S01 Amendment 01 Supporing Images DSR_VI-STC-400_Site Showing.pdf

PDF 4 MB Posted

Attached to
Debris Removal Services, U. S. Virgin Islands, St. Croix
Solicitation number
12FPC323Q0091
Issued by

About this file

This document contains a damage survey report and associated site pictures documenting debris removal needs in St. Croix, U.S. Virgin Islands following Hurricane Dorian. The damage survey report details sediment, vegetative debris, woody debris, and an electric pole that need removal from upstream and downstream areas within several waterways. It also notes an overflowing sanitary manhole and debris deposited on a downstream pile. The related federal contract opportunity is a solicitation from the Department of Agriculture seeking debris removal services in St. Croix, U.S. Virgin Islands. The solicitation number is 12FPC323Q0091 and is seeking debris removal to address needs documented in the damage survey report and site pictures.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Damage Survey Report (DSR) DSR VI-STC-401 EWP Debris/Obstruction Removal - ST Croix – Hurricane Dorian

Catherines Rest, St Croix, VI

Picture #1: Upstream Inside waterway, sediment, and vegetative debris to be removed.

Site showing 8/31/2023.

Picture #2: Upstream, live tree to be removed obstructing water course inside channel bottom.

Site showing 8/31/2023.

Damage Survey Report (DSR) DSR USVI-STC-400

Christiansted, Strawberry Hill, St Croix, VI

Picture #3: Upstream from Road. Need maintenance, sediment to be removed.

Picture #4: Under Bridge span 2, Inlet Upstream, partially sedimented. Site showing 8/31/2023.

Attachment Site Pictures

Picture #6, 7#: Downstream Inside waterway. Woody debris to be removed inside the waterway and, electric pole damage. DSR Original Pictures vs Existing conditions

Picture #5: Under Bridge span 2, Inlet Upstream, partially sedimented. Site showing 8/31/2023.

Picture #6: Downstream left bank. Sanitary manhole (SEWER) OVERFLOWING.

Picture #5: Downstream left bank. Woody debris, trash, and sediment deposit on pile. DSR Original Pictures vs Existing conditions

Additional pictures showing existing Downstream conditions.

File details come from the government source that posted it. Updated .