RS Means Seed Project Example.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Z2DA--VA Central Western Massachusetts Healthcare System (HCS) – Single Award Task Order Contracts (SATOC)
Solicitation number
36C24125R0068
Issued by

About this file

The document is an RS Means Seed Project Excel spreadsheet detailing cost estimates for a Route 9 (RT 9) Sign Replacement project in Springfield, Massachusetts, associated with VA Central Western Massachusetts Healthcare System's Single Award Task Order Contract (SATOC) solicitation number 36C24125R0068. The spreadsheet provides granular unit cost estimates for various construction activities, including electrical underground duct installation, structural concrete placement, wire installation, traffic sign removal, sign fabrication, excavation, backfilling, grading, seeding, and erosion control.

The project's cost breakdown covers multiple line items with detailed specifications, such as PVC conduit installation, copper wire threading, aluminum sign fabrication, and site preparation tasks. The cost estimates are predictive for the 2025 Quarter 2 period, based on data from 2024 Quarter 4, and are specifically scoped for the Springfield, Massachusetts location. The spreadsheet includes unit measurements, crew types, and extended cost calculations for materials, labor, and equipment, though the subtotal and grand total columns are currently showing zero values.

View the file

Other files

File Type Posted
36C24125R0068 0001.docx DOCX document
36C24125R0068 Solicitation.pdf PDF
SATOC Statement of Work CWM Rev1.pdf PDF
Seed Project 631-25-004 SOW All Work.pdf PDF
36C24125R0068 Solicitation.docx DOCX document
Attch C-Specifications.pdf PDF
Attch A-Full Drawing Set.pdf PDF
Wage Determination MA20240003.pdf PDF
Attachment 1 VHA ICRA.pdf PDF
Combined SATOC Specs.pdf PDF
Attachment 2 PPQ.pdf PDF
Attch B-Appendix A Supplemental Requirements.pdf PDF
Attachment 3 VA Pay Form.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 RT 9 Sign replacement

Data Release: Predictive Year 2025 Quarter 2 as of Year 2024 Quarter 4 Unit Cost Estimate by WBS

Quantity LineNumber Line Source SubContracted Ind. Description Crew Daily Output Labor Hours Unit Material

Labor

EquipmentTotalExt. Mat.Ext. LaborExt. Equip.Ext. TotalMat. O&PLabor O&PEquip. O&PTotal O&PExt. Mat. O&PExt. Labor O&PExt. Equip. O&PExt. Total O&PLabor TypeData ReleaseCCI LocationNotes
RT 9 Sign replacement
337119151050Electrical underground ducts and manholes, PVC, conduit with coupling, 2" diameter, schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concreteElectricL.F.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
033113701200Structural concrete, placing, duct bank, direct chute, excludes materialCrew C6C.Y.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
260519901600Wire, copper, stranded, 600 volt, 1/0, type THWN-THHN, normal installation conditions in wireway, conduit, cable trayElectricC.L.F.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
260519901350Wire, copper, stranded, 600 volt, #6, type THWN-THHN, normal installation conditions in wireway, conduit, cable trayElectricC.L.F.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
100505104020Signs, traffic sign removal, to 10 S.F., including supportsCrew B80Ea.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
101453200012Signs, stock, aluminum, reflectorized, .080" aluminum, 24" x 24", excludes postsCrew B80Ea.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
101453200010USignsUnitUSERPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
312316130060Excavating, trench or continuous footing, common earth, 1/2 C.Y. excavator, 1' to 4' deep, excludes sheeting or dewateringB11MB.C.Y.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
312323130800Backfill and compact, by hand, 12" layers, compaction in layers, hand tamp, add to above1 ClabB.C.Y.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
312216103300Fine grading, slopes, gentle, finish gradingB11LS.Y.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
329219144200Seeding athletic fields, seeding shade mix with mulch and fertilizer, 6 lb. per M.S.F., hydro or air seedingB81M.S.F.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
033113350200Structural concrete, ready mix, heavyweight, 3500 psi, includes local aggregate, sand, Portland cement (Type I) and water, delivered, excludes all additives and treatmentsC.Y.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
101426100011Post and panel/pylon signage, aluminum, concrete footings per post, includes 2 posts & 2-sided panel (blank)RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
311413231500Topsoil stripping and stockpiling, loam or topsoil, remove and stockpile on siteRRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
312514160020Synthetic erosion control, jute mesh, 100 SY per roll, 4' wide, stapledB80AS.Y.RRPredictive Year 2025 Quarter 2 as of Year 2024 Quarter 4MASSACHUSETTS / SPRINGFIELD (010-011)
RT 9 Sign replacement Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Grand Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

SATOC Coefficient 0 0

Proposal Total $ - 0