J-1 Pricing Worksheet.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- N6817126RN001
About this file
This is a J-1 Pricing Worksheet for the AEGIS ASHORE MISSILE DEFENSE SYSTEM (USAAMDS) ROMANIA contract, issued by the Department of the Navy Naval Supply Systems Command. The pricing document covers two primary contract line items (CLINs): Selected Restrictive Availability (SRA) NAPL-501-26 and Continuous Maintenance Availability (CMAV) NAPL-008-26, with a total contract value of $15,000.00.
The SRA work package includes multiple tasks such as Combat Systems Discrepancy Correction (192 hours, $15,000 in subcontractor costs), support services, antenna services, and hazardous waste management. The CMAV work package involves various repair and replacement activities including structural door latch repair, antenna ground strap weld repair, and handrail assembly manufacturing. The contract period of performance spans from early June to late September, with work to be conducted at the Naval Support Facility in Deveselu, Romania, focusing on maintenance and support of the AEGIS Ashore Missile Defense System.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment N6817126RN0010004 SF 30.pdf | ||
| Sol. Amendment N6817126RN0010003 SF 30.pdf | ||
| Sol. Amendment N6817126RN0010002 SF 30.pdf | ||
| Sol. Amendment N6817126RN0010001 SF 30.pdf | ||
| Solicitation - N6817126RN001.pdf | ||
| S-2 PP Questionnaire.docx | DOCX document | |
| S-3 NDA.docx | DOCX document | |
| J-2 SRA and CMAV Work Items (19 NOV).pdf | ||
| S-1 _PP Information.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRICING
| PRICING | |||||||||||
| CLIN 0001 | SRA (NAPL-501-26) | ||||||||||
| SUBCLIN | WORK ITEM | DESCRIPTION | HOURS | LABOR RATE | TOTAL LABOR COST | MATERIAL | SUBCONTRACTOR | OTHER COSTS | TOTAL | Period of Performance | |
| A001 | 532-11-001 | SPY Radar and Command and Decision (C and D) Demineralized Water System Chelate Flush; | 0 | $0 | $ - 0 | $ - 0 | $ - 0 | 4 Jun-17 Jul | |||
| A002 | 623-12-001 | Vertical Ladder Remove; accomplish | 0 | $0 | $ - 0 | $ - 0 | $ - 0 | 4 Jun-17 Jul | |||
| A003 | 631-20-001 | Launcher Module Enclosure (LME), Exterior Preserve; accomplish | 0 | $0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 8 Jun-17 jul | ||
| A004 | 631-21-001 | Mast, Hand Rails and Brackets Preserve; accomplish | 0 | $0 | $ - 0 | $ - 0 | $ - 0 | 4 Jun-17 Jul | |||
| A005 | 721-31-001 | Vertical Launch System (VLS), MK 41 Launcher Top and Uptake Hatch; preserve | 0 | $0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 8 Jun-17 jul | ||
| A006 | 837-11-001 | Antenna Photos; provide | 0 | $0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 4 Jun - 30 Sept | ||
| A007 | 844-31-001 | Combat Systems Discrepancy Correction; accomplish | 192 | $0 | $ - 0 | $15,000.00 | $ 15,000.00 | 4 Jun - 30 Sept | |||
| A008 | 980-11-001 | Support Services For SA 95861 / USQ-T52A; | TOTAL FROM TAB WI 980-11-001 | $ - 0 | 4 Jun - 30 Sept | ||||||
| A009 | 991-12-001 | Antenna Array Temporary Staging and AN/SPY-1D Antenna Protective Cover, | 0 | $0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | 4 Jun - 30 Sept | ||
| A010 | 992-11-001 | Translator Services; provide the total price | $ - 0 | 4 Jun - 30 Sept | |||||||
