About this file

This document is an amendment to a federal solicitation for replacement of a chiller plant at a VA medical center. The solicitation is for construction services to replace the chiller plant in Phase 2 of the project at the Oscar G. Johnson VA Medical Center located in Iron Mountain, Michigan. The amendment provides responses to vendor questions, clarifies requirements for pipe testing and cleaning, and notes that existing door hardware can be reused. It also states that improved drawings have been included in an addendum to help identify existing duct banks and clarify cable drops for energy management system data connections. Bids are due no later than January 19, 2023 at 1:00pm Central Time and are to be delivered to the address specified. Attachments include sign-in sheets from pre-bid meetings and the referenced addendum.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 01-09-2023 585-23-2-6941-0003 585-21-116 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25223B0003 12-13-2022

X X X

PROJECT 585-21-116- Replace Chiller Plant (Phase 2) at the Oscar G. Johnson VA Medical Center in Iron Mountain, MI.

Amendment 00001 is hereby incorporated into the above noted solicitation. See continuation pages and attachmentments for particular details.

Kristi Kluck Contracting Officer

SOLICITATION 36C25223B0003

AMENDMENT 001

January 9, 2023

Project:585-21-116 Replace Chiller Plant – Phase 2
Location:Oscar G. Johnson VA Medical Center in Iron Mountain. MI

Amendment 001 hereby incorporates the following clarifications/change(s) into the solicitation package:

A. VENDOR QUESTIONS, submitted 12/20/2022:

1. On Page 578 of the specification section 23-22-13-6, it speaks about the testing of the underground piping.

0. Should the hydrostatic test be performed prior to insulating and radiographic or UT testing?

VA REPLY: Refer to section 23-22-13-6 (G.): no insulation installed until pipe is tested.

0. If the hydrostatic test is performed is the radiographic and or UT testing necessary?

VA REPLY: Radiographic or UT testing is not required unless the pipe fails the hydro test.

0. If the Radiographic or UT testing is required, can you please provide a specification on the requirements and criteria of the testing?

VA REPLY: Test requirements are to follow ASME section IX.

0. For underground piping can field insulated fittings be supplied by manufacture and utilized in place of factory insulated fittings?

VA REPLY: Field insulated fittings are acceptable if witnessed by a VA representative

1. On page 562 of the specification section 21-21-13-16 3.4 Flushing and Cleaning Piping Systems paragraphs B and C Initial flushing’s and cleanings the feet per second (5.9) would require an approx. flow rate in excess of 800 gallons per minute. Is this going to remain the requirement?

VA REPLY: Revise to minimum .9m/s (2.9f/s) for flushing. System pumps may be used for this flushing and cleaning.

1. On page A102-2 of the plan set there appears to be no door hardware called out. Please provide door hardware schedule.

VA REPLY: Reuse existing door hardware. Prep new hollow metal door and frame to accommodate existing hardware. Reference Demolition Plan Keyed Note K. for reuse of existing electric strike, door position switch, and card reader. Replace any individual hardware item if not compatible for reuse with new door and frame.

1. Please provide as-built drawings showing the actual route of the existing duct bank seen in red on the screenshot below from drawing E101-2.

VA REPLY: No as-built drawings are currently available. The VA will continue to see if any can be found.

1. Additional information is needed to estimate the energy valve data drop scope shown in E103-2.

3. Can a cable schedule be provided for the data drops?

VA REPLY: The drop locations are identified on the plans, for bidding purpose, utilize the 250-foot cable distance listed in New Work Plan Keyed Note 1/E103-2.

3. Could as-builts of patch panel locations (referenced on page E103-2, Keyed note 1) be provided? We need to understand where each data drop connects to each panel (ex: Riser diagram) to be able to estimate length of cable.

VA REPLY: As-builts of patch panel exact locations are not available. The patch panels are located within the existing rack(s).

3. Page E103-2 references a Keyed Note #2 in the drawing but the description is not included in the Keyed Notes Legend. Please advise.

VA REPLY: Reference attached Addendum No. 1 dated 1-5-23. Keyed Plan Note 2. does not exist and “A” is a demolition note located on the demolition sheets.

3. Page E103-2 references Keyed Note “A” in the drawing but the description is not included in the Keyed Notes Legend. Please advise.

VA REPLY: Reference attached Addendum No. 1 dated 1-5-23. Plan Note “A” is a demolition note located on the demolition sheets.

1. Could cleaned-up versions of ED101-2, E101-2 and E103-2 be provided? It appears the layers are not lining up and there are conflicts in the text which make it illegible.

VA REPLY: Reference attached Addendum No. 1 dated 1-5-23.

B. To date, the bid opening due date has not changed. Bids must be delivered to the following address NLT Thursday, January 19, 2023 at 13:00 CST:

Department of Veterans Affairs 115 S. 84th Street, Suite 101 Milwaukee, WI 53214

Attention: Kristi Kluck, Kristi.Kluck3@va.gov Ref: 36C25223B0003

ATTACHMENTS

See attached document: S06 001 Att1 2022.12.29 Pre-Bid Sign-visit attendence 36C25223B0003 585-21-116.

See attached document: S06 001 Att2 2022.12.22 Pre-Bid Sign-visit attendence 36C25223B0003 585-21-116.

See attached document: S06 001 Att3 21FED0400_AddendumNo.1_2023-01-05.

image1.png image2.png image3.png

File details come from the government source that posted it. Updated .