S02 Atch C Drawings - 22 pages.pdf
PDF 18 MB Posted
- Solicitation number
- 36C26326B0033
About this file
This is a Bid-Permit Set of construction design drawings for the Hot Springs Electrical Upgrade project at the U.S. Department of Veterans Affairs (VA) facility in Hot Springs, South Dakota (VA #568A4-24-202), dated May 9, 2025.
The project encompasses electrical upgrades to Buildings 10, 12, and 64 at the VA campus, including the design and construction of a new primary switchgear building. The scope includes site demolition and layout, structural foundations with concrete piers and helical piers, a new pre-engineered metal building with concrete slab-on-grade, exterior steel stairs with grated treads, and comprehensive electrical distribution systems. Key structural requirements specify 4,500 PSI concrete for certain locations, hot-dip galvanized steel components, and foundation design for an allowable soil bearing pressure of 2,000 PSF. The drawings detail electrical site plans for both demolition and remodel phases, electrical plans for each building, primary distribution system one-line diagrams, riser diagrams for normal and emergency systems in Building 12, and switchgear elevations. Design consultants include Stone Group Architects, FMG Engineering (civil), Albertson Engineering Inc. (structural), and West Plains Engineering Inc. (MEP). The bid set consists of 22 sheets covering general information, civil, structural, architectural elements, and electrical systems with associated schedules and specifications.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP - (HOT SPRINGS, SD - VA CAMPUS LOCATION)
TRUE
NORTH
PLAN
NORTH
PROJECT
LOCATION
VICINITY MAP - (VA CAMPUS - BUILDING & SITE)
TRUE
NORTH
PLAN
NORTH
BLDG 64 & NEW
SWITCHGEAR BLDG
LOCATION
BLDG 12
LOCATION
BLDG 10
LOCATION
VA FORM 08 - 6231
A
B
C
D
A
B
C
D
2 4 5 61
O N
E E
IG
H
T H
I N
C H
O
N E
F O
O T
1/
8"
'-0
O N
E Q
U A
R T
E R
I N
C H
O
N E
F O
O T
1/
4"
'-0
T H
R E
E E
IG
H
T H
S
IN
C H
O
N E
F O
O T
(3 /8
1' -0
O N
E H
A
LF
I N
C H
O
N E
F O
O T
1/
2"
'-0
T
H R
E E
Q U
A R
T E
R S
IN
C
H
O N
E F
O O
T
3/ 4"
'-0
6"
O N
E I
N C
H
O N
E F
O O
T
1"
'-0
6"
O N
E A
N D
O N
E H
A
LF
I N
C H
E S
O
N E
F O
O T
1/ 2"
'-0
6"
T H
R E
E
IN
C H
E S
O
N E
F O
O T
3"
'-0
6"
32 4 5 61
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
DESIGNER OF RECORD
A/E:
STAMPCONSULTANTS
CIVIL: STRUCTURAL: MEP:
FMG ENGINEERING
3700 STURGIS RD
RAPID CITY, SD 57702-0317
Phone: 605-342-4105
ALEX FISHER
ALBERTSON ENGINEERING INC.
3202 W MAIN ST SUITE C
RAPID CITY, SD 57702
Phone: 605-343-9606
STEPHEN KILBER
WEST PLAINS ENGINEERING, INC.
1750 RAND RD
RAPID CITY, SD 57702
Phone: 605-348-7455
DAREN BECKLOFF
C :\U se rs
\d .to ug as
\D oc um en ts \2
8_ V
A H ot S pr in gs _E le c
U pg ra de
_d ar rin tJ
Y
L.
rv t 5/
8/
:1 9:
P
M
U.S. DEPARTMENT OF VETERANS AFFAIRS
HOT SPRINGS ELECTRICAL UPGRADE
HOT SPRINGS, SD 47747
VA #568A4-24-202
05-09-2025
BID - PERMIT SET
GI000
COVER SHEET
STONE GROUP ARCHITECTS
600 EAST 7TH STREET
SIOUX FALLS, SD 57103
605-271-1144
GARRY BLACK
HOT SPRINGS ELECTRICAL
UPGRADE
HOT SPRINGS, SD 47747
10, 12 & 64
DOUG SPRINKLE
05-09-2025 GB DT
SGA #241938
VA #568A4-24-202
BID - PERMIT SET
SHEET INDEX - FEDERAL
01 - GENERAL INFORMATION
GI000 COVER SHEET
03 - CIVIL
C100 SITE DEMO & LAYOUT
04 - STRUCTURAL
S-001 STRUCTURAL GENERAL NOTES
S-002 IBC INSPECTION TABLES
S-003 CONCRETE SURFACE REQUIREMENTS
S-101 FOUNDATION, STAIR FRAMING PLAN AND DETAILS
07 - ARCHITECTURAL ELEMENTS
AE101 ARCHITECTURAL FLOOR PLAN, ROOF PLAN, EXTERIOR ELEVATIONS, STAIR SECTION AND DETAILS
12 - ELECTRICAL
E001 ELECTRICAL SITE PLAN - DEMOLITION
E002 ELECTRICAL SITE PLAN - REMODEL
E101 PRIMARY SWITCHGEAR BLDG ELECTRICAL PLANS
E102 BUILDING 10 ELECTRICAL PLANS
E103 BUILDING 12 ELECTRICAL PLANS
E201 PRIMARY DISTRIBUTION SYSTEM ONE-LINE-ELECTRICAL DEMOLITION
E202 BUILDING 10 DOMICILIARY MAIN SERVICE - ELECTRICAL DEMOLITION
E203 BUILDING 12 - NORMAL SYSTEM RISER DIAGRAM - ELECTRICAL DEMOLITION
E204 BUILDING 12 EMERGENCY SYSTEM RISER DIAGRAM - ELECTRICAL DEMOLITION
E301 PRIMARY DISTRIBUTION SYSTEM ONE-LINE-ELECTRICAL REMODEL
E302 BUILDING 10 DOMICILIARY MAIN SERVICE - ELECTRICAL REMODEL
E303 BUILDING 12 - NORMAL SYSTEM RISER DIAGRAM - ELECTRICAL REMODEL
E304 BUILDING 12 EMERGENCY SYSTEM RISER DIAGRAM - ELECTRICAL REMODEL
E401 ELECTRICAL PRIMARY SWITCHGEAR ELEVATIONS
E501 ELECTRICAL SCHEDULES
TOTAL SHEET COUNT: 22
REVISION # DESCRIPTION DATE
01 BID - PERMIT SET 05/09/2025
3534.99
3534.95 3534.95
3534.74
3534.71
3534.39
3534.66 35
.06
3532.39
3528.96
3529.47
3529.90
3534.35
3534.81
3534.12
3534.35
3534.46
3534.46
3534.59
3534.56
3534.77
.1
3534.65
3534.93
3534.52
3533.25
.32
3533.71
3534.40
3534.54
3534.87
3534.30
3533.81
3534.40
3534.35
3535.01
3535.44
3534.21 3534.19
3534.23
3534.50
.93
.14
3535.29
.7
3535.02
3531.71
3532.06
3535.00
3534.90
3534.32
3534.32
.48
3534.35
3534.59
3532.82
3533.31
3532.66
3533.48
3532.76
3531.73
3528.35
3529.67
3529.42
3533.10
3534.68
3534.68
3533.87
3532.95
3534.24
3532.68
3531.58
3531.71
3530.46
3534.24
3534.69
.08
.18
3534.84
.65
3535.01
3534.83
.8
3534.70
3534.96
3534.54
3534.64
3534.83
3535.06
Garage
Garage
T T
T T
T T
T
T
T
T
T
T T
T T
T T
T T
T T
E
UP
UP
E
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
50"
12"
35"
8"(2)
W
Building Wall
Fire Department Connection
Gravel
Gravel
Asphalt
C oncrete
Concrete Steps and Landing
Concre te
Con cre te
White Utility Locate Flag (Unknown Purpose)
Concrete
Asphalt
Asphalt
12" Box Culvert
Approximate Alignment of Box Culvert - North End Not Found
Concrete Curb
Concrete Retaining Wall
Concrete Column
Concrete
(Broken up)
T
T
T
T
T
T
T
T
T
T
Landscape Timbers
UP
UP
UP
UP
UP
UP
UP
UP
Conduit on Building Wall
Last Utility Paint Marks
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
VA FORM 08 - 6231
A
B
C
D
A
B
C
D
2 4 5 61
32 4 5 61
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
C100
Site Demo & Layout
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
PhaseDESIGNER OF RECORD A/E:
STAMPCONSULTANTS
DOUG SPRINKLE
AF JS
CIVIL: STRUCTURAL: MEP:
NO. DESCRIPTION DATE
WEST PLAINS ENGINEERING, INC.
1750 RAND RD
RAPID CITY, SD 57702
Phone: 605-348-7455
DAREN BECKLOFF
ALBERTSON ENGINEERING INC.
3202 W MAIN ST SUITE C
RAPID CITY, SD 57702
Phone: 605-343-9606
STEPHEN KILBER
Z:
\2
1.
S to ne G rp -H ot S pr in gs V
A R en ov at e
El ec tri ca l E qu ip m en t\C
AD
\D es ig n D ra w in gs
\2
1_
D es ig n.
dw g
- H ot
S pr in gs
V A
- T hu rs da y, M ay
, 2
:4 7:
P
M
STONE GROUP ARCHITECTS
600 EAST 7TH STREET
SIOUX FALLS, SD 57103
605-271-1144
GARRY BLACK
STONE GROUP ARCHITECTS
600 EAST 7TH STREET
SIOUX FALLS, SD 57103
605-271-1144
GARRY BLACK
BID - PERMIT SET HOT SPRINGS ELECTRICAL
UPGRADE
HOT SPRINGS, SD 47747
10, 12 & 64
04-09-2025
SGA #241938
VA #568A4-24-202
FMG ENGINEERING
3700 Sturgis Road Rapid City, SD 57702
605.342.4105 • fmgengineering.com
FMG Job #
241471.0001 BID - PERMIT SET 05/09/2025
2.5'
Scale: 1" = 5'
0' 5' 10'
Note:
1) Gravel surface area at north side of switch gear building to be stripped of all top soil and organics and subgrade moisture conditioned and recompacted per geotechnical report.
