S02 523A5-22-001 Combined Drawing Set.pdf
PDF 9 MB Posted
- Attached to
- Z1DA--523A5-22-001 Replace Roofs Multiple Buildings VA Medical Center (VAMC) Brockton, MA
- Solicitation number
- 36C24124B0025
About this file
This document package includes construction drawings and specifications for replacing roofs on multiple buildings at the VA Medical Center in Brockton, Massachusetts. The project involves removing and replacing roofing systems on Buildings 4 and 22, including new membrane roofing, insulation, flashing, drains, and fall protection anchors. Additional work includes installing gutters, downspouts, ladders, stairs and safety railings. The construction drawings provide plans, elevations, sections, details, schedules and notes for the scope of work. Specifications reference applicable standards and codes for materials, installation and warranties.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
DRAWING INDEX
DRAWING NUMBER DRAWING TITLE
GENERAL
GI001 TITLE SHEET AND DRAWING INDEX
GI002 GENERAL NOTES AND LEGENDS
GC101 GENERAL PHASING AND STAGING PLAN
ARCHITECTURAL
AD101 ARCHITECTURAL DEMOLITION PLAN - BLDG 4 WEST ROOF
AD102 ARCHITECTURAL DEMOLITION PLAN - BLDG 4 EAST ROOF
AD103 ARCHITECTURAL DEMOLITION PLAN - BLDG 22 ROOF
AD201 ARCHITECTURAL DEMOLITION NORTH ELEVATIONS - BLDG 4
AD202 ARCHITECTURAL DEMOLITION SOUTH ELEVATIONS - BLDG 4
AD203 ARCHITECTURAL DEMOLITION WEST AND EAST ELEVATIONS - BLDG 4
AD204 ARCHITECTURAL DEMOLITION NORTH AND SOUTH ELEVATION - BLDG 22
AD205 ARCHITECTURAL DEMOLITION WEST AND EAST ELEVATIONS - BLDG 22
AD501 ARCHITECTURAL DEMOLITION ROOF REMOVAL DETAILS
AD502 ARCHITECTURAL DEMOLITION ROOF REMOVAL DETAILS
AD503 ARCHITECTURAL DEMOLITION ROOF REMOVAL DETAILS
A-101 ARCHITECTURAL PLAN - BLDG 4 WEST ROOF
A-102 ARCHITECTURAL PLAN - BLDG 4 EAST ROOF
A-103 ARCHITECTURAL PLAN - BLDG 22 ROOF
A-501 ARCHITECTURAL ROOF DETAILS
A-502 ARCHITECTURAL ROOF DETAILS
A-503 ARCHITECTURAL ROOF DETAILS
A-504 ARCHITECTURAL ROOF DETAILS
A-601 ARCHITECTURAL ROOF SCHEDULES
ELECTRICAL
EG101 ELECTRICAL GROUNDING PLAN - BLDG 4 WEST ROOF
EG102 ELECTRICAL GROUNDING PLAN - BLDG 4 EAST ROOF
EG103 ELECTRICAL GROUNDING PLAN - BLDG 22 ROOF
EG501 ELECTRICAL LIGHTNING PROTECTION SYSTEM DETAILS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
GI001
TITLE SHEET AND DRAWING INDEX
4, 22
GHR CCW
DD###
DD###
X
DD###
X
1'-0" = 1'-0"
DETAIL TITLE
X
1 / DD###
DD###
X
DD###
X
NORTH ARROWVIEW TITLE
BUILDING/WALL SECTION CUT
EXTERIOR ELEVATION
DETAIL SECTION CUT
DETAIL CALLOUT
DRAWING SYMBOLS
INTERIOR ELEVATION
ARCHITECT/ENGINEER
Encorus Group 23 Mechanic Street - P.O. Box 344 Springville, New York 14141-0344 716-592-3980
DETAIL NUMBER
DETAIL IDENTIFIER
DETAIL TITLE NUMBER /
SHEET REF NUMBER
SECTION IDENTIFIER
SHEET REF NUMBER
DETAIL
IDENTIFIER
SHEET REF
NUMBER
DETAIL SECTION IDENTIFIER
VIEWING
DIRECTION
TRUE NORTH
PLAN NORTH
VIEWING
DIRECTION
SHEET REF NUMBER
SHEET REF NUMBER
A/E ROOF REPLACEMENT BUILDING 4 AND 22
BROCKTON VA MEDICAL CENTER
940 BELMONT STREET
BROCKTON, MA 023301
BROCKTON VA MEDICAL
CENTERM
A
S S
A V
E
MASS AVE
PLYMOUTH AVE
PLY
MOUTH A
VE
STANDISH RD
S
TA
N D
IS
H
R D
P
ILG
R
IM
A V
E
STAN
D
ISH
R
D
P
IL
G R
IM
A
V E
PILGRIM AVE
BLDG 4
B
LD
G
N N
Revisions: Date: 9/21/2023
RD
HP
LP
HP
LP
AT
LINE TYPES
ABBREVIATIONSGENERAL DRAWING SYMBOLS
ARCHITECTURAL SYMBOLS
ELECTRICAL SYMBOLS
X
X
SYMBOLS & LEGEND
SYMBOL DESCRIPTION
AREA OF COVERED WALKWAY CANOPIES.
CONSTRUCTION FENCING AND GATE PER SPEC REQUIRED.
CRICKET SLOPE - 1/4" PER FOOT = MAXIMUM OVERALL THICKNESS.
SADDLE SLOPE - 1/4" PER FOOT = MAXIMUM OVERALL THICKNESS.
ROOF SLOPE - 1/4" PER FOOT FLAT ROOF AREAS MIN.
HIGH POINT INSULATION THICKNESS. X = APPROXIMATE THICKNESS BASED UPON
AN AVERAGE R VALUE PRESCRIBED IN THE SPECIFICATIONS AND THE INDICATED
ROOF SLOPE. FIELD VERIFY ALL VALUES.
LOW POINT INSULATION THICKNESS. X = APPROXIMATE THICKNESS BASED UPON
AN AVERAGE R VALUE PRESCRIBED IN THE SPECIFICATIONS AND THE INDICATED
ROOF SLOPE. FIELD VERIFY ALL VALUES.
19"
5"
19"
5"
ABBREVIATION MEANING
A/E ARCHITECT/ENGINEER
ACT ACOUSTICAL CEILING TILE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU AIR HANDLING UNIT
ALT ALTERNATE
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
AUX AUXILIARY
AVG AVERAGE
BD BOARD
BKG BACKING
BLDG BUILDING
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRDG JST BRIDGING JOIST
BRG BEARING
BRG PL BEARING PLATE
BSMT BASEMENT
BTWN BETWEEN
CBB CEMENTITIOUS (BACKER) BOARD
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONSTR CONSTRUCTION
CONTR CONTRACTOR
CONT CONTINIOUS
CT CERAMIC TILE
DEMO DEMOLITION
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL DIAGRAM
DIAG DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DOC DOCUMENT
DN DOWN
DR DOOR, DRAIN, OR DRIVE
DS DOWNSPOUT
EA EACH
EPS EXPANDED POLYSTYRENE BOARD
EQ EQUAL
EW EACH WAY
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXP BT EXPANSION BOLT
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXT GR EXTERIOR GRADE
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FIN FINISH
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FLR FLOOR
FLR FIN FLOOR FINISH
FRMG FRAMING
FT FEET OR FOOT
FTG FOOTING
ABBREVIATION MEANING
GALV GALVANIC OR GALVANIZED
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GWB GYPSUM WALL BOARD
GYP GYPSUM
GYP BD GYPSUM BOARD
HDR HEADER
HM HOLLOW METAL
HORIZ HORIZONTAL
HOSP HOSPITAL
HT HEIGHT
INSUL INSULATION
MAT MATERIAL
OC ON CENTER
OFD OVERFLOW DRAIN
PRELIM PRELIMINARY
PT PAINT, PNEUMATIC TUBE, OR PRESSURE
PTD PAINTED
PWR POWER
QTY QUANTITY
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REQD REQUIRED
RET RETARDANT
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RO ROUGH OPENING
SAN SANITARY
SIM SIMILAR
SPEC SPECIFICATION
SPKLR SPRINKLER
STD STANDARD
STL PL STEEL PLATE
STRUCT STRUCTURAL
STRUCT STL STRUCTURAL STEEL
SUSP CLG SUSPENDED CEILING
SYS SYSTEM
TBD TO BE DETERMINED
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TYP TYPICAL
VERT VERTICAL
VIF VERIFY IN FIELD
W/ WITH
W/O WITHOUT
WD WOOD
WP WATERPROOF
DESIGN DATA:
IN ITS COMPLETED STATE, AE DESIGN SERVICES FOR ROOF REPLACEMENT BUILDING 4
AND BUILDING 22 FOR THE BROCKTON VA MEDICAL CENTER IS DESIGNED FOR THE
FOLLOWING SURCHARGE LOADS. DO NOT EXCEED STATED SURCHARGE LOADS.
