls Health Care System - Royal C. Johnson Veterans' Memorial Hospital 2501 West 22nd Street Sioux Falls, SD 57105-5046
605-336-3230 Larry Galero
Larry.Galero@va.gov 605-336-3230
STRUCTURAL ENGINEER:
IMEG Corp.
1138 Columbus Street St. Louis, MO 63143
Ali Gharamti Ali.Gharamti@imegcorp.com
815.770.5795
Revisions: Date:
STAMP
ng H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
NOTES & SCHEDULES
10-GI101
GENERAL NOTES
LEGEND OF SYMBOLS USED
STATEMENT OF WORK SUMMARY
RESPONSIBILITY MATRIX
PHASING PLAN
CONSTRUCTION FENCE W/ GATE
PERMANENT SECURITY FENCE W/ GATE
BOLLARD
DESCRIPTION OF DEMOLITION TASKS
RESPONSIBILITY MATRIX
ITEM NO. TASK ITEM RESPONSIBLE PARTY
1 Protect Communications Bdlg under tower State of S.D.
2 Remove protective coverings from bldg upon completion of project State of S.D.
3 Relocate condensor unit for communications bldg State of S.D.
4 Replace condensor unit at communications building State of S.D.
5 Install temporary construction fencing General contractor
Remove temporary fencing and remove from site upon completion of project
General contractor
7 Install permanent fencing upon completion of project General contractor 8 Furnish, install and maintain temporary pressure tank system General contractor
Remove temporary pressure tank system upon completion of project General contractor
10 Isolate, and drain elevated tank and close valves VA
11 Lockout/Tagout valves closed by VA VA, General contractor and applicable sub-contractor
12 Disinfect and test temporary tank General contractor (also provide documentation to COR)
13 Replace aviation warning lights on tank with LED General contractor
14 Remove cathodic protection anodes and control panel General contractor
15 Furnish, install and commission tank mixing system General contractor 16 Fabricate and install frost free vent on top of elevated tank General contractor
17 Fabricate and install two manways on elevated tank sidewall General contractor
18 Fabricate and install ladder platforms General contractor 19 Furnish and install signs to fence and to ladder gate on tower General contractor 20 Remove tank drain valve from center tank riser General contractor 21 Remove valve and piping from valve vault below center tank riser General contractor 22 Remove sediment from vault below center tank riser General contractor 23 Install new valves, piping and fittings in vault below center tank riser General contractor 24 Remove interior wet ladder if one exists General contractor 25 Install protective shroud on elevated tank structure General contractor 26 Prepare exterior and interior tank surfaces and recoat General contractor
27 Disinfect and test elevated tank General contractor (also provide documentation to COR)
Remove tank shroud, construction debris, and clean construction site General contractor
29 Fill elevated tank VA
30 Check for leaks and resolve any punch list items General contractor
PHASING PLAN
NO. TASK
Install temporary construction fencing. Construction fence to be completed before any other work is allowed to begin.
2 Protect Communications Bdlg under tower 3 Relocate condensor unit for communications bldg 4 Furnish, install and maintain temporary pressure tank system 5 Disinfect and test temporary tank 6 Isolate, and drain elevated tank 7 Replace aviation warning lights on tank with LED 8 Remove cathodic protection anodes and control panel 9 Fabricate and install frost free vent on top of elevated tank
10 Fabricate and install two manways on elevated tank sidewall 11 Fabricate and install ladder platforms 12 Remove tank drain valve from center tank riser & plug outlet 13 Remove valve and piping from valve vault below center tank riser 14 Remove sediment from vault below center tank riser
15 Install new valves, piping and fittings in vault below center tank riser
16 Remove interior wet ladder if one exists
17 Install protective full shroud on elevated tank structure
18 Prepare exterior and interior tank surfaces and recoat 19 Furnish, install and commission tank mixing system 20 Disinfect and test elevated tank
