This document package includes construction drawings and specifications for the replacement of a chiller plant at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan.
The project involves demolishing the existing 250-ton chiller, pumps, piping, and controls and installing a new 350-ton air-cooled chiller, chilled water pumps, associated piping to connect the new equipment to existing mains, and updated control systems. Additional work includes new concrete pads, piping supports, insulation, and tie-ins. Drawings provide demolition, new work, and detail plans for the sub-basement, basement, and various floor mechanical rooms. Specifications cover equipment, materials, testing, balancing, warranties and other requirements.
The solicitation number is 36C25223B0003 for Phase 2 construction with an estimated value over $2 million. The Department of Veterans Affairs Veterans Health Administration VISN 12 is listed as the contracting agency. The incumbent is not specified. Responses are due by November 16, 2022 according to the document dates.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHERE (2) STUD MOUNTED
DEVICES ARE SCHEDULED,
ALIGN HEIGHTS OF FINISHED
PRODUCT.
WHERE MULTIPLE DEVICES
ARE SCHEDULED TO OCCUR
WITHIN 16" OF EACH OTHER,
ALIGN DEVICES ON (1) FACE
OF STUD
STUDS
DOOR
WHERE MULTIPLE DEVICES ARE SCHEDULED,
ALONG A DOOR, DEVICES SHALL BE ALIGNED ON (1)
FACE OF METAL STUD AND SHALL OCCUR AT
SWING/ LATCH SIDE OF DOOR. EXC THERMOSTATS
ROOM
CORRIDOR
WHERE MULTIPLE DEVICES
ARE SCHEDULED IN CLOSE
PROXIMITY IN HEIGHT, ALIGN
DEVICES.
POSITION ROOM THERMOSTAT TO
ALIGN TOP OF THERMOSTAT WITH
LIGHT SWITCH COVER PLATE
WHERE MULTIPLE DEVICES ARE
SCHEDULED IN CLOSE PROXIMITY IN
HEIGHT, ALIGN DEVICES.
4' -0
" T O
T O
P
ITEMS ARE TO BE LOCATED ABOVE UNLESS NOTED OTHERWISE
TITLE SHEET - PHASE 2
G001-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
NOVEMBER 16, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
REPLACE CHILLER PLANT PHASE 2,
OSCAR G. JOHNSON VA MEDICAL CENTER
IRON MOUNTAIN, MI 49801
BID DOCUMENTS
NOVEMBER 16, 2022
SHEET INDEXGENERAL NOTES
DIRECTOR
ASSOCIATE DIRECTOR
ASSOCIATE DIRECTOR FOR N&PCS
CHIEF OF POLICE
CHIEF OF ENGINEERING
INFECTION CONTROL NURSE
PATIENT SAFETY
A.F.G.E.
INDUSTRIAL HYGIENIST
APPROVALS
CHIEF OF STAFF
SAFETY
VERIFY ALL DIMENSIONS RELATING NEW CONSTRUCTION TO EXISTING CONSTRUCTION.1.
GENERAL TRADE SHALL PATCH HOLES IN SLABS, PARTITIONS, AND CEILINGS CAUSED BY ANY TRADE AS FOLLOWS:2.
A). AT REMOVED DUCTWORK, CONDUIT, AND PIPING
B). AT NEW DUCTWORK, CONDUIT AND PIPING IN EXISTING PARTITIONS
C). AT ADDED OR REMOVED PARTITION MOUNTED ITEMS
WHERE EXPOSED TO VIEW, PATCHED SURFACES SHALL MATCH ADJACENT FINISHES. WORK SHALL MAINTAIN EXISTING
SEPARATION RATINGS.
3.
GENERAL TRADE SHALL REMOVE ACOUSTICAL TILE AND PLASTER CEILINGS WHERE REQUIRED FOR MECHANICAL OR ELECTRICAL TRADES. REINSTALL ACOUSTICAL TILE AND PATCH PLASTER WHEN WORK ABOVE CEILING
HAS BEEN COMPLETED.
4.
CONSTRUCTION IN SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT IS CURRENTLY IN PROGRESS. ACTUAL
EXISTING CONDITIONS MAY VARY FROM CONDITIONS INDICATED ON THESE DRAWINGS.
5.
SEE SPECIFICATION SECTION 01 35 26 FOR INFECTION CONTROL. SEE SPECIFICATION SECTION 01 00 00 FOR PHASING AND WORK
TIME LIMITATIONS
6.
FOR MOUNTING HEIGHTS AND LOCATIONS OF DEVICES PROVIDED BY OTHER TRADES, SEE7.
WHERE MECHANICAL EQUIPMENT DOES NOT ALLOW STUDS TO EXTEND TO STRUCTURE, PROVIDE STRUCTURAL METAL STUD BOX HEADER BENEATH ALL EQUIPMENT. BOX HEADER SHALL BE CONSTRUCTED OF (2) STRUCTURAL STUDS LAID ON THEIR BACK SIDE UTILIZING THE SAME DIMENSION STUDS AS THE WALL BE CONSTRUCTED (IE, 3 5/8"). OPENINGS BETWEEN 8'-0" AND 12'-0" SHALL UTILIZE .0451 THICKNESS
STUDS. OPENINGS LESS THAN 8'-0" SHALL UTILIZE .0346 THICKNESS STUDS.
8.
ALL CONTRACTORS UTILIZING ELECTRONIC DRAWING SETS ARE RESPONSIBLE TO CONFIRM DRAWINGS ARE PRINTED/INSERTED INTO OTHER SOFTWARE TO SCALE. CONSTRUCTION DRAWINGS ON FULL SIZE SHEETS ARE TO BE 24" X 36" OR 30" X 42" WHEN
PRINTED AT 1:1. A SCALE VERIFICATION IS PROVIDED BELOW.
9.
C5 G001-2
G001-2
C5 DEVICE MOUNTING SCHEDULE
1/4" = 1'-0" 2'0" 1' 4' 6'
4'0" 2' 8' 12'
2'0" 1' 4' 6'
1'0" 6" 2' 3'
8"0" 4" 16" 24"
6"0" 3" 12" 18"
4"0" 2" 8" 12"
2"0" 1" 4" 6"
1/8" = 1'-0"
1/4" = 1'-0"
1/2" = 1'-0"
3/4" = 1'-0"
1" = 1'-0"
1 1/2" = 1'-0"
3" = 1'-0"
SCALE VERIFICATION
10. FURNISH AND INSTALL FIRESTOPS IN WALLS, FLOORS, AND PARTITIONS AND AROUND PENETRATIONS OF PIPE, DUCT, CABLE AND OTHER ELECTRICAL DEVICES OR IN BLANK OPENINGS AS INDICATED AT FIRE RATED LOCATION ON THE REFLECTED CEILING PLAN. FIRE STOPPING SHALL BE INSTALLED AND TESTED AS LISTED IN ASTM E814, E119, AND UNDERWRITERS LABORATORIES: FIRE RESISTANCE DIRECTORY. WHERE THERE IS NO SPECIFIC THIRD PARTY TESTED ASSEMBLY, ENGINEERING JUDGEMENTS SHALL BE BASED UPON THE REFERENCED DOCUMENTS AND MUST BE PROVIDED VIA THIRD PARTY AND SUBMITTED TO THE AHJ FOR APPROVAL PRIOR TO INSTALLATION. COSTS ASSOCIATED WITH THE ENGINEERING JUDGEMENT SHALL BE THE RESPONSIBILITY OF THE FIRESTOPPING TRADE. FIRESTOPPING OF ALL PENETRATIONS SHALL BE BY A LICENSED FIRESTOPPING TRADE. UPON COMPLETION OF THE FIRESTOPPING SYSTEM, PROVIDE A RECORD IN THE O&M MANUAL OF THE INSTALLED SYSTEMS INDICATING THE UL REFERENCE, LOCATION OF THE PENETRATION AND INSTALLED HOURLY RATING. ALL PENETRATIONS SHALL BE LABELED WITH A PERMANENT TAG INDICATED THE HOURLY RATING, SYSTEM REFERENCE NUMBER, INSTALLERS NAME, ADDRESS, PHONE NUMBER AND DATE OF INSTALLATION. TAGS SHALL BE LABELED WITH “WARNING FIRESTOPPING DO NOT
DISTURB. NOTIFY BUILDING MANAGEMENT OF ANY DAMAGE” OR SIMILAR.
A. FIRESTOPPING MATERIALS SHALL CONFORM TO FLAME (F) AND TEMPERATURE (T) RATINGS AS REQUIRED BY LOCAL BUILDING CODE AND AS TESTED BY NATIONALLY ACCEPTED TEST AGENCIES PER ASTM E814, UL 1479, OR UL 2079. THE F RATING MUST BE A MINIMUM OF ONE
(1) HOUR BUT NOT LESS THAN THE FIRE RESISTANCE RATING OF THE ASSEMBLY BEING PENETRATED. T RATING, WHEN REQUIRED BY CODE AUTHORITY, SHALL BE BASED ON THE MEASUREMENT OF THE TEMPERATURE RISE ON THE PENETRATING ITEM(S). THE FIRE TEST
PRESSURE DIFFERENTIAL OF A MINIMUM 0.01" OF WATER COLUMN IS REQUIRED.
B. T AND F RATINGS AT FLOOR PENETRATIONS SHALL BE EQUAL AND NOT LESS THAN 2 HOUR.
C. PENETRATIONS THRU WALL SHALL HAVE AN F RATING EQUAL TO THAT OF THE RATED WALL ASSEMBLY D. SYSTEM SHALL WITHSTAND THE PASSAGE OF COLD SMOKE EITHER AS AN INHERENT PROPERTY OF THE SYSTEM OR BY THE USE OF E. SEPARATE PRODUCT INCLUDED AS A PART OF THE UL SYSTEM OR DEVICE AND DESIGNED TO PERFORM THIS FUNCTION.
1.1. AT SMOKE BARRIER WALLS - 1S, 2S, AND 3S WALLS IN HOSPITAL OCCUPANCY, WALL ASSEMBLIES MUST HAVE A MAXIMUM L RATING OF 50
CFM PER 100SF OF WALL ASSEMBLY.
