This file contains construction drawings and specifications for the Replace Chiller Plant - Phase 2 project at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The project involves demolishing existing chillers and associated infrastructure in the chiller plant and exterior yard, and constructing new chillers, electrical equipment, and underground utilities. Key project details include replacing two centrifugal chillers with new air-cooled chillers, installing new switchgear and transformers, and upgrading the underground electrical distribution system between the new chiller plant and existing buildings. The construction drawings show demolition plans, new work plans, details of exterior yard work and basement mechanical room upgrades. Specification documents provide requirements for executing the planned infrastructure upgrades to support the new chillers. Completion of this project will modernize the medical center's chilled water system serving its air conditioning and process cooling needs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum No. 1, Page 1 of 1

ADDENDUM NO. 1

REPLACE CHILLER PLANT PHASE 2

OSCAR G. JOHNSON VA MEDICAL CENTER

IRON MOUNTAIN, MICHIGAN

PROJECT NO. 585-21-116

This Addendum is issued to modify, explain or correct the original drawings and specifications and is hereby made part of the Contract Documents.

DRAWINGS

1. Sheets ED101-2 EXTERIOR DEMOLITION PLAN - PHASE 2, ED102-2 SUB-BASEMENT

DEMOLITION PLAN – PHASE 2, E101-2 EXTERIOR NEW WORK PLAN – PHASE 2,

E102-2 SUB-BASEMENT NEW WORK PLAN – PHASE 2, and E103-2 BASEMENT, SECOND, THIRD, AND SIXTH FLOOR NEW WORK PLANS – PHASE 2

A. These Sheets have been revised in regards to layers and are being re-issued.

ATTACHMENTS

Reissued Sheets ED101-2, ED102-2, E101-2, E102-2, and E103-2 dated

January 5, 2023

BERNERS-SCHOBER ASSOCIATES, INC.

GREEN BAY, WISCONSIN

January 5, 2023

EX

EM 13.8 KV

FIELD

DISTRIBUTION

SUBSTATION

EX

CHILLERS 1&3

XFMR

13.8/480

EX

BLDG 1

CHILLERS

1&3

EX CHILLERS 1&3 HVL SW

EX

CHILLERS 5-7

XFMR

13.8/480

EX CHILLERS 5-7 HVL SW

EX

BLDG 1

CHILLERS

5-7EX CHILLERS NORM/EMER. SWBD (480V)

EX UTILITY 480V

SERVICES TO

REMAIN

EX PULLBOX

TO REMAIN

ALL EXISTING EQUIPMENT TO REMAIN

UNLESS NOTED OTHERWISE

EDB

EX

EX DUCT BANK

FROM BUILDING

PULL BOX TO REMAIN

EX DUCT BANK

FROM CHILLER

SWBD TO XCHILL

CONCRETE PAD TO

REMAIN

STAIR 5

DN

f f f

EX 1600A, 480V

PANEL XCHILL TO

BE CONVERTED

TO PULL BOX

EX 800A, 480V

DISCONNECT

TO REMAIN

CHILLER #1

PULL BOX

TO BE REMOVED

EX 600A, 480V

DISCONNECT

TO BE REMOVED

EX PULLBOX

TO BE REMOVED

CHILLER #5

CHILLER #6

EX

DRY COOLER #7

CHILLER #3

EX

EX CHILLER TO BE

DISCONNECTED

A B

EX CHILLER TO BE

DISCONNECTED

A B

EX MOTOR TO

BE RE-FED FROM BUILDING 11

A B

E

E

F

EX CHILLER TO BE

DISCONNECTED

D

EX CHILLER

TO REMAIN

EX PULL BOX

TO REMAINC

TO MTS-HCHILL

G

H

EX FEEDER

TO REMAIN

CR

ESPS

CR

ESPS

EX GROUNDING

TEST WELL TO

REMAINI

EX FENCE AND

GROUND RODS AND

CONDUCTORS TO

REMAIN

EX FENCE AND

GROUND RODS AND

CONDUCTORS TO BE

REMOVED

GROUND ROD

(TYP.)

EX FENCE AND

GROUND RODS AND

CONDUCTORS TO

REMAIN

J

K

K

J

J

EXTERIOR DEMOLITION PLAN -

PHASE 2

ED101-2MLL NMP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116

JANUARY 05, 2023

Revisions: Date:

REPLACE CHILLER PLANT

OSCAR G. JOHNSON VA MEDICAL CENTER

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED

BID DOCUMENTS

Comm. Number: 21FED04.00

50% OWNER REVIEW 03/14/2022

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

325 H STREET,

IRON MOUNTAIN, MI 49801

95% OWNER REVIEW 06/06/2022

100% DESIGN DOCUMENTS 09/23/2022

BID DOCUMENTS 11/16/2022

ADDENDUM 01 01/05/2023

DWG. 15 OF 21

ED101-2

F5 EXTERIOR DEMOLITION PLAN

1/8" = 1'-0" 4'0" 2' 8' 12'

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A

B

C

D

DISCONNECT EXISTING CHILLER. REMOVE DISCONNECT, CONDUIT

AND WIRING BACK TO PANEL XCHILL.

A PORTION OF THE EXISTING CONDUIT MAY BE ABLE TO BE SALVAGED

FOR REUSE IN RE-FEEDING THE DRY COOLER AND/OR THE NEW

CHILLERS FROM THE EXISTING CHILLERS SWBD. REFERENCE THE

NEW WORK PLANS.

DISCONNECT THE 1600 AMP FEEDER FROM THE CHILLERS SWBD TO

PANEL XCHILL, REMOVE THE CONDUCTORS. MARK THE BREAKER IN

CHILLERS SWBD AS SPARE. SALVAGE ALL THE CONDUIT(S) FROM

BUILDING 11 TO THE EXISTING CONCRETE PAD OF PANEL XCHILL.

REMOVE ALL CONDUCTORS FROM XCHILL OUT TO CHILLERS #5, #6

AND DRY COOLER #7. REMOVE ANY CONDUITS WHICH CAN NOT, OR

WILL NOT BE REUSED. REMOVE THE INTERIOR/BREAKERS OF PANEL

XCHILL, SALVAGE THE ENCLOSURE AS A PULL BOX.

DISCONNECT EXISTING CHILLER. REMOVE CONDUIT AND WIRING

BACK TO PULL BOX(ES) AND FUSED DISCONNECT. SALVAGE ALL

CONDUITS ROUTED BACK TO CHILLERS SWBD LOCATED IN

BUILDING 11, REMOVE THE CONDUCTORS. MARK THE BREAKER AS

SPARE.

DISCONNECT AND REMOVE EXISTING PULL BOX, FUSED DISCONNECT

AND ALL ASSOCIATED CONDUIT AND WIRING.

DISCONNECT AND REMOVE EXISTING PULL BOX. REMOVE ALL

CONDUCTORS BACK TO SOURCE. REMOVE A PORTION OF THE

UNDERGROUND CONDUITS MADE ACCESSIBLE BY THE REMOVAL OF

CONCRETE SLAB. ABANDON ANY CONDUIT UNDERGROUND BELOW

THE SLAB, OUTSIDE OF THE DEMOLITION AREA.

PRIOR TO ANY DEMOLITION WORK, SWITCH THE MANUAL TRANSFER

SWITCH MTS-HCHILL (LOCATED IN THE SUB-BASEMENT) OVER TO THE

X-RAY PANEL FEEDER. THIS WILL ALLOW WORK TO BE DONE ON THE

OTHER FEEDER. INTERCEPT THE UNDERGROUND FEEDER FROM

PANEL XCHILL TO MTS-HCHILL LOCATED IN SUB-BASEMENT. SALVAGE

THE FEEDER FOR REVISIONS PER THE NEW WORK PLAN.

PROVIDE A TEMPORARY FEED (60A, 480V, 3-PHASE) FROM EXISTING

CHILLERS SWBD OUT TO EXISTING DRY COOLER. REPLACE THE

TEMPORARY FEED WITH THE PERMANENT ONE SPECIFIED BEFORE

PROJECT COMPLETION.

THE EXISTING GROUNDING CONDUCTOR FROM THE TEST WELL TO

THE FIRE PUMP GROUND LOCATED IN SUB-BASEMENT SHALL BE

MAINTAINED.