21 Remove tank shroud, construction debris, and clean construction site
22 Fill elevated tank
23 Install permanent fencing
24 Remove temporary fencing and remove from site 25 Furnish and install signs to fence and to ladder gate on tower 26 Check for leaks and resolve any punch list items
27 Remove temporary pressure tank system upon completion of project
28 Remove coverings and replace condensor
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
LOCATION MAP
10-CS102
VETERANS ADMINISTRATION HOSPITAL
NOT TO SCALE
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
SITE PLAN & TOWER IMPROVEMENTS
10-CS103
S G
AR
FI
EL
D
A
VE
INSTALL TEE AND GATE VALVE ON BOOSTER
PUMP DISCHARGE HEADER INSIDE BOILER
BUILDING WITH CAM LOCK FITTING FOR FLEXIBLE
HOSE TO TEMPORARY PRESSURE TANK
WATERMAIN LOCATION DETAIL
N.T.S
PIPE RACK DETAIL AND NOTES
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
10-CS104
DESCRIPTION OF TEMPORARY POTABLE WATER STORAGE SYSTEM
DESCRIPTION OF TEMPORARY STORAGE SYSTEM WORK
SCHEDULE
MOBILIZATION & DE-MOBILIZATION
TEMPORARY STORAGE SYSTEM
MAINTAIN & OPERATE TEMPORARY SYSTEM
ACCEPTABLE TEMPORARY STORAGE SYSTEM SUPPLIERS
EXISTING PIPE RACK INSIDE BOILER
BUILDING ELEVATION VIEW
S G
AR
FI
EL
D
A
VE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
FENCING & SIGNAGE
10-CS105
NOTES:
TYPICAL FENCE TERMINAL
AT BUILDING CORNER DETAIL
NOT TO SCALE
S G
AR
FI
EL
D
A
VE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
COMMUNICATION EQUIPMENT PROTECTION
10-CS106
GENERAL TOWER RENOVATION PLAN
CONCEPTUAL TOWER RENOVATION PLAN
N.T.S
NOTES:
(NOTE:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
10-CU107
SURFACE PREPARATION & PAINTING SPECIFICATIONS
EXTERIOR SURFACES - MASTIC COATING SYSTEM
INTERIOR SURFACES - ELASTOMERIC COATING SYSTEM
CONFINED
SPACE
AUTHORIZED PERSONNEL ONLY
DANGER
VIEW OF TOWER LOOKING NORTH
TOP VIEW OF WATER TOWER
DETAILS
AA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
10-CU108
A
A
B
B
WET RISER MANWAY HATCH DETAIL
N.T.S
SECTION A-A
COVER
N.T.S
SECTION B-B
TANK FLANGE
N.T.S
NOTES:
10-CU108
FILL PIPE ADAPTER DETAIL
N.T.S
10-CU108
TYPICAL FENCING DETAIL
N.T.S
TYPICAL FENCE & BOLLARD DETAIL
N.T.S
TYPICAL SINGLE SWING GATE DETAIL
N.T.S
TYPICAL DOUBLE SWING GATE DETAIL
N.T.S
10-CU108
10-CU108
10-CU108
10-CU108
TYPICAL BOLLARD DETAIL
N.T.S
10-CU108
10-CU108
CHAIN ANCHOR &
PIVOT JOINT DETAIL
N.T.S
10-CU108
PIVOT JOINT SIDE VIEW
PIVOT JOINT BASE
(TYP. VIEW)
MANWAY VAULT BRACKET DETAIL
FROST FREE ROOF VENT DETAILS
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
10-CU109
FROST FREE ROOF VENT DETAIL
N.T.S
10-CU109
FROST FREE ROOF VENT
WELDING DETAIL
N.T.S
10-CU109
FROST FREE ROOF VENT DETAIL
N.T.S
10-CU109
10-CU109
FROST FREE ROOF VENT DETAIL
FILL PIPE & SIGNAGE DETAILS
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
10-CU110
WARNING!
TAMPERING WITH
THIS FACILITY
IS A
FEDERAL
OFFENSE!
US CODE TITLE 42, SECTION 300i-1
NO TAMPERING SIGN DETAIL
N.T.S
DANGER
CONFINED
SPACE
AUTHORIZED PERSONNEL ONLY
CONFINED SPACE SIGN DETAIL
N.T.S
VAULT PIPING DETAIL
N.T.S
10-CU110
10-CU110
10-CU110
WATER TOWER
PLATFORM-STRUCTURAL DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
Fi le P at h
6/
/2
:3 9:
P
M
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
JAK DJP/JJP
Revisions: Date:
438-23-350 of
SIOUX FALLS, SOUTH DAKOTA
FEBRUARY 1, 2024
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Romanyk Consulting Focusing on what matters
0' 1'
2' 6"
Gr ap hi c S ca le
: 1
1' -0
0' 1'
2' 6"
Gr ap hi c S ca le
: 3 /4"
1'
-0
0' 2'
4' 1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 3 /8"
1'
-0
0' 2'
1' 4'
Gr ap hi c S ca le
: 1 /4"
1'
-0
0' 8'
4' Gr ap hi c S ca le
: 1 /8"
1'
-0
0'
8' Gr ap hi c S ca le : 1
/16
1' -0
0' 4"
8" 1'
2'
Gr ap hi c S ca le
: 3 /32
1'
-0
0' 1'
6" 3"
1'
Gr ap hi c S ca le
: 1 /2"
1'
-0
Spinklered
Office of Construction and Facilities Management
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
FINAL BIDDING DOCUMENTS UPGRADE WATER TOWER
H S
REGISTERED
ENGINEER
L
PROFESSIONAL
P.
I
XE
J O
ON
L I
I S
E
- 2
42141
K
N
A. KU
2/1/24
10-CU111
WATER TOWER PLATFORMS
STRUCTURAL DETAILS
SCALE: 3/4" = 1'-0"
B
SECTION A-A SECTION B-B
B
A
A
TOE GUARD DETAIL - 1 REQ
N.T.S
1. STRUCTURAL STEEL SHALL BE DETAILED IN ACCORDANCE WITH THE AMERICAN
INSTITUTE OF STEEL CONSTRUCTION (AISC) “ DETAILING FOR STEEL
CONSTRUCTION ” AND FABRICATED AND ERECTED IN ACCORDANCE WITH THE “
SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS ” .
2. STRUCTURAL STEEL SHALL CONFORM TO ASTM STANDARDS AS NOTED BELOW:
WIDE FLANGE SHAPES ASTM A992 Fy = 50 KSI OTHER ROLLED SHAPES ASTM A36 Fy = 36 KSI
ELECTRODES FOR ARC WELDING AWS 5.1, E70XX
3. ALL WELDS SHALL CONFORM TO THE AMERICAN WELDING SOCIETY “ STRUCTURAL
WELDING CODE - STEEL ” (AWS D1.1), “ STRUCTURAL WELDING CODE - SEISMIC
SUPPLEMENT ” (AWS D1.8), AND BE MADE WITH APPROVED ELECTRODES.
4. ALL WELDING OF STRUCTURAL STEEL SHALL BE PERFORMED BY CERTIFIED
WELDERS WITH EXPERIENCE AND CERTIFICATION IN THE TYPES OF WELDING
CALLED FOR. WELDERS SHALL HAVE BEEN RECENTLY QUALIFIED AS PRESCRIBED
IN “ QUALIFICATION PROCEDURES ” OF THE AMERICAN WELDING SOCIETY (AWS).
STEEL NOTES
1. INSTALL PLATFORM TO NOT INTERFERE WITH CROSS FRAMING.
2. IT SHALL BE CONTRACTORS RESPONSIBILITY TO PAINT
PLATFORM IN ITS ENTIRETY. COORDINATE COLOR WITH OWNER.
3. SEE PAINTING SPECIFICATIONS ON SHEET 10-CU107.
4. INSTALL PLATFORM TO BE IN A LEVEL POSITION.
5. CUT OUT AND REMOVE LATTICE BARS IN CONFLICT WITH
CHANNEL INSTALLATION.
6. WELD CHANNELS PLUMB TO EXISTING TOWER LEG. SHIM WHEN
NECESSARY.
7. ALL WELDS TO BE 3/16" UNLESS NOTED OTHERWISE.
8. ALL CHANNELS TO BE 6x8.2
PLAN NOTES
PLAN VIEW
TOE GUARD DETAIL - 2 REQ
N.T.S
TOE GUARD WELDING DETAIL - TYPICAL
N.T.S
SQUARE TUBE GUARD RAIL SECTION
| 10-GI100 |
| Cover |
| 10-GI101 |
| General Notes |
| 10-CS102 |
| C-1 LOCATION MAP |
| 10-CS103 |
| 10CS103-SITE PLAN & WM LOCATION |
| 10-CS104 |
| 10CS104 - PIPE RACK DETAIL |
| 10-CS105 1 |
| 10CS105-SIGNAGE & FENCING |
| 10-CS106 |
| 10CS106-COMM EQUIP PROTECTION |
| 10-CU107 |
| 10CU107-GENERAL TOWER RENOVATION PLAN |
| 10-CU108 |
| 10CU107-FILL PIPE ADAPTER DETAIL |
| 10-CU109 |
| 10CU109-FROST FREE ROOF VENT DETAIL |
| 10-CU110 |
| 10CU110-FILL PIPE DETAILS |
| 10-CU111 |
| 10CU111-WTR TWR PLATFORM STR DTLS |
File details come from the government source that posted it. Updated .