F. SMOKE RATED WALLS SHALL BE SEALED WITH A PRODUCT TO RESIST THE PASSAGE OF SMOKE.
G. FIRESTOPPING PRODUCTS SHALL BE ASBESTOS-FREE, FREE OF ANY PCBS, AND FREE OF ANY LEAD.
H. FOR ALL CABLING FIRE PENETRATIONS AT WALLS, PROVIDE THE EZ-PATH FIRE RATED PATHWAY SYSTEM BY SPECIFIED TECHNOLOGIES, INC. OR EQUIVALENT SYSTEM BY HILTI CORPORATION.
12. PROVIDE MANUFACTURER'S STANDARD WARRANTY ON ALL ITEMS.
13. REMOVE ALL WALL OUTLETS AND SWITCH COVERS AS REQUIRED FOR REPAINT; REINSTALL COVERS UPON COMPLETION OF
WORK
14. INFILL ALL NAIL HOLES IN WALLS SCHEDULED FOR NEW FINISH
11. WHERE MECHANICAL AND ELECTRICAL PENETRATIONS THROUGH FLOOR SLABS ARE REMOVED, OR CUT FOR NEW WORK, PATCH HOLES
THROUGH THE SLAB.
B. FILL HOLES 3" TO 12" IN DIAMETER WITH CLASS B CONCRETE. ANCHOR TO SLAB WITH TWO NO. 4 DOWELS.
C. FILL HOLES 12" X 12" TO 36" X 36" WITH NO. 4 DOWELS, 8" O.C. BOTH WAYS.
15. THE SEALANT SCHEDULE IN NO WAY LISTS EVERY SEALANT JOINT CONDITION REQUIRED ON THIS PROJECT AND DOES NOT RELIEVE THE CONTRACTOR RESPONSIBILITY TO CAULK ITEMS AS INDICATED IN DETAILS. REFERENCE DETAILS AND NOTES FOR REQUIRED SEALANT LOCATIONS. UNLESS NOTED OTHERWISE PROVIDE SEALANT PER THE BELOW SCHEDULE APPROVED FOR USE WITH MATERIAL INSTALLED AGAINST (USE M-MORTAR, G-GLASS, A-ALUMINUM, O-OTHER (LIST ACCEPTABLE SUBSTRATES AND PREPARATIONS)). PRIOR TO INSTALLATION OF SEALANT, CONTRACTOR SHALL PROVIDE A SEALANT SCHEDULE SHOWING PRODUCT SELECTION, MANUFACTURER'S APPROVAL FOR MATERIAL USAGE (PROVIDE PRIMER IF REQUIRED) AND WITH MANUFACTURERS FULL SELECTION OF COLORS SUBMITTED TO THE ARCHITECT FOR REVIEW FOR EACH APPLICATION:
D. ALL HOLES TO BE FILLED IN STRUCTURAL FLOOR SLABS SHALL BE FILLED OR FORMED IN SUCH A MANNER AS
TO PREVENT NEW CURED CONCRETE FROM FALLING TO FLOOR BELOW.
E. PATCH EXISTING SLABS ON GRADE WHERE FLOOR HAS BEEN CUT FOR PLUMBING, HEATING AND OTHER REMODELING WORK. REINFORCE CUTS GREATER THAN 24" IN EACH DIRECTION WITH 6 X 6 WL.4 X WL.4 WIRE MESH. REINFORCE TRENCHES LESS THAN 24" WIDE WITH TWO #3 RODS CONTINUOUS. REPAIR UNDERSLAB
VAPOR RETARDER WITH MATERIAL EQUAL TO ORIGINAL INSTALLATION.
A. FILL HOLES 3" AND SMALLER IN DIAMETER WITH NON-SHRINK GROUT.
1. ALL PRESENT SERVICES INSTALLED AND OPERATING SHALL BE KEPT
IN OPERATION THROUGH THE NEW CONSTRUCTION UNTIL EQUAL
NEW SERVICES OR TEMPORARY LINES SATISFACTORY TO OWNER
ARE INSTALLED AND OPERATING
2. PARTITIONS SHOWN TO BE REMOVED SHALL BE COMPLETELY
REMOVED FROM STRUCTURE ABOVE TO STRUCTURAL FLOOR SLAB
3. CUT OPENINGS IN EXISTING WALLS. OPENINGS IN MASONRY AND
CONCRETE SHALL BE SAWCUT; EXECUTE WORK WITH A MINIMUM
DISTURBANCE TO EXISTING CONSTRUCTION WHICH REMAINS
4. UNLESS NOTED OTHERWISE ON THE PLANS, REMOVE EXISTING BASE
AS REQUIRED TO INSTALL NEW BASE. BASE SHALL BE REMOVED
DOWN TO ORIGINAL FINISHED WALL SURFACE; REMOVE ALL
ADHESIVE RESIDUE WHICH WILL INTERFERE WITH INSTALLATION OF
NEW BASE
5. ALL MATERIALS, RUBBISH, AND DEBRIS SHALL BE REMOVED FROM
THE BUILDING AND FROM THE PREMISES AS SOON AS IT
ACCUMULATES; REMOVAL OF RUBBISH AND DEBRIS SHALL BE
CONDUCTED IN SUCH A WAY THAT A MINIMUM OF DUST IS CAUSED
6. MAINTAIN OWNER OCCUPIED AREAS AS CLEAN AS POSSIBLE TO
AVOID INTERFERENCE WITH OWNER'S OPERATIONS
DEMOLITION NOTES
SEALANT SCHEDULE
SILICONE - 50% MOVEMENT -
CLASS 50
SILICONE - 25%
MOVEMENT/MILDEW
RESISTANT - CLASS
SINGLE
COMPONENT
URETHANE - 35%
MOVEMENT -
CLASS 35
MULTI-COMPONENT
URETHANE - 50%
MOVEMENT - CLASS
TAMPER RESISTANT
URETHANE - 12.5%
MOVEMENT CLASS
12.5 , ASTM D-412
375 TENSILE
STRENGTH
TAMPER PROOF
EPOXY - 0%
MOVEMENT CLASS 0
ASTM C-882 3530
BOND STRENGTH
LATEX - NO MOVEMENT -
CLASS 12.5
ACOUSTICAL
SEALANT -
NON-HEAD OF
WALL - 12.5%
MOVEMENT
ACOUSTICAL SEALANT
- HEAD OF WALL -
EXPANSION JOINTS -
33% MOVEMENT
BUILDING
INTERIOR -
UTILIZE
TAMPER
RESISTANT/
PROOF
PRODUCTS
ONLY IN
PSYCHIATRIC
CARE AREAS
BELOW
CEILING
LINES
JOINT BETWEEN SILLS AND
EXTERIOR FENESTRATIONS:
GRADE NS
JOINTS BETWEEN
PLUMBING FIXTURES
AND ADJOINING
MATERIALS: GRADE
NS
CONTROL JOINTS
SCHEDULED TO
BE CAULKED:
GRADE NS
EXPANSION JOINTS
NOT EXPOSED TO
UV: GRADE NS -
VERTICAL (AND
CEILING), GRADE P,
USE T - HORIZONTAL
CONTROL JOINTS/
EXPANSION
SCHEDULED TO BE
CAULKED: GRADE
NS AT VERTICAL,
GRADE P USE T AT
HORIZONTAL
JOINT BETWEEN
WALLS AND
ACOUSTICAL GRID:
GRADE NS
INTERIOR DOOR FRAMES
NOT EXPOSED TO UV, AT
INTERSECTION OF WALL
AND FRAME: GRADE NS, P
TYPICAL. USE SINGLE
COMPONENT URETHANE
SEALANT GRADE NS, T AT
FLOOR INTERSECTION
WALL
PERIMETERS
HEAD OF WALL JOINTS
JOINT BETWEEN INTEGRAL
BASE AND DOOR FRAMES:
GRADE NS
VERTICAL JOINTS AT
INSIDE CORNERS OF
CERAMIC TILE
CONDITIONS: GRADE
NS
PENETRATIONS
OF MECHANICAL
EQUIPMENT IN
SMOKE TIGHT
WALLS: GRADE
NS
JOINTS BETWEEN
DIS-SIMILAR
MATERIALS: GRADE
NS
INTERIOR DOOR
FRAMES NOT
EXPOSED TO UV, AT
INTERSECTION OF
WALL AND FRAME:
GRADE NS, P
TYPICAL.
JOINTS WHERE NO
MOVEMENT IS EXPECTED:
GRADE NS
SMOKE RESISTANT
EXPANSION JOINTS
(WHERE SILICONE
SEALANTS ARE NOT
UTILIZED)
EXPANSION JOINTS EXPOSED
TO UV: GRADE NS VERTICAL,
GRADE P USE T - HORIZONTAL
JOINT BETWEEN
TILED FLOOR AND
WALL
INTERSECTIONS:
GRADE NS, USE T
TERMINATION OF
VINYL WALL
COVERING:
GRADE NS
BETWEEN
COUNTERTOP AND
WALL SURFACES,
JOINTS BETWEEN
SILLS AND
EXTERIOR
FENESTRATIONS:
GRADE NS
JOINTS WHERE NO
MOVEMENT IS
EXPECTED: GRADE
NS
JOINTS BETWEEN DIS-SIMILAR
MATERIALS SUBJECT TO UV
EXPOSURE: GRADE NS
BETWEEN
COUNTERTOP AND
WALL SURFACES:
GRADE NS
JOINT BETWEEN
WALLS AND
ACOUSTICAL
GRID: GRADE NS
JOINTS BETWEEN
PLUMBING
FIXTURES AND
ADJOINING
MATERIALS: GRADE
NS
JOINTS BETWEEN
DIS-SIMILAR
MATERIALS NOT
SUBJECT TO UV
EXPOSURE:
GRADE NS
JOINT BETWEEN
INTEGRAL BASE
AND DOOR FRAMES:
GRADE NS
1. SUBMIT SEALANT SCHEDULE PRIOR TO INSTALLATION OF SEALANTS INDICATING WHERE SEALANT IS SCHEDULED TO BE INSTALLED FOR APPROVAL. PROVIDE ACTUAL SAMPLES FOR COLOR SELECTION FROM FULL RANGE OF COLORS FOR EACH SEALANT SCHEDULED TO BE INSTALLED. SEALANTS MUST BE FROM ONE OF THE PRODUCTS LISTED BELOW
2. SILICONE SEALANT
2.1. DOW CORNING CORPORATION: 795 SILICONE BUILDING SEALANT
2.2. MOMENTIVE PERFORMANCE MATERIALS (GE): SILPRUF NB SCS9000
2.3. PECORA CORPORATION: 890 NST SILICONE SEALANT
2.4. TREMCO: SPECTREM 1
3. URETHANE JOINT SEALANTS
3.1. BASF BUILDING SYSTEMS (SONNEBORN): SONOLASTIC NP-1
3.2. BOSTIK, INC.: CHEM-CALK 2020
3.3. SIKA CORPORATION: SIKAFLEX-1A
4. MULTI-COMPONENT NON-SAG URETHANE
4.1. DYNATROL II
4.2. TREMCO DYMERIC 240/240FC
5. ACOUSTICAL SEALANT (EXCEPT HEAD OF WALL)
5.1. PECORA AC-20 FTR
5.2. USG SHEETROCK ACOUSTICAL SEALANT
6. ACOUSTICAL SEALANT (HEAD OF WALL)
6.1. FIRE JOINT SPRAY (CFS-SP WB), MANUFACTURED BY HILTI INC., TULSA, OKLAHOMA, PHONE: 800-879-6000
6.2. RECTORSEAL SMOKE AND ACOUSTIC SEALANT, MANUFACTURED BY RECTORSEAL, HOUSTON, TEXAS, PHONE: 800-231-3345
7. TAMPER RESISTANT URETHANE (POLYURETHANE) SEALANT
7.1. PECORA DYNAFLEX
7.2. BASF MASTERSEAL CR 195
7.3. SIKAFLEX 2C NS TG
8. TAMPER PROOF EPOXY SEALANT
8.1. PECORA DYNAPOXY EP-1200
SEALANT NOTES
M.V. K.K.S.
