S000000348 Q&A.pdf
PDF 81 KB Posted
- Attached to
- High School Championship Video Production
- Solicitation number
- S000000348
- Issued by
- Franklin County, Arkansas
About this file
This document is a question and answer (Q&A) extract related to a state and local contract opportunity for video production services for high school championship events in Arkansas. The Arkansas Educational Television Commission dba Arkansas PBS (ARPBS) is seeking bids for a one-year contract with up to six one-year renewal options to provide switched program feeds and clean feeds for 11 filming days across volleyball, football, basketball, baseball, and softball championships taking place at various locations in central Arkansas. Bids are due by August 22, 2024 at 10:00 a.m. Central Time, and the anticipated contract start date is October 1, 2024.
The contract requires detailed technical specifications and personnel requirements, including equipment, staffing, and performance standards. Pricing is based on daily rates for various required personnel positions as well as an hourly rate for inclement weather production days. The solicitation does not mention any set-aside designations or restrictions on the types of organizations that can respond, and there are no details provided about any incumbent vendors or current contractors, or any existing infrastructure or technology that requires integration. The total contract value is not specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S000000348 IFB- High School Championship Video Production.pdf | ||
| S000000348 Price Sheet Final.xlsx | XLSX spreadsheet | |
| S000000348 Response Packet.pdf | ||
| S000000348 Response Packet- Amended.docx | DOCX document | |
| S000000348 Contract and Grant Disclosure.pdf | ||
| Solicitation Response Guide~20.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Number Question Subject Question Text Answers
1 Streaming? Will the event need to be streamed? No.
2 Section 2.1 What is the championship event? See Section 2.1 of the RFP.
3 Section 2.4 How many days, and what is the location? See Section 2.4 of the RFP.
4 Section 2.4 D Are setup days included for the dates for championships, or is setup the day prior to the date listed?
Setup days are not included. Setup days are prior to the actual game days. Most take between up to 3 days for setup. Baseball/Softball may take longer due to the two field setup.
5 Section 2.4 F-1 How is travel time calculated and what rate is assigned during travel time? (i.e., is each crew member paid for their travel on a per hr basis?)
We do not pay for travel. The contractor must account for all travel costs including their staff within the bid.
6 Section 2.5 B & C Are the weekly pre-production meetings available via Zoom or any other remote viewing meeting platform?
Weely pre-production meetings will be conducted virtually via Microsoft Teams Chat.
7 Section 2.6 C the Contractor being present two hours prior to the first game of the day. Is this a single company representative, or the full crew that is expected to be present two hours prior?
All staff/crew of the contractor must be present two hours prior to the first game of the day for pre-checks and runthroughs. Other scheduling will be discussed and implemented as needed.
8 Section 2.6 D the Contractor breaking down and departing the venue by required time. How much time is typically given for break down?
Venue breakdown will vary for each event. For example, if they have events coming in immediately following our event, we will be required to teardown immediately after the event.
Another example is War Memorial who will allow for breakdown the following week of an event. A third example is Bank OZK Arena who often requires us to be out by late that night after the final game or early the following morning. Contractor should accomodate for any of those venue requirements.
9 Section 2.7 A How many ARPBS producers and staff should be expected to be in the production truck in addition to production crew?
One producer is expected at the very least. A multiviewer (video village) outside the unit is acceptable for other producer or staff if needed.
10 Section 2.8 - 10. d Will the ARPBS Dejero transmission hookup be located in the truck, or in the venue?
For baseball, softball, and football, the Dejero main and backup are to be located inside the production unit or inside the venue. We require wired internet uplink from the venue, power and SDI video source to the Dejeros at their location. For volleyball and basketball events shot at Bank OZK Arena where the production unit is parked indoors, the Dejero is typically is place on the table outside the production unit next to the i/o panel. The Dejero units should never be sitting outdoors exposed to elements.
11 Section 2.9 E
The Director responsibilities, the director is required to work with ARPBS Producers from pre-production through post production. What post production elements or execution will the director be responsible for? Will this interaction be outside of the games produced? If so, what is the estimated time spent and should this be billed separately and by the hour or project?
The director is expected to engage after the productions for an immediate assessment of the production and attend the official post mortem meeting the following week. The time needed for post production should be minimal (1-3 hours).
12 Section 2.10 TABLE A: PERFORMANCE
STANDARDS:
If Damages are incurred, are they deducted from payments owed to the company, or does the company pay it separately?
Damages will be deducted from payments owed to the company.
13 Section 3.2 A What are the Net Terms for payment? 30 days after invoice is received.