Robins AFB_CTS PWS_v12 April 14 2026.pdf
PDF 924 KB Posted
- Attached to
- LONG-DISTANCE WIRED TELECOMMUNICATION SERVICES
- Solicitation number
- FA850126Q0056_Robins_AFB_Long_Distance_Commercial_Telecommunication_Services
About this file
This is a Performance Work Statement (PWS) for Commercial Telecommunication Services (CTS) at Robins Air Force Base, Georgia, dated April 14, 2026, Version 11.0.
The contractor shall provide comprehensive local, long-distance, and international commercial telecommunications services supporting 24/7/365 operations at Robins AFB. The primary objective is to deliver 99.9% availability of phone service through two SIP circuits—one delivering 20 Primary Rate Interface (PRI) trunks to the Base Main Switch (Building 214) with 100 MB minimum bandwidth, and one delivering 1 PRI to the Base Emergency Telephone Switch (Building 2320) with 5 MB minimum bandwidth. The contractor must configure and convert SIP circuits to ISDN PRI format with RJ45 female connection handoff. Service routing shall utilize SIP trunking architecture with the contractor providing Customer Premise Equipment (CPE) including a multifunction edge router with SIP/ISDN conversion capability. The Government will provide an Edge Boundary Controller (if available) and demarcation point facility space. The contractor must establish Interconnection Agreements and prepare a detailed Installation and Cutover Plan within 14 days of award, with cutover to be completed within 90 days. PIC/ported number ranges include NPA 478-602-0050 to 0099 for BETS and four ranges for the Base Main Switch (478-327-0000 to 9999, 478-926-0000 to 9999, 478-222-0000 to 9999, and 478-201-1000 to 5999). Support for Government Emergency Telecommunications Service (GETS) via NPA 710 is required. The contractor must comply with outage notification and restoration procedures categorized as High Priority (respond onsite within 1 hour), Medium Priority (respond within 24 hours), and Low Priority (respond within 5 working days). Performance thresholds include timely scheduled outage notification (minimum 30 days advance notice), timely response and restoration for all priority levels, and 100% compliance with notification requirements. Safety and health plans, mishap reporting procedures, and OPSEC compliance are mandatory deliverables due within specified timeframes after award.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS-Version 12 Dated: 14 April 2026 Robins AFB, GA
PERFORMANCE WORK STATEMENT
(PWS)
Commercial Telecommunication Services (CTS)
Robins AFB, Georgia
DATE: 14 April 2026
VERSION: 11.0
TABLE OF CONTENTS
1. INTRODUCTION
1.1. Objective
1.2. Background
2. SCOPE
2.1. Outages
2.2. Services Summary
3. GOVERNMENT PROVIDED SPACE AND SERVICES
4. GENERAL REQUIREMENTS
4.1. Personnel…………………………………………………………………………...8
4.2. Government Emergency Telecommunications Service……………………….9
4.3. Interconnection Agreements, and Installation and Cutover Plans….………..9
4.4. Operations Security (OPSEC) Requirements………………………………..10
4.5. Safety, Health and Fire Protection Requirements……………………………10
4.6. Statement of Facts……………………………...….…………………………
5. APPENDIXES….…………...…………………………………………………………13
APPENDIX 1 – SITE SPECIFIC REQUIREMENTS……..……………………….….13
5.1. Required Services and Features………………..…...………………
5.2. Special Services……… ..……………………………………………..……13
5.3. Service Routing…..…….…………………………………….……………..14
Diagram 1 UTILIZING SIP TRUNKING……………………………..……………..….15
APPENDIX 2 - DEFINITIONS & ACRONYMS………………………….………
1. INTRODUCTION
1.1. Objective
This requirement will provide essential Commercial Telecommunication Services (CTS) and features supporting Robins AFB, Georgia. Site specific equipment connectivity requirements are identified in Appendix 1, along with required features.
This CTS shall support the Military installation 24 hours a day/seven days a week/365 days a year (24/7/365).