DWG. 1 OF 21
PHASE 2: GENERAL
G001-2 TITLE SHEET - PHASE 2
PHASE 2: ARCHITECTURAL
A101-2 SUB-BASEMENT FLOOR PLANS - PHASE 2
A102-2 BASEMENT FLOOR PLANS - PHASE 2
PHASE 2: FIRE PROTECTION
F101-2 SUB-BASEMENT PLANS - PHASE 2
PHASE 2: PLUMBING
P101-2 SUB-BASEMENT PLANS - PHASE 2
PHASE 2: HVAC
MD101-2 SUB-BASEMENT AND BASEMENT FLOOR PLANS - PHASE 2 PRE-WORK
MD102-2 SUB-BASEMENT AND BASEMENT DEMOLITION PLANS - PHASE 2
MP101-2 SUB-BASEMENT NEW WORK PLAN - PHASE 2
MP102-2 BASEMENT NEW WORK PLAN - WEST - PHASE 2
MP103-2 SECOND, THIRD, FIFTH AND SIXTH FLOOR MECH. ROOM PLANS - PHASE 2
M501-2 DETAILS - PHASE 2
M502-2 CHILLED WATER RISER DIAGRAM - DEMOLITION
M503-2 CHILLED WATER RISER DIAGRAM - NEW WORK
M601-2 SCHEDULES - PHASE 2
PHASE 2: ELECTRICAL
ED101-2 EXTERIOR DEMOLITION PLAN - PHASE 2
ED102-2 SUB-BASEMENT DEMOLITION PLAN - PHASE 2
E101-2 EXTERIOR NEW WORK PLAN - PHASE 2
E102-2 SUB-BASEMENT NEW WORK PLAN
E103-2 BASEMENT, SECOND, THIRD, AND SIXTH FLOOR NEW WORK PLANS
E501-2 DETAILS
E601-2 LEGENDS, SYMBOLS & SCHEDULES
AutoCAD SHX Text S
MULTICORELINK:21FED0400A101-2WFSB-21FED0400A101-2WFSB
MULTICORELINK:21FED0400A101-2WFSB-21FED0400A101-2WFSB
MULTICORELINK:21FED0400A102-2WF00-21FED0400A102-2WF00
MULTICORELINK:21FED0400A102-2WF00-21FED0400A102-2WF00
MULTICORELINK:21FED0400F101-2WFSB-F101-2
MULTICORELINK:21FED0400F101-2WFSB-F101-2
MULTICORELINK:21FED0400P101-2WFSB-P101-2
MULTICORELINK:21FED0400P101-2WFSB-P101-2
MULTICORELINK:21FED0400MD101-2WFSBPH2-MD101-2
MULTICORELINK:21FED0400MD101-2WFSBPH2-MD101-2
MULTICORELINK:21FED0400MD102-2WFSBPH2-MD102-2
MULTICORELINK:21FED0400MD102-2WFSBPH2-MD102-2
MULTICORELINK:21FED0400MP101-2WFSBPH2-MP101-2
MULTICORELINK:21FED0400MP101-2WFSBPH2-MP101-2
MULTICORELINK:21FED0400MP102-2WF00WPH2-MP102-2
MULTICORELINK:21FED0400MP102-2WF00WPH2-MP102-2
MULTICORELINK:21FED0400MP103-2WF02PH2-MP103-2
MULTICORELINK:21FED0400MP103-2WF02PH2-MP103-2
MULTICORELINK:21FED0400M501-2WDPH2-M501-2
MULTICORELINK:21FED0400M501-2WDPH2-M501-2
MULTICORELINK:21FED0400M502-2WD-M502-2
MULTICORELINK:21FED0400M502-2WD-M502-2
MULTICORELINK:21FED0400M503-2WD-M503-2
MULTICORELINK:21FED0400M503-2WD-M503-2
MULTICORELINK:21FED0400M601-2WSPH2-M601-2
MULTICORELINK:21FED0400M601-2WSPH2-M601-2
MULTICORELINK:21FED0400ED101-2-ED101-2
MULTICORELINK:21FED0400ED101-2-ED101-2
MULTICORELINK:21FED0400ED102-2-ED102-2
MULTICORELINK:21FED0400ED102-2-ED102-2
MULTICORELINK:21FED0400E101-2-E101-2
MULTICORELINK:21FED0400E101-2-E101-2
MULTICORELINK:21FED0400E102-2-E102-2
MULTICORELINK:21FED0400E102-2-E102-2
MULTICORELINK:21ED04000E103-2WF0B-06-E103-2
MULTICORELINK:21ED04000E103-2WF0B-06-E103-2
MULTICORELINK:21FED0400E501WD-2-21FED0400E501WD-2
MULTICORELINK:21FED0400E501WD-2-21FED0400E501WD-2
MULTICORELINK:21FED0400E601WS-2-21FED0400E601WS-2
MULTICORELINK:21FED0400E601WS-2-21FED0400E601WS-2
ST
EA
M
TU
NN
EL
FD
FD FD
FD
Fire Pump System
ERV-4
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
Steam Piping
STAIR 2
UP
UP
SERVICE
ELEV
H X
's
P U
M P
LIFT
STATION
MECHANICAL
ROOM
S001
UPS
S002
IMAGING
MATERIALS
S004
SWITCHGEAR
ROOM
S003
ST
EA
M
TU
NN
EL
STEAM
TUNNEL
STEAM
TUNNEL
REMOVE CONCRETE PAD
FLUSH WITH FLOOR,
GRIND SMOOTH
REMOVE CONCRETE PAD
FLUSH WITH FLOOR,
GRIND SMOOTH
ST
EA
M
TU
NN
EL
FD
FD FD
FD
Fire Pump System
ERV-4
M at er ia l S to ra ge
LiquiTech System
C on de ns at io n
P it
Steam Piping
STAIR 2
UP
UP
SERVICE
ELEV
H X
's
P U
M P
LIFT
STATION
MECHANICAL
ROOM
S001
UPS
S002
IMAGING
MATERIALS
S004
SWITCHGEAR
ROOM
S003
ST
EA
M
TU
NN
EL
STEAM
TUNNEL
STEAM
TUNNEL
(7) NEW CONCRETE
PADS, SEE
F6 A101-2
72" X 30"
72" X 30"
72" X 30"
48" X 24"
42" X 42"
30" X 30"
36" X 36"
4"
BOND BREAK
CONCRETE SLAB WITH
6 X 6 W1.4 X W1.4 WIRE
MESH AT CENTERLINE
COORDINATE DIMENSIONS
AND LOCATION WITH
TRADE REQUIRING
CURBING
TOOLED
EDGES
EXISTING SLAB
ON GRADE
4"
#3 DOWELS X 5" LONG
AT 16" O.C. MAX. AT
PERIMETER OF PAD
SUB-BASEMENT FLOOR PLANS -
PHASE 2
A101-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
NOVEMBER 16, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
DWG. 2 OF 21
DPD JAP
A101-2
F1 SUB-BASEMENT DEMOLITION PLAN
1/8" = 1'-0"
N
4'0" 2' 8' 12' A101-2
F7 SUB-BASEMENT NEW WORK PLAN
1/8" = 1'-0"
N
4'0" 2' 8' 12' A101-2
F6 EQUIPMENT PAD REINFORCING
3" = 1'-0" 2"0" 1" 4" 6"
TA
STAIR 5
UP
DN
B-S5.1
5'-0"
7 7 7 7
B7 A102-2
ELECT.
ELECT.
ELECT.
EL
EC
T.
G
AS
STORM
STORM
ST
O
R M
TA
STAIR 5
UP
DN
A
A
A
B
B
C
C
D
D E
F
G
D
H
ELECT.
ELECT.
ELECT.
EL
EC
T.
