S02 36C26325Q0714.pdf
PDF 611 KB Posted
- Attached to
- J045--Cast Iron Survey - NWI
- Solicitation number
- 36C26325Q0714
About this file
This is a Federal Acquisition Regulation (FAR) Part 13 solicitation (RFQ) for a Cast Iron Survey service for the Department of Veterans Affairs' Nebraska Western Iowa Health Care System. The total set-aside contract is specifically designated for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with NAICS code 238220 and a $19 million size standard. The procurement will result in a firm fixed-price contract to perform comprehensive surveys at two VA medical facilities: Omaha VA Medical Center and Grand Island VA Medical Center.
The contract will cover a 5-year performance period from 04-01-2025 to 03-31-2030, involving detailed surveys of steam distribution systems, including documenting cast iron and malleable iron fittings, identifying A307 bolts, creating comprehensive drawings, labeling equipment, and developing replacement and safety recommendations. Technical questions are due by 5:00pm CST on 06-20-2025, and quotes must be submitted electronically to the Contracting Specialist, Evan Beachy, by 5:00pm CST on 06-27-2025. Prospective offerors must be registered in the System for Award Management (SAM) and comply with specific technical industry standards and survey requirements outlined in the solicitation.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1 OF 1. REQUISITION NO.
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL
TIME
9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
8(A)
NAICS:
SIZE STANDARD:
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
13a. THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13b. RATING
14. METHOD OF SOLICITATION
RFQ IFB RFP
15. DELIVER TO CODE 16. ADMINISTERED BY CODE
17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE
TELEPHONE NO. UEI: EFT:
PHONE: FAX:
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED
SEE ADDENDUM
19. 20. 21. 22. 23. 24.
ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)
PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212
7. FOR SOLICITATION
INFORMATION CALL:
STANDARD FORM 1449
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
636-25-4-5058-0164
36C26325Q0714 06-18-2025
Evan Beachy 319-688-3629 07-02-2025
17:00 CDT
36C263 Department of Veterans Affairs
NETWORK 23 CONTRACTING OFFICE
1303 5th St Suite 300 Coralville IA 52241
X 100
X
238220
$19 Million
N/A
X
36C636
Department of Veterans Affairs NWI/Omaha VA Health Care System 4101 Woolworth Ave Omaha NE 68105-1850
36C263
NETWORK 23 CONTRACTING OFFICE
1303 5th St, Suite 300
System Electronic Invoicing System Tungsten Electronic Invoicing VA Tungsten Number is: AAA544240062 Refer to VAAR Clause 852.232-72
1-877-489-6135
See CONTINUATION Page
Cast Iron Survey - NWI
See Attached Schedule of Services for Individual Line Items
See CONTINUATION Page
636-3650162-5058-855100-2543-010055592 636-25-4-5058-0164
X X
X 1
John Milroy
VA-VHA-RPOC-2023-0067
36C26325Q0714
Table of Contents
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
B.2 PRICE/COST SCHEDULE
B.3 DELIVERY SCHEDULE
SECTION C - CONTRACT CLAUSES
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES (NOV 2023)
C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
C.3 SUPPLEMENTAL INSURANCE REQUIREMENTS
C.4 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)
C.5 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED
SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)
(DEVIATION)
C.6 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
C.7 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
C.8 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ... 33
C.9 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
C.10 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT
STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (JAN 2025) (DEVIATION FEB 2025)
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS
SECTION E - SOLICITATION PROVISIONS
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND
COMMERCIAL SERVICES (SEP 2023)
E.2 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2021)
E.3 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
E.4 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS
AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)
E.5 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT
ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023)
E.6 52.233-2 SERVICE OF PROTEST (SEP 2006)
E.7 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
E.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
E.9 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—
COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024) (DEVIATION
FEB 2025)
SECTION B - CONTINUATION OF SF 1449 BLOCKS
B.1 CONTRACT ADMINISTRATION DATA
1. Contract Administration: All contract administration matters will be handled by the following individuals:
a. CONTRACTOR:
b. GOVERNMENT: Contracting Officer 36C263
NETWORK 23 CONTRACTING OFFICE
1303 5th St Suite 300
2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:
[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[] 52.232-36, Payment by Third Party
3. INVOICES: Invoices shall be submitted in arrears:
a. Quarterly []
b. Semi-Annually []
c. Other []
4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.
