S02 - 695-22-123 Drawings Part 1 of 4.pdf
PDF 15 MB Posted
- Solicitation number
- 36C25226B0023
About this file
Summary: Bid Documents - Upgrade North Campus Medium Voltage Feeder
This document set comprises architectural and engineering bid drawings for an electrical infrastructure upgrade project at the Clement J. Zablocki Veterans Affairs Medical Center (VAMC) located at 5000 W. National Avenue, Milwaukee, Wisconsin 53295. The project involves upgrading the medium voltage power distribution system for the North Campus facility, with work organized across six primary phases plus mobilization and demobilization activities.
The project scope includes duct bank construction, establishment of a medium voltage loop distribution system, replacement of high-voltage switches (HVS), transformers (XF), electrical panels (PNL), and associated electrical feeders and components across multiple zones of the campus. Key deliverables include excavation and installation of new duct banks with multiple access points (MH-12A through MH-12E, MH-36A, MH-36B), replacement of existing infrastructure with new equipment, cable pulling and termination work, and acceptance testing per specifications 26-05-13 and 26-29-21. The phasing plan progresses from mobilization and equipment procurement, through duct bank installation, loop establishment, and sequential shutdown and replacement of equipment in defined campus areas (Northeast, Northwest, BCL/B102, B112/B119/B150/B84, B1301/"K", B43/B39, and CLC panel areas), concluding with loop balancing, demobilization, and project closeout. All work requires coordination with VA campus personnel and the Project Contracting Officer regarding site outages, with mandatory lock-out/tag-out procedures and generator support for affected buildings.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
TITLE SHEET AND DRAWING INDEX BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM
VOLTAGE FEEDER CLEMENT J.
ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2025/10/09
GI001
SITE
695-22-123
TRG DAK
NORTH ARROW
DETAIL NUMBER
DETAIL IDENTIFIER
DETAIL TITLE NUMBER /
SHEET REF NUMBER
SECTION IDENTIFIER
SHEET REF NUMBER
DETAIL
IDENTIFIER
SHEET REF
NUMBER
DETAIL SECTION IDENTIFIER
VIEWING
DIRECTION
VIEW TITLE
BUILDING/WALL SECTION CUT
EXTERIOR ELEVATION
DETAIL SECTION CUT
DETAIL CALLOUT
DRAWING SYMBOLS
N
INTERIOR ELEVATION
DD###
DD###
X
DD###
X
SCALE: 1'-0" = 1'-0"
DETAIL TITLEX
1 / DD###
DD###
X
DD###
X
TRUE NORTH
PLAN NORTH
VIEWING
DIRECTION
SHEET REF NUMBER
SHEET REF NUMBER
N
REV 0 - BID DOCUMENTS 2025-10-09
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CERTIFICATE OF AUTHORIZATION NUMBER: 0020000
DRAWING LIST
DRAWING
NUMBER DRAWING SHEET
GENERAL
GI001 TITLE SHEET AND DRAWING INDEX
GC101 GENERAL PHASING PLAN - PHASE 1
GC102 GENERAL PHASING PLAN - PHASE 2 DUCT BANK CONSTRUCTION
GC103 GENERAL PHASING PLAN - PHASE 3 ESTABLISH THE LOOP
GC104 GENERAL PHASING PLAN - PHASE 4A NORTH EAST CAMPUS
GC105 GENERAL PHASING PLAN - PHASE 4B
GC106 GENERAL PHASING PLAN - PHASE 4C
GC107 GENERAL PHASING PLAN - PHASE 4D
GC108 GENERAL PHASING PLAN - PHASE 4E
GC109 GENERAL PHASING PLAN - PHASE 4F
GC110 GENERAL PHASING PLAN - PHASE 5A
GC111 GENERAL PHASING PLAN - PHASE 5B
GC112 GENERAL PHASING PLAN - PHASE 5C
GC113 GENERAL PHASING PLAN - PHASE 6
GC501 PHASING TEMPORARY FENCING DETAIL
SURVEY AND MAPING
VF101 SITE SURVEY - EXISTING CONDITIONS
VF102 SITE SURVEY - EXISTING CONDITION
VF103 SITE SURVEY - EXISTING CONDITIONS
CIVIL
C-001 CIVIL GENERAL NOTES AND LEGENDS
C-101 CIVIL SITE PLAN
CS101 CIVIL SITE PLAN
CS401 CIVIL SITE ENLARGED PLANS
CS402 CIVIL SITE ENLARGED PLANS
CS501 CIVIL SITE DETAILS
CS502 CIVIL SITE DETAILS
CU101 CIVIL UTILITIES PLAN
CU201 CIVIL UTILITIES PLAN AND PROFILES
CU202 CIVIL UTILITIES PLAN AND PROFILES
CU203 CIVIL UTILITIES PLAN AND PROFILES
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES AND LEGEND
ED101 ELECTRICAL DEMOLITION SITE PLAN
ED401 ELECTRICAL DEMOLITION - ZONE 1
ED402 ELECTRICAL DEMOLITION - ZONE 2
ED403 ELECTRICAL DEMOLITION - ZONE 3
ED404 ELECTRICAL DEMOLITION - ZONE 4
ED405 ELECTRICAL DEMOLITION - ZONE 5
ED601 SINGLE LINE DIAGRAM - DEMOLITION
ED611 ELECTRICAL FEEDER SCHEDULE - DEMOLITION
ED612 ELECTRICAL FEEDER SCHEDULE - DEMOLITION
ES101 ELECTRICAL SITE PLAN - POWER DISTRUTION PROPOSED
ES401 ELECTRICAL - ZONE 1
ES402 ELECTRICAL - ZONE 2
ES403 ELECTRICAL - ZONE 3
ES404 ELECTRICAL - ZONE 4
ES405 ELECTRICAL - ZONE 5
ES501 SITE ELECTRICAL DETAILS
ES502 SITE ELECTRICAL DETAILS
ES601 ELECTRICAL FEEDER SCHEDULE - NEW WORK
ES602 ELECTRICAL SCHEDULES
ES603 ELECTRICAL SCHEDULES
ES604 ELECTRICAL SCHEDULES
ES605 KIRK KEY INFORMATION
EG101 ELECTRICAL SITE PLAN- GROUNDING PROPOSED
EG501 ELECTRICAL GROUNDING DETAILS
EP101 ELECTRICAL BUILDING 115 FLOOR PLAN
EP201 BUILDING 115 - ELEVATIONS
EP601 SINGLE LINE DIAGRAM - PROPOSED
RE601 RESOURCE ELECTRICAL BUILDING 115 SINGLE LINE DIAGRAM
Exp.: 12/31/2028
MULTICORELINK:DWG-24555-GC101.REVX GENERAL PHASING PLAN - PHASE 1-DWG-24555-GC101.REVX GENERAL PHASING PLAN - PHASE 1 MULTICORELINK:DWG-24555-GC101.REVX GENERAL PHASING PLAN - PHASE 1-DWG-24555-GC101.REVX GENERAL PHASING PLAN - PHASE 1 MULTICORELINK:DWG-24555-GC102.REVX GENERAL PHASING PLAN - PHASE 2-DWG-24555-GC102.REVX GENERAL PHASING PLAN - PHASE 2 MULTICORELINK:DWG-24555-GC102.REVX GENERAL PHASING PLAN - PHASE 2-DWG-24555-GC102.REVX GENERAL PHASING PLAN - PHASE 2 MULTICORELINK:DWG-24555-GC103.REVX GENERAL PHASING PLAN - PHASE 3-DWG-24555-GC103.REVX GENERAL PHASING PLAN - PHASE 3 MULTICORELINK:DWG-24555-GC103.REVX GENERAL PHASING PLAN - PHASE 3-DWG-24555-GC103.REVX GENERAL PHASING PLAN - PHASE 3 MULTICORELINK:DWG-24555-GC104.REVX GENERAL PHASING PLAN - PHASE 4A-DWG-24555-GC104.REVX GENERAL PHASING PLAN - PHASE 4A MULTICORELINK:DWG-24555-GC104.REVX GENERAL PHASING PLAN - PHASE 4A-DWG-24555-GC104.REVX GENERAL PHASING PLAN - PHASE 4A MULTICORELINK:DWG-24555-GC105.REVX GENERAL PHASING PLAN - PHASE 4B-DWG-24555-GC105.REVX GENERAL PHASING PLAN - PHASE 4B MULTICORELINK:DWG-24555-GC105.REVX GENERAL PHASING PLAN - PHASE 4B-DWG-24555-GC105.REVX GENERAL PHASING PLAN - PHASE 4B MULTICORELINK:DWG-24555-GC106.REVX GENERAL PHASING PLAN - PHASE 4C-DWG-24555-GC106.REVX GENERAL PHASING PLAN - PHASE 4C MULTICORELINK:DWG-24555-GC106.REVX GENERAL PHASING PLAN - PHASE 4C-DWG-24555-GC106.REVX GENERAL PHASING PLAN - PHASE 4C MULTICORELINK:DWG-24555-GC107.REVX GENERAL PHASING PLAN - PHASE 4D-DWG-24555-GC107.REVX GENERAL PHASING PLAN - PHASE 4D MULTICORELINK:DWG-24555-GC107.REVX GENERAL PHASING PLAN - PHASE 4D-DWG-24555-GC107.REVX GENERAL PHASING PLAN - PHASE 4D MULTICORELINK:DWG-24555-GC108.REVX GENERAL PHASING PLAN - PHASE 4E-DWG-24555-GC108.REVX GENERAL PHASING PLAN - PHASE 4E MULTICORELINK:DWG-24555-GC108.REVX GENERAL PHASING PLAN - PHASE 4E-DWG-24555-GC108.REVX GENERAL PHASING PLAN - PHASE 4E MULTICORELINK:DWG-24555-GC109.REVX GENERAL PHASING PLAN - PHASE 4F-DWG-24555-GC109.REVX GENERAL PHASING PLAN - PHASE 4F MULTICORELINK:DWG-24555-GC109.REVX GENERAL PHASING PLAN - PHASE 4F-DWG-24555-GC109.REVX GENERAL PHASING PLAN - PHASE 4F MULTICORELINK:DWG-24555-GC110.REVX GENERAL PHASING PLAN - PHASE 5A-DWG-24555-GC110.REVX GENERAL PHASING PLAN - PHASE 5A MULTICORELINK:DWG-24555-GC110.REVX GENERAL PHASING PLAN - PHASE 5A-DWG-24555-GC110.REVX GENERAL PHASING PLAN - PHASE 5A MULTICORELINK:DWG-24555-GC111.REVX GENERAL PHASING PLAN - PHASE 5B-DWG-24555-GC111.REVX GENERAL PHASING PLAN - PHASE 5B MULTICORELINK:DWG-24555-GC111.REVX GENERAL PHASING PLAN - PHASE 5B-DWG-24555-GC111.REVX GENERAL PHASING PLAN - PHASE 5B MULTICORELINK:DWG-24555-GC112.REVX GENERAL PHASING PLAN - PHASE 5C-DWG-24555-GC112.REVX GENERAL PHASING PLAN - PHASE 5C MULTICORELINK:DWG-24555-GC112.REVX GENERAL PHASING PLAN - PHASE 5C-DWG-24555-GC112.REVX GENERAL PHASING PLAN - PHASE 5C MULTICORELINK:DWG-24555-GC113.REVX GENERAL PHASING PLAN - PHASE 6-DWG-24555-GC113.REVX GENERAL PHASING PLAN - PHASE 6 MULTICORELINK:DWG-24555-GC113.REVX GENERAL PHASING PLAN - PHASE 6-DWG-24555-GC113.REVX GENERAL PHASING PLAN - PHASE 6 MULTICORELINK:DWG-24555-GC501.REVX PHASING TEMPORARY FENCING DETAIL-DWG-24555-GC501.REVX PHASING TEMPORARY FENCING DETAIL MULTICORELINK:DWG-24555-GC501.REVX PHASING TEMPORARY FENCING DETAIL-DWG-24555-GC501.REVX PHASING TEMPORARY FENCING DETAIL MULTICORELINK:DWG-24555-E-001.REVX ELECTRICAL GENERAL NOTES AND LEGEND-DWG-24555-E-001REVX. ELECTRICAL GENERAL NOTES AND LEGEND MULTICORELINK:DWG-24555-E-001.REVX ELECTRICAL GENERAL NOTES AND LEGEND-DWG-24555-E-001REVX. ELECTRICAL GENERAL NOTES AND LEGEND MULTICORELINK:DWG-24555-ED101.REVX ELECTRICAL DEMOLITION SITE PLAN-DWG-24555-ED101.REVX ELECTRICAL DEMOLITION SITE PLAN MULTICORELINK:DWG-24555-ED101.REVX ELECTRICAL DEMOLITION SITE PLAN-DWG-24555-ED101.REVX ELECTRICAL DEMOLITION SITE PLAN MULTICORELINK:DWG-24555-ED401.REVX ELECTRICAL DEMOLITION - ZONE 1-DWG-24555-ED401.REVX ELECTRICAL DEMOLITION - ZONE 1 MULTICORELINK:DWG-24555-ED401.REVX ELECTRICAL DEMOLITION - ZONE 1-DWG-24555-ED401.REVX ELECTRICAL DEMOLITION - ZONE 1 MULTICORELINK:DWG-24555-ED402.REVX ELECTRICAL DEMOLITION - ZONE 2-DWG-24555-ED402.REVX ELECTRICAL DEMOLITION - ZONE 2 MULTICORELINK:DWG-24555-ED402.REVX ELECTRICAL DEMOLITION - ZONE 2-DWG-24555-ED402.REVX ELECTRICAL DEMOLITION - ZONE 2 MULTICORELINK:DWG-24555-ED403.REVX ELECTRICAL DEMOLITION - ZONE 3-DWG-24555-ED403.REVX ELECTRICAL DEMOLITION - ZONE 3 MULTICORELINK:DWG-24555-ED403.REVX ELECTRICAL DEMOLITION - ZONE 3-DWG-24555-ED403.REVX ELECTRICAL DEMOLITION - ZONE 3 MULTICORELINK:DWG-24555-ED404.REVX ELECTRICAL DEMOLITION - ZONE 4-DWG-24555-ED404.REVX ELECTRICAL DEMOLITION - ZONE 4 MULTICORELINK:DWG-24555-ED404.REVX ELECTRICAL DEMOLITION - ZONE 4-DWG-24555-ED404.REVX ELECTRICAL DEMOLITION - ZONE 4 MULTICORELINK:DWG-24555-ED405.REVX ELECTRICAL DEMOLITION - ZONE 5-DWG-24555-ED405.REVX ELECTRICAL DEMOLITION - ZONE 5 MULTICORELINK:DWG-24555-ED405.REVX ELECTRICAL DEMOLITION - ZONE 5-DWG-24555-ED405.REVX ELECTRICAL DEMOLITION - ZONE 5 MULTICORELINK:DWG-24555-ED601.REVX SINGLE LINE DIAGRAM - DEMOLITION-DWG-24555-ED601.REVX SINGLE LINE DIAGRAM - DEMOLITION MULTICORELINK:DWG-24555-ED601.REVX SINGLE LINE DIAGRAM - DEMOLITION-DWG-24555-ED601.REVX SINGLE LINE DIAGRAM - DEMOLITION MULTICORELINK:DWG-24555-ED611.REVX ELECTRICAL FEEDER SCHEDULE - DEMOLITION-DWG-24555-ED611.REVX ELECTRICAL FEEDER SCHEDULE - DEMOLITION MULTICORELINK:DWG-24555-ED611.REVX ELECTRICAL FEEDER SCHEDULE - DEMOLITION-DWG-24555-ED611.REVX ELECTRICAL FEEDER SCHEDULE - DEMOLITION MULTICORELINK:DWG-24555-ED612.REVX ELECTRICAL FEEDER SCHEDULE - DEMOLITION-DWG-24555-ED612.REVX ELECTRICAL FEEDER SCHEDULE - DEMOLITION MULTICORELINK:DWG-24555-ED612.REVX ELECTRICAL FEEDER SCHEDULE - DEMOLITION-DWG-24555-ED612.REVX ELECTRICAL FEEDER SCHEDULE - DEMOLITION MULTICORELINK:DWG-24555-ES101.REVX ELEC SITE PLAN- POWER DISTRIBUTION PROPOSED-DWG-24555-ES101.REVX.ELEC SITE PLAN- POWER DISTRIBUTION PROPOSED MULTICORELINK:DWG-24555-ES101.REVX ELEC SITE PLAN- POWER DISTRIBUTION PROPOSED-DWG-24555-ES101.REVX.ELEC SITE PLAN- POWER DISTRIBUTION PROPOSED MULTICORELINK:DWG-24555-ES401.REVX ELECTRICAL - ZONE 1-DWG-24555-ES401.REVX ELECTRICAL - ZONE 1 MULTICORELINK:DWG-24555-ES401.REVX ELECTRICAL - ZONE 1-DWG-24555-ES401.REVX ELECTRICAL - ZONE 1 MULTICORELINK:DWG-24555-ES402.REVX ELECTRICAL - ZONE 2-DWG-24555-ES402.REVX ELECTRICAL - ZONE 2 MULTICORELINK:DWG-24555-ES402.REVX ELECTRICAL - ZONE 2-DWG-24555-ES402.REVX ELECTRICAL - ZONE 2 MULTICORELINK:DWG-24555-ES403.REVX ELECTRICAL - ZONE 3-DWG-24555-ES403.REVX ELECTRICAL - ZONE 3 MULTICORELINK:DWG-24555-ES403.REVX ELECTRICAL - ZONE 3-DWG-24555-ES403.REVX ELECTRICAL - ZONE 3 MULTICORELINK:DWG-24555-ES404.REVX ELECTRICAL - ZONE 4-DWG-24555-ES404.REVX ELECTRICAL - ZONE 4 MULTICORELINK:DWG-24555-ES404.REVX ELECTRICAL - ZONE 4-DWG-24555-ES404.REVX ELECTRICAL - ZONE 4 MULTICORELINK:DWG-24555-ES405.REVX ELECTRICAL - ZONE 5-DWG-24555-ES405.REVX ELECTRICAL - ZONE 5 MULTICORELINK:DWG-24555-ES405.REVX ELECTRICAL - ZONE 5-DWG-24555-ES405.REVX ELECTRICAL - ZONE 5 MULTICORELINK:DWG-24555-ES501.REVX