G
AS
STORM
STORM
ST
O
R M
2' -1
0" 6"
8" 8"
SEE
SCHEDULE
SE
E
SC
H
ED
U
LE
A
SEE
SCHEDULE
FOR
GLAZING
2" 2"
SE
E
SC
H
ED
U
LE
2"
SEE
SCHEDULE
HF-1J1
HOLLOW METAL
MATCH
EXISTING
MATCH
EXISTING
1 15/16" AT
DOOR SIDE
2" 1/
4" S
H
IM
, B
AC
KE
R
R O
D A
N D
S
EA
LA
N
T
CONTINUOUS BEAD
OF SEALANT
EXISTING
WALL, VERIFY
MATERIAL
SLUSH JAMBS FULL
WITH MORTAR
PATCH EXISTING WALL TO
MATCH EXISTING ADJACENT
WALLS AS NECCESSARY
CONTRACTOR TO DETERMINE
PREFERRED METHOD OF
ANCHORING AT OPENING. FIELD
VERIFICATION REQUIRED
VERIFY
ON SITE
11"
M
AT
C H
EX
IS
TI
N
G
#5 AT 12 DOWELS X
1'-0" LONG WITH 4"
EPOXY EMBEDMENT
(2) #4 HORIZONTAL
BASEMENT FLOOR PLANS - PHASE 2
A102-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
NOVEMBER 16, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
DWG. 3 OF 21
DPD JAP
A102-2
F6 BASEMENT NEW WORK PLAN
1/8" = 1'-0"
N
4'0" 2' 8' 12' A102-2
F1 BASEMENT DEMOLITION PLAN
1/8" = 1'-0"
N
4'0" 2' 8' 12'
DOOR SCHEDULE
DOOR
NUMBER
DOOR
ELEVATION
DOOR
MATERIAL
DOOR
CORE WIDTH DOOR
HEIGHT
DOOR
GLAZING
FRAME
ELEVATION
FRAME
MATERIAL
FRAME
GLAZING HEAD JAMB SILL LABEL HARD
WARE REMARKS REVISION
B-S5.1 A HOLLOW
METAL INSULATED 40 7'-1" 1"
INSULATED HF-1 HOLLOW
METAL - - J1 - - FIELD VERIFY MASONRY OPENING FOR DOOR DIMENSIONS
A102-2
D8 DOOR ELEVATION
1/4" = 1'-0" 2'0" 1' 4' 6'
A102-2
D7 FRAME ELEVATION
1/4" = 1'-0" 2'0" 1' 4' 6'
A102-2
D5 FRAME DETAIL
1 1/2" = 1'-0" 4"0" 2" 8" 12"
DEMOLITION NOTES
1. REMOVE ALL FENCING, DOORS, FRAMES, SLABS AND EQUIPMENT IN
THEIR ENTIRETY SHOWN DASHED ON THIS PLAN. COORDINATE WITH
OWNER ITEMS TO BE SALVAGED.
2. WHERE EXISTING CONSTRUCTION IS SCHEDULED TO REMAIN, REPAIR/
PATCH OPENINGS (I.E. AFTER REMOVAL OF ADJACENT WALLS, PIPES,
SLABS ETC.) IN WALLS AND FLOORS THAT ARE NOT SCHEDULED TO BE
REMOVED. PROVIDE SMOOTH AND INVISIBLE TRANSITIONS.
DEMOLITION KEYED NOTES:
CHILLER AND 8" CONCRETE PAD WITH #5 @ 12 EACH WAY TO BE
REMOVED. COORDINATE WITH HVAC
A
CHILLER AND 8" CONCRETE PAD TO REMAINB
REMOVE FENCING AND GATES AS SHOWN DASHEDC
4" CONCRETE PAVING TO BE REMOVED, PERIMETER SHOWN DASHEDD
MANHOLE TO REMAINE
REMOVE STEEL SUPPORT AND FOOTINGSF
REMOVE DOOR AND FRAME. PREP FOR NEW DOOR SWINGING IN
OPPOSITE DIRECTION. SEE NEW WORK PLANS
G
H REMOVE ABANDONED 12" PVC PIPE. PATCH EXTERIOR WALL AFTER
REMOVAL TO MATCH EXISTING
NEW WORK PLAN NOTES
GENERAL NOTES:
1. COORDINATE ALL WORK WITH THE TRADES INVOLVED. SEE MEP
TRADES DRAWINGS FOR COORDINATION
NEW WORK KEYED NOTES:
NEW 9' X 47' X 8' THICK CONCRETE PAD WITH #5 @ 12 BOTTOM EACH
WAY OVER 12" COMPACTED CRUSHED STONE BASE COURSE
2 NEW 8' X 39' X 8' THICK CONCRETE PAD WITH #5 @ 12 BOTTOM EACH
WAY OVER 12" COMPACTED CRUSHED STONE BASE COURSE. PROVIDE
APPROXIMATELY 3 CUBIC YARDS OF ADDITIONAL COMPACTED FILL IN
THIS AREA TO REPLACE ORIGINAL MATERIAL LOST DUE TO PREVIOUS
WASHOUTS
3 RELOCATE EXISTING FENCING AND MODIFY FOR NEW CONDITIONS OR
PROVIDE NEW FENCING AND GATES AS SHOWN TO MATCH EXISTING
4 EXISTING GATE POST TO REMAIN. NEW FENCE TO BUTT INTO POST
5 4" CONCRETE PAVEMENT OVER MINIMUM 4" BASE COURSE. SLOPE
EAST AS POSSIBLE WHILE KEEPING SMOOTH TRANSITION WITH
EXISTING SLAB
6 COORDINATE PAD LOCATIONS WITH EXISTING MANHOLE
7 STRIP AND REPAINT STEEL SUPPORTS AND RAILING
A102-2
B7 STOOP STEP ADDITION
1/2" = 1'-0" 1'0" 6" 2' 3'
3. ELECTRICAL, STORM, GAS, ETC. UTILITIES SHOWN IN GENERAL
LOCATION FOR COORDINATION. CONFIRM LOCATIONS AND DEPTH
BEFORE DIGGING.
2"SPD
2"SPD-DN TO EXISTING SUMP PIT
2"SPD AT FLOOR
?"-UP
2"SPD
INSPECTOR
TEST AND DRAIN
MAIN TO FLOOR
DRAIN
8" M
AI
N
EXISTING
HOSE
CONNECTION
EXISTING FIRE
PUMP
EXISTING JOCKEY
PUMP
3" 3"3"
3"
1" 1"
1" 1"1"
1" 1"
1"
1" 1"
1"
1"1"1"
1"
1"
1"
1" 1"
1" 1"
1"
1" 1"
1" 1"
1" 1"
1"
1" 1"
1" 1"
1" 1"
1"
1" 1"
1" 1"
1" 1"
1"
1" 1"
1" 1"
1" 1"
1"
1"
1"1"
1" 1"
1" 1"
1"
1"
FDC
2"
2" MAIN DRAIN INTO
SUMP PIT
FLOOR CONTROL FOR
SUB-BASEMENT
2" 2"
6"
6"
6"
6"
4"
4"
4" 2"
2"
2"
2"
8"
2" DRAIN 1" 1"
1"1"
1"1" 1" 1"
2"
REMOVE AND REPLACE
PIPE AND SPRINKLER
HEADS FOR HVAC WORK.
REROUTE AS NECESSARY.
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
2"SPD
2"SPD-DN TO EXISTING SUMP PIT
2"SPD AT FLOOR
?"-UP
2"SPD
INSPECTOR
TEST AND DRAIN
MAIN TO FLOOR
DRAIN
8" M
AI
N
EXISTING
HOSE
CONNECTION
EXISTING FIRE
PUMP
EXISTING JOCKEY
PUMP
3" 3"3"
3"
1" 1"
1" 1"1"
1" 1"
1"
1" 1"
1"
1"1"1"
1"
1"
1"
1" 1"
1" 1"
1"
1" 1"
1" 1"
1" 1"
1"
1" 1"
1" 1"
1" 1"
1"
1" 1"
1" 1"
1" 1"
1"
1" 1"
1" 1"
1"
1"1"
1" 1"
1" 1"
1"
1"
FDC
2"
2" MAIN DRAIN INTO
SUMP PIT
FLOOR CONTROL FOR
SUB-BASEMENT
2" 2"
6"
6"
6"
6"
4"
4"
4" 2"
2"
2"
2"
8"
2" DRAIN 1" 1"
1"1"
1"1" 1" 1"
2"
1" 1"
1"
REMOVE AND REPLACE
PIPE AND SPRINKLER
HEADS FOR HVAC WORK.
REROUTE AS NECESSARY.
2 VERIFY
SIZE
VERIFY AND MATCH
EXISTING UPRIGHT
SPRINKLER HEADS IN
THE SUB-BASEMENT
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
SUB-BASEMENT PLANS - PHASE 2
F101-2R.V.L. K.K.S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
NOVEMBER 16, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
DWG. 04 OF 21
F101-2
F4 SUB-BASEMENT DEMOLITION PLAN - PHASE 2
1/8" = 1'-0" F101-2
F7 SUB-BASEMENT NEW WORK PLAN - PHASE 2
1/8" = 1'-0"
N N
4'0" 2' 8' 12' 4'0" 2' 8' 12'
EXISTING FIRE SPRINKLER PIPING/HEAD TO REMAIN-NO CHANGE
MAKE NEW CONNECTION TO EXISTING PIPING
REMOVE SPRINKLER AND PIPING. CAP/EXTEND PIPE AS INDICATED
ON DRAWING
FITTING. MAKE NEW CONNECTION TO EXISTING FITTING AND EXTEND
NEW ARMOVER TO NEW SPRINKLER LOCATION AS INDICATED ON
EXISTING FIRE MAIN/RISER TO REMAIN-NO CHANGE
EXISTING FIRE MAIN/RISER TO BE REMOVED, RELOCATED, OR
REVISED TO SUIT NEW REMODELING WORK
REMOVE EXISTING SPRINKLER AND ARMOVER TO BRANCHLINE
FUTURE POINT OF CONNECTION
DRAWING
PLAN KEYED NOTES
CONCEALED PENDENT SPRINKLER
SPRINKLER SYSTEM RISER
SPRINKLER SYSTEM DROP
EXISTING SPRINKLER SYSTEM PIPING
EXISTING SPRINKLER SYSTEM PIPING TO BE REMOVED
FIRE RATED PIPE SLEEVEF.R.P.S.
FLOW SWITCH
BELOW DUCT BD
ROOM NUMBER
ROOM NAME
EXISTING PENDENT SPRINKLER-NO CHANGE
EXISTING PENDENT SPRINKLER TO BE REMOVED
STANDARD SPRAY UPRIGHT SPRINKLER
EXISTING UPRIGHT SPRINKLER-NO CHANGE
NEW BUTTERFLY VALVE (B-FLY) WITH TAMPER SWITCH
CORR.
