This document is a set of mechanical and control systems design drawings for the VA HVAC Controls Upgrade – Phase 2E project at VA Medical Center in Wilmington, Delaware, representing a partial submittal that includes ground floor and first floor HVAC equipment.
The project encompasses control system design for multiple air handling units (AHU-1, AHU-2, AHU-5, AHU for Rehab, and AHU for Morgue) and variable air volume (VAV) box systems serving different building zones including clinical additions and the morgue. The drawings detail air handling unit controls with associated controller wiring diagrams and sequences of operation for each unit. Key functional requirements include temperature control via modulating control valves to maintain supply air temperature setpoints, air flow control through variable speed motor controllers and damper modulation, humidity control with override capabilities to maintain supply duct humidity below 80 percent, and freeze protection with automatic shutdown when temperatures fall below specified thresholds. Emergency shutdown capabilities are integrated to respond to smoke detection by closing dampers and stopping supply and exhaust fans. For VAV box systems, the design specifies modulating dampers controlled by space temperature sensors, with typical control sequences provided for ground floor clinical addition (34 boxes), first floor clinical addition (65 boxes), and first floor east (44 boxes) areas. Heat exchanger controls for the clinical addition include booster heater hot water pump operation based on hot water demand and sensor-modulated valve control to maintain 180°F supply water temperature. The design references Modern Controls Johnson DDC controllers (FEC2611, IOM4711 modules) as the control platform, with all control points and terminal designations to be recorded in field documentation as part of project closeout procedures.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL AND CONTROL SYSTEMS
Environmental Control System
Building Automation System
PROJECT
ARCHITECT
ENGINEER
CONTRACTOR
211-1009
DATE CONTRACT NUMBER
IW/BM
APPLICATION ENGINEER
12/30/11IW/JA
PROJECT MANAGER
IW
SALES ENGINEER
REFERENCE DRAWING
NO. REVISION-LOCATION ECN DATE BY
Automatic Temperature Controls
Heating
Air Conditioning
Air Filters
Water Treatment
Coil Cleaning
Contract Operations
Time-Shared Automated Building Service
Refrigeration
Industrial Controls / Recording / Indication Equipment
Air and Water Systems Balancing
Instrumentation System Installation
Building Operations Management
Energy Conservation Control
Custom Programmed Maintenance
VA MEDICAL CENTER
HVAC CONTROLS UPGRADE - PHASE 2E
WILMINGTON, DELAWARE
HATCH MOTT MACDONALD
27 BLEEKER ST.
MILLBURN, NJ 07041
BOB SMITH CONTRACTORS
281 EAST EVERGREEN ST.
WEST GROVE, PA 19390
DEPT. OF VETERANS AFFAIRS
1601 KIRKWOOD HIGHWAY
WILMINGTON, DE 19805
VA HVAC CONTROLS UPGRADE - PHASE 2E
(PARTIAL SUBMITTAL - INCLUDES GROUND & 1ST FLOOR HVAC EQUIPMENT)
PAGE # DRAWING TITLE LAST REVISION
TP-1 TITLE PAGE 01/28/14
C-1A AIR HANDLING UNIT CONTROL – AHU-1 (MER 245) 12/06/13
C-1B CONTROLLER WIRING DETAIL – AHU-1 (MER 245) 12/06/13
C-1C SEQUENCE OF OPERATIONS – AHU-1 (MER 245) 12/06/13
C-2A AIR HANDLING UNIT CONTROL – AHU-2 (MER 245) 12/06/13
C-2B CONTROLLER WIRING DETAIL – AHU-2 (MER 245) 12/06/13
C-2C SEQUENCE OF OPERATIONS – AHU-2 (MER 245) 12/06/13
C-3A AIR HANDLING UNIT CONTROL – AHU-5 (MER 227) 12/06/13
C-3B CONTROLLER WIRING DETAIL – AHU-5 (MER 227) 12/06/13
C-3C SEQUENCE OF OPERATIONS – AHU-5 (MER 227) 12/06/13
C-4A AIR HANDLING UNIT CONTROL – AHU FOR REHAB 12/06/13
C-4B CONTROLLER WIRING DETAIL – AHU FOR REHAB. 12/06/13
C-4C SEQUENCE OF OPERATIONS – AHU FOR REHAB 12/06/13
C-5A AIR HANDLING UNIT CONTROL – AHU FOR MORGUE 12/06/13
C-5B CONTROLLER WIRING DETAIL – AHU FOR MORGUE 12/06/13
C-5C SEQUENCE OF OPERATIONS – AHU FOR MORGUE 12/06/13
C-6A TYPICAL VAV BOX CONTROL; GROUND FLOOR CLINICAL ADDITION 12/06/13
C-6B TYPICAL VAV BOX CONTROL; 1ST FLOOR ADDITION 12/06/13
C-6C TYPICAL VAV BOX CONTROL; 1ST FLOOR EAST 12/06/13
C-7A TYPICAL HEAT EXCHANGER CONTROL (CLINICAL) 12/20/13
C-7B CONTROLLER WIRING DETAIL – TYPICAL HEAT EXCHANGER (CLINICAL) 12/20/13
SUB. REVISION TITLE DATES1 12/13/11 VD
AS-BUILT REV. DRAWING TITLE/DATES2 12/06/13 BM
2 3
AS-BUILT REV. ADD ‘MASTER’ NOTE3 01/28/14 DB
NOTE(S): REFER TO ‘MASTER BUILDING NETWORK ARCHITECTURE DRAWING’
PROVIDED IN OUR ATC AS-BUILT / O&M MANUAL BINDER FOR ALL
SUPERVISORY CONTROLLER INFORMATION AND ASSOCIATED IP
ADDRESSES USED BY MODERN CONTROLS.
REFER TO ‘MASTER BUILDING VALVE SCHEDULE’ PROVIDED IN OUR
ATC AS-BUILT / O&M MANUAL BINDER FOR A COMPLETE LIST OF ALL
CONTROL VALVES PROVIDED FOR AIR HANDLING UNITS AND
ASSOCIATED VAV BOXES.
IW/BMIW/JAIW BM 12/30/11
C-1C
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
TRACT NUMBER
WING NUMBER
Drawing Title
SEQUENCE OF OPERATIONS -
AHU-1 (MER 245)
Project Title
VA HVAC CONTROLS UPGRADE -
PHASE 2E
WILMINGTON, DELAWARE
AHU-1 (MER 245) AND AHU-4 (MER 2147) - SEQUENCE OF OPERATION
1. GENERAL
UNITS ARE NORMALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. H-O-A SWITCH SHALL BE KEPT IN THE “AUTO” POSITION. “HAND” AND “OFF”
POSITIONS SHALL BE USED FOR MAINTENANCE ONLY. WHEN THE UNITS ARE “OFF” D-1 SHALL BE CLOSED. WHEN THE UNITS ARE “ON” D-1 SHALL BE FULLY OPEN.
2. TEMPERATURE CONTROL
SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING V-1 AND V-2 IN SEQUENCE.
PUMP 1-P7 RUNS WHEN OUTDOOR AIR TEMPERATURE AT T-1 IS BELOW 45°F AND ABOVE 80°F. PUMP IS OFF WHEN OUTDOOR AIR TEMPERATURE IS BETWEEN 46°F AND
79°F.
3. AIR FLOW CONTROL
THE SUPPLY FAN SHALL RUN AT CONSTANT SPEED PROVIDING CONSTANT AIR FLOW.
4. HUMIDITY CONTROL
WHEN THE DCP IS NOT CALLING FOR HUMIDIFICATION (BASED ON HUMIDITY SENSED BY THE EXHAUST BY THE EXHAUST AIR HUMIDISTAT H-1), THE TWO-WAY “ON-OFF”
CONTROL VALVE V-3 SHALL REMAIN CLOSED. WHEN THE DCP IS CALLING FOR HUMIDIFICATIN, V-3 SHALL OPEN.
EXHAUST AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING CONTROL VALVE V-4 TO MAINTAIN THE DESIRED HUMIDITY. THE DCP SHALL
OVERRIDE THE CONTROL TO MAINTAIN HUMIDITY IN SUPPLY DUCT BELOW 80% AS SENSED BY H-2.
DCP SHALL CLOSE VALVE V-3 WHENEVER THE SUPPLY FAN IS OFF.
VALVE V-4 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM
TEMPERATURE.
5. FREEZE PROTECTION
IF THE AIR TEMPERATURE SENSED BY T-2 FALLS BELOW 45°F AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS BELOW 40°F THE
SUPPLY FAN SHALL SHUT DOWN, D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL INDICATE AT THE DCP AND BMS.
6. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY FAN SHALL SHUT OFF AND AN ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE
ALARM SYSTEM, DAMPER D-1 SHALL CLOSE, EXHAUST FAN SERVICING AREAS OF THE SUPPLY FAN SHALL CONTINUE TO RUN.
SUPPLY FAN RESTARTS AND DAMPER D-1 OPENS WHEN THE FIRE ALARM CIRCUIT IS MANUALLY RESET.
