These are bid documents for the Upgrade North Campus Medium Voltage Feeder project at the Clement J. Zablocki VA Medical Center in Milwaukee, Wisconsin. The project is numbered 695-22-123 and includes comprehensive civil, utilities, and electrical work with an issue date of October 9, 2025.

The civil scope includes site details for tree planting, tree staking stabilization, tree protection with rigid plastic mesh guards, seeded lawn establishment, storm inlet protection with fiber roll and filter fabric, and typical silt fence details. The utilities work encompasses a complete civil utilities plan showing jack and bore operations, new duct bank installations, and profiles connecting multiple manholes (MH-36, MH-36A, MH-36B, MH-12, MH-12A, MH-12B, MH-12C, MH-12D, MH-12E) with storm water, water, gas, phone, and fiber lines at various stations. The electrical demolition work requires removal of existing medium voltage cables, transformers, switchgear, and pedestals across five zones, with detailed feeder schedules identifying cable sizes, lengths, source designations (Source "A" or "B"), and specific actions (replace or remove). The electrical proposed work includes new power distribution switches, transformers, and panel installations at multiple locations with new duct bank and cable routing. The documents specify that all work must comply with the National Electrical Code, VA standards, the Buy American Act, and applicable local codes. Critical buildings requiring continuous power include the Transitional Residence, SPS, Boiler Plant, CLC buildings, and Fisher House. The project involves coordination with WE Energies for existing utility connections and protection of underground utilities during construction.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RIGID PLASTIC MESH TREE GUARD

TREE STAKING. SEE DETAIL

PLANT SHALL BE SET AT OR

SLIGHTLY ABOVE THE

ESTABLISHED FINISH GRADE

IF B&B, UNTIE AND ROLL BACK BURLAP

FROM MIN. 1/3 OF ROOT BALL.

SYNTHETIC WRAP IS UNACCEPTABLE.

CUT WIRE BASKETS AND REMOVE.

SPECIFIED PLANTING MIX

GRADE TO FORM SAUCER

IN LAWN AREAS ONLY

SCARIFY SIDES AND BOTTOM OF TREE PIT TO

PREVENT GLAZING OF SUBGRADE. SET TREE

DIRECTLY ON SUBGRADE TO PREVENT SETTLING.

EXISTING SUB GRADE

DEPTH OF ROOT BALL +/-6"

FINISHED GRADE

VARIES

4" SPECIFIED SHREDDED BARK MULCH

3 X THE WIDTH OF ROOT BALL

6" MI

N

NOTES:

1. SEE PLANS FOR EXTENTS

2. WHEN SURFACE IS SEEDED, INCLUDE

STRAW MULCH OR NATURAL COLOR

HYDROMULCH

3. ADD STARTER FERTILIZER PER SOILS

TEST RESULT

HYDROMULCH

INTO SOIL OR HYDROSEEDED

3" TURF SOIL. ROLL AND COMPACT

TO 85% PROCTOR DENSITY

CONCRETE SAND WITH COMPOST

AMENDMENT @ 1.5 CY / 1000 SF

UNDISTURBED SUBGRADE

OR COMPACTED FILL

DEMARCATION LAYER9"

1'- 0"

C

OV

ER

SE

E

PL

AN

S 3"

SECTION VIEW

PLAN VIEW

PREVAILING

WIND

LODGE POLE STAKES

RUBBER TREE TIES

REMOVE NURSERY STAKE. IF CENTRAL LEADER

NEEDS TO BE STRAIGHTENED OR HELD ERECT,

IT IS ACCEPTABLE TO ATTACH A 1/2" X 8' BAMBOO

POLE TO THE CENTRAL LEADER AND TRUNK

THREE (3) TWO INCH LODGE POLE STAKES.

INSTALL APPROXIMATELY 2" AWAY FROM THE

EDGE OF THE ROOT BALL. STAKE LOCATION SHALL

NOT INTERFERE WITH PERMANENT BRANCHES.

32" LONG NON-ABRASIVE RUBBER TIES.

RIGID PLASTIC MESH TREE GUARD

2'- 0"

6'- 0"

KEEP OUT

TREE PROTECTION

AREA

NOTES:

1. OUTSIDE EDGE OF GUARD SHOULD BE PLACED AT DRIPLINE OR AS INDICATED

ON DEMOLITION PLAN, WHICHEVER IS GREATER. GUARDS MAY BE PLACED

AROUND INDIVIDUAL TREES OR GROUPS OF TREES AS SHOWN ON PLAN.

TENSIONED 12 GA TOP

WIRE SECURED TO FENCE

8.5" x 11" SIGN LAMINATED IN PLASTIC

SPACED EVERY 50' ALONG FENCE

48" ORANGE POLYPROPYLENE

CONTRACTOR-GRADE

CONSTRUCTION FENCE

FINISH GRADE

CROWN DRIP LINE OR OTHER LIMIT OF TREE PROTECTION AREA

4'- 0"

VARIES, 8' MAX

3'-0"

MINEMBEDMENT 18" MIN

24" MAX

12" MIN

FLOW FLOW

FL

OW

FLOW

PLACE SANDBAGS OVER

FIBER ROLL TO HOLD IN PLACE

(TYP)

6" FIBER ROLL (MIN)

FIBER ROLL ENDS SHALL BE

OVERLAPPED 12" MIN AND TIED

TOGETHER

STORM DRAIN INLET

1' MIN

DROP INLET

WITH GATE

2"X4" WOOD FRAME

1.5' MAX

3' MIN

GATHER EXCESS

AT CORNERS

FRAME

FABRIC

STAKE

CONSTRUCTION SPECIFICATIONS

1. FILTER FABRIC SHALL HAVE AN EOS OF 40-85. BURLAP MAY BE USED FOR

SHORT TERM APPLICATIONS.

2. CUT FABRIC FROM A CONTINUOUS ROLL TO ELIMINATE JOINTS. IF JOINTS ARE

NEEDED THEY WILL BE OVERLAPPED TO THE NEXT STAKE.

3. STAKE MATERIALS WILL BE STANDARD 2" x 4" WOOD OR EQUIVALENT. METAL

WITH A MINIMUM LENGTH OF 3 FEET.

4. SPACE STAKES EVENLY AROUND INLET 3 FEET APART AND DRIVE A MINIMUM 18

INCHES DEEP. SPANS GREATER THAN 3 FEET MAY BE BRIDGED WITH THE USE

OF WIRE MESH BEHIND THE FILTER FABRIC FOR SUPPORT.

5. FABRIC SHALL BE EMBEDDED 1 FOOT MINIMUM BELOW GROUND AND

BACKFILLED. IT SHALL BE SECURELY FASTENED TO THE STAKES AND FRAME.

6. A 2" x 4" WOOD FRAME SHALL BE COMPLETED AROUND THE CREST OF THE

FABRIC FOR OVER FLOW STABILITY.

MAXIMUM DRAINAGE AREA 1 ACRE

BURIED

FABRIC

WOVEN WIRE FENCE (MIN 14 1/2

GAUGE W/ MAX 6" MESH SPACING)

36" MIN LENGTH FENCE

POSTS DRIVEN MIN 16"

INTO GROUND.

HEIGHT OF FILTER

= 16" MIN

8" MIN

FLO

W

FLO

W

10' MAX OC

UNDISTURBED GROUND

EMBED FILTER CLOTH

A MIN OF 6" IN GROUND 4"

16"MIN

WOVEN WIRE FENCE

(MIN 14 1/2 GA W/ MAX 6" MESH SPACING)

WITH FILTER CLOTH

36" MIN FENCE POST

FLOW

COMPACTED SOIL

20"MIN

PERSPECTIVE VIEW

SECTION VIEW

CONSTRUCTION SPECIFICATIONS

1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES

OR STAPLES. POSTS SHALL BE STEEL EITHER "T" OR "U" TYPE OR HARDWOOD.

2. FILTER CLOTH TO BE TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH

TIES SPACED EVERY 24" AT TOP AND MID SECTION. FENCE SHALL BE WOVEN WIRE,

12 1/2 GAUGE, 6" MAXIMUM MESH OPENING.

3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER-

LAPPED BY SIX INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHER FILTER X,

MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT.

4. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED

EQUIVALENT.