SITE ELECTRICAL DETAILS-DWG-24555-ES501.REVX SITE ELECTRICAL DETAILS MULTICORELINK:DWG-24555-ES501.REVX SITE ELECTRICAL DETAILS-DWG-24555-ES501.REVX SITE ELECTRICAL DETAILS MULTICORELINK:DWG-24555-ES502.REVX SITE ELECTRICAL DETAILS-DWG-24555-ES502.REVX SITE ELECTRICAL DETAILS MULTICORELINK:DWG-24555-ES502.REVX SITE ELECTRICAL DETAILS-DWG-24555-ES502.REVX SITE ELECTRICAL DETAILS MULTICORELINK:DWG-24555-ES601.REVX ELECTRICAL FEEDER SCHEDULES - NEW WORK-DWG-24555-ES601.REVX ELECTRICAL FEEDER SCHEDULES - NEW WORK MULTICORELINK:DWG-24555-ES601.REVX ELECTRICAL FEEDER SCHEDULES - NEW WORK-DWG-24555-ES601.REVX ELECTRICAL FEEDER SCHEDULES - NEW WORK MULTICORELINK:DWG-24555-ES602.REVX ELECTRICAL SCHEDULES-DWG-24555-ES602.REVX ELECTRICAL SCHEDULES MULTICORELINK:DWG-24555-ES602.REVX ELECTRICAL SCHEDULES-DWG-24555-ES602.REVX ELECTRICAL SCHEDULES MULTICORELINK:DWG-24555-ES603.REVX ELECTRICAL SCHEDULES-DWG-24555-ES603.REVX ELECTRICAL SCHEDULES MULTICORELINK:DWG-24555-ES603.REVX ELECTRICAL SCHEDULES-DWG-24555-ES603.REVX ELECTRICAL SCHEDULES MULTICORELINK:DWG-24555-ES604.REVX ELECTRICAL SCHEDULES-DWG-24555-ES604.REVX ELECTRICAL SCHEDULES MULTICORELINK:DWG-24555-ES604.REVX ELECTRICAL SCHEDULES-DWG-24555-ES604.REVX ELECTRICAL SCHEDULES MULTICORELINK:DWG-24555-ES605.REVX KIRK KEY INFORMATION-DWG-24555-ES605.REVX KIRK KEY INFORMATION MULTICORELINK:DWG-24555-ES605.REVX KIRK KEY INFORMATION-DWG-24555-ES605.REVX KIRK KEY INFORMATION MULTICORELINK:DWG-24555-EG101.REVX ELEC SITE PLAN- GROUNDING PROPOSED-DWG-24555-EG101.REVX ELEC SITE PLAN- GROUNDING PROPOSED MULTICORELINK:DWG-24555-EG101.REVX ELEC SITE PLAN- GROUNDING PROPOSED-DWG-24555-EG101.REVX ELEC SITE PLAN- GROUNDING PROPOSED MULTICORELINK:DWG-24555-EG501.REVX ELECTRICAL GROUNDING DETAILS-DWG-24555-EG501.REVX ELECTRICAL GROUNDING DETAILS MULTICORELINK:DWG-24555-EG501.REVX ELECTRICAL GROUNDING DETAILS-DWG-24555-EG501.REVX ELECTRICAL GROUNDING DETAILS MULTICORELINK:DWG-24555-EP101.REVX ELECTRICAL BUILDING 115 FLOOR PLAN-DWG-24555-EP101.REVX ELECTRICAL BUILDING 115 FLOOR PLAN MULTICORELINK:DWG-24555-EP101.REVX ELECTRICAL BUILDING 115 FLOOR PLAN-DWG-24555-EP101.REVX ELECTRICAL BUILDING 115 FLOOR PLAN MULTICORELINK:DWG-24555-EP201.REVX BUILDINGS 115 - ELEVATIONS-DWG-24555-EP201.REVX BUILDING 115 - ELEVATIONS MULTICORELINK:DWG-24555-EP201.REVX BUILDINGS 115 - ELEVATIONS-DWG-24555-EP201.REVX BUILDING 115 - ELEVATIONS MULTICORELINK:DWG-24555-EP601.REVX SINGLE LINE DIAGRAM - PROPOSED-DWG-24555-EP601.REVX SINGLE LINE DIAGRAM - PROPOSED MULTICORELINK:DWG-24555-EP601.REVX SINGLE LINE DIAGRAM - PROPOSED-DWG-24555-EP601.REVX SINGLE LINE DIAGRAM - PROPOSED MULTICORELINK:DWG-24555-RE601.REVX RES ELECTRICAL BUILDING 115 SINGLE LINE DIA-DWG-24555-RE601.REVX RES ELECTRICAL BUILDING 115 SINGLE LINE DIA MULTICORELINK:DWG-24555-RE601.REVX RES ELECTRICAL BUILDING 115 SINGLE LINE DIA-DWG-24555-RE601.REVX RES ELECTRICAL BUILDING 115 SINGLE LINE DIA AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
UPGRADE NORTH CAMPUS MEDIUM VOLTAGE FEEDER
AutoCAD SHX Text
CLEMENT J. ZABLOCKI VAMC 5000 W NATIONAL AVE MILWAUKEE, WI 53295
109110
7 2
6C
6A 6D6B
T105
BCL
T107
XF-16
HVP-8
XF-41
HVS-23B
109110
T114
7 2
6C
6A 6D6B
T105
HVP-K
HVS-16
HVP-15
HVS-18
HVP-18
HVP-36
XF-36XF-4
HVS-20
XF-5
HVP-29
HVP 4
AFTON CT
GENERAL MITCHELL BLVD
WAREHOUSE WAY
LINCOLN DR
BARRON CT
RED ARROW CIR
W
OR
KS
HO
P
RO
AD
BARRON CTN M
ITC
HE
LL
BL
VD
HI
NE
S
BL
VD
CHRYSLER WOOD AVE
KILBOURN CIR
KILBOURN CIR
JU
NE
AU
A
VE
W
AL
KE
R
DR
IV
E
AMERICAN WARMOTHERS AVE
ZABLOCKI DR
GE
N
MI
TC
HE
LL
B
LV
D
STADIUM LN
GENERAL WOLCOTT BLVD
GENERAL WOLCOTT AVE
WOOD AVE
MEMORIAL DR
FLOWER DR HINES BLV
D
HVP-16XF-102
XF-49
BCL
XF-108
HVP-34
XF-1
XF-7
XF-43
XF-119
XF-6
PNL-49
PNL-39
HVP-146
HVS-146
XF-146
CB-100-CLC
CB-600-146
HVP-147
HVS-147
XF-147
CB-600-147
CB-600-148
XF-148
HVS-148
HVP-148
MH-37
PNL-1
MH-47A
MH-2A
MH-15
MH-23
MH-25
MH-27
MH-30
MH-31
MH-32
MH-34 MH-35 MH-36
MH-38
HVS-11
XF-39
MH-9 MH-10
MH-11
MH-8A
PNL-K
HVP-40
HVP-41
XF-MP-FDS
PNL-17
PNL-3
MH-40
MH-43
HVP-42
MH-42
MH-18
MH-4
MH-47
MH-13
MH-2
XF-57
MH-13A
PNL-2V
MH-39
EDG
EDG
MH-22
Wheeler Lake
XF-112
PNL-CLC
XF-17
HANK AARON TRAIL BRIDGE
T106 T107
HVP-42
GO
LD
ST
AT
E
DR
PNL-11
HVS-SL1
XF-SL1
MH-3
GENERAL MITCHELL BLVD
MH-44
MH
HVP-20
MH-41
MH-12
XF-K
HVS-3
HVS-36
HVS-22
HVS-2
HVS-23A
HVP-27
HVP-24
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
HVS-A
MH-29
HVP-22
HVP-2
E
E
E
E
E
XF-97
XF-20
107/108-DS-A
XF-2
HVP-30
XF-3
XF-11
XF-27
PNL-27
XF-CL1
XF-1301
XF-14
PNL-16
XF-41
PNL-41
PNL-62
PNL-19
XF-19
HVS 4
XF-12
HVP-31
MH-21
MH-16
HVP-44
XF-62
MH-20
HVP-23
PNL-14
HVS-41
PNL-SL1
HVP-11
GC501
Wood National
Cemetary
Wood National
Cemetary
PANEL, OUTSIDE
SERVICE NORTH LOT
E
NRF
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
GENERAL PHASING PLAN - PHASE 1 BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM
VOLTAGE FEEDER CLEMENT J.
ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2025/10/09
GC101
SITE
695-22-123
CJR DAK
REV 0 - BID DOCUMENTS 2025-10-09
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CERTIFICATE OF AUTHORIZATION NUMBER: 0020000
GENERAL LINETYPES
- POWER DISTRIBUTION SWITCH (HVP OR HVS)
- TRANSFORMER (XF)
- ELECTRICAL PANEL (PNL)
SITE PLAN SYMBOL LEGEND
EXISTING DUCT BANK
- UTILITY, ELECTRICAL MANHOLE (MH)E
DEMOLISH
- BUILDING FED BY WE ENERGIES
- BUILDING FED BY VA
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. SEE DRAWING ED601 FOR DEMOLITION SINGLE LINE DIAGRAM.
3. SEE ED611 AND ED612 FOR ELECTRICAL DEMOLTION FEEDER SCHEDULES.
4. SEE ES601 FOR ELECTRICAL NEW WORK FEEDER SCHEDULE.
5. SEE DRAWING EP601 FOR NEW SINGLE LINE DIAGRAM
6. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY
AND TRUE LOCATIONS OF UTILITY LINES.
7. CONTRACTOR TO COORDINATE SITE OUTAGE WITH PROJECT COR AND VA CAMPUS
8. CONTRACTOR TO ENSURE THAT ALL ASSOCIATED CIRCUIT BREAKER HAVE BEEN
OPENED AND RACKED OUT AND LOCKED OUT / TAGGED OUT.
9. CONTRACTOR TO ENSURE ALL ASSOCIATED HVS'S AND TRANSFORMERS ARE
DE-ENERGIZED AND LOCKED OUT / TAGGED OUT.
10. CONTRACTOR TO PERFORM ACCEPTANCE CHECK PER SPECIFICATION 26-05-13 SECTION
3.7 ON FEEDER(S) ONCE INSTALLED BEFORE TERMINATING.
11. CONNECT PORTABLE GENERATOR OR START-UP EXISTING GENERATORS TO ANY
BUILDINGS AS NEEDED.
12. RE-ENERGIZE ANY APPLICABLE BREAKERS, HVS'S, TRANSFORMERS OR PANELS ONCE
WORK IS COMPLETED.
13. CONTRACTOR TO PERFORM ACCEPTANCE CHECKS ON HVS'S ONCE INSTALLED PER
SPECIFICATION 26-29-21 SECTION 3.2
GENERAL PHASING - PHASE 1 MOBILIZATION
1 PURCHASE LONG LEAD TIME EQUIPMENT (HVS, XF, ETC). COORDINATE SCHEDULE WITH
PROJECT COR AND VAMC SCHEDULERS
2 ESTABLISH CONTRACTOR LAYDOWN / MOBILIZATION AREA
SCALE: 1" = 200'
GENERAL PHASING PLAN - PHASE 11
N
Exp.: 12/31/2028
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
XF-16
HVP-8
XF-41
HVS-23B
109110
T114
7 2
6C
6A 6D6B
T105
HVP-K
HVS-16
HVP-15
HVS-18
HVP-18
HVP-36
XF-36XF-4
HVS-20
XF-5
HVP-29
HVP 4
AFTON CT
GENERAL MITCHELL BLVD
WAREHOUSE WAY
LINCOLN DR
BARRON CT
RED ARROW CIR
W
OR
KS
HO
P
RO
AD
BARRON CT
N M
ITC
HE
LL
BL
VD
HI
NE
S
BL
VD
CHRYSLER WOOD AVE
KILBOURN CIR
KILBOURN CIR
JU
NE
AU
A
VE
W
AL
KE
R
DR
IV
E
AMERICAN WARMOTHERS AVE
ZABLOCKI DR
GE
N
MI
TC
HE
LL
B
LV
D
STADIUM LN
GENERAL WOLCOTT BLVD
GENERAL WOLCOTT AVE
WOOD AVE
MEMORIAL DR
FLOWER DR HINES BLV
D
HVP-16XF-102
XF-49
BCL
XF-108
HVP-34
XF-1
XF-7
XF-43
XF-119
XF-6
PNL-49
PNL-39
HVP-146
HVS-146
XF-146
CB-100-CLC
CB-600-146
HVP-147
HVS-147
XF-147
CB-600-147
CB-600-148
XF-148
HVS-148
HVP-148
MH-37
PNL-1
MH-47A
MH-2A
MH-15
MH-23
MH-25
MH-27
MH-30
MH-31
MH-32
MH-34 MH-35 MH-36
MH-38
HVS-11
XF-39
MH-9 MH-10
MH-11
MH-8A
PNL-K
HVP-40
HVP-41
XF-MP-FDS
PNL-17
PNL-3
MH-40
MH-43
HVP-42
MH-42
MH-18
MH-4
MH-47
MH-13
MH-2
XF-57
MH-13A
PNL-2V
MH-39
EDG
EDG
MH-22
Wheeler Lake
XF-112
PNL-CLC
XF-17
HANK AARON TRAIL BRIDGE
T106 T107
HVP-42
GO
LD
ST
AT
E
DR
PNL-11
HVS-SL1
XF-SL1
PNL-SL1
MH-3
GENERAL MITCHELL BLVD
MH-44
MH
HVP-20
MH-36A
MH-36B
MH-12
XF-K
HVS-3
HVS-36
HVS-22
HVS-2
HVS-23A
HVP-27
HVP-24
E
E
E
HVS-12
MH-12B
MH-12A
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
HVS-A
HVP-11
MH-29
HVP-22
HVP-2
E
E
E
E
E
E
E
E
XF-97
XF-20
107/108-DS-A
XF-2
HVP-30
XF-3
XF-11
XF-27
PNL-27
XF-CL1
XF-1301
XF-14
PNL-16
XF-41
PNL-41
PNL-62
PNL-19
XF-19
HVS 4
XF-12
HVP-31
MH-16
HVP-44
XF-62
E
E
MH-20
PNL-14
HVP-23
HVS-41
MH-41
E
E
E
E
E
E
MH-12C
MH-12D
MH-12E
Wood National
Cemetary
Wood National
Cemetary
NRF
MH-21E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
GENERAL PHASING PLAN - PHASE 2
DUCT BANK CONSTRUCTION
BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM
VOLTAGE FEEDER CLEMENT J.
ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2025/10/09
GC102
SITE
695-22-123
CJR DAK
- POWER DISTRIBUTION SWITCH (HVP OR HVS)
- TRANSFORMER (XF)
- ELECTRICAL PANEL (PNL)
- UTILITY, ELECTRICAL MANHOLE (MH)
SITE PLAN SYMBOL LEGEND
REV 0 - BID DOCUMENTS 2025-10-09
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CERTIFICATE OF AUTHORIZATION NUMBER: 0020000
E
BUILDING FED FROM WE ENERGIES
BUILDING FED FROM VA
GENERAL LINETYPES
EXISTING DUCT BANK (TO BE REUSED)
NEW DUCT BANK
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. SEE DRAWING ED601 FOR DEMOLITION SINGLE LINE DIAGRAM.
3. SEE ED611 AND ED612 FOR ELECTRICAL DEMOLTION FEEDER SCHEDULES.
4. SEE ES601 FOR ELECTRICAL NEW WORK FEEDER SCHEDULE.
5. SEE DRAWING EP601 FOR NEW SINGLE LINE DIAGRAM
6. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY
AND TRUE LOCATIONS OF UTILITY LINES.
7. CONTRACTOR TO COORDINATE SITE OUTAGE WITH PROJECT COR AND VA CAMPUS
8. CONTRACTOR TO ENSURE THAT ALL ASSOCIATED CIRCUIT BREAKER HAVE BEEN
OPENED AND RACKED OUT AND LOCKED OUT / TAGGED OUT.
9. CONTRACTOR TO ENSURE ALL ASSOCIATED HVS'S AND TRANSFORMERS ARE
DE-ENERGIZED AND LOCKED OUT / TAGGED OUT.
10. CONTRACTOR TO PERFORM ACCEPTANCE CHECK PER SPECIFICATION 26-05-13 SECTION
3.7 ON FEEDER(S) ONCE INSTALLED BEFORE TERMINATING.
11. CONNECT PORTABLE GENERATOR OR START-UP EXISTING GENERATORS TO ANY
BUILDINGS AS NEEDED.
12. RE-ENERGIZE ANY APPLICABLE BREAKERS, HVS'S, TRANSFORMERS OR PANELS ONCE
WORK IS COMPLETED.
13. CONTRACTOR TO PERFORM ACCEPTANCE CHECKS ON HVS'S ONCE INSTALLED PER
SPECIFICATION 26-29-21 SECTION 3.2
GENERAL PHASING - PHASE 2 DUCT BANK
CONSTRUCTION
1 EXCAVATE TO LOCATE SPARE CONDUITS AT B115.
2 EXCAVATE TRENCH AND JACK AND BORE TO INSTALL DUCT BANK FROM B115 TO MH-12D
AND INSTALL MH-12E, MH-12D. RESTORE TO MATCH PREVIOUS CONDITIONS.
EXCAVATE TRENCH TO INSTALL DUCT BANK BETWEEN MH-12D AND MH-12C. INSTALL
MH-12C. BACKFILL TO LEVEL WITH PARKING LOT TO ALLOW TRAFFIC TO PASS. REFER TO
CS402 FOR ADDITIONAL DETAIL. NOTE THAT OFF-SHIFT WORK MAY BE REQUIRED IN THIS
AREA TO MINIMIZE IMPACTS TO PARKING LOT TRAFFIC.
EXCAVATE TRENCH TO INSTALL DUCT BANK BETWEEN MH-12C AND MH-12B. INSTALL
MH-12B. RESTORE ENTIRE PARKING LOT TO MATCH PREVIOUS CONDITION. REFER TO
CS402 FOR ADDITIONAL DETAIL.NOTE THAT OFF-SHIFT WORK MAY BE REQUIRED IN THIS
AREA TO MINIMIZE IMPACTS TO PARKING LOT TRAFFIC.
5 EXCAVATE TRENCH AND JACK AND BORE TO INSTALL DUCT BANK FROM MH-12B TO
MH-12 AND INSTALL MH-12A. RESTORE TO MATCH PREVIOUS CONDITIONS.
6 INSTALL HVS-12 AND DUCT BANK TO MH-12.
7 EXCAVATE TRENCH AND JACK AND BORE TO INSTALL DUCT BANK FROM MH-12 TO MH-36
AND INSTALL MH-36B, MH-36A. RESTORE TO MATCH PREVIOUS CONDITIONS.
