This document is a Statement of Work (SOW) for asbestos-containing material (ACM) and lead paint abatement services across multiple building locations. The work is divided into six task groups with specific scope, timeline, and monitoring requirements.

Tasks 1 and 2 involve Building 1, Floor 3 (Rooms D333, D335, and D335A) and require abatement of all lead paint excluding windows, with the contractor assuming all paint is lead-based. The scope includes removal of ACM floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows, followed by re-insulation of all abated piping components. This phase allows 8 calendar days for completion, 6 abatement days, and 8 monitoring days, with work restricted to Monday-Friday day shift hours. Tasks 3, 4, and 5 cover Building 1, Floor 4 (Rooms D405, D407, D407A, D409, and D409A) with identical abatement requirements for lead paint and ACM materials, allocated 10 calendar days, 8 abatement days, and 10 monitoring days. Task 6 addresses Building 200 Stone space and focuses exclusively on ACM pipe insulation, pipe fittings, and pipe elbows abatement with re-insulation, requiring 34 calendar days, 32 abatement days, and 34 monitoring days. All tasks are scheduled for Monday-Friday day shift completion.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tasks 1 and 2 Bldg 1 – Floor 3, Room D333, D335, and D335A

Calendar Days = 8 Abatement Days = 6 Monitoring Days = 8

• Abate all lead paint – excluding all windows – contractor shall assume all paint is lead based paint.

• Abate all ACM floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows

• Re-insulate all abated piping, pipe fittings, and pipe elbows.

• This work can be completed during Monday-Friday day shift hours

Tasks 3, 4, and 5 Bldg 1 – Floor 4, Room D405, D407, D407A, D409 and D409A

• Abate all lead paint – excluding all windows – contractor shall assume all paint is lead based paint.

• Abate all ACM floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows

• Re-insulate all abated piping, pipe fittings, and pipe elbows.

• This work can be completed during Monday-Friday day shift hours

Calendar Days = 10 Abatement Days = 8 Monitoring Days = 10

Tasks 6 Bldg. 200 Stone space – Example of an existing condition

Calendar Days = 34 Abatement Days = 32 Monitoring Days = 34

• Abate all ACM pipe insulation, pipe fittings, and pipe elbows

• Re-insulate all abated piping, pipe fittings, and pipe elbows.

• This work can be completed during Monday-Friday day shift hours