EXISTING UPRIGHT SPRINKLER TO BE REMOVED
DRAIN PIPE
WET SPRINKLER MAIN PIPING
LOW POINT AUXILIARY DRAIN
A1
F101 SHEET DETAIL OR DIAGRAM IS DRAWN ON
DETAIL OR DIAGRAM NUMBER
PRESSURE GAUGE
SIGHT GLASS
TEST/DRAIN VALVE
SPRINKLER BRANCH/MAIN ARMOVER REFERENCE
DRY VALVE SYSTEM
GLYCOL SYSTEM
PREACTION SYSTEM
PIPING TO BE ABANDONED (PER NFPA) - SEE PLAN
FIRE DEPARTMENT CONNECTION (FDC)
FLOW SWITCH
CHECK VALVE
NEW BUTTERFLY VALVE (B-FLY)
BALL VALVE
? KEY PLAN NOTE
ISOLATION VALVE WITH TAMPER SWITCH
ISOLATION VALVE
DETAIL ??/???
FOR NOTES
SIDEWALL PENDENT SPRINKLER
EXISTING SIDEWALL PENDENT SPRINKLER
EXISTING SIDEWALL PENDENT TO BE REMOVED
HIGH TEMPERATURE PENDENT SPRINKLER
CONCEALED DRY PENDENT SPRINKLER
DRY UPRIGHT PENDENT SPRINKLER
GENERAL SYMBOLS
ELEVATION-CENTERLINE OF PIPE TO FINISHED FLOOR"X"
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
AutoCAD SHX Text x
4" CW
2" CW
4" CW
2"CWS
4" CW3"CWS
3" CW
3" CW
3" HW
1 1/2" CW
LIQUITECH
COPPER SILVER
IONIZATION
SYSTEM
4" CW
3" HW
4" CW
2" HWR
M
6" CW
6" CW
(4)4" BFP'S
12" HIGH
CONC CURB
6"CW
4"CW
6" CW
2"RW
4"CW
2"RW
6"
1" HW
2" RW
2"RW
FIRE SPRINKLER SYSTEM
8" INTERAL BYPASS
2" HWR
1" HW
ET
EXISTING BAS
CONTROL PANEL
EXISTING BAS
CONTROL PANEL
6"CW 4" CW
1EWC
1"1"
1SINK
1EES
3"FD
1-1/2" RPZ BFP
TO CHILLER
8" CW
8" RPZ BFP
TO FIRE PUMP
1" BFP FOR
HTG. SUPPLY
1TMV
(2) 1/2" H/CW RPZ
1 TMV
3/4"HWR
3"HW
1-1/2"HWR
2" CWS
3" HW
4" CW
2" CW
1 NSF
1(2)WH
1 WS1 WS1 WS
(4)1" BYPASS(PEX)
EXISTING VALVES
64"CW, 3"HW
1-1/2" HWR-UP
(CLC AND 4TH)
6 4"CW, 3"HW
2"HWR, AND
2"CWS-UP
6 1/2"IW-UP TO
ALTOSHAM
RO SYSTEM
64" CW, 2 1/2" HW,
2" HWR, RISERS
62" RAW WATER-UP
63" CW & 2" HW
UP TO 7TH FLOOR
6 2"RAW-UP
2" CW
1" CW
3" HWR
2" CWS
REMOVE AND REPLACE
PIPE FOR HVAC WORK.
REROUTE AS NECESSARY.
SHUTDOWNS DURING
NIGHT/PREMIUM HOURS.
REMOVE AND REPLACE
PIPE FOR HVAC WORK.
REROUTE AS NECESSARY.
MP-SUBRAWH20PRESS
DRAIN TO
FLOOR DRAIN
MP-SUBCOLDH20PRESS
MP-SUBHOTH20PRESS
MP-DOMH20
MP-DHWMIXLWT
MP-DHW1HWST
MP-DHW1HWRT
MP-DHW2HWST
MP-DHW2HWRT
MP-DHW1FLOW
1/2"
9H/CW
RECONNECT
TO EXISTING
BACKFLOW
PREVENTERS.
9HW
NOTE: PROVIDE
TEMPORARY
PIPING TO KEEP
DIETARY SERVICE
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
4" CW
2" CW
4" CW
2"CWS
4" CW3"CWS
3" CW
3" CW
3" HW
1 1/2" CW
LIQUITECH
COPPER SILVER
IONIZATION
SYSTEM
4" CW
3" HW
4" CW
2" HWR
M
6" CW
6" CW
(4)4" BFP'S
12" HIGH
CONC CURB
6"CW
4"CW
6" CW
2"RW
4"CW
2"RW
6"
1" HW
2" RW
2"RW
FIRE SPRINKLER SYSTEM
8" INTERAL BYPASS
2" HWR
1" HW
ET
EXISTING BAS
CONTROL PANEL
EXISTING BAS
CONTROL PANEL
6"CW 4" CW
1EWC
1"1"
1SINK
1EES
3"FD
1-1/2" RPZ BFP
TO CHILLER
8" CW
8" RPZ BFP
TO FIRE PUMP
1" BFP FOR
HTG. SUPPLY
1TMV
(2) 1/2" H/CW RPZ
1 TMV
3/4"HWR
3"HW
1-1/2"HWR
2" CWS
3" HW
4" CW
2" CW
1 NSF
1(2)WH
1 WS1 WS1 WS
(4)1" BYPASS(PEX)
EXISTING VALVES
64"CW, 3"HW
1-1/2" HWR-UP
(CLC AND 4TH)
6 4"CW, 3"HW
2"HWR, AND
2"CWS-UP
6 1/2"IW-UP TO
ALTOSHAM
RO SYSTEM
64" CW, 2 1/2" HW,
2" HWR, RISERS
62" RAW WATER-UP
63" CW & 2" HW
UP TO 7TH FLOOR
6 2"RAW-UP
2" CW
1" CW
3" HWR
2" CWS
REMOVE AND REPLACE
PIPE FOR HVAC WORK.
REROUTE AS NECESSARY.
SHUTDOWNS DURING
NIGHT/PREMIUM HOURS.
REMOVE AND REPLACE
PIPE FOR HVAC WORK.
REROUTE AS NECESSARY.
NEW BALL
VALVE
MP-SUBRAWH20PRESS
DRAIN TO
FLOOR DRAIN
MP-SUBCOLDH20PRESS
MP-SUBHOTH20PRESS
MP-DOMH20
MP-DHWMIXLWT
MP-DHW1HWST
MP-DHW1HWRT
MP-DHW2HWST
MP-DHW2HWRT
MP-DHW1FLOW
1/2"
2H/CW
RECONNECT
TO EXISTING
BACKFLOW
PREVENTERS.
2HW
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
SUB-BASEMENT PLANS - PHASE 2
P101-2J.G.D. K.K.S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
NOVEMBER 16, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
DWG. 05 OF 21
P101-2
F3 SUB-BASEMENT SUPPLY PIPING DEMOLITION PLAN - PHASE 2
1/8" = 1'-0" P101-2
F7 SUB-BASEMENT SUPPLY PIPING NEW WORK PLAN - PHASE 2
1/8" = 1'-0"
N N
4'0" 2' 8' 12' 4'0" 2' 8' 12'
EXISTING PLUMBING STACKS/RISERS/ROOF CONDUCTOR(S) TO BE
EXISTING PLUMBING STACKS/RISERS/ROOF CONDUCTOR(S) TO
REMOVE PLUMBING FIXTURE OR EQUIPMENT. REMOVE RELATED
SERVICE PIPING BACK TO STACK/RISERS/MAINS. CAP OR EXTEND.
REMOVE PLUMBING FIXTURE OR EQUIPMENT. REMOVE RELATED
REMOVE PLUMBING FIXTURE OR EQUIPMENT. CAP SERVICE PIPING
EXISTING SERVICE PIPING TO FIXTURE(S) ABOVE -NO CHANGE.
BE REMOVED, RELOCATED OR REVISED TO SUIT NEW REMODELING
SERVICE PIPING AS SHOWN. CAP OR EXTEND.
MAKE NEW CONNECTION TO EXISTING PIPING.
PLUMBING FIXTURE OR EQUIPMENT TO REMAIN -NO CHANGE.
FUTURE POINT OF CONNECTION.
PLAN KEYED NOTES
BEHIND WALL.
WORK.
REMAIN -NO CHANGE.
REMOVE PIPING SERVING EXISTING FIXTURE(S) ABOVE. EXISTING10 FIXTURE(S) TO REMAIN - NO CHANGE. RE-CONNECT SERVICE
PIPING TO EXISTING FIXTURE(S) AT STRUCTURE - VERIFY SIZES.
PLUMBING SYMBOLS
WATER CLOSET
WASTE STACK
WASTE PIPING
WALL CLEANOUT
STORM OR CLEARWATER PIPING
SANITARY SEWER
JANITOR'S CURB
FLOOR DRAIN
FLOOR CLEANOUT
ZV ZONE VALVE
VS
WC
WS
W
W.CO
VT
VENT STACK
VENT
ST
SS
SH
SAN
SOIL STACK
SHOWER
LAV / L
JC
HD
FD
F.CO
LAVATORY
HUB DRAIN
CIRCUIT SETTER
BACKFLOW PREVENTER
SHEET DETAIL OR DIAGRAM IS DRAWN ON
DETAIL OR DIAGRAM NUMBER
ROOM NUMBER
ELECTRIC WATER COOLER
CIRCUIT VENT
ALARM PANEL
ACCESS PANEL
THERMOMETER
TYPICAL FIXTURE STOP
WATER HAMMER ARRESTOR
FLOOR CLEANOUT
CHECK VALVE
ARROW INDICATES DIRECTION OF FLOW IN
DISTRIBUTION OR DRAINAGE PIPING
EXISTING PIPING TO BE REMOVED OR ABANDONED
-SEE PLAN FOR NOTES
CO
EWC
CS
BFP
C.VT
CLEANOUT
CLINIC SINK
AL.P
AP
CORE DRILL
BALL VALVE
HOT WATER RECIRCULATION PIPING [HWR]
HOT WATER DISTRIBUTION PIPING [HW] (110°-120°F)
COLD WATER MAIN OR DISTRIBUTION PIPING [CW]
STORM AND CLEARWATER DRAINAGE PIPING [ST.]