5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN

"BULGES" DEVELOP IN THE SILT FENCE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

CIVIL SITE DETAILS BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

CS502

SITE

695-22-123

Br CGR

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SCALE: NTS

TYPICAL TREE PLANTING DETAIL1

SCALE: NTS

TYPICAL SEEDED LAWN ESTABLISHMENT DETAIL4

GENERAL NOTES

1. SEE C-001 FOR C-SERIES NOTES AND LEGENDS.

ABBREVIATIONS

GA GAUGE

MAX MAXIMUM

MIN MINIMUM

NTS NOT TO SCALE

TYP TYPICAL

VIF VERIFY IN FIELD

SCALE: NTS

TYPICAL TREE STAKING STABILIZATION DETAIL2 SCALE: NTS

TYPICAL TREE PROTECTION DETAIL3

CS401, CS402

SCALE: NTS

STORM INLET PROTECTION DETAIL5

CS401

CS402

SCALE: NTS

TYPICAL FILTER FABRIC INLET PROTECTION6

CS401

CS402

SCALE: NTS

TYPICALSILT FENCE DETAIL7

CS401

CS402

EXP 03/31/2027

HYDRO EXCAVATION ONLY

IN THIS AREA

T106

T107

EXISTING MH-36

MH-36A

MH-36B

EXISTING MH-12

HVS-12

MH-12B

MH-12D

E

E

E

E

E

E

E

E

E

WORKSHOPS RD.

BARRO

N C

T.

GENERAL M

IT

CHELL

BLVD.

LIN

CO

LN D

R.

N

W A

SH

IN

G T

O N

D R

H A

N K

A A

R O

N T

R A

IL

W O

R K

SH

O

PS R

D

PA

IN

T

SH

O P

R D

BARRON CT.

R E

D A

R R

O W

C

IR

C

LE

CONCRETE CULVERT

MH-12A

MH-12C

MH-12E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

CIVIL UTILITIES PLAN BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

CU101

SITE

695-22-123

Br CGR

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SCALE: 1" = 50'

CIVIL UTILITIES PLAN1N

GENERAL NOTES

1. SEE C-001 FOR CIVIL GENERAL NOTES AND LEGENDS

2. SEE CS-401 FOR CIVIL SITE ENLARGED PLAN

3. SEE CU201, CU202 AND CU203 FOR CIVIL UTILITIES ENLARGED PLANS

4. SEE ES501 FOR DUCT BANK DETAILS

5. SEE GC101 THROUGH GC113 FOR PHASING DRAWINGS.

GENERAL LINETYPES

NEW DUCT BANK

- POWER DISTRIBUTION SWITCH (HVP OR HVS)

- TRANSFORMER (XF)

- ELECTRICAL PANEL (PNL)

SITE PLAN SYMBOL LEGEND

EXISTING DUCT BANK

- UTILITY, ELECTRICAL MANHOLE (MH)E

ABBREVIATIONS

MH MANHOLE

HVS POWER DISTRIBUTION SWITCH

LF LINEAL FEET

- TREES OR BUSHES

- POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

NEW JACK AND BORE

0+00 0+50 1+00 1+50

2+00 2+50 3+00

ST

A:

0+

CL

E

XI

ST

IN

G

MH

-3

ST

A:

3+

CE

NT

ER

M

H3 6-

A

ST

A:

0+

BE

ND

ST

A:

1+

BE

ND

ST

A:

1+

BA

CK

O F

CU

RB

ST

A:

1+

BA

CK

O F

CU

RB

ST

A:

1+

RA

IL

ST

A:

2+

RA

IL

ST

A:

2+

ED

GE

O F

AS

PH

AL

T

ST

A:

2+

ED

GE

O F

AS

PH

AL

T

ST

A:

0+

ED

GE

O F

CO

NC

RE

TE

ST

A:

0+

EL

EC

TR

IC

ST

A:

0+

ED

GE

O F

CO

NC

RE

TE

ST

A:

0+

W

AT

ER

ST

A:

0+

GA

S

ST

A:

0+

PH

ON

E

ST

A:

1+

" S

TO

RM

W

AT

ER

ST

A:

1+

ST

EA

M

EL 630.5

EXIST MH-36

EL 628.5

MH-36A

JA

CK

A

ND

BO

RE

ST

A:

2+

JA

CK

A

ND

B

OR

E

3+00 3+50 4+00 4+50

5+00 5+50 6+00

6+50

ST

A:

3+

CE

NT

ER

M

H-

A

ST

A:

6+

CE

NT

ER

M

H-

B

640 640

ST

A:

4+

BE

ND

ST

A:

5+

BE

ND

ST

A:

5+

BE

ND

ST

A:

4+

" S

TO

RM

W

AT

ER

ST

A:

5+

BA

CK

O F

CU

RB

ST

A:

5+

BA

CK

O F

CU

RB

ST

A:

5+

" S

TO

RM

W

AT

ER

ST

A:

5+

PH

ON

EST

A:

5+

EL

EC

TR

IC

EL 628.5

MH-36A

EL 629.5

MH-36B

ST

A:

5+

W

AT

ER

ST

A:

5+

EL

EC

TR

IC

ST

A:

5+

JA

CK

A

ND

B

OR

E

ST

A:

5+

JA

CK

A

ND

B

OR

E

JA

CK

A

ND

BO

RE

EE

EXISTING

MH-36

MH-36A

E E

MH-36A

MH-36B

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

CIVIL UTILITIES PLAN AND

PROFILES

BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

CU201

SITE

695-22-123

Br CGR

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

GENERAL NOTES

1. SEE C-001 FOR CIVIL GENERAL NOTES AND LEGENDS

2. SEE CU101 FOR CIVIL UTILITIES PLAN

3. SEE ES501 FOR DUCT BANK DETAILS

4. SEE GC101 THROUGH GC113 FOR PHASING DRAWINGS.

5. LENGTH OF JACK AND BORE ARE APPROXIMATE. CONTRACTOR TO CONFIRM BASED

UPON CONTRACT SPECIFICATIONS AND INDUSTRY BEST PRACTICES.

6. THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS AND PIPED UTILITIES

SHALL BE 2'-0" AND THE MINIMUM VERTICAL CLEARANCE SHALL BE 18".

SCALE: 1" = 20'

MH-36A TO MH-36B ENLARGED PLAN3

N

SCALE: 1" = 20'

MH-36 TO MH-36A ENLARGED PLAN1N

SCALE: HORZ: 1" = 20'-0", VERT: 1"=10'-0"

MH-36 TO MH-36A PROFILE2

SCALE: HORZ: 1" = 20'-0", VERT: 1"=10'-0"

MH-36A TO MH-36B PROFILE4

GENERAL LINETYPES

- POWER DISTRIBUTION SWITCH (HVP OR HVS)

- TRANSFORMER (XF)

- ELECTRICAL PANEL (PNL)

SITE PLAN SYMBOL LEGEND

- UTILITY, ELECTRICAL MANHOLE (MH)E

ABBREVIATIONS

MH MANHOLE

HVS POWER DISTRIBUTION SWITCH

LF LINEAL FEET

- TREES OR BUSHES

- POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

NEW DUCT BANK

EXISTING DUCT BANK

7+00 7+50

8+00 8+50 9+00 9+50 10+00

6+50

ST

A:

6+

CE

NT

ER

M

H-

B

ST

A:

+0

CE

NT

ER

E

XI

ST

IN

G

MH

-1

ST

A:

8+

BA

CK

O F

CU

RB

ST

A:

9+

BA

CK

O F

CU

RB

ST

A:

9+

BA

CK

O F

CU

RB

ST

A:

7+

GA

S ST

A:

7+

" S

TO

RM

W

AT

ER

ST

A:

7+

BA

CK

O F

CU

RB

ST

A:

9+

EL

EC

TR

IC

ST

A:

8+

PH

ON

E

EL 629.5

MH-36B

EL 626.0

EXIST MH-12

ST

A:

9+

JA

CK

A

ND

B

OR

E

ST

A:

8+

JA

CK

A

ND

B

OR

E

ST

A:

7+

JA

CK

A

ND

B

OR

E

E E

MH-36B EXISTING MH-12

HVS-12

WORKSHOPS RD.

BARRON CT.

R

ED

A R

R O

W

CIR

CLE

10+00 10+50 11+00 11+50 12+00 12+50 13+00

ST

A:

+0

CE

NT

ER

E

XI

ST

IN

G

MH

-1

ST

A:

+8

CE

NT

ER

M H-

B

ST

A:

+6

BE

ND ST

A:

+4

ED

GE

O

F

SI

DE

W

AL

K

ST

A:

+5

BE

ND

ST

A:

+1

EL

EC

TR

IC

ST

A:

+5

GA

S ST

A:

+6

FI

BE

R

EL 621.5

MH-12A

EL 626.0

EXIST MH-12

ST

A:

+9

CO

NC

RE

TE

C

UL

VE

RT

ST

A:

+2

CO

NC

RE

TE

C

UL

VE

RT

ST

A:

+7

" S

TO

RM

W

AT

ER

EL 617.6

TOP OF CULVERT

EL 610.6

INVERT CULVERT

610 610

ST

A:

+0

CE

NT

ER

M H-

A

EE E

EXISTING MH-12

HVS-12

MH-12B

CONCRETE CULVERT

MH-12A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

CIVIL UTILITIES PLAN AND

PROFILES

BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

CU202

SITE

695-22-123

Br CGR

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

GENERAL NOTES

1. SEE C-001 FOR CIVIL GENERAL NOTES AND LEGENDS

2. SEE CU101 FOR CIVIL UTILITIES PLAN

3. SEE ES501 FOR DUCT BANK DETAILS

4. SEE GC101 THROUGH GC113 FOR PHASING DRAWINGS.

5. LENGTH OF JACK AND BORE ARE APPROXIMATE. CONTRACTOR TO CONFIRM BASED

UPON CONTRACT SPECIFICATIONS AND INDUSTRY BEST PRACTICES.

6. THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS AND PIPED UTILITIES

SHALL BE 2'-0" AND THE MINIMUM VERTICAL CLEARANCE SHALL BE 18".

SCALE: 1" = 20'

MH-36B TO EXISTING MH-12 ENLARGED PLAN1N

SCALE: HORZ: 1" = 20'-0", VERT: 1"=10'-0"

MH-36B TO EXISTING MH12 PROFILE2

SCALE: 1" = 20'

EXISTING MH-12 TO MH-12B ENLARGED PLAN3

N

SCALE: HORZ: 1" = 20'-0", VERT: 1"=10'-0"

EXISTING MH-12 TO MH-12B PROFILE4

GENERAL LINETYPES

- POWER DISTRIBUTION SWITCH (HVP OR HVS)

- TRANSFORMER (XF)

- ELECTRICAL PANEL (PNL)

SITE PLAN SYMBOL LEGEND

- UTILITY, ELECTRICAL MANHOLE (MH)E

ABBREVIATIONS

MH MANHOLE

HVS POWER DISTRIBUTION SWITCH

LF LINEAL FEET

- TREES OR BUSHES

NEW DUCT BANK

EXISTING DUCT BANK

E E

MH-12D

BLDG 115

EXISTING ELECTRICAL

DUCT BANK

LINCOLN DR.

MH-12E

E EE

MH-12B MH-12D

G E

N E

R A

L

M

ITC

H E

LL

B

LV

D

WASHINGTON DR.

MH-12C

13+00 13+50 14+00 14+50

15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50

ST

A:

+8

CE

NT

ER

O F

MH

-1

2B

ST

A:

+7

CE

NT

ER

O F

MH

-1

2D

ST

A:

+2

BA

CK

O

F

CU

RB

ST

A:

+4

BA

CK

O

F

CU

RB

ST

A:

+7

ED

GE

O

F

PA

RK

IN

G

LO

T

ST

A:

+7

ED

GE

O

F

PA

RK

IN

G

LO

T

ST

A:

+9

PH

ON

E

ST

A:

+8

EL

EC

TR

IC

ST

A:

+6

EL

EC

TR

IC

ST

A:

+6

EL

EC

TR

IC

EL 625.5

MH-12B

EL 621.5

MH-12A

ST

A:

+5

JA

CK

A

ND

B

OR

E

ST

A:

+0

ED

GE

O

F

SI

DE

W

AL

K

ST

A:

+0

JA

CK

A

ND

B

OR

E

ST

A:

+8

CE

NT

ER

O F

MH

-1

2C

ST

A:

+4

" S

TO

RM

W

AT

ER

ST

A:

+3

" S

TO

RM

W

AT

ER

19+00 19+50 20+00 20+50 21+00 21+50 22+00

ST

A:

+7

CE

NT

ER

O F

MH

-1

2D

22+50

615 615

ST

A:

+1

NE

W T

O

EX

IS

TI

NG

CO

NN

EC

TI

ON

P

OI

NT

ST

A:

+4

EX

IS

TI

NG

B

LD

G

ST

A:

+0

ED

GE

O

F

SI

DE

W

AL

K

ST

A:

+1

ED

GE

O

F

SI

DE

W

AL

K

ST

A:

+3

BA

CK

O

F

CU

RB

ST

A:

+6

BA

CK

O

F

CU

RB

ST

A:

+8

BE

ND

ST

A:

+9

ED

GE

O

F

AS

PH

AL

T

ST

A:

+9

ED

GE

O

F

SI

DE

W

AL

K

ST

A:

+1

EL

EC

TR

IC

ST

A:

+3

ST

OR

M

W

AT

ER

ST

A:

+7

ST

OR

M

W

AT

ER

ST

A:

+9

EL

EC

TR

IC

ST

A:

.08

EL

EC

TR

IC

EL 625.5

MH-12B

JA

CK

A

ND

BO

RE

ST

A:

+9

JA

CK

A

ND

B

OR

E

ST

A:

+3

CE

NT

ER

O F

MH

-1

2E

SI

ZE

U

NK

NO

W

N

SI

ZE

U

NK

NO

W

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

CIVIL UTILITIES PLAN AND

PROFILES

BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

CU203

SITE

695-22-123

Br CGR

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SCALE: 1" = 20'

MH-12D TO BLDG 115 ENLARGED PLAN3

N

SCALE: 1" = 20'

MH-12A TO MH-12B ENLARGED PLAN1

N

SCALE: HORZ: 1" = 20'-0", VERT: 1"=10'-0"

MH-12B TO MH-12D PROFILE2

SCALE: HORZ: 1" = 20'-0", VERT: 1"=10'-0"

MH-12D TO BLDG 115 PROFILE4

GENERAL LINETYPES

- POWER DISTRIBUTION SWITCH (HVP OR HVS)

- TRANSFORMER (XF)

- ELECTRICAL PANEL (PNL)

SITE PLAN SYMBOL LEGEND

- UTILITY, ELECTRICAL MANHOLE (MH)E

ABBREVIATIONS

MH MANHOLE

HVS POWER DISTRIBUTION SWITCH

LF LINEAL FEET

- TREES OR BUSHES

- POINT OF CONNECTION BETWEEN NEW

AND EXISTING WORK

NEW DUCT BANK

EXISTING DUCT BANK

NEW JACK AND BORE

GENERAL NOTES

1. SEE C-001 FOR C-SERIES NOTES AND LEGENDS.

2. SEE CU101 FOR CIVIL UTILITIES PLAN

3. SEE ES501 FOR DUCT BANK DETAILS

4. SEE GC101 THROUGH GC113 FOR PHASING DRAWINGS.

5. LENGTH OF JACK AND BORE ARE APPROXIMATE. CONTRACTOR TO CONFIRM USING JACK

AND BORE DESIGN CRITERIA.

6. THE PREFERRED VERTICAL CLEARANCE BETWEEN DUCT BANKS AND PIPED UTILITIES

SHALL BE 2'-0" AND THE MINIMUM VERTICAL CLEARANCE SHALL BE 18".

KEYED NOTES

1 AS INDICATED IN RECORD DRAWINGS FROM VAPROJECT 659-352. NOT IDENTIFIED IN RA

SMITH SURVEY.

2 REFER TO CS402 AND GC102 FOR ADDITIONAL INFORMATION ON PHASED WORK WITHIN

THE PARKING LOT.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

ELECTRICAL GENERAL NOTES AND

LEGEND

BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09 E-001

SITE

695-22-123

CJR DAK

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

MOLDED CASE CIRCUIT BREAKER

ELECTRICAL SYMBOLS - POWER PLAN

GENERAL NOTES

1. DRAWINGS ARE DIAGRAMMATIC IN NATURE, CONTRACTOR RESPONSIBLE

FOR DETERMINING EXACT ROUTINGS AND DEVICE PLACEMENT IN FIELD.

2. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE

INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE

MANUFACTURERS RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL

AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE

LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA STANDARDS.

3. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES,EQUIPMENT AND

FEEDERS WHERE THE BUILDING CONSTRUCTION IS NOT SUITABLE FOR

DIRECT MOUNTING.

4. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR

SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS,

FLOORS, CEILINGS AND ROOFS IN ACCORDANCE WITH REQUIREMENTS OF

THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENTS AND THE

APPLICABLE BUILDING CODES.

5. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS

AND ALL REQUIRED MOUNTING HARDWARE TO SUIT THE PARTICULAR

INSTALLATION.

6. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES

DURING CONSTRUCTION.

7. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

8. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO

INSTALLATION SO AS TO AVOID CONFLICT DURING CONSTRUCTION.

9. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING

EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING

ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE OR SPACE.

10. MANUFACTURERS NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE

PURPOSES TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO

LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER, PRODUCTS DEEMED

EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL

PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".

11. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANELS,

BREAKER AND/OR PARTICULAR EQUIPMENT MANUFACTURERS

SPECIFICATIONS.

12. CIRCUITRY TO SWITCHES, RECEPTACLES AND ALL OTHER DEVICES SHALL BE

TERMINATED ON THE DEVICES SCREW TERMINALS.

13. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET,

FIXTURE OR EQUIPMENT UNLESS OTHERWISE NOTED.

14. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

15. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS

OTHERWISE NOTED.

16. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC

CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF

SIX (6) FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE

CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE,

LMFC CONDUIT SHALL BE USED (MAXIMUM SIX (6) FEET) FOR FINAL

CONNECTIONS.

17. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL

BE LABEL LISTED BY AN APPROVED THIRD PARTY TESTING AGENCY.

18. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE

CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT

REQUIREMENTS OR GREATER QUANTITY OF WORK, AS DETERMINED BY THE

GOVERNMENT, SHALL BE PROVIDED.

19. COMPRESSION COUPLINGS SHALL NOT BE USED. NO SET SCREW FITTINGS

ARE ALLOWED, EXCEPT 2-1/2" OR LARGER. FOR EMT OR IMT CONDUIT.

20. CONTRACTOR TO TERMINATE ALL EQUIPMENT FEEDERS PER

MANUFACTURERS INSTRUCTIONS

21. ALL SINGLE PHASE TRANSFORMER PRIMARY CONNECTION TYPE SHALL BE

LINE-TO-LINE.

GENERAL NOTES DEMOLITION

1. FOR EXISTING EQUIPMENT, SUCH AS LIGHTING FIXTURES, WIRING DEVICES,

CONDUITS, ETC., SHOWN ON PLANS TO BE REMOVED, COMPLETELY CUT/CAP

CONDUITS AT THE AREA OF WORK PERIMETER AND REMOVE CONDUIT

WITHIN THE WORK AREA, DISCONNECT WIRING AT THE OVERCURRENT

PROTECTIVE DEVICE AND REMOVE WIRING COMPLETELY FROM THE

ABANDONED CONDUITS.

2. DISCONNECT ALL ABANDONED WIRING OF ALL TYPES AT THE OVERCURRENT

PROTECTIVE DEVICE. COMPLETELY REMOVE ALL ABANDONED WIRING.

3. MAINTAIN AND RESTORE, IF INTERRUPTED, ALL CONDUITS AND

CONDUCTORS PASSING THROUGH RENOVATED AREAS AND SERVICING

UNDISTURBED AREAS.

4. COORDINATE ALL EXCAVATION WORK WITH WE ENERGIES AND DIGGERS

HOTLINE BEFORE COMMENCEMENT OF WORK.

5. CONTRACTOR TO REPLACE ALL LOW VOLTAGE PANELS IN KIND, USING

EXISTING MOUNTING METHODS AND LOCATIONS

GENERAL SYMBOLS

1PH SINGLE-PHASE

1P SINGLE POLE

2/C TWO-CONDUCTOR

3/C THREE-CONDUCTOR

3PH THREE-PHASE

4/C FOUR-CONDUCTOR

4W FOUR-WIRE

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAP ALARM ANNUNCIATOR PANEL

AC ALTERNATING CURRENT OR

ARMORED CABLE

ACC ACCESSIBLE

ADDL ADDITIONAL

ADJ ADJACENT, ADJOINING

ADO AUTOMATIC DOOR OPENER

AF AMPERE FRAME OR AMP FUSE

AFC ABOVE FINISHED COUNTER,

AUTOMATIC FREQUENCY

CONTROL, OR AVAILABLE FAULT

CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AH AMPERE HOUR

AHJ AUTHORITY HAVING

JURISDICTION

AIC AMPERE INTERRUPTING

CAPACITY

ALT ALTERNATE

AMB OR A AMBIENT

AMP AMPERE

ARCH ARCHITECT

ASC AMPS SHORT CIRCUIT

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AV AUDIO VISUAL

BAT BATTERY

BC BARE COPPER

BD BOARD

BFF BELOW FINISH FLOOR

BIL BASIC INSULATION LEVEL

BLDG BUILDING

BRKR BREAKER

BYP BY PASS

C CONDUIT

CAB CABINET

CALC CALCULATE

CAP CAPACITY

CAT CATALOG

CATV COMMUNITY ANTENNA

TELEVISION

CCR CONTROL CONTACTOR

CCTV CLOSED CIRCUIT TELEVISION

cd CANDELA

CD CONSTRUCTION DOCUMENTS

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR

FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR

FURNISHED/OWNER INSTALLED

CFE CONTRACTOR FURNISHED

EQUIPMENT

CHW CHILLED WATER

CHWP CHILLED WATER PUMP

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

CLF CURRENT LIMITING FUSE

CLG CEILING

CMU CONCRETE MASONRY UNIT

COAX COAX CABLE

COMM COMMUNICATION

COMP COMPUTER

COMPT COMPARTMENT

CONC CONCRETE

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CPT CONTROL POWER

TRANSFORMER

CRI COLOR RENDERING INDEX

CT CURRENT TRANSFORMER

CTV CABLE TELEVISION

CU COPPER

CU FT CUBIC FEET

CUR CURRENT

DB DECIBEL OR DIRECT BURIAL

DC DIRECT CURRENT

DCP DIMMER CONTROL PANEL

DEG C DEGREES CELSIUS

DEG F DEGREES FAHRENHEIT

DEMO DEMOLITION

DIAG DIAGRAM

DISC DISCONNECT

DISTR DISTRIBUTION

DISTR PNL DISTRIBUTION PANEL

DMR SW DIMMER SWITCH

DN DOWN

DPDT DOUBLE POLE, DOUBLE THROW

DPST DOUBLE POLE, SINGLE THROW

DRSW DOOR SWITCH

DS DISCONNECT SWITCH

DWG DRAWING

EC EMPTY CONDUIT

EG EQUIPMENT GROUND

EL ELEVATION

ELEC ELECTRIC OR ELECTRICAL

ELEV ELEVATOR

EMCP EMERGENCY MONITORING

CONTROL PANEL

EMER EMERGENCY

EMI ELECTROMAGNETIC

INTERFERENCE

EMT ELECTRICAL METALLIC TUBING

ENCL ENCLOSURE

EPO EMERGENCY POWER OFF

EPRF EXPLOSION PROOF

ESMT EASEMENT

EWC ELECTRIC WATER COOLER

EWH ELECTRIC WATER HEATER

EXIST EXISTING

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR

PANEL

FABL FIRE ALARM BELL

FABX FIRE ALARM BOX

FACP FIRE ALARM CONTROL PANEL

FC FOOTCANDLE

FI FILM ILLUMINATOR

FIXT FIXTURE

FLA FULL LOAD AMPS

FLEX FLEXIBLE METALLIC CONDUIT

FLT FLOODLIGHT

FOUTT TELEPHONE FLOOR OUTLET

FP FIRE PROTECTION

FT FEET OR FOOT

FU SW FUSED SWITCH

FVNR FULL VOLTAGE NON-REVERSING

FVR FULL VOLTAGE REVERSING

GND GROUND

GEN GENERATOR

GFCI GROUND FAULT CIRCUIT

INTERRUPTER

GTB GROUND TERMINAL BOX

HID HIGH INTENSITY DISCHARGE

HOA HAND-OFF-AUTOMATIC

HP HORSEPOWER

HT HEIGHT

HVP HIGH VOLTAGE PEDESTAL

HVS HIGH VOLTAGE SWITCH

HZ HERTZ

IESNA ILLUMINATION ENGINEERING

SOCIETY OF NORTH AMERICA

IMC INTERMEDIATE METAL CONDUIT

INCAND INCANDESCENT

IR INFRARED

IWH INSTANTANEOUS WATER HEATER

J-BOX JUNCTION BOX

kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR kWHM KILOWATT HOUR METER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LM LUMEN

