S02 - 07 - VA Hospital Phase 2F - ATC As-Built Drawings.pdf
PDF 3 MB Posted
- Solicitation number
- 36C24426Q0857
About this file
This document is a set of technical drawings and specifications for a VA HVAC Controls Upgrade - Phase 2F project at the VA Medical Center in Wilmington, Delaware. The project represents a partial submittal that includes Building #17 CLC HVAC equipment controls.
The technical drawings specify the installation and control of multiple Air Handling Units (AHU-1 Main MER, AHU-1 West MER, and AHU-2 East MER) with integrated mechanical and control systems. Key components include pneumatic and electronic control devices that have been replaced with modern Johnson DDC (Direct Digital Control) controllers, including FEC2611 and IOM4711 controllers for sequencing operations. The design incorporates temperature control through sensors (T-1, T-2, T-3) that maintain setpoints via modulating control valves (V-1, V-2, V-3), freeze protection protocols triggered at 45°F with shutdown at 40°F, emergency shutdown/restart functionality via duct-mounted smoke detectors, and constant speed supply fan operation with air flow control. Additional systems include humidifier controls, VAV (Variable Air Volume) box controls for Building #17 with 37 total zones, and chiller and heat exchanger controls with pump management. The sequence of operations details specify manual unit start/stop via DCP (Direct Control Panel) or remote BMS (Building Management System) control, with damper D-1 closing when units are off. The bill of materials identifies specific sensor and equipment components including TE-G315F-1 sensors, MS-FEC2611-0 controllers, and associated expansion modules. All drawings carry a revision date of 12/10/13 to 01/28/14 and are identified as AS-BUILT documentation prepared for VA Medical Center in Wilmington, Delaware.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VD 1/04/12
REFERENCE DRAWING
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
ONTRACT NUMBER
RAWING NUMBER
Drawing Title
Project Title
211-1009
IW/BMIW/JAIW
C-1C
SEQUENCE OF OPERATIONS -
AHU MAIN MER
VA HVAC CONTROLS UPGRADE -
PHASE 2F
WILMINGTON, DELAWARE
SEQUENCE OF OPERATIONS – AHU MAIN MER
AHU-1 FOR CLC SEQUENCE OF OPERATION
1. GENERAL
UNIT IS MANUALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. WHEN UNIT IS OFF DAMPER D-1 IS CLOSED. WHEN UNIT IS ON DAMPER D-1 IS OPEN.
2. TEMPERATURE CONTROL
DURING HEATING MODE THE SPACE TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT BY DCP MODULATING V-1. DURING COOLING MODE THE COOLING
COIL LEAVING AIR TEMPERATURE SENSED BY T-3 SHALL BE MAINTAINED AT SETPOINT BY DCP BY MODULATING V-2, AND THE SPACE TEMPERATURE SENSED BY T-1 SHALL
BE MAINTAINED AT SETPOINT BY MODULATING V-3.
3. AIR FLOW CONTROL
THE SUPPLY FAN SHALL RUN AT CONSTANT SPEED PROVIDING CONSTANT AIR FLOW.
4. FREEZE PROTECTION
IF THE AIR TEMPERATURE AS SENSED BY T-2 FALLS BELOW 45F AN ALARM SIGNAL IS INDICATED AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS BELOW 40F THE UNIT
SUPPLY FAN SHALL STOP, THE DAMPER D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL BE INDICATED AT THE DCP AND BMS.
5. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY FAN SHALL SHUT OFF, DAMPER D-1 CLOSE AND AN ALARM SIGNAL SHALL BE
TRANSMITTED TO THE FIRE ALARM SYSTEM. SUPPLY FAN SHALL RESTART AND DAMPER D-1 SHALL OPEN WHEN THE FIRE ALARM CIRCUIT IS MANUALLY RESET.
AS-BUILT REV. NEW DWG.1 12/10/13 DB