1. DEAD LOAD: STRUCTURE SELF WEIGHT
2. ROOF LIVE LOAD : 20 PSF
300 LB CONCENTRATED
3. SNOW LOAD: FLAT ROOF SNOW LOAD Pf = 26.5 PSF GROUND SNOW LOAD Pg = 35 PSF SNOW EXPOSURE FACTOR Ce = 1.0 SNOW LOAD IMPORTANCE FACTOR Is = 1.2 THERMAL FACTOR Ct = 1.0 DRIFT SURCHARGE Pd = 75 PSF DRIFT WIDTH w = 16'-0"
4. WIND LOAD : ULTIMATE DESIGN WIND SPEED, Vult = 136 MPH NOMINAL DESIGN WIND SPEED, Vasd = 106 MPH
RISK CATEGORY IV
IMPORTANCE FACTOR, Iw = 1.00
WIND EXPOSURE CATEGORY, B
INTERNAL PRESSURE COEFFICIENT, GCpi = +/-0.18
COMPONENTS AND CLADDING WIND PRESSURES
6. SEISMIC LOAD :
RISK CATEGORY IV
IMPORTANCE FACTORS, Ie = 1.50
SOIL SITE CLASS = D
MAPPED SPECTRAL ACCELERATIONS/RESPONSES
Ss = 0.218 S1 = 0.054
SDS = 0.233
SD1 = 0.093
SEISMIC DESIGN CATEGORY = C
SEISMIC RESISTING SYSTEM = SEISMIC DEMAND ON
NONSTRUCTURAL COMPONENTS
COMPONENT AMPLIFICATION FACTOR, ap = 2.5 COMPONENT RESPONSE MODIFICATION FACTOR, Rp = 1.5
EQUIVALENT LATERAL FORCE METHOD
HORIZONTAL FORCE, Fph = 0.233 x SELF WEIGHT VERTICAL FORCE, Fpv = ± 0.093 x SELF WEIGHT
ROOF DRAIN
VENT PIPE
VENTILATION HOOD WITH CURB
ROOF OR SMOKE HATCH
AREA BOUNDARY
LIGHTNING ROD
GROUND
CONDUCTOR
DEMOLITION
ELECTRIC
DEMOLISH/REMOVE
L LIGHT FIXTURE, WALL MOUNTED
HIGH POINT MARKER
KEYED NOTE
LOW POINT MARKER
FULL DOWNLEAD TO GROUND
COLUMN CENTER LINE
X
X X
X
BUILDING 4 COMPONENTS AND
CLADDING WIND LOAD SCHEDULE
COMPONENT ZONE
PRES (+VE)
(PSF)
PRES (-VE)
(PSF)
< =10 SF 2 14.7 -75.9
100 SF 2 11.6 -59.7
200 SF 2 11.6 -54.8
> 500 SF 2 11.6 -48.3
< = 10 SF 3 14.7 -103.4
100 SF 3 11.6 -71.0
200 SF 3 11.6 -61.2
> 500 SF 3 11.6 -48.3
BUILDING 22 COMPONENTS AND
CLADDING WIND LOAD SCHEDULE
COMPONENT ZONE
PRES (+VE)
(PSF)
PRES (-VE)
(PSF)
< =10 SF 1 12.5 -49.1
100 SF 1 9.9 -38.4
200 SF 1 9.9 -35.1
> 500 SF 1 9.9 -30.8
< = 10 SF 1' 12.5 -4.7
100 SF 1' 9.9 -4.7
500 SF 1' 9.9 -4.7
> 1000 SF 1' 9.9 -4.7
< = 10 SF 2 12.5 -64.8
100 SF 2 9.9 -51.0
200 SF 2 9.9 -46.8
> 500 SF 2 9.9 -41.3
< = 10 SF 3 12.5 -88.3
100 SF 3 9.9 -60.6
200 SF 3 9.9 -52.3
> 500 SF 3 9.9 -41.3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
GI002
GENERAL NOTES AND LEGENDS
4, 22
GHR CCW
ELECTRICAL GENERAL NOTES:
GENERAL DEMOLITION NOTES:
ARCHITECTURAL GENERAL NOTES:
1. THE CONTRACTOR SHALL COORDINATE ALL WORK ASSOCIATED WITH THIS PROJECT WITH THE SUB- CONTRACTORS, TO PROVIDE A COMPLETE AND FINISHED PROJECT. THIS FACILITY IS OCCUPIED. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION AND
SHALL BE RESPONSIBLE TO THE VA COR FOR PROVIDING A SAFE WORK ENVIRONMENT DURING THE
CONSTRUCTION PERIOD. THE CONTRACTOR SHALL ENSURE THE SAFETY OF PATIENTS AND VA
STAFF, IS NOT COMPROMISED DUE TO ANY CONSTRUCTION RELATED ACTIVITIES.
2. ALL MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN
INSTRUCTIONS AND RECOMMENDATIONS, UNLESS OTHERWISE NOTED.
3. DIMENSIONS AND DETAILS ARE BASED ON THE BEST AVAILABLE INFORMATION AND THE
CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING FIELD DIMENSIONS BEFORE ORDERING
MATERIALS AND PREFABRICATED ITEMS.
4. ALL WORK SHALL BE PERFORMED IN THE BEST AND MOST PROFESSIONAL MANNER BY CONTRACTOR
SKILLED IN THEIR RESPECTIVE TRADES.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTING AND CORRECTING HIS/HER OWN
WORKMANSHIP.
6. ALL WORKMANSHIP AND MATERIALS, UNLESS CARRYING A GUARANTEE BY A MANUFACTURER FOR A LONGER PERIOD OF TIME SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR PER CONTRACT AND
FAR REGULATIONS AS STIPULATED BY THE CONTRACTING OFFICER.
7. THE CONTRACTOR SHALL VISIT THE SITE TO VERIFY FIELD CONDITIONS.
8. THE CONTRACTOR SHALL MAKE EVERY EFFORT TO PREVENT THE SPREAD OF DUST, SMOKE, FUMES, ETC., THROUGHOUT THE BUILDING AND NEIGHBORHOOD. PROTECT ALL AIR INTAKES WITH CHARCOAL
FILTERS FOR ROOF APPLICATIONS.
9. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SERVICES INCLUDING, ADEQUATE LIGHTING, WATER, TOILETS, POWER, HEAT, ETC. AS REQUIRED FOR WORKMAN, MATERIAL INSTALLATION, WORK
PROTECTION, ETC., OR AS DISCUSSED AND ALLOWED BY THE VA COR.
10. THE CONTRACTOR SHALL PROVIDE THE VA COR A COMPLETE MAINTENANCE AND OPERATIONAL INSTRUCTIONS IN BOTH WRITTEN AND VERBAL FORM FOR ALL CONTRACTOR PROVIDED EQUIPMENT.
11. THE CONTRACTOR SHALL REVIEW ALL CONSTRUCTION DOCUMENTS AND NOTIFY THE VA COR OF ANY INACCURACIES OR DISCREPANCIES IN THE DOCUMENTS AND IN FIELD CONDITIONS SHOWN ON THE
DRAWINGS IN A TIMELY MANNER.
12. THE CONTRACTOR SHALL PERFORM ALL WORK IN STRICT ACCORDANCE WITH ALL FEDERAL CODES, RULES, REGULATIONS AND ORDINANCES INCLUDING, BUT NOT LIMITED TO, THE INTERNATIONAL
ENERGY CONSERVATION CODE, THE INTERNATIONAL BUILDING CODE, AMERICAN NATIONAL
STANDARDS INSTITUTE (ANSI), NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), AND
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) WHETHER OR NOT INFORMATION
AND/OR WORK IS SPECIFICALLY SHOWN ON THE DRAWINGS.
13. THE CONTRACTOR SHALL BE AWARE THAT THE EXISTING FACILITY HAS THE POTENTIAL OF HAVING
OTHER CONSTRUCTION PROJECTS GOING ON AT THE SAME TIME. COORDINATE WITH VA COR.
14. THE CONTRACTOR IS RESPONSIBLE TO COORDINATE ALL MATERIAL DELIVERIES WITH VA COR AND VA
STAFF IN CHARGE OF THE LOADING DOCK. NO CONTRACTOR MATERIAL WILL BE STORED ON OR
AROUND LOADING DOCK UNLESS AUTHORIZED BY THE VA COR. THE VA WILL NOT RECEIVE
CONTRACTOR MATERIAL.
15. CONTRACTOR TO PROVIDE MULTIPLE CHUTES TO CONVEY CONSTRUCTION WASTE FROM ROOF
DOWN TO GROUND LEVEL. CONTRACTOR TO PROVIDE TEMPORARY WASTE RECEPTACLES UNDER
OUTPUT OF CHUTES TO TRANSPORT WASTE BETWEEN CHUTES AND DUMPSTER. PROTECT ALL
AREAS THAT TEMPORARY WASTE RECEPTACLES TRAVERSE. WASTE SHALL NOT PILE UP ON LOWER ROOFS OR GROUND. IMMEDIATELY RELOCATE WASTE TO DUMPSTER. NO CHUTES ARE ALLOWED FOR
ASBESTOS CONTAINING MATERIAL.
16. STOCK PILING OF NEW ROOFING MATERIALS ON EXISTING AND NEW ROOF AREAS IS NOT PERMITTED.
17. ALL WOOD BLOCKING SHALL BE PRESSURE TREATED AND FIRE RETARDANT WITH STAMP SHOWN.
18. CONTRACTOR SHALL SUBMIT A PLAN TO THE COR WITHIN 10 CALENDAR DAYS OF THE NTP FOR EACH
OF THE FOLLOWING: STAGING AREA IN PARKING LOT L AS WELL AS THE SCAFFOLDING, ELECTRIC
WINCH HOIST, DUMPSTER, AND CHUTE AREA FOR EACH PHASE OF WORK.
19. CONTRACTOR TO PROVIDE FIRE PREVENTION PLAN TO VA COR FOR REVIEW AND APPROVAL.
20. ALL LIFE-SAFETY SYSTEMS SHALL REMAIN OPERATIONAL THROUGHOUT THE DURATION OF THE
PROJECT. ANY INTERRUPTION OF THE LIFE-SAFETY SHALL BE COORDINATED WITH THE COR AHEAD
OF TIME.
21. THE CONTRACTOR WILL FOLLOW THE REQUIREMENTS SPELLED OUT ON THE HOT WORK PERMIT AND
SAFETY PROTOCOLS WHILE PERFORMING HOT WORK.
22. CONTRACTOR SHALL SUBMIT SCAFFOLDING SHOP DRAWINGS FOR EACH LOCATION SIGNED AND
SEALED BY A PE. EACH DRAWING IS TO BE SIGNED AND SEALED.
23. THE CONTRACTOR SHALL PROVIDE WRITTEN NOTIFICATION TO THE CONTRACTING OFFICER'S REPRESENTATIVE THIRTY (30) CALENDAR DAYS IN ADVANCE OF THE DATE WHICH THE SPECIAL
INSPECTION IS REQUIRED TO TAKE PLACE ON.
24. THE CONTRACTOR TO SUBMIT A PLAN TO PROTECT ODORS FROM ENTERING ANY OUTSIDE AIR
INTAKES IN THE VICINITY OF CONSTRUCTION ACTIVITIES.
1. EXISTING MECHANICAL EQUIPMENT, VENTS, PIPING, CONDUIT, EXHAUSTS, DUCTWORK SHALL EITHER BE LEFT IN PLACE OR TEMPORARILY RELOCATED FOR DEMOLITION/RE-ROOFING/FLASHING WORK TO
BE EXECUTED IN ACCORDANCE WITH THE DETAILS PROVIDED. ELECTRICAL AND MECHANICAL
EQUIPMENT REQUIRING TEMPORARY SHUTDOWN AND RE-START SHALL BE NOTED ON THE
EQUIPMENT SCHEDULES PROVIDED ON DRAWINGS. COORDINATE THOSE SHUTDOWNS WITH THE
BROCKTON VA, IF REQUIRED.
2. REMOVE ALL EXISTING ROOFING MATERIALS AT EACH ROOF AREA AS IDENTIFIED IN THE EXISTING ROOF TYPES ON EACH DEMOLITION PLAN, DOWN TO THE EXISTING ROOF DECK. REMOVALS SHALL INCLUDE ALL BASE FLASHING, METAL FLASHING AND OTHER MATERIALS ASSOCIATED WITH THE ROOF
AND IN ACCORDANCE WITH THE DETAILS.
3. IF ANY PREVIOUSLY-UNIDENTIFIED OR OTHERWISE UNANTICIPATED SUSPECT MATERIAL IS
IDENTIFIED DURING CONSTRUCTION, STOP WORK AND NOTIFY THE OWNER OR THEIR
REPRESENTATIVE FOR FURTHER DIRECTION. UNDER NO CIRCUMSTANCES SHALL THE CONTRACTOR
COLLECT AND/OR ANALYZE BULK SAMPLES OF SUSPECT MATERIALS WITHOUT THE APPROVAL OF
THE VA.
4. THE CONTRACTOR SHALL REPLACE ANY EXISTING FIRESTOPPING WHICH WAS DISLODGED OR
DAMAGED DURING CONSTRUCTION.
5. REMOVE ADHESIVES, ASPHALT, AND OTHER MATERIALS DOWN TO DECK; TO PROVIDE A UNIFORM, EVEN SUBSTRATE IN ACCORDANCE WITH GOOD PRACTICE AND NRCA INDUSTRY STANDINGS.
1. LOCATE AIR TERMINALS AS SHOWN. TAKE CARE TO INSURE THAT ALL POINTS ARE WITHIN 2'-0" OF OUTSIDE BUILDING EDGE, OUTSIDE CORNERS, RIDGE ENDS, AND THAT MAXIMUM SPACING DOES NOT
EXCEED 20'-0", AND THAT MINIMUM PROJECTION ABOVE OBJECT PROTECTED IS 10" (POINTS
PROJECTING 24" MAY BE SPACED AT 25' MAX).
2. MAINTAIN HORIZONTAL OR DOWNWARD COURSING OF MAIN CONDUCTOR AND INSURE THAT ALL
BENDS HAVE AT LEAST AN 8" RADIUS AND DO NOT EXCEED 90°.
3. ATTACH ALL EXPOSED ROOF, DOWN LEAD, AND BONDING CABLES AT 3'-0" ON CENTER MAXIMUM.
VERIFY COMPATIBILITY OF ADHESIVE ON MEMBRANE ROOF APPLICATIONS PRIOR TO INSTALLATION.
4. GROUND ELECTRODES SHALL BE INSTALLED AS SHOWN BUT IN NO INSTANCE SHALL THEY BE LESS THAN 1'-0" BELOW GRADE AND 2'-0" FROM FOUNDATION WALL DRIVEN RODS SHALL PENETRATE
EARTH AT LEAST 10'-0".
5. BOND TO WATER SERVICE AND OTHER PIPING SYSTEMS AS SHOWN AND AS REQUIRED BY CODES.
6. INTERCONNECT LIGHTNING PROTECTION GROUND TO ELECTRIC, TELEPHONE, AND OTHER BUILDING
GROUND SYSTEMS AS SHOWN OR AS REQUIRED BY CODE.
7. SYSTEM SHALL BE INSTALLED AS SHOWN TO INSURE PROPER CODE COMPLIANCE AND SYSTEM
CERTIFICATION. ANY MAJOR VARIANCE SHALL ENTAIL RE-SUBMITTAL AND NEW APPROVAL.
8. "AS-BUILT" DRAWINGS SHALL BE SUBMITTED IN ACCORDANCE WITH CERTIFICATION PROCEDURES.
9. ALL MATERIALS ARE UNDERWRITERS LABORATORIES APPROVED WITH LABELS ON CONDUCTORS AT
10'-0" INTERVALS AND LABELS ON ALL AIR TERMINALS.
GND
PHASE 2
PHASE 1
GRASS STAGING AREA
PORTION OF PARKING LOT
STAGING AREA
24 HOUR EXIT/
ENTRANCE
WORK AREA
POTENTIAL WEEKEND WORK AREA.
COORDINATE AVAILABILITY WITH VA
1 5
24 HOUR EXIT/
ENTRANCE
24 HOUR EXIT/
ENTRANCE
24 HOUR EXIT/
ENTRANCE
24 HOUR EXIT/
ENTRANCE
24 HOUR EXIT/
ENTRANCE
24 HOUR EXIT/
ENTRANCE
24 HOUR EXIT/
ENTRANCE
24 HOUR
EXIT/
ENTRANCE
X
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
GC101
GENERAL PHASING AND STAGING
PLAN SITE
GHR CCW
SCALE: 1" = 100'-0"1
GENERAL PHASING AND STAGING PLAN
N
12. IF ANY MEANS OF EGRESS FROM THE BUILDINGS WILL BE BLOCKED BY THIS PROJECT
PROVIDE TEMPORARY LIFE SAFETY DRAWINGS DETAILING RE-ROUTED EGRESS
ROUTES. BLOCKAGE/OBSTRUCTUION WOULD INCLUDE FALLING DEBRIS AREAS OVER
EXTERIOR DOORWAYS AND FENCING ENCLOSURES THAT PREVENT OCCUPANTS FROM
REACHING A PUBLIC WAY. THIS INCLUDES TOTAL TRACEL DISTANCE, COMMON PATH OF
TRAVEL DISTANCE, DEAD END CORRIDORS, AND EGRESS CAPACITY.
11. THE CONTRACTOR SHALL SHOW THE FOLLOWING
A. WALKWAYS TO BE PROTECTED FROM CONSTRUCTION DAMAGE DURING
CONSTRUCTION AND BE FREE OF ALL DEBRIS FOR SAFE PASSAGE OF PEDESTRIANS
B. LOCATION OF TEMPORARY BARRIER SUCH AS CONES AND SAFETY TAPE
C. METHODS OF PROTECTING THE WALKWAY AND STREET ACCESS
10. THE CONTRACTOR SHALL SUBMIT A WORK PLAN TO THE VA PRIOR TO MOBILIZATION
9. THE CONTRACTOR SHALL SUBMIT THE FOLLOWING AS PART OF THEIR STAGING PLAN;
A. LOCATION OF FENCED AREAS
B. LOCATION AND METHOD OF PROTECTING 24 HOUR EXITS AND ENTRANCES
C. STOOGE CONTAINER LOCATIONS
D. DUMPSTER AND TRASH CHUTE LOCATIONS
E. LOCATION OF WORK AREAS
F. LOCATIONS OF TREE AND VEGETARION PROTECTION
8. ALL ON SITE TEMPORARY FACILITIES WILL BE REVIEWED WITH THE VA PROJECT
ENGINEER PRIOR TO INSTALLATION. MODIFICATIONS TO THIS PLAN MAY OCCUR
PERIODICALLY THROUGHOUT AS PROJECT NEEDS REQUIRE. TEMP CONTROLS TO BE...
7. ENSURE THAT FREE ACCESS FROM THE STRET FOR FIRE HYDRANTS AND THE
SPRINKLER SYSTEM FIRE DEPARTMENT CONNECTION IS MAINTAINED AT ALL TIMES.
ADD NECESSARY GUIDANCE AND DETAILS TO THE DRAWING TO ENSURE TEMPORARY...
6. CONTRACTOR'S VEHICLES SHALL NOT BE IDLING WITHIN 50 FEET OF ANY OUTSIDE AIR
INTAKE.
5. GAS POWERED EQUIPMENT IS NOT PERMITTED ON THIS PROJECT. THIS INCLUDES, BUT
IS NOT LIMITED TO WINCHES, LIFTS, ETC., WHICH SHALL BE ELECTRIC.
4. CONTRACTOR IS TO SUBMIT A STAGING PLAN FOR EACH PHASE AT THE START OF THE
CONSTRUCTION PROJECT (WITHIN 10 CALANDER DAYS OF THE NTP).
3. NOTIFY THE VA IN WRITING OF ALL SHUTDOWNS FOR EQUIPMENT, CELL SERVICE,
RADIO SERVICE, ETC. PER THE GUIDELINES SET FORTH ON THE DRAWINGS AND...
2. CONTRACTOR RESPONSIBLE FOR ALL MEANS AND METHODS,MOVEMENT, OF
MATERIAL,SAFETY PRECAUTIONS, STORAGE AND MAINTENANCE OF EXITS FROM THE
BUILDING.
1. SEE GI002 FOR NOTES AND LEGENDS.
GENERAL NOTES
SYMBOL DESCRIPTION
SYMBOLS AND LEGEND
AREA OF COVERED WALKWAY CANOPIES. REFER TO DRAWING
GI002 FOR CLOSURES, AND SAFETY PROCEDURES.
CONSTRUCTION FENCING AND GATE PER SPEC REQUIRED.
KEYED NOTES
1 PROVIDE COVERED TEMPORARY PROTECTION TO MAINTAIN PATHWAY FROM BUILDING
DURING CONSTRUCTION; REFER TO SECTION 01 35 26 SAFETY REQUIREMENTS.
2 PROTECT THREE (4) WALL LOUVERS AT PENTHOUSE DURING CONSTRUCTION TO LIMIT
ODORS INTO THE BUILDING.
3 PROTECT ONE (1) WALL LOUVER AT PENTHOUSE DURING CONSTRUCTION. 10' WIDE MIN
TO LIMIT ODORS INTO THE BUILDING.
4 WALKWAY BETWEEN FENCE AND BUILDING FOR EGRESS.
5 PROTECT EXIT/ENTRANCE BASEMENT AS PER KEY NOTE 1
6 PROTECT EXIT/ENTRANCE FROM FIRST FLOOR AS PER KEY NOTE 1. THIS INCLUDES
ENTRANCE ROOF AND A MINIMUM OF 12' FROM EDGE OF EX. ROOF
7 PROTECT TREES
8 LIMITED CLEARANCE
9 POTENTIAL LAY DOWN AREA
10 POTENTIAL CRANE LOCATION
11 POTENTIAL WORK AREA
12 THE BUILDING 4 EAST SIDE EXTERIOR COVERED AREA IS ABOVE THE TUNNEL AND
CANNOT SUPPORT VEHICLES/ACTIVITIES PROVIDE TEMPORARY FENCING TO PREVENT
VEHICLES IN THIS AREA
13 LOADING DOCK ACCESS TO REMAIN
14 PICNIC SITTING AREA TO REMAIN & BE PROTECTED
COVERED 24-HOUR ENTRANCE/EXIT.
A D
M A
T C
H
LI
E
96' - 0" 44' - 1"
42' - 1" 43' - 11" 40' - 9"90' - 6"
9'
0"
AD202
AD203
AD201
EXISTING ROOF
TO REMAIN
SLOPE
GUTTER
EXISTING
WALL
MOUNTED
LADDER
EXISTING WALL
MOUNTED LADDER
S
LO
P E
SLOPE
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
SLOPESLOPE
S
LO
P E
S
LO
P E
HP
HP
RD6 RD8
RD7 RD9
RD5
RD1
WV
DS
DS
RD2
RD3
RD10 RD12
RD11
WV
RD4
WV
WV
5 5
LP LP
5 5
HP
LP
LP
WV
WV
RTU A27
WV
LP
LP
WV
WV
EXISTING STAIRS
EQUIPMENT PLATFORMS
TO REMAIN
EQUIPMENT PLATFORMS
TO REMAIN
FAN UNIT
RD13
1 6
WV
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD502
AD503
AD503
AD502
HIGH
LOW
HIGH
HIGH
AD502
AD502
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD101
ARCHITECTURAL DEMOLITION PLAN -
BLDG 4 WEST ROOF 4
DJS CCW
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"1
ARCHITECTURAL DEMOLITION PLAN - BLDG 4 WEST ROOF
KEYPLAN
N
2. THE CONTRACTOR IS TO PERFORM WORK SO AS NOT TO VOID THE WARRANTY OF THE
EXISTING ROOFING SYSTEMS TO REMAIN.
1. SEE GI002 FOR GI-SERIES NOTES AND LEGENDS.
GENERAL NOTES
N
KEYED NOTES
1 REMOVE WOOD BLOCKING, ALUMINUM COPING, FASCIA, AND PARAPET FLASHING.
2 GUARDRAILS TO REMAIN.
3 REMOVE WOOD STAIRS; REFER TO DETAIL 10/AD502.
4 REMOVE EXISTING CONDUIT AND PIPING SUPPORTS DURING ROOFING REMOVAL.
TEMPORARY SUPPORTS WILL BE REQUIRED DURING THE CONSTRUCTION PROCESS
PRIOR TO THE ROOF REPLACEMENT; REFER TO DETAILS 1/AD503, 2/AD503, AND 3/AD503.
5 REMOVE ROOF DRAIN; REFER TO DETAIL 2/AD501.
6 REMOVE BALLAST, BUILT-UP ROOFING, AND INSULATION DOWN TO EXISTING
CONCRETE DECK; REFER TO DETAIL 7/AD501.
7 REMOVE FLASHING AT WASTE VENTS; REFER TO DETAIL 8/AD502.
8 REMOVE REGLET FLASHING AT BASE OF WALL. REFER TO DETAIL 6/AD501.
9 REMOVE PITCH CURB. PROVIDE TEMPORARY PROTECTION DURING ROOF
CONSTRUCTION. REFER TO DETAIL 11/AD501.
10 REMOVE FLASHING AT THE BASE OF PIPE COLUMNS SUPPORTING THE EQUIPMENT
PLATFORMS; REFER TO DETAIL 9/AD501.
11 HVAC OUTLINE ON ROOF.
12 REMOVE 12" x 24" CONCRETE SPLASH BLOCKS.
13 REMOVE FLASHING AT DUCT SUPPORTS TO ROOF; REFER TO DETAIL 11/AD501.
14 REMOVE WOOD BLOCKING, FLASHING, AND EXPANSION JOINT; REFER TO DETAIL
7/AD502.
16 REMOVE ROOF HATCH. PROTECT OPENING PRIOR TO CONCRETE INFILL; REFER TO
DETAIL 5/AD502.
17 REMOVE GUTTERS AND FASCIA BELOW, INCLUDING DOWNSPOUTS; REFER TO DETAIL
4/AD502.
18 REMOVE BALLAST, BUILT-UP ROOFING, AND INSULATION DOWN TO EXISTING
CONCRETE DECK; REFER TO DETAIL 7/AD501.
19 REMOVE FLASHING AT FLUE VENT PIPE; REFER TO DETAIL 6/AD502.
20 REMOVE PITCH POCKETS FROM ELECTRICAL CONDUITS; REFER TO DETAIL 10/AD501.
21 REMOVE, STORE, AND REINSTALL WEIGHTED GUARDRAIL SYSTEM AND GATE AT
EXISTING ROOF LADDERS.
22 REMOVE CURB FLASHING FROM RAIL CURBS. ALUMINUM COPING AND CURBS TO
REMAIN; REFER TO DETAIL 5/AD501.
A D
M A
T C
H
LI
25' - 11 3/8" 36' - 5 5/8" 44' - 1" 96' - 0"
/2
42' - 1" 90' - 6"18' - 7" 40' - 9" 43' - 11"
9'
0"
AD202
AD203
AD201
SLOPE
SLOPE
GUTTER
S
LO
P E
EXISTING WALL
MOUNTED LADDER
EXISTING WALL MOUNTED LADDER
HP
HP
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
RD18 RD19
RD23
RD22
WV
WV
DS
DS
RD20RD17
RD24
WV
WV
RD16RD15
RD14
WV
WV
WV
WV
RD25 2 2
LP
LP
LP
HP
LP
CONDUITS ARE INSTALLED OVER
EXISTING EXPANSION JOINT
WV WV
WV
RTU A34 VENT THROUGH ROOF
RTU A33 VENT
THROUGH ROOF
WV
WVWV
RTU A35 VENT THROUGH ROOF
DUCT CURB
LP
LP
WV
DUCT WORK
ABOVE ROOF
DUCT WORK ABOVE ROOF
WV
DUCT WORK ABOVE ROOF
DUCT WORK ABOVE ROOF
DUCT WORK
ABOVE ROOF
WV
SLOPESLOPE
7 10
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD502
AD502
AD503
AD503
AD502
LOW
HIGH
AD502
LOW
AD501
LOW
AD502
LOW
LOW
AD502
R T
U A
RTU A27
R T
U A
RTU A34 VENT
THROUGH ROOF
AD502
AD502
RTU A33
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD102
ARCHITECTURAL DEMOLITION PLAN -
BLDG 4 EAST ROOF 4
GHR CCW
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"1
ARCHITECTURAL DEMOLITION PLAN - BLDG 4 EAST ROOF
KEYPLAN
N
N
2. THE CONTRACTOR IS TO PERFORM WORK SO AS NOT TO VOID THE WARRANTY OF THE
EXISTING ROOFING SYSTEMS TO REMAIN.
1. SEE GI002 FOR NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 REMOVE WOOD BLOCKING, ALUMINUM COPING, FASCIA, AND PARAPET FLASHING.
2 GUARDRAILS TO REMAIN.
3 REMOVE WOOD STAIRS; REFER TO DETAIL 10/AD502.
4 REMOVE EXISTING CONDUIT AND PIPING SUPPORTS DURING ROOFING REMOVAL.
TEMPORARY SUPPORTS WILL BE REQUIRED DURING THE CONSTRUCTION PROCESS
PRIOR TO THE ROOF REPLACEMENT; REFER TO DETAILS 1/AD503, 2/AD503, AND 3/AD503.
5 REMOVE ROOF DRAIN; REFER TO DETAIL 2/AD501.
6 REMOVE BALLAST, BUILT-UP ROOFING, AND INSULATION DOWN TO EXISTING
CONCRETE DECK; REFER TO DETAIL 7/AD501.
7 REMOVE FLASHING AT WASTE VENTS; REFER TO DETAIL 8/AD502
8 REMOVE REGLET FLASHING AT BASE OF WALL. REFER TO DETAIL 6/AD501.
9 REMOVE TEMPORARY PITCH CURB. PROVIDE TEMPORARY PROTECTION DURING ROOF
CONSTRUCTION. REFER TO DETAIL 11/AD501.
10 REMOVE ROOF CRICKETS.
11 REMOVE CURB FLASHING AT HVAC EQUIPMENT. THE ROOF CURBS ARE TO REMAIN;
REFER TO DETAIL 1/AD501.
12 REMOVE FLASHING AT THE BASE OF PIPE COLUMNS SUPPORTING THE EQUIPMENT
PLATFORMS. REFER TO DETAIL 9/AD501.
13 HVAC OUTLINE ON ROOF.
14 REMOVE FLASHING AT DUCT SUPPORTS TO ROOF; REFER TO DETAIL 11/AD501.
15 REMOVE WOOD BLOCKING, FLASHING, AND EXPANSION JOINT; REFER TO DETAIL
7/AD502.
16 REMOVE GUTTERS AND FASCIA BELOW, INCLUDING DOWNSPOUTS; REFER TO DETAIL
4/AD502.
17 REMOVE 12" x 24" CONCRETE SPLASH BLOCKS.
18 REMOVE CURB FLASHING FROM RAIL CURBS. ALUMINUM COPING AND CURBS TO
REMAIN; REFER TO DETAIL 5/AD501.
19 REMOVE, STORE, AND REINSTALL WEIGHTED GUARDRAIL SYSTEM AND GATE AT
EXISTING ROOF LADDERS.
62' - 1 1/2" 35' - 9" 62' - 1 1/2"
30' - 0" 100' - 0" 30' - 0"
AD204
AD204
AD205
AD205
WV31
S
LO
P E S
LO
P
E
S
LO
P E
SLOPE
SLOPE
S
LO
P E S
LO
P
E
WV
WV
WV
SLOPE 8 SLOPE
5 5
14 14
1 10
1311 2
WV WV
8 1 10
WV25
1"
5'
9"
62' - 1 1/2" 35' - 9" 62' - 1 1/2"
160' - 0"
4'
0"
4'
0"
6 6
EXISTING WALL
MOUNTED LADDER
160' - 0"
4'
0"
WEATHER
VANE POLE
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
AD503
HIGH
HIGH
HIGH
AD503
HIGH
RD3
RD4
RD5
RD7
11 13 11 13 11 13
11 13
RD9 RD8
RD6RD2
RD1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD103
ARCHITECTURAL DEMOLITION PLAN -
BLDG 22 ROOF 22
GHR CCW
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1
ARCHITECTURAL DEMOLITION PLAN - BLDG 22 ROOF
KEYPLAN
N
N
3. THE CONTRACTOR IS TO PERFORM WORK SO AS NOT TO VOID THE WARRANTY OF THE
EXISTING ROOFING SYSTEMS TO REMAIN.
2. GAS LINE TO HVAC UNITS AT EACH UNIT, VERIFY LOCATION IN FEILD.
1. SEE GI002 FOR NOTES AND LEGENDS.
GENERAL NOTES
KEYED NOTES
1 REMOVE WOOD BLOCKING, ALUMINUM COPING, FASCIA, AND PARAPET FLASHING.
REFER TO DETAIL 5/AD503.
2 REMOVE MEMBRANE ROOFING, AND INSULATION DOWN TO CONCRETE DECK; REFER
TO DETAIL 13/AD501.
3 REMOVE TEMPORARY BLOCKING UNDER A/C UNITS. PROVIDE TEMPORARY ROOF CURB
DURING ROOF RECONSTRUCTION.
4 REMOVE EXISTING CONDUIT AND PIPING SUPPORTS DURING ROOFING REMOVAL.
TEMPORARY SUPPORTS WILL BE REQUIRED DURING THE CONSTRUCTION PROCESS
PRIOR TO THE ROOF REPLACEMENT; REFER TO DETAILS 1/AD503, 2/AD503, AND 3/AD503.
5 REMOVE ROOF DRAIN; REFER TO DETAIL 2/AD501.
6 REMOVE BALLAST, MEMBRANE ROOFING, AND INSULATION DOWN TO EXISTING
CONCRETE DECK; REFER TO DETAIL 7/AD501.
7 REMOVE FLASHING AT WASTE VENTS. REFER TO DETAIL 4/AD502.
8 REMOVE REGLET FLASHING AT BASE OF WALLS. REFER TO DETAIL 6/AD501.
9 REMOVE TEMPORARY PITCH CURB. PROVIDE TEMPORARY PROTECTION DURING ROOF
CONSTRUCTION. REFER TO DETAIL 11/AD501.
10 REMOVE ROOF CRICKETS.
11 REMOVE CURB FLASHING AT HVAC EQUIPMENT. THE ROOF CURBS ARE TO REMAIN.
REFER TO DETAIL 1/AD501.
12 REMOVE ROOF WALKWAY RUNNERS. REFER TO DETAIL 13/AD501.
13 HVAC OUTLINE ON ROOF.
14 REMOVE SCUPPER FLASHING. REFER TO DETAIL 8/AD501.
15 REMOVE CURB FLASHING AT FAN UNIT. REFER TO DETAIL 11/AD502.
SECOND FLOOR - BLDG 4
LOW POINT ROOF SLAB - BLDG 4
A D
M A
T C
H
LI
N E
FIRST FLOOR
BASEMENT FLOOR - BLDG 4
ELEVATION 112.46'
ELEVATION 123.00'
ELEVATION 134.50'
/2
/2
LOW POINT PENTHOUSE ROOF SLAB - BLDG 4
/1 AD101
1 1
ADDITION BY OTHERS
APPROXIMATE FINISHED
GRADE ELEVATION 121.50'
3 3
SECOND FLOOR - BLDG 4
LOW POINT ROOF SLAB - BLDG 4
A D
M A
T C
H
LI
N E
FIRST FLOOR
BASEMENT FLOOR - BLDG 4
ELEVATION 112.46'
ELEVATION 123.00'
ELEVATION 134.50'
/2
/2
LOW POINT PENTHOUSE ROOF SLAB - BLDG 4
/1 AD102
APPROXIMATE FINISHED
GRADE ELEVATION 121.50'
1 1
3 2
SCALE: 1/8" = 1'-0"1
ARCHITECTURAL DEMOLITION NORTH ELEVATIONS - BLDG 4 (WEST SIDE)
SCALE: 1/8" = 1'-0"2
ARCHITECTURAL DEMOLITION NORTH ELEVATIONS - BLDG 4 (EAST SIDE)
N
KEYPLAN
(BUILDING 4)
AD202
1,2
AD201
1,2
AD203
AD203
UNIT C UNIT B
UNIT
A
2. REFER TO REMOVAL DRAWINGS AD101 AND AD102 FOR REMOVALS.
1. SEE GI002 FOR NOTES AND LEGENDS.
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD201
ARCHITECTURAL DEMOLITION NORTH
ELEVATIONS - BLDG 4 4
GHR CCW
FULLY SPRINKLERED
KEYED NOTES
1 EXISTING GUARDRAILS TO REMAIN.
2 REMOVE, STORE, AND REINSTALL WEIGHTED GUARDRAIL SYSTEM AND GATE AT
EXISTING ROOF LADDERS.
3 REMOVE ALUMINUM COPING AND WOOD BLOCKING AT ROOF EDGE.
0-BASEMENT FL-working view 4
1-FIRST FL-working view 4
SECOND FLOOR - BLDG 4
LOW POINT ROOF SLAB - BLDG 4
A D
M A
T C
H
LI
N E
FIRST FLOOR
BASEMENT FLOOR - BLDG 4
LOW POINT PENTHOUSE ROOF SLAB - BLDG 4
/2
/2
/1 AD101
APPROXIMATE FINISHED
GRADE ELEVATION 121.50'
ADDITION BY OTHERS
ELEVATION 112.46'
ELEVATION 123.00'
ELEVATION 134.50'
SECOND FLOOR - BLDG 4
LOW POINT ROOF SLAB - BLDG 4
A D
M A
T C
H
LI
N E
FIRST FLOOR
BASEMENT FLOOR - BLDG 4
LOW POINT PENTHOUSE ROOF SLAB - BLDG 4
/2
/2
/1 AD102
APPROXIMATE FINISHED
GRADE ELEVATION 121.50'
2 1 1
ELEVATION 112.46'
ELEVATION 123.00'
ELEVATION 134.50'
3 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD202
ARCHITECTURAL DEMOLITION SOUTH
ELEVATIONS - BLDG 4 4
GHR CCW
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1
ARCHITECTURAL DEMOLITION SOUTH ELEVATIONS - BLDG 4 (WEST SIDE)
SCALE: 1/8" = 1'-0"2
ARCHITECTURAL DEMOLITION SOUTH ELEVATIONS - BLDG 4 (EAST SIDE)
2. REFER TO REMOVAL DRAWINGS AD101 AND AD102 FOR REMOVALS.
1. SEE GI002 FOR NOTES AND LEGENDS.
GENERAL NOTES
N
KEYPLAN
(BUILDING 4)
AD202
1,2
AD201
1,2
AD203
AD203
UNIT C UNIT B
UNIT
A
KEYED NOTES
1 EXISTING GUARDRAILS TO REMAIN.
2 REMOVE, STORE, AND REINSTALL WEIGHTED GUARDRAIL SYSTEM AND GATE AT
EXISTING ROOF LADDERS.
SECOND FLOOR - BLDG 4
LOW POINT ROOF SLAB - BLDG 4
FIRST FLOOR
BASEMENT FLOOR - BLDG 4
LOW POINT PENTHOUSE ROOF SLAB - BLDG 4
/2
/2
/1 AD101
APPROXIMATE FINISHED
GRADE ELEVATION 121.50'
1 1
ELEVATION 112.46'
ELEVATION 123.00'
ELEVATION 134.50'
23 3
SECOND FLOOR - BLDG 4
LOW POINT ROOF SLAB - BLDG 4
FIRST FLOOR
BASEMENT FLOOR - BLDG 4
LOW POINT PENTHOUSE ROOF SLAB - BLDG 4
/2
/2
/1 AD102
APPROXIMATE FINISHED
GRADE ELEVATION 121.50'
ELEVATION 112.46'
ELEVATION 123.00'
ELEVATION 134.50'
3 3
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD203
ARCHITECTURAL DEMOLITION WEST
AND EAST ELEVATIONS - BLDG 4 4
GHR CCW
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1
ARCHITECTURAL DEMOLITION WEST ELEVATION - BLDG 4
SCALE: 1/8" = 1'-0"2
ARCHITECTURAL DEMOLITION EAST ELEVATION - BLDG 4
2. REFER TO REMOVAL DRAWINGS AD101 AND AD102 FOR REMOVALS
1. SEE GI002 FOR NOTES AND LEGENDS.
GENERAL NOTES
N
KEYPLAN
(BUILDING 4)
AD202
1,2
AD201
1,2
AD203
AD203
UNIT C UNIT B
UNIT
A
KEYED NOTES
1 EXISTING GUARDRAILS TO REMAIN.
2 REMOVE, STORE, AND REINSTALL WEIGHTED GUARDRAIL SYSTEM AND GATE AT
EXISTING ROOF LADDERS.
FIRST FLOOR - BLDG 22
LOW POINT PENT HOUSE ROOF SLAB - BLDG 22
HIGH POINT POINT ROOF SLAB - BLDG 22
LOW POINT PENTHOUSE ROOF SLAB - BLDG 22
SECOND FLOOR - BLDG 22
9'
/4
3'
8"
/1 AD103
APPROXIMATE FINISHED GRADE
2 1
FIRST FLOOR - BLDG 22
LOW POINT PENT HOUSE ROOF SLAB - BLDG 22
HIGH POINT POINT ROOF SLAB - BLDG 22
LOW POINT PENTHOUSE ROOF SLAB - BLDG 22
SECOND FLOOR - BLDG 22
3'
8" 9'
/4
/1 AD103
APPROXIMATE FINISHED GRADE
2 2
2 1
1 2 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD204
ARCHITECTURAL DEMOLITION NORTH
AND SOUTH ELEVATION - BLDG 22 22
GHR CCW
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1
ARCHITECTURAL DEMOLTION WEST ELEVATION - BLDG 22
SCALE: 1/8" = 1'-0"2
ARCHITECTURAL DEMOLTION EAST ELEVATION - BLDG 22
KEYPLAN
(BUILDING 22)
AD204
AD204
AD205
AD205
N
2. REFER TO REMOVAL DRAWING AD103 FOR REMOVALS
1. SEE GI002 FOR NOTES AND LEGENDS
GENERAL NOTES
KEYED NOTES
1 REMOVE, STORE, AND REINSTALL COPPER WASTE PIPE COVERS (2) PIECES EACH
2 REMOVE ALUMINUM COPING AND WOOD BLOCKING AT ROOF EDGE
FIRST FLOOR - BLDG 22
ELEVATION 123.00'
ELEVATION 112.00'
LOW POINT PENT HOUSE ROOF SLAB - BLDG 22
HIGH POINT POINT ROOF SLAB - BLDG 22
LOW POINT PENTHOUSE ROOF SLAB - BLDG 22
SECOND FLOOR - BLDG 22
9'
/4
3'
8"
/1 AD103
APPROXIMATE FINISHED GRADE
2 2
FIRST FLOOR - BLDG 22
ELEVATION 123.00'
ELEVATION 112.00'
LOW POINT PENT HOUSE ROOF SLAB - BLDG 22
HIGH POINT POINT ROOF SLAB - BLDG 22
LOW POINT PENTHOUSE ROOF SLAB - BLDG 22
SECOND FLOOR - BLDG 22
3'
8" 9'
/4
/1 AD103
APPROXIMATE FINISHED GRADE
2 1 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD205
ARCHITECTURAL DEMOLITION WEST
AND EAST ELEVATIONS - BLDG 22 22
GHR CCW
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"1
ARCHITECTURAL DEMOLTION SOUTH ELEVATION - BLDG 22
SCALE: 1/8" = 1'-0"2
ARCHITECTURAL DEMOLTION NORTH ELEVATION - BLDG 22
2. REFFER TO REMOVAL DRAWING AD103 FOR REMOVALS
1. SEE GI002 FOR NOTES AND LEGENDS.
GENERAL NOTES
KEYPLAN
(BUILDING 22)
AD204
AD204
AD205
AD205
N
KEYED NOTES
1 REMOVE, STORE, AND REINSTALL WEIGHTED GUARDRAIL SYSTEM AND GATE AT ROOF
EXISTING LADDERS
2 REMOVE ALUMINUM COPING AND WOOD BLOCKING AT ROOF EDGE
EXISTING CAST IRON DRAIN BOWL
AND LEADER PIPE TO REMAIN
REMOVE
STRAINER AND
DRAIN
REMOVE ROOFING AND
INSULATION DOWN TO THE
CONCRETE DECK TYP
REFER TO ROOF PLANS
FOR DRAIN DIAMETERS
REMOVE WOOD
BLOCKING, ALUMINUM
COPING AND EDGE
FLASHING
REMOVE ROOFING AND INSULATION
DOWN TO CONCRETE DECK
EXISTING CONCRETE DECK
1'-0"
REMOVE FLASHING BOX
OR FLASHING AS
REQUIRED
REMOVE FLANGED CABLE
PENETRATION FLASHING
CONDUIT TO REMAIN
REMOVE CONTINUOUS
BACKER ROD AND SEALANT
REMOVE SURFACE MOUNTED
REGLET RECEIVER
REMOVE ALUMINUM SPRING
LOCK FLASHING PIECE
REMOVE SEALANT,
COUNTERFLASHING
AND FLASHING
EXISTING WALL
REMOVE REINFORCED
FLASHING MEMBRANE
EXISTING BRICK
EXISTING FLAT CONCRETE
DECK TO REMAIN
REMOVE ROOFING AND INSULATION
DOWN TO CONCRETE DECK
REMOVE STONE BALLAST
1/8"/ FT
SLOPE
REMOVE SCUPPER
SECTION A-A
A
A
EXISTING CONCRETE DECK
SLOPE
8" BLOCK
4" BRICK
REMOVE ALUMINUM WALL CAP
REMOVE WOOD BLOCKING
REMOVE ROOF SYSTEM
2"
REMOVE SCUPPER
8" 1'-1"
EXISTING SLOPED
CONCRETE DECK TO REMAIN
REMOVE ROOFING AND INSULATION
DOWN TO CONCRETE DECK1/8"/ FT
SLOPE
REMOVE FLASHING
EXISTING STRUCTURAL PIPE
OR I-BEAM SUPPORT, FIELD
VERIFY
UPPER PLATFORM FRAMING
ROOF SYSTEM AS SPECIFIED
EXISTING SLOPED
CONCRETE DECK TO REMAIN
REMOVE ROOFING AND INSULATION
DOWN TO CONCRETE DECK
RTU TO REMAIN
REMOVE FLASHING
FLASHING AT RTU CURBS MAY VARY (VIF)
REMOVE FLASHING
INSULATED METAL
CURB TO REMAIN
WOOD NAILER
EXISTING CONCRETE DECK REMOVE EXISTING ROOF
SYSTEM AND INSULATION
/1 AD102
/1 AD102
/1 AD101
/1 AD103
REMOVE ROOF SYSTEM TYP EXISTING CONCRETE DECK
REMOVE ROOF SYSTEM
DOWN TO CONCRETE DECK
WOOD BLOCKING TO REMAIN
REMOVE FLASHING
METAL CAP
WOOD BLOCKING TO REMAIN
NEOPRENE PAD
HVAC UNIT; TO REMAINALUMINUM CAP TO REMAIN
3" 2"
1'
0"
1/ 2"
/1 AD102
/1 AD101
/1 AD101
/1 AD102 /1 AD102
/1 AD101
/1 AD103
EXISTING CONCRETE DECK
ELEVATE POURABLE SEALER
CUT PVC PIPE
PENETRATION POCKET
TPO QUICKPRIME
TPO MEMBRANE ADHESIVE
INSULATION AND ROOF
SYSTEM PER SCHEDULE
NUMBER OF PIPES AND CONDUITS VARIES
SIZE VARIES
/1 AD101
/1 AD101
/1 AD103
REMOVE WALK WAY RUNNER
EXISTING STEEL TUBE SUPPORT;
SIZES VARY FROM 2"X2" TO 4"X4"
REMOVE INSULATION
AND ROOF SYSTEM
EXISTING CONCRETE DECK
REMOVE ELEVATE POURABLE SEALER
REMOVE PENETRATION POCKET
STEEL PLATE
/1 AD102
/1 AD101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD501
ARCHITECTURAL DEMOLITION ROOF
REMOVAL DETAILS 4, 22
GHR CCW
FULLY SPRINKLERED
SCALE: NTS1
ROOF SYSTEM AND INSULATION REMOVAL DETAIL
SCALE: 1" = 1'-0"2
RETROFIT ROOF DRAIN REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"3
TYP COPING REMOVAL DETAIL
SCALE: 1" = 1'-0"4
TYP CONDUIT / CABLE PENETRATION DETAIL
SCALE: 1 1/2" = 1'-0"5
HVAC EQUIPMENT CURB REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"6
COUNTERFLASHING REMOVAL DETAILS
SCALE: NTS7
ROOF ASSEMBLY REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"8
TYP SCUPPER REMOVAL DETAIL
SCALE: NTS12
TYP ROOF ASSEMBLY REMOVAL DETAIL
SCALE: NTS10
PENETRATION WITH QUICKSEAM 6" PENETRATION POCKET
SCALE: 1" = 1'-0"9
TYP STRUCTURAL PLATFORM SUPPORT PENETRATION REMOVAL DETAIL
SCALE: NTS13
ROOF ASSEMBLY REMOVAL DETAIL
SCALE: NTS11
PENETRATION WITH QUICKSEAM 8" PENETRATION POCKET REMOVAL
1. SEE GI002 FOR NOTES AND LEGENDS.
GENERAL NOTES
REMOVE ROOF AND INSULATION SYSTEM
EXISTING CONCRETE DECK
1'-6"
2" 8"8"
REMOVE EXPANSION JOINT AND METAL COPING
REMOVE FLASHING
REMOVE WOOD BLOCKING
2" 3"
EXISTING BLOCK TO REMAIN
REMOVE FLASHING TYP
1'-0"
EXISTING WALL
V A
R
IE
S
EXISTING CONCRETE SLAB
REMOVE ROOD MEMBRANE,
INSULATION, AND BALLAST
REMOVE WOOD BLOCKING
REMOVE ALUMINUM COPING
REMOVE PARAPET FLASHING
EXISTING CONCRETE SLAB
EXISTING 2"x12" ROOF
CURB TO REMAIN
RTU UNIT
REMOVE FLASHING REMOVE ROOF MEMBRANE,
INSULATION, AND BALLAST
REMOVE 2"x6" WOOD BLOCKING
BRACKET ATTACHED
TO WALL
GUARDRAIL TO REMAIN
REMOVE METAL COPING AND WOOD BLOCKING
REMOVE FLASHING
REMOVE ROOF MEMBRANE,
INSULATION, AND BALLAST
4" 8"
2" 3"
REMOVE FLASHING TYP
PIPE OR FLUE VENT TO REMAIN
REMOVE ROOFING AND INSULATION
EXISTING CONCRETE DECKROUND PENETRATION
REMOVE FLASHING
CONCRETE
DECK
REMOVE ROOF
SYSTEM DOWN
TO CONC DECK
VENT STACK TO REMAIN
2"
REMOVE (2) PC
COPPER VENT BOOT;
TOP IS REMOVABLE
FOR MAINTENANCE
3"
REMOVE EXPANSION JOINT
REMOVE ALUMINUM COPING
REMOVE WOOD BLOCKING
EXISTING 12" BLOCK BEYOND
8"2"1'-0"
EXISTING 8" BLOCK TO REMAIN
REMOVE ROOF COVERING AND HATCH
REMOVE FLASHING OVER HATCH
REMOVE DORMANT ROOF HATCH AND CURB
2" 3"
REMOVE MEMBRANE
ROOF AND INSULATION
EXISTING CONCRETE DECK
EXHAUST ROOF
FAN TO REMAIN
REMOVE STONE
BALLAST
CURB TO
REMAIN
EXISTING CONCRETE DECK
EXISTING
4" BRICK
EXISTING
8" CMU
REMOVE
COPINGREMOVE WOOD COPING
REMOVE FLASHING
REMOVE ROOF AND
INSULATION
H E
IG
H
T V
A R
IE
S
EXISTING CONCRETE DECK
1/8"/ FT
SLOPE
1/8"/ FT
SLOPE
REMOVE ROOF SYSTEM,
INSULATION, AND BALLAST ROOF HIGH POINT
ELEVATION
11" 3' - 4" 11"
1'
4"
REMOVE WOOD
CONSTRUCTION AT
LANDING AND STAIRS
STRINGER BEYOND TYP
REMOVE ROOF SYSTEM
DOWN TO CONCRETE DECK
EXISTING CONCRETE DECK
REFER TO EXPANSION JOINT DETAIL
7/AD502 FOR REMOVAL DESCRIPTION
MASONRY TO REMAIN
/1 AD102
/1 AD101
REMOVE WOOD BLOCKING
REMOVE FLASHING
REMOVE GUTTER
AND DOWNSPOUT
BRICK
CMU
REMOVE FLASHING BELOW GUTTER
/1 AD102
/1 AD101
/1 AD101
/1 AD102
/1 AD101
/1 AD102
/1 AD101 /1 AD101
/1 AD102
/1 AD101
/1 AD102
/1 AD101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD502
ARCHITECTURAL DEMOLITION ROOF
REMOVAL DETAILS 4, 22
GHR CCW
FULLY SPRINKLERED
SCALE: 1" = 1'-0"10
WOOD STAIR REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"4
GUTTER REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"7
EXPANSION JOINT REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"1
TYP PARAPET WALL REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"2
TYP FLASHING REMOVAL AT RTU DETAIL
SCALE: 1 1/2" = 1'-0"3
TYP GUARDRAIL REMOVAL DETAIL
SCALE: NTS6
FLASHING AT PIPE OR FLUE VENT PENETRATION REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"8
ROOF VENT FLASHING REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"9
EXPANSION JOINT DETAIL
SCALE: 1 1/2" = 1'-0"5
ROOF HATCH REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"11
TYP EXHAUST FAN FLASHING REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"12
TYP ROOF AND FLASHING REMOVAL DETAIL
SCALE: 3" = 1'-0"13
RIDGE REMOVAL DETAIL
1. SEE GI002 FOR NOTES AND LEGENDS.
A A
ROLLER IN MINIMUM
POSITION
7/16-14 THREAD
REMOVE ROOF PIPE SUPPORTS. DIMENSIONS
VARY. PIPES NOT SHOWN FOR CLARITY
ELEVATION SECTION A-A
A A
ELEVATIONSECTION A-A
ISOMETRICPLAN REMOVE ROOF CONDUIT
SUPPORTS. DIMENSIONS VARY.
CONDUIT NOT SHOWN FOR
CLARITY
A A
ELEVATIONSECTION A-A ISOMETRIC
REMOVE ROOF PIPE SUPPORTS.
DIMENSIONS VARY. PIPE NOT
SHOWN FOR CLARITY
NOTE:
CONSULT THE ROOFING SYSTEM MANUFACTURER FOR APPROVED PAVERS.
EXISTING CONCRETE DECK
ROOF
REMOVE EPDM ROOF PAVERS
2"
REMOVE ROOF SYSTEM
REMOVE WOOD BLOCKING
REMOVE ALUMINUM COPING REMOVE ROOF MEMBRANE,
INSULATION, AND BALLAST
EXISTING
BRICK TO
REMAIN
EXISTING CONCRETE
STRUCTURE TO REMAIN
REMOVE ROOF SYSTEM
EXISTING
CONCRETE DECK
REMOVE CAP AND
WOOD BLOCKING
BRICK
8" BLOCK
/1 AD102
/1 AD101
/1 AD103
/1 AD102
/1 AD101
/1 AD103
REMOVE ROOF PIPE SUPPORTS.
DIMENSIONS VARY. PIPES NOT
SHOWN FOR CLARITY
/1 AD102
/1 AD101
/1 AD103
/1 AD103 /1 AD101
/1 AD102
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21
AD503
ARCHITECTURAL DEMOLITION ROOF
REMOVAL DETAILS 4, 22
GHR CCW
FULLY SPRINKLERED
SCALE: NTS1
ROOF PIPE SUPPORTS REMOVAL DETAIL
SCALE: NTS3
ROOF CONDUIT SUPPORTS REMOVAL DETAIL
SCALE: NTS2
ROOF PIPE SUPPORTS REMOVAL DETAIL
SCALE: 1" = 1'-0"4
TYP ROOF PAVER REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"5
ROOF EDGE REMOVAL DETAIL
SCALE: 1 1/2" = 1'-0"6
FASCIA DETAIL
1. SEE GI002 FOR NOTES AND LEGENDS.
A -1
M A
T C
H
LI
WV
AHU
RD12
RTU A27
RD5
RD1 RD3
RD9
RD7
RD6
WV
WV
WV
WV
WV WV
WV
WV
RD13
EXISTING ROOF
TO REMAIN
SLOPE
GUTTER
EXISTING WALL
MOUNTED
LADDER
EXISTING WALL
MOUNTED LADDER
S
LO
P E
SLOPE
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
S
LO
P E
SLOPESLOPE
S
LO
P E
S
LO
P E
HP
HP
LP LP
HP
LP
LP
LP
LP
EXISTING STAIRS
EQUIPMENT PLATFORMS
TO REMAIN
EQUIPMENT
PLATFORMS TO
REMAIN
96' - 0" 44' - 1" 36' - 6 1/2" 25' - 10 1/2"
42' - 1" 43' - 11" 40' - 9"90' - 6"
9'
0"
1 1
1 1
161616
15 15
WV
EXISTING ROOF
TO REMAIN
S
LO
P E
3'
3"
/2
/2
WV
RD11
RD10
RD2
RD8
A-504
RD4
20 21
20 21
20 21
15' - 0"
15' - 0"
15' - 0"
A-504
SIM
A-502
A-502
A-502
A-502
A-501
A-502
A-502
A-504
A-504
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved: Project Director
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10 on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
REV 0 - FINAL BID CONSTRUCTION DOCUMENTS 2023-09-21
FINAL BID CONSTRUCTION
DOCUMENTS
A/E ROOF REPLACEMENT BUILDING
4 AND 22
940 BELMONT STREET
BROCKTON, MA 02301
523A5-22-001
2023-09-21 A-101
ARCHITECTURAL PLAN - BLDG 4 WEST
ROOF 4
GHR CCW
FULLY SPRINKLERED
SCALE: 3/32" = 1'-0"1
ARCHITECTURAL PLAN - BLDG 4 WEST ROOF
KEYPLAN
N
N
6. CONTRACTOR TO VERIFY ROOF DRAIN SIZES IN FIELD.
5. ROOF SYSTEM CONTINUES BELOW ROOFTOP DUCTWORK AND EQUIPMENT
PLATFORMS. THE DUCTWORK IS ELEVATED OFF THE ROOF AND IS SUPPORTED BY
STANTIONS ATTACHED TO THE ROOF DECK. CONTRACTOR SHALL VERIFY QUANTITY IN
FIELD AND IS RESPONSIBLE FOR FLASHING THESE INTO THE NEW ROOF.
4. THE CONTRACTOR IS TO PREFORM WORK SO AS NOT TO VOID THE WARRANTY OF THE
EXISTING ROOFING SYSTEM TO REMAIN.
3. GUARDRAILS TO BE REMOVED IN PHASING AS NOT TO LEAVE THE ENTIRE ROOF
UNPROTECTED.
2. GUARDRAILS…