DISCONNECT AND REMOVE ALL 120V CIRCUIT CONNECTIONS

ASSOCIATED WITH THE CHILLER, INCLUDING HEAT TAPE,

RECEPTACLES, BARREL HEATER AND CONTROLS ETC. REMOVE ALL

WIRING, SALVAGE CONDUIT FOR REUSE AS FEASIBLE.

DISCONNECT, REMOVE AND SALVAGE THE ELECTRIC STRIKE,

POSITION SWITCH, CARD READER AND ASSOCIATED WIRING FOR

REINSTALLATION AT NEW DOOR. REFERENCE SHEET E101-2.

E

F

G

H

EMERGENCY

POWER

BUILDING

I

J

K

N

BM

S

BM

S

BM

S

BM

S

ATS MONITOR

PNL

SBP-B SLP

FLO-COLD

EQ-A

SBL

FA EQ CR

SBA

BCR

CR-DIST

(CR-UPS)

EQ-2

SBP- C

EQ-5

LS-UPS

LS

XRAY DIST.

PNL

SBP-A

SBP

HCHILL

REF

DP-EQ1

UNI-STRUT

DDC

CONTROL

PNLS

MTS-HCHILL

S001

S002

S003

P1 P2 P2A

P3

P4

P5

P6

ALL EXISTING PANELS, UPS,

AND ATS TO REMAIN

ALL EXISTING PANELS, UPS,

AND ATS TO REMAIN

FEEDER FROM

XCHILL TO BE REVISED

P3

P4

P5

P6

P1

P2

P2A

EX

A A A

A A

A

A

A

A

A

C

B

S1 D

E

ST

EA

M

TU

NN

EL

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

ST

EA

M

TU

NN

EL

STEAM

TUNNEL

STEAM

TUNNEL

SUB-BASEMENT DEMOLITION PLAN -

PHASE 2

ED102-2MLL NMP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116

JANUARY 05, 2023

Revisions: Date:

REPLACE CHILLER PLANT

OSCAR G. JOHNSON VA MEDICAL CENTER

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED

BID DOCUMENTS

Comm. Number: 21FED04.00

50% OWNER REVIEW 03/14/2022

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

325 H STREET,

IRON MOUNTAIN, MI 49801

95% OWNER REVIEW 06/06/2022

100% DESIGN DOCUMENTS 09/23/2022

BID DOCUMENTS 11/16/2022

ADDENDUM 01 01/05/2023

DWG. 16 OF 21

ED102-2

F4 SUB-BASEMENT DEMOLITION PLAN

1/8" = 1'-0" 4'0" 2' 8' 12'

(THIS SHEET ONLY)

DEMOLITION PLAN KEYED NOTES

A

B

DISCONNECT EXISTING MOTOR, ASSOCIATED STARTER OR VFD,

CONDUIT AND WIRING BACK TO SOURCE PANEL. MARK THE BREAKER

AS SPARE.

PRIOR TO ANY DEMOLITION WORK, SWITCH THE MTS-HCHILL OVER TO

THE FEEDER FROM X-RAY PANEL. THIS WILL KEEP H-CHILL PANEL LIVE

WHILE THE DEMOLITION WORK OUTSIDE AT XCHILL IS BEING

COMPLETED.

BEFORE THE INSTALLATION/COMPLETION OF THE NEW PUMPS,

REPLACE PANEL HCHILL WITH A NEW PANEL HCHILL AS SCHEDULED.

THIS WORK TO BE COMPLETED DURING LATE NIGHT HOURS AND/OR

WEEKENDS.

DISCONNECT/REMOVE AND SALVAGE EXISTING FIXTURE IN WAY OF

NEW CONSTRUCTION. MAINTAIN EXISTING LIGHTING IN SERVICE.

REFERENCE THE NEW WORK PLAN.

MODIFY THE EXISTING 1 1/4" CONDUIT WITH 3-#1/0 AND #6 GND (FROM

PANEL DPEQ1) IN WAY OF NEW CONSTRUCTION. COORDINATE WITH

MECHANICAL CONTRACTOR. IF THIS FEEDER (CONDUIT AND WIRING)

IS SPARE, REMOVE THE PORTION OF FEEDER WHICH IS IN THE WAY

OF NEW CONSTRUCTION.

C

D

E

EX

EM 13.8 KV

FIELD

DISTRIBUTION

SUBSTATION

EX

CHILLERS 1&3

XFMR

13.8/480

EX

BLDG 1

CHILLERS

1&3

EX CHILLERS 1&3 HVL SW

EX

CHILLERS 5-7

XFMR

13.8/480

EX CHILLERS 5-7 HVL SW

EX

BLDG 1

CHILLERS

5-7EX CHILLERS NORM/EMER. SWBD (480V)

EDB

EX

EX DUCT

BANK

EX DUCT

BANK

PROVIDE NEW BREAKERS

IN EX SWBD

EXEXEX

STAIR 5

DN

CHILLER #3

EX

DRY COOLER #7

OLD PANEL

USED AS

PULL-BOX

EX 800A, 480V

DISCONNECT

800A, 480V

NEMA 3R

DISCONNECT

CHILLER #1

NEW

EX FEEDER TO

MTS-HCHILL

WITHIN BASEMENT

EXEX

EX

EX

EX

EX

IN-GROUND

PULL-BOX

800A, 480V

NEMA 3R

DISCONNECT

8EX

CHILLER #4

NEW

800A, 480V

NEMA 3R

DISCONNECT

CHILLER #2

NEW

NEW

NEW

NEW

NEW

EX

PULL BOX

EX

RT

CR

ESPS

UG

EX GROUNDING

TEST WELL

4 4

TCP &

HEAT TAPE

7 8

TCP &

HEAT TAPE

7 8

TCP &

HEAT TAPE

7 8

GF/RT

REF-18

GF/RT

6 REF-16

EX

EXTERIOR NEW WORK PLAN -

PHASE 2

E101-2MLL NMP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116

JANUARY 05, 2023

Revisions: Date:

REPLACE CHILLER PLANT

OSCAR G. JOHNSON VA MEDICAL CENTER

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED

BID DOCUMENTS

Comm. Number: 21FED04.00

50% OWNER REVIEW 03/14/2022

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

325 H STREET,

IRON MOUNTAIN, MI 49801

95% OWNER REVIEW 06/06/2022

100% DESIGN DOCUMENTS 09/23/2022

BID DOCUMENTS 11/16/2022

ADDENDUM 01 01/05/2023

DWG. 17 OF 21

E101-2

F2 EXTERIOR NEW WORK PLAN

1/8" = 1'-0" 4'0" 2' 8' 12'

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

PROVIDE NEW SQUARE-D MASTERPACT BREAKER(S) IN EXISTING

SWBD TO FEED NEW AND EXISTING MOTORS #5,6,7,8 AND MTS/PNL

HCHILL. REFERENCE THE RISER DIAGRAM AND SCHEDULES. UTILIZE

THE SPARE CONDUIT(S) OUT TO THE CHILLER YARD AND PROVIDE

NEW CONDUIT(S) FROM THERE ON.

PROVIDE NEW QUAZITE (POLYMER CONCRETE) STRAIGHT WALL, OPEN

PULL BOX (OR EQUAL), SIZE AS REQUIRED TO SPLICE NEW CONDUIT

AND CONDUCTORS (200AMP, 4-WIRE) TO EXISTING FEEDER OF

MTS/PANEL-HCHILL.

PROVIDE STAINLESS STEEL STRUT SUPPORTS AS REQUIRED TO

SUPPORT THE NEW DISCONNECT.

PROVIDE NEW 10 FOOT COPPER GROUND ROD(S) AND #6 BARE

COPPER GROUNDING CONDUCTOR CONNECTED TO THE RODS AND

FENCE TO REPLACE THE GROUNDING SYSTEM WHICH WAS PARTIALLY

REMOVED IN A SEPARATE PROJECT, AND/OR IN THIS PROJECT.

PROVIDE A NEW #6 BARE COPPER GROUNDING CONDUCTOR

BETWEEN EACH NEW OR EXISTING CHILLER/DRY-COOLER AND THE

EXISTING GROUNDING TEST WELL. PROVIDE CADWELD CONNECTIONS

TO THE EXISTING CONDUCTORS BONDED TO THE TEST WELL GROUND

ROD.

MAINTAIN EXISTING GFCI DUPLEX RECEPTACLE IN SERVICE. (VERIFY

EXACT LOCATION)

PROVIDE A 20AMP, 120V CIRCUIT CONNECTION TO EACH CHILLER

TEMPERATURE CONTROL PANEL AND HEAT TAPE. UTILIZE EXISTING

CONDUITS FROM PANEL REF AS FEASIBLE. PROVIDE NEW AS

REQUIRED.

UTILIZE THE NEW CIRCUIT BREAKERS CALLED OUT ON THE PANEL

SCHEDULE FOR PANEL REF TO FEED THE NEW CONNECTIONS AT THE

CHILLER. CHILLER #1 SHALL UTILIZE CIRCUITS 27 AND 29. CHILLER #2

SHALL UTILIZE CIRCUITS 31 AND 33. CHILLER #4 SHALL UTILIZE

CIRCUITS 35 AND 37. PROVIDE 2-#12 AND #12 GND IN 3/4" CONDUIT AS

REQUIRED.

REINSTALL/REWIRE CARD READER AND DOOR HARDWARE AS

REQUIRED. COORDINATE WITH DOOR/HARDWARE SUPPLIER AND

JCI/SIMPLEX.

UTILIZE EXISTING SPARE 20A/1P BREAKER WITHIN PANEL REF TO

FEED NEW DUPLEX RECEPTACLE. PROVIDE CONDUIT AND WIRING AS

REQUIRED.

EMERGENCY

POWER

BUILDING

LIF

E

SA

FE

TY

U

PS

CRITICAL UPS

ATS

CN

TR

L

BM

S

BM

S

BM

S

BM

S

J

AHU-12

ATS MONITOR

PNL

CNTRL

SBP-B

EX LIGHTING

CONTROLS

SLP

CN

TR

L

JOCKEY

PUMP CONTROLLER

FIRE PUMP

CONTROL

PANEL

FLO-COLD

BMS

EQ-A

CN

TR

L

SUMP

EF-34

EF-34

ERV-1

SBL

FA EQ CR

SBA

BCR

ATS-CR

ATS-EQ

ATS-LS

ATS-XRAY

ATS-FP

CR-DIST

(CR-UPS)

EQ-2

SBP- C

EQ-5

LS-UPS

ADP

SPLICE BOX

LS

ATS ATS ATS ATS

AT

S

AT

S

ATS-CR2

ATS-CR3

AT

S

ATS-EQ2

XRAY DIST.

PNL

SBP-A

SBP

REF

DP-EQ1

UNI-STRUT

DDC

CONTROL

PNLS

DDC CTRL

PNL

F.P.

CONTROLLER

PORTABLE

GENERATOR

DISC.

1600A

SQ-D TERM. BOX

PORTABLE

GENERATOR

CONNECTION

CN

TR

L

MTS-HCHILL

EX

EX

EX

EX EX

EX EX

EX

PUMP

EX

PUMP

EX

AHU-12

EX

EX

EX

SBP.9

EX

EX

EX

CHILLER

PUMP PUMP

PUMP

PUMP

EX

EX

EX

EX

EX

EXEX

EX

EX

EX

EX

EX EX

EX

EX

EX

EX

EX

EX

EXEX

EX

EX

EX

EX

EX

EX

EX

EX

EX EX

PUMP

PUMP

PUMP

PUMP

CHWP-2

CHWP-1

MTS TO BE

RE-FED FROM

CHILLERS SWBD

EX

CHWP-3

CHWP-4

HCHILL

NEW

EX

FC

EX

ERV-4

FC

EX

FC

#1 #2 #3

EX

EXEX

EX

EX

EX

GLYCOL

PACKAGE

EXEX

EX

EX

S1

ST

EA

M

TU

NN

EL

FD

FD FD

FD

STAIR 2

UP

UP

SERVICE

ELEV

MECHANICAL

ROOM

S001

UPS

S002

IMAGING

MATERIALS

S004

SWITCHGEAR

ROOM

S003

ST

EA

M

TU

NN

EL

STEAM

TUNNEL

STEAM

TUNNEL

SUB-BASEMENT NEW WORK PLAN -

PHASE 2

E102-2MLL NMP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116

JANUARY 05, 2023

Revisions: Date:

REPLACE CHILLER PLANT

OSCAR G. JOHNSON VA MEDICAL CENTER

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED

BID DOCUMENTS

Comm. Number: 21FED04.00

50% OWNER REVIEW 03/14/2022

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

325 H STREET,

IRON MOUNTAIN, MI 49801

95% OWNER REVIEW 06/06/2022

100% DESIGN DOCUMENTS 09/23/2022

BID DOCUMENTS 11/16/2022

ADDENDUM 01 01/05/2023

DWG. 18 OF 21

4'0" 2' 8' 12' E102-2

F5 SUB-BASEMENT NEW WORK PLAN

1/8" = 1'-0"

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

REFEED MTS-HCHILL FROM EXISTING CHILLERS SWBD IN BUILDING 11.

PROVIDE A NEW 200A/3P BREAKER IN THE SWBD. UTILIZE ONE OF THE

SPARE CONDUITS OUT TO THE CHILLER YARD PULL BOX. INTERCEPT

AND CONNECT TO THE EXISTING 200A FEEDER FROM THE YARD TO

THE EXISTING 200A FEEDER TO MTS-HCHILL. PROVIDE IN-GROUND

PULL BOX AND 2" CONDUIT WITH #4/0 CONDUCTORS AND #6 GND AS

REQUIRED. REFERENCE SHEET E101-2 AND THE PANEL SCHEDULE ON

E601-2.

REPLACE THE EXISTING PANEL WITH NEW AS SCHEDULED ON E601-2.

RECONNECT EXISTING FEEDER FROM MTS-HCHILL.

PROVIDE NEW BREAKERS FOR EXISTING PANEL. REFERENCE SHEET

E101-2 AND THE PANEL SCHEDULE ON E601-2.

REINSTALL/REWIRE FIXTURE SALVAGED FROM DEMOLITION.

COORDINATE WITH OWNER FOR EXACT LOCATION. UTILIZE EXISTING

SWITCHED CIRCUIT. PROVIDE NEW SUPPORT, CONDUIT AND WIRING

AS REQUIRED.

LNM1

EQCLC2

SIMPLEX FIRE ALARM

TRANSPONDER PANEL

RAF13

GF

RACKRACK

RACK

RACK

VFD

TEMP. CONTROL PANEL

ERV-4

ERV-5

RAF-13

AHU-13

HWP-26

SECURITY SYSTEM

HEAD-END/EXPANSION I.P. CAMERA EXPANSION

FAN

COIL

HWP-27

POWER

SUPPLY

HWP-27

SP-1

CONTROL PANEL

DT-1

CONTROL PANEL

INT. LIGHTS

U.V.

HWP-28

LNM1-2

GUTTER MELT

CONTROL PANEL

48"

48"

COND.

PUMP

30"

EX

EX

EXEX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EXEX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

BM

S

JJJ

NH-ME-1

AHU

EX

PUMP

EX

EX

PUMP

TA

TA BLEQ2

HX-15

EX EX

HX-16

AHU-21

EX

MECH.

ROOMSTERILIZER

DP-PH2

E6A 1 1 /4"

C . T

O

ER

U-

EA

ST

BBBB

P-6P-8

EX

EX

AHU-10

EF-2

HX-6

HX-8

TCP

PUMP

UH

UH

1D

AHU11 SUP. FAN 1

AHU11 SUP. FAN 2

AH11 RET. FAN 2

AH11 RET. FAN 1

DP-PH1W6A

PUMP

EX

EX

AHU-11

EF-1

HX-6

HX-8

UH

EX

PUMP

TCP

PUMP

UH

1D

ROLAIRTROL

GB

78"

22"

1-SF-5

1-RF-5

78"

C

VACUUM

PUMPS

X-RAY

CR2E

EQ4

2CR-1

2CRDP

ESD

EX

EX

EX.

FAN

EX

RF-5

EX

AHU-4

MPA MPB

EX

AH-15

EXEXEX

EX

EX

EX

EXEX

EX

EX

1D 1

1D 1D 1

EX

LIEBERT

EX

AH-5

EX

HWP-24/25

EX

1D 1AHU-30

TCP TCP

EX EX

FD FD FD

DWV

FD

FD

EX UNIT

HEATER

EX

F-003

TCP

TCP

AHU RAF

EX

RAF-1

EX

HX-20

EX

HX-19

EX

AHU-24

EX

EX

EX EX

EX

EX

P-018

P-019

EX

AS-001

AHU-24

PNL B1

PNL B2

PNL KP

TA

STAIR 5

UP

E1

E1

B5

B3

EX

EX

EX

EX

EX

CR

ESPS

CORRIDOR

B199B-1

RETAIL

STORE

B174

CHIEF,

CANTEEN

B174A

CANTEEN

STORAGE

B175A

CANTEEN

KITCHEN

B175

MAIN

KITCHEN

B186

COOLER 2

RETHERM

COOLER 1

ELECTRIC

ROOM

B186I

B186B B186CB186AB192

BASEMENT, SECOND, THIRD AND

SIXTH FLOOR NEW WORK PLANS -

PHASE 2

E103-2MLL NMP

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

PhaseARCHITECT/ENGINEER OF RECORD STAMP 585-21-116

JANUARY 05, 2023

Revisions: Date:

REPLACE CHILLER PLANT

OSCAR G. JOHNSON VA MEDICAL CENTER

ARCHITECT/ENGINEER

310 Pine Street | Green Bay, WI 54301 920-432-4865 | www.bernersschober.com FULLY SPRINKLERED

BID DOCUMENTS

Comm. Number: 21FED04.00

50% OWNER REVIEW 03/14/2022

VA FORM 08 - 6231

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

325 H STREET,

IRON MOUNTAIN, MI 49801

95% OWNER REVIEW 06/06/2022

100% DESIGN DOCUMENTS 09/23/2022

BID DOCUMENTS 11/16/2022

ADDENDUM 01 01/05/2023

DWG. 19 OF 21

E103-2

F4 PARTIAL BASEMENT NEW WORK PLAN - PHASE 2

1/8" = 1'-0" E103-2

F9 PARTIAL BASEMENT NEW WORK PLAN - PHASE 2

1/8" = 1'-0"E103-2

F8 PARTIAL BASEMENT NEW WORK PLAN - PHASE 2

1/8" = 1'-0"

E103-2

D3 PARTIAL SIXTH FLOOR RM 6222A - NEW WORK - PHASE 2

1/8" = 1'-0"E103-2

D1 PARTIAL SIXTH FLOOR RM 6122A - NEW WORK - PHASE 2

1/8" = 1'-0"

E103-2

E1 PARTIAL SECOND FLOOR NEW WORK PLAN - PHASE 2

1/8" = 1'-0"

E103-2

F1 PARTIAL THIRD FLOOR NEW WORK PLAN - PHASE 2

1/8" = 1'-0"

MECHANICAL

ROOM

B094

AREAWAY

B096

IT

ROOM

B091

ELECTRICAL,

EMERGENCY

B092

ELECTRICAL,

INCOMING

B092

MECH.

ROOM

B231C

BULK

MEDICAL

STORAGE

B231D

MECH.

ROOM

B231A

STORAGE

LOGISTICS

B231

MECHANICAL

ROOM

B079

MECHANICAL

ROOM

6222A

MECHANICAL

ROOM

6122A

MECHANICAL

ROOM

MECHANICAL

ROOM

E103-2

D4 PARTIAL BASEMENT NEW WORK PLAN - PHASE 2

1/8" = 1'-0"

4'0" 2' 8' 12'4'0" 2' 8' 12'4'0" 2' 8' 12'4'0" 2' 8' 12'

4'0" 2' 8' 12' 4'0" 2' 8' 12' 4'0" 2' 8' 12'

4'0" 2' 8' 12'

(THIS SHEET ONLY)

NEW WORK PLAN KEYED NOTES

1 PROVIDE NEW DATA DROP(S) AS CALLED FOR AT THE NEW ENERGY

VALVES. COORDINATE VALVE LOCATIONS WITH MECHANICAL

CONTRACTOR. UTILIZE EXISTING DATA RACK AND PATCH PANEL FROM

LOCAL IDF WITHIN A 250 FEET OF VALVE.

NO

ELECTRICAL

WORK

NO

ELECTRICAL

WORK

N N N

N

N N N N

AutoCAD SHX Text

BAS

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

RAMP