SANITARY VENT PIPING ABOVE GROUND [VT.] (AG)
SANITARY PIPING ABOVE GROUND [SAN.] (AG)
H/CW HOT AND COLD WATER
WET VENTW.VT
KEYED PLAN NOTE
A1 P101
CLEANOUT
AIR GAP WASTEAGW
OR
OR
EYEWASHEW
EXISTING VENT PIPING BELOW GROUND (BG)
EXISTING SANITARY PIPING BELOW GROUND (BG)
NEW SANITARY PIPING BELOW GROUND (BG)
NEW SANITARY VENT PIPING BELOW GROUND (BG)
FLOW RATE OF RISER OR VALVE[25 GPM]
2 1/2"
(2)6"CWS AND
(2)6"CWR STACKED
X=7'-0", X=9'-2"
EXISTING
EXPANSION
TANK
10"
8"
" 10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
3" CWS/R-UP
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR
X=6'-5"
1 1/2" NG
1" N
G
1" NG
1 1/2" NG
1 1/2" NG
1 1/2" NG
1 1/2" NGEXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
IN TUNNEL
6" CWS/R TO
BASEMENT PLAN
TO PUMP #3
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
X= 7'-
4"
VFD-CHWP1
VFD-CHWP2
VFD-CHWP2A
X=7'-3"
BOTTOM OF TUNNEL IS
92" TO SUB-BASEMENT
FINISH FLOOR.
BOTTOM OF TUNNEL IS
92" TO SUB-BASEMENT
FINISH FLOOR.
BOTTOM OF TUNNEL IS
90" TO SUB-BASEMENT
FINISH FLOOR.
(2)6"CWS,
(2)6"CWR AND
4"CWS/R TO
BASEMENT PLAN
6"
10" 10"
8"CWS/R TO
BASEMENT
PLAN
TCP
8" X=9'-7" (CH-3)
X= 5'-
5"
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'
-1 1"
X= 7'-
X=8'-4"
X=7'-1"
CWR
CWS
ABANDONED FILTER
X=8'-2"
X=6'-7"
8" X=8'-8"
8" X=10'-4"
X=7'-0"
X= 7'-
2"
X= 7'-
0"
X=9'-4"
X=8'-3, X=9'-2"
X=8'-4"
8"
8"
X=9'-4"
C
C
C
C
C
F
REPLACE 6" VALVE
(2) 6" HOSES
ON CWS FOR
TEMPORARY
OPERATION
I
D
D
H D
D
D
D
D 4"
G
TCP
X=5'-8"
X=7'-0"
10" X=6-7"
X=8'-3"
J
F
J
J
DE
MO
A
ND
C
AP
AT
V
AL
VE
S
FM-3
A
VFD-PCHW1
VFD-PCHW2
4"X=7'-1"
4x6 INC.
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
S004
S001
S002
S003
VV
1"
2 1/2"
(2)6"CWS AND
(2)6"CWR STACKED
X=7'-0", X=9'-2"
EXISTING
EXPANSION
TANK
10"
8"
" 10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
3" CWS/R-UP
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR
X=6'-5"
2"
2"
3 1/2"
3 12"
6"
2"
6"
2 1/2"
2"
4" 6"
2 1/2"
5" 2"
6"
3" 6" 10"
4"CPD
4" HPS UP
1"
4"CPD
X=9'-4"
6" LPS
8" HPS HEADER
4" X=6'-8"
4"
3" LPC UP
4" LPS UP
2" MPS UP
3"
8" MPS HEADER
4"
1" HPC-UP
4"
4" HPC
3/4" HPC
2" HPC
2" HPC
X=6'-4"
2" HPC
2" HPC
1 1/2" NG
1" N
G
1" NG
1 1/2" NG
1 1/2" NG
1 1/2" NG
1 1/2" NGEXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
IN TUNNEL
6" CWS/R TO
BASEMENT PLAN
TO PUMP #3
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
2"
CPD
1" 20 PSI STEAM
SUPPLY AND
CONDENSATE
RETURN
1"
2"
CPDCPD
CP
D
2"HPS
2"LPS-UP
1"LPCR-UP
EXISTING ZONE
MANIFOLD
MPS (1-1/4") PRV 110# - 60#
6"
3/4"
TO KITCHEN
PRV
6" MPS-UP
2" MPC-UP
X= 7'-
4"
X=9'-3"
X=8'-1"X=7'-8" X=7'-8"
VFD-CHWP1
VFD-CHWP2
VFD-CHWP2A
X=7'-3"
X=6'-10"
MPS (2-1/2" AND 2") PRV 110# - 50#
LPS (2-1/2" AND 2") PRV 50# - 10#
4" LPS
HX-3
HX-4
3" TO DOM. WH
6"
4"
2"
3"
3"
4"
4"
3"
2"
2"
3"
3/4"
X=1'-9"
X=2'-0"
X=9'-9"
BOTTOM OF TUNNEL IS
92" TO SUB-BASEMENT
FINISH FLOOR.
BOTTOM OF TUNNEL IS
92" TO SUB-BASEMENT
FINISH FLOOR.
2" X=9'-8"
X=8'-2"
BOTTOM OF TUNNEL IS
90" TO SUB-BASEMENT
FINISH FLOOR.
X=2'-6"
3" X=8'-0"
4"
MPS/C TO AIR
CURTAIN
2"MPS
6" LPS
HEADER
6"MPS
2"
2"
2- 1/2" 2-1/2"
4"
3/4"MPC
3/4"HPC(2)6"CWS,
(2)6"CWR AND
4"CWS/R TO
BASEMENT PLAN
6"
10" 10"
8"CWS/R TO
BASEMENT
PLAN
3"
1 "12
X=1'-3"
1"
3"
4" X=15"
1-1/2"LPC X=1'-3"
3"
2"
1-1/2"
3"
10"
TCP
3/4"
8" X=9'-7" (CH-3)
X= 5'-
5"
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'
-1 1"
X= 7'-
X=8'-4"
X=7'-1"
CWR
CWS
ABANDONED FILTER
X=8'-2"
X=6'-7"
8" X=8'-8"
8" X=10'-4"
X=7'-0"
X= 7'-
2"
X= 7'-
0"
X=9'-4"
X=8'-3, X=9'-2"
X=8'-4"
1"
8"
8"
X=9'-4"
C
C
C
C
C
1"D X=10"
1"D X=12"
F
REPLACE 6" VALVE
(2) 6" HOSES
ON CWS FOR
TEMPORARY
OPERATION
I
D
D
H D
D
D
D
D 4"
G
TCP
X=5'-8"
X=7'-0"
10" X=6-7"
X=8'-3"
J
F
J
J
DE
MO
A
ND
C
AP
AT
V
AL
VE
S
FM-3
A
VFD-PCHW1
VFD-PCHW2
4"X=7'-1"
4x6 INC.
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
S004
S001
S002
S003
VV
1"
3/4" 1"
3/8" 7/8"
3/4"
3/4"
2"
1 1/4"
1 1/2"
2"
1" COND. DN
TO OPEN SITE
EXISTING
CONVECTOR
6" CWS/R
4" CWR
4" CWS
CH-1
CH-6
CH-5
EXISTING
CH-7
EXISTING
CH-3
UNDERGROUND PIPING
TO SUBBASEMENT
UNDERGROUND
PIPING UNDERGROUND
PIPING
6" CWR6" CWS
UNDERGROUND
PIPING
6" CWR
6" CWS
(2)6"CWS AND
(2)6"CWR TO
SUB-BASEMENT
6"CWS/R TO
SUB-BASEMENT
6" CWR
6" CWS
8"CWS/R
8"CWS/R TO
SUB-BASEMENT
8"
4" CWS
4" CWR
4"CWS/R STACKED
TO SUB-BASEMENT
4" ABANDONED
CWS/R-UP
BEHIND CHILLER
3'-0" HIGH PLATFORM
W/ LADDER
E
E
E
4"CWS/R HOSES
TO DRY COOLER
FOR TEMPORARY
OPERATION
D D
D
D D
D
D
D
REMOVE
ABANDONED
12" PVC PIPE
J
J
J
D
UNDERGROUND
PIPING
D
STAIR 5
UP
DN
V
SUB-BASEMENT AND BASEMENT
FLOOR PLANS - PHASE 2
PRE-WORK
MD101-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
NOVEMBER 16, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
DWG. 6 OF 21
4'0" 2' 8' 12'
N
KEYPLAN
NO SCALE
N J.G.D. K.K.S.
GENERAL NOTES
1.
2.
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANICES WITHIN PROJECTS.
THERE WILL BE A SHUT-DOWN TO INSTALL THE TEMPORARY HOSES,
NOTES G, H AND I IN ORDER TO ALLOW THE DRYCOOLER AND CHILLER
CH-3 TO OPERATE DURING DEMOLITION AND NEW WORK.
4'0" 2' 8' 12'
N
MD101-2
F1 SUB-BASEMENT PLAN - PHASE 2 PRE-WORK (FOR REFERENCE ONLY)
1/8" = 1'-0"
N
4'0" 2' 8' 12'
MD101-2
C4 BASEMENT PLAN - PHASE 2 PRE-WORK
1/8" = 1'-0"
MD101-2
F5 SUB-BASEMENT PLAN - PHASE 2 PRE WORK
1/8" = 1'-0"
A
B
D
C
E
PROVIDE NEW PROGRAM TO OPERATE SYSTEM IN TEMP MODE.
PIPE MAINS EXTEND TO MECHANICAL ROOM ON SIXTH FLOOR.
CLOSE VALVES ON SIXTH FLOOR. DRAIN RISER PIPING. VALVE AND
CAP ADJACENT ELBOW AT APPROXIMATELY X=8'-6". PROVIDE
DRAIN VALVE AT BASE OF RISER.
REMOVE CHILLED WATER PUMPS, PIPING, DRIVES AND CONTROLS.
REMOVE CWS/R PIPING AND EQUIPMENT.
REMOVE AND DISPOSE OF 250 TON CHILLER AND REFRIGERANT,
CHILLED WATER PIPING AND CONTROLS.
REMOVE GAS PIPING, VALVES AND REGULATOR NECESSARY TO
INSTALL NEW CHILLED WATER PIPING.
