This is a technical design document package for the VA HVAC Controls Upgrade - Phase 2G project at VA Medical Center in Wilmington, Delaware, specifically addressing Building #13 Regional Office HVAC equipment controls.
The document is a partial submittal containing control system design drawings and specifications for two air handling units (AHU-1 and AHU-2) serving Building #13. The project involves replacement of pneumatic control devices with electronic Johnson DDC (Direct Digital Control) controllers, specifically FEC2611 and IOM4711 units. The control system design includes: air handling unit controls with temperature modulation through three heating/cooling control valves (V-1, V-2, V-3); freeze protection monitoring via temperature sensor T-2 with alarm thresholds at 45°F and emergency shutdown at 40°F; smoke detector integration for emergency damper closure; constant speed supply fan operation; and chiller/heat exchanger control coordination. The sequence of operations specifies manual unit startup/shutdown via the DDC panel or building management system, with damper D-1 closing when units are offline. Temperature control maintains space setpoints during heating mode and coil leaving air temperature during cooling mode through modulating control valves. All pneumatic devices have been replaced with new electronic valves provided by Modern Controls. The design references a Master Building Network Architecture Drawing and Master Building Valve Schedule maintained in separate O&M manual documentation for complete supervisory controller information, IP addresses, and valve specifications. Drawing revision date is 12/10/13, with project number 211-1009.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL AND CONTROL SYSTEMS
Environmental Control System
Building Automation System
PROJECT
ARCHITECT
ENGINEER
CONTRACTOR
REFERENCE DRAWING
NO. REVISION-LOCATION ECN DATE BY
Automatic Temperature Controls
Heating
Air Conditioning
Air Filters
Water Treatment
Coil Cleaning
Contract Operations
Time-Shared Automated Building Service
Refrigeration
Industrial Controls / Recording / Indication Equipment
Air and Water Systems Balancing
Instrumentation System Installation
Building Operations Management
Energy Conservation Control
Custom Programmed Maintenance
211-1009IW/BM 12/17/12IW/JAIW
VA MEDICAL CENTER
HVAC CONTROLS UPGRADE - PHASE 2G
WILMINGTON, DELAWARE
HATCH MOTT MACDONALD
27 BLEEKER ST.
MILLBURN, NJ 07041
BOB SMITH CONTRACTORS
281 EAST EVERGREEN ST.
WEST GROVE, PA 19390
DEPT. OF VETERANS AFFAIRS
1601 KIRKWOOD HIGHWAY
WILMINGTON, DE 19805
VA HVAC CONTROLS UPGRADE - PHASE 2G
(PARTIAL SUBMITTAL - INCLUDES BLDG. #13 REGIONAL OFFICE HVAC EQUIPMENT)
PAGE # DRAWING TITLE LAST REVISION
TP-1 TITLE PAGE 12/10/13
C-1A AIR HANDLING UNIT CONTROL – AHU-1 12/10/13
C-1B CONTROLLER WIRING DETAIL – AHU-1 12/10/13
C-1C AIR HANDLING UNIT CONTROL – AHU-2 12/10/13
C-1D CONTROLLER WIRING DETAIL – AHU-2 12/10/13
C-1E SEQUENCE OF OPERATIONS – BLDG. 13 AHU-1 & AHU-2 12/10/13
C-2 CHILLER & ASSOCIATED HEAT EXCHANGER CONTROL 12/10/13
AS-BUILT REV. FINAL POINT TERM.1 12/10/13 DB
1 2
AS-BUILT REV. ADD ‘MASTER’ NOTE1 01/28/14 DB
NOTE(S): REFER TO ‘MASTER BUILDING NETWORK ARCHITECTURE DRAWING’
PROVIDED IN OUR ATC AS-BUILT / O&M MANUAL BINDER FOR ALL
SUPERVISORY CONTROLLER INFORMATION AND ASSOCIATED IP
ADDRESSES USED BY MODERN CONTROLS.
REFER TO ‘MASTER BUILDING VALVE SCHEDULE’ PROVIDED IN OUR
ATC AS-BUILT / O&M MANUAL BINDER FOR A COMPLETE LIST OF ALL
CONTROL VALVES PROVIDED FOR AIR HANDLING UNITS AND
ASSOCIATED VAV BOXES.
REFERENCE DRAWING NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
ONTRACT NUMBER
RAWING NUMBER
Drawing Title
Project Title
BM 12/17/12
211-1009
IW/BMIW/JAIW
C-1E
SEQUENCE OF OPERATIONS -
BLDG.#13 AIR HANDLING
UNITS (AHU-1 & AHU-2)
VA HVAC CONTROLS UPGRADE -
PHASE 2G
WILMINGTON, DELAWARE
SEQUENCE OF OPERATIONS - BLDG.#13 AIR HANDLING UNITS
(TYPICAL FOR AHU-1 & AHU-2)
GENERIC AHU - SEQUENCE OF OPERATION
1. GENERAL
UNIT IS MANUALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. WHEN UNIT IS OFF DAMPER D-1 IS CLOSED. WHEN UNIT IS ON DAMPER D-1 IS OPEN.
2. TEMPERATURE CONTROL
DURING HEATING MODE THE SPACE TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT BY DCP MODULATING V-1. DURING COOLING MODE THE COOLING
COIL LEAVING AIR TEMPERATURE SENSED BY T-3 SHALL BE MAINTAINED AT SETPOINT BY DCP BY MODULATING V-2, AND THE SPACE TEMPERATURE SENSED BY T-1 SHALL
BE MAINTAINED AT SETPOINT BY MODULATING V-3.
3. AIR FLOW CONTROL
THE SUPPLY FAN SHALL RUN AT CONSTANT SPEED PROVIDING CONSTANT AIR FLOW.
4. FREEZE PROTECTION
IF THE AIR TEMPERATURE AS SENSED BY T-2 FALLS BELOW 45F AN ALARM SIGNAL IS INDICATED AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS BELOW 40F THE UNIT
SUPPLY FAN SHALL STOP, THE DAMPER D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL BE INDICATED AT THE DCP AND BMS.
5. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY FAN SHALL SHUT OFF, DAMPER D-1 CLOSE AND AN ALARM SIGNAL SHALL BE
TRANSMITTED TO THE FIRE ALARM SYSTEM. SUPPLY FAN SHALL RESTART AND DAMPER D-1 SHALL OPEN WHEN THE FIRE ALARM CIRCUIT IS MANUALLY RESET.
*SEE NOTES
NOTES: AHU-1 AND AHU-2 WERE PROGRAMMED TO MATCH THE
EXISTING CSI CONTROLLERS PROGRAM. ABOVE SEQUENCE
WAS FROM ‘AHU-1 CLINICAL’ WHICH WAS THE SAME TYPE OF
UNIT. *SEE ASSOCIATED CONTROL DIAGRAM ON DRAWING
C-1A AND C-1C.
AS-BUILT REV. NEW DWG. / POINT TERM.1 12/10/13 DB