2) New gravel surfacing at north side of switchgear building to consist of limestone ledgerock base course meeting requirements of SDDOT Standard Specification (2015) Section 882.2. Gravel surfacing to be placed to a minimum thickness of 4".
Proposed Legend
Seeded Area
4" Gravel Surfacing
Concrete Pad
Remove Telephone Line
Remove Tree
T
Seed mixture shall be as follows: SDDOT Type F Permanent Seed Mixture (modified) Seed rate given is for drilled seed.
Seed Mixture Table
Grass Species Variety Pure Live Seed
(PLS)
(Pounds/Acre)
Western Wheatgrass Arriba, Flintlock, Rodan, Rosana, Walsch
Green Needlegrass Lodorm, AC Mallard Ecovar 28
Sideoats Grama Butte, Pierre 21
Blue Grama Bad River 14
Oats or Spring Wheat: April Through May Winter Wheat: August through November 70
Total 182
Topsoil - Salvage, Stockpile, and Placement
Prior to excavation, the Contractor shall strip and stockpile all the available topsoil. The topsoil shall be completely stripped to the full depth beneath all areas that will need to be excavated. The Contractor shall stockpile the topsoil in a neat and uniform manner in an easily identifiable location.
Topsoil shall be placed to a minimum depth of 4" using topsoil salvaged from the site grading. Topsoil salvaging, stockpiling, and placement shall be in accordance with section 230 of SDDOT Standard Specifications for Roads and Bridges.
Revegetation
All disturbed areas that are proposed as turf and existing turf areas that were disturbed from construction activities will need to be revegetated per the seeding, fertilizing, and mulching notes on this sheet. Revegetation shall consist of salvaged or/and imported topsoil placement, seeding, fertilizing, and mulching.
Seeding, Fertilizing, and Mulching
Topsoil placement, seeding, fertilizing, and mulching shall be in accordance with sections 230, 730, 731, and 732 of SDDOT Standard Specifications for Roads and Bridges.
Unless otherwise specified, the following shall be used:
· The seed mixture to be used shall be SDDOT Type F Permanent Seed Mixture (Modified - See Table).
· Drilled Seeding rates shall be DOUBLED in areas shown as Erosion Control Blanket, Turf Reinforcement Mat, or for areas that require hand seeding.
· Cover Crop Seeding may be used per the referenced specification. The use of a Cover crop will be at the Contractors expense, no extra payment will be made for using a cover crop.
· Drilling or Hydro seeding methods are allowed for seeding.
· Fertilizer type and quantity for projects with seeding areas less than two acres shall be a commercial fertilizer with a minimum guaranteed analysis of 18-46-0 or an approved alternate fertilizer. The application rate shall be at 3 pounds per 1,000 sf.
· Mulch shall be fiber mulch applied at a rate of 3,000 pounds per acre. An additional 2% by weight of tackifier will be added to the fiber mulch product .
· The Contractor shall allow the fiber mulch to cure a minimum of 18 hours prior to watering or any storm event to ensure proper cohesion between the soil and fiber particles.
Watering
Water for vegetation consists of applying water to seeded areas to enhance germination and/or root growth. When watering, use the following guidelines:
Immediately after seeding:
· Keep the topsoil moist but not excessively wet until the seed has germinated.
· Water a minimum of 3 days a week for 2 weeks preferably watering 2 or 3 times a day in small quantities. Additional watering may be required.
· Use fine spray and low pressure to avoid topsoil wash and to prevent uncovering buried seeds.
After emergence:
· Topsoil will be kept thoroughly moistened by sprinkling, as necessary, for 6 weeks. After the 6-week period, an inspection will be made to determine if grass is established enough to suspend watering. Continue watering until grass has been thoroughly established.
· Never apply water at a rate faster than the topsoil can absorb.
· Water during early morning hours or early evening hours.
· Do not water when rain is forecasted for the area.
· If rainfall occurs, suspend watering according to rainfall amount.
No extra payment will be made for watering
Care During Construction and Final Inspection
The Contractor is responsible for smoothing dirt ridges, which result from his/her operations or from traffic. Such ridges shall be smoothed so they will not interfere with future mowing. Following completion of seeding operations, foot, vehicular, or equipment traffic over the seeded area shall be kept to a minimum. Areas damaged from such traffic shall be reworked and reseeded as determined by the Engineer or Owner.
Reseeding of Previously Seeded Areas
Existing weeds and cover crop shall be preserved for its mulch value. The seed shall be drilled directly into existing cover if possible, or mowing and disking shall be provided to permit penetration of drill openers and placement of seed to the specified depth.
4" CONCRETE PAD SECTION
Not To Scale
4" Concrete
4" Aggregate Base Course
4" 4"
Match Exiting (3534.65 ±)
Match Existing (3534.65 ±)
3534.87
3534.87
Match Existing (3534.75 ±)
Match Existing (3534.75 ±)
3534.87
3.43'
3.43'
5.42'
4.76'
9.6'
6.42'
3534.87
3534.87
3534.873534.87
3534.87
3534.87
3534.87
10'
8'
10'
8'
Concrete for Concrete Pad Concrete shall have a minimum compressive strength at 28 days of 3000 psi.
New Switchgear Building.
FF = 3536.37
1'
1'
1'
1'
Site Callouts Callout No. Description
Remove Tree
(1 EA)
Remove Telephone Line and Reroute as Necessary
Protect & do not Disturb Shrub
Protect & do not Disturb Barbed Wire Fence
Concrete Pad
(76 SY)
4" Gravel Surface to Match Existing Grades
(53 SY)
Seeded Area
(55 SY)
Underground Utilities not Marked During Utility Locate Request. Contractor to Pothole as Necessary to Locate Horizontal and Vertical Locations of Underground Utilities and Relocate as Necessary to Avoid New Construction.
Electrical Vaults Below Slab. Coordinate with Electrical & Structural Drawings for Specification & Design.
Building Foundation Piles, See Structural
Match Existing (3534.32 ±)
Match Existing (3534.53 ±)
RE
EN
IG
N
LANOISSEFOR
DERETSIGE
SOUT H DA KOT A
REG. NO.
E
P
R FISHER
ALEX M.
04-25-25
1/2" 1"0" 2"SCALE: FULL
CONCRETE PROPERTIES
LOCATION
28 DAY
COMPRESSIVE
STRENGTH
ENTRAINED
AIR
SLUMP
MAX W/C
RATIO
ALL LOCATIONS 4,500 PSI 4.0% - 6.0% 5" +/- 1" 0.45
POST INSTALLED ANCHORS & REBAR
ANCHOR TYPE
ADHESIVE ANCHORS /
REBAR IN CONCRETE
REMARKS
ADHESIVE ANCHORS / REBAR IN
CONCRETE W/ > 12" EMBEDMENT
PRODUCT
HILTI HIT - HY 200 V3
SIMPSON AT-XP
HILTI HIT - RE 500 V3
SIMPSON SET-3G
ADHESIVE ANCHORS /
REBAR IN GROUT FOR
HOLLOW MASONRY
HILTI HIT - HY 270
SIMPSON SET-XP
PROVIDE
MANUFACTURER'S
RECOMMENDED
SCREEN TUBES IN
HOLLOW MASONRY
EXPANSION ANCHORS
IN CONCRETE
HILTI KWIK BOLT TZ
SIMPSON STRONG
BOLT 2
EXPANSION ANCHORS IN
GROUTED MASONRY
HILTI KWIK BOLT 3
SIMPSON STRONG
BOLT 2
SCREW ANCHORS IN CONCRETE
OR GROUTED MASONRY
SIMPSON TITEN HD
MOST COMMONLY USED STRUCTURAL ABBREVIATIONS
SYMBOLS USED AS ABBREVIATIONS:
& AND
L ANGLE
LL DOUBLE ANGLE
@ AT
CL ℄ CENTER LINE
// PARALLEL
d PENNY (NAIL)
┴ PERPENDICULAR
PL PLATE
# POUND OR NUMBER
Ø ROUND OR DIAMETER
ABBREVIATIONS:
(A)--------------------
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT/ROD
ABV ABOVE
ADDL ADDITIONAL
ADDM ADDENDUM
ADH ADHESIVE
ADJ ADJUSTABLE, ADJACENT,
ADJOINING
AFF ABOVE FINISH FLOOR
AGGR AGGREGATE
AHR ANCHOR, ANCHORAGE
ALT ALTERNATE
APPROX APPROXIMATE
**AR ANCHOR ROD
ARCH ARCHITECT (URAL)
(B)---------------------
BEV BEVELED
BFF BELOW FINISH FLOOR
**BL BRICK LEDGE
BLDG BUILDING
BLW BELOW
**BLK BLOCK (ING)
BM BEAM
BOT BOTTOM
**BO BOTTOM OF
**BOC BOTTOM OF CONCRETE
**BOF BOTTOM OF FOOTING
BRG BEARING
**BRK BRICK
BSMT BASEMENT
BTWN BETWEEN