| A011 | 992-11-002 | Portable Toilets, provide | $ - 0 | 4 Jun - 30 Sept | |||||||
| A012 | 993-21-002 | Crane, Rigging, Forklift, Transportation Support ( SEE TAB 993-21-002) | 0 | $0 | $ - 0 | $ - 0 | 0 | $ - 0 | $ - 0 | 4 Jun - 30 Sept | (25) forklift lifts 25 boom lifts |
| A013 | 998-41-001 | Hazardous Waste Produced on Naval Vessel; control | TOTAL FROM TAB WI 998-41-001 | $ - 0 | 4 Jun - 30 Sept | ||||||
| TOTAL SRA | $ 15,000.00 |
| CLIN 0002 | CMAV (NAPL-008-26) | |||||||||
| CLIN/ELIN | WORK ITEM | DESCRIPTION | HOURS | LABOR RATE | TOTAL LABOR COST | MATERIAL | SUBCONTRACTOR | OTHER COSTS | TOTAL | |
| A014 | 167-11-001 | Structural Door Latch repair | $ - 0 | $ - 0 | 4 May - 2 Jun | |||||
| a015 | 441-11-001 | Antenna OE-570 Ground Strap Weld Repair, accomplish | $ - 0 | $ - 0 | 4 May - 2 Jun | |||||
| A016 | 456-01-001 | Spy Array Flange, repair | $ - 0 | $ - 0 | 4 May - 2 Jun | |||||
| A017 | 513-11-001 | Vent Damper System Cable, repalce | 4 May - 2 Jun | |||||||
| A018 | 612-11-001 | Handrail Assembly, Manufacture New and Replace; accomplish | $ - 0 | $ - 0 | 4 May - 2 Jun | |||||
| TOTAL CMAV | $ - 0 |
GRAND TOTAL $ 15,000.00
980-11-001
| DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL PRICE |
| Provision of a Laydown aerea 8 ft by 8ft | each | 1 | 0 | 0 |
| Delivery and storage of material | each | 1 | 0 | 0 |
| Transportation to/from Supply Warehouse/HI Bay/Deckhouse | trip | 1 | 0 | 0 |
| Forklift with Certifiled Operator (1000lbs max)/riggers and transportation | lift | 10 | 0 | 0 |
| Rigging Service | hour | 64 | 0 | 0 |
| Remove equipment identified in para 1.3.1 | each | 1 | 0 | 0 |
| Install equipment identified in para 1.3.2 | each | 1 | 0 | 0 |
| accomplish close out inspection | lot | 1 | 0 | 0 |
| total | 0 |
998-41-001
| 998-41-001 | Hazardous Waste Produced on Naval Vessel; control | |||
| The unit price shall be all inclusive | ||||
| DESCRIPTION | UNIT | QTY | UNIT PRICE | TOTAL PRICE |
| Sodium Hydroxide | GAL | 5 | $ - 0 | $ - 0 |
| Methyl Ethyl Ketone | GAL | 1 | $ - 0 | $ - 0 |
| Spent Abrasive | LB | 200 | $ - 0 | $ - 0 |
| Blast Trichloroethane | GAL | 5 | $ - 0 | $ - 0 |
| Miscellaneous Chemicals (Ignitable) | GAL | 1 | $ - 0 | $ - 0 |
| Miscellaneous Chemicals (Corrosive) | GAL | 1 | $ - 0 | $ - 0 |
| Miscellaneous Chemicals (Toxic) | GAL | 1 | $ - 0 | $ - 0 |
| Miscellaneous Chemicals (Reactive) | GAL | 1 | $ - 0 | $ - 0 |
| Painters, thinners, remover varnishes | GAL | 25 | $ - 0 | $ - 0 |
| Strippers | GAL | 5 | $ - 0 | $ - 0 |
| Total for the WI | $ - 0 |
993-21-002 ITEM NO: 993-21-002 Title: Crane, Rigging, Forklift, Transportation Support; provide POP: 4 Jun - 30 Sept26
| Price All Inclusive | ||||
| DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL PRICE |
| Crane Lifts (10,000 lb. max) | EA | 20 | $ - 0 | $ - 0 |
| Forklift Lifts (2,000 lb. max) | EA | 25 | $ - 0 | $ - 0 |
| Man Lift/Boom Lifts (1,000 lb. max) | EA | 25 | $ - 0 | $ - 0 |
| Transportation Round Trip (10 miles each) - Price shall include the Pallet Jacks | ROUNDTRIP | 10 | $ - 0 | $ - 0 |
| TRI WALLS | EACH | 2 | $ - 0 | $ - 0 |
| Work Completion Certification (Attachment A) | EACH | 1 | $ - 0 | $ - 0 |
| GRAND TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .