Asbestos Report Amendment 1.pdf

PDF 1 MB Posted

Attached to
Z1DA--523A5-22-001 Replace Roofs Multiple Buildings VA Medical Center (VAMC) Brockton, MA
Solicitation number
36C24124B0025
Issued by

About this file

This regulated building materials survey report evaluates two buildings at the VA Medical Center in Brockton, MA in advance of planned roof replacements. Samples were collected from roofs of Buildings 4 and 22 and analyzed for asbestos and lead paint. While materials from both buildings were found to not contain regulated substances above threshold levels, the report recommends full roof replacements given the age of the existing systems at approximately 70 years old, with work prioritized for Building 4. Roof drains and equipment on both buildings should also be addressed as part of the projects. Specifications and cut sheets are provided in the appendices for recommended roofing materials and accessories.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

p

REGULATED BUILDING MATERIALS

SURVEY REPORT

A/E Services Roof Replacement Buildings 4 and 22 VA Project. 523A5-22-001

Brockton VA Medical Center 940 Belmont St.

Brockton, MA 02301

Mabbett Project No.: R2023004.000

February 16, 2023

Prepared for:

Encorus Group Engineering 23 Mechanic Street Springville, New York 14141

Mabbett & Associates, Inc. www.mabbett.com

105 Central Street, Suite 4100 Stoneham, MA 02180-1260 T. 781-275-6050 Massachusetts | Virginia | Rhode Island | New York

© 2023, Mabbett & Associates, Inc.

REGULATED BUILDING MATERIALS SURVEY REPORT

A/E Roof Replacement Buildings 4 and 22, Brockton VAMC

© 2023, Mabbett & Associates, Inc. Page i February 16, 2023 Mabbett Project No. R2023004.000 RBM Survey Report Brockton VAMC Bldg 4 and 22 Roofs Final

ACKNOWLEDGEMENT

This Regulated Building Materials Survey Report has been prepared by Mabbett & Associates, Inc. (Mabbett®) for the A/E Services Roof Replacement Buildings 4 and 22 at the Brockton Veterans Affairs (VA) Medical Center, Brockton, Massachusetts. The information presented herein is based on the facts and information conveyed to or received by Mabbett during the preparation of this report. If any of the information provided to Mabbett that was used in preparing this report is incorrect, incomplete, or subject to change, Mabbett would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to Mabbett as of the date of this report and considered applicable to this report.

Mabbett does not claim to have identified all hazardous materials that could be present in the facility. Mabbett has conducted this assessment with reasonable care and has performed this project in accordance with industry standards. There can be no assurances, and Mabbett makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.

The attached Regulated Building Materials Survey Report was prepared by Mr. Kevin M. Donovan, Senior Environmental, Health & Safety Specialist of Mabbett & Associates, Inc.

This report has been reviewed and approved by:

Michael F. Delaney Director, Building Sciences Group

© 2023, Mabbett & Associates, Inc. Page ii February 16, 2023

TABLE OF CONTENTS

SECTION PAGE

1.0 INTRODUCTION

1.1 Summary of Survey Results

1.2 Purpose and Objectives

2.0 ASBESTOS SURVEY

2.1 Sampling Methodology

2.2 Analytical Methodology

2.3 Summary of Asbestos Containing Materials Findings

3.0 LEAD CONTAINING PAINT SAMPLING

4.0 RECOMMENDATIONS

4.1 Asbestos

5.0 LIMITATIONS

TABLES

Table 1 – Summary of Identified ACM

FIGURES

RBM-1, Bldg. 4, Regulated Building Materials Sample Location Plan RBM-2 Bldg.22, Regulated Building Materials Sample Locations Plan

APPENDICES

Appendix A – Summary of ACM Sampling Results Appendix B – Asbestos Laboratory Report and Chains of Custody

© 2023, Mabbett & Associates, Inc. Page 1 February 16, 2023

1.0 INTRODUCTION

Mabbett and Associates, Inc. (Mabbett®) performed a survey for regulated building materials (RBM) as part of the A/E Services for VAMC Brockton Buildings 4 & 22 Roofs at the Brockton VA Medical Center (VAMC), Brockton, Massachusetts. The site survey was performed by Mr. Kevin M. Donovan of Mabbett, on January 25, 2023, and consisted of the following activities:

A review of the existing facility regulated building reports and renovation history;

An Asbestos Containing Material (ACM) survey of suspect materials (Analysis by Polarized Light Microscopy

[PLM]); and Lead Containing Paint (LCP) sampling (Analysis by atomic absorption [AA]).

The survey was limited to areas that may be impacted by the planned roof replacement of Buildings 4 and 22.

Survey and sampling locations were limited to the accessible roof areas and as identified in design documents for VA Project Number 523A5-22-001. Areas and materials outside of this scope of work were not surveyed by Mabbett.

1.1 Summary of Survey Results

As required by State and Federal regulations, bulk samples of suspected ACM were collected by Mabbett using PLM and stop positive methodology and submitted under chain-of-custody (COC) procedures to Asbestos Identification Lab (AIL) located in Woburn, Massachusetts, a certified asbestos, and lead analysis laboratory that is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP). The Environmental Protection Agency (EPA) and the Occupational Safety and Health Administration (OSHA) defines ACM as any material that contains greater than one percent (>1%) asbestos. Twenty-four (24) bulk samples for suspect ACM were collected from the two roofs.

Based on laboratory analysis of suspect ACM, none of the identified materials contained asbestos greater than 1%. The Environmental Protection Agency (EPA) and the Occupational Safety and Health Administration (OSHA) defines ACM as any material that contains greater than one percent (>1%) asbestos.

1.2 Purpose and Objectives

The regulated building material survey was comprised of three primary project tasks including:

Evaluation of existing site conditions and formulation of a sampling plan.

Site survey to collect building material samples for laboratory analysis.

Development of this Regulated Building Materials Survey Report.

This project was designed to accomplish two primary objectives: to conduct a review of previous sampling conducted on the roofs of both buildings and collect a representative number of additional building materials for laboratory analysis and reporting; and to use data from the laboratory analysis efforts to estimate the volume of regulated building materials present on the roofs the buildings for subsequent use in development of an abatement scope and design. These two objectives were met through a combination of a site visit and inspection to collect building material samples for laboratory analysis; and interpretation of qualitative data collected in the field; and the quantitative laboratory data generated from analysis of the building materials as summarized in this survey report.

© 2023, Mabbett & Associates, Inc. Page 2 February 16, 2023

2.0 ASBESTOS SURVEY

A visual inspection was conducted by a trained and licensed inspector to identify locations of suspect ACM and conceptualize the sampling program. Only areas that were accessible during the field work phase were inspected, with reasonable efforts made during the initial field survey work to access areas as necessary to complete the asbestos survey and sampling program.

2.1 Sampling Methodology

The asbestos survey was performed on January 25, 2023, by Mabbett licensed asbestos inspectors, Mr. Kevin M.

Donovan (#AI002014). Roof cores and patching were performed by Mabbett roof sub-contractor, Aulson Roofing out of Methuen, Massachusetts. Prior to collecting samples, a visual screening assessment was conducted to identify locations of suspect ACM and develop a sampling plan. Only areas that were accessible during the field work phase were included in the survey, with reasonable efforts made to access areas needed to complete the asbestos survey and sampling program. Any unsampled or new materials discovered during roof demolition activities must be sampled and submitted to a laboratory for analysis.

Miscellaneous material:

• At least two bulk samples shall be collected from each homogeneous area that is less than 100 ft2.

• At least three bulk samples shall be collected from each homogeneous area that is greater than

100 ft2.

2.2 Analytical Methodology

The collected bulk samples were submitted under standard chain of custody (COC) procedures to Asbestos Identification Lab (AIL) located in Woburn, Massachusetts. Sample analysis was conducted by PLM, in accordance with EPA Method 600/R-93/116, using stop positive methodology. Asbestos Identification Lab is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP).

Bulk sample results from this inspection are summarized in Appendix A, Summary of ACM Sampling Results. The EPA and Occupational Safety and Health Administration (OSHA) define ACM as any material that contains greater than one percent (>1%) asbestos. As such, the analytical laboratory would identify bulk samples of suspected ACM as positive for asbestos when they met or exceeded the regulatory criteria of greater than one percent (>1%) asbestos.

Asbestos analytical laboratory report and the chain of custody is provided in Appendix B of this report.

2.3 Summary of Asbestos Containing Materials Findings

The current laboratory analytical data indicated that none of the materials sampled at building 4 and 22 roofs were found to contain greater than 1% asbestos. The results of the ACM sampling and laboratory reports are provided in Appendix A.

© 2023, Mabbett & Associates, Inc. Page 3 February 16, 2023

3.0 LEAD CONTAINING PAINT SAMPLING

An assessment for lead containing paint was conducted by visual inspection and no painted surfaces and systems were observed on the roofs of Buildings 4 and22 with the potential for disturbance during roof replacement.

© 2023, Mabbett & Associates, Inc. Page 4 February 16, 2023

4.0 RECOMMENDATIONS

4.1 Asbestos

Any suspect materials encountered during renovation or demolition activities that are not identified in this report as being non-ACM should be assumed to be ACM unless sample results prove otherwise. Suspect ACM that may be present within inaccessible locations, should be assumed to contain asbestos if discovered during any renovation or demolition process or until otherwise verified.

© 2023, Mabbett & Associates, Inc. Page 5 February 16, 2023

5.0 LIMITATIONS

This survey report is the result of a diligent and thorough inspection for regulated building materials of the designated areas and materials that may be impacted by the A/E Services Roof Replacement Buildings 4 and 22 project. Inaccessible areas were not included in this survey. Although a comprehensive inspection was performed, Mabbett does not claim to have identified all hazardous materials that could be present in the facility (for example, materials potentially located within the inaccessible areas). Mabbett has conducted this assessment with reasonable care and has performed this project in accordance with generally accepted industry standards. There can be no assurances, and Mabbett makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.

© 2023, Mabbett & Associates, Inc. Page 6 February 16, 2023

FIGURES

APPENDIX A

Summary of ACM Sampling Results

© 2023, Mabbett & Associates, Inc. Page 2 February 16, 2023

APPENDIX A

Asbestos Containing Material Bulk Sample Results A/E Services Roof Replacement Buildings 4 and 22

Buildings 4 and 22 Brockton VA Medical Center

Sample No. Sample Location Description of Material Percent and Type of Asbestos

04-01A Bldg. #4 East Side Black Built up roof NAD 04-01B Bldg. #4 South Center Black Built up roof NAD 04-01C Bldg. #4 West Side Black Built up roof NAD 04-02A Bldg. #4 East Side Black Flashing NAD 04-02B Bldg. #4 South Center Black Flashing NAD 04-02C Bldg. #4 West Side Black Flashing NAD

04-03A Bldg. #4 East Side Black Rubber Roof Skim Sealant NAD

04-03B Bldg. #4 South Center Black Rubber Roof Skim Sealant NAD 04-03C Bldg. #4 West Side Black Rubber Roof Skim Sealant NAD 04-04A Bldg. #4 West Side Gray Flashing Caulk NAD 04-04B Bldg. #4 South Center Gray Flashing Caulk NAD 04-04C Bldg. #4 East Side Gray Flashing Caulk NAD 22-01A Bldg. #22, North Black Built up roof NAD 22-01B Bldg. #22, Northeast Black Built up roof NAD 22-01C Bldg. #22, Southeast Black Built up roof NAD 22-02A Bldg. #22, Northwest Gray Flashing Caulk NAD 22-02B Bldg. #22, Northeast Gray Flashing Caulk NAD 22-02C Bldg. #22, Southeast Gray Flashing Caulk NAD 22-03A Bldg. #22, Northeast Black Flashing NAD 22-03B Bldg. #22, Northwest Black Flashing NAD 22-03C Bldg. #22, Southeast Black Flashing NAD 22-04A Bldg. #22, North Gray Flashing NAD 22-04B Bldg. #22, Northeast Gray Flashing NAD 22-04C Bldg. #22, Northeast Gray Flashing NAD

Notes:

NAD = No Asbestos detected

Replace Potable Water Heating Systems – Bedford VAMC

APPENDIX B

Asbestos Laboratory Report and Chain of Custody

Asbestos Identification Laboratory.

165 New Boston St., Ste 227

Woburn, MA 01801 781-932-9600

Web: www.asbestosidentificationlab.com Email:

mikemanning@asbestosidentificationlab.com

Batch: 91062

Dear Michael Delaney, Thank you Michael Delaney for your business.

Michael Manning Owner/Director

Asbestos Identification Laboratory has completed the analysis of the samples from your office for the above referenced project.

The Analysis Method is BULK PLM ANALYSIS, EPA/600/R-93/116The information and analysis contained in this report have been generated using the EPA /600/R-93/116 Method for the Determination of Asbestos in Bulk Building Materials. Materials or products that contain more than 1% of any kind or combination of asbestos are considered an asbestos containing building material as determined by the EPA. This Polarized Light Microscope (PLM) technique may be performed either by visual estimation or point counting. Point counting provides a determination of the area percentage of asbestos in a sample. If the asbestos is estimated to be less than 10% by visual estimation of friable material, the determination may be repeated using the point counting technique. The results of the point counting supersede visual PLM results. Results in this report only relate to the items tested. This report may not be used by the customer to claim product endorsement by NVLAP or any other U.S.

Government Agency.

Michael Delaney Mabbett & Associates, Inc.

105 Central St.

Suite 4100 Stoneham, MA 02180

Project Information

#R2023004.000

Brockton VAMC - Bldgs #4 & 22

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

• NVLAP Lab Code: 200919-0

• Massachusetts Certification License: AA000208

• State of Connecticut, Department of Public Health Approved Environmental Laboratory Registration Number: PH-0142

• State of Maine, Department of Environmental Protection Asbestos Analytical Laboratory License Number: LB-0078(Bulk) LA-0087(Air)

• State of Rhode Island and Providence Plantations. Department of Health Certification: AAL-121

• State of Vermont, Department of Health Environmental Health License AL934461

Laboratory results represent the analysis of samples as submitted by the customer. Information regarding sample location, description, area, volume, etc., was provided by the customer. Asbestos Identification Laboratory is not responsible for sample collection activities or analytical method limitations. Unless notified in writing to return samples, Asbestos Identification Laboratory discards customer samples after 30 days. Samples containing subsamples or layers will be analyzed separately when applicable. Reports are kept at Asbestos Identification Laboratory for three years. This report shall not be reproduced, except in full, without the written consent of Asbestos Identification Laboratory.

Michael Delaney Mabbett & Associates, Inc.

105 Central St.

Suite 4100 Stoneham, MA 02180

Project Information

#R2023004.000

Brockton VAMC - Bldgs #4 & 22

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID multi Fiberglass 10

Non-Fibrous 90 1000358

04-01A Bldg. #4, East SideBlack Built Up Roof None Detected multi Fiberglass 10 Non-Fibrous 90

1000359

04-01B Bldg. #4, South CenterBlack Built Up Roof None Detected multi Fiberglass 10 Non-Fibrous 90

1000360

04-01C Bldg. #4, West SideBlack Built Up Roof None Detected black Fiberglass 10 Non-Fibrous 90

1000361

04-02A Bldg. #4, East SideBlack Flashing None Detected black Fiberglass 10 Non-Fibrous 90

1000362

04-02B Bldg. #4, South CenterBlack Flashing None Detected black Non-Fibrous 100

1000363

04-02C Bldg. #4, West SideBlack flashing None Detected multi Non-Fibrous 100

1000364

04-03A Bldg. #4, East SideBlack Rubber Roof Skim Sealanat

None Detected multi Non-Fibrous 100

1000365

04-03B Bldg. #4, South CenterBlack Rubber Roof Seam Sealanat

None Detected multi Non-Fibrous 100

1000366

04-03C Bldg. #4, West SideBlack Rubber Roof Seam Sealanat

None Detected multi Non-Fibrous 100

1000367

04-04A Bldg. #4, West SideGray Flashing Caulk None Detected multi Non-Fibrous 100

1000368

04-04B Bldg. #4 South CenterGray Flashing Caulk None Detected multi Non-Fibrous 100

1000369

04-04C Bldg. #4, East SideGray Flashing Caulk None Detected multi Fiberglass 10 Non-Fibrous 90

1000370

22-01A Bldg. #22, NorthBlack Built Up Roof None Detected multi Fiberglass 10 Non-Fibrous 90

1000371

22-01B Bldg. #22, North EastBlack Built Up Roof None Detected multi Fiberglass 10 Non-Fibrous 90

1000372

22-01C Bldg. #22, South EastBlack Built Up Roof None Detected gray Non-Fibrous 100

1000373

22-02A Bldg. #22, North WestGrey Flashing Caulk None Detected

Sampled: Received: January 26, 2023January 25, 2023 Analyzed:January 25, 2023

Analyzed by: 91062Batch:

Friday 27 January 2023

Michael Delaney Mabbett & Associates, Inc.

105 Central St.

Suite 4100 Stoneham, MA 02180

Project Information

#R2023004.000

Brockton VAMC - Bldgs #4 & 22

Method: BULK PLM ANALYSIS, EPA/600/R-93/116

Asbestos %Material Color Non-Asbestos %LocationFieldID

LabID gray Non-Fibrous 100

1000374

22-02B Bldg. #22, North EastGrey Flashing Caulk None Detected gray Non-Fibrous 100

1000375

22-02C Bldg. #22, South EastGrey Flashing Caulk None Detected black Non-Fibrous 100

1000376

22-03A Bldg. #22, North Eastblack Flashing None Detected black Non-Fibrous 100

1000377

22--3B Bldg. #22, North WestBlack Flashing None Detected black Non-Fibrous 100

1000378

22-03C Bldg. #22, South EastBlack Flashing None Detected white Non-Fibrous 100

1000379

22-04A Bldg. #22, NorthGrey Flashing None Detected white Non-Fibrous 100

1000380

22-04B Bldg. #22, North EastGrey Flashing None Detected white Non-Fibrous 100

1000381

22-04C Bldg. #22, North EastGrey Flashing None Detected

Sampled: Received: January 26, 2023January 25, 2023 Analyzed:January 25, 2023

Analyzed by: 91062Batch:

Friday 27 January 2023

RFI #1 Pre-Bid22.pdf
REP-23007-001.REVA Condition Survey Report1.pdf
1.0 Executive Summary
2.0 General scope
3.0 Site Safety
4.0 existing conditions
4.1 Regulated Building Material Survey Results
4.2 Infrared Scans
4.3 General Roof Conditions
In general, the roofs on Building 4 and 22 consist of smooth or granulated built-up bituminous systems with one to three inches of insulation and multi-ply built up and liquid applied roofing systems with loose laid stone ballast.
The insulation systems when present, are predominately tapered systems with accessory crickets, saddles, sump areas and edge strips. In most cases the insulation is polyisocyanurate with fiberglass type facers. The high points are roughly 2-3” with t...
4.4 Building 4
4.4.1 In reference with the above general descriptions, the roofs on building 4 can be further grouped into areas based upon similar roof types, conditions and areas/levels.
4.4.2 Roof Drains
There are about four (4) roof drains under water which means that they are clogged. The obstructions would have to be cleared first and then the drain can be removed and replaced.
4.4.3 Rooftop Equipment
4.4.4 Roof Deficiencies
4.5 Building 22
4.5.1 Roof System
4.5.2 Roof Deficiencies
4.5.3 Roof Drains
4.5.4 Rooftop Equipment
5.0 proposed recommendations
5.1 Roof Replacement Priority List
5.2 Building 4
5.2.1 It is our opinion that Building 4 should be considered Priority 3 for replacement based upon the supporting data in section 5.1. The existing roof system is approximately 70 years old and at the end of its life expectancy. It is recommended that...
5.2.2 Roof Drains
5.2.3 Rooftop Equipment
5.3 Building 22
5.3.1 It is our opinion that Building 22 should be considered Priority 3 for replacement based upon the supporting data in section 5.1. The existing roof system is approximately 70 years old and at the end of its life expectancy. It is recommended tha...
5.3.2 Roof Drains and Roof Drain Piping
There are 9 roof drain that require investigation as of this report. Where it is determined that most of the roof-drain assemblies are either in poor condition or the sloping of the roof is inadequate which is causing ponding and deterioration to thos...
5.3.3 Rooftop Equipment

5.4 Roofing Material Recommendation

6.0 Project Phasing and impacts on medical center
7.0 Estimate of construction costs
REP-23007-001.REVA 30% Appendices.pdf
REGULATED BUILDING MATERIAL SURVEY REPORT
A
RECOMMENDED MATERIAL CUT SHEETS
A
KEY PLAN
A
INFRARED SCAN NUMBER LOCATIONS
A
Appendix A - RBM Survey Report.pdf
1.0 INTRODUCTION
1.1 Summary of Survey Results
1.2 Purpose and Objectives
2.0 ASBESTOS SURVEY
2.1 Sampling Methodology
2.2 Analytical Methodology
2.3 Summary of Asbestos Containing Materials Findings
3.0 LEAD CONTAINING PAINT SAMPLING
4.0 RECOMMENDATIONS
4.1 Asbestos
5.0 LIMITATIONS
RBM-1 Bldg-4.pdf
Sheets and Views
RBM-1 Bldg-4
RBM-2 Bldg-22.pdf
Sheets and Views
RBM-2 Bldg-22
Binder1.pdf
1-Adhesive
2-Densdek Cover Board
3-Roof Insualtion Flat insualtion
4-TPO roofing Tech Sheet1
5-Perma-Tite Coping Flat
6-Firestone walkway Path
7-Perma-Tite Coping Sloped
Appendix C - Keyplan pdf.pdf
Sheets and Views
Layout1
Appendix D - Infrared Scan Number Locations.pdf
BLDG 4 east side
BLDG 4 west side
BLDG 22 Infrared