CONTROLLER WIRING DETAIL – AHU-1 (MER 245)
(ASSOCIATED W/ AHU-4 IN MER 2147)
AS-BUILT REV. NEW DWG.1 12/6/13 BM
SEE CONTROL DRAWING C-1A/1B IN PHASE-2E FOR
ASSOCIATED AIR HANDLING UNIT ‘AHU-1 (MER 245) & AHU-4
(MER 2147)’ CONTROL. THESE (2) UNITS ARE IN SEPARATE
MECHANICAL ROOMS BUT OPERATE TOGETHER PER THIS
SEQUENCE OF OPERATIONS.
THE SAME CONTROL DRAWING IS REFERENCED ON C-4A/4B
FOR ASSOCIATED AIR HANDLING UNIT ‘AHU-4 (MER 2147)’ IN
PHASE-2D.
NOTE(S):1
C-2C
BY DATE
APPROVED
ONTRACT NUMBER
RAWING NUMBER
Drawing Title
SEQUENCE OF OPERATIONS -
AHU-2 (MER 245)
Project Title
VA HVAC CONTROLS UPGRADE -
PHASE 2E
WILMINGTON, DELAWARE
SEQUENCE OF OPERATIONS - AHU-2 (MER 245)
AHU-2 (MER 245) SEQUENCE OF OPERATION
1. GENERAL
UNIT AHU-2 AND RETURN FAN 1-RF ARE NORMALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. H-O-A SWITCH SHALL BE KEPT IN THE “AUTO” POSITION. “HAND” AND “OFF” POSITIONS SHALL BE
USED FOR MAINTENANCE ONLY. WHEN THE UNIT IS “OFF” D-1, D-2, D-3, SD-1 AND SD-2 SHALL BE CLOSED. WHEN THE UNIT IS “ON” D-1, D-2, D-3, SD-1 AND SD-2 SHALL BE OPEN.
2. TEMPERATURE CONTROL
SUPPLY AIR TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING EITHER V-1 AND V-2 OR D-1, D-2 AND D-3 IN SEQUENCE.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR PROVIDED BY BMS IS ABOVE 65°F DCP PREVENTS MODULATION OF D-1, D-2 AND D-3; D-1 ASSUMES MINIMUM OUTSIDE AIR POSITION (D-3 IS CLOSED AND D-2 IS OPEN.)
V-1 MODULATES TO MAINTAIN SUPPLY AIR TEMPERATURE SENSED BY T-1.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR PROVIDED BY BMS IS BETWEEN 65°F AND THE SUPPLY AIR TEMPERATURE SENSED BY T-1 DAMPER D-2 IS CLOSED, DAMPER D-1 IS OPEN TO MAXIMUM OUTSIDE AIR
POSITION AND D-3 IS FULLY OPENED. V-1 MODULATES TO MAINTAIN THE SUPPLY AIR TEMPERATURE SENSED BY T-1.
WHEN THE TEMPERATURE OF THE OUTSIDE AIR PROVIDED BY BMS IS BELOW THE SUPPLY AIR TEMPERATURE SENSED BY T-1 THEN DAMPERS D-1, D-2 AND D-3 MODULATE TO MAINTAIN THE SCHEDULED SUPPLY AIR
TEMPERATURE. IF D-2 IS OPEN AND D-1 IS CLOSED TO MINIMUM OUTSIDE AIR IN THIS MODE V-2 MODULATES OPEN TO MAINTAIN THE SUPPLY AIR TEMPERATURE.
3. AIR FLOW CONTROL
THE SUPPLY AIR FLOW IS CONTROLLED BY THE DCP MODULATING SUPPLY FAN VARIABLE SPEED MOTOR CONTROLLER (VSMC) TO MAINTAIN THE DUCT STATIC PRESSURE SETPOINT AS SENSED BY SPS-1.
THE DCP BY USING TOTAL SUPPLY AIR AND RETURN AIR FLOW SIGNALS SHALL RESET THE RETURN AIR FAN VSMC TO MAINTAIN A CONSTANT CFM DIFFERENCE BETWEEN THE SUPPLY AIR FAN CFM AND THE
RETURN AIR FAN CFM.
THE DCP BY USING HIGH PRESSURE SENSOR SPS-2 LOCATED AT THE SUPPLY AIR FAN DISCHARGE PREVENTS THE SUPPLY AIR FAN FROM DEVELOPING OVER 3” STATIC PRESSURE. IF STATIC PRESSURE AT SPS-2
EXCEEDS 3” THE SUPPLY FAN STOPS.