PROVIDE 8" PIPE AT SUCTION OF PUMP TO ATTACH (2) 6" HOSES
FOR TEMPORARY OPERATION. KEEP PUMP P-2A AND VFD.
PROVIDE 1-1/2" PIPE FROM EXPANSION TANK TO CWR.
PROVIDE 8" PIPE FROM 10" AIR SEPARATOR TO CHILLER CH-3 CWR
FOR TEMPORARY OPERATION.
NEW TEMPORARY CONNECTION.
REMOVE AND REINSTALL 3" STEAM CONDENSATE TANK VENT FOR
NEW PIPING.
(THIS SHEET ONLY)
PLAN KEYED NOTES
- REMOVE ALL DUCTS, PIPING, AND EQUIPMENT NOTED AND/OR
SHOWN DASHED.
- SALVAGE 35% PROPYLENE GLYCOL SOLUTION FROM THE PIPING TO
BE REMOVED. REFILL NEW PIPING WITH SAME FLUID AND PROVIDE
ADDITIONAL FLUID WHICH MATCHES EXISTING. COORDINATE FLUID
WITH FACILITY STAFF. SYSTEM VOLUME IS 9,000 GAL.
F
THIS PLAN IS FOR REFERENCE TO
EXISTING HVAC PIPING AND EQUIPMENT
THAT WILL EFFECT THE DEMOLITION
AND ACCESSIBILITY TO WORK.
G
H
I
J
K
KK
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text 2A
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text R13
AutoCAD SHX Text R14
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text 2A
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
RAMP
EXISTING
EXPANSION
TANK
" 10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
3" CWS/R-UP
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR
X=6'-5"
1" N
G
1" NG
1 1/2" NG
1 1/2" NG
1 1/2" NG
1 1/2" NGEXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
X= 7'-
4"
VFD-CHWP2A
X=7'-3"
BOTTOM OF TUNNEL IS
92" TO SUB-BASEMENT
FINISH FLOOR.
BOTTOM OF TUNNEL IS
92" TO SUB-BASEMENT
FINISH FLOOR.
BOTTOM OF TUNNEL IS
90" TO SUB-BASEMENT
FINISH FLOOR.
10"
8"CWS/R TO
BASEMENT
PLAN
TCP
8" X=9'-7" (CH-3)
X= 5'-
5"
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'
-1 1"X=8'-4"
X=7'-1"
CWR
CWS
8" X=8'-8"
8" X=10'-4"
REPLACE 6" VALVE
(2) 6" HOSES
ON CWS FOR
TEMPORARY
OPERATION
B
B
C
A
C
D
D
D
TCP
X=5'-8"
X=7'-0"
FM-3
VFD-PCHW1
VFD-PCHW2
4"X=7'-1"
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
S004
S001
S002
S003
2 1/2"
EXISTING
EXPANSION
TANK
" 10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
3" CWS/R-UP
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR
X=6'-5"
2"
2"
3 1/2"
3 12"
6"
2"
6"
2 1/2"
2"
4" 6"
2 1/2"
5" 2"
6"
3" 6" 10"
4"CPD
4" HPS UP
1"
4"CPD
X=9'-4"
6" LPS
8" HPS HEADER
4" X=6'-8"
4"
3" LPC UP
4" LPS UP
2" MPS UP
3"
8" MPS HEADER
4"
1" HPC-UP
4"
4" HPC
3/4" HPC
2" HPC
2" HPC
X=6'-4"
2" HPC
2" HPC
1" N
G
1" NG
1 1/2" NG
1 1/2" NG
1 1/2" NG
1 1/2" NGEXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
2"
CPD
1" 20 PSI STEAM
SUPPLY AND
CONDENSATE
RETURN
1"
2"
CPDCPD
CP
D
V
2"HPS
2"LPS-UP
1"LPCR-UP
EXISTING ZONE
MANIFOLD
MPS (1-1/4") PRV 110# - 60#
6"
3/4"
TO KITCHEN
PRV
6" MPS-UP
2" MPC-UP
X= 7'-
4"
X=9'-3"
X=8'-1"X=7'-8" X=7'-8"
VFD-CHWP2A
X=7'-3"
X=6'-10"
MPS (2-1/2" AND 2") PRV 110# - 50#
LPS (2-1/2" AND 2") PRV 50# - 10#
4" LPS
HX-3
HX-4
3" TO DOM. WH
6"
4"
2"
3"
3"
4"
4"
3"
2"
2"
3"
3/4"
X=1'-9"
X=2'-0"
X=9'-9"
BOTTOM OF TUNNEL IS
92" TO SUB-BASEMENT
FINISH FLOOR.
BOTTOM OF TUNNEL IS
92" TO SUB-BASEMENT
FINISH FLOOR.
2" X=9'-8"
X=8'-2"
BOTTOM OF TUNNEL IS
90" TO SUB-BASEMENT
FINISH FLOOR.
X=2'-6"
3" X=8'-0"
4"
MPS/C TO AIR
CURTAIN
2"MPS
6" LPS
HEADER
6"MPS
2"
2"
2- 1/2" 2-1/2"
4"
3/4"MPC
3/4"HPC
10"
8"CWS/R TO
BASEMENT
PLAN
6"
6" V-UP
4" V
3"
1 "12
V
X=1'-3"
1"
3"
4" X=15"
1-1/2"LPC X=1'-3"
3"
2"
1-1/2"
3"
3"V X=7'-8"
10"
TCP
3/4"
8" X=9'-7" (CH-3)
X= 5'-
5"
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'
-1 1"X=8'-4"
X=7'-1"
CWR
CWS
8" X=8'-8"
8" X=10'-4"
1" 1"D X=10" 1-1/4"V
1-1/4"V
1"D X=12"
REPLACE 6" VALVE
(2) 6" HOSES
ON CWS FOR
TEMPORARY
OPERATION
B
B
C
A
C
D
D
D
TCP
X=5'-8"
X=7'-0"
FM-3
VFD-PCHW1
VFD-PCHW2
4"X=7'-1"
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
S004
S001
S002
S003
R-6
R-6A S-6A
S-7
S-7
R-7
R-8
R-9
R-10
R-11
S-8
S-9 S-10
4"
4"
3/4" 1"
3/8" 7/8"
3/4"
3/4"
2"
1 1/4"
1 1/2"
2"
1" COND. DN
TO OPEN SITE
EXISTING
CONVECTOR
4" CWR
4" CWS
EXISTING
CH-7
EXISTING
CH-3
8"CWS/R
8"CWS/R TO
SUB-BASEMENT
8"
3'-0" HIGH PLATFORM
W/ LADDER
4"CWS/R HOSES
TO DRY COOLER
FOR TEMPORARY
OPERATION
A
STAIR 5
UP
DN
SUB-BASEMENT AND BASEMENT
DEMOLITION PLANS - PHASE 2
MD102-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
NOVEMBER 16, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
DWG. 7 OF 21
4'0" 2' 8' 12'
N
KEYPLAN
NO SCALE
N J.G.D. K.K.S.
GENERAL NOTES
1.
2.
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
AFTER NEW PIPING AND EQUIPMENT SHOWN ON SHEET MP101-2 IS
COMPLETED, THERE WILL BE A SHUT-DOWN TO DEMOLISH THE
TEMPORARY ITEMS AND TIE THE NEW PIPING TO EXISTING MAINS.
MD102-2
F5 SUB-BASEMENT DEMOLITION PLAN - PHASE 2
1/8" = 1'-0" 4'0" 2' 8' 12'
N
MD101-2
F1 SUB-BASEMENT DEMOLITION PLAN - PHASE 2 (FOR REFERENCE ONLY)
1/8" = 1'-0"
MD102-2
C4 BASEMENT DEMOLITION PLAN - PHASE 2
1/8" = 1'-0"
N
4'0" 2' 8' 12'
A
B
C
REMOVE HOSES.
REMOVE PUMP AND VFD. REMOVE ASSOCIATED PIPING AND
CONTROLS.
REMOVE EXPANSION TANK, AIR SEPARATOR AND PIPE TIE-IN.
REMOVE MAIN PIPING FOR NEW CONNECTION ON SHEET MP101-2.
(THIS SHEET ONLY)
PLAN KEYED NOTES
- REMOVE ALL DUCTS, PIPING, AND EQUIPMENT NOTED AND/OR
SHOWN DASHED.
- SALVAGE 35% PROPYLENE GLYCOL SOLUTION FROM THE PIPING TO
BE REMOVED. REFILL NEW PIPING WITH SAME FLUID AND PROVIDE
ADDITIONAL FLUID WHICH MATCHES EXISTING. COORDINATE FLUID
WITH FACILITY STAFF. SYSTEM VOLUME IS 9,000 GAL.
THIS PLAN IS FOR REFERENCE TO
EXISTING HVAC PIPING AND EQUIPMENT
THAT WILL EFFECT THE DEMOLITION
AND ACCESSIBILITY TO WORK.
D
CWS/R RISER-ISOLATION
VALVES IN KITCHEN ABOVE
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
CWP
AutoCAD SHX Text 2A
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text R13
AutoCAD SHX Text R14
AutoCAD SHX Text
CWP
AutoCAD SHX Text 2A
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
RAMP
" 10" CWS/R-UP
1"
1"
1"
CONDENSER RACK 1 1/2"
4" CWR
4" CWS
4" CWR
NCNC
NC
2 1/2" CWS/R UP
THRU FLOOR
2 1/2"CWS/R
X=8'-4"
3" CWS/R-UP
4" CWS
X=6'-8"
3" CWS
X=6'-8"
4" CWR
X=6'-6"
3" CWR
X=6'-5"
1" N
G
1" NG
1 1/2" NG
1 1/2" NG
1 1/2" NG
1 1/2" NGEXISTING
FANCOIL
EXISTING
FANCOIL
EXISTING
COOLING
COIL
1 1/4"
1"
1 1/4"
EXISTING
FANCOIL
2"
EXISTING
FANCOIL
4" HWS/R-UP
EXISTING HR
CHILLER - CH9
EXISTING
FANCOIL
X= 7'-
4"
X=7'-3"
92" TO SUB-BASEMENT
FINISH FLOOR.
BOTTOM OF TUNNEL IS
92" TO SUB-BASEMENT
FINISH FLOOR.
8"CWS/R TO
BASEMENT
PLAN
8" X=9'-7" (CH-3)
4"HWS/R
X=8'-6"
X=6'-8"
X= 6'
-1 1"X=8'-4"
X=7'-1"
CWR
CWS
8" X=8'-8"
8" X=10'-4"
(2)8"CWS,
(2)8"CWR AND
4"CWS/R
X=10'-4"
SEE MP102-2
8" CWS/R TO
CH-1
VFD-CHWP-1
VFD-CHWP-2
VFD-CHWP-3
VFD-CHWP-4
1 1/2" NG
CHWP-1
CHWP-2
CHWP-3
CHWP-4
RACK 10" CWS/R
AT 7'-0" AND 5'-5"
X=9'-3" LEAVING TUNNEL
(2) 6" HOSES
ON CWS FOR
TEMPORARY
OPERATION
1 CH-3
REUSE
EXISTING
HOLES THRU
FOUNDATION
WALLS
4" X=9'-0" (CH-7)
4" X=7'-5"
8" X=9'-3" (CH-4)
8" X=9'-7" (CH-2)
8"
8"
4"
X= 7'
-0
8"
10" X=7'-0"
ET-1
AS-1
CWR BELOW
X=5'-5"
" X
=5 '-5
FM
-5
FM-2
ISOLATION VALVE
ON BOTH PIPES.
CONTROL VALVE ON
SUPPLY AND FLOW
METER ON RETURN.
FM-1
FM-4
1"
10" X=5'-5"
2 FILL
TANK
8"
10" X=7'-0"
1- 1/
2"
FI
LT
ER
FM-6
RELIEF
VALVE
FM-3
4"X=7'-1"
CW
S
X=7'-0"
BA
L.
0G
PM
R
EL
O C
AT
ED
SE
N
SO
R
FM-7 4"
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
S004
S001
S002
S003
SUB-BASEMENT NEW WORK
PLAN - PHASE 2
MP101-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
NOVEMBER 16, 2022
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
DWG. 8 OF 21
2'0" 1' 4' 6'
N
KEYPLAN
NO SCALE
N
(THIS SHEET ONLY)
PLAN KEYED NOTES
NEW CONNECTION TO EXISTING PIPING.
EXTEND (2) 1" RELIEF TO 1-1/2" CONNECTED TO GLYCOL TANK.
PROVIDE NEW WALL SUPPORT FRAMING PER DETAIL F4/M501-2.
SUPPORT AS-1 FROM FLOOR.
REFER TO C6/M501 FOR PIPING.
REFER TO F6/M501 FOR PIPING. FINAL SYSTEM/PUMP BALANCE IS
1650 GPM @ 95 FT.
REINSTALL GAS PIPING FOR NEW WORK TO OCCUR.
PROVIDE 2" GLYCOL FILL CONNECTION.
PROVIDE 45° CONNECTION DOWN TO CWR.
REFER TO SPEC FOR BALANCING PUMPS CURRENT PEAK LOAD
ESTIMATED AT 1550 GPM AT 90 FEET.
J.G.D. K.K.S.
GENERAL NOTES
1.
2.
SOME AREAS SURROUNDING THE LIMITS OF THIS CONTRACT MAY
EITHER BE STARTING CONSTRUCTION SOON, UNDER CONSTRUCTION
NOW OR FINISHING UP CONSTRUCTION. SOME OF THESE PROJECTS
MAY OVERLAP EACH OTHER. COORDINATE WITH OWNER AND ANY
APPLICABLE CONTRACTORS OF PROJECTS ON SEQUENCE OR
PHASING OF OVERLAPPING PROJECTS TO ENSURE ACCURACY AND
COORDINATED DRAWINGS. NOTIFY OWNER/ARCHITECT OF ANY
DISCREPANCIES WITHIN PROJECTS.
AFTER NEW PIPING AND EQUIPMENT SHOWN ON SHEET MP101-2 IS
COMPLETED, THERE WILL BE A SHUT-DOWN TO DEMOLISH THE
TEMPORARY ITEMS AND TIE THE NEW PIPING TO EXISTING MAINS.
MP101-2
F5 SUB-BASEMENT NEW WORK PLAN - PHASE 2
1/4" = 1'-0"
AutoCAD SHX Text
ERV
AutoCAD SHX Text
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AutoCAD SHX Text
HPC
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PCHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
PHW
AutoCAD SHX Text
AutoCAD SHX Text
AHU
FLT
AHU
AHU-6
TCP
AHU-6
-1225 SUP
-270 O.A. (22%)
-955 RET
EXISTING
AHU
TUNNEL ACCESS
(CONFINED SPACE)
4" CHWS/R
3" CHWS/R
3"
CHWS/R
2"
3/4"
6" CHWS/R
3" CHWS/R
2"3/4"
2" HWS/R UP
3" HWS/R
2 1/2" CHWS/R
3/4"
3/4"
3/4"
3/4"
3/4"
1-1/2"
1" DOWN THRU
ABANDONED
CONVECTOR
3/4"
3/4"
1"HWS&R
PIPING
EXISTING CHILLER
EXST. CONCRETE PAD
UNDERGROUND
PIPES
2" CHS&R UP -
SECURE PIPING
TO WALL
150 GALLON HORIZONTAL
STORAGE TANK MOUNTED
ON EQUIPMENT SUPPORT
RAILS
EXISTING AHU-016
EXISTING
AHU
EXISTING
PUMP(S)
3/4"
3/4"
3/4" 1 1/2"
2"
1"
3/4"
3/4"
3/4"
3/4" 1"
3/4" 1"
1"
6"
6" x8
(2)150CFM
12x8
300CFM
4" CHWS/R
3"
2"
3/4"
3/4"
1"
1 1/4"
1"1"
2"
2"
3/4"
1"
1 1/2"
1 1/2"
1"
3/4"
1 1/4"
1 1/2"
2"
2"
1"
4"
COND. TO
WINDOW WELL
10" CHWS/R UP
35% PROP.
GLYCOL (TYP.)
3/4"
1"
1" H
W S/
R -D
N
TO
T U
N N
EL
3/4"
1 1/4"
3/4"
1" 1"
3/4"
3/4"
3/4"
EX. STEAM COIL
2 1/2" CHWS/R UP
THRU FLOOR TO
AHU-1
1 1/2" CHWS/R ABOVE
AND BELOW
4" HWS/R UP &
DN THRU FLOORS
2 1/2" CHWS/R
1" HWS/R UP
THRU FLOOR
2 1/2" CHWS/R DN THRU
FLOOR
PUMPS
PUMPS
S-44 R-44
4" HWS/R-DN
TO HX 10/11
EXISTING
CONVECTOR
EXISTING
CONVECTOR
1 "14
T
FCU-001
1"
1"
EXISTING
CONVECTOR
EXISTING
CONVECTOR
EXISTING
CONVECTOR
AHU-28
39x72
OUTSIDE
INSULATION
20x12
M
4"
1"
1"
EX. STEAM COIL
EX. HUMIDIFIER
3/4"HWS/R
3/4"HWS/R
LPS
LPC
LPS
LPC
1"
2"
2"
EX. FTR
EX. FTR
EX. FTR
EX. FTR
EX. FTR
EX. FTR
EX. FTR
EX. FTR
EX. FTR
EX. FTREX. FTREX. FTREX. FTR
EX. FTR
EX. FTR
EX. FTR
EX. FTR
3/4" HWS/R
3/4" HWS/R
3/4" HWS/R
3/4" HWS/R
3/4" HWS/R
EX. HUMID
1- 1/
2"
LP
S- D
N
1"
LP
C -D
N
1"
1"
T
3/4"
EX. UH
X=7'-0"
21x25 OUTSIDE
INSULATION
TCP
X=10'-0" 3/4"
X=7'-9" FRPS(TYP.)
3/4"
3/4"
3/4" 3/4"
3/4"
3/4"
3/4"
1/2" PURGE PORTS
1-1/2"GS/R-UP
THRU ROOF
SMOKE RATED
SLEEVE
X=6' - 10"
H W
H
LP
S
C
PD
G C
G C
R
X=9' - 0" 3"ø
X=9' - 2"
GC
GCR
3"ø
X=8' - 6"
G C
G C
R
3"ø
X=9' - 0"
X=9' - 0" 3"ø
3", X=9'-0" THRU EXISTING
HOLE IN FOUNDATION
WALL
1 HR X=10' - 0"
3"ø
1 HR
3/4"øLPC
DRIP TRAP
TP-5
X=7' - 1"
X=7'-6"
3/4" GLYCOL FILL
AND DRAIN
A
3/8"ø
4" CWR
4" CWS
EXISTING
CH-7
EXISTING
CH-3
8"CWS/R
8"CWS/R TO
SUB-BASEMENT
DEMO PIPE
SEE DETAIL
E1/M501
8"
CH-1
CH-2
TCP
V
2"
REMOVE 1-1/2x2
RELIEF VALVE AND
PIPING TO
EXTERIOR
3'-0" HIGH PLATFORM
W/ LADDER
(2)8"CWS,
(2)8"CWR AND
4"CWS/R TO
SUB-BASEMENT
8"CWS/R TO
SUB-BASEMENT
RISE TO
RACK (TYP.)
RACKED PIPING
CH-4
4"
8"
SAME AS EXISTING
EX. FTR
EX. FTR
1 1/4"
CWS
CWR
C W
S
C W
R
CWS
CWR
C W
S C
W R
C W
S C
W R
SEE MP101-2
CWS
CWR
3"CHS/R UP
TO AHU-30
TCP
ELEC.
CAB.
TCP
ELEC. CAB.
TCP
ELEC. CAB.
GAS METER
EXISTING RISER
ISOLATION VALVES
CWS CONN.
CWR CONN.
BB
A A
EE
STACKED LPCR
PIPING
LPC-DN
X=9'-11"
E F
F
FF
F
F
FD FD
FD
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
SERVICE
ELEVATOR
FEC
FEC
COORDINATE UNDERGROUND CWS/R PIPING WITH
NEW AND EXISTING UNDERGROUND ELECTRICAL.
SEE SHEET E101-2 FOR MORE INFORMATION.
BASEMENT NEW WORK PLAN -
WEST - PHASE 2
MP102-2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of…