ELECTRONIC INVOICING: The Department of Veterans Affairs, Financial Services Center (FSC), has changed the accounts payable process and has transitioned to electronic invoicing.
Your participation in this existing process is required in order to continue providing products or services to the Department of Veteran Affairs in compliance with the Improper Payments Elimination and Recovery Act of 2010 (IPERA) and Mandate AN97.
TUNGSTEN NETWORK
To begin submitting electronic invoices, free of charge, please visit the following website:
https://authentication.tungsten-network.com/login and review the electronic invoicing process.
Project Name: Cast Iron, Malleable Fitting, A307 Steam & HW Survey - NWI 2025
Location of Services
Omaha VAMC, 4101 Woolworth Ave, Omaha, NE 68105
Facility Size: 813,984 sq. ft
Grand Island VAMC, 2201 N Broadwell Ave, Grand Island, NE 68803
Facility Size: 253,358 sq. ft
Period of Performance
Award +180 Days
Contract Vehicle
This performance work statement (PWS) is a firm fixed contract. As stated in FAR 16.202-1, a firm-fixed-price contract provides for a price that is not subject to any adjustment on the basis of the contractor’s cost experience in performing the contract.
This contract type places upon the contractor maximum risk and full responsibility for all costs and resulting profit or loss. It provides maximum incentive for the contractor to control costs and perform effectively and imposes a minimum administrative burden upon the contracting parties. Any questions regarding the PWS shall be provided to the contracting officer (CO) during the solicitation phase prior to award to prevent ambiguity and potential contractor loss due to misinterpretation of the PWS requirements.
Performance Work Statement Scope
This performance work statement is a service as defined in FAR 37.1. Contractor shall perform thorough investigation above ceiling, behind walls (no modifications to real property are permitted) utilizing necessary instrumentation to verify requirements in difficult to reach or tight locations. Survey will include drawings and a report (excel table preferred) including pictures of existing conditions, reasons for noncompliance or deficiency, methods for testing including instrumentation used, equipment listing (unique identifier), location, and pressure. Any insulation or associated equipment that is removed shall be replaced for like.
Equipment Labeling
At each valve, expansion joint, and area identified as a deficiency (cast, malleable or A307) the contractor shall provide heavy duty labels that can endure chemicals, high temperatures, moisture, and abrasion. The labels shall include the equipment identified (linked to the drawings), and for valves and expansion joints, the spaces downstream that they feed in typed format.
Cast Iron, Malleable Fittings
Contractor shall conduct a steam distribution system survey to document the locations and type of any cast iron and malleable iron fittings and components for systems operating at a pressure of 15 pounds per square inch gauge (psig) or greater. Also included are distributions systems for hot water or other liquids at a temperature of greater than 257 degrees Fahrenheit.
ASTM A307 Bolt Survey
Contractor shall perform a survey of existing steam and hot water piping systems and identify if A307 bolts (all grades) are utilized.
Drawings
Drawings shall be downloadable in .dwg or. dwf format and pdf. These drawings shall also be published on 12 laminated half size drawing sets (12’’x18’’) with 4 to be delivered to the Grand Island site and 8 to be delivered to the Omaha site. Prior to publishing drawing sets on laminated sheets, approval to proceed forward shall be given by the COR and include all VA recommendations. These drawings will be utilized by HVAC technicians, pipefitters, boiler plant operators and other maintenance personnel and should be clearly labeled. Should the contractor have concerns that details of the drawing are congested and full-size drawing sets are warranted, they should reach out to the VA COR for acknowledgement and approval. The total dollar value of the 12 laminated sheets will be considered with any reduction of half size sets to compensate for full size with the ultimate pricing staying consistent.
Contractor shall conduct a steam survey, trace each line, and provide drawings at both sites to include low pressure steam (LPS) which is up to 15 psig, medium pressure steam (MPS) which is between 15 psig and 60 psig as well as high pressure steam (HPS) steam systems. These drawings shall be complete to include flow sheets with instruments, flow/capacity/pressure, direction of flow. Instruments and equipment shall have unique tag numbers that are correlated to an instrument and equipment index. Tag numbers shall be coordinated with the shops to ensure standard nomenclature is aligned with local facility. Pipe size and material of construction shall be indicated for all piping. Equipment shall be listed and scheduled in conformance with VA National CAD Standard details: https://www.cfm.va.gov/til/sDetail.asp#23
Expansion Joint
Contractor shall identify expansion joints at the facility and list the manufacturer, the allowable movement, flow direction, design pressure, location and temperature, date of manufacture, and identifying the expansion joint by the identification number in the drawings. Contractor shall also verify existing condition and any deficiencies with the https://www.cfm.va.gov/til/sDetail.asp#23 stated joint. In the contractor’s report, it should be identified the operating pressure of the service and whether the expansion joint conforms to the below.
Pressure Containment:
o Steam Service 35-200 kPa (5-29 psig): Rated 345 kPa (50 psig) at 148 degrees C (298 degrees F).
o Steam Service 214-850 kPa (31-123 psig): Rated 1035 kPa (150 psig) at 186 degrees C (366 degrees F).
o Steam Service 869-1035 kPa (126-150 psig): Rated 1380 kPa (200 psig) at 194 degrees C (381 degrees F).
o Condensate Service: Rated 690 kPa (100 psig) at 154 degrees C (309 degrees F).
Valves
Contractor shall verify functionality of all valves greater than 15psig. Contractor shall check physical condition of valve for corrosion, mineral deposits, leaks, or associated components.
Corrective Action
Replacement Plan / Recommendations
Include the detailed site survey report complete with pictures and findings of the existing conditions in the report deliverable and describe chronic problems and shortcomings that may impact the project scope of work for future replacement. These conditions may be technical, or scope or budget related. The narrative shall not only state the issue, but shall discuss possible solutions and ramifications if the issue cannot be addressed. The contractor shall include any equipment to include insulation that is verified during the survey for recommendations.
Contractor shall develop a replacement plan, prioritizing high and medium pressure steam and hot water piping systems operating over 50 pounds per square inch for A307 bolts, of any cast iron and malleable iron fittings and components.
All deficiencies shall accompany a cost estimate, pictures of existing conditions, reasons for noncompliance or deficiency, methods for testing including instrumentation used, equipment listing, location, and pressure.
Start Up / Shutdown / Water Hammer Response
Contractor shall review existing procedures (where available) at both sites for start-up/shutdown procedures of all boilers operating above 15psig. Contractor shall interview boiler plant and pipefitter staff and formulate each procedure utilizing industry best practice to prevent safety concerns and ensure repeatability. Each procedure shall include pictures for future new hires and veteran staff to follow. The procedure must also address action to be taken in response to any reported or observed water hammer.
The purpose of the procedure is to mitigate the risk of effects of water hammer and shock loading on the piping system.
Interim Safety Measures
Systems identified with A307 bolts shall have a contractor provided Interim Safety Measure to ensure the safety of staff and the facility until replacement is complete.
The contractor shall develop a risk assessment and interim safety measures pending replacements of all cast iron or malleable fittings with forged or cast steel fittings over time.
The standard format for all contractor provided interim safety measures is included as reference.
Any questions on contractor requirements shall be asked and answered during the project kickoff meeting.
References
• VHA 1810
• Steam, Heating Hot Water, and Outside Distribution Systems Design Manual
• Correct Mechanical Deficiencies Steam Survey
• VHA Operational Alert and Guidance Document, Cast Iron Fittings / Valve housing use in High and medium Pressure Steam distribution systems.
• Requirements for Identification and Replacement of A307 Bolts Memo Signed
• Interim Safety Measure Template
Contracting Officer Representative / Technical Representative Contact Information
Primary: Jeremy Davis, Jeremy.davis@va.gov , 531-215-2942
Secondary: William Sis, William.sis@va.gov , 918-613-1621
Tertiary: Griffin Walsh, griffin.walsh@va.gov , 531-232-9231
Work Hours Expected
The contractor shall limit all patient or staff impacts by phasing work during or after hours. Normal business hours are 0730-1600. Should services provided not impact patient or staff services work can be performed during normal business hours. If services provided will impact patient or staff services, the contractor shall schedule this work with the COR in order to minimize these disruptions. Questions on local facility impacts and work proposed by the contractor shall be directed to the contracting officer representative for approval of work to be performed during or after hours.
mailto:Jeremy.davis@va.gov mailto:William.sis@va.gov mailto:griffin.walsh@va.gov
Kickoff Meeting
The general contractor shall schedule a kickoff meeting no later than 5 business days following notice to proceed. At a minimum the local site COR, and the contracting officer shall attend. The contractor shall provide an agenda in preparation of the meeting. The contractor shall take meeting minutes and shall email these notes to all parties included in the meeting invite. At a minimum the contractor shall provide the general contractor contact information that can be reached 24/7 as well as subcontractors, and any required onsite coordination for inspection, testing or deliveries during the duration of the period of performance, any hazards expected, preconstruction risk assessments where applicable and infection control risk assessments where applicable. At the discretion of the contracting officer (CO) in accordance with FAR 42.503-1 the action of establishing a time and place of the conference, agenda and summary may be delegated or taken on by the contracting officer who awarded such contract.
Certifications
It is the expectation that all contractors meet the below qualifications. If contracted employees change from the proposal provided in the solicitation the general contractor shall provide credentials for VA review and approval prior to work.
General contractor shall provide one OSHA “Competent Person” (CP) to be physically present at all job sites. This individual shall be directly employed by the general contractor with authority to speak on behalf of the general contractor. This individual shall be capable of identifying existing and predictable hazards in the surroundings and working conditions which are unsanitary, hazardous, or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them (see 29 CFR 1926.32(f)). The prime contractor(s) are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that Mishap prevention responsibilities are being carried out. This individual shall have a current OSHA 30 certification and provide no less than 3 years’ worth of job-related experience similar to that being asked in this contract.
General Requirements
Shall contractors work involve any of the below the stated requirement shall be met.
All work shall comply with the most recent edition of USACE EM 385-1-1, comply with 29 CFR 1926, comply with 29 CFR 1910 as incorporated by reference within 29 CFR
1926, comply with ASSP A10.34, and all applicable federal, state, and local laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards for resolution before starting work. Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern except with specific approval and acceptance.
All electrical work shall comply with VHA Directive 1028, NFPA 70 (NEC), NFPA 70B, NFPA 70E, 29 CFR Part 1910 Subpart J – General Environmental Controls, 29 CFR Part 1910 Subpart S – Electrical, and 29 CFR 1926 Subpart K.
All installation, maintenance, and servicing of equipment or machinery shall comply with 29 CFR 1910.147 except for specifically referenced operations in 29 CFR 1926
All hot work shall be safeguarded in accordance with NFPA 241 and NFPA 51B. Hot work permits shall be issued daily for work in accordance with local policy.
All confined space entry shall comply with 29 CFR 1926, Subpart AA except for specifically referenced operations in 29 CFR 1926.
All floor and wall openings shall comply with 29 CFR 1926 Subpart M and EM 385-1-1.
All crane work shall comply with 29 CFR 1926 Subpart CC and EM 385-1-1. Crane lift plans shall be reviewed and approved by the contracting officer representative prior to work
The fall protection (FP) threshold height requirement is 4ft for ALL WORK in government occupied sites, unless the OSHA 29 CFR 1926 or EM 385-1-1 requirements are more stringent. All work at or above this threshold shall meet OSHA or EM 385-1-1 whichever is more stringent.
Contractor shall maintain free and unobstructed access to facility emergency services and for fire, police and other emergency response forces in accordance with NFPA 241
Government Furnished Property or Space
The contractor will not be provided government furnished property. Contractor equipment shall be removed or approved on a case by case basis by the contracting officer representative. The government is not liable for theft or security of such equipment if approved.
The contractor will be responsible for keeping a reasonably clean (free of miscellaneous debris) working environment. Failure to do so on a continuous basis shall result in the contractor being back charged for cleaning services.
Job Hazard Analysis
Shall any of the below hazards be expected or present themselves during the work, an activity hazard analysis also known as a job hazard analyses, job safety analyses and activity safety analyses shall be performed meeting all of the requirements from the below. Deviations will be only be approved by the contracting officer.
Job Site Risks associated with the below
1) Emergency response;
2) Contingency for severe weather;
3) Fire Prevention;
4) Medical Support;
5) Posting of emergency telephone numbers;
6) Prevention of alcohol and drug abuse;
7) Site sanitation (housekeeping, drinking water, toilets);
8) Night operations and lighting;
9) Hazard communication program;
10) Welding/Cutting “Hot” work;
11) Electrical Safe Work Practices (Electrical LOTO/NFPA 70E);
12) General Electrical Safety;
13) Hazardous energy control (LOTO);
14) Site-Specific Fall Protection & Prevention;
15) Excavation/trenching;
16) Asbestos abatement;
17) Lead abatement;
18) Crane Critical lift;
19) Respiratory protection;
20) Health hazard control program;
21) Radiation Safety Program;
22) Abrasive blasting;
23) Heat/Cold Stress Monitoring;
24) Crystalline Silica Monitoring (Assessment);
25) Demolition plan (to include engineering survey);
26) Formwork and shoring erection and removal;
27) Pre-Cast Concrete;
28) Public (Mandatory compliance with ANSI/ASSP A10.34-2012);
29) Sub-contractor or cross-trade coordination;
Before beginning each work activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or sub-contractor is to perform the work, the Contractor(s) performing that work activity shall prepare an AHA (Example electronic AHA forms can be found on the US Army Corps of Engineers web site)
AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk.
Work shall not begin until the AHA for the work activity has been accepted by the Contracting Officer Representatives and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives at preparatory and initial control phase meetings.
The names of the Competent/Qualified Person(s) required for a particular activity (for example, excavations, scaffolding, fall protection, other activities as specified by OSHA, EM 385-1-1, or other State and Local agencies) shall be identified and included in the AHA. Certification of their competency/qualification shall be submitted to the contracting officer representative for acceptance prior to the start of that work activity.
The AHA shall be reviewed and modified as necessary to address changing site conditions, operations, or change of competent/qualified person(s).
If more than one Competent/Qualified Person is used on the AHA activity, a list of names shall be submitted as an attachment to the AHA. Those listed must be Competent/Qualified for the type of work involved in the AHA and familiar with current site safety issues.
If a new Competent/Qualified Person (not on the original list) is added, the list shall be updated (an administrative action not requiring an updated AHA). The new person shall acknowledge in writing that he or she has reviewed the AHA and is familiar with current site safety issues.
Submit AHAs to the contracting officer, primary contracting officer representative and alternate contracting officer representative.
Preconstruction Risk Assessment / Infection Control Risk Assessment
Contractor shall control all construction-associated hazards that affect VA medical facilities, their occupants, services and mission-essential functions and capabilities is critical in all medical center facilities.
Contractor shall ensure interior construction activities causing disturbance of existing dust, or creating new dust, must be conducted within ventilation-controlled areas that minimize the flow of airborne particles into patient areas.
Contractor shall ensure compliance VHA 7715 and post a copy of the latest PCRA and ICRA forms at all jobs sites found at
• VHA PCRA: http://vaww.hefp.va.gov/resources/vha-pre-construction-risk-assessment-pcra
• VHA ICRA: http://vaww.hefp.va.gov/resources/vha-infection-control-risk-assessment-icra https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fvaww.hefp.va.gov%2Fresources%2Fvha-pre-construction-risk-assessment-pcra&data=05%7C01%7C%7C35fabe489a224e29ca4e08db6379f655%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638213147692050152%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=O%2B4gD79A6%2BxSKltZgLa95UUPtMlvZHR9j1fVypepzpM%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fvaww.hefp.va.gov%2Fresources%2Fvha-pre-construction-risk-assessment-pcra&data=05%7C01%7C%7C35fabe489a224e29ca4e08db6379f655%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638213147692050152%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=O%2B4gD79A6%2BxSKltZgLa95UUPtMlvZHR9j1fVypepzpM%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fvaww.hefp.va.gov%2Fresources%2Fvha-infection-control-risk-assessment-icra&data=05%7C01%7C%7C35fabe489a224e29ca4e08db6379f655%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638213147692050152%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=KxMLKZWCHwpofa25RiHcYe1kKwSqEL9doVcRTmxnsNw%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=http%3A%2F%2Fvaww.hefp.va.gov%2Fresources%2Fvha-infection-control-risk-assessment-icra&data=05%7C01%7C%7C35fabe489a224e29ca4e08db6379f655%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638213147692050152%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=KxMLKZWCHwpofa25RiHcYe1kKwSqEL9doVcRTmxnsNw%3D&reserved=0
VHA-PCRAs and ICRAs will be re-validated and updated as needed based on but not limited to changes from affected individuals, areas/locations, scope, contractor means and methods, safety requirements, phasing, contractor competencies and capabilities.
The COR with concurrence from a VHA infection control specialist, VHA patient safety and VHA occupational health and safety officer will have ultimate decision on activity type and the level of precautions the contract needs to take.
Deliverables
The contractor shall provide inspection, and testing documentation no later than 30 business days following the onsite services. At a minimum they shall provide the manufacturer’s recommendations, the servicing performed, the results of such servicing and the technician who performed the work. Delays in contractor reporting will result in deductions of the approved monthly invoice. This is to include contractor’s failure to report clearly and precisely the above requirements. Documents shall be provided in a pdf form with standardized labeling to include the equipment with unique model numbers, location, frequency period, general description of inspection or maintenance performed.
Schedule
Contractor shall provide a schedule to meet each aspect covered in the performance work statement NLT 10 calendar days from notice to proceed. Changes to this schedule shall be communicated to the Contracting Officer, primary and alternate contracting officer representatives immediately.
Due to the continuous operations of the hospital and sensitive populations served, all equipment or utility outages shall be communicated to the contracting officer, primary and alternate COR for VA approval. The contractor shall build time for the VA to receive adequate approvals for such outages into their schedule and be prepared to work outside of normal business hours to accomplish any outages to limit impact to the patients, staff and visitors of the NWIHCS.
Contracting Officer Authority
Only contracting officers, acting within the scope of their authority, are able to bind the government by entering into, administering, or terminating contracts, as well as making related determinations and findings. The contracting officer is also responsible for ensuring that all laws, executive orders, regulations, and other applicable procedures have been followed in accordance with FAR 1.602-1. In addition, contracting officers are expected to take the lead in encouraging business process innovations and ensuring that business decisions are sound.
In accordance with FAR 1.602-2 the contracting officer shall designate and authorize, in writing and in accordance with agency procedures, a contracting officer’s representative (COR) on all contracts and orders other than those that are firm-fixed price, and for firm-fixed-price contracts and orders as appropriate, unless the contracting officer retains and executes the COR duties. The list of duties that can be delegated by the contracting officer under a COR delegation memo are included under FAR 42.302.
Site Security
In accordance with FAR 52.204-9 and VA Directive 0735 – Personal Identity Verification of Federal Employees and Contractors, any contract person who requires routine physical access to a Federally-controlled facility and/or routine access to a Federally-controlled information system will be required to verify their identity prior to providing services under the contract. Prior to providing services under the contract, each contract person will be asked to provide two (2) forms of identification from the Accepted Identification Documentation List to the appropriate VA representative in order to obtain a proper VA-issued identification card (PIV badge). No work onsite shall ensue without issuance of a VA PIV badge or internal escorting. Contractor is expected to build lead times for PIV issuance into schedules. The general contractor shall be onsite for any subcontractors who do not have a PIV card issued to them for the duration of the subcontractor’s work including escorting subcontractors. The prime contractor shall check in all subcontractors prior to performing work each day in the engineering office space.
Failure to Perform
The contractor may receive deductions or even termination based on failure to perform.
The following criteria apply for determining appropriate action:
• Notifications. Consistent with FAR Part 49, the contracting officer shall notify the service provider of failure to meet standards through QA monitoring forms, cure notices, or show cause notices and shall inform the service provider manager or designated alternate of such notices.
• Deductions. The government has the right to deduct a specified dollar amount for failure to meet performance standards. The amount is identified in the Performance Requirements Summary (Attachment 1).
• Termination. If the contracting officer determines that the contractor has failed to perform to the extent that a termination for default is justified, the contracting officer shall issue a notice of termination, consistent with FAR Part 49.
Attachment 1: Performance Requirements Summary (PRS)
National Archives and Records Administration (NARA) Records Management Language for Contracts RECORDS MANAGEMENT OBLIGATIONS
Contractor will be required to complete “ VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or the Use of VA Sensitive Information”, TMS 20939 No Access. Form will be provided upon award.
Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
Definitions “Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
includes Department of Veteran Affairs records.
does not include personal materials.
applies to records created, received, or maintained by Contractors pursuant to their Department of Veteran Affairs contract.
may include deliverables and documentation associated with deliverables.
Requirements Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a).
These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
Required Services Performance Standards AQL Method of Surveillance Disincentive
Work Management submit reports within time window specified in deliverables section of PWS in a format that meets the minimum requirements
Files review, periodic and random observations, complaints
$1000 for each documented instance, $500 for each week uncorrected
Administrative Services Ensure visitor log entries are complete, and 100 Files review, periodic and $1000 for each documented instance
Facilities Services
Test, certify, inspect and/or service equipment listed in PWS as required per manufacturer's recommendations or regulations stated in the
PWS
Files review, periodic and random observations, complaints
$1000 for each documented instance, $500 for each week uncorrected
In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
In accordance with 36 CFR 1222.32, Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
Department of Veteran Affairs and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation.
Records may not be removed from the legal custody of Department of Veteran Affairs or destroyed except for in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, Contractor must report to Department of Veteran Affairs. The agency must report promptly to NARA in accordance with 36 CFR 1230.
The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the contract action.
The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records and/or equipment is no longer required, it shall be returned to Department of Veteran Affairs control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the contract action. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and Department of Veteran Affairs guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with Department of Veteran Affairs policy.
The Contractor shall not create or maintain any records containing any non-public Department of Veteran Affairs information that are not specifically tied to or authorized by the contract.
The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
The Department of Veteran Affairs owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S.
Government for which Department of Veteran Affairs shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
Training. All Contractor employees assigned to this contract who create, work with, or otherwise handle records are required to take Department of Veteran Affairs-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
[Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.] Flowdown of requirements to subcontractors
The Contractor shall incorporate the substance of this clause, its terms and requirements including this paragraph, in all subcontracts under this contract action, and require written subcontractor acknowledgment of same.
Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
B.2 PRICE/COST SCHEDULE
ITEM
NUMBER
DESCRIPTION OF
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
1.00 JB __________________ __________________
Equipment / Hardware Labeling PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
MANUFACTURER PART NUMBER (MPN): N/A
LOCAL STOCK NUMBER: N/A
Cast Iron, Malleable Fitting, Expansion Joint, ASTM A307 Bolt Survey PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
Valve Survey PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
Drawings - Medium, High Pressure PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
Drawings - Low Pressure (Bid Deduct) PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
Documentation - Recommendations, replacement plan, start up/shutdown procedures, interim life safety measures PRINCIPAL NAICS CODE: 238220 - Plumbing, Heating, and Air- Conditioning Contractors
PRODUCT/SERVICE CODE: J045 - Maintenance, Repair, and Rebuilding of Equipment - Plumbing, Heating, and Waste Disposal Equipment
GRAND TOTAL __________________
B.3 DELIVERY SCHEDULE
ITEM
NUMBER SHIPPING INFORMATION QUANTITY
DELIVERY
DATE
0001 SHIP TO: Department of Veterans Affairs Omaha VA Health Care System 4101 Woolworth Ave Omaha, NE 68105 1850
USA
1.00
0002 SHIP TO: Department of Veterans Affairs Omaha VA Health Care System 4101 Woolworth Ave
0003 SHIP TO: Department of Veterans
Omaha VA Health Care System 4101 Woolworth Ave
0004 SHIP TO: Department of Veterans
Omaha VA Health Care System 4101 Woolworth Ave
0005 SHIP TO: Department of Veterans Affairs Omaha VA Health Care System 4101 Woolworth Ave
0006 SHIP TO: Department of Veterans
Omaha VA Health Care System 4101 Woolworth Ave
SECTION C - CONTRACT CLAUSES
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
It is the vendor’s responsibility to review the deviated clauses by any Executive Order.
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL
PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—
(1) Within a reasonable time after the defect was discovered or should have been discovered;
and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice.
(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.—
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212- 5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected…
This is the start of the file's text. The full file is on GovTribe.