S-1 _PP Information.docx

DOCX document 36 KB Posted

Attached to
AEGIS ASHORE MISSILE DEFENCE SYSTEM ROMANIA CMAV AND SRA
Solicitation number
N6817126RN001
Issued by

About this file

This document is an Attachment S-1 Past Performance/CPARS Information Sheet for a naval maintenance contract related to the US AEGIS Ashore Missile Defense System in Romania. The form is designed for contractors to provide detailed past performance information, including contract references, work descriptions, and performance metrics across multiple evaluation areas such as ship systems (propulsion, electrical, communication), hull/structural repairs, preservation efforts, dry-dock work, material control, and contract management.

The document is specifically linked to a Department of the Navy Naval Supply Systems Command solicitation (N6817126RN001) for the Fiscal Year 26 Selected Restrictive Availability (SRA) and Continuous Maintenance Availability (CMAV) for the AEGIS Ashore Missile Defense System located at the Naval Support Facility in Deveselu, Romania. The form requires contractors to demonstrate work similarities, provide contract performance details, discuss schedule adherence, key personnel management, and any growth or new work performed during previous contracts, with an emphasis on showcasing relevant technical and operational capabilities.

View the file

Other files

File Type Posted
Solicitation Amendment N6817126RN0010004 SF 30.pdf PDF
Sol. Amendment N6817126RN0010003 SF 30.pdf PDF
Sol. Amendment N6817126RN0010002 SF 30.pdf PDF
Sol. Amendment N6817126RN0010001 SF 30.pdf PDF
J-2 SRA and CMAV Work Items (19 NOV).pdf PDF
J-1 Pricing Worksheet.xlsx XLSX spreadsheet
Solicitation - N6817126RN001.pdf PDF
S-2 PP Questionnaire.docx DOCX document
S-3 NDA.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS TRETON (T-EPF 5) FY22 ROHAttachment S-1
USNS TRETON (T-EPF 5) FY22 ROHAttachment S-1
US AEGIS ASHORE MISSILE DEFENSE SYSTEMAttachment S-1

ATTACHMENT S-1 (PAST PERFORMANCE/CPARS INFORMATION SHEET)

TO BE COMPLETED BY OFFEROR

Contractor:

Unique Identifier ID/CAGE Code:

Reference #1
Reference #2
Reference #3

Contract Number / Delivery Order Number

Was CPARS completed?

If so, when?

Type of Contract

Ship Name

Type of Availability

Amount of Total Award

Period of Performance

Final Dollar Value of Contract (Award + Growth/New Work) **If work performed as a subcontractor, identify the final dollar value and hours of the subcontract and only those portions.**

Procuring Agency Point(s) of Contact (not to exceed 3):

Name, Email and Telephone Number(s) of Government or Commercial Entity for which the contract was performed.

Was your company the prime or subcontractor? (If the subcontractor, identify only those portions of the contract performed by your company).

DETAILED DESCRIPTION OF WORK (DEMONSTRATING THE SIMILARITY OF THE WORK PERFORMED TO

ATTACHMENT J-2 (WORK SPECIFICATION PACKAGE)

Work Specification Package Content: Provide detailed descriptions on work package similarities with current solicited work package.

Ship Systems: Propulsion, Electrical, Communication & Navigation, Auxiliary Machinery, Heating, Ventilation & air Conditioning (HVAC), etc.

Hull / Structural: Types of welding procedures and certifications used, type and scope of structural repair.

Preservation: Preservation efforts similar in scope to current requirement.

Dry-Dock: Duration of time spent in dry-dock as well as scope of work performed while in dry-dock.

Material Control and Storage

Quality Control

Facilities: Description of Facilities utilized for contract.

Key Personnel and OEM Management

Management of Contract: Description of schedule and critical path analysis. Was the contract completed on time? If not, provide detailed explanation. Discuss any growth/new work performed during the course of the contract and impact, if any, on project completion.

File details come from the government source that posted it. Updated .