BU BUILT-UP
(C)---------------------
C CHANNEL
CAM*(C=) CAMBER
CB CARRIAGE BOLT
CU FT CUBIC FEET OR FOOT
CHFR CHAMFER
CIP CAST-IN-PLACE
**CIPC CAST-IN-PLACE CONCRETE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLR CLEAR, CLEARANCE
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONN CONNECT (ION)
CONSTR CONSTRUCTION
CONT CONTINUOUS, CONTINUE
CONTR CONTRACT (OR)
COORD COORDINATE
CTR CENTER
CU CUBIC
CU YD CUBIC YARD
(D)---------------------
D DEEP, DEPTH, PENNY (NAIL)
DBL DOUBLE
DEMO DEMOLITION, DEMOLISH
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL, DIAGRAM
DIM DIMENSION
DIR DIRECTION
DIV DIVIDE, DIVISION
**DKG DECKING
DL DEAD LOAD
DOUG FIR DOUGLAS FIR
DR DRAIN
DT DRAIN TILE
DWG DRAWING (S)
(E)---------------------
**(E) EXISTING (SEE EXIST)
EA EACH
**EAB EPOXY ANCHOR BOLT
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
**EMB EMBED (ED)
EPS EXPANDED POLYSTYRENE
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE
EW EACH WAY
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXP BT EXPANSION BOLT
EXT EXTERIOR, EXTERNAL
(F)---------------------
FD FLOOR DRAIN
**FND FOUNDATION
FF EL FINISH FLOOR ELEVATION
FIN FINISH (ED)
FLG FLANGE
FLR FILLER, FLOOR (ING)
**FO FACE OF
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOS FACE OF STUD
**FOW FACE OF WALL
FS FAR SIDE
FT FOOT, FEET
FTG FOOTING
FRMG FRAMING
FUT FUTURE
**FV FIELD VERIFY
(G)---------------------
GA GAGE, GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
**GL GLUE LAMINATED (BEAM)
GLU LAM GLUE LAMINATED (BEAM)
GR BM GRADE BEAM
GRTG GRATING
GYP GYPSUM
GYP BD GYPSUM BOARD
(H)---------------------
H HIGH
**HAB HEADED ANCHOR BOLT
**HAS HEADED ANCHOR STUD
HC HOLLOW CORE
HDR HEADER
HGR HANGER
HORIZ HORIZONTAL
HS HIGH STRENGTH
**HSB HIGH STRENGTH BOLT
**HSS HOLLOW STRUCTURAL SHAPE
HT HEIGHT
(I)---------------------
ID INSIDE DIAMETER
INCL INCLUDE (D), INCLUDING
INFO INFORMATION
INSUL INSULATE (D), INSULATION
INT INTERIOR
INV EL INVERT ELEVATION
(J)---------------------
**JST JOIST
**JT JOINT
(K)---------------------
K THOUSAND (KIP)
**KCJ KEYED CONSTRUCTION JOINT
KIP THOUSAND POUND
KLF KIPS PER LINEAR FOOT
KSF KIPS PER SQUARE FOOT
KSI KIPS PER SQUARE INCH
(L)---------------------
L ANGLE
LAM LAMINATE (ED)
**LB POUND
LF LINEAR FEET
**LGR LEDGER
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
LONG LONGITUDINAL
**LSL LAMINATED STRAND LUMBER
LT WT LIGHTWEIGHT
**LVL LAMINATED VENEER LUMBER
LVR LOUVER
(M)---------------------
MACH MACHINE
MB MACHINE BOLT
MATL MATERIAL
MAX MAXIMUM
MBR MEMBER
**MC MISCELLANEOUS CHANNEL
MECH MECHANICAL
MEZZ MEZZANINE
MFD MANUFACTURED
MFR MANUFACTURER
MFR REC MANUFACTURER'S
RECOMMENDATION
MIN MINIMUM
MISC MISCELLANEOUS
MTL METAL
(N)---------------------
**(N) NEW
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
(O)---------------------
OC ON CENTER
OD OUTSIDE DIAMETER
OH DR OVERHEAD DOOR
OPNG OPENING
OPP OPPOSITE
**OSB ORIENTED STRAND BOARD
**OVS OVERSIZED
(P)---------------------
**PAF POWDER ACTUATED
FASTENER
PAR PARALLEL
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERF PERFORATED
PERP PERPENDICULAR
PL PLATE
PLF POUNDS PER LINEAR FOOT
PLYWD PLYWOOD
PNL PANEL
PR PAIR, PIPE RAIL
PRCST PRECAST CONCRETE
PREFAB PREFABRICATE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
**PSL PARALLEL STRAND LUMBER
PT POST TENSION (ED),
PRESSURE TREATED
PVC POLYVINYL CHLORIDE
(R)---------------------
R RADIUS/RISE (R)
RCP REINFORCED CONCRETE PIPE
REF REFERENCE
REINF REINFORCE (D), (ING)
REQ REQUIRE
REQD REQUIRED
REV REVISION (S), REVISED
RO ROUGH OPENING
RS ROUGH SAWN
RVS REVERSE (SIDE)
(S)---------------------
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
**SL SNOW LOAD
SLNT SEALANT
SLV SLEEVE
**SOG SLAB-ON-GRADE
SPEC SPECIFICATION (S)
SQ SQUARE
**SSL SHORT SLOTTED (HOLE)
**SSLT SHORT SLOTTED (HOLE)
TRANSVERSE
SST STAINLESS STEEL
STD STANDARD
STIF STIFFENER
STL STEEL
STRUCT STRUCTURAL
SUB FL SUBFLOOR
SUSP SUSPENDED
**SW SHEAR WALL
SYMM SYMMETRY, SYMMETRICAL
(T)---------------------
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
**TBD TO BE DETERMINED
**TCX TOP CHORD EXTENSION
THD THREAD (ED) (S)
THK THICKNESS
THRU THROUGH
**TL TOTAL LOAD
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PIER
TO PAR TOP OF PARAPET
TOS TOP OF STEEL, SLAB
TO SHTHG TOP OF SHEATHING
TO SUB FL TOP OF SUBFLOOR
TOW TOP OF WALL
**TRANS TRANSVERSE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
(U)--------------------
UNO UNLESS NOTED OTHERWISE
(V)---------------------
**V SHEAR
VERT VERTICAL
VIF VERIFY IN FIELD
VR VAPOR RETARDER
VRFY VERIFY
(W)---------------------
W WIDTH
W/ WITH
W/O WITHOUT
**WA WEDGE ANCHOR
WD WOOD
WF (W) WIDE FLANGE
WL WIND LOAD
WLD WELD (ED)
WP WATERPROOFING, WORKING
POINT
**WS WALL STEP
WT WEIGHT
WWR WELDED WIRE REINFORCEMENT
(X)---------------------
XPS EXTRUDED POLYSTYRENE
(Y)---------------------
YD YARD
** NOT LISTED IN THE NCS MANUAL
CL
STRUCTURAL GENERAL NOTES
XC1 R1
XX" Ø X
XX'-X" XX'-X"
X
XN
XXNNN
XN
XXNNN
XN
XXNNN
F1
A
HSS _x_x_
B1
20GA TYPE 'W3' MTL DECK
PC S
PAN
Hx R15:12
B
B
SYMBOLS LEGEND
S J
W--x--
(XXX'-XX")
ELEVATION
INDICATOR
CUT SECTION
INDICATOR
WALL
REINFORCING
INDICATOR
PC SPAN
IDENTIFIER
STEP TOP OF
WALL INDICATOR
PIER TAG CALLOUT INDICATOR
ROOF SLOPE
INDICATOR
STEP TOP OF
FOOTING
IDENTIFIER
MASONRY PIER
INDICATOR
CORNER REINF
INDICATOR
CONTINUOUS
BEAM
INDICATOR
MATCH LINE INDICATOR
PLAN NORTH ORIENTED 90°
TO THE SHEET W/ MAGNETIC
NORTH (OPTIONAL)
DETAIL BUBBLE
INDICATOR
DETAIL/SECTION/PLAN
BLOCK TITLE INDICATOR
EXT ELEVATION
INDICATOR
COLUMN
INDICATOR(S)
KEYNOTE
IDENTIFIER
REVISION
SYMBOL
FOOTING/PIER
IDENTIFIER
STEP
INDICATOR
HOLDOWN
INDICATOR
BEAM
INDICATOR(S)
MOMENT
INDICATOR
DECK INDICATOR
SHEAR WALL
INDICATOR
LINTEL
INDICATOR
RAFTER
INDICATOR
ASTERISK
INDICATOR
SLOPE
INDICATOR
WORK POINT
INDICATOR
XN
ELEVATION INDICATOR
SECTION
INDICATOR
COLUMN/FND
GRID INDICATOR
SLAB JOINT
INDICATOR
STRUCTURAL HATCH PATTERNS
BRICK
CONCRETE
NATIVE
UNDISTURBED
SOIL
BACKFILL/FILL
ENGINEERED FILL
DRAINAGE
COURSE
GYPSUM
BOARD
WD- BLKG
OR SHIM
PLYWOOD/OSB
/PARTICLE BD
WD- GLUED
/LAMINATED
WOOD-
CONTINUOUS
FRAMING
INSUL/FIRE
SAFING
METAL FLOOR
GRATING
GROUT
RIGID
INSUL/ICF/SIP
/EIFS SYSTEMS
METALS
MORTAR
CMU
ROUGH LOG
WALL
WOOD STUD
BRG WALL
CONC WALL
HOLDOWN
(BLOCKOUT)
STONE/
ROCK WALL
C1
Hx
NTRUE
NORTH
CONT
MC-x
-xx"
/REF - ---
/REF - ---
INSULATED
PRECAST WALL
SW
-x
SOLID PRECAST
WALL
COORDINATE SYSTEM
SHEET TYPE DESIGNATORS
SHEET IDENTIFICATION
SHEET TYPE
DESIGNATOR
SHEET SEQUENCE
NUMBER 01-99
MODIFIER
CHARACTER
DISCIPLINE
CHARACTER
-S
AA
NNN
0 GENERAL (SYMBOLS LEGEND, NOTES, ETC)
1 PLANS (HORIZONTAL VIEWS)
2 ELEVATIONS (VERTICAL VIEWS)
3 SECTIONS (SECTIONAL VIEWS)
4 LARGE SCALE VIEWS (PLANS, ELEV, OR SECTIONS, NOT DETAILS)
5 DETAILS
6 SCHEDULES AND DIAGRAMS
7 USER DEFINED
8 USER DEFINED
9 3D REPRESENTATIONS (ISOMETRICS, PERSPECTIVES, PHOTOGRAPHS)
A1
54321
54321
D
B
A
C
D
B
A
C
A3
C5C4
D4
C3
D3
1. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH JOB
SPECIFICATIONS AND ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND
SITE DRAWINGS. CONSULT THESE DRAWINGS FOR SLEEVES, DEPRESSIONS AND
OTHER DETAILS NOT SHOWN ON STRUCTURAL DRAWINGS.
2. ALL DIMENSIONS AND CONDITIONS MUST BE VERIFIED IN THE FIELD. ANY
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE
PROCEEDING WITH THE AFFECTED PART OF THE WORK.
3. THE STRUCTURE IS DESIGNED TO BE SELF SUPPORTING AND STABLE AFTER THE
BUILDING IS COMPLETE. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO
DETERMINE ERECTION PROCEDURES AND SEQUENCE TO ENSURE SAFETY OF THE
BUILDING AND ITS COMPONENTS DURING ERECTION. THIS INCLUDES THE ADDITION
OF NECESSARY SHORING, SHEETING, TEMPORARY BRACING (AND ACCOMPANYING
FOOTINGS), GUYS OR TIE-DOWNS.
4. ADDITIONAL OBSERVATIONS AS A RESULT OF REJECTION OF WORK COMPLETED
AND/OR ADDITIONAL OBSERVATIONS DUE TO THE DEFICIENCIES IN WORK OBSERVED
WILL BE AT THE EXPENSE OF THE CONTRACTOR.
5. ALL STRUCTURAL SHOP DRAWINGS TO BE REVIEWED BY JOB SUPERINTENDENT IN
ADDITION TO ALL PERSONNEL DEEMED NECESSARY BY CONTRACTOR PRIOR TO
SUBMITTAL TO ENGINEER FOR APPROVAL.
6. ALL SHOP DRAWINGS TO BE REVIEWED BY ALBERTSON ENGINEERING INC. SHALL
HAVE ELECTRONIC COPIES PROVIDED TO ALBERTSON ENGINEERING INC. FOR
REVIEW. AN ELECTRONIC MARKED SET OF THOSE DRAWINGS WILL BE RETURNED TO
THE CONTRACTOR. NO ADDITIONAL HARD COPIES OF THE SHOP DRAWINGS NEED TO
BE PROVIDED TO ALBERTSON ENGINEERING INC., ALTHOUGH OTHER PARTIES MAY
REQUIRE HARD COPIES OF THE MARKED UP DRAWINGS. THESE REQUIREMENTS ARE
IN ADDITION TO THE TYPICAL PROJECT SHOP DRAWING SUBMITTAL REQUIREMENTS
STATED IN THE PROJECT SPECIFICATIONS.
7. THE DESIGN OF THE STRUCTURE SHOWN IN THESE CONSTRUCTION DOCUMENTS IS
FOR THE ONE-TIME USE AT THE SPECIFIC SITE REFERENCED IN THE GEOTECHNICAL
REPORT.
FOUNDATIONS ARE DESIGNED FOR AN ALLOWABLE SOIL BEARING PRESSURE OF 2,000
PSF ON EXISTING SOILS. BEFORE CONSTRUCTION COMMENCES, SOIL BEARING
CAPACITY SHALL BE VERIFIED BY A SUBSURFACE INVESTIGATION, A CERTIFIED TESTING
LABORATORY, WHOSE REPORT SHALL INCLUDE ANALYSIS AND RECOMMENDATIONS
FOR SITE PREPARATION IN ORDER TO BEAR THE FOUNDATION LOADS. ABOVE REPORT
SHALL BE SUBMITTED TO THE STRUCTURAL ENGINEER FOR REVIEW BEFORE
FOUNDATION CONSTRUCTION BEGINS.
1. SHALL BE ASTM F1554, GR. 36 ROD WITH THREADED ENDS. PROVIDE HOT DIP
GALVANIZE FINISH ON ALL ANCHOR BOLTS PERMANENTLY EXPOSED TO EXTERIOR
OR IN CONTACT WITH PRESSURE TREATED LUMBER.
2. THREADED ROD EMBEDMENT DEPTH SPECIFIED IN THE DRAWINGS SHALL BE FROM
TOP OF CONCRETE TO TOP OF DOUBLE NUT.
1. CONCRETE TESTING SHALL BE PAID FOR BY THE OWNER. TESTING LABORATORY
SHALL PERFORM THE FOLLOWING TEST ON CAST-IN-PLACE CONCRETE:
A. ASTM C143 - "STANDARD TEST METHOD FOR SLUMP OF PORTLAND CEMENT
CONCRETE."
B. ASTM C39 - "STANDARD TEST METHOD FOR COMPRESSIVE STRENGTH OF
CYLINDRICAL CONCRETE SPECIMENS. A SEPARATE TEST SHALL BE
CONDUCTED FOR EACH CLASS, FOR EVERY 50 CUBIC YARDS (OR FRACTION
THEREOF), PLACED PER DAY. REQUIRED CYLINDER(S) QUANTITIES AND TEST
AGE AS FOLLOWS:
a. (1) AT 7 DAYS
b. (2) AT 28 DAYS
c. (1) ADDITIONAL RESERVE CYLINDER TO BE TESTED UNDER THE DIRECTION
OF THE ENGINEER, IF REQUIRED. IF 28 DAY STRENGTH IS ACHIEVED, THE
ADDITIONAL CYLINDER(S) MAY BE DISCARDED.
C. TESTING SHALL BE BASED UPON CONCRETE TAKEN AT POINT OF PLACEMENT.
D. IN ADDITION TO TYPICAL TESTING REQUIREMENTS, SLUMP AND AIR CONTENT
SAMPLES SHALL BE TAKEN AT BEGINNING OF FIRST TRUCK PRIOR TO ANY
PLACEMENT AND REPEATED AT THE MIDDLE OF FIRST TRUCK. CONCRETE
PLACEMENT SHALL NOT START IF INITIAL TEST(S) FAIL AND SHALL NOT
CONTINUE IF TEST TAKEN AT MIDDLE OF FIRST LOAD FAILS.
E. IF ANY SLUMP OR AIR CONTENT FAILS DURING PLACEMENT, TESTS SHALL BE
IMMEDIATELY REPORTED AND RETAKEN. IF RETAKEN TESTS FAIL THEN ALL
SUBSEQUENT LOADS MUST BE TESTED AT ARRIVAL AND TEST MUST SHOW
COMPLIANCE PRIOR TO THE CONCRETE IN THAT TRUCK BEING ALLOWED FOR
USE ON PROJECT. ALL COSTS FOR ADDITIONAL TESTING SHALL BE COMPLETED
AT NO EXPENSE TO THE OWNER.
NO PENETRATIONS SHALL BE MADE IN ANY STRUCTURAL MEMBERS OTHER THAN THOSE
LOCATED ON THESE DRAWINGS WITHOUT PREVIOUS APPROVAL OF THE ENGINEER.
1. CONCRETE MIX SHALL BE DESIGNED BY RECOGNIZED TESTING LABORATORY TO
ACHIEVE A STRENGTH AT 28 DAYS AS SHOWN IN THE BELOW CONCRETE
PROPERTIES SCHEDULE WITH A PLASTIC AND WORKABLE MIX:
2. SUBMIT PROPOSED MIX DESIGN WITH RECENT FIELD CYLINDER OR LAB TESTS FOR
REVIEW PRIOR TO USE. MIX SHALL BE UNIQUELY IDENTIFIED BY MIX NUMBER OR
OTHER POSITIVE IDENTIFICATION. CONCRETE SHALL COMPLY WITH ALL THE
REQUIREMENTS OF ASTM STANDARD C94 FOR MEASURING, MIXING,
TRANSPORTING, ETC. CONCRETE TICKETS SHALL BE TIME STAMPED WHEN
CONCRETE IS BATCHED. THE MAXIMUM TIME ALLOWED FROM THE TIME THE MIXING
WATER IS ADDED UNTIL IT IS DEPOSITED IN ITS FINAL POSITION SHALL NOT EXCEED
ONE AND ONE HALF (1-1/2) HOURS. IF FOR ANY REASON THERE IS A LONGER DELAY
THAN STATED ABOVE, THE CONCRETE SHALL BE DISCARDED. IT SHALL BE THE
RESPONSIBILITY OF THE TESTING LAB TO NOTIFY THE OWNER'S REPRESENTATIVE
AND THE CONTRACTOR OF ANY NONCOMPLIANCE WITH THE ABOVE. ALL SLABS
SHALL BE CURED USING CURING COMPOUND MEETING ASTM STANDARD C309 TYPE
1 AND SHALL HAVE A FUGITIVE DYE. THE COMPOUND SHALL BE PLACED AS SOON
AS THE FINISHING IS COMPLETED OR AS SOON AS THE WATER HAS LEFT THE
UNFINISHED CONCRETE. ALL SCUFFED OR BROKEN AREAS IN THE CURING
MEMBRANE SHALL BE RECOATED DAILY. CALCIUM CHLORIDES SHALL NOT BE
UTILIZED; OTHER ADMIXTURES MAY BE USED ONLY WITH THE APPROVAL OF THE
ENGINEER.
3. ALL CONCRETE SHALL UTILIZE TYPE IL CEMENT.
4. COARSE AND FINE AGGREGATES WITHIN ALL CONCRETE EXCEPT CONCRETE USED
FOR FOOTINGS, FOUNDATION WALLS, AND PIERS SHALL COMPLY WITH ASTM C33
AND ACI 302.1, CURRENT VERSIONS.
a. COMPLIANCE WITH THE NON-REACTIVE REQUIREMENTS OF ACI 302.1 SHALL NOT
BE PROVIDED FOR BY THE PROVISION OF ACI 302.1 (SUBSECTION 7.3) THAT
EXCLUDES THE AGGREGATES BEING CLASSIFIED AS DELETERIOUSLY REACTIVE
WITH ALKALIES IF THE AGGREGATE HAS A SATISFACTORY SERVICE RECORD
EVALUATION OR WITH THE ADDITION OF A MATERIAL THAT HAS SHOWN TO
PREVENT HARMFUL EXPANSION DUE TO ALKALI-AGGREGATE REACTION.
b. CONCRETE MIX DESIGN SHALL INCLUDE TEST RECORDS OF THE COMPLIANCE
OF THE AGGREGATE MEETING THE REQUIREMENTS OF ASTM C1260, AND THAT
THE EXPANSION OF THE MORTAR SAMPLE SHALL NOT EXCEED 0.10% WHEN
TESTED IN ACCORDANCE WITH ASTM C1260 AT 14 DAYS. USE OF ADMIXTURES
THAT MITIGATE THE EFFECT OF THE REACTIVE AGGREGATE TO BE PROPOSED
IN CONCRETE MIX SHOP DRAWING MAY BE AN APPROVED APPROACH BY THE
ENGINEER TO ALLOW FOR THE USE OF OTHERWISE REACTIVE AGGREGATES. IF
SUCH MITIGATING MEASURES ARE PROPOSED, THEY MUST BE INCLUDED WITHIN
MIX DESIGN SUBMITTAL. THE ENGINEER IS GIVEN DISCRETION AS TO WHETHER
OR NOT TO ACCEPT MITIGATING MEASURES OR TO MAINTAIN REQUIREMENTS
THAT NONREACTIVE AGGREGATES MUST BE USED. AT A MINIMUM, SUCH
DOCUMENTATION MUST SHOW THAT REACTIVE AGGREGATES USED IN
COMBINATION WITH A GIVEN AMOUNT OF ADMIXTURE RESULTS IN THE
EXPANSION OF THE MORTAR SAMPLE BEING LESS THAN 0.10% WHEN TESTED IN
ACCORDANCE WITH ASTM C1567 AT 14 DAYS. LIABILITY OF THE PERFORMANCE
OF THE CONCRETE MIX REMAINS SOLELY WITH GENERAL CONTRACTOR.
c. IF CONCRETE MIXES ARE APPROVED BY THE ENGINEER THAT CONTAIN EITHER
FINE OR COARSE AGGREGATE, THAT EITHER SEPARATELY OR IN COMBINATION
EXCEED THE 0.10% EXPANSION WHEN TESTED ACCORDING TO ASTM C1260,
SPECIAL CONSIDERATIONS MUST BE GIVEN TO SLAB CURING (SLABS ON GRADE
AND ELEVATED SLABS). IN SUCH INSTANCES SLABS SHALL BE CURED USING
EITHER A WET BURLAP OR CONTINUOUS WETTING/FOGGING METHOD FOR
SLABS FOR AT LEAST 10 DAYS. USE OF CURING AND/OR SEALING COMPOUNDS
IS NOT ACCEPTABLE UNTIL THE SLAB HAS CURED A MINIMUM OF 28 DAYS AND
THE CONDITIONS FOR THE APPLICATION OF THE CURING COMPOUND ON THE
CONCRETE SLAB SET BY THE MANUFACTURER’S RECOMMENDATIONS HAVE
BEEN MET.
d. ENGINEER HAS SOLE DISCRETION IN DETERMINING ACCEPTABILITY OF A
CONCRETE SLAB THAT IS EXHIBITING ALKALI-SILICA REACTION. FOR SLABS
SHOWING AN ALKALI SILICA REACTION SOLELY WITHIN THE FINE AGGREGATE: A
SLAB SHOWING AN AVERAGE DENSITY OF POPOUTS GREATER THAN 1 PER 8
SQUARE FEET OVER ANY CONTIGUOUS AREA OF 100 SQUARE FEET OR LARGER,
OR ANY AREA WITH A DENSITY OF 1 POPOUTS PER 2 SQUARE FEET WITHIN ANY
AREA UP TO 100 SQUARE FEET WOULD BE CONSIDERED AS A BASIS FOR THE
REJECTION OF THE SLAB FROM WHICH THOSE SAMPLE AREAS ARE INCLUDED.
FOR A ALKALI SILICA REACTION WITHIN THE COARSE AGGREGATE: THE POPOUT
DENSITIES CONSIDERED FOR REJECTION OF THE CONCRETE SLAB SHALL BE ½
OF THE DENSITIES GIVEN FOR FINE AGGREGATE. THE EXTENT OF REJECTED
SLAB TO BE DETERMINED BY ENGINEER. THE TIME FRAME FOR OBSERVATION
OF ALKALI SILICA REACTIONS AND DETERMINATION OF REJECTION OF THE
CONCRETE SLAB SHALL BE AT LEAST 56 DAYS FROM THE DATE OF POUR.
e. CONCRETE MIXES UTILIZING CRUSHED LIMESTONE AS COARSE AGGREGATE
AND CONTAINING AT LEAST 25% CLASS F FLY ASH AND HAVING A
SATISFACTORY SERVICE RECORD PER ACI 302.1 IS CONSIDERED AN
ACCEPTABLE ALTERNATIVE APPROACH TO THE COMPLIANCE REQUIREMENTS
OUTLINED IN PROVISIONS 4a THROUGH 4d ABOVE.
5. THE CONCRETE STRENGTHS SHOWN IN THE SECTION ABOVE AND IN THE
SPECIFICATIONS ARE MINIMUM COMPRESSIVE STRENGTHS. THE ENGINEER SHALL
DETERMINE IF THE CONCRETE IS ACCEPTABLE, OR TO BE REMOVED, OR TO
RECEIVE SPECIAL CURING IF THE COMPRESSIVE STRENGTHS ARE LESS THAN
SPECIFIED.
6. WATER REDUCING AGENTS MAY BE USED IN THE CONCRETE MIX. PLASTICIZERS
AND SUPER-PLASTICIZERS MAY BE USED ONLY WHEN WRITTEN PERMISSION OF THE
ENGINEER IS GIVEN.
7. NO SALTS OF ANY KIND MAY BE USED IN CONCRETE BEFORE OBTAINING THE
ENGINEER'S WRITTEN PERMISSION FOR THEIR USE.
1. STEEL SHALL CONFORM TO ASTM A992 (Fy=50 KSI) FOR ALL W-SHAPES, AND ASTM A36 (Fy=36 KSI) FOR ALL OTHER MISCELLANEOUS SHAPES AND PLATES.
STRUCTURAL TUBING SHALL CONFORM TO ASTM A500, GRADE B OR GRADE C (Fy=46
KSI). STRUCTURAL PIPE SHALL CONFORM TO ASTM A53, GRADE B, TYPE "E" OR "S"
(Fy=35 KSI).
2. STEEL SHALL CONFORM TO THE LATEST EDITION OF AISC SPECIFICATIONS FOR
STRUCTURAL STEEL BUILDINGS.
3. ALL SHOP CONNECTIONS TO BE WELDED (UTILIZING E70XX ELECTRODES) AND FIELD
CONNECTIONS TO BE BOLTED, UNLESS OTHERWISE NOTED. STEEL TO RECEIVE ONE
SHOP COAT AND ONE FIELD TOUCH UP COAT OF APPROVED PAINT, EXCEPT WHERE
GALVANIZED IS INDICATED ON THE DRAWINGS.
4. WELDS FOR ALL EXPOSED STRUCTURAL STEEL SHALL BE GROUND SMOOTH UNLESS
NOTED OTHERWISE.
5. ALL BOLTED CONNECTIONS SHALL CONSIST OF 3/4" DIA. (MIN.) ASTM F3125 GRADE
F1852 (A325-TC) BOLTS, UNLESS NOTED OTHERWISE.
A. FAILURE OF A BOLT OR NUT DURING INSTALLATION PROCESS RESULTING IN A
CRACK IN THE BOLT OR NUT SHALL BE GROUNDS FOR REJECTION OF ALL THE
FAILED BOLTS OR NUTS COMING FROM THE SAME LOT. IF THE DOCUMENTATION
OF THE LOT OF ORIGIN FOR THE FAILED NUT(S) OR BOLT(S) DOES NOT EXIST, OR
IS NOT PROVIDED, THEN ALL OF THE BOLT(S) OR NUT(S) SHALL BE ASSUMED TO
COME FROM THE LOT CONTAINING THE FAILED NUT(S) OR BOLT(S).
6. CONTRACTOR TO FURNISH AND INSTALL 500 LBS. OF ADDITIONAL MISCELLANEOUS
STEEL TO BE USED AT ENGINEER'S DISCRETION.
7. CONTRACTOR SHALL MAINTAIN ERECTION TOLERANCES OF STRUCTURAL STEEL AND
ARCHITECTURALLY EXPOSED STRUCTURAL STEEL WITHIN AISC'S CODE OF
STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES.
8. ANCHOR BOLT HOLES IN STRUCTURAL STEEL SHALL BE OVERSIZED PER THE AISC
MANUAL.
1. SHEAR STUD CONNECTORS SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE
WITH AWS D1.1, "STRUCTURAL WELDING CODE", SECTION 7 - STUD WELDING. STUDS
SHALL BE TYPE "B", HEADED STUDS, HAVING A MINIMUM TENSILE STRENGTH OF 65,000
PSI, AND SHALL BE OF LENGTH AND DIAMETER SHOWN ON THE DRAWINGS.
1. SEE DETAILED INSPECTION AND TESTING REQUIREMENTS
AS INDICATED ON SHEET S-002
1. ALL CONCRETE SHALL BE PLACED IN ACCORDANCE WITH ACI 301 AND ACI 117
EXCEPT AS MODIFIED BELOW:
A. ACI 117 ITEM 4.3.1.1 ELEVATIONS OF SLABS-ON-GRADE TOP OF SLAB ELEVATION
SHALL BE WITHIN A 3/8" ENVELOPE EITHER SIDE OF THE THEORETICAL DESIGN
SURFACE.
B. ACI 117 ITEM 4.5.7 FLOOR FINISH TOLERANCES AS MEASURED BY PLACING A
FREESTANDING (UNLEVELED) 10 FT. STRAIGHTEDGE ANYWHERE ON THE SLAB
AND ALLOWING IT TO REST UPON TWO HIGH SPOTS WITHIN 28 DAYS AFTER
SLAB CONCRETE PLACEMENT. THE GAP AT ANY POINT BETWEEN THE
STRAIGHT EDGE AND THE FLOOR SHALL NOT EXCEED 1/4".
2. ALL REINFORCING STEEL TO BE ASTM A615, GRADE 60 (#4 AND LARGER), EXCEPT
WHERE NOTED OTHERWISE. REINFORCING SHALL NOT BE WELDED
3. WELDED WIRE REINFORCEMENT TO CONFORM TO ASTM A1064 AND SHALL BE
FREE FROM OIL, SCALE, AND RUST. PLACE WWR IN ACCORDANCE WITH THE
TYPICAL PLACING DETAILS OF ACI STANDARDS AND THE SPECIFICATIONS.
MINIMUM LAPS SHALL BE ONE SPACE PLUS 2".
4. ALL REINFORCING STEEL BARS TO BE DETAILED AND PLACED IN ACCORDANCE
WITH THE LATEST ACI MANUALS.
5. LAP ALL REINFORCING SPLICES IN CONCRETE A MINIMUM OF 48 BAR DIAMETERS
OR 24 INCHES, WHICHEVER IS GREATER, UNLESS NOTED OTHERWISE ON
DRAWINGS (CLASS B SPLICE).
6. PROVIDE CORNER BARS OF SAME BAR DIAMETER AS SPECIFIED FOR THE WALL,
BEAM OR FOOTING. PROVIDE MINIMUM OF 40 BAR DIAMETER LAP FOR ALL CORNER
BARS, UNLESS NOTE OTHERWISE.