LP LIGHT POLE

LPS LOW PRESSURE SODIUM

LRA LOCKED ROTOR AMPS

LTCP LOCAL TEMPERATURE CONTROL

PANEL

LT LIGHT

LTG LIGHTING

LTG PNL LIGHTING PANEL

LTNG LIGHTNING

LV LOW VOLTAGE

MATV MASTER ANTENNA TELEVISION

SYSTEM

MAX MAXIMUM

MC METAL-CLAD

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MG MOTOR GENERATOR

MH MANHOLE

MIN MINIMUM

MOCP MAXIMUM OVERCURRENT

PROTECTION

MLO MAIN LUGS ONLY

MT MOUNT

MTD MOUNTED

MTG MOUNTING

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

MVA MEGAVOLT-AMPERE

MW MEGAWATT MICROWAVE

NA NOT APPLICABLE

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURERS ASSOCIATION

NEUT OR

N

NEUTRAL

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NL NIGHT LIGHT

NO NORMALLY OPEN

NS NO SCALE

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OL OVERLOAD

P POLE

PA PUBLIC ADDRESS

PB PANELBOARD, PULL BOX, OR

PUSHBUTTON

PBPU PREFABRICATED BEDSIDE

PATIENT UNIT

PCB POLYCHLORINATED BIPHENYL

PEC PHOTOELECTRIC CELL

PED PEDESTAL

PEND PENDANT

PF POWER FACTOR

PH PHASE

PNL PANEL

POD POWER OPERATED DAMPER

PT POTENTIAL TRANSFORMER

PTRV POWER TYPE ROOF VENTILATION

PVC POLYVINYL CHLORIDE (PLASTIC)

PWR POWER

RCP REFLECTED CEILING PLAN

REC RECESSED

RECPT RECEPTACLE

RGS RIGID GALVANIZED STEEL

RM ROOM

RMS ROOT MEAN SQUARE

REQ'D REQUIRED

SCC SHORT CIRCUIT CAPACITY

SES SERVICE ENTRANCE SECTION

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SHT SHEET

SI INTERNATIONAL SYSTEM OF

UNITS

SPEC SPECIFICATION

SPST SINGLE POLE, SINGLE THROW

SURF SURFACE

SW SWITCH

SWBD SWITCHBOARD

SWGR SWITCHGEAR

TC TIME CLOCK

TE TELECOMMUNICATION

ENCLOSURE

TEL TELEPHONE

TP TWISTED PAIR

TPS TWISTED PAIR SHIELDED

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

TYP TYPICAL

UFD UNDERFLOOR DUCT

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER

SUPPLY

UTIL UTILITY

V VOLT

VA VOLT AMPERE

VAR VOLT AMPERE REACTIVE

VFD VARIABLE FREQUENCY DRIVE

VOLT VOLTAGE

W WATT

WH WATER HEATER

WP WEATHERPROOF

XFER TRANSFER

XFMR TRANSFORMER

ELECTRICAL ABBREVIATIONSSITE DEMOLITION LINE TYPES

DETAIL CALLOUT

AREA CALLOUT

K

BUILDING NUMBER

CABLE NUMBER

KIRK-KEY

MANHOLE

HIGH VOLTAGE SWITCH WITH KIRK KEY INTERLOCK

TRANSFORMER WITH DISCONNECT

TRANSFORMER WITH FEED SELECTOR

AND INTEGRAL LOW VOLTAGE PANEL

TRANSFORMER WITH INTEGRAL LOW VOLTAGE PANEL

TRANSFORMER WITH FEED SELECTOR

HIGH VOLTAGE PEDESTAL

LOW VOLTAGE PANEL

NON-FUSED SWITCH

FUSED SWITCH

STREET LIGHT/LIGHT POLE

NON-FUSED DISCONNECT

SYNCHRONOUS RELAY

MEDIUM VOLTAGE CABLE INSTALLATION NOTES:

1. CABLES SHALL BE PULLED INTO DUCTS WITH EQUIPMENT DESIGNED FOR THIS PURPOSE,

INCLUDING POWER-DRIVEN WINCHES, CABLE FEEDING FLEXIBLE TUBE GUIDES, CABLE GRIPS,

PULLING EYES AND LUBRICANTS. A SUFFICIENT NUMBER OF TRAINED PERSONNEL AND

EQUIPMENT SHALL BE EMPLOYED TO ENSURE THE CAREFUL AND PROPER INSTALLATION OF

THE CABLE.

2. CABLE REELS SHALL BE SET UP AT THE SIDE OF THE MANHOLE OPENING AND ABOVE THE

DUCT OR HATCH LEVEL, ALLOWING CABLES TO ENTER THROUGH THE OPENING WITHOUT

REVERSE BENDING. FLEXIBLE TUBE GUIDES SHALL BE INSTALLED THROUGH THE OPENING IN

A MANNER THAT WILL PREVENT CABLES FROM RUBBING ON THE EDGES OF ANY STRUCTURAL

MEMBER.

3. CABLES SHALL BE UNREELED FROM THE TOP OF THE REEL. PAY-OUT SHALL BE CAREFULLY

CONTROLLED. CABLES TO BE PULLED SHALL BE ATTACHED THROUGH A SWIVEL TO MAIN

PULLING WIRE BY MEANS OF A SUITABLE CABLE GRIP AND PULLING EYE.

4. CABLE MAXIMUM PULL LENGTH, MAXIMUM PULLING TENSION AND MINIMUM BEND RADIUS

SHALL CONFORM WITH THE RECOMMENDATIONS OF THE CABLE MANUFACTURER. DO NOT

BEND CABLE TIGHTER THAN MINIMUM BEND RADIUS AT ANY TIME BEFORE DURING OR AFTER

INSTALLATION. DO NOT EXCEED MAXIMUM SIDEWALL PRESSURE

5. SEAL THE CABLE ENDS PRIOR TO PULLING TO PREVENT THE ENTRY OF MOISTURE OR

LUBRICANT.

6. USE SUITABLE LUBRICATING COMPOUNDS ON THE CABLE TO PREVENT PULLING DAMAGE.

PROVIDE COMPOUNDS THAT ARE NOT INJURIOUS TO THE CABLE JACKET AND DO NOT HARDEN

OR BECOME ADHESIVE. DO NOT BEND THE CABLE TIGHTER THAN THE MINIMUM BEND RADIUS

AT ANY TIME BEFORE DURING OR AFTER INSTALLATION.

7. CABLES SHALL BE LIBERALLY COATED WITH A SUITABLE LUBRICANT AS THEY ENTER THE

TUBE GUIDE OR DUCT. ROLLERS SHALL CONFORM TO THE MINIMUM BENDING RADIUS OF THE

CABLE.

8. CABLES SHALL BE PULLED INTO DUCT AT A REASONABLE SPEED. CABLE PULLING USING A

VEHICLE SHALL NOT BE PERMITTED. PULLING OPERATIONS SHALL BE STOPPED IMMEDIATELY

AT ANY INDICATION OF BINDING OR OBSTRUCTION, AND SHALL NOT BE RESUMED UNTIL THE

POTENTIAL FOR DAMAGE TO THE CABLES IS CORRECTED. SUFFICIENT SLACK SHALL BE

PROVIDED FOR FREE MOVEMENT OF CABLES DUE TO EXPANSION OR CONTRACTION.

9. CABLES CUT IN THE FIELD SHALL HAVE THE CUT ENDS IMMEDIATELY SEALED TO PREVENT

ENTRANCE OF MOISTURE.

10. CONTRACTOR PROVIDE A STATEMENT THAT EACH TERMINATION WAS COMPLETELY

INSTALLED IN A SINGLE CONTINUOUS WORK PERIOD BY A SINGLE QUALIFIED WORKER

WITHOUT ANY OVERNIGHT INTERRUPTION.

11. SOLDER BLOCK THROUGHOUT STRANDED GROUNDING WIRES THAT MIGHT PENETRATE THE

TERMINATING MATERIALS.

12. USE MIRRORS TO OBSERVE THE INSTALLATION OF MATERIALS ON THE BACKSIDES OF

TERMINATIONS.

13. EMPLOYEES WHO SHALL INSTALL TERMINATIONS AND TEST THE CABLES SHALL HAVE NOT

FEWER THAN FIVE (5) YEARS OF EXPERIENCE SPLICING AND TERMINATING CABLES

EQUIVALENT TO THOSE BEING TERMINATED, INCLUDING EXPERIENCE WITH THE MATERIALS IN

THE KITS.

14. COVER ALL CABLE SEGMENTS EXPOSED IN MANHOLES AND PULL-BOXES WITH FIREPROOFING

TAPE.

15. CABLE SPLICES SHALL BE WATERPROOF, ACCESSIBLE, PROPERLY BONDED AND

MECHANICALLY SECURED. USE 200A DEADBREAK LOCKING SPLICES OR EQUAL.

16. ALL CABLES SHALL BE TESTED PRIOR TO COMMISSIONING IN ACCORDANCE WITH

SPECIFICATION 26-05-13 SECTION 3.7(C).

17. ALL MEDIUM VOLTAGE TERMINATIONS SHALL BE LOAD BREAK TYPE ELBOWS AND TEES.

WORK HOURS

SCHEDULED POWER OUTAGE

1. CONTRACTOR SHALL PERFORM WORK DURING NORMAL WORK HOURS

(7:00 AM - 4:30 PM) UNLESS OTHERWISE APPROVED BY THE COR.

2. NON-POWERED WORK OUTAGES TO BE PERFORMED OUTSIDE OF

NORMAL WORK HOURS (OFF SHIFT), INCLUDUING FEDERAL HOLIDAYS,

SHALL BE SCHEDULED WITH THE COR THREE WEEKS BEFORE

COMMENCEMENT OF WORK.

3. REFERENCE SPECIFICATION 01-01-10SN PARAGRAPH 3.21 FOR

ADDITIONAL INFORMATION.

1. ALL POWER OUTAGES MUST BE REQUESTED BY THE GENERAL

CONTRACTOR TO THE COR AT LEAST THREE (3) WEEKS IN ADVANCE.

2. WORK THAT REQUIRES EXTENDED POWER SHUT DOWNS TO THE

ENTIRE NORTH CAMPUS LOOP AND WORK THAT REQUIRES POWER

SHUT DOWNS TO CRITICAL BUILDINGS SHALL BE LIMITED TO THE

WEEKENDS.

3. OTHER WORK THAT REQUIRES POWER SHUTDOWNS SHALL BE

PLANNED AND LIMITED TO OFF HOURS AND WEEKENDS.

CRITICAL BUILDING LIST

BUILDING - 11 - TRANSITIONAL RESIDENCE

BUILDING - 102 - SPS

BUILDING - 112 - BOILER PLANT

BUILDING - 146 - CLC

BUILDING - 147 - CLC

BUILDING - 148 - CLC

BUILDING - 150 - FISHER HOUSE

SINGLE LINE DEMOLITION LINE TYPES

SINGLE LINE PROPOSED LINE TYPES

SITE PROPOSED LINE TYPES

DEMOLISH

EXISTING

REMOVE AND REPLACE

NEW

EXISTING

MATCHLINE

EXISTING CABLE

DEMOLISH

ABANDONED DUCT BANK

REMOVED CABLE

MATCHLINE

EXISTING DUCT BANK AND NEW CABLE

NEW DUCT BANK / CABLE / EQUIPMENT

ABANDONED DUCT BANK

EXISTING LOW VOLTAGE DUCT BANK

Exp.: 12/31/2028

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

ZONE 5

1/ED405

1/ED404

1/ED402

1/ED401

109110

T114

7 2

6C

6A 6D6B

T105

HVP-22

HVP-23

HVP-K

HVP-15

HVP-18

XF-97

XF-36XF-4

XF-2

HVS-20

PNL-27

XF-27

XF-5

HVP-29

HVP-4

XF-3

GENERAL MITCHELL BLVD

LINCOLN DR

BARRON CT

RED ARROW CIR

W

OR

KS

HO

P

RO

ADBARRON CT

N M

ITC

HE

LL

BL

VD

HI

NE

S

BL

VD

CHRYSLER WOOD AVE

KILBOURN CIR

KILBOURN CIR

JU

NE

AU

A

VE

W

AL

KE

R

DR

IV

E

AMERICAN WARMOTHERS AVE

ZABLOCKI DR

GE

N

MI

TC

HE

LL

B

LV

D

STADIUM LN

GENERAL WOLCOTT BLVD

GENERAL WOLCOTT AVE

WOOD AVE

MEMORIAL DR

FLOWER DR HINES BLV

D

HVP-16

XF-102

XF-49

BCL

XF-108

XF-7

XF-43

XF-119

XF-6

XF-CL1

PNL-49

HVS-146

XF-146

CB-100-CLC

CB-600-146

HVS-147

XF-147

CB-600-147

CB-600-148

XF-148

HVS-148

MH-37

107/108-DS-A

PNL-1

PNL-41

MH-47A

MH-2B

MH-2A

MH

MH-15

MH-20

MH-23

MH-24 MH-25

MH-27 MH-29

MH-31

MH-32

MH-34 MH-35

MH-38

XF-39

MH-9 MH-10

MH-8A

MH-7

PNL-K

HVP-40

HVS-41

HVP-41

XF-MP-FDS

PNL-17

HVP-44

PNL-3

MH-40

MH-43

HVP-42

MH-42

MH-8

MH-18

MH-4

MH-47

MH-13

XF-1301

HVS-23B

MH-13A

PNL-2V

XF-41

MH-39

XF-62

MH-22

MH-21

Cemetery National Wood

Cemetery National Wood

Wheeler Lake

XF-112

PNL-CLC

XF-17

HANK AARON TRAIL BRIDGE

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E E

E

E

E

E

E

E

PNL-19

PNL-62

XF-19

T106 T107

HVP-42

GO

LD

ST

AT

E

DR

HVS-SL1

E

XF-SL1

PNL-SL1

MH-3

GENERAL MITCHELL BLVD

HVP-2

MH-44

MH

HVP-20

HVS-23A

HVS-22

HVS-18

HVS-11

HVP-8

XF-16

E

E

XF-14

PNL-14

MH-41

HVS-A

MH-12

XF-41

HVS-16

XF-K

HVS-20

HVP-27

HVP-30

XF-11

PNL-11

HVS-41

XF-41

HVS-36

HVP-31

PNL-16

HVS-2

MH-36

HVP-24

HVP-3

MH-2

PNL-39

HVP-11

MH-11

E

XF-20

HVP-34

XF-1

WAREHOUSE WAY

HVP-36

OUTSIDE SERVICE

NORTH LOT PANEL

MH-30

HVS-4

XF-12

NRF E

ZONE 2

ZONE 1

ZONE 4

ZONE 3

1/ED403

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

ELECTRICAL DEMOLITION SITE

PLAN

BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

ED101

SITE

695-22-123

CJR CGR

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SITE DEMOLITION LINETYPES

MATCHLINE

- POWER DISTRIBUTION SWITCH (HVP OR HVS)

- TRANSFORMER (XF)

- ELECTRICAL PANEL (PNL)

SITE PLAN SYMBOL LEGEND

EXISTING CABLE

SCALE: 1" = 200'

ELECTRICAL DEMOLITION SITE PLAN1

N

- UTILITY, ELECTRICAL MANHOLE (MH)E

DEMOLISH

- BUILDING FED BY WE ENERGIES

- BUILDING FED BY VA

BUILDING SCHEDULE

NUMBER BUILDING

1 VACANT (ON WE ENERGIES)

2 OLD MAIN (ON WE ENERGIES)

3 WADSWORTH LIBRARY

4 SOCIAL CENTER

5 ADMINISTRATIVE SERVICES

6 SERVICE OFFICES

7 COMPENSATED WORK THERAPY

11 TRANSITIONAL RESISENCE

12 VACANT

14 QUARTERS (ON WE ENERGIES)

16 QUARTERS (ON WE ENERGIES)

17 SURGEONS RESIDENCE (ON WE ENERGIES)

18 QUARTERS (ON WE ENERGIES)

19 QUARTERS (ON WE ENERGIES)

20 WAREHOUSE

39 GOVERNOR'S MANSION (ON WE ENERGIES)

41 WARD THEATER

43 DOMICILIARY

49 QUARTERS (ON WE ENERGIES)

50 QUARTERS (ON WE ENERGIES)

57 CEMETERY STAGE

60 GARAGE

62 QUARTERS (ON WE ENERGIES)

64 QUARTERS (ON WE ENERGIES)

70 OLD HOSPITAL, RESEARCH

73 GARAGE

84 GARAGE

91 PUMP HOUSE

97 PAINT SHOP

99 GARAGE

102 SPS

107 GROUNDS STORAGE

108 ARCH/MACHINE SHOP

109 WOMENS MENTAL HEALTH

110 TWO CAR GARAGE

112 BOILER PLANT

113 CHILLER PLANT

115 ELECTRICAL SWITCHGEAR PLANT

119 SALT STORAGE BUILDING

146 CLC BUILDING

147 CLC BUILDING

148 CLC BUILDING

150 FISHER HOUSE

1301 WOOD NATIONAL CEMETARY

4801 CEMETERY BUILDING

BCL CRASH LABORATORY

T105 QUONSET HUT (FM STORAGE)

