S01 Amendment 02 QAs.pdf
PDF 331 KB Posted
- Attached to
- Debris Removal Services, U. S. Virgin Islands, St. Croix Federal contract opportunity
- Solicitation number
- 12FPC323Q0091
About this file
This document contains additional questions and answers related to solicitation number 12FPC323Q0091 from the Department of Agriculture Under Secretary for Farm Production and Conservation for debris removal services in St. Croix, U.S. Virgin Islands. The first question addresses temporary traffic control requirements during roadway work, clarifying that the contractor must furnish, install, and remove all traffic signs and safety devices in compliance with public safety standards. The second question indicates that an old car shown in a site photo is not part of the proposed work area and does not need removal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S01 Amendment 03 12FPC323Q0091.pdf | ||
| S01 Amendment 03 QAs.pdf | ||
| S01 Amendment 02 12FPC323Q0091.pdf | ||
| S01 Amendment 01 Site Showing Report 9_7_2023_updated.pdf | ||
| S01 Amendment 01 Supporing Images DSR_VI-STC-400_Site Showing.pdf | ||
| S01 Amendment 01 12FPC323Q0091.pdf | ||
| S01 Amendment 01 Supporing Images DSR_VI-STC-401_Site Showing.pdf | ||
| S01 Attachment 4 Service Wage Determinations 2015-5715.pdf | ||
| S01 Attachment 5 NRCS Supplement to OSHA Parts 1910 and 1926.pdf | ||
| S01 Attachment 3 DSR-VI-STC-401 FINAL_Sponsor Package_rev 03232023.pdf | ||
| S01 12FPC323Q0091.pdf | ||
| S01 Attachment 1 EWP SOW_May 2023 v1_rev DSR-VI-STC-400.pdf | ||
| S01 Attachment 2 DSR-VI-STC-400 FINAL_Sponsor Package_rev 03202023.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addi�onal Ques�ons:
1. Seeing that work needs to be done in close proximity to the roadway, will the contractor be required to schedule and plan temporary traffic control, like traffic cones and signs, for public safety, or will this be handled by public works, if it's something that is needed?
• The contractor shall furnish, install, and, upon completion of the work, promptly remove all signs, warning devices, and other materials used in the performance of this work for compliance with public safety requirements during construction. The contractor's operations shall cause no unnecessary inconvenience to the public. The public rights-of way shall be always maintained unless interruption is authorized by proper local authority. Any associated expense for this activity is the responsibility of the contractor.
All signs, signals, barricades, use of flaggers, and other traffic control and public safety devices shall conform to the general requirements set forth in the Manual of Uniform Traffic Control Devices (MUTCD) and the latest edition of Standard Highway Signs and Standard Alphabets for Highway Signs and/or OSHA Construction Industry Standards (29 CFR Part 1926), Subpart G, Signs, Signals, and Barricades.
2. Also, noticed in one of the pictures at site USVI-STC-400 there is an old car. Does this car need to be removed from the area as well?
• No, the car it is not part of the DSR proposed action. In the photo of this site included in the “site showing supporting images” document, shows the original vs existing condition of the downstream left bank.
o The objective is to show that the sediment and vegetative debris to be removed still piled in the area bud covered by dense vegetation. The car it is outside of the working area and next to a private residence.