7. PROVIDE FOUNDATION DOWELS AS SHOWN. MINIMUM SIZE DOWELS TO BE #4,
UNLESS OTHERWISE NOTED. ALL VERTICAL REINFORCING STEEL IN COLUMNS AND
PIERS, OR VERTICAL REINFORCING IN WALLS, SHALL BE DOWELED INTO THE
FOOTINGS WITH SAME SIZE AND QUANTITY DOWEL AS THE VERTICAL
REINFORCING.
8. WHERE SHOWN ON THE DRAWINGS, PROVIDE WELD PLATES, WELDMENTS, OR
CONCRETE INSERTS FOR FASTENING AND SECURING OTHER COMPONENTS.
CONCRETE INSERTS SHALL BE FURNISHED BY THE CONTRACTOR REQUIRING
THEM AND INSTALLED BY THE CONTRACTOR CASTING THE CONCRETE AROUND
THEM. CLIP ANGLES SHALL BE FURNISHED BY THE CONTRACTOR REQUIRING
THEM.
9. REINFORCING STEEL SHALL RECEIVE CONCRETE COVER AS FOLLOWS:
DESCRIPTION MINIMUM COVER
CAST AGAINST & PERMANENTLY 3"
EXPOSED TO EARTH
EXPOSED TO EARTH OR WEATHER
#6 THROUGH #18 BARS 2"
#5 BARS OR SMALLER 1 1/2"
NOT EXPOSED TO EARTH OR WEATHER
OR IN CONTACT WITH THE GROUND, SLABS
AND WALLS
#11 BARS OR SMALLER 3/4"
#14 AND #18 1 1/2"
BEAMS AND COLUMNS 1 1/2"
SHELLS, FOLDED PLATE MEMBERS:
NO. 6 BAR AND LARGER 3/4"
NO. 5 BAR, W31 OR D31 WIRE AND SMALLER 1/2"
10. PROVIDE TWO (2) #5'S, ONE AT EACH FACE, UNLESS NOTED OTHERWISE, AROUND
ALL OPENINGS LESS THAN 12"x12" IN CAST-IN-PLACE CONCRETE. EXTEND
REINFORCING 2'-0" BEYOND OPENING IN BOTH DIRECTIONS. CONTACT ENGINEER
FOR ALL OPENINGS GREATER THAN 12"x12" FOR DESIGN.
11. COLD WEATHER AND HOT WEATHER PROVISIONS OF ACI 306 AND 305 (CURRENT
EDITIONS), RESPECTIVELY, SHALL BE MAINTAINED.
12. CONTRACTOR TO FURNISH AND INSTALL 500 LINEAL FEET EACH OF ADDITIONAL #4
& #5 REINFORCING STEEL TO BE USED AT ENGINEER'S DISCRETION.
13. UNLESS NOTED OTHERWISE ALL UNDER SLAB VAPOR RETARDERS SHALL
CONFORM TO THE REQUIREMENTS OF ASTM E1745 CLASS A AND SHALL BE
INSTALLED AS PER MANUFACTURER'S RECOMMENDATIONS.
14. FLOOR FLATNESS AND LEVELNESS TOLERANCES:
A. MINIMUM FF & FL NUMBERS PER ASTM E1155.
FF = 35
FL = 25
B. CORRECT SLAB SURFACE IF COMPOSITE OVERALL VALUE IS LESS THAN
SPECIFIED OR IF LOCAL VALUE IS LESS THAN 2/3 OF THE SPECIFIED FF OR FL
NUMBERS.
C. CORRECT BY REMOVAL AND REPLACEMENT OF DEFECTIVE WORK.
15. OWNER SHALL ENGAGE PARTY TO TEST FF & FL NUMBERS WITHIN 72 HOURS OF
CASTING. CONTRACTORS MUST PROVIDE 10 DAYS NOTICE PRIOR TO CASTING
CONCRETE SLAB-ON-GRADE SECTIONS.
16. PRIOR TO SCREEDING AN ELEVATED SLAB, CONCRETE SHALL BE UNIFORMLY
PLACED ON ALL (3) SPANS OF THE DECK TO A THICKNESS APPROXIMATELY EQUAL
TO THE SPECIFIED SLAB THICKNESS AT EACH BEAM OR JOIST LINE.
17. CONTRACTOR IS RESPONSIBLE FOR ESTIMATING CONCRETE QUANTITIES ON
ELEVATED SLABS AND SHALL ACCOUNT FOR DEFLECTIONS IN THE FLOOR
STRUCTURE.
18. CONTRACTOR SHALL MAINTAIN A CONSTANT THICKNESS OVER THE ENTIRE
ELEVATED SLAB. ELEVATED SLAB THICKNESS SHALL NOT BE 3/8" GREATER THAN
OR 1/4" LESS THAN THE SPECIFIED THICKNESS.
19. LASER SCREED OR OTHER SIMILARLY FUNCTIONING EQUIPMENT SHALL NOT BE
PERMITTED FOR ELEVATED SLABS UNLESS AUTHORIZED BY ALBERTSON
ENGINEERING INC.
THE STRUCTURAL SYSTEM FOR THIS BUILDING HAS BEEN DESIGNED WITH THE
FOLLOWING SUPERIMPOSED LOADINGS BASED ON A RISK CATEGORY IV:
ROOF:
SNOW LOAD 34 PSF + DRIFT
GROUND SNOW LOAD 40 PSF
SNOW EXPOSURE FACTOR 1.0
SNOW THERMAL FACTOR 1.0
SNOW IMPORTANCE FACTOR 1.1
DEAD LOAD 20 PSF
WIND:
ULTIMATE WIND SPEED 120 MPH
EXPOSURE CATEGORY C
INTERNAL PRESSURE COEFFICIENT ±0.18
GENERAL NOTES:
FOUNDATIONS:
DESIGN LOADS:
PENETRATIONS:
CONCRETE MIX DESIGN: CONCRETE AND REINFORCING PLACEMENT:
CONCRETE TESTING:
ANCHOR RODS:
STRUCTURAL STEEL:
SHEAR STUD CONNECTORS:
SPECIAL INSPECTION AND TESTING:
1. MICROPILE FOUNDATION SYSTEM SHALL BE DESIGNED BY SPECIALTY CONTRACTOR
TO THE CONFIGURATION AND LOAD CARRYING CAPACITY SHOWN ON THE DRAWINGS
AND THE SPECIFICATIONS.
2. MICROPILES SHALL BE DESIGN FOR A MAXIMUM VERTICAL DEFLECTION OF 0.5in.
3. SHOP DRAWINGS AND A LETTER OF CERTIFICATION SHALL BE SUBMITTED FOR
REVIEW AND APPROVAL PRIOR TO INSTALLATION, AND SHOP DRAWINGS SHALL BEAR
THE SIGNATURE AND SEAL OF A SOUTH DAKOTA REGISTERED PROFESSIONAL
ENGINEER. SHOP DRAWINGS SHALL INDICATE THE DESIGN LOADS AND JOB NAME
AND NUMBER. THEY SHALL INCLUDE DRAWINGS OF THE MICROPILES AND THE
CONNECTION TO THE PILE CAPS.
4. ALTERNATE MICROPILE LAYOUTS ARE ACCEPTABLE ONLY AS A CHANGE ORDER
WHICH WILL INCLUDE ENGINEERING CHARGES TO THE CONTRACTOR FOR REDESIGN
FOR REVIEW PRIOR TO INSTALLATION.
5. STRUCTURAL DESIGN OF ALL MICROPILE COMPONENTS ARE TO BE DONE BY
MICROPILE CONTRACTOR. STRUCTURAL DESIGN TO BE COMPLETED BY A
PROFESSIONAL ENGINEER LICENSED IN THE STATE IN WHICH THE PROJECT IS
LOCATED. PROFESSIONAL ENGINEER(S), OR SOMEONE WORKING UNDER THEIR
DIRECT SUPERVISION SHALL MAKE PERIODIC OBSERVATIONS DURING THE
INSTALLATION OF THE MICROPILES TO VERIFY THAT THE INSTALLATION IS IN
CONFORMANCE WITH THEIR SEALED DOCUMENTS. A MINIMUM OF TWO SEPARATE
OBSERVATIONS SHALL BE MADE BY SUCH PARTY. COST FOR SUCH PROFESSIONAL
ENGINEER(S) OR SOMEONE WORKING UNDER THEIR DIRECT SUPERVISION TO BE PAID
BY CONTRACTOR. ANY AND ALL DEFICIENT ITEMS SHALL BE RECORDED BY THE
PROFESSIONAL ENGINEER AND ITEMS SHALL BE CORRECTED AND CORRECTIONS
VERIFIED BY THE PROFESSIONAL ENGINEER(S) FOR THE MICROPILE CONTRACTOR.
PROFESSIONAL ENGINEER(S) FOR MICROPILE CONTRACTOR SHALL CERTIFY THAT
INSTALLATION IS IN COMPLIANCE WITH THEIR DESIGN DOCUMENTS AT THE
COMPLETION OF THEIR WORK. PROFESSIONAL ENGINEER(S) FOR MICROPILE
CONTRACTOR SHALL PROVIDE CERTIFICATION AND WRITTEN OBSERVATION REPORTS
FOR EVERY VISIT MADE TO THE ARCHITECT. OBSERVATION REPORTS SHALL BE GIVEN
TO ARCHITECT WITHIN 3 WORKING DAYS OF THE VISIT TO THE SITE.
6. FOR THE PURPOSES OF THIS STRUCTURAL NOTES SECTION, ALL OF THE FIELD
OBSERVATION WORK DESCRIBED TO BE PERFORMED BY PROFESSIONAL ENGINEER
RESPONSIBLE FOR DESIGN OF MICROPILES OR SOMEONE WORKING UNDER HIS / HER
DIRECT SUPERVISION. ALL OBSERVATION REPORTS TO BE SIGNED BY PERSON WHO
MADE OBSERVATION AND PROFESSIONAL ENGINEER RESPONSIBLE FOR THE DESIGN.
1. THE PRE-ENGINEERED METAL BUILDING SHALL CONSIST OF ALL STRUCTURAL ITEMS
INCLUDING ROOF DECK, WALL PANELS, FLOOR FRAMING, FLOOR AND ROOF DECKING,
SUPPORT STEEL FRAMING AND ALL ASSOCIATED ITEMS. SEE ARCHITECTURAL AND
ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION IN PARTICULAR FOR NON-
STRUCTURAL ITEMS.
2. THE SYSTEM SHALL BE DESIGNED AND DETAILED BY THE MANUFACTURER TO
SUSTAIN THE DESIGN LOADS SPECIFIED. THE DESIGN SHALL BE IN ACCORDANCE TO
AISC AND AISI SPECIFICATIONS AND MBMA "METAL BUILDING SYSTEMS MANUAL"
DESIGN PRACTICES, LATEST ISSUES.
3. ANCHOR BOLT SPACING REQUIREMENTS:
A. ALL BOLTS TO BE SPACED NO CLOSER THAN 5" ON CENTER.
B. ALL ANCHOR BOLTS TO BE SPACED NO CLOSER THAN 5" FROM CENTERLINE OF
BOLT TO EDGE OF CONCRETE WALL OR PIER.
4. ROOF X-BRACING LOCATIONS TO BE DETERMINED BY PEMB MANUFACTURER. X-
BRACING MUST BE BELOW LINER PANELS IN ALL LOCATIONS.
5. ALL PEMB MEMBERS (MAIN & SECONDARY) WHICH MUST PASS THRU LINER PANELS
(I.E. BRACES, ETC.) MUST BE INSTALLED IN SUCH A WAY THAT LINER PANELS WILL
HAVE ONLY A MINIMAL HOLE CUT AROUND PENETRATIONS. LINER PANELS PIECED
AROUND PENETRATIONS ARE NOT ACCEPTABLE.
6. THE MANUFACTURER SHALL BE REGULARLY ENGAGED IN METAL BUILDING DESIGN
AND MANUFACTURING. MANUFACTURER MUST BE IAS AC472 ACCREDITED.
7. SHOP DRAWINGS AND A LETTER OF CERTIFICATION SHALL BE SUBMITTED FOR
REVIEW AND APPROVAL PRIOR TO FABRICATION. SHOP DRAWINGS SHALL BEAR THE
SIGNATURE AND SEAL OF A REGISTERED PROFESSIONAL ENGINEER LICENSED IN THE
STATE IN WHICH THE PROJECT IS LOCATED. SHOP DRAWINGS SHALL INDICATE THE
DESIGN LOADS AND JOB NAME AND NUMBER. THEY SHALL INCLUDE DRAWINGS OF
THE FRAMING MEMBERS WITH THE CONNECTIONS, THE ANCHOR BOLT PLAN AND
REACTIONS. STANDARD CUT SHEETS OF THE ABOVE ARE NOT ACCEPTABLE.
STANDARD CUT SHEETS MAY BE SUBMITTED FOR SECONDARY FRAMING
CONNECTION DETAILS, FLASHING AND SHEETING DETAILS, ETC.
1. IF PROFESSIONAL DESIGN SERVICES OR CERTIFICATIONS BY A DESIGN
PROFESSIONAL RELATED TO SYSTEMS, MATERIALS, OR EQUIPMENT ARE
SPECIFICALLY REQUIRED OF THE CONTRACTOR BY THE CONTRACT
DOCUMENTS; THE ARCHITECT AND/OR ALBERTSON ENGINEERING, INC. WILL
SPECIFY THE PERFORMANCE AND DESIGN CRITERIA THAT SUCH SERVICES
MUST SATISFY WITHIN THE CONTRACT DOCUMENTS.
2. THE CONTRACTOR SHALL BE ENTITLED TO RELY UPON THE ADEQUACY AND
ACCURACY OF THE PERFORMANCE AND DESIGN CRITERIA PROVIDED IN THE
CONTRACT DOCUMENTS. THE CONTRACTOR SHALL CAUSE SUCH SERVICES
OR CERTIFICATIONS TO BE PROVIDED BY AN APPROPRIATELY LICENSED
DESIGN PROFESSIONAL"SPECIALTY ENGINEER", WHOSE SIGNATURE AND
SEAL SHALL APPEAR ON ALL DRAWINGS, CALCULATIONS, SPECIFICATIONS,
CERTIFICATIONS, SHOP DRAWINGS, AND OTHER SUBMITTALS PREPARED BY
THE "SPECIALTY ENGINEER".
3. SHOP DRAWINGS AND OTHER SUBMITTALS RELATED TO THE WORK,
DESIGNED OR CERTIFIED BY THE "SPECIALTY ENGINEER" SHALL BEAR THE
"SPECIALTY ENGINEER'S" WRITTEN APPROVAL AND CONFIRMATION THAT
SUCH WORK COMPLIES WITH ALL APPLICABLE CODES AND THE DESIGN
CRITERIA WHEN SUBMITTED TO THE ARCHITECT AND/OR ALBERTSON
ENGINEERING, INC.
4. THE OWNER, ARCHITECT, AND ALBERTSON ENGINEERING, INC. SHALL BE
ENTITLED TO RELY UPON THE ADEQUACY AND ACCURACY OF THE SERVICES,
CERTIFICATIONS, AND APPROVALS PERFORMED OR PROVIDED BY SUCH
DESIGN PROFESSIONALS, PROVIDED THE CONTRACT DOCUMENTS HAVE
SPECIFIED TO THE CONTRACTOR THE PERFORMANCE AND DESIGN CRITERIA
THAT SUCH SERVICES MUST SATISFY.
5. ARCHITECT AND/OR ALBERTSON ENGINEERING, INC. WILL REVIEW OR TAKE
OTHER APPROPRIATE ACTION ON SUBMITTALS ONLY FOR THE LIMITED
PURPOSE OF CHECKING FOR CONFORMANCE WITH INFORMATION GIVEN AND
THE DESIGN CONCEPT EXPRESSED IN THE CONTRACT DOCUMENTS.
6. ALL SHOP DRAWINGS SUBMITTED FOR APPROVAL FOR WHICH
PROFESSIONAL DESIGN SERVICES OR CERTIFICATIONS BY A DESIGN
PROFESSIONAL ARE REQUIRED RELATED TO SYSTEMS, MATERIALS, OR
EQUIPMENT ARE TO BE COMPLETED TO A LEVEL SUCH THAT THE OWNER,
ARCHITECT, AND ALBERTSON ENGINEERING, INC. SHALL BE ENTITLED TO
RELY UPON THE ADEQUACY AND ACCURACY OF THE SERVICES,
CERTIFICATIONS, AND APPROVALS SUBMITTED. THE "SPECIALTY ENGINEER"
SHALL COMPLETE WORK WITH ACCEPTANCE THAT ALBERTSON
ENGINEERING, INC. WILL NOT UNDERTAKE A REVIEW OF THE "SPECIALTY
ENGINEER'S" CALCULATIONS AND SUBMITTALS AND THE "SPECIALTY
ENGINEER" ACKNOWLEDGES THAT THEY ARE SOLELY RESPONSIBLE FOR
THE DELEGATED DESIGN WORK CERTIFIED BELOW AND ARE NOT RELYING
UPON ALBERTSON ENGINEERING, INC. FOR ANY REVIEW.
THESE PROVISIONS ARE CONTRACTED REQUIREMENTS FOR SAID PROJECT
AND THE "SPECIALTY ENGINEER" IS BOUND BY THESE PROVISIONS.
7. DELEGATED DESIGN ITEMS INCLUDE:
A. PRE-ENGINEERED METAL BUILDING
B. HELICAL PIERS
PRE-ENGINEERED METAL BUILDING:
MICROPILE FOUNDATION:
DELEGATED DESIGN - RESPONSIBILITIES AND SUBMITTAL
REQUIREMENTS FOR CONTRACTOR:
1. SEE GEOTECHNICAL REPORT FOR ANTICIPATED DEPTHS AND INSTALLATION
REQUIREMENTS.
2. THE BASE BID SHALL INCLUDE 20 FEET OF INSTALLED HELICAL PIER MEASURED FROM
BOTTOM OF CONCRETE GRADE BEAM OR PILE CAP. PAYMENT TO BE ADJUSTED PER
ACTUAL LENGTH INSTALLED FROM UNIT PRICES PROVIDED IN THE BID FORM.
3. HELICAL PIERS AND HELICAL PIER CAPS SHALL BE DESIGNED BY SPECIALTY
CONTRACTOR TO THE CONFIGURATION, QUANTITY, AND LOAD CARRYING CAPACITY
SHOWN ON THE DRAWINGS AND THE SPECIFICATIONS. DETERMINING SHAFT SIZE AND
PLATE SIZE AND SPACING IS THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL
BE INCLUDED IN THE BASE BID.
4. HELICAL PIERS SHALL BE DESIGNED FOR A MAXIMUM VERTICAL DEFLECTION OF 0.33in.
5. A HELICAL PIER SHALL BE LOAD TESTED ACCORDING TO ASTM D1143. TESTED PIER
CAN BE A PRODUCTION PILE AT SPECIALTY ENGINEER'S CHOICE. SEE GEOTECHNICAL
REPORT FOR ADDITIONAL TESTING REQUIREMENTS. IF TEST PIER FAILS, CONTRACTOR
SHALL MODIFY THEIR DESIGN AND INSTALL AND TEST ANOTHER PIER AT THEIR
EXPENSE.
6. SHOP DRAWINGS AND A LETTER OF CERTIFICATION SHALL BE SUBMITTED FOR
REVIEW AND APPROVAL PRIOR TO INSTALLATION, AND SHOP DRAWINGS SHALL BEAR
THE SIGNATURE AND SEAL OF A REGISTERED PROFESSIONAL ENGINEER LICENSED IN
THE STATE IN WHICH THE PROJECT IS LOCATED. SHOP DRAWINGS SHALL INDICATE
THE DESIGN LOADS AND JOB NAME AND NUMBER. THEY SHALL INCLUDE DRAWINGS
OF THE HELICAL PIERS AND THE CONNECTION TO THE PILE CAPS OR GRADE BEAMS.
7. STRUCTURAL DESIGN OF ALL HELICAL PIER COMPONENTS ARE TO BE DONE BY
HELICAL PIER CONTRACTOR. STRUCTURAL DESIGN TO BE COMPLETED BY A
PROFESSIONAL ENGINEER LICENSED IN THE STATE IN WHICH THE PROJECT IS
LOCATED. PROFESSIONAL ENGINEER(S), OR SOMEONE WORKING UNDER THEIR
DIRECT SUPERVISION SHALL MAKE PERIODIC OBSERVATIONS DURING THE
INSTALLATION OF THE HELICAL PIERS TO VERIFY THAT INSTALLATION IS IN
CONFORMANCE WITH THEIR SEALED DOCUMENTS. A MINIMUM OF TWO SEPARATE
OBSERVATIONS SHALL BE MADE BY SUCH PARTY. COST FOR SUCH PROFESSIONAL
ENGINEER(S) OR SOMEONE WORKING UNDER THEIR DIRECT SUPERVISION SHALL BE
INCLUDED IN THE BASE BID. ANY AND ALL DEFICIENT ITEMS SHALL BE RECORDED BY
THE PROFESSIONAL ENGINEER AND ITEMS SHALL BE CORRECTED AND CORRECTIONS
VERIFIED BY THE PROFESSIONAL ENGINEER(S) FOR THE HELICAL PIER CONTRACTOR.
PROFESSIONAL ENGINEER(S) FOR HELICAL PIER CONTRACTOR SHALL CERTIFY THAT
INSTALLATION IS IN CONFORMANCE WITH THEIR DESIGN DOCUMENTS AT THE
COMPLETION OF THEIR WORK. PROFESSIONAL ENGINEER(S) FOR HELICAL PIER
CONTRACTOR SHALL PROVIDE CERTIFICATION AND WRITTEN OBSERVATION REPORTS
FOR EVERY VISIT MADE TO THE ARCHITECT. OBSERVATION REPORTS SHALL BE GIVEN
TO ARCHITECT WITHIN 3 WORKING DAYS OF THE VISIT TO THE SITE
8. FOR THE PURPOSES OF THIS STRUCTURAL NOTES SECTION, ALL OF THE FIELD
OBSERVATION WORK DESCRIBED TO BE PERFORMED BY PROFESSIONAL ENGINEER
RESPONSIBLE FOR DESIGN OF HELICAL PIERS OR SOMEONE WORKING UNDER
HIS/HER DIRECT SUPERVISION. ALL OBSERVATION REPORTS TO BE SIGNED BY
PERSON WHO MADE OBSERVATION AND PROFESSIONAL ENGINEER RESPONSIBLE
FOR THE DESIGN.
HELICAL PIERS:
• 2018 INTERNATIONAL BUILDING CODE.
• ACI 318-19 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND
COMMENTARY.
• AISC 360-16 SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS.
• ASCE 7-16 MINIMUM DESIGN LOADS AND ASSOCIATED CRITERIA FOR BUILDINGS AND
OTHER STRUCTURES.
DESIGN CODES:
1. ALL PERSONNEL INSTALLING POST-INSTALLED ANCHORS SHALL HAVE COMPLETED
INSTALLATION TRAINING FROM THE MANUFACTURER FOR ALL OF THE ANCHORING
PRODUCTS SPECIFIED. TRAINING MUST HAVE BEEN COMPLETED NO MORE THAN 5
YEARS FROM THE DATE OF PROJECT INITIATION. IF TRAINING HAS NOT BEEN
COMPLETED OR IF TRAINING OCCURRED MORE THAN 5 YEARS BEFORE THE DATE OF
PROJECT INITIATION, THE CONTRACTOR SHALL ARRANGE AN ANCHOR
MANUFACTURER'S REPRESENTATIVE TO PROVIDE ON-SITE INSTALLATION TRAINING.
CONTRACTOR SHALL SUBMIT DOCUMENT CONFIRMING THAT ALL PERSONNEL
INSTALLING ANCHORS HAVE PASSED THE TRAINING COURSE PRIOR TO THE
COMMENCEMENT OF INSTALLING ANCHORS.
2. ADHESIVE ANCHORS INSTALLED HORIZONTALLY OR UPWARDLY INCLINED INTO
CONCRETE THAT WILL SUPPORT SUSTAINED TENSION LOADS WILL BE MARKED WITH
(SUSTAINED) ON THE DRAWINGS. PERSONNEL WHO WILL INSTALL THESE ANCHORS
SHALL BE CERTIFIED BY THE ACI/CRSI ADHESIVE ANCHOR INSTALLER CERTIFICATION
PROGRAM. CONTRACTOR SHALL SUBMIT A DOCUMENT CONFIRMING THAT PERSONNEL
HAVE PASSED THE CERTIFICATION PROGRAM PRIOR TO INSTALLING ANCHORS.
3. ALL POST INSTALLED ANCHORS AND REBAR SHALL BE INSTALLED ACCORDING TO
MANUFACTURER'S INSTALLATION INSTRUCTIONS.
4. THE FOLLOWING CONDITIONS MUST BE MET FOR ALL ADHESIVE ANCHORS AND
ADHESIVE ANCHORED REINFORCEMENT UNLESS WRITTEN APPROVAL IS RECEIVED
FROM THE ENGINEER PRIOR TO INSTALLATION.
A. DRY CONCRETE UNLESS NOTED OTHERWISE
B. CONCRETE TEMPERATURE AT TIME OF INSTALLATION THROUGH CURE TIME MUST
BE WITHIN THE TEMPERATURE RANGE SPECIFIED IN MANUFACTURER'S PRINTED
INSTALLATION INSTRUCTIONS. SEE MANUFACTURER'S PRINTED INSTALLATION
INSTRUCTIONS FOR ADHESIVE GEL AND CURE TIMES.
C. ANCHOR HOLES SHALL BE HAMMER DRILLED.
D. ANCHOR HOLES TO BE CLEANED PER MANUFACTURER'S PRINTED INSTALLATION
INSTRUCTION PRIOR TO ADHESIVE INJECTION.
E. CONCRETE MUST BE AT LEAST 21 DAYS OLD BEFORE INSTALLATION OF ANCHORS.
5. THE LOCATION OF EXISTING REINFORCING STEEL BARS, POST-TENSIONED STEEL
STRANDS, OR PRE-TENSIONED STEEL STRANDS SHALL BE ESTABLISHED PRIOR TO
INSTALLING POST INSTALLED ANCHORS OR REINFORCEMENT. LOCATION SHALL BE
ESTABLISHED BY USING A SCANNER, GPR, X-RAY, CHIPPING OR OTHER MEANS.
EXISTING REINFORCEMENT OR STRAND SHALL NOT BE DAMAGED UNLESS PRIOR
APPROVAL IS GIVEN BY THE ENGINEER.
6. ALTERNATE PRODUCTS MUST BE APPROVED IN WRITING BY THE STRUCTURAL
ENGINEER PRIOR TO USE. CONTRACTOR SHALL PROVIDE CALCULATIONS AND
PRODUCT DATA SHOWING THAT THE SUBSTITUTED PRODUCT IS IN COMPLIANCE WITH
THE RELEVANT BUILDING CODES, LOAD RESISTANCE, INSTALLATION CATEGORY,
CREEP, IN-SERVICE TEMPERATURE AND INSTALLATION TEMPERATURE OF THE
SPECIFIED PRODUCT.
POST INSTALLED ANCHORS AND REBAR:
MICHAEL D.
ALBERTSON
OFE ISS
E
T
E R
U O
S
E T
S I
G
D
E R R
PR
E
DA KH
O
T
A
E R
O. NG
L
A
NO
N G
I N
E
VA FORM 08 - 6231
A
B
C
D
A
B
C
D
2 4 5 61
6"
6"
6"
6"
O N
E E
IG
H
T H
I N
C H
O
N E
F O
O T
1/
8"
'-0
O
N E
Q U
A R
T E
R I
N C
H
O N
E F
O O
T
1/ 4"
'-0
T H
R E
E E
IG
H
T H
S
IN
C H
O
N E
F O
O T
(3 /8
1' -0
O
N E
H A
LF
I
N C
H
O N
E F
O O
T
1/ 2"
'-0
T H
R E
E Q
U A
R T
E R
S
IN
C H
O
N E
F O
O T
3/
4"
'-0
O
N E
I N
C H
O
N E
F O
O T
1"
'-0
O N
E A
N D
O N
E H
A
LF
I N
C H
E S
O
N E
F O
O T
1/ 2"
'-0
T H
R E
E
IN
C H
E S
O
N E
F O
O T
3"
'-0
32 4 5 61
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
DESIGNER OF RECORD
A/E:
STAMPCONSULTANTS
CIVIL: STRUCTURAL: MEP:
FMG ENGINEERING
3700 STURGIS RD
RAPID CITY, SD 57702-0317
Phone: 605-342-4105
ALEX FISHER
WEST PLAINS ENGINEERING, INC.
1750 RAND RD
RAPID CITY, SD 57702
Phone: 605-348-7455
DAREN BECKLOFF
ALBERTSON ENGINEERING INC.
3202 W MAIN ST SUITE C
RAPID CITY, SD 57702
Phone: 605-343-9606
05-09-25
C :\U se rs
\je ffb
\D oc um en ts \2
4-
S
-M O
D E
L R
-2 3_
Je ffB
S
3K .r vt 5/
8/
:1 7:
A
M
S-001
STRUCTURAL GENERAL NOTES HOT SPRINGS ELECTRICAL
UPGRADE
HOT SPRINGS, SD 47747
10, 12 & 64
DOUG SPRINKLE
5.9.2025 MDA JAB
SGA #AEI #24-238
VA #VA #568A4-24-202
BID - PERMIT SET
NO. DESCRIPTION DATE
01 BID - PEMIIT SET 05/09/2025
TABLE N5.4-1
INSPECTION TASKS PRIOR TO WELDING
TABLE N5.4-2
INSPECTION TASKS DURING WELDING
AISC 360-16 TABLE N5.4-3
INSPECTION TASKS AFTER WELDING
INSPECTION TASKS PRIOR TO WELDING
WELDING PROCEDURE SPECIFICATIONS (WPSs) AVAILABLE
MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES AVAILABLE
MATERIAL IDENTIFICATION (TYPE/GRADE)
WELDER IDENTIFICATION SYSTEM(a)
FIT-UP OF GROOVE WELDS (INCLUDING JOINT GEOMETRY)
• JOINT PREPARATION
• DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL)
• CLEANLINESS (CONDITION OF STEEL…
This is the start of the file's text. The full file is on GovTribe.