RWSL FLS RCP Section D.pdf
PDF 294 KB Posted
- Attached to
- Runway Status Lights (RWSL) Field Lighting System (FLS) Replacement Components Procurement (RCP)
- Solicitation number
- 693KA7-24-R-00006
About this file
This screening information request (SIR) is seeking proposals for an indefinite delivery indefinite quantity contract to provide sustainment of the Runway Status Lights Field Lighting System. The Federal Aviation Administration intends to award a ten-year IDIQ contract consisting of a five-year base period and five one-year option periods. The contractor will be responsible for component design, development, testing, installation, integration and configuration of replacement components for the Individual Light Controller, Master Light Controller, Constant Current Regulators, Lighting Computer, and CCR Controller. The North American Industry Classification System code for this requirement is 335139 for Electric Lamp Bulb and Other Lighting Equipment Manufacturing. Offerors must submit any requests for additional documents by March 11, 2024 and final proposals are due by April 22, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RWSL FLC RCP Amendment 2.zip | ZIP file | |
| RWSL FLC RCP Amendment 2.zip | ZIP file | |
| RWSL FLC RCP Ammendment 1.zip | ZIP file | |
| RWSL FLS RCP Section K.pdf | ||
| RWSL FLS RCP Delivery Orders.zip | ZIP file | |
| RWSL FLS RCP Section G.pdf | ||
| RWSL FLS RCP Section F.pdf | ||
| RWSL FLS RCP Section M.pdf | ||
| RRWSL FLS RCP Section C.pdf | ||
| RWSL FLS RCP Section H.pdf | ||
| RWSL FLS RCP Section L.zip | ZIP file | |
| RWSL FLS RCP Section E.pdf | ||
| RWSL FLS RCP Section B.pdf | ||
| RWSL FLS RCP Section J.zip | ZIP file | |
| RWSL FLS RCP Section I.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Screening Information Request (SIR) No. 693KA7-24-R-XXXXX
D-1
PART I – SECTION D
PACKAGING, HANDLING, STORAGE AND TRANSPORTATION
Table of Contents
PACKAGING, HANDLING, STORAGE AND TRANSPORTATION
D.1 PACKAGING, HANDLING, STORAGE, and TRANSPORATION (PHS&T)
D.2 Preservation, Packing, and Marking ................................... Error! Bookmark not defined.
D.2.1 Packaging Standards D.2.2 Prohibited Packaging Materials D.2.3 Shipping Containers D.2.4 Hazardous Materials/Dangerous Goods Packaging D.2.5 Electrostatic Discharge (ESD) Items Packaging D.2.6 Heavy Items D.2.7 Identification Marking D.2.8 Packing Sheets D.2.9 Warning Labels
D.3 Spares Requirements ........................................................... Error! Bookmark not defined.
D.3.1 Storage Requirements
D.3 MARKING OF DELIVERABLES (Contract Documentation, Reports) Error! Bookmark not defined.
D.4 STORAGE AND TRANSPORATION
D-2
D.1 PACKAGING, HANDLING, STORAGE, and TRANSPORATION (PHS&T)
The following specifications and standards apply to packaging, handling, storage and transportation requirements:
• ASTM D5118 - Standard Practice for Fabrication of Fiberboard Shipping Boxes
• ASTM D3951 - Standard Practice for Commercial Packaging
• ASTM D6251/D6251M-11 - Standard Specification for Wood-Cleated Panel board
Shipping Boxes
• ASTM D6253-10 Standard Practice for Treatment and/or Marking of Wood
Packaging Martials
• CFR-49 - Code of Federal Regulations Title 49
• ISPM 15 - International Standard for Phytosanitary Measures
• ASTM-D-5077-90 (2015), Standard Terminology Relating to
Electrostatic Discharge (ESD) Packaging Materials
• 29 CFR 1910, Occupational Safety and Health Standards
• FAA Asset Identification Process and Procedure Guide, Jan 29, 2013
• FAA Order 4600.27D, Personal Property Asset Lifecycle Management
• FAA order 42950.9C, FAA Supply Chain and Field Materiel Management
D.2 PRESERVATION, PACKING, AND MARKING
The Contractor must provide transportation services to include vehicles with liftgates and inside delivery, as needed by equipment configuration (size/weight). Items received by the Government that are noncompliant with preservation and packaging (especially ESD protection) are subject to be returned at no cost to the Government and the Contractor must expeditiously send compliant replacements to the Government. In the event of an urgent need, the Federal Aviation Administration (FAA) may exercise the following action: The noncompliant packaged items will be retained and repackaged to specification at the FAA location. The FAA will deduct packaging charges from the Delivery Order. Noncompliant ESD packages WILL be returned.
