This Damage Survey Report details proposed debris removal services in response to Hurricane Dorian in the U.S. Virgin Islands. The Natural Resources Conservation Service is requesting removal of sediment and debris obstructing a road bridge and downstream drainage structures in Christiansted, St. Croix. Services include clearing 40 feet upstream and 100 feet downstream of the bridge, removing vegetative and sediment debris from the downstream left bank, and seeding and mulching affected areas. The estimated schedule is 12 days to complete mobilization, debris removal and disposal, streambank shaping, general cleanup, and demobilization. The solicitation is seeking bids for debris removal services in the U.S. Virgin Islands under Solicitation 12FPC323Q0091 from the Department of Agriculture Farm Production and Conservation agency.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NRCS-PDM-20

June 2016

Natural Resources Conservation Service

DAMAGE SURVEY REPORT (DSR)

Emergency Watershed Protection Program – Recovery

Section 1B - Sponsor Information

Sponsor Name:

Address:

City/State/Zip:

Telephone Number Fax:

Section 1A Date of report

DSR number

Project number

NRCS Entry Only Eligible: Yes No Approved: Yes No Funding priority number (from sect. 4) Limited Resource Area: Yes No

1 Major disaster declaration 2 Emergency declaration 3 Fire management assistance declaration 4 Local declaration

Section 1C - Site Location Information County: State Congressional District

Latitude Longitude UTM Coordinates

Drainage name Site name

Reach

Damage description

PROPOSED ACTION: Removal of sediment and debris 40 ft upstream and 100 ft downstream from the Bridge.

Clearing under bridge is included in the work to be performed. Removal of vegetative and sediment debris from downstream left bank. Applies seeding and mulching on channel banks and all affected areas.

EWP SEDIMENT AND VEGETATIVE DEBRIS WILL BE REMOVED TO RESTORE STREAM/STRUCTURE

ORIGINAL FLOW CAPACITY. THE CULVERTS, STRUCTURES AND/OR UNDER THE BRIDGE MUST

BE CLEANED BY THE CONTRACTOR.

CONTRACTOR MUST ESTIMATE ALL THE QUANTITIES TO DETERMINE THE WORK TO BE COMPLETED AND

THE COST OF THE PROJECT.

CONSULT WITH UTILITIES AUTHORITIES FOR POWER, WATER, COMMUNICATONS LOCATED WITHIN EWP

PROPOSED WORK AREA.

THE RESULTED MATERIAL SHALL BE REMOVED FROM SITE AND DUMPED IN A PREVIOUSLY APPROVED

LOCATION.

EWP - EMERGENCY PHASE

DSR: VI-STC- 400

Coordinate System: NAD 1983 UTM Zone 19N Projection: Transverse Mercator Units: Meter

Assisted by: CE Rolando Collazo CE Lee Brown

Legend

Sites Dic_2019

0 50 100 150 20025 Meters

1:4,000

EWP TEAM

Caguas Field Office Date: 12/ 10 / 2019

Addres:Melvin H. Evan Hwy Int.

St Ann's Rd, Christiansted, Strawberry Hill, St Croix, V.I.

Location Map: Aereal Photo - After Hurricane Dorian

The Village Mall

Richardo Richards Elementary School Melvin H. Evan Hwy

VI-STC-400St Ann's Rd

EWP - EMERGENCY PHASE

DSR: VI-STC- 400

Coordinate System: NAD 1983 UTM Zone 19N Projection: Transverse Mercator Units: Meter

Assisted by: CE Rolando Collazo CE Lee Brown

Legend

Sites Dic_2019

8Location Map: Topographic Map 1:10000

0 150 300 450 60075 Meters

1:10,000

EWP TEAM

Caguas Field Office Date: 12/ 10 / 2019

Addres:Melvin H. Evan Hwy Int.

St Ann's Rd, Christiansted, Strawberry Hill, St Croix, V.I.

VI-STC-400

Rolando.Collazo Sticky Note

Damage Survey Report (DSR) DSR USVI-STC-400 EWP Debris/Obstruction Removal - ST Croix – Hurricane Dorian

Christiansted, Strawberry Hill, St Croix, VI Attachment Site Pictures

Picture #1: Upstream from Road. Need maintenance, sediment to be removed.

Picture #2: Under Bridge first span, Inlet upstream, partially sedimented.

Picture #3: Under Bridge second span, Inlet Upstream, Partially sedimented.

Picture #4: Downstream Inside waterway. Woody debris to be removed, electric pole damage.

Picture #5: Downstream left bank. Woody debris, trash and sediment deposit on pile.

Picture #6: Downstream left bank. Sanitary manhole (SEWER) OVERFLOWING.

Picture #7: Road Intersection.

Picture #8: Road Intersection.

DSR#

DURATION

(Days) 1 2 3 4 5 6 7 8 9 10 11 12

1 Mobilization to site 1 X 2 Access prep 1 X 3 Debris removal and disposal 6 X X X X X X 4 Streambank shaping 1 X 5 General clean-up 2 X X 6 Demobilization 1 X

Damage Survey Report Proposed Schedule (Gantt Chart)

Green cells below have drop down menus Yellow cells below accept values

ITEM

NO.

TASKS

PROPOSED

START DATE

ESTIMATED

END DATE

Days

VI-STC-400

CPA52-PR-QUE-001.pdf
CPA-52
CleanAir
CleanAir (FS1)
CleanAir (FS2)
CleanWater
CleanWater FS
CulturalResources
CulturalResources FS
EandTSpecies
EandTSpecies FS
EssentialFishHabitat
EssentialFishHabitat FS
FloodplainManagement
FloodplainManagement FS
InvasiveSpecies
InvasiveSpecies FS
NaturalAreas
NaturalAreas FS
RiparianArea
RiparianArea FS
WildScenicRivers
WildScenicRivers FS
ResourceConsiderations-optional
DSR-PR-QUE-001_COPY.pdf
DAMAGE SURVEY REPORT (DSR)
Emergency Watershed Protection Program – Recovery
Section 1D - Site Evaluation
Section 1E - Proposed Action
Section 1F - NRCS State Office Review and Approval
Section 2 - Environmental Evaluation and Special Environmental Concerns
Section 3 - Economic Considerations
Section 4 Social Consideration
Section 5 - Group Representation Information
Section 6 - Engineering Cost Estimate
Section 7 - NRCS EWP Funding Priority
Section 8 - Findings
Section 9 - Attachments:
Instructions for Completing the NRCS-PDM-20, DSR
NRCS Entry Only
Section 1A
Section 1B - Sponsor Information
Section 1C - Site Location Information
Date:
Date:
Date:
Date:

Untitled

GC-PR-QUE-001.pdf
1 Gantt Chart
DSR VI-STC-400 Gantt Chart.pdf
Gantt Chart
Date of report: 12-10-20119
Project number:
Eligible yes: Yes
Eligible no: Off
Approved yes: Off
Approved no: Off
Funding Priority #:
LRA yes: Off
LRA no: Off
Major disaster:
0: Off
Emerg declaration: Off
Fire mgmt assistance: Off
Local declarateion: Yes
Sponsor name: VI Department of Public Works
Address: 8244 Subbase Charlotte Amalie
City State Zip: St Thomas / US Virgin Islands / 8244 00802
Sponsor phone: 1 340-776-4844
Sponsor fax:
Site County: St. Croix
Site State: Virgin Island
Site Congr District:
Site latitude: 17.725590
Site longitude: -64.712602
Site UTM coordinates: NAD83, 19 Zone
Site drainage name:
Site name: Christiansted, Strawberry Hill
Site Reach:
Site damage desciption: SEDIMENTS AND DEBRIS CLOGGING ROAD BRIDGE AND DOWNSTREAM DRAIN STRUCTURE REDUCING FLOW CAUSING ROAD FLOOD WASHOUT AND FLOODING. ADDITIONAL VEGETATIVE AND SEDIMENT DEBRIES WAS REMOVED FROM THE DRAINAGE AND DEPOSITED ON PILES DOWNSTREAM LEFT BANK. ROAD SERVICES AS MAIN ACCESS TO HOMES AND BUSINESSES. NOTE: A UTILITY (SEWER AND POWER POLE) IS IN THE EWP PROPOSED WORK AREA. CONSIDER COORDINATION WITH UTILITIES AUTHORITY BEFORE CONTRACTIN.
DSR number: USVI-STC-400