4. HUMIDITY CONTROL
WHEN THE DCP IS NOT CALLING FOR HUMIDIFICATIN (BASED ON HUMIDITY SENSED BY THE EXHAUST AIR HUMIDISTAT H-1) THE TWO-WAY “ON-OFF” CONTROL VALVE V-3 SHALL REMAIN CLOSED WHEN THE DCP IS
CALLING FOR HUMIDIFICATION THE, V-3 SHALL OPEN.
EXHAUST AIR HUMIDITY SHALL BE MAINTAINED AT SETPOINT VIA DCP BY MODULATING CONTROL VALVE V-4 TO MAINTAIN THE DESIRED HUMIDITY. THE DCP SHALL OVERRIDE THE CONTROL TO MAINTAIN HUMIDITY IN
SUPPLY DUCT BELOW 80 AS SENSED BY H-2.
DCP SHALL CLOSE VALVE V03 WHENEVER THE SUPPLY FAN IS OFF.
VALVE V-4 SHALL BE INTERLOCKED WITH A TEMPERATURE SWITCH TO KEEP THE HUMIDIFIER OFF UNTIL CONDENSATE TEMPERATURE APPROACHES STEAM TEMPERATURE.
5. FREEZE PROTECTION
IF THE AIR TEMPERATURE SENSED BY T-2 FALLS BELOW 45°F AN ALARM SIGNAL SHALL INDICATE AT THE DCP AND BMS. IF THE TEMPERATURE FALLS BELOW 40°F THE SUPPLY FAN SHALL SHUT DOWN, D-1 SHALL
CLOSE AND A CRITICAL ALARM SHALL INDICATE AT THE DCP AND BMS.
6. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY AND RETURN FANS SHALL STOP AND THE ALARM SIGNAL SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM, SMOKE
DAMPERS SD-1 AND SD-2 DHALL CLOSE. THE SUPPLY AND RETURN FANS SHALL RESTART AND SMOKE DAMPERS SHALL BE OPEN WHEN THE FIRE ALARM CIRCUIT IS MANUALLY RESET.
7. EMERGENCY CONSTANT SPEED OPERATION
UPON FAILURE OF VSMC THE SUPPLY AND RETURN FANS SHALL BE STARTED/STOPPED MANUALLY AT THE DCP OR THE BMS THROUGH THE BYPASS STARTER. FANS SHALL THEN OPERATE AT CONSTANT SPEED.
AS-BUILT REV. NEW DWG. / POINT TERM.1 12/6/13 BM
IW/BMIW/JAIW BM 12/30/11
C-3C
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
ONTRACT NUMBER
RAWING NUMBER
Drawing Title
SEQUENCE OF OPERATIONS -
AHU-5 (MER 227)
Project Title
VA HVAC CONTROLS UPGRADE -
PHASE 2E
WILMINGTON, DELAWARE
SEQUENCE OF OPERATIONS - AHU-5 (MER 227)
AHU-5 (VESTIBULE) MER-227 - SEQUENCE OF OPERATION
1. GENERAL
UNIT IS MANUALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. WHEN UNIT IS OFF DAMPER D-1 IS CLOSED. WHEN UNIT IS
ON DAMPER D-1 IS OPENED.
2. TEMPERATURE CONTROL
THE SPACE AIR TEMPERATURE, SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT BY DCP MODULATING V-1 IN SEQUENCE. THE FAN STOPS
AND V-1 CLOSES TO COIL WHEN OUTDOOR AIR TEMPREATURE IS ABOVE 50°F.
3. AIR FLOW CONTROL
THE SUPPLY FAN SHALL RUN AT CONSTANT SPEED PROVIDING CONSTANT AIR FLOW.
4. FREEZE PROTECTION
IF THE AIR TEMPERATURE AS SENSED BY T-2 FALLS BELOW 45°F AN ALARM SIGNAL IS INDICATED AT THE DCP AND BMS. IF THIS TEMPERATURE
FALLS BELOW 40°F THE UNIT SUPPLY FAN STOPS AND A CRITICAL ALARM IS INDICATED AT THE DCP AND BMS.
5. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY DUCT SMOKE DETECTOR THE SUPPLY FAN SHALL SHUT OFF, DAMPER D-1 SHALL CLOSE AND AN ALARM SIGNAL
SHALL BE TRANSMITTED TO THE FIRE ALARM SYSTEM. SUPPLY FAN RESTARTS AND DAMPER D-1 OPENS WHEN THE FIRE ALARM CIRCUIT IS
MANUALLY RESET.
AS-BUILT REV. NEW DWG.1 12/6/13 DB