S02 - Att 02 Combined Drawings 100CD.pdf
PDF 30 MB Posted
- Attached to
- Y1DZ--B1 Interior Demo & Abatement 556-24-102
- Solicitation number
- 36C25225B0019
About this file
This is a comprehensive set of demolition and abatement design documents for Building 1 at the Captain James A. Lovell Federal Healthcare Center in North Chicago, Illinois. The 76-sheet drawing set covers a full interior demolition and abatement project across four building levels (basement, levels 1-3, and attic), with detailed plans for removing electrical, mechanical, plumbing, fire protection, and telecommunications systems.
Key scope elements include removing asbestos-containing materials using specialized techniques like glovebag methods, demolishing existing HVAC equipment and ductwork, removing lead-based paint surfaces, disconnecting electrical systems and panels, and carefully managing telecommunications infrastructure. The project requires strict infection control measures, with specific protocols for negative air pressure, dust containment, and worker safety. The demolition work is part of VA project number 556-24-102, with documents prepared by Spur Design, LLC and dated December 20, 2024. The drawings provide extensive technical details for contractors, including demolition plans, equipment removal strategies, and requirements for protecting remaining building systems during the renovation process.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MEP/TELECOM ENGINEER
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation. FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RSH
11140 SOUTH TOWN SQUARE, STE 100
ST. LOUIS, MO 63123
(713) 864-2900
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
H2B
1225 N. LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
ARCH REG. BETHANY JACKSON, #a7055
MECH REG. ROSS MYLES, #062.071715
ELEC REG. IAN COLLINS, #2024006402
EXP. 06/30/2025
EXP. 11/30/2025
EXP. 12/31/2024
/1
/2
:5
:3
A
M
COVER SHEET
KJW 01 OF 76AJS
100% CONSTRUCTION DOCUMENTS
BUILDING 1 INTERIOR DEMOLITION
AND ABATEMENT
VA PROJECT NUMBER: 556-24-102
BUILDING 1 INTERIOR
DEMOLITION AND
ABATEMENT
12/20/2024
556-24-102
CAPTAIN JAMES A LOVELL FHCC
3001 GREEN BAY ROAD
NORTH CHICAGO, IL 60064-3048
CAPTAIN JAMES A LOVELL FHCC
3001 GREEN BAY ROAD
NORTH CHICAGO, IL 60064-3048
100% CONSTRUCTION DOCUMENTS
GI000
SPUR #: 23100.03
LOCATION
PLAN
AREA
PLAN
N N
PROJECT LOCATION
BUILDING 1
NUMBER REVISION DESCRIPTION DATE
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
01 GI000 COVER SHEET
02 GI001 GENERAL INFORMATION
03 GI002 ICRA CONSTRUCTION DETAILS
04 GI003 OCCUPIED PLANS
[02] ENVIRONMENTAL
05 HA100 BUILDING 1 - LEVEL 0 - ABATEMENT PLAN
06 HA101 BUILDING 1 - LEVEL 1 - ABATEMENT PLAN
07 HA102 BUILDING 1 - LEVEL 2 - ABATEMENT PLAN
08 HA103 BUILDING 1 - LEVEL 3 - ABATEMENT PLAN
09 HA104 BUILDING 1 - LEVEL 4 - ABATEMENT PLAN
[03] ARCHITECTURAL
10 AD101 DEMOLITION PLAN - LEVEL 1
11 AD102 DEMOLITION REFLECTED CEILING PLAN - LEVEL 1
12 AD103 DEMOLITION PLAN - LEVEL 2
13 AD104 DEMOLITION REFLECTED CEILING PLAN - LEVEL 2
14 AD105 DEMOLITION PLAN - LEVEL 3
15 AD106 DEMOLITION REFLECTED CEILING PLAN - LEVEL 3
16 AE101 FLOOR PLAN - LEVEL 1
17 AE102 FLOOR PLAN - LEVEL 2
18 AE103 FLOOR PLAN - LEVEL 3
19 AC131 REFLECTED CEILING PLAN - LEVEL 1
20 AC132 REFLECTED CEILING PLAN - LEVEL 2
21 AC133 REFLECTED CEILING PLAN - LEVEL 3
22 AE401 EXISTING PHOTOS
23 AE402 EXISTING PHOTOS
24 AE403 EXISTING PHOTOS
25 AE404 EXISTING PHOTOS
26 AE405 EXISTING PHOTOS
27 AE406 EXISTING PHOTOS
[04] FIRE PROTECTION
28 FA001 FIRE ALARM GENERAL NOTES
29 FA101 FIRE ALARM AUDIBILITY LEVEL 1 FLOOR PLAN
30 FA102 FIRE ALARM AUDIBILITY LEVEL 2 FLOOR PLAN
31 FA103 FIRE ALARM AUDIBILITY LEVEL 3 FLOOR PLAN
32 FA104 FIRE ALARM AUDIBILITY ATTIC PLAN
33 FA105 FIRE ALARM CEILING PLAN LEVEL 1
34 FA106 FIRE ALARM CEILING PLAN LEVEL 2
35 FA107 FIRE ALARM CEILING PLAN LEVEL 3
36 FA108 FIRE ALARM ATTIC PLAN
37 FX001 FIRE SUPPRESSION GENERAL NOTES
38 FX101 FIRE SUPPRESSION HAZARD CLASSIFICATION LEVEL 1 FLOOR PLAN
39 FX102 FIRE SUPPRESSION HAZARD CLASSIFICATION LEVEL 2 FLOOR PLAN
40 FX103 FIRE SUPPRESSION HAZARD CLASSIFICATION LEVEL 3 FLOOR PLAN
41 FX104 FIRE SUPPRESSION HAZARD CLASSIFICATION ATTIC PLAN
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[05] PLUMBING
42 P-000 PLUMBING LEGEND
43 PD101 DOMESTIC WATER PLUMBING DEMOLITION PLAN - BASEMENT LEVEL
44 PD102 DOMESTIC WATER PLUMBING DEMOLITION PLAN - LEVEL 1
45 PD103 DOMESTIC WATER PLUMBING DEMOLITION PLAN - LEVEL 2
46 PD104 DOMESTIC WATER PLUMBING DEMOLITION PLAN - LEVEL 3
47 PD105 DWV DEMOLITION PLAN - BASEMENT LEVEL
48 PD106 DWV DEMOLITION PLAN - LEVEL 1
49 PD107 DWV DEMOLITION PLAN - LEVEL 2
50 PD108 DWV DEMOLITION PLAN - LEVEL 3
51 PD109 DWV DEMOLITION PLAN- ATTIC
[06] MECHANICAL
52 M-000 LEGEND AND ABBREVIATIONS
53 MD101 HVAC DUCT DEMOLITION PLAN - BASEMENT LEVEL
54 MD102 HVAC DUCT DEMOLITION PLAN - LEVEL 1
55 MD103 HVAC DUCT DEMOLITION PLAN - LEVEL 2
56 MD104 HVAC DUCT DEMOLITION PLAN - LEVEL 3
57 MD105 HVAC DUCT DEMOLITION PLAN - ATTIC
58 MD106 HVAC PIPING DEMOLITION PLAN - BASEMENT LEVEL
59 MD107 HVAC PIPING DEMOLITION PLAN - LEVEL 1
60 MD108 HVAC PIPING DEMOLITION PLAN - LEVEL 2
61 MD109 HVAC PIPING DEMOLITION PLAN - LEVEL 3
62 MD110 HVAC PIPING DEMOLITION PLAN - ATTIC
[07] ELECTRICAL
63 E-001 ELECTRICAL LEGEND AND ABBREVIATIONS
64 ED100 ELECTRICAL DEMOLITION PLAN - BASEMENT
65 ED101 ELECTRICAL DEMOLITION PLAN - LEVEL 1
66 ED102 ELECTRICAL DEMOLITION PLAN - LEVEL 2
67 ED103 ELECTRICAL DEMOLITION PLAN - LEVEL 3
68 ED104 ELECTRICAL DEMOLITION PLAN - ATTIC
69 EL201 TEMPORARY ELECTRICAL PLAN - LEVEL 1
70 EL202 TEMPORARY ELECTRICAL PLAN - LEVEL 2
71 EL203 TEMPORARY ELECTRICAL PLAN - LEVEL 3
72 E-601 ELECTRICAL ONE-LINE DRAWING
[08] TELECOMMUNICATIONS
73 TN001 TELECOMMUNICATIONS COVER SHEET
74 TND101 TELECOMMUNICATIONS DEMOLITION PLAN - LEVEL 1
75 TND102 TELECOMMUNICATIONS DEMOLITION PLAN - LEVEL 2
76 TND103 TELECOMMUNICATIONS DEMOLITION PLAN - LEVEL 3
TOTAL SHEETS: 76
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
FIXTURE MOUNTING HEIGHTS AND CLEARANCES - NOT APPLICABLE TO PROJECT SCOPE
DOOR AND FIXTURE CLEARANCES - NOT APPLICABLE TO PROJECT SCOPE
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS. REFERENCE RELEVANT ADDENDA FOR EACH OF THE ADOPTED CODES AND STANDARDS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2024 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2024 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2024 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2024 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2024 INTERNATIONAL MECHANICAL CODE
• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2024 INTERNATIONAL PLUMBING CODE (IPC)
• 2022 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2022 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
• 2022 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2023 STEEL CONSTRUCTION MANUAL (16TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2022 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2022 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
• 2024 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: CHICAGO, ILLINOIS
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 4A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING
ATTIC AND OTHER: R-49 EXISTING
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 EXISTING
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. EXISTING
FLOORS
MASS: R-14.6 c.i. EXISTING
STEEL-FRAMED: R-30 EXISTING
WOOD-FRAMED AND OTHER: R-30 EXISTING
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING
OPAQUE DOORS
SWINGING: U-0.370 EXISTING
NONSWINGING: U-0.310 EXISTING
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.36 EXISTING
OPERABLE: U-0.45 EXISTING
ENTRANCE DOOR: U-0.63 EXISTING
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM
ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE
DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY WORK,
TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY DISCREPANCIES TO
THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND
EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR
ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR
REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
9. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE AND
OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS, BUT
DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL DRAWINGS.
CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER SHEETS
AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT
WORK REQUIRED TO ACHIEVE A COMPLETE AND OPERATIONAL GOAL. LACK OF
COORDINATION AND REVIEW OF DRAWINGS AND SPECIFICATIONS AS AN ENTIRE
DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS, BEING OBVIOUS AND
TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS, SHALL
NOT BE IN ANY WAY AN ADDITIONAL COST TO THE GOVERNMENT.
10. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH SERVICES
TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN ADVANCE OF
PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND
APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY
SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE
DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR
INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY
NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL
CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR.
CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH
OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE
TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE
MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING
HOURS. SCHEDULE INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT
BE AN ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT
MAY AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
11. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS
(ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE DESIGNED/SPECIFIED AS BUILDING
MATERIAL IN ANY OF THE CONSTRUCTION DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
CLEAN UTILITY
000A
150 SF
/1 A101
X0000
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
SIM
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
C/C CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALKBOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CPT CARPET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPOXY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
QT QUARRY TILE
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
R
RAF RESILIENT ATHLETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
SWC STAINLESS STEEL WALLCOVERING
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
V/C VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL-FACED ACOUSTICAL TILE
VP VENEERED PLASTER
VT VINYL TILE
V/V VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
TRUE
NORTH
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MEP/TELECOM ENGINEER
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation. FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RSH
11140 SOUTH TOWN SQUARE, STE 100
ST. LOUIS, MO 63123
(713) 864-2900
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
H2B
1225 N. LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
ARCH REG. BETHANY JACKSON, #a7055
MECH REG. ROSS MYLES, #062.071715
ELEC REG. IAN COLLINS, #2024006402
EXP. 06/30/2025
EXP. 11/30/2025
EXP. 12/31/2024
/1
/2
:5
:3
A
M
GENERAL INFORMATION
KJW 02 OF 76AJS
100% CONSTRUCTION DOCUMENTS
BUILDING 1 INTERIOR
DEMOLITION AND
ABATEMENT
12/20/2024
556-24-102
CAPTAIN JAMES A LOVELL FHCC
3001 GREEN BAY ROAD
NORTH CHICAGO, IL 60064-3048
GI001
SPUR #: 23100.03NUMBER REVISION DESCRIPTION DATE
OUTSIDE OF BUILDING
WEEKLY CHANGED
HEPA FILTER
HEPA NEGATIVE
AIR UNIT
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE FILTER
FIRE RATED PLYWOOD
F
LE
X D
U C
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
6 MIL PLASTIC
TEMPORARY DIGITAL MANOMETER FOR NEGATIVE
PRESSURE MONITORING OUTSIDE OF ICRA BARRIER
FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.01
OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL
OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
PROVIDE STICKY MAT, DRY MAT, WET MAT
(CHANGED END OF SHIFT OR MORE IF
NECESSARYTO MAINTAIN CLEANLINESS)
PROVIDE WIPES AND SPRAY FOR WET MAT
POST ICRA ILSM FIRE
INSPECTION SHEETS
CONTAINER VISIBLE
TO PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE DIFFUSERS)
E
DOOR OPENING
VENT TO OUTSIDE ROUTE
TO BE APPROVED BY COR.
FIRE PULL STATION WITH AUDIO/
VISUAL
ILSM SIGNAGE
ICRA BARRIER, SEE PLANS FOR TYPE AND LOCATION
GI002
GI002
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO LOCKING
BRAKES
MOBILE CART
A D
JU
S
T A
B
LE
H E
IG
H
T
HEPA NEGATIVE AIR
UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
HEATED DETECTOR CUT-OFF
BASIS OF DESIGN: HEPA NEGATIVE AIR UNIT
INTEGRAL WITH EDGEGUARD BARRIER SYSTEM.
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
EXISTING WINDOW FRAME
TYPE A OR C ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
TYPE B OR D ICRA BARRIER,
SEE PLANS FOR TYPE AND
LOCATION
EXISTING CEILING
EXISTING CONCRETE SLAB FLOOR OR
ROOF ASSEMBLY
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING
REPLACED MUST BE PROTECTED.
COVER WITH ROSIN PAPER/ FIRE
RATED PLYWOOD.
WHEN WORKING ABOVE CEILING WITH
BARRIERS THAT TERMINATE AT CEILING,
PROVIDE PLASTIC ENCLOSURE IN
PLENUM SPACE.
XXXXXX
XXXXXX
XXXXXX
A .F
.F
4' -0
THIS IS A RESTRICTED AREA
AREA UNDER CONSTRUCTION
PERSONNEL ENTERING MUST HAVE: HARD HAT,
SAFETY GLASSES AND PROPER I.D.
COMING SOON!!
--DESCRIPTION ON NEWLY PROPOSED OCCUPANCY--
ICRA, ISLM, WATCH,
MISC. FORMS
PAPER CADDY
INDICATOR
(REFER TO
PLAN AND
ELEVATION)
FRAMED PICTURE
OF C.O.R. WITH
CONTACT
INFORMATION
CONSTRUCTION
SUPERVISOR
NAME AND CELL NUMBER
XXXXX
BOILER/CHILLER PLANT AFTER
HOURS CONTACT PHONE XXXXX
FIRE EMERGENCY DIAL 911
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
WALL TO EXTEND TO UNDERSIDE
OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
/2
3 5/8" 16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
CB
3 5/8" INSULATED WALL WITH 16
GAUGE METAL STUDS @ 16" O.C.
(2) LAYERS 5/8" GYPSUM BOARD
EACH SIDE. WALL TO EXTEND TO
UNDERSIDE OF DECK
5/8" FIRE RESISTANT GYPSUM
BOARD - BOTH SIDES
EXISTING CEILING SYSTEM
BASE - TO MATCH EXISTING
AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
D
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
FIRE RESISTANT SEALANT, BOTH
SIDES
1-HR RATED AND SMOKE RATED
U.L. DESIGN NO. U404
SMOKE RATED 2-HR RATED AND SMOKE
RATED
U.L. DESIGN NO. U404A
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET
BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING RUNNER
TOP SEALING RUNNER
SUPPORT POLES,
QUANTITY PER MANUF.
RECOMMENDATIONS
CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK IS COMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S). AS THE ACTIVITY PROGRESSES, A FULL RE-
EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO
DOWNGRADING THE LEVEL OF PRECAUTIONS.
LEVEL I:
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION
OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF
CONTAMINANTS AND LOOSE MATERIAL.
LEVEL II:
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED
AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT
CART OR SOME OTHER SYSTEM).
2. IF WORK SITE CONTAINED, MUST BE NEUTRAL OR NEGATIVELY PRESSURIZED.
3. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE
WORK AREA.
4. REMOVE/ISOLATE/TAPE OFF AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC
SYSTEM FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS
DIFFUSER ISOLATION.
5. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR
ISOLATED FROM THE MAIN SYSTEM.
6. SEAL/CLOSE DOORS TO PREVENT DUST MIGRATION. MAY PUT ZIPPER PLASTIC BARRIER
OVER DOOR.
7. CONSIDER HEPA CART USE.
8. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND
DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.
9. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN
SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE
AREA.
10. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO
TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS
MUST BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE
CONTAINED WORK AREA.
11. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA
BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY
SOILED.
12. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR
HEPA VACUUMING SURFACES AT LEAST DAILY.
LEVEL III:
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS.
BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK
ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY
AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM
MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING,
USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE
WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS (UNLESS A
WORK SPECIFIC WAIVER IS APPROVED BY VHA’S OFFICE OF HEALTHCARE ENGINEERING);
THIS MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE PROJECT.
EXHAUST DISCHARGED DIRECTLY TO THE OUTDOORS THAT IS 25 FEET OR GREATER FROM
ENTRANCES, AIR INTAKES AND WINDOWS IS NOT REQUIRED TO BE HEPA-FILTERED.
EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS, OR OTHER
SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.
6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR
DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR
AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR
APPARATUS ARE NOT ACCEPTABLE.
LEVEL IV:
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM
MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND
CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST
BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF
COVER SUITS IS ACCEPTABLE.
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM.
SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED
SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.
GENERAL ICRA NOTES - LEVEL OF PRECAUTIONS & CONTROL MEASURES
CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THE ACTIVITY AND
INSPECTED PRIOR TO TERMINATING MEASURES DEFINED IN TABLE 5.
LEVELS I -II:
CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
HVAC SYSTEMS:
1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
WATER SYSTEMS:
1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
LEVELS III - IV:
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL
ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL
MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED.
ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER
THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING
HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT)
MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION
OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND
BEFORE REMOVAL OF CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW
AND AIR EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT
LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED
UPON COMPLETION OF THE ACTIVITY
INSPECTIONS AND NON-INVASTIVE ACTIVITES
MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION
CATEGORY A
INCLUDES BUT NOT LIMITED TO:
• WORK CAN BE COMPLETED IN A SINGLE SHIFT, DOES NOT EXCEED 10 HOURS, AND DOES NOT CREATE DUST OR DEBRIS.
• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.
• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR VISUAL INSPECTION LIMITED TO 1 TILE
PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO EXCEED AN HOUR FOR EACH TILE) WITHIN THE SHIFT.
• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT CREATE DUST OR DEBRIS.
• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS PLUMBING ON POTABLE SYSTEMS LIMITED TO FAUCET REPLACEMENT
ETC. AND ELECTRICAL WORK SUCH AS REPLACEMENT OF BULBS, RECEPTACLES, OR SWITCHES.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATES MINIMAL DUSTCATEGORY B
INCLUDES BUT NOT LIMITED TO:
• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING A WEEK.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• WORK THAT CREATES MINIMAL DUST AND DEBRIS.
• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF FIREWALLS AND BARRIERS, AND
NEW FLOORING THAT PRODUCES MINIMAL DUST AND DEBRIS. CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY
SANDING) THAT PRODUCE MINIMAL DUST AND DEBRIS.
• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING FOR A SINGLE FIXTURE. ANY
WORK ON SANITARY PLUMBING INCLUDING SNAKING OF DRAINS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW
DEVICE SUCH AS A LIGHT FIXTURE THAT PRODUCES MINIMAL DUST AND DEBRIS.
• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A SINGLE DIFFUSER, SINGLE
TERMINAL UNIT OR A SINGLE DEVICE THAT PRODUCES MINIMAL DUST AND DEBRIS.
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES
DEMOLITION OR REMOVAL OF ANY FIXED BUILDING COMPONENTS OR ASSEMBLIES
INCLUDES BUT NOT LIMITED TO:
• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• DEMOLITION/REMOVAL OF EXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER ARCHITECTURAL ELEMENTS.
• DEMOLITION/REMOVAL OF MORE THAN 32 FT2 OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING AND MINIMAL
INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS AND BRANCH PIPING.
• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL/PLASTER AND ASSOCIATED WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS AND TOILETS AND ASSOCIATED PLUMBING.
• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.
• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS, AND TERMINAL UNITS FOR AN AREA.
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS
INCLUDES BUT NOT LIMITED TO:
• WORK DURATION EXCEEDING 6 MONTHS; PATIENTS AND EMPLOYEES NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• LARGE-SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE INCLUDING REMOVAL OF MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC.
• THE INSTALLATION BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL AND
ASSOCIATED PLASTER WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF: NEW MEDICAL GAS SYSTEMS, STEAM/HEATING HOT WATER, CONDENSATE
SYSTEMS, MULTIPLE SINKS, SHOWERS AND TOILETS INCLUDING ASSOCIATED PLUMBING.
• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND MEDICAL GAS SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE FOR
LIGHTING, RECEPTACLES AND SWITCHES, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL
UNITS, FANS, ELECTRICAL SHUTDOWN OF MULTIPLE PANELS, ETC.
• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED DUCTWORK, DIFFUSERS, HEAT
EXCHANGERS, TERMINAL UNITS AND CONTROLS.
CATEGORY C
CATEGORY D
LOW RISK
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
• PUBLIC HALLWAYS AND
GATHERING AREAS NOT
IN CLINICAL AREAS
• OFFICE AREAS NOT IN
CLINICAL AREAS
• BREAKROOMS NOT IN
CLINICAL AREAS
• BATHROOMS OR LOCKER
ROOMS NOT IN CLINICAL
AREAS
• MECHANICAL/ELECTRICAL
ROOMS NOT IN CLINICAL
AREAS
• EMS CLOSETS NOT ON
CLINICAL UNITS
• WAITING AREAS
• CLINICAL ENGINEERING
(BIOMEDICAL/ STORAGE
CLOSETS FOR ITEMS
USED ON A CLINICAL
UNIT.)
• MATERIALS
MANAGEMENT/LOGISTICS/
TSS
• STERILE PROCESSING
DEPARTMENT – DIRTY
SIDE
• KITCHEN, CAFETERIA,
GIFT SHOP, COFFEE
SHOP, AND FOOD KIOSKS
• PATIENT CARE ROOMS AND
AREAS
• ALL ACUTE CARE UNITS,
INCLUDING MENTAL HEALTH
• ALL OUTPATIENT UNITS AND
CLINICS
• EMERGENCY DEPARTMENT
• DOMICILIARIES AND
TRANSITIONAL RESIDENCES
• EMPLOYEE HEALTH
• PHARMACY – GENERAL
WORK ZONE
• MEDICATION ROOMS AND
CLEAN UTILITY ROOMS
• IMAGING SUITES –
DIAGNOSTIC IMAGING
• LABORATORY
• ALL TRANSPLANT UNITS
• ALL INTENSIVE CARE UNITS
• ALL ONCOLOGY UNITS AND
CHEMOTHERAPY/INFUSION
CENTERS
• OR THEATERS AND
RESTRICTED AREAS
• HEMODIALYSIS UNITS
• PROCEDURAL ROOMS*
• PHARMACY COMPOUNDING
AREA
• STERILE PROCESSING
DEPARTMENT – CLEAN SIDE
• TRANSFUSION SERVICES
• IMAGING SUITES –
INTERVENTIONAL IMAGING
• DEDICATED ISOLATION
WARDS/UNITS FOR
INFECTIOUS DISEASES
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
I
I
I
II
II
II
II
III
II
III
IV
IV
III
IV
IV
IV
CONSTRUCTION PROJECT TYPE
NOTE: AN INFECTION PREVENTION AND CONTROL PERMIT IS REQUIRED FOR LEVEL III AND LEVEL IV. CONSULT WITH INFECTION
PREVENTION AND CONTROL FOR LEVEL I AND LEVEL II.
NON-PATIENT CARE
AREAS SUCH AS:
PATIENT CARE SUPPORT
AREAS SUCH AS:
PATIENT CARE
AREAS SUCH AS:
PROCEDURAL, INVASIVE,
STERILE SUPPORT AND HIGHLY
COMPROMISED PATIENT CARE
AREAS SUCH AS:
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MEP/TELECOM ENGINEER
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation. FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RSH
11140 SOUTH TOWN SQUARE, STE 100
ST. LOUIS, MO 63123
(713) 864-2900
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
H2B
1225 N. LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
ARCH REG. BETHANY JACKSON, #a7055
MECH REG. ROSS MYLES, #062.071715
ELEC REG. IAN COLLINS, #2024006402
EXP. 06/30/2025
EXP. 11/30/2025
EXP. 12/31/2024
/1
/2
:5
:3
A
M
ICRA CONSTRUCTION DETAILS
KJW 03 OF 76AJS
100% CONSTRUCTION DOCUMENTS
BUILDING 1 INTERIOR
DEMOLITION AND
ABATEMENT
12/20/2024
556-24-102
CAPTAIN JAMES A LOVELL FHCC
3001 GREEN BAY ROAD
NORTH CHICAGO, IL 60064-3048
GI002
SPUR #: 23100.03
1/2" = 1'-0"
GENERAL ICRA CONSTRUCTION PLAN LAYOUT13/8" = 1'-0"
ICRA MOBILE CONTAINMENT CART23/8" = 1'-0"
SECTION AT ICRA CONSTRUCTION PLAN3
3/8" = 1'-0"
ICRA ELEVATION4
3/4" = 1'-0"
ICRA BARRIER WALL TYPES5
NUMBER REVISION DESCRIPTION DATE
OCCUPANCY PLAN LEGEND
1. HATCHED AREAS INDICATE FURNITURE TO BE SALVAGED AND RETURNED TO
THE VA FOR REUSE. FURNITURE AND EQUIPMENT IN UNHATCHED AREAS SHALL BE
REMOVED AND DISPOSED OF BY CONTRACTOR.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
MEP/TELECOM ENGINEER
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation. FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
INDUSTRIAL HYGENIST
RSH
11140 SOUTH TOWN SQUARE, STE 100
ST. LOUIS, MO 63123
(713) 864-2900
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
STRUCTURAL ENGINEER
H2B
1225 N. LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
ARCH REG. BETHANY JACKSON, #a7055
MECH REG. ROSS MYLES, #062.071715
ELEC REG. IAN COLLINS, #2024006402
EXP. 06/30/2025
EXP. 11/30/2025
EXP. 12/31/2024
/1
/2
:5
:4
A
M
OCCUPIED PLANS
KJW 04 OF 76AJS
100% CONSTRUCTION DOCUMENTS
BUILDING 1 INTERIOR
DEMOLITION AND
ABATEMENT
12/20/2024
556-24-102
CAPTAIN JAMES A LOVELL FHCC
3001 GREEN BAY ROAD
NORTH CHICAGO, IL 60064-3048
GI003
SPUR #: 23100.03
N
3/64" = 1'-0"
LEVEL 1 - OCCUPIED PLAN1
N
3/64" = 1'-0"
LEVEL 2 - OCCUPIED PLAN2
N
3/64" = 1'-0"
LEVEL 3 - OCCUPIED PLAN3
NUMBER REVISION DESCRIPTION DATE
e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
BUILDING 1 INTERIOR
DEMOLITION AND
ABATEMENT
3001 GREEN BAY ROAD
NORTH CHICAGO, IL 60064-3048
MEP/TELECOM ENGINEER
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
INDUSTRIAL HYGENIST
RSH
11140 SOUTH TOWN SQUARE, STE 100
ST. LOUIS, MO 63123
(713) 864-2900
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
STRUCTURAL ENGINEER
H2B
1225 N. LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
ARCH REG. BETHANY JACKSON, #a7055
MECH REG. ROSS MYLES, #062.071715
ELEC REG. IAN COLLINS, #2024006402
EXP. 06/30/2025
EXP. 11/30/2025
EXP. 12/31/2024
/8
/2
:3 6:
A
M
BUILDING 1 - LEVEL 0 - ABATEMENT
PLAN
05 OF 7612/20/2024
HA100
SPUR #: 23100.03No. REVISION DESCRIPTION DATE
JR CD
KEY NOTES & VISUAL GUIDE
REMOVE ASBESTOS MUDDED RESIDUAL AT PIPE FITTINGS AND HANGERS USING
GLOVEBAG METHODS, 75 EACH. REFER TO PLUMBING AND MECHANICAL DEMOLITION
DRAWINGS FOR LOCATIONS AND EXTENTS.
REMOVE INSULATION AND ASSOCIATED ASBESTOS INSULATION STICK PIN ADHESIVE
ON DUCTWORK USING MANUAL MEANS AND CHEMICAL METHODS, 4,300 SF. REFER TO
MECHANICAL DEMOLITION DRAWINGS FOR LOCATIONS AND EXTENTS.
ASBESTOS IMPACTED CRAWLSPACE SOIL IS TO BE FULLY ENCLOSED. IN THE
CRAWLSPACE AREA AND UNDER NEGATIVE PRESSURE, REMOVE VISIBLE DEBRIS
WHERE PRESENT, APPLY LOCKDOWN ENCAPSULANT ON SOIL FACE AND ALLOW TO
DRY. INSTALL A 60 MILLIMETER THICK EPDM MEMBRANE OVER EXPOSED SOIL
SURFACE, WITH MEMBRANE SHEETS CHEMICALLY WELDED AT SEAMS (WITH 12"
OVERLAP AT ALL SEAMS), AND PHYSICALLY SEALED ALONG PERIMETER EDGES (I.E.
FURRING STRIPS AND TAP-CONS WITH MEMBRANE FOLDED OVER) TO CONCRETE
WALLS AND/OR COLUMNS, AS NEEDED TO ENSURE AN AIR-TIGHT LAYER IS ACHIEVED
AND MAINTAINED BETWEEN SOILS AND CRAWL SPACE. PROVIDE AIR TIGHT
BOUNDARY WALL AND EDPM COVER SYSTEMS WITH EDGE SEALS. PERFORM ALL
WORK WITHIN NEGATIVE PRESSURE ENCLOSURE. RIGOROUS PRE-CLEANING BY
HEPA VACUUM, MANUAL WIPING AND APPLICATION OF LOCKDOWN ENCAPSULANT OF
ALL SURFACES WILL BE NECESSARY TO ACHIEVE CLEARANCE, 19,100 SF OF EDPM
COVER SYSTEM AND 2 NEGATIVE PRESSURE ENCLOSURES AND 23,500 SF
LOCKDOWN ENCAP.
PRE-CLEAN MECHANICAL ROOM SURFACES BY HEPA VACUUM, MANUAL WIPING AND
APPLICATION OF LOCKDOWN ENCAPSULANT OF ALL SURFACES, AS NECESSARY TO
ACHIEVE CLEARANCE, 1 NEGATIVE PRESSURE ENCLOSURE AND 3,600 SF EACH OF
CLEANING AND ENCAPSULANT.
LARGE STEAM PIPE VALVES WITH PRESUMED ASBESTOS GASKETS (PACM), PROTECT
AS NECESSARY.
H1
H2
H4
H5
H2 H1
H2 H1
H2 H1
H2 H1
H2 H1
H2 H1H2 H1
H3
BLDG 1 - LEVEL 0 - ABATEMENT PLAN1
556-24-102
H4
N
1/16" = 1'-0"
100% CONSTRUCTION DOCUMENTS
H3
H5
H1
H2
H3 e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
DRAWING TITLE PROJECT TITLE
LOCATION
DATE CHECKED DRAWN
PROJECT NUMBERCONSULTANTS:
DRAWING #
VA HEALTH CARE SYSTEM APPROVAL:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
DRAWING NUMBER
BUILDING NUMBER
BUILDING 1 INTERIOR
DEMOLITION AND
ABATEMENT
3001 GREEN BAY ROAD
NORTH CHICAGO, IL 60064-3048
MEP/TELECOM ENGINEER
SPUR DESIGN
2519 MADISON AVE, STE 100
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
INDUSTRIAL HYGENIST
RSH
11140 SOUTH TOWN SQUARE, STE 100
ST. LOUIS, MO 63123
(713) 864-2900
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, STE 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
STRUCTURAL ENGINEER
H2B
1225 N. LOOP WEST, STE 800
HOUSTON, TX 77008
(713) 864-2900
ARCH REG. BETHANY JACKSON, #a7055
MECH REG. ROSS MYLES, #062.071715
ELEC REG. IAN COLLINS, #2024006402
EXP. 06/30/2025
EXP. 11/30/2025
EXP. 12/31/2024
/8
/2
:3 6:
A
M
BUILDING 1 - LEVEL 1 - ABATEMENT
PLAN
06 OF 7612/20/2024
HA101
No. REVISION DESCRIPTION DATE
JR CD
DN
UP
P
P
SD
SD
SD
FEC
H8
H26
BLDG 1 - LEVEL 1 - ABATEMENT PLAN1
SPUR #: 23100.03
556-24-102
KEY NOTES & VISUAL GUIDE
REMOVE ACM FLOOR TILE AND/OR UNDERLYING ASBESTOS BLACK MASTIC ON CONCRETE USING MANUAL MEANS AND CHEMICAL
METHODS, APPROX 8,600 SF EACH.
REMOVE ACM LINOLEUM AND ADHESIVE WITH UNDERLYING ASBESTOS MASTIC ON CONCRETE USING MANUAL MEANS AND
CHEMICAL METHODS, 150 SF EACH.
REMOVE ACM LINOLEUM WITH ADHESIVE AND UNDERLYING ASBESTOS FLOOR TILE (GENERALLY 9" X 9") WITH ASBESTOS BLACK
MASTIC ON CONCRETE USING MANUAL MEANS AND CHEMICAL METHODS, 150 SF EACH.
REMOVE ASBESTOS MUDDED PIPE FITTINGS AND JOINTS USING GLOVEBAG METHODS, 1,110 EACH. ASBESTOS BLACK TAR WRAP IS PRESENT ON SOME FITTINGS. REMOVE PLASTER CHASE, SUSPENDED PLASTER CEILING, DRYWALL CEILING, PERIMETER PLASTER STEAM SOFFIT AND/OR WET WALL SECTIONS WITH LBP PLASTER AND BLOCK TO ACCESS PIPE WITH ASSOCIATED ASBESTOS FITTINGS. ASBESTOS FIITINGS ARE OCCASIONALLY PRESENT OUT OF CHASE OR SOFFITS AND LOCATED ON WATER SERVICE AND STEAM/RETURN LINES. PLASTERING OF SOFFITS, STEAM CHASES, AND SUSPENDED CEILINGS ARE APPLIED TO EXPANDED METAL LATH. REFER TO MECHANICAL AND ARCHITECTURAL DEMOLITION DRAWINGS FOR LOCATIONS AND EXTENTS, APPROXIMATELY 2,200 SF OF LBP PLASTER SOFFIT, 2,250 SF OF VERTICAL LBP PLASTER CHASES, 10,000 SF SUSPENDED LBP PLASTER CEILING, AND 12,500 SF DRYWALL CEILING. REMOVE ACT CEILING GRID SYSTEMS WHERE PRESENT. ALL CHASES
IMPACTED.
REMOVE ACM VIBRATION DAMPENING JOINT CLOTH USING DISMANTLING METHODS AND NONDESTRUCTIVE TECHNIQUES, 10 SF
OF ASBESTOS JOINT CLOTH.
REMOVE VINYL SHEET FLOOR AND UNDERLYING ASBESTOS YELLOW AND BLACK MASTIC AT STAIR LANDINGS USING MANUAL
MEANS AND CHEMICAL METHODS, 400 SF OF FLOORING IN STAIRWELL LANDING AREAS TOTAL.
ACM BLACK TAR IS PRESENT WITHIN INTERIOR WALL VOID OF PERIMETER WALLS, PROTECT AS NECESSARY. USING MANUAL AND CHEMICAL MEANS PROVIDE WALL PENETRATIONS UP TO 1 SF EACH AT 8 LOCATIONS THROUGH ACM WALL VOID IN LOCATIONS
REQUESTED BY THE VA.
REMOVE ACM TRANSITE PANELS IN FUME HOOD USING DISMANTLING METHODS AND NON-DESTRUCTIVE TECHNIQUES, 1 HOOD AT 64 SF OF TRANSITE PANELS. DOUBLE WRAP TRANSITE PANELS WITH 6-MIL POLY AND HEPA VACUUM PRIOR TO REMOVAL
FROM ENCLOSURE. FUME HOOD ASSEMBLY WITH LBP PAINT, PROTECT AS NECESSARY.
REMOVE ACM TRANSITE PANELS IN FUME HOOD AND ASBESTOS COUNTERTOP USING DISMANTLING…
This is the start of the file's text. The full file is on GovTribe.