T106 QUONSET HUT (FM STORAGE)

T107 QUONSET HUT (FM STORAGE)

T114 QUONSET HUT (FM STORAGE)

NRF NEUROLOGY RESEARCH FACILITY

ABANDONED DUCT BANK

REMOVED CABLE

REMOVE AND REPLACE EQUIPMENT

GENERAL NOTES

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

2. SEE ED601 FOR DEMOLITION SINGLE LINE DIAGRAM.

3. SEE ED611 AND ED612 FOR DEMOLITION CABLE SCHEDULE

4. SEE ES101 FOR PRIMARY DISTRIBUTION SITE PLAN

5. SEE ES602 FOR EQUIPMENT SCHEDULES

6. SEE EG101 FOR GROUNDING SITE PLAN

7. SEE GC101 THROUGH GC113 FOR PHASING DRAWINGS

8. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY

AND TRUE LOCATIONS OF UTILITY LINES.

9. REMOVE ALL "SOURCE B" CABLES AND ABANDON EXISTING CONDUIT.

10. REMOVE AND REPLACE ALL "SOURCE A" CABLES AS REQUIRED.

KEYED NOTES

1 REMOVE CABLE AND ABANDON DUCT BANK IN PLACE.

2 REMOVE CABLE AND DUCT BANK

3 REMOVE CABLES AND RE-USE DUCT BANK TO RE-FEED LOW VOLTAGE LOADS

EXP 12/31/2025

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHRYSLER WOOD AVE

JU

NE

AU

A

VE

W

AL

KE

R

DR

IV

E

AMERICAN WARMOTHERS AVE

ZABLOCKI DR

GE

N

MI

TC

HE

LL

B

LV

D

STADIUM LN

MEMORIAL DR

PNL-41

HVS-41

HVP-41

XF-MP-FDS

PNL-17

HVP-44

MH-43

HVP-42

MH-42

XF-41

XF-62

Cemetery National Wood

XF-17

E

E

E

PNL-19

PNL-62

XF-19

HVP-42

GO

LD

ST

AT

E

DR

TO BUILDING 57

AND MONUMENT

E MH-44

XF-16

MH-41

HVS-41

XF-41

PNL-16

OUTSIDE SERVICE

NORTH LOT PANEL

XF-12

2195 2184

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

ELECTRICAL DEMOLITION - ZONE 1 BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

ED401

SITE

695-22-123

CJR DAK

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SITE DEMOLITION LINETYPES

- POWER DISTRIBUTION SWITCH (HVP OR HVS)

- TRANSFORMER (XF)

- ELECTRICAL PANEL (PNL)

SITE PLAN SYMBOL LEGEND

SCALE: 1" = 60'

ELECTRICAL DEMOLITION - ZONE 11

N

- UTILITY, ELECTRICAL MANHOLE (MH)E

ZONE 2 1/ED402

MATCHLINE

- BUILDING FED BY WE ENERGIES

- BUILDING FED BY VA

MATCHLINE

EXISTING CABLE

DEMOLISH

ABANDONED DUCT BANK

REMOVED CABLE

REMOVE AND REPLACE EQUIPMENT

GENERAL NOTES

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

2. SEE ED601 FOR DEMOLITION SINGLE LINE DIAGRAM.

3. SEE ED611 AND ED612 FOR DEMOLITION SCHEDULES.

4. SEE GC101 THROUGH GC113 FOR PHASING DRAWINGS.

5. THIS DRAWING IS DIAGRAMMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE

SURVEY AND TRUE LOCATIONS OF UTILITY LINES.

6. REMOVE ALL "SOURCE B" CABLES AND ABANDON EXISTING CONDUIT.

7. REMOVE AND REPLACE ALL "SOURCE A" CABLES AS REQUIRED.

KEYED NOTES

REMOVE PNL-62, XF-62, PNL-19, XF-19 AND HVP-44 AND ALL CABLING. LOCAL AREA

STREET LIGHTS TO BE RE-FED FROM NEW MV TRANSFORMER AND LV PANEL LOCATED

AT MH-43. COVER XF-62, XF-19, AND HVP-44 PER ES501 DETAIL 7.

2 REMOVE XF-12 AND FEEDERS BACK TO HVS-41. ABANDON DUCT BANK IN PLACE.

BUILDING 12 TO BE TRANSFERRED TO WE ENERGIES GRID BY SEPARATE PROJECT

3 REMOVE PNL-16 AND XF-16. EXISTING LOADS TO BE MOVED TO PNL-41. SEE ES501 DETAIL

7 FOR COVER DETAIL.

4 DUCT BANK TO BE REUSED FOR FEEDING LOW VOLTAGE LOADS ON PNL-62.

5 PNL-17 AND XF-MP-FDS TO BE REPLACED

6 REMOVE AND COVER HVS-41. THIS BECOMES A PASS-THROUGH PULL BOX HVP-41A. SEE

ES501 DETAIL 7 FOR COVER DETAIL.

- LIGHT POLE

EXISTING LOW VOLTAGE DUCT BANK

Exp.: 12/31/2028

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

7 2

6C

6A

6D

6B

HVP-22

HVP-23

HVP-18

XF-4

XF-2

HVS-20

PNL-27

XF-27

XF-5

HVP-29

HVP-4

XF-3

N M

ITC

HE

LL

BL

VD

KILBOURN CIR

KILBOURN CIR

GENERAL WOLCOTT BLVD

GENERAL WOLCOTT AVE

XF-49

XF-7

XF-6

XF-CL1

PNL-49

PNL-1

MH-20

MH-23

MH-24

MH-25

MH-27

MH-29

MH-31

MH-32

MH-34

MH-9

MH-8A

MH-7

HVP-40

PNL-3

MH-40

MH-8

MH-18

MH-4

HVS-23B

MH-39

MH-22

XF-112

E

E

E

E

E

E E

E

E

E

E

E E

E

E

E

E

E

E

GENERAL MITCHELL BLVD

MH

HVP-20

HVS-23A

HVS-22

HVS-18

HVP-8

XF-14

PNL-14

XF-41

HVS-20

HVP-27

HVP-30

XF-11

PNL-11

HVP-31

HVP-24

E

HVP-34

XF-1

MH-30

HVS-4

2626 2628

36062624 3624 2625

1504 1523NRF

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

ELECTRICAL DEMOLITION - ZONE 2 BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

ED402

SITE

695-22-123

CJR DAK

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SITE DEMOLITION LINETYPES

MATCHLINE

- POWER DISTRIBUTION SWITCH (HVP OR HVS)

- TRANSFORMER (XF)

- ELECTRICAL PANEL (PNL)

SITE PLAN SYMBOL LEGEND

SCALE: 1" = 60'

ELECTRICAL DEMOLITION - ZONE 21

N

- UTILITY, ELECTRICAL MANHOLE (MH)E

ZONE 1 1/ED401

MATCHLINE

ZONE 4 1/ED404

MATCHLINE

ZO

NE

1/E

D4

MA

TC

HL

IN

E

GENERAL NOTES

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

2. SEE ED601 FOR DEMOLITION SINGLE LINE DIAGRAM

3. SEE ED611 AND ED612 FOR DEMOLITION SCHEDULES

4. SEE GC101 THROUGH GC113 FOR PHASING DRAWINGS

5. THIS DRAWING IS DIAGRAMMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE

SURVEY AND TRUE LOCATIONS OF UTILITY LINES.

6. REMOVE ALL "SOURCE B" CABLES AND ABANDON EXISTING CONDUIT.

7. REMOVE AND REPLACE ALL "SOURCE A" CABLES AS REQUIRED.

8. EXISTING PADS FROM DEMOLISTED HVS'S, HVP'S, AND XF'S TO BE COVERED PER

DRAWING ES501 DETAIL 7.

KEYED NOTES

1 REMOVE AND COVER HVS-23A, HVS-23B AND HVP-23. SEE ES501 DETAIL 7 FOR COVER

DETAIL.

2 REMOVE PNL-14 AND XF-14. REMOVE FEEDERS AND ABANDON DUCT BANK IN PLACE.

EXISTING LOADS TO BE MOVED TO PNL-41.

3 REMOVE XF-2 AND FEEDERS, ABANDON DUCT BANK IN PLACE

4 REMOVE AND COVER HVS-22 AND HVP-22. SEE ES501 DETAIL 7 FOR COVER DETAIL.

5 REMOVE AND COVER HVS-18. SEE ES501 DETAIL 7 FOR COVER DETAIL.

6 REMOVE AND COVER HVP-8. SEE ES501 DETAIL 7 FOR COVER DETAIL.

7 REMOVE XF-41

- BUILDING FED BY WE ENERGIES

- BUILDING FED BY VA

REMOVE AND REPLACE EQUIPMENT

EXISTING CABLE

DEMOLISH

REMOVED CABLE

- LIGHT POLE

EXISTING LOW VOLTAGE DUCT BANK

Exp.: 12/31/2028

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

T105XF-97

XF-36

W

OR

KS

HO

P

RO

AD

BARRON CT

WOOD AVE

XF-108

MH-37

107/108-DS-A

MH-35

MH-38

MH-10

PNL-2V

HANK AARON TRAIL BRIDGE

E

E E

E

E

T106

T107

HVS-36

MH-36

XF-20

HVP-36

1538 3589

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

ELECTRICAL DEMOLITION - ZONE 3 BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

ED403

SITE

695-22-123

CJR DAK

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SITE DEMOLITION LINETYPES

MATCHLINE

- POWER DISTRIBUTION SWITCH (HVP OR HVS)

- TRANSFORMER (XF)

- ELECTRICAL PANEL (PNL)

- MANHOLE (MH)

SITE PLAN SYMBOL LEGEND

SCALE: 1" = 60'

ELECTRICAL DEMOLITION - ZONE 31

N

E

MATCH LINE

ZONE 5 1/ED405

MA

TC

H

LIN

E

- BUILDING FED BY WE ENERGIES

- BUILDING FED BY VA

ZO

NE

1/E

D4

DEMOLISH

REMOVE AND REPLACE EQUIPMENT

EXISTING CABLE

REMOVED CABLE

- LIGHT POLE

EXISTING LOW VOLTAGE DUCT BANK

GENERAL NOTES

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

2. SEE ED601 FOR DEMOLITION SINGLE LINE DIAGRAM.

3. SEE ED611 AND ED612 FOR DEMOLITION SCHEDULES.

4. SEE GC101 THROUGH GC113 FOR PHASING DRAWINGS

5. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY

AND TRUE LOCATIONS OF UTILITY LINES.

6. REMOVE ALL "SOURCE B" CABLES AND ABANDON EXISTING CONDUIT.

7. REMOVE AND REPLACE ALL "SOURCE A" CABLES AS REQUIRED.

KEYED NOTES

1 REMOVE AND COVER HVS-36 BECOMES PASS-THROUGH PULL BOX HVP-36A. SEE ES501

DETAIL 7 FOR COVER DETAIL.

Exp.: 12/31/2028

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

HVP-K

HVP-15

LINCOLN DR

HI

NE

S

BL

VD

FLOWER DR

HINES BLV

D

HVP-16

XF-102

BCL

XF-43

XF-119

MH-47A

MH-2B

MH-2A

MH

MH-15

PNL-K

MH-47

XF-1301

MH-21

Cemetery National Wood

Wheeler Lake

E

E

E

E

E

E

E

E

HVS-SL1

MH-3

GENERAL MITCHELL BLVD

HVP-2

E

HVS-A

HVS-16

XF-K

HVS-2

HVP-3

MH-2

265126552674

30493050

E

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

ELECTRICAL DEMOLITION - ZONE 4 BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

ED404

SITE

695-22-123

CJR DAK

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SITE DEMOLITION LINETYPES

MATCHLINE

- POWER DISTRIBUTION SWITCH (HVP OR HVS)

- TRANSFORMER (XF)

- ELECTRICAL PANEL (PNL)

SITE PLAN SYMBOL LEGEND

SCALE: 1" = 60'

ELECTRICAL DEMOLITION - ZONE 41

N

- UTILITY, ELECTRICAL MANHOLE (MH)E

DEMOLISH

GENERAL NOTES

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

2. SEE ED601 FOR DEMOLITION SINGLE LINE DIAGRAM.

3. SEE ED611 AND ED612 FOR DEMOLITION SCHEDULES.

4. SEE GC101 THROUGH GC113 FOR PHASING DRAWINGS

5. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY

AND TRUE LOCATIONS OF UTILITY LINES.

6. REMOVE ALL "SOURCE B" CABLES AND ABANDON EXISTING CONDUIT.

7. REMOVE AND REPLACE ALL "SOURCE A" CABLES AS REQUIRED.

8. EXISTING PADS FROM DEMOLISHED HVS'S, HVP'S, AND XF'S TO BE COVERED PER

DRAWINT ES501 DETIAL 7.

KEYED NOTES

1 REMOVE AND COVER HVP-K TO BECOME PASS-THROUGH PULL BOX. SEE ES501 DETAIL 7

FOR COVER DETAIL.

2 REMOVE AND COVER HVP-2 TO BECOME PASS-THROUGH PULL BOX. SEE ES501 DETAIL 7

FOR COVER DETAIL.

3 REMOVE AND COVER HVS-16 TO BECOME PASS-THROUGH PULL BOX HVP-16A. SEE ES501

DETAIL 7 FOR COVER DETAIL.

MATCH LINE

ZONE 2 1/ED402

MA

TC

H

LIN

E

ZO

NE

1/E D4

- BUILDING FED BY WE ENERGIES

- BUILDING FED BY VA

REMOVE AND REPLACE EQUIPMENT

EXISTING CABLE

REMOVED CABLE

- LIGHT POLE

EXISTING LOW VOLTAGE DUCT BANK

Exp.: 12/31/2028

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL MITCHELL BLVD

BARRON CT

RED ARROW CIR

W

OR

KS

HO

P

RO

AD

HVS-146

XF-146

CB-100-CLC

CB-600-146

HVS-147

XF-147

CB-600-147

CB-600-148

XF-148

HVS-148

XF-39

MH-13 MH-13A

PNL-CLC

E

E

E

E

XF-SL1

PNL-SL1

HVS-11

E

MH-12

PNL-39

HVP-11

MH-11

WAREHOUSE WAY

2 2

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

23 MECHANIC STREET, SPRINGVILLE, NY 14141

ELECTRICAL DEMOLITION - ZONE 5 BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM

VOLTAGE FEEDER CLEMENT J.

ZABLOCKI VAMC

5000 W. NATIONAL AVE.

MILWAUKEE, WI 53295

2025/10/09

ED405

SITE

695-22-123

CJR DAK

REV 0 - BID DOCUMENTS 2025-10-09

"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".

CERTIFICATE OF AUTHORIZATION NUMBER: 0020000

SITE DEMOLITION LINETYPES

MATCHLINE

- POWER DISTRIBUTION SWITCH (HVP OR HVS)

- TRANSFORMER (XF)

- ELECTRICAL PANEL (PNL)

SITE PLAN SYMBOL LEGEND

EXISTING CABLE

SCALE: 1" = 60'

ELECTRICAL DEMOLITION - ZONE 51

N

- UTILITY, ELECTRICAL MANHOLE (MH)E

ZONE 3 1/ED403

MA

TC

H

LIN

E

MATCH LINE

ZO

NE

1E

D/

GENERAL NOTES

1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.

2. SEE ED601 FOR DEMOLITION SINGLE LINE DIAGRAM.

3. SEE ED611 AND ED612 FOR DEMOLITION SCHEDULES.

4. SEE GC101 THROUGH GC113 FOR PHASING DRAWINGS

5. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY

AND TRUE LOCATIONS OF UTILITY LINES.

6. REMOVE ALL "SOURCE B" CABLES AND ABANDON EXISTING CONDUIT.

7. REMOVE AND REPLACE ALL "SOURCE A" CABLES AS REQUIRED.

KEYED NOTES

1 REMOVE EXISTING FEEDERS FROM DUCT BANK, ABANDON DUCT BANK IN PLACE.

2 REMOVE AND COVER…