D.2.1 Packaging Standards
The Contractor must prepare item packaging in accordance with ASTM D3951-15, Standard Practice for Commercial Packaging, for shipment and storage for a minimum of one (1) year from the time of receipt at destination. Unless otherwise directed by the Program Office, the Contractor must prepare Quantity per Unit Pack (QUP) in accordance with ASTM D3951-15. If the packages of this standard will not provide the protection required for the type of material being shipped, the Contractor must use other materials, containers, or processes provided they meet or exceed the applicable container requirements as specified in ASTM D3951-10.
The Contractor must package Exchange and Repair (E&R) items in reusable type containers to facilitate round-trip shipments between the Government and the repair source.
D-3
The Contractor must package common hardware items in multiple unit pack quantities, or in standard commercial unit packed quantities compatible with unit of issue. The Contractor must package all common hardware items and mark them in accordance with ASTM D3951.
D.2.2 Prohibited Packaging Materials
The Contractor must not use materials that endanger the product by corrosion, static damage, or contamination. The Contractor must not apply to the product being shipped any preservative that, when removed from such product using a standard removal technique, would cause damage to such product, or harm to personnel. The Contractor must not use metal staples to secure polyethylene wrapped or bagged items. The Contractor must not use newsprint, styrene “chips,” “peanuts,” “popcorn” or shredded paper for wrapping or cushioning.
D.2.3 Shipping Containers
The Contractor must provide containers constructed to provide for the safe handling of the item and afford the item protection. The Contractor must utilize shipping containers uniform in size whenever possible. The Contractor must utilize containers of minimum tare weight and size consistent with the protection required. The Contractor must utilize containers that meet the minimum packaging requirements of the common carriers for acceptance for safe transportation at the lowest rate applicable. Disassembly of items to conserve size is desirable when reassembly can be done by unskilled labor using common hand tools at no risk to the finish or function of the part.
The Contractor must make maximum use of corrugated fiberboard containers that meet or exceed those specifications of ASTM D5118, Standard Practice for Fabrication of Fiberboard Shipping Boxes, and close said containers by taping or banding so they may be opened without damage. If the Contractor determines the capacity of fiberboard containers is exceeded, Contractor must use wood packaging material “WPM”, crates/pallets/skids/etc. that complies with the requirements listed here in Section D. Closure by use of removable fasteners such as “Klimps” or steel banding is desirable unless other means are required for Item protection.
The Contractor must install all inner bracing on wooden crates with Philips head wood screws.
The Contractor must process or treat raw wood in accordance with International Standard for Phytosanitary Measures (ISPM) 15; document can be found at:
https://www.ippc.int/en/publications/640/. In conjunction with ISPM 15, the Contractor must obtain certification from an accredited agency recognized by the Contractor’s National Plant Protection Organization “NPPO”. (United States - Animal and Plant Health Inspection Service “APHIS” – http://www.aphis.usda.gov/ppq/wpm/).
D.2.4 Hazardous Materials/Dangerous Goods Packaging
The Contractor must package, pack and mark hazardous materials and dangerous goods for the most restrictive mode of transportation. Contractor must pack dangerous goods per United Nations (UN) performance-tested specification packaging. Contractors must use https://www.ippc.int/en/publications/640/ http://www.aphis.usda.gov/ppq/wpm/
D-4 specifications/standards/publications to determine the packaging requirements for dangerous goods depending on mode of transportation in reference with Code of Federal Regulations Title 49 Transportation.
D.2.5 Electrostatic Discharge (ESD) Items Packaging
The Contractor must mark containers with ESD sensitive attention label and in accordance with ASTM-D-5077-90 (2015), Standard Terminology Relating to Electrostatic Discharge (ESD) Packaging Materials. The label used by the Contractor must be sized proportionate to the size of the container. The Contractor must mark—in black on a yellow background--ESD sensitive devices symbol and the words “ATTENTION OBSERVE PRECAUTIONS FOR HANDLING ELECTROSTATIC DISCHARGE SENSITIVE DEVICES” on [WHERE?]. One label must be placed on the identification-marked side of an intermediate container.
The Contractor must place two labels on each exterior container. The Contractor must place one label on the identification- marked side (or surface), and one label on the opposite side (or surface). The minimum size of the symbol must be 0.625 inch (15.9 mm) measured vertically at the base of the triangle as follows:
Exterior and intermediate container label
D.2.6 Heavy Items
The Contractor must crate heavy items exceeding 50 lbs. in a manner that meets the American Society for Testing and Materials (ASTM) D6251/D6251M-11, Standard Specification for Wood-Cleated Panel board Shipping Boxes. Crates must bear the markings of American Society for Testing and Materials (ASTM) D6253-10 Standard Practice for Treatment and/or Marking of Wood Packaging Martials.
D.2.7 Identification Marking
The Contractor must mark all components, equipment, and spares in accordance with ASTM D3951-15 Marking for Shipment and Storage. The Contractor must bar code label all components, equipment, and spares in accordance with FAA Asset Identification Process and Procedure Guide, dated Jan 29, 2013. The Contractor must mark each unit, intermediate and
D-5 exterior container in accordance with ASTM D3951-15, Standard Practice for Commercial Packaging, section 5.1.6.2.
The Contractor must mark all assemblies, modules, and equipment with a serial number to serve as a unique identifier.
D.2.8 Packing Sheets
The Contractor must ensure that all materials shipped are accompanied by a standard commercial packing sheet. The Contractor must include the information on the packing sheet in accordance with ASTM D3951-15 section 5.1.6.2. Each major shipping container must include an inventory listing of all individual material, documentation, parts, and loose items included. The complete listing must show item name, manufacturer’s part number, and quantity included. The inventory listing of all individual material must include each units part number and serial number and a bar code of each units serial number.
D.2.9 Warning Labels
The Contractor must label shipping and storage containers containing materials or articles that are capable of releasing Hazardous substance when manufacturing processes as required by the Occupational Safety & Health Administration regulations found in 29 CFR PART 1910.
D.3 SPARES REQUIREMENTS
The Contractor must package and mark all spares shipped to sites or the depot in accordance with the specifications and standards identified in Section D.1. The Contractor must bar code label all Exchange and Repair spares in accordance with FAA Asset Identification Process and Procedure Guide, dated Jan 29, 2013.
D.3.1 Storage Requirements
The Contractor must identify any unique storage requirements, both site and depot, for the system and related spares and equipment. The Contractor must package and mark all materials designated for storage at the FAA Logistics Center (FAALC) in accordance with the specifications and standards identified in D.1. In addition, the Contractor must mark each unit, intermediate, and exterior container with the following information:
1) Serial Number
2) Part Number
3) National Stock Number (if applicable)
4) Contract Number/Delivery Order No.
5) Contract Line Item Number
6) Item Description
7) Quantity
8) Unit of Issue
9) Level of Protection and Date Packed
D-6
The preservation, packaging, packing and marking of all other RWSL FLS components must be in accordance with the specifications and standards identified in D.1.
D.3.2 MARKING OF DELIVERABLES (Contract Documentation, Reports) The Contractor must mark all data deliverables as follows:
1) CLIN Number
2) Title of CDRL or Deliverable
3) Delivery Order Number
4) Data Description
5) Distribution, if not addressed in the CDRL or in response to a CDRL
Where the delivery is via electronic means, a letter of transmittal must be delivered to the Contracting Officer with foregoing information included.
D.4 STORAGE AND TRANSPORATION
The Contractor must make all shipments in accordance with FAA Order 4600.27D, Personal Property Asset Lifecycle Management. Components, equipment and spares must be transported by the most economical means considering dependability, safety, urgency of need, and the use of the least costly mode meeting these considerations. The Contractor must ship all material FOB destination.
The Contractor must “ship-in-place" all palletized items / materials and subsequently ship from the contractor directly to the site as directed by the FAA.
In addition to the requirements of FAA order 42950.9C FAA Supply Chain and Field Materiel Management, the Contractor must provide notification in writing of pending shipments consigned to the FAALC at least 30 days prior to the anticipated shipping date. The Contractor’s notice must include the contract number, national stock number, number of pieces, weight and dimensions of each piece in each shipment, as well as any special storage requirements. The Contractor must send and direct the Notice to:
FAA, MMAC, FAALC
Storage and Transportation Branch, AJW-L610 FAA Logistic Center F&E Serviceable Stock 3601 S. Thomas Road Oklahoma City, OK 73169
END OF SECTION D
| PART I – SECTION D |
| PACKAGING, HANDLING, STORAGE AND TRANSPORTATION |
| Table of Contents |
| D.1 PACKAGING, HANDLING, STORAGE, and TRANSPORATION (PHS&T) |
| D.2 PRESERVATION, PACKING, AND MARKING |
| D.2.1 Packaging Standards |
| D.2.2 Prohibited Packaging Materials |
| D.2.3 Shipping Containers |
| D.2.4 Hazardous Materials/Dangerous Goods Packaging |
| D.2.5 Electrostatic Discharge (ESD) Items Packaging |
| D.2.6 Heavy Items |
| D.2.7 Identification Marking |
| D.2.8 Packing Sheets |
| D.2.9 Warning Labels |
| D.3 SPARES REQUIREMENTS |
| D.3.1 Storage Requirements |
| D.3.2 MARKING OF DELIVERABLES (Contract Documentation, Reports) |
D.4 STORAGE AND TRANSPORATION
File details come from the government source that posted it. Updated .