SCALE: 1" = 200'
GENERAL PHASING PLAN - PHASE 21
N
Exp.: 12/31/2028
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
109110
7 2
6C
6A 6D6B
T105
T106 T107
XF-16
HVP-8
XF-41
HVS-23B
109110
T114
7 2
6C
6A 6D6B
T105
HVP-K
HVS-16
HVP-15
HVS-18
HVP-18
HVP-36
XF-36XF-4
HVS-20
XF-5
HVP-29
HVP 4
AFTON CT
GENERAL MITCHELL BLVD
WAREHOUSE WAY
LINCOLN DR
BARRON CT
RED ARROW CIR
W
OR
KS
HO
P
RO
AD
BARRON CT
N M
ITC
HE
LL
BL
VD
HI
NE
S
BL
VD
CHRYSLER WOOD AVE
KILBOURN CIR
KILBOURN CIR
JU
NE
AU
A
VE
W
AL
KE
R
DR
IV
E
AMERICAN WARMOTHERS AVE
ZABLOCKI DR
GE
N
MI
TC
HE
LL
B
LV
D
STADIUM LN
GENERAL WOLCOTT BLVD
GENERAL WOLCOTT AVE
WOOD AVE
MEMORIAL DR
FLOWER DR HINES BLV
D
HVP-16XF-102
XF-49
BCL
XF-108
HVP-34
XF-1
XF-7
XF-43
XF-119
XF-6
PNL-49
PNL-39
HVP-146
HVS-146
XF-146
CB-100-CLC
CB-600-146
HVP-147
HVS-147
XF-147
CB-600-147
CB-600-148
XF-148
HVS-148
HVP-148
MH-37
PNL-1
MH-47A
MH-2A
MH-15
MH-23
MH-25
MH-27
MH-30
MH-31
MH-32
MH-34 MH-35 MH-36
MH-38
HVS-11
XF-39
MH-9 MH-10
MH-11
MH-8A
PNL-K
HVP-40
HVP-41
XF-MP-FDS
PNL-17
PNL-3
MH-40
MH-43
HVP-42
MH-42
MH-18
MH-4
MH-47
MH-13
MH-2
XF-57
MH-13A
PNL-2V
MH-39
EDG
EDG
MH-22
Wheeler Lake
XF-112
PNL-CLC
XF-17
HANK AARON TRAIL BRIDGE
T106 T107
HVP-42
GO
LD
ST
AT
E
DR
PNL-11
HVS-SL1
XF-SL1
MH-3
GENERAL MITCHELL BLVD
MH-44
MH
HVP-20
MH-36A
MH-36B
MH-12
XF-K
HVP-3
HVS-36
HVS-22
HVS-2
HVS-23A
HVP-27
HVP-24
E
E
E
HVS-12
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
HVS-A
MH-29
HVP-22
HVP-2
E
E
E
E
E
E
E
E
XF-97
XF-20
107/108-DS-A
XF-2
HVP-30
XF-3
XF-11
XF-27
PNL-27
XF-CL1
XF-1301
XF-14
PNL-16
XF-41
PNL-41
PNL-62
PNL-19
XF-19
HVS 4
XF-12
HVP-31
MH-16
HVP-44
XF-62
E
E
E
MH-20
MH-8
HVP-11
HVP-23
PNL-14
MH-41
HVS-41
PNL-SL1
E
E
E
MH-12A
MH-12B
MH-12C
MH-12D
MH-12E
Wood National
Cemetary
Wood National
Cemetary
10 11
1 9
NRF
MH-21E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
GENERAL PHASING PLAN - PHASE 3
ESTABLISH THE LOOP
BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM
VOLTAGE FEEDER CLEMENT J.
ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2025/10/09
GC103
SITE
695-22-123
CJR DAK
- POWER DISTRIBUTION SWITCH (HVP OR HVS)
- TRANSFORMER (XF)
- ELECTRICAL PANEL (PNL)
- UTILITY, ELECTRICAL MANHOLE (MH)
SITE PLAN SYMBOL LEGEND
REV 0 - BID DOCUMENTS 2025-10-09
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CERTIFICATE OF AUTHORIZATION NUMBER: 0020000
E
BUILDING FED FROM WE ENERGIES
BUILDING FED FROM VA
GENERAL LINETYPES
EXISTING DUCT BANK (TO BE REUSED)
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. SEE DRAWING ED601 FOR DEMOLITION SINGLE LINE DIAGRAM.
3. SEE ED611 AND ED612 FOR ELECTRICAL DEMOLTION FEEDER SCHEDULES.
4. SEE ES601 FOR ELECTRICAL NEW WORK FEEDER SCHEDULE.
5. SEE DRAWING EP601 FOR NEW SINGLE LINE DIAGRAM
6. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY
AND TRUE LOCATIONS OF UTILITY LINES.
7. CONTRACTOR TO COORDINATE SITE OUTAGE WITH PROJECT COR AND VA CAMPUS
8. CONTRACTOR TO ENSURE THAT ALL ASSOCIATED CIRCUIT BREAKER HAVE BEEN
OPENED AND RACKED OUT AND LOCKED OUT / TAGGED OUT.
9. CONTRACTOR TO ENSURE ALL ASSOCIATED HVS'S AND TRANSFORMERS ARE
DE-ENERGIZED AND LOCKED OUT / TAGGED OUT.
10. CONTRACTOR TO PERFORM ACCEPTANCE CHECK PER SPECIFICATION 26-05-13 SECTION
3.7 ON FEEDER(S) ONCE INSTALLED BEFORE TERMINATING.
11. CONNECT PORTABLE GENERATOR OR START-UP EXISTING GENERATORS TO ANY
BUILDINGS AS NEEDED.
12. RE-ENERGIZE ANY APPLICABLE BREAKERS, HVS'S, TRANSFORMERS OR PANELS ONCE
WORK IS COMPLETED.
13. CONTRACTOR TO PERFORM ACCEPTANCE CHECKS ON HVS'S ONCE INSTALLED PER
SPECIFICATION 26-29-21 SECTION 3.2
GENERAL PHASING - PHASE 3 ESTABLISH
MEDIUM VOLTAGE LOOP
1 OPEN BREAKER NW-4A AND SE-4B IN B115
2 INSTALL FEEDERS 12 AND 13
3 REPLACE HVP-31 WITH NEW HVS-31
4 REPLACE HVS-20, REMOVE INTERNALS FROM HVP-20 BECOMES A PULL-THROUGH PULL
BOX
5 REPLACE HVP-3 WITH NEW HVS-3 USING EXISTING FEEDERS
6 PULL BACK FEEDER 21A FROM HVP-8 TO MH-12, RESERVING ENOUGH LENGTH TO
RECONNECT TO NEW HVS-12, DUCT BANK ABANDONED IN PLACE
7 RENUMBER FEEDER 21A TO 45 AND CONNECT TO HVS-12
8 OPEN SWITCH HVS-12 FEEDING HVP-36
9 CLOSE BREAKER NW-4A AND SE-4B IN B115
10 CLOSE SWITCH HVS-12 TO B115
11 CLOSE SWITCH HVS-12 FEEDING B146, B147 AND B148
SCALE: 1" = 200'
GENERAL PHASING PLAN - PHASE 31
N
NEW CABLE IN EXISTING DUCT BANK
CABLE REMOVED FROM EXISTING DUCT BANK
DUCT BANK ABANDONED IN PLACE
Exp.: 12/31/2028
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
109110
7 2
6C
6A 6D6B
T105
BCL
T107
XF-16
HVP-8
XF-41
HVS-23B
109110
T114
7 2
6C
6A 6D6B
T105
HVP-K
HVS-16
HVP-15
HVS-18
HVP-18
HVP-36
XF-36XF-4
HVS-20
XF-5
HVP-29
HVP 4
AFTON CT
GENERAL MITCHELL BLVD
WAREHOUSE WAY
LINCOLN DR
BARRON CT
RED ARROW CIR
W
OR
KS
HO
P
RO
AD
BARRON CTN M
ITC
HE
LL
BL
VD
HI
NE
S
BL
VD
CHRYSLER WOOD AVE
KILBOURN CIR
KILBOURN CIR
JU
NE
AU
A
VE
W
AL
KE
R
DR
IV
E
AMERICAN WARMOTHERS AVE
ZABLOCKI DR
GE
N
MI
TC
HE
LL
B
LV
D
STADIUM LN
GENERAL WOLCOTT BLVD
GENERAL WOLCOTT AVE
WOOD AVE
MEMORIAL DR
FLOWER DR HINES BLV
D
HVP-16XF-102
XF-49
BCL
XF-108
HVP-34
XF-1
XF-7
XF-43
XF-119
XF-6
PNL-49
PNL-39
HVP-146
HVS-146
XF-146
CB-100-CLC
CB-600-146
HVP-147
HVS-147
XF-147
CB-600-147
CB-600-148
XF-148
HVS-148
HVP-148
MH-37
PNL-1
MH-47A
MH-2A
MH-15
MH-23
MH-25
MH-27
MH-30
MH-31
MH-32
MH-34 MH-35 MH-36
MH-38
HVS-11
XF-39
MH-9 MH-10
MH-11
MH-8A
PNL-K
HVP-40
HVP-41
XF-MP-FDS
PNL-17
PNL-3
MH-40
MH-43
HVP-42
MH-42
MH-18
MH-4
MH-47
MH-13
MH-2
XF-57
MH-13A
PNL-2V
MH-39
EDG
EDG
MH-22
Wheeler Lake
XF-112
PNL-CLC
XF-17
HANK AARON TRAIL BRIDGE
T106 T107
HVP-42
GO
LD
ST
AT
E
DR
PNL-11
HVS-SL1
XF-SL1
MH-3
GENERAL MITCHELL BLVD
MH-44
MH
HVP-20
MH-36A
MH-36B
MH-12
XF-K
HVS-3
HVS-36
HVS-22
HVS-2
HVS-23A
HVP-27
HVP-24
E
E
HVS-12
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
HVS-A
HVP-11
MH-29
HVP-22
HVP-2
E
E
E
E
E
E
E
XF-97
XF-20
107/108-DS-A
XF-2
HVP-30
XF-3
XF-11
XF-27
PNL-27
XF-CL1
XF-1301
XF-14
PNL-16
XF-41
PNL-41
PNL-62
PNL-19
XF-19
HVS 4
XF-12
HVS-31
MH-16
HVP-44
XF-62
E
MH-20
9 1
7 8
HVP-23
PNL-14
HVS-41
MH-41
PNL-SL1
E
EE
E
E
E
E
E
MH-12A
MH-12B
MH-12C
MH-12D
MH-12E
Wood National
Cemetary
Wood National
Cemetary
NRF
MH-21E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
GENERAL PHASING PLAN - PHASE
4A NORTH EAST CAMPUS
BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM
VOLTAGE FEEDER CLEMENT J.
ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2025/10/09
GC104
SITE
695-22-123
CJR DAK
REV 0 - BID DOCUMENTS 2025-10-09
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CERTIFICATE OF AUTHORIZATION NUMBER: 0020000
GENERAL LINETYPES
- POWER DISTRIBUTION SWITCH (HVP OR HVS)
- TRANSFORMER (XF)
- ELECTRICAL PANEL (PNL)
SITE PLAN SYMBOL LEGEND
EXISTING DUCT BANK
- UTILITY, ELECTRICAL MANHOLE (MH)E
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. SEE DRAWING ED601 FOR DEMOLITION SINGLE LINE DIAGRAM
3. SEE ED611 AND ED612 FOR ELECTRICAL DEMOLTION FEEDER SCHEDULES.
4. SEE ES601 FOR ELECTRICAL NEW WORK FEEDER SCHEDULE.
5. SEE DRAWING EP601 FOR NEW SINGLE LINE DIAGRAM.
6. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY
AND TRUE LOCATIONS OF UTILITY LINES.
7. CONTRACTOR TO COORDINATE SITE OUTAGE WITH PROJECT COR AND VA CAMPUS
8. CONTRACTOR TO ENSURE THAT ALL ASSOCIATED CIRCUIT BREAKER HAVE BEEN
OPENED AND RACKED OUT AND LOCKED OUT / TAGGED OUT.
9. CONTRACTOR TO ENSURE ALL ASSOCIATED HVS'S AND TRANSFORMERS ARE
DE-ENERGIZED AND LOCKED OUT / TAGGED OUT.
10. CONTRACTOR TO PERFORM ACCEPTANCE CHECK PER SPECIFICATION 26-05-13 SECTION
3.7 ON FEEDER(S) ONCE INSTALLED BEFORE TERMINATING.
11. CONNECT PORTABLE GENERATOR OR START-UP EXISTING GENERATORS TO ANY
BUILDINGS AS NEEDED.
12. RE-ENERGIZE ANY APPLICABLE BREAKERS, HVS'S, TRANSFORMERS OR PANELS ONCE
WORK IS COMPLETED.
13. CONTRACTOR TO PERFORM ACCEPTANCE CHECKS ON HVS'S ONCE INSTALLED PER
SPECIFICATION 26-29-21 SECTION 3.2
GENERAL PHASING - PHASE 4A NORTH EAST
CAMPUS AREA SHUTDOWN
1 OPEN HVS-31 AND HVS-12 TO ISOLATE NORTH EAST AREA
2 REPLACE HVP-34
3 REPLACE XF-20, XF-108, XF-97 AND XF-36
4 REPLACE PNL-2V
5 REPLACE XF-1 AND PNL-1
6 REMOVE AND COVER HVS-36. HVS-36 TO BECOME A PASS-THROUGH PULLBOX NAMED
HVP-36A. CONTRACTOR TO INSTALL COVER PER DRAWING ES501 DETAIL 7.
7 REMOVE FEEDERS 57A AND 64A.
8 INSTALL FEEDERS 10, 11 AND 38 THROUGH 44.
9 CLOSE SWITCHES HVS-31 AND HVS-12
SCALE: 1" = 200'
GENERAL PHASING PLAN - PHASE 4A1
N
NEW CABLE IN EXISTING DUCT BANK
ABANDONED DUCT BANK
BUILDING FED FROM WE ENERGIES
BUILDING FED FROM VA
Exp.: 12/31/2028
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
XF-41
HVS-23B
109110
T114
7 2
6C
6A 6D6B
T105
HVP-K
HVS-16
HVP-15
HVS-18
HVP-18
HVP-36
XF-36XF-4
HVS-20
XF-5
HVP-29
HVP 4
AFTON CT
GENERAL MITCHELL BLVD
WAREHOUSE WAY
LINCOLN DR
BARRON CT
RED ARROW CIR
W
OR
KS
HO
P
RO
AD
BARRON CT
N M
ITC
HE
LL
BL
VD
HI
NE
S
BL
VD
CHRYSLER WOOD AVE
KILBOURN CIR
KILBOURN CIR
JU
NE
AU
A
VE
W
AL
KE
R
DR
IV
E
AMERICAN WARMOTHERS AVE
ZABLOCKI DR
GE
N
MI
TC
HE
LL
B
LV
D
STADIUM LN
GENERAL WOLCOTT BLVD
GENERAL WOLCOTT AVE
WOOD AVE
MEMORIAL DR
FLOWER DR HINES BLV
D
HVP-16XF-102
XF-49
BCL
XF-108
HVP-34
XF-1
XF-7
XF-43
XF-119
XF-6
PNL-49
PNL-39
HVP-146
HVS-146
XF-146
CB-100-CLC
CB-600-146
HVP-147
HVS-147
XF-147
CB-600-147
CB-600-148
XF-148
HVS-148
HVP-148
MH-37
PNL-1
MH-47A
MH-2A
MH-15
MH-23
MH-25
MH-27
MH-30
MH-31
MH-32
MH-34 MH-35 MH-36
MH-38
HVS-11
XF-39
MH-9 MH-10
MH-11
MH-8A
PNL-K
HVP-40
HVP-41
XF-MP-FDS
PNL-17
PNL-3
MH-40
MH-43
HVP-42
MH-42
MH-18
MH-4
MH-47
MH-13
MH-2
XF-57
MH-13A
PNL-2V
MH-39
EDG
EDG
MH-22
Wheeler Lake
XF-112
PNL-CLC
XF-17
HANK AARON TRAIL BRIDGE
T106 T107
HVP-42
GO
LD
ST
AT
E
DR
PNL-11
HVS-SL1
XF-SL1
MH-3
GENERAL MITCHELL BLVD
MH-44
MH
HVP-20
MH-36A
MH-36B
MH-12
XF-K
HVS-3
HVP-36A
HVS-22
HVS-2
HVS-23A
HVP-27
HVP-24
E
E
HVS-12
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
HVS-A
HVP-11
MH-29
HVP-22
HVP-2
E
E
E
E
E
E
E
XF-97
XF-20
107/108-DS-A
XF-2
HVP-30
XF-3
XF-11
XF-27
PNL-27
XF-CL1
XF-1301
XF-14
PNL-16
XF-41
PNL-41
PNL-62
PNL-19
XF-19
HVS 4
XF-12
HVS-31
MH-16
HVP-44
XF-62
E
MH-20
7 2
6C
6A 6D6B
T105
T106 T107
2 9
MH-24
HVP-23
PNL-14
HVS-41
MH-41
PNL-SL1
E
EE
E
E
E
E
MH-12A
MH-12B
MH-12C
MH-12D
MH-12E
E
Wood National
Cemetary
Wood National
Cemetary
NRF
MH-21E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
GENERAL PHASING PLAN - PHASE
4B
BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM
VOLTAGE FEEDER CLEMENT J.
ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2025/10/09
GC105
SITE
695-22-123
CJR DAK
- POWER DISTRIBUTION SWITCH (HVP OR HVS)
- TRANSFORMER (XF)
- ELECTRICAL PANEL (PNL)
- UTILITY, ELECTRICAL MANHOLE (MH)
SCALE: 1" = 200'
GENERAL PHASING PLAN - PHASE 4B1
REV 0 - BID DOCUMENTS 2025-10-09
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CERTIFICATE OF AUTHORIZATION NUMBER: 0020000
N
BUILDING FED FROM WE ENERGIES
BUILDING FED FROM VA
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. SEE DRAWING ED601 FOR DEMOLITION SINGLE LINE DIAGRAM
3. SEE ED611 AND ED612 FOR ELECTRICAL DEMOLTION FEEDER SCHEDULES.
4. SEE ES601 FOR ELECTRICAL NEW WORK FEEDER SCHEDULE.
5. SEE DRAWING EP601 FOR NEW SINGLE LINE DIAGRAM.
6. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY
AND TRUE LOCATIONS OF UTILITY LINES.
7. CONTRACTOR TO COORDINATE SITE OUTAGE WITH PROJECT COR AND VAMC CAMPUS
8. CONTRACTOR TO ENSURE THAT ALL ASSOCIATED CIRCUIT BREAKERS HAVE BEEN
OPENED AND RACKED-OUT AND LOCKED-OUT / TAGGED-OUT
9. CONTRACTOR TO ENSURE THAT ASSOCIATED HVS'S AND TRANSFORMERS ARE
DE-ENERGIZED AND LOCKED-OUT / TAGGED-OUT.
10. CONTRACTOR TO PERFORM ACCEPTANCE CHECK PER SPECIFICATION 26-05-13 SECTION
3.7 ON FEEDER(S) ONCE INSTALLED BEFORE TERMINATING.
11. CONNECT PORTABLE GENERATOR OR START UP EXISTING GENERATORS TO ANY
BUILDINGS AS NEEDED.
12. RE-ENERGIZE ANY APPLICABLE BREAKERS, HVS'S, TRANSFORMERS OR PANELS ONCE
WORK IS COMPLETED.
13. CONTRACTOR TO PERFORM ACCEPTANCE CHECKS ON HVS'S ONCE INSTALLED PER
SPECIFICATION 26-29-21 SECTION 3.2
GENERAL PHASING - PHASE 4B NORTH WEST
CAMPUS AREA SHUTDOWN
1 OPEN HVS-31, HVS23A AND HVS-23B TO ISOLATE NORTH WEST AREA
2 REMOVE FEEDERS; 11A THROUGH 13A, 11B THROUGH 12B, 35A, 48A, 50A THROUGH 54A,
48B THROUGH 51B, 53B, AND 55B
3 REMOVE AND COVER XF-2. DUCT BANK TO BE ABANDONED IN PLACE. CONTRACTOR TO
INSTALL COVER PER DRAWING ES501 DETAIL 7.
4 REPLACE HVP-29 AND HVP-30
5 REPLACE HVP-27 WITH NEW HVS-27
6 REPLACE HVP-24 WITH NEW HVS-24
7 REPLACE XF-4, XF-5, XF-6, XF-7, XF-11 AND XF-27
8 REPLACE PNL-11 AND PNL-27
9 INSTALL FEEDERS 7 THROUGH 9, 25 AND 32 THROUGH 39
10 CLOSE HVS-31, HVS-24 AND HVS-27
SITE PLAN SYMBOL LEGEND
E
GENERAL LINETYPES
EXISTING DUCT BANK
NEW CABLE IN EXISTING DUCT BANK
ABANDONED DUCT BANK
Exp.: 12/31/2028
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
XF-41
HVS-23B
109110
T114
7 2
6C
6A 6D6B
T105
HVP-K
HVS-16
HVP-15
HVS-18
HVP-18
HVP-36
XF-36XF-4
HVS-20
XF-5
HVP-29
HVP 4
AFTON CT
GENERAL MITCHELL BLVD
WAREHOUSE WAY
LINCOLN DR
BARRON CT
RED ARROW CIR
W
OR
KS
HO
P
RO
AD
BARRON CT
N M
ITC
HE
LL
BL
VD
HI
NE
S
BL
VD
CHRYSLER WOOD AVE
KILBOURN CIR
KILBOURN CIR
JU
NE
AU
A
VE
W
AL
KE
R
DR
IV
E
AMERICAN WARMOTHERS AVE
ZABLOCKI DR
GE
N
MI
TC
HE
LL
B
LV
D
STADIUM LN
GENERAL WOLCOTT BLVD
GENERAL WOLCOTT AVE
WOOD AVE
MEMORIAL DR
FLOWER DR HINES BLV
D
HVP-16XF-102
XF-49
BCL
XF-108
HVP-34
XF-1
XF-7
XF-43
XF-119
XF-6
PNL-49
PNL-39
HVP-146
HVS-146
XF-146
CB-100-CLC
CB-600-146
HVP-147
HVS-147
XF-147
CB-600-147
CB-600-148
XF-148
HVS-148
HVP-148
MH-37
PNL-1
MH-47A
MH-2A
MH-15
MH-23
MH-25
MH-27
MH-30
MH-31
MH-32
MH-34 MH-35 MH-36
MH-38
HVS-11
XF-39
MH-9 MH-10
MH-11
MH-8A
PNL-K
HVP-40
HVP-41
XF-MP-FDS
PNL-17
PNL-3
MH-40
MH-43
HVP-42
MH-42
MH-18
MH-4
MH-47
MH-13
MH-2
XF-57
MH-13A
PNL-2V
MH-39
EDG
EDG
MH-22
Wheeler Lake
XF-112
PNL-CLC
XF-17
HANK AARON TRAIL BRIDGE
T106 T107
HVP-42
GO
LD
ST
AT
E
DR
PNL-11
HVS-SL1
XF-SL1
MH-3
GENERAL MITCHELL BLVD
MH-44
MH
HVP-20
MH-36A
MH-36B
MH-12
XF-K
HVS-3
HVP-36A
HVS-22
HVS-2
HVS-23A
HVS-27
HVS-24
E
E
E
HVS-12
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
HVS-A
HVP-11
MH-29
HVP-22
HVP-2
E
E
E
E
E
E
E
E
XF-97
XF-20
107/108-DS-AHVP-30
XF-3
XF-11
XF-27
PNL-27
XF-CL1
XF-1301
XF-14
PNL-16
XF-41
PNL-41
PNL-62
PNL-19
XF-19
HVS 4
XF-12
HVS-31
MH-16
HVP-44
XF-62
E
E
MH-20
109110
7 2
6C
6A 6D6B
T105
T106 T107
1 7
HVP-23
MH-24
PNL-14
HVS-41
MH-41
PNL-SL1
EE
E
E
E
E
E
MH-12A
MH-12B
MH-12C
MH-12D
MH-12E
Wood National
Cemetary
Wood National
Cemetary
MH-21NRF E
1 7
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
GENERAL PHASING PLAN - PHASE
4C
BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM
VOLTAGE FEEDER CLEMENT J.
ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2025/10/09
GC106
SITE
695-22-123
CJR DAK
- POWER DISTRIBUTION SWITCH (HVP OR HVS)
- TRANSFORMER (XF)
- ELECTRICAL PANEL (PNL)
- UTILITY, ELECTRICAL MANHOLE (MH)
REV 0 - BID DOCUMENTS 2025-10-09
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CERTIFICATE OF AUTHORIZATION NUMBER: 0020000
BUILDING FED FROM WE ENERGIES
BUILDING FED FROM VA
SITE PLAN SYMBOL LEGEND
E
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. SEE DRAWING ED601 FOR DEMOLITION SINGLE LINE DIAGRAM
3. SEE ED611 AND ED612 FOR ELECTRICAL DEMOLTION FEEDER SCHEDULES.
4. SEE ES601 FOR ELECTRICAL NEW WORK FEEDER SCHEDULE.
5. SEE DRAWING EP601 FOR NEW SINGLE LINE DIAGRAM.
6. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY
AND TRUE LOCATIONS OF UTILITY LINES.
7. CONTRACTOR TO COORDINATE SITE OUTAGE WITH PROJECT COR AND VAMC CAMPUS
8. CONTRACTOR TO ENSURE THAT ALL ASSOCIATED CIRCUIT BREAKERS HAVE BEEN
OPENED AND RACKED-OUT AND LOCKED-OUT / TAGGED-OUT
9. CONTRACTOR TO ENSURE THAT ASSOCIATED HVS'S AND TRANSFORMERS ARE
DE-ENERGIZED AND LOCKED-OUT / TAGGED-OUT.
10. CONTRACTOR TO PERFORM ACCEPTANCE CHECK PER SPECIFICATION 26-05-13 SECTION
3.7 ON FEEDER(S) ONCE INSTALLED BEFORE TERMINATING.
11. CONNECT PORTABLE GENERATOR OR START UP EXISTING GENERATORS TO ANY
BUILDINGS AS NEEDED.
12. RE-ENERGIZE ANY APPLICABLE BREAKERS, HVS'S, TRANSFORMERS OR PANELS ONCE
WORK IS COMPLETED.
13. CONTRACTOR TO PERFORM ACCEPTANCE CHECKS ON HVS'S ONCE INSTALLED PER
SPECIFICATION 26-29-21 SECTION 3.2
GENERAL PHASING - PHASE 4C BCL AND
B102 AREA SHUTDOWN
1 OPEN HVS-20 AND HVS-24
2 REMOVE AND COVER HVS-22, HVP-22, AND HVS-23A. HVS-22 TO BECOME A
PASS-THROUGH PULLBOX NAMED HVP-22A. HVS-23A TO BECOME PASS-THROUH
PULLBOX NAMED HVP23A. CONTRACTOR TO INSTALL COVERS PER DRAWING ES501
DETAIL 7.
3 REMOVE AND COVER HVS-23B. CONTRACTOR TO INSTALL COVER PER DRAWING ES501
DETAIL 7.
4 REPLACE XF-CL1
5 REMOVE FEEDERS 7A THROUGH 10A, 7B THROUGH 10B, 31A, 31B, 32AB, 33A, 33B AND
34AB
6 INSTALL FEEDERS 6, 23 AND 24
7 CLOSE HVS-24 AND HVS-20
SCALE: 1" = 200'
GENERAL PHASING PLAN - PHASE 4C1
N
- HVS OR HVP REMOVED
GENERAL LINETYPES
EXISTING DUCT BANK
NEW CABLE IN EXISTING DUCT BANK
ABANDONED DUCT BANK
EXP 12/31/2025
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
XF-41
109110
T114
7 2
6C
6A 6D6B
T105
HVP-K
HVS-16
HVP-15
HVS-18
HVP-18
HVP-36
XF-36XF-4
HVS-20
XF-5
HVP-29
HVP 4
AFTON CT
GENERAL MITCHELL BLVD
WAREHOUSE WAY
LINCOLN DR
BARRON CT
RED ARROW CIR
W
OR
KS
HO
P
RO
AD
BARRON CTN M
ITC
HE
LL
BL
VD
HI
NE
S
BL
VD
CHRYSLER WOOD AVE
KILBOURN CIR
KILBOURN CIR
JU
NE
AU
A
VE
W
AL
KE
R
DR
IV
E
AMERICAN WARMOTHERS AVE
ZABLOCKI DR
GE
N
MI
TC
HE
LL
B
LV
D
STADIUM LN
GENERAL WOLCOTT BLVD
GENERAL WOLCOTT AVE
WOOD AVE
MEMORIAL DR
FLOWER DR HINES BLV
D
HVP-16XF-102
XF-49
BCL
XF-108
HVP-34
XF-1
XF-7
XF-43
XF-119
XF-6
PNL-49
PNL-39
HVP-146
HVS-146
XF-146
CB-100-CLC
CB-600-146
HVP-147
HVS-147
XF-147
CB-600-147
CB-600-148
XF-148
HVS-148
HVP-148
MH-37
PNL-1
MH-47A
MH-2A
MH-15
MH-23
MH-25
MH-27
MH-30
MH-31
MH-32
MH-34 MH-35 MH-36
MH-38
HVS-11
XF-39
MH-9 MH-10
MH-11
MH-8A
PNL-K
HVP-40
HVP-41
XF-MP-FDS
PNL-17
PNL-3
MH-40
MH-43
HVP-42
MH-42
MH-18
MH-4
MH-47
MH-13
MH-2
XF-57
MH-13A
PNL-2V
MH-39
EDG
EDG
MH-22
Wheeler Lake
XF-112
PNL-CLC
XF-17
HANK AARON TRAIL BRIDGE
T107
HVP-42
GO
LD
ST
AT
E
DR
PNL-11
HVS-SL1
XF-SL1
MH-3
GENERAL MITCHELL BLVD
MH-44
MH
HVP-20
MH-36A
MH-36B
MH-12
XF-K
HVS-3
HVP-36A
HVP-22A
HVS-2
HVP23A
HVS-27
HVS-24
E
E
E
HVS-12
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
HVS-A
HVP-11
MH-29
HVP-22
HVP-2
E
E
E
E
E
E
E
E
XF-97
XF-20
107/108-DS-AHVP-30
XF-3
XF-11
XF-27
PNL-27
XF-CL1
XF-1301
XF-14
PNL-16
XF-41
PNL-41
PNL-62
PNL-19
XF-19
HVS 4
XF-12
HVS-31
MH-16
HVP-44
XF-62
E
E
MH-20
109110
7 2
6C
6A 6D6B
T105
BCL
T106 T107
1 6
4 5
HVP-23
PNL-14
HVS-41
MH-41
PNL-SL1
EE
E
E
E
E
E
MH-12A
MH-12B
MH-12C
MH-12D
MH-12E
Wood National
Cemetary
Wood National
Cemetary
NRF
6 MH-21E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date:
23 MECHANIC STREET, SPRINGVILLE, NY 14141
GENERAL PHASING PLAN - PHASE
4D
BID DOCUMENTS UPGRADE NORTH CAMPUS MEDIUM
VOLTAGE FEEDER CLEMENT J.
ZABLOCKI VAMC
5000 W. NATIONAL AVE.
MILWAUKEE, WI 53295
2025/10/09
GC107
SITE
695-22-123
CJR DAK
REV 0 - BID DOCUMENTS 2025-10-09
"Unauthorized alteration or addition to any plans, specifications or reports bearing a Licensed Professional Engineer's seal is a violation of Section 7209, subdivision 2, of the New York State Education Law".
CERTIFICATE OF AUTHORIZATION NUMBER: 0020000
- POWER DISTRIBUTION SWITCH (HVP OR HVS)
- TRANSFORMER (XF)
- ELECTRICAL PANEL (PNL)
SITE PLAN SYMBOL LEGEND
- UTILITY, ELECTRICAL MANHOLE (MH)E
- BUILDING FED BY WE ENERGIES
- BUILDING FED BY VA
GENERAL NOTES
1. SEE E-001 FOR E-SERIES NOTES AND LEGENDS.
2. SEE DRAWING ED601 FOR DEMOLITION SINGLE LINE DIAGRAM
3. SEE ED611 AND ED612 FOR ELECTRICAL DEMOLTION FEEDER SCHEDULES.
4. SEE ES601 FOR ELECTRICAL NEW WORK FEEDER SCHEDULE.
5. SEE DRAWING EP601 FOR NEW SINGLE LINE DIAGRAM.
6. THIS DRAWING IS DIAGRAMATIC IN NATURE ONLY. SEE CU101 FOR ACTUAL SITE SURVEY
AND TRUE LOCATIONS OF UTILITY LINES.
7. CONTRACTOR TO COORDINATE SITE OUTAGE WITH PROJECT COR AND VAMC CAMPUS
8. CONTRACTOR TO ENSURE THAT ALL ASSOCIATED CIRCUIT BREAKERS HAVE BEEN
OPENED AND RACKED-OUT AND LOCKED-OUT / TAGGED-OUT
9. CONTRACTOR TO ENSURE THAT ASSOCIATED HVS'S AND TRANSFORMERS ARE
DE-ENERGIZED AND LOCKED-OUT / TAGGED-OUT.
10. CONTRACTOR TO PERFORM ACCEPTANCE CHECK PER SPECIFICATION 26-05-13 SECTION
3.7 ON FEEDER(S) ONCE INSTALLED BEFORE TERMINATING.
11. CONNECT PORTABLE GENERATOR OR START UP EXISTING GENERATORS TO ANY
BUILDINGS AS NEEDED.
12. RE-ENERGIZE ANY APPLICABLE BREAKERS, HVS'S, TRANSFORMERS OR PANELS ONCE
WORK IS COMPLETED.
GENERAL PHASING - PHASE 4D B112, B119,
B150 AND B84 AREA SHUTDOWN
1 OPEN HVS-3 AND HVS-20
2 REMOVE AND COVER HVP-16, HVS-16, AND HVS-18. HVS-16 TO BECOME A PASS-THROUGH
PULLBOX NAMED HVP-16A. HVS-18 TO BECOME A PASS-THROUGH PULLBOX NAMED
HVP-18A. CONTRACTOR TO INSTALL COVER PER DRAWING ES501 DETAIL 7.
3 REPLACE XF-49
4 REMOVE FEEDERS 5A THROUGH 6A, 5B THROUGH 6B, 25A THROUGH 29A, 25B THROUGH
28B, 30AB AND 45AB
5 INSTALL FEEDERS 4 THROUGHG 5 AND 19 THROUGH 22
6 CLOSE HVS-20 AND HVS-3
SCALE: 1" = 200'
GENERAL PHASING PLAN - PHASE 4D1
N
GENERAL LINETYPES
EXISTING DUCT BANK
NEW CABLE IN EXISTING DUCT BANK
ABANDONED DUCT BANK
Exp.: 12/31/2028
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
XF-41
109110
T114
7 2
6C
6A 6D6B
T105
HVP-K
HVP-16A
HVP-15
HVP-18A
HVP-18
HVP-36
XF-36XF-4
HVS-20
XF-5
HVP-29
HVP 4
AFTON CT
GENERAL MITCHELL BLVD
WAREHOUSE WAY
LINCOLN DR
BARRON CT
RED ARROW CIR
W
OR
KS
HO
P
RO
AD
BARRON CT
N M
ITC
HE
LL
BL
VD
HI
NE
S
BL
VD
CHRYSLER WOOD AVE
KILBOURN CIR
KILBOURN CIR
JU
NE
AU
A
VE
W
AL
KE
R
DR
IV
E
AMERICAN WARMOTHERS AVE
ZABLOCKI DR
GE
N
MI
TC
HE
LL
B
LV
D
STADIUM LN
GENERAL WOLCOTT BLVD
GENERAL WOLCOTT AVE
WOOD AVE
MEMORIAL DR
FLOWER DR HINES BLV
D
HVP-16XF-102
XF-49
BCL
XF-108
HVP-34
XF-1
XF-7
XF-43
XF-119
XF-6
PNL-49
PNL-39
HVP-146
HVS-146
XF-146
CB-100-CLC
CB-600-146
HVP-147
HVS-147
XF-147
CB-600-147
CB-600-148
XF-148
HVS-148
HVP-148
MH-37
PNL-1
MH-47A
MH-2A
MH-15
MH-23
MH-25
MH-27
MH-30
MH-31
MH-32
MH-34 MH-35 MH-36
MH-38
HVS-11
XF-39
MH-9 MH-10
MH-11
MH-8A
PNL-K
HVP-40
HVP-41
XF-MP-FDS
PNL-17
PNL-3
MH-40
MH-43
HVP-42
MH-42
MH-18
MH-4
MH-47
MH-13
MH-2
XF-57
MH-13A
PNL-2V
MH-39
EDG
EDG
MH-22
Wheeler Lake
XF-112
PNL-CLC
XF-17
HANK AARON TRAIL BRIDGE
T106 T107
HVP-42
GO
LD
ST
AT
E
DR
PNL-11
HVS-SL1
XF-SL1
MH-3
GENERAL MITCHELL BLVD
MH-44
MH
HVP-20
MH-36A
MH-36B
MH-12
XF-K
HVS-3
HVP-36A
HVP-22A
HVS-2
HVP-23A
HVS-27
HVS-24
E
E
E
HVS-12
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
HVS-A
HVP-11
MH-29
HVP-22
E
E
E
E
E
E
E
E
XF-97
XF-20
107/108-DS-AHVP-30
XF-3
XF-11
XF-27
PNL-27
XF-CL1
XF-1301
XF-14
PNL-16
XF-41
PNL-41
PNL-62
PNL-19
XF-19
HVS 4
XF-12
HVS-31
MH-16
HVP-44
XF-62
E
E
MH-20
109110
7 2
6C
6A 6D6B
T105
T106 T107
9 1
8 7
HVP-23
PNL-14
8 7
HVS-41
MH-41
PNL-SL1
HVP-2
EE
E
E
E
E
E
MH-12A
MH-12B
MH-12C
MH-12D
MH-12E
Wood National
Cemetary
Wood National
Cemetary
MH-21NRF
E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .