S02 Att07.6 Seed 578-26-008 Hines Abatement Task Order E Locations.pdf
PDF 511 KB Posted
- Solicitation number
- 36C25226R0038
About this file
This document is a Statement of Work (SOW) for asbestos-containing material (ACM) and lead paint abatement services across multiple building locations. The work is divided into six task groups with specific scope, timeline, and monitoring requirements.
Tasks 1 and 2 involve Building 1, Floor 3 (Rooms D333, D335, and D335A) and require abatement of all lead paint excluding windows, with the contractor assuming all paint is lead-based. The scope includes removal of ACM floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows, followed by re-insulation of all abated piping components. This phase allows 8 calendar days for completion, 6 abatement days, and 8 monitoring days, with work restricted to Monday-Friday day shift hours. Tasks 3, 4, and 5 cover Building 1, Floor 4 (Rooms D405, D407, D407A, D409, and D409A) with identical abatement requirements for lead paint and ACM materials, allocated 10 calendar days, 8 abatement days, and 10 monitoring days. Task 6 addresses Building 200 Stone space and focuses exclusively on ACM pipe insulation, pipe fittings, and pipe elbows abatement with re-insulation, requiring 34 calendar days, 32 abatement days, and 34 monitoring days. All tasks are scheduled for Monday-Friday day shift completion.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tasks 1 and 2 Bldg 1 – Floor 3, Room D333, D335, and D335A
Calendar Days = 8 Abatement Days = 6 Monitoring Days = 8
• Abate all lead paint – excluding all windows – contractor shall assume all paint is lead based paint.
• Abate all ACM floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows
• Re-insulate all abated piping, pipe fittings, and pipe elbows.
• This work can be completed during Monday-Friday day shift hours
Tasks 3, 4, and 5 Bldg 1 – Floor 4, Room D405, D407, D407A, D409 and D409A
• Abate all lead paint – excluding all windows – contractor shall assume all paint is lead based paint.
• Abate all ACM floor tile, ceiling tile, glue dots, mastic, pipe insulation, pipe fittings, and pipe elbows
• Re-insulate all abated piping, pipe fittings, and pipe elbows.
• This work can be completed during Monday-Friday day shift hours
Calendar Days = 10 Abatement Days = 8 Monitoring Days = 10
Tasks 6 Bldg. 200 Stone space – Example of an existing condition
Calendar Days = 34 Abatement Days = 32 Monitoring Days = 34
• Abate all ACM pipe insulation, pipe fittings, and pipe elbows
• Re-insulate all abated piping, pipe fittings, and pipe elbows.
• This work can be completed during Monday-Friday day shift hours
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |