S01 Amendment 03 QAs.pdf
PDF 218 KB Posted
- Attached to
- Debris Removal Services, U. S. Virgin Islands, St. Croix Federal contract opportunity
- Solicitation number
- 12FPC323Q0091
About this file
This document contains questions and answers regarding Amendment 03 to Solicitation 12FPC323Q0091 for debris removal services in St. Croix, U.S. Virgin Islands. The amendment increases the performance time per site from 10 to 20 days, for a total project time of 40 days. The original proposal to stabilize a scoured area with 30 feet of riprap was changed to backfilling with soil from clearing and shaping the channel, compacted as specified in the statement of work. Trees for removal will be identified by the sponsor, the Department of Planning and Natural Resources, and the contractor will be responsible for removing and disposing of downed trees, logs, stumps, brush, tops, blockages, rubbish, sediment, and debris from the channel and adjacent areas, including live trees over 6 inches in diameter or affecting the watercourse. Pricing should assume removal of six trees over 6 inches and eight trees under 6 inches at one site, and one tree under 6 inches at another site.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S01 Amendment 03 12FPC323Q0091.pdf | ||
| S01 Amendment 02 12FPC323Q0091.pdf | ||
| S01 Amendment 02 QAs.pdf | ||
| S01 Amendment 01 Site Showing Report 9_7_2023_updated.pdf | ||
| S01 Amendment 01 Supporing Images DSR_VI-STC-400_Site Showing.pdf | ||
| S01 Amendment 01 12FPC323Q0091.pdf | ||
| S01 Amendment 01 Supporing Images DSR_VI-STC-401_Site Showing.pdf | ||
| S01 Attachment 4 Service Wage Determinations 2015-5715.pdf | ||
| S01 Attachment 5 NRCS Supplement to OSHA Parts 1910 and 1926.pdf | ||
| S01 Attachment 1 EWP SOW_May 2023 v1_rev DSR-VI-STC-400.pdf | ||
| S01 Attachment 2 DSR-VI-STC-400 FINAL_Sponsor Package_rev 03202023.pdf | ||
| S01 Attachment 3 DSR-VI-STC-401 FINAL_Sponsor Package_rev 03232023.pdf | ||
| S01 12FPC323Q0091.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The performance time increase 10 more days per site. 20 days per site totalizing 40 days of total project performance time?
o Yes
The Attachment 2 DSR‐VI‐STC‐401 Final_Sponsor Package rev 03232023.pdf still mentioning in the proposed action “Stabilize the scouring area with 30 ft with rip rap downstream right bank”.
o According to the solicitation and SOW, the original submitted DSR for site VI- STC-401 include a 30 ft riprap stream bank protection. After evaluating with the Contracting Officer, the riprap component needs to be removed from the Site Specific information to maintain the services as debris removal (clearing and snagging) only.
o The original riprap proposed action was changed to stabilize the scoured area with the available soil from the site clearing or hauling suitable material of site for use as earth fill with compaction and protection as specified in the SOW with seeding, fertilizing, and mulching. The area shall be cleared, backfill material shall be obtained from existing channel clearing and shaping. Earth-fill is required to be compacted to a density equivalent to that of the surrounding fill. The work also requires providing and installing seeding, fertilizing, and mulching in all excavated, fill, and disturbed areas as specified in the SOW.
The sponsor (DPNR) is responsible to identify the trees to be removed.
o Yes o The contractor will be responsible to remove and properly dispose of all downed trees, logs, stumps, brush, tops, blockages, rubbish, sediment, and debris (organic and inorganic) deposited in and adjacent to the channel; inside culverts/pipes and under bridges including live trees and roots obstructing water course inside channel bottom and stream banks after sponsor approval (DPNR).
o For quoting purpose consider the removal and disposal of six (6) live trees with a diameter greater than 6 inches and eight (8) live trees with a diameter less than 6 inches on the site VI-STC-401 downstream of the culverts.
o For site VI-STC-400 consider the removal and disposal of one (1) live tree with a diameter less than 6 inches on site upstream of the culverts.