This file contains construction drawings and specifications for the Replace Chiller Plant - Phase 2 project at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The project involves demolishing existing chillers and associated infrastructure in the chiller plant and exterior yard, and constructing new chillers, electrical equipment, and underground utilities. Key project details include replacing two centrifugal chillers with new air-cooled chillers, installing new switchgear and transformers, and upgrading the underground electrical distribution system between the new chiller plant and existing buildings. The construction drawings show demolition plans, new work plans, details of exterior yard work and basement mechanical room upgrades. Specification documents provide requirements for executing the planned infrastructure upgrades to support the new chillers. Completion of this project will modernize the medical center's chilled water system serving its air conditioning and process cooling needs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 1, Page 1 of 1
ADDENDUM NO. 1
REPLACE CHILLER PLANT PHASE 2
OSCAR G. JOHNSON VA MEDICAL CENTER
IRON MOUNTAIN, MICHIGAN
PROJECT NO. 585-21-116
This Addendum is issued to modify, explain or correct the original drawings and specifications and is hereby made part of the Contract Documents.
DRAWINGS
1. Sheets ED101-2 EXTERIOR DEMOLITION PLAN - PHASE 2, ED102-2 SUB-BASEMENT
DEMOLITION PLAN – PHASE 2, E101-2 EXTERIOR NEW WORK PLAN – PHASE 2,
E102-2 SUB-BASEMENT NEW WORK PLAN – PHASE 2, and E103-2 BASEMENT, SECOND, THIRD, AND SIXTH FLOOR NEW WORK PLANS – PHASE 2
A. These Sheets have been revised in regards to layers and are being re-issued.
ATTACHMENTS
Reissued Sheets ED101-2, ED102-2, E101-2, E102-2, and E103-2 dated
January 5, 2023
BERNERS-SCHOBER ASSOCIATES, INC.
GREEN BAY, WISCONSIN
January 5, 2023
EX
EM 13.8 KV
FIELD
DISTRIBUTION
SUBSTATION
EX
CHILLERS 1&3
XFMR
13.8/480
EX
BLDG 1
CHILLERS
1&3
EX CHILLERS 1&3 HVL SW
EX
CHILLERS 5-7
XFMR
13.8/480
EX CHILLERS 5-7 HVL SW
EX
BLDG 1
CHILLERS
5-7EX CHILLERS NORM/EMER. SWBD (480V)
EX UTILITY 480V
SERVICES TO
REMAIN
EX PULLBOX
TO REMAIN
ALL EXISTING EQUIPMENT TO REMAIN
UNLESS NOTED OTHERWISE
EDB
EX
EX DUCT BANK
FROM BUILDING
PULL BOX TO REMAIN
EX DUCT BANK
FROM CHILLER
SWBD TO XCHILL
CONCRETE PAD TO
REMAIN
STAIR 5
DN
f f f
EX 1600A, 480V
PANEL XCHILL TO
BE CONVERTED
TO PULL BOX
EX 800A, 480V
DISCONNECT
TO REMAIN
CHILLER #1
PULL BOX
TO BE REMOVED
EX 600A, 480V
DISCONNECT
TO BE REMOVED
EX PULLBOX
TO BE REMOVED
CHILLER #5
CHILLER #6
EX
DRY COOLER #7
CHILLER #3
EX
EX CHILLER TO BE
DISCONNECTED
A B
EX CHILLER TO BE
DISCONNECTED
A B
EX MOTOR TO
BE RE-FED FROM BUILDING 11
A B
E
E
F
EX CHILLER TO BE
DISCONNECTED
D
EX CHILLER
TO REMAIN
EX PULL BOX
TO REMAINC
TO MTS-HCHILL
G
H
EX FEEDER
TO REMAIN
CR
ESPS
CR
ESPS
EX GROUNDING
TEST WELL TO
REMAINI
EX FENCE AND
GROUND RODS AND
CONDUCTORS TO
REMAIN
EX FENCE AND
GROUND RODS AND
CONDUCTORS TO BE
REMOVED
GROUND ROD
(TYP.)
EX FENCE AND
GROUND RODS AND
CONDUCTORS TO
REMAIN
J
K
K
J
J
EXTERIOR DEMOLITION PLAN -
PHASE 2
ED101-2MLL NMP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
JANUARY 05, 2023
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
ADDENDUM 01 01/05/2023
DWG. 15 OF 21
ED101-2
F5 EXTERIOR DEMOLITION PLAN
1/8" = 1'-0" 4'0" 2' 8' 12'
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A
B
C
D
DISCONNECT EXISTING CHILLER. REMOVE DISCONNECT, CONDUIT
AND WIRING BACK TO PANEL XCHILL.
A PORTION OF THE EXISTING CONDUIT MAY BE ABLE TO BE SALVAGED
FOR REUSE IN RE-FEEDING THE DRY COOLER AND/OR THE NEW
CHILLERS FROM THE EXISTING CHILLERS SWBD. REFERENCE THE
NEW WORK PLANS.
DISCONNECT THE 1600 AMP FEEDER FROM THE CHILLERS SWBD TO
PANEL XCHILL, REMOVE THE CONDUCTORS. MARK THE BREAKER IN
CHILLERS SWBD AS SPARE. SALVAGE ALL THE CONDUIT(S) FROM
BUILDING 11 TO THE EXISTING CONCRETE PAD OF PANEL XCHILL.
REMOVE ALL CONDUCTORS FROM XCHILL OUT TO CHILLERS #5, #6
AND DRY COOLER #7. REMOVE ANY CONDUITS WHICH CAN NOT, OR
WILL NOT BE REUSED. REMOVE THE INTERIOR/BREAKERS OF PANEL
XCHILL, SALVAGE THE ENCLOSURE AS A PULL BOX.
DISCONNECT EXISTING CHILLER. REMOVE CONDUIT AND WIRING
BACK TO PULL BOX(ES) AND FUSED DISCONNECT. SALVAGE ALL
CONDUITS ROUTED BACK TO CHILLERS SWBD LOCATED IN
BUILDING 11, REMOVE THE CONDUCTORS. MARK THE BREAKER AS
SPARE.
DISCONNECT AND REMOVE EXISTING PULL BOX, FUSED DISCONNECT
AND ALL ASSOCIATED CONDUIT AND WIRING.
DISCONNECT AND REMOVE EXISTING PULL BOX. REMOVE ALL
CONDUCTORS BACK TO SOURCE. REMOVE A PORTION OF THE
UNDERGROUND CONDUITS MADE ACCESSIBLE BY THE REMOVAL OF
CONCRETE SLAB. ABANDON ANY CONDUIT UNDERGROUND BELOW
THE SLAB, OUTSIDE OF THE DEMOLITION AREA.
PRIOR TO ANY DEMOLITION WORK, SWITCH THE MANUAL TRANSFER
SWITCH MTS-HCHILL (LOCATED IN THE SUB-BASEMENT) OVER TO THE
X-RAY PANEL FEEDER. THIS WILL ALLOW WORK TO BE DONE ON THE
OTHER FEEDER. INTERCEPT THE UNDERGROUND FEEDER FROM
PANEL XCHILL TO MTS-HCHILL LOCATED IN SUB-BASEMENT. SALVAGE
THE FEEDER FOR REVISIONS PER THE NEW WORK PLAN.
PROVIDE A TEMPORARY FEED (60A, 480V, 3-PHASE) FROM EXISTING
CHILLERS SWBD OUT TO EXISTING DRY COOLER. REPLACE THE
TEMPORARY FEED WITH THE PERMANENT ONE SPECIFIED BEFORE
PROJECT COMPLETION.
THE EXISTING GROUNDING CONDUCTOR FROM THE TEST WELL TO
THE FIRE PUMP GROUND LOCATED IN SUB-BASEMENT SHALL BE
MAINTAINED.
DISCONNECT AND REMOVE ALL 120V CIRCUIT CONNECTIONS
ASSOCIATED WITH THE CHILLER, INCLUDING HEAT TAPE,
RECEPTACLES, BARREL HEATER AND CONTROLS ETC. REMOVE ALL
WIRING, SALVAGE CONDUIT FOR REUSE AS FEASIBLE.
DISCONNECT, REMOVE AND SALVAGE THE ELECTRIC STRIKE,
POSITION SWITCH, CARD READER AND ASSOCIATED WIRING FOR
REINSTALLATION AT NEW DOOR. REFERENCE SHEET E101-2.
E
F
G
H
EMERGENCY
POWER
BUILDING
I
J
K
N
BM
S
BM
S
BM
S
BM
S
ATS MONITOR
PNL
SBP-B SLP
FLO-COLD
EQ-A
SBL
FA EQ CR
SBA
BCR
CR-DIST
(CR-UPS)
EQ-2
SBP- C
EQ-5
LS-UPS
LS
XRAY DIST.
PNL
SBP-A
SBP
HCHILL
REF
DP-EQ1
UNI-STRUT
DDC
CONTROL
PNLS
MTS-HCHILL
S001
S002
S003
P1 P2 P2A
P3
P4
P5
P6
ALL EXISTING PANELS, UPS,
AND ATS TO REMAIN
ALL EXISTING PANELS, UPS,
AND ATS TO REMAIN
FEEDER FROM
XCHILL TO BE REVISED
P3
P4
P5
P6
P1
P2
P2A
EX
A A A
A A
A
A
A
A
A
C
B
S1 D
E
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
ST
EA
M
TU
NN
EL
STEAM
TUNNEL
STEAM
TUNNEL
SUB-BASEMENT DEMOLITION PLAN -
PHASE 2
ED102-2MLL NMP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
JANUARY 05, 2023
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
ADDENDUM 01 01/05/2023
DWG. 16 OF 21
ED102-2
F4 SUB-BASEMENT DEMOLITION PLAN
1/8" = 1'-0" 4'0" 2' 8' 12'
(THIS SHEET ONLY)
DEMOLITION PLAN KEYED NOTES
A
B
DISCONNECT EXISTING MOTOR, ASSOCIATED STARTER OR VFD,
CONDUIT AND WIRING BACK TO SOURCE PANEL. MARK THE BREAKER
AS SPARE.
PRIOR TO ANY DEMOLITION WORK, SWITCH THE MTS-HCHILL OVER TO
THE FEEDER FROM X-RAY PANEL. THIS WILL KEEP H-CHILL PANEL LIVE
WHILE THE DEMOLITION WORK OUTSIDE AT XCHILL IS BEING
COMPLETED.
BEFORE THE INSTALLATION/COMPLETION OF THE NEW PUMPS,
REPLACE PANEL HCHILL WITH A NEW PANEL HCHILL AS SCHEDULED.
THIS WORK TO BE COMPLETED DURING LATE NIGHT HOURS AND/OR
WEEKENDS.
DISCONNECT/REMOVE AND SALVAGE EXISTING FIXTURE IN WAY OF
NEW CONSTRUCTION. MAINTAIN EXISTING LIGHTING IN SERVICE.
REFERENCE THE NEW WORK PLAN.
MODIFY THE EXISTING 1 1/4" CONDUIT WITH 3-#1/0 AND #6 GND (FROM
PANEL DPEQ1) IN WAY OF NEW CONSTRUCTION. COORDINATE WITH
MECHANICAL CONTRACTOR. IF THIS FEEDER (CONDUIT AND WIRING)
IS SPARE, REMOVE THE PORTION OF FEEDER WHICH IS IN THE WAY
OF NEW CONSTRUCTION.
C
D
E
EX
EM 13.8 KV
FIELD
DISTRIBUTION
SUBSTATION
EX
CHILLERS 1&3
XFMR
13.8/480
EX
BLDG 1
CHILLERS
1&3
EX CHILLERS 1&3 HVL SW
EX
CHILLERS 5-7
XFMR
13.8/480
EX CHILLERS 5-7 HVL SW
EX
BLDG 1
CHILLERS
5-7EX CHILLERS NORM/EMER. SWBD (480V)
EDB
EX
EX DUCT
BANK
EX DUCT
BANK
PROVIDE NEW BREAKERS
IN EX SWBD
EXEXEX
STAIR 5
DN
CHILLER #3
EX
DRY COOLER #7
OLD PANEL
USED AS
PULL-BOX
EX 800A, 480V
DISCONNECT
800A, 480V
NEMA 3R
DISCONNECT
CHILLER #1
NEW
EX FEEDER TO
MTS-HCHILL
WITHIN BASEMENT
EXEX
EX
EX
EX
EX
IN-GROUND
PULL-BOX
800A, 480V
NEMA 3R
DISCONNECT
8EX
CHILLER #4
NEW
800A, 480V
NEMA 3R
DISCONNECT
CHILLER #2
NEW
NEW
NEW
NEW
NEW
EX
PULL BOX
EX
RT
CR
ESPS
UG
EX GROUNDING
TEST WELL
4 4
TCP &
HEAT TAPE
7 8
TCP &
HEAT TAPE
7 8
TCP &
HEAT TAPE
7 8
GF/RT
REF-18
GF/RT
6 REF-16
EX
EXTERIOR NEW WORK PLAN -
PHASE 2
E101-2MLL NMP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
JANUARY 05, 2023
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
ADDENDUM 01 01/05/2023
DWG. 17 OF 21
E101-2
F2 EXTERIOR NEW WORK PLAN
1/8" = 1'-0" 4'0" 2' 8' 12'
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
PROVIDE NEW SQUARE-D MASTERPACT BREAKER(S) IN EXISTING
SWBD TO FEED NEW AND EXISTING MOTORS #5,6,7,8 AND MTS/PNL
HCHILL. REFERENCE THE RISER DIAGRAM AND SCHEDULES. UTILIZE
THE SPARE CONDUIT(S) OUT TO THE CHILLER YARD AND PROVIDE
NEW CONDUIT(S) FROM THERE ON.
PROVIDE NEW QUAZITE (POLYMER CONCRETE) STRAIGHT WALL, OPEN
PULL BOX (OR EQUAL), SIZE AS REQUIRED TO SPLICE NEW CONDUIT
AND CONDUCTORS (200AMP, 4-WIRE) TO EXISTING FEEDER OF
MTS/PANEL-HCHILL.
PROVIDE STAINLESS STEEL STRUT SUPPORTS AS REQUIRED TO
SUPPORT THE NEW DISCONNECT.
PROVIDE NEW 10 FOOT COPPER GROUND ROD(S) AND #6 BARE
COPPER GROUNDING CONDUCTOR CONNECTED TO THE RODS AND
FENCE TO REPLACE THE GROUNDING SYSTEM WHICH WAS PARTIALLY
REMOVED IN A SEPARATE PROJECT, AND/OR IN THIS PROJECT.
PROVIDE A NEW #6 BARE COPPER GROUNDING CONDUCTOR
BETWEEN EACH NEW OR EXISTING CHILLER/DRY-COOLER AND THE
EXISTING GROUNDING TEST WELL. PROVIDE CADWELD CONNECTIONS
TO THE EXISTING CONDUCTORS BONDED TO THE TEST WELL GROUND
ROD.
MAINTAIN EXISTING GFCI DUPLEX RECEPTACLE IN SERVICE. (VERIFY
EXACT LOCATION)
PROVIDE A 20AMP, 120V CIRCUIT CONNECTION TO EACH CHILLER
TEMPERATURE CONTROL PANEL AND HEAT TAPE. UTILIZE EXISTING
CONDUITS FROM PANEL REF AS FEASIBLE. PROVIDE NEW AS
REQUIRED.
UTILIZE THE NEW CIRCUIT BREAKERS CALLED OUT ON THE PANEL
SCHEDULE FOR PANEL REF TO FEED THE NEW CONNECTIONS AT THE
CHILLER. CHILLER #1 SHALL UTILIZE CIRCUITS 27 AND 29. CHILLER #2
SHALL UTILIZE CIRCUITS 31 AND 33. CHILLER #4 SHALL UTILIZE
CIRCUITS 35 AND 37. PROVIDE 2-#12 AND #12 GND IN 3/4" CONDUIT AS
REQUIRED.
REINSTALL/REWIRE CARD READER AND DOOR HARDWARE AS
REQUIRED. COORDINATE WITH DOOR/HARDWARE SUPPLIER AND
JCI/SIMPLEX.
UTILIZE EXISTING SPARE 20A/1P BREAKER WITHIN PANEL REF TO
FEED NEW DUPLEX RECEPTACLE. PROVIDE CONDUIT AND WIRING AS
REQUIRED.
EMERGENCY
POWER
BUILDING
LIF
E
SA
FE
TY
U
PS
CRITICAL UPS
ATS
CN
TR
L
BM
S
BM
S
BM
S
BM
S
J
AHU-12
ATS MONITOR
PNL
CNTRL
SBP-B
EX LIGHTING
CONTROLS
SLP
CN
TR
L
JOCKEY
PUMP CONTROLLER
FIRE PUMP
CONTROL
PANEL
FLO-COLD
BMS
EQ-A
CN
TR
L
SUMP
EF-34
EF-34
ERV-1
SBL
FA EQ CR
SBA
BCR
ATS-CR
ATS-EQ
ATS-LS
ATS-XRAY
ATS-FP
CR-DIST
(CR-UPS)
EQ-2
SBP- C
EQ-5
LS-UPS
ADP
SPLICE BOX
LS
ATS ATS ATS ATS
AT
S
AT
S
ATS-CR2
ATS-CR3
AT
S
ATS-EQ2
XRAY DIST.
PNL
SBP-A
SBP
REF
DP-EQ1
UNI-STRUT
DDC
CONTROL
PNLS
DDC CTRL
PNL
F.P.
CONTROLLER
PORTABLE
GENERATOR
DISC.
1600A
SQ-D TERM. BOX
PORTABLE
GENERATOR
CONNECTION
CN
TR
L
MTS-HCHILL
EX
EX
EX
EX EX
EX EX
EX
PUMP
EX
PUMP
EX
AHU-12
EX
EX
EX
SBP.9
EX
EX
EX
CHILLER
PUMP PUMP
PUMP
PUMP
EX
EX
EX
EX
EX
EXEX
EX
EX
EX
EX
EX EX
EX
EX
EX
EX
EX
EX
EXEX
EX
EX
EX
EX
EX
EX
EX
EX
EX EX
PUMP
PUMP
PUMP
PUMP
CHWP-2
CHWP-1
MTS TO BE
RE-FED FROM
CHILLERS SWBD
EX
CHWP-3
CHWP-4
HCHILL
NEW
EX
FC
EX
ERV-4
FC
EX
FC
#1 #2 #3
EX
EXEX
EX
EX
EX
GLYCOL
PACKAGE
EXEX
EX
EX
S1
ST
EA
M
TU
NN
EL
FD
FD FD
FD
STAIR 2
UP
UP
SERVICE
ELEV
MECHANICAL
ROOM
S001
UPS
S002
IMAGING
MATERIALS
S004
SWITCHGEAR
ROOM
S003
ST
EA
M
TU
NN
EL
STEAM
TUNNEL
STEAM
TUNNEL
SUB-BASEMENT NEW WORK PLAN -
PHASE 2
E102-2MLL NMP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
JANUARY 05, 2023
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
ADDENDUM 01 01/05/2023
DWG. 18 OF 21
4'0" 2' 8' 12' E102-2
F5 SUB-BASEMENT NEW WORK PLAN
1/8" = 1'-0"
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
REFEED MTS-HCHILL FROM EXISTING CHILLERS SWBD IN BUILDING 11.
PROVIDE A NEW 200A/3P BREAKER IN THE SWBD. UTILIZE ONE OF THE
SPARE CONDUITS OUT TO THE CHILLER YARD PULL BOX. INTERCEPT
AND CONNECT TO THE EXISTING 200A FEEDER FROM THE YARD TO
THE EXISTING 200A FEEDER TO MTS-HCHILL. PROVIDE IN-GROUND
PULL BOX AND 2" CONDUIT WITH #4/0 CONDUCTORS AND #6 GND AS
REQUIRED. REFERENCE SHEET E101-2 AND THE PANEL SCHEDULE ON
E601-2.
REPLACE THE EXISTING PANEL WITH NEW AS SCHEDULED ON E601-2.
RECONNECT EXISTING FEEDER FROM MTS-HCHILL.
PROVIDE NEW BREAKERS FOR EXISTING PANEL. REFERENCE SHEET
E101-2 AND THE PANEL SCHEDULE ON E601-2.
REINSTALL/REWIRE FIXTURE SALVAGED FROM DEMOLITION.
COORDINATE WITH OWNER FOR EXACT LOCATION. UTILIZE EXISTING
SWITCHED CIRCUIT. PROVIDE NEW SUPPORT, CONDUIT AND WIRING
AS REQUIRED.
LNM1
EQCLC2
SIMPLEX FIRE ALARM
TRANSPONDER PANEL
RAF13
GF
RACKRACK
RACK
RACK
VFD
TEMP. CONTROL PANEL
ERV-4
ERV-5
RAF-13
AHU-13
HWP-26
SECURITY SYSTEM
HEAD-END/EXPANSION I.P. CAMERA EXPANSION
FAN
COIL
HWP-27
POWER
SUPPLY
HWP-27
SP-1
CONTROL PANEL
DT-1
CONTROL PANEL
INT. LIGHTS
U.V.
HWP-28
LNM1-2
GUTTER MELT
CONTROL PANEL
48"
48"
COND.
PUMP
30"
EX
EX
EXEX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EXEX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
BM
S
JJJ
NH-ME-1
AHU
EX
PUMP
EX
EX
PUMP
TA
TA BLEQ2
HX-15
EX EX
HX-16
AHU-21
EX
MECH.
ROOMSTERILIZER
DP-PH2
E6A 1 1 /4"
C . T
O
ER
U-
EA
ST
BBBB
P-6P-8
EX
EX
AHU-10
EF-2
HX-6
HX-8
TCP
PUMP
UH
UH
1D
AHU11 SUP. FAN 1
AHU11 SUP. FAN 2
AH11 RET. FAN 2
AH11 RET. FAN 1
DP-PH1W6A
PUMP
EX
EX
AHU-11
EF-1
HX-6
HX-8
UH
EX
PUMP
TCP
PUMP
UH
1D
ROLAIRTROL
GB
78"
22"
1-SF-5
1-RF-5
78"
C
VACUUM
PUMPS
X-RAY
CR2E
EQ4
2CR-1
2CRDP
ESD
EX
EX
EX.
FAN
EX
RF-5
EX
AHU-4
MPA MPB
EX
AH-15
EXEXEX
EX
EX
EX
EXEX
EX
EX
1D 1
1D 1D 1
EX
LIEBERT
EX
AH-5
EX
HWP-24/25
EX
1D 1AHU-30
TCP TCP
EX EX
FD FD FD
DWV
FD
FD
EX UNIT
HEATER
EX
F-003
TCP
TCP
AHU RAF
EX
RAF-1
EX
HX-20
EX
HX-19
EX
AHU-24
EX
EX
EX EX
EX
EX
P-018
P-019
EX
AS-001
AHU-24
PNL B1
PNL B2
PNL KP
TA
STAIR 5
UP
E1
E1
B5
B3
EX
EX
EX
EX
EX
CR
ESPS
CORRIDOR
B199B-1
RETAIL
STORE
B174
CHIEF,
CANTEEN
B174A
CANTEEN
STORAGE
B175A
CANTEEN
KITCHEN
B175
MAIN
KITCHEN
B186
COOLER 2
RETHERM
COOLER 1
ELECTRIC
ROOM
B186I
B186B B186CB186AB192
BASEMENT, SECOND, THIRD AND
SIXTH FLOOR NEW WORK PLANS -
PHASE 2
E103-2MLL NMP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116
JANUARY 05, 2023
Revisions: Date:
REPLACE CHILLER PLANT
OSCAR G. JOHNSON VA MEDICAL CENTER
ARCHITECT/ENGINEER
310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED
BID DOCUMENTS
Comm. Number: 21FED04.00
50% OWNER REVIEW 03/14/2022
VA FORM 08 - 6231
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
325 H STREET,
IRON MOUNTAIN, MI 49801
95% OWNER REVIEW 06/06/2022
100% DESIGN DOCUMENTS 09/23/2022
BID DOCUMENTS 11/16/2022
ADDENDUM 01 01/05/2023
DWG. 19 OF 21
E103-2
F4 PARTIAL BASEMENT NEW WORK PLAN - PHASE 2
1/8" = 1'-0" E103-2
F9 PARTIAL BASEMENT NEW WORK PLAN - PHASE 2
1/8" = 1'-0"E103-2
F8 PARTIAL BASEMENT NEW WORK PLAN - PHASE 2
1/8" = 1'-0"
E103-2
D3 PARTIAL SIXTH FLOOR RM 6222A - NEW WORK - PHASE 2
1/8" = 1'-0"E103-2
D1 PARTIAL SIXTH FLOOR RM 6122A - NEW WORK - PHASE 2
1/8" = 1'-0"
E103-2
E1 PARTIAL SECOND FLOOR NEW WORK PLAN - PHASE 2
1/8" = 1'-0"
E103-2
F1 PARTIAL THIRD FLOOR NEW WORK PLAN - PHASE 2
1/8" = 1'-0"
MECHANICAL
ROOM
B094
AREAWAY
B096
IT
ROOM
B091
ELECTRICAL,
EMERGENCY
B092
ELECTRICAL,
INCOMING
B092
MECH.
ROOM
B231C
BULK
MEDICAL
STORAGE
B231D
MECH.
ROOM
B231A
STORAGE
LOGISTICS
B231
MECHANICAL
ROOM
B079
MECHANICAL
ROOM
6222A
MECHANICAL
ROOM
6122A
MECHANICAL
ROOM
MECHANICAL
ROOM
E103-2
D4 PARTIAL BASEMENT NEW WORK PLAN - PHASE 2
1/8" = 1'-0"
4'0" 2' 8' 12'4'0" 2' 8' 12'4'0" 2' 8' 12'4'0" 2' 8' 12'
4'0" 2' 8' 12' 4'0" 2' 8' 12' 4'0" 2' 8' 12'
4'0" 2' 8' 12'
(THIS SHEET ONLY)
NEW WORK PLAN KEYED NOTES
1 PROVIDE NEW DATA DROP(S) AS CALLED FOR AT THE NEW ENERGY
VALVES. COORDINATE VALVE LOCATIONS WITH MECHANICAL
CONTRACTOR. UTILIZE EXISTING DATA RACK AND PATCH PANEL FROM
LOCAL IDF WITHIN A 250 FEET OF VALVE.
NO
ELECTRICAL
WORK
NO
ELECTRICAL
WORK
N N N
N
N N N N
AutoCAD SHX Text
BAS
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
RAMP
File details come from the government source that posted it. Updated .