1.2. Background
Historically, the 38th Contracting Squadron (38 CONS) acquired Commercial Telecommunication Services (CTS) on behalf of its customer sites using a government-driven Statement of Work (SOW), which limited the contractor to providing services using legacy systems and equipment. Now the AFSC/PZIOB is soliciting CTS does not include Defense Switching Network (DSN) services, which is beyond the scope of this action. Due to changes in technology, equipment, and processes, it has become evident that the Government should acquire these services in a performance-based manner, consistent with the principles contained in Air Force Instruction (AFI) 63-138 “Acquisition of Services.” These services are considered Information Technology (IT) In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 239.74 “Telecommunications Services.” The requirement herein represents the site’s performance-based requirements for Local, Long Distance, and international “dial-tone” and ancillary services as defined herein. As a part of the new process, the Air Force (AF) encourages the Contractor to identify or suggest improvements to existing CTS processes, operating procedures, systems, or applications to the Contracting Officer (CO).
2. SCOPE
The Contractor shall provide all labor, tools, facilities, materials, and services needed to perform and provide local access to the designated circuits demarcation point(s) identified in Appendix 1 to this PWS. These services shall include any equipment, wiring, or infrastructure to ensure the Contractor’s proposed solution is compatible with the Government’s current infrastructure without additional Government expense. Access to the local exchange shall also include operator assistance functions. These services shall exclude residential or business services for non-Government entities or Government contractors. The Contractor shall follow all Federal Communications Commission (FCC), Public Utility Commission (PUC), Department of Defense (DoD), AF, and industry standards for this requirement.
The Contractor shall provide and install transmission equipment and cables for local, long distance, and international exchange access/transport service circuits to the Government-provided floor space at the Government demarcation location(s) identified in Appendix 1. The Contractor shall connect to Government-provided power connection points and termination frames. The Contractor shall coordinate with the Government Point of Contact (POC) (primary and alternate names, emails, and telephone numbers shall be provided by the Government No Later Than (NLT) five days after contract award) prior to any installation. The Government does not authorize aerial cable installations.
2.1. Outages
2.1.1. Outage Procedures
The Contractor shall follow procedures identified below for outages. In all cases, notification shall include:
• Reason for interruption
• Duration
• Start and stop times
• Affected equipment, lines, and buildings; and
• Restoration action (identify service impacted and how service will be/was restored)
2.1.2. Scheduled Outage
The Contractor shall notify the Government POC of any scheduled outage that will affect any CTS. The Contractor shall inform the Government POC NLT 30 days prior to the scheduled outage. The Contractor shall provide a detailed explanation for the outage to include the amount of downtime and end users affected. The Contractor shall notify the Government POC via email of the need for any scheduled service outages. Such outages shall be scheduled to minimize inconvenience to users, based upon Government user work schedules. The Government POC must release all affected equipment and circuits prior to any service disruption.
2.1.3. Unscheduled Outages
If multiple facilities, areas, primary trunks, or cables/fibers are impacted, the Communications Focal Point (CFP) and Government POC shall assign the category of the outage and establish the repair priority. The Contractor shall notify the CFP and Government POC verbally of problem(s) and follow-up with documentation via email within time specified for each outage type.
2.1.4. Outage Priority, Restoration of Service, and Maintenance
The Contractor shall respond and restore service outages. From the time of receipt of the notification, the Contractor shall respond and coordinate with the Government POC within the time limits indicated below. The Contractor shall prioritize and perform restorations IAW the Telecommunications Services Priority (TSP) and Restoration Priority List (RPL), which are provided by the Government POC. In the event the Contractor anticipates not being able to perform any of the contractor services (i.e. beyond the Contractor’s control) IAW the TSP and RPL during a crisis, Contractor shall notify the Government POC as expeditiously as possible and use its best efforts to cooperate with the Government in the Government’s efforts to maintain the continuity of operations. If the Government POC determines that the outage restoration time frames cannot be met for other non-mission essential functions, the Government POC can declare any outage restoration priority level as high to medium to low if the outage significantly affects the mission of the Government.
2.1.4.1. High Priority Outage
2.1.4.1.1. A high priority outage is normally a sudden and widespread disaster stemming from the result of a man-made or natural disaster in which property, equipment, and site infrastructure are destroyed. The Contractor shall respond onsite to the outage NLT one hour of receipt of notification by the CFP or Government POC and advise the CFP and Government POC of its restoration procedures for a catastrophic situation. The Contractor shall provide the CFP or Government POC with updates NLT every four-hours on the status of restoration actions.
2.1.4.1.2. The following defines a high priority outage:
• Loss or degradation to any single or multiple Session Initiation Protocol (SIP) and Primary Rate Interface trunk(s), to include supporting systems infrastructure (Core Unified Communication Servers/ Database/ SAN), supporting wireline/fiber infrastructure, and delivery systems (i.e.
Multiprotocol Label Switching (MPLS) or equivalent) regardless of location, that result in the following conditions:
- Complete loss of SIP/PRI Trunking capability to the Government facility regardless of the source location of the outage
- Partial loss of SIP/PRI Trunking capability to the Government facility regardless of the source location of the outage when the Call Setup Success Rate (CSSR) falls below 25% of system capacity
- Partial loss of SIP/PRI Trunking capability to the Government facility regardless of the source location of the outage when the Dropped Call Rate (DCR) exceeds 50% of system capacity
- Loss of greater than 75% of total call handling capability of any legacy analog communications system
2.1.4.2. Medium Priority Outage
2.1.4.2.1. A medium priority outage may be a sudden or widespread disaster stemming from the result of a man-made or natural disaster, which disrupts service to property, equipment, and site infrastructure. The Contractor shall respond on-site to the outage NLT 24-hours after receiving notification by the Government POC and CFP.
2.1.4.2.2. The following defines a medium priority outage:
• Loss or degradation to any single or multiple SIP/PRI trunk(s), to include supporting systems infrastructure (Core Unified Communication Servers/ Database/ SAN), supporting wireline/fiber infrastructure, and delivery systems (i.e. MPLS or equivalent) regardless of location, that result in the following conditions:
- Partial loss of SIP/PRI Trunking capability to the Government facility regardless of the source location of the outage when the CSSR falls below 75% of system capacity
- Partial loss of SIP/PRI Trunking capability to the Government facility regardless of the source location of the outage when the DCR is greater than 5% but less than 50% of system capacity
- Loss of greater than 25% but less than 75% of total call handling capability of any legacy analog communications system
2.1.4.3. Low Priority Outage
2.1.4.3.1. A low priority outage minimally disrupts service to property, equipment, and site infrastructure. The Contractor shall respond on-site NLT five working days of notification by the Government POC and CFP. All future references to days shall indicate working days unless otherwise noted.
2.1.4.3.2. The following defines a Low Priority Outage:
• Loss or degradation to any single or multiple SIP/PRI Trunk(s), to include supporting systems infrastructure (Core Unified Communication Servers/ Database/ SAN), supporting wireline/fiber infrastructure, and delivery systems (i.e. MPLS or equivalent) regardless of location, that result in the following conditions:
- Partial loss of SIP/PRI Trunking capability to the Government facility regardless of the source location of the outage when the CSSR) falls below 90% of system capacity
- Partial loss of SIP/PRI Trunking capability to the Government facility regardless of the source location of the outage when the DCR exceeds greater than 1% but less than 5% of system capacity
Loss of greater than 1% but less than 25% of total call handling capability of any legacy analog communications system
2.2. Services Summary
2.2.1. Services Summary Table (SST)
Performance Element Number
Performance Objective
PWS
Paragraph
Performance Threshold
1 Perform and provide access at the designated circuit demarcation points identified in Appendix 1 to this PWS.
2 Continuous operation of phone service 24/7/365 with 99.9% availability
2 Inform the Government POC NLT 30 days in advance of scheduled outage providing a detailed explanation for the outage.
2.1.1 Timely and detailed
notification provided 100% of time
3 Responds and restores High Priority service outages IAW PWS, TSP, and RPL as coordinated with the Government
POC.
2.1.4 and 2.1.4.1
Timely response to notification and timely restoration of services provided 100% of the time
4 Respond and restore Medium Priority service outages IAW PWS, TSP, and RPL as coordinated with the Government
POC.
2.1.4 and 2.1.4.2
Timely response to notification and timely restoration of services provided 100% of the time
5 Respond and restore Low Priority service outages IAW PWS, TSP, and RPL as coordinated with the Government
POC.
2.1.4 and 2.1.4.3
Timely response to notification and timely restoration of services provided 100% of the time
6 Respond and restore Maintenance service outages IAW PWS, TSP, and RPL as coordinated with the Government
POC.
2.1.4 Timely response to
notification and timely restoration of services provided 100% of the time
2.2.2. Inspection
The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. The Government has the right to inspect all services identified within the contract (SS and Non-SS items), to the extent practicable at any time and place during the term of the contract.
2.2.3. Grade of Service
Locations carrying contracted voice grade that is packetized for transport across an IP, MPLS, or other IXC system require grade of service (GoS), implemented as quality of service (QoS), to ensure that end-to-end per-call latency and packet jitter remain within ITU standards. This requirement is applicable to VoIP traffic, video traffic, or other real-time traffic that has been identified and contracted for an elevated GoS. Vendor will ensure QoS end to end including through sub-contracted external LEC/CLEC facilities; implementation strategies that may include Committed Access Rates (CAR), Expedited Forwarding (EF), and traffic shaping determined by customer marked DSCP packets or pre-contracted data flows.
3. GOVERNMENT PROVIDED SPACE AND SERVICES
3.1. The Contractor shall secure Government facilities, equipment, and materials before leaving a facility. The Contractor shall safeguard the Government provided facilities and material contained therein.
3.2. The Government will provide one 19” or 23” R/R of rack space for the installation of the Contractor’s provided transmission equipment. The floor space shall be coordinated with the Government POC to accommodate Contractor-provided relay rack(s), at each demarcation point. Space is available for relay rack(s) for Contractor equipment in the demarcation point.
3.3. The Government will provide sufficient environmental controls to maintain humidity and temperature within the Contractor’s equipment operating specifications. In addition, the Government will provide primary and emergency conditioned power sources to operate the Contractor’s equipment within manufacturer’s specifications.
4. GENERAL REQUIREMENTS
4.1. Personnel
The Contractor is solely responsible for ensuring sufficient personnel are assigned to this requirement. Appropriate personnel shall possess the qualifications and certifications to fulfil the requirements listed herein. These qualifications and certifications shall include those required by the Original Equipment Manufacturer (OEM) to maintain, install, and/or operate the equipment covered by this contract.
4.2. Government Emergency Telecommunications Service (GETS)
GETS will be used in an emergency or crisis when the Public Switched Telephone Network (PSTN) is congested and the probability of completing a call over normal telecommunication means has significantly decreased. The Contractor must have NPA (710) in the switch to allow access to the GETS line assigned to a specific site. Authorized users access emergency services by dialing 0/1+710-NXX-XXXX.
The 710 NPA provides access to a tariffed service of the GETS interexchange carriers and the call is billed to the United States Government.
4.3. Interconnection Agreements, and Installation and Cutover Plans
In the event the award is made to a non-incumbent contractor, the incoming Contractor shall submit all Interconnection Agreements (IAs) via link, or as an addendum, to the Government with their quote. The addendum is not included in the technical quote, and a 10 page limitations apply to this submittal. Additionally, if providing a quote as a Competitive Local and Long-Distance/International Exchange Carrier (CLDEC) for any and/or all services, provide documented evidence of IAs and/or leasing agreements relevant to this effort. The Contractor Technical Quote shall include: 1. Cost Per Minute for calls 2. Monthly cost for each SIP circuit, and 3. Option to add (Preferred Interconnection Carrier PIC/Porting) additional NPA, Prefix Ranges
The cutover for this site is 90 Days after contract award. The Contractor shall develop an initial Installation and Cutover Plan for submittal to the Government with their technical quote. A final plan may be requested by the Government and shall be provided NLT fourteen days after contract award (CDRL A/B/C/D/E003). The plan shall include installation of the initial required services for cutover of CTS requirements, along with the recommended time frame to complete the cutover process. The Contractor shall coordinate deviations from the proposed installation plan with the Government POC prior to any work commencing in the affected area.
The Contractor shall ensure that all circuits, equipment, and service provided by the incumbent, under the prior contract, are disconnected/discontinued upon successful cutover. At this point, the Contractor shall inform the Government POC that the previous provider’s equipment is no longer needed and may be removed by the previous provider. Any omissions or discrepancies in the installation/cutover plans do not relieve the Contractor of its responsibility to install, cutover, and perform all services identified in this requirement. It is the Contractor’s responsibility to resolve any issues associated with these efforts within a time agreed upon by the Government POC and the contractor. (CDRL A/B/C/D/E003)
4.3.1. Installation and Cutover Plan Content (CDRL A/B/C/D/E003). The Installation and Cutover Plan(s) shall contain, at a minimum, the following site-specific information:
a. Conditions/Support required prior to the start of installation and cutover.
b. Detailed installation schedule listing all actions/events that must occur for successful cutover of all items identified in Appendix 1
c. Awardee responsibilities for cutover and installation
d. Government responsibilities for cutover and installation
e. Dialing tests to ensure PIC/Ported numbers operate and access to the
GETS
f. Service routing diagram (reference Appendix Diagrams 1 and 2 for examples) and/or service routing description
g. Detailed description of new equipment to be installed and location/floor plan (to include space required)
4.4. Operations Security (OPSEC) Requirements
4.4.1. All contractors, subcontractors, their employees, associates, and consultants who have access to 78 ABW/SC Critical Information (CI) must comply with the DoD and Air Force-sponsored Operations Security (OPSEC) programs. The OPSEC Program is directed by NSDD298, DOD Publications, and applicable Air Force guidance.
4.4.2. All contractors assigned/performing duties at RAFB will comply with government-provided OPSEC training IAW Air Force & 78 ABW guidance.
4.4.3. Contractor will seek approval of 78 SC OPSEC Coordinator and 78 ABW AFB Public Affairs, prior to releasing any non-public DoD/Air Force information outside of official U.S. Government channels (via any media).
4.5. Safety, Health and Fire Protection Requirements
The Contractor shall follow local procedures established by the local safety and health offices. Reference the instructions in Code of Federal Regulations (CFR) 29, Part 1926.58, Appendix G for proximate to asbestos containing materials. The Contractor shall record and report to the CSO all available facts relating to each instance of accidental damage to Government property or injury to either Contractor or Government personnel.
4.5.1 Safety and Health Plan (A/B/C/D/E001 DI-MGMT-80368A/T). Within 10 calendar days after the contract award, the contractor shall provide a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596). The Safety Plan shall be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the Contracting Officer (CO).
4.5.2 The contractor Safety Plan shall address in detail the items listed in the Contract Appendix 5, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix 5, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in Appendix 5, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO. (CDRL A/B/C/D/E001)
4.5.2.1 Safety Mishap/Incident Reporting (A/B/C/D/E002 DI-MGMT-80368A/T).
The contractor shall report all mishaps/incidents in accordance with Appendix 5.
The contractor shall immediately secure the mishap scene and damaged property and impound pertinent maintenance and training records until released by the Government’s Safety Office (78ABW/SE). Such release shall be accomplished through the CO. The contractor shall assist Government personnel in the investigation of the incident and submit an Accident/Incident Report within 24 hours of the accident/incident. The Contractor shall require all subcontractors to comply with required safety, health and fire standards. (CDRL A/B/C/D/E002)
4.5.3 Contractor Environmental, Safety, and Occupational Health Compliance: The Contractor shall comply with Government Safety and Health regulations including, but not limited to, Public Law 91-596, Occupational Safety and Health Act (OSHA), and DoD Directive 4715.01E, Environmental, Safety, and Occupational Health (ESOH). The Contractor shall establish and maintain a site-specific safety and health program detailed in a written Contractor’s Safety and Health Plan (SHP).
The Contractor shall send a copy of the plan to the 78 ABW Safety Office at:
(78abw.se.frontoffice@us.af.mil). The Contractor shall require all subcontractors to comply with the required safety, health, and fire standards.
4.5.4 Mishap Notification/Investigation: In accordance with DAFI 91-204, Safety Investigations and Reports, the Contractor shall report mishaps involving damage or injury to USAF assets/interests. The Contractor shall ensure the USAF is notified of mishaps occurring on Robins AFB. The Contractor shall contact the Contracting Officer (CO) or the Contracting Officer’s Representative (COR), if available, or another MFT member, and the 78 ABW Safety Office (78abw.se.frontoffice@us.af.mil; 478-926 6271) by email/telephone within eight (8) hours of any damage to government property where the dollar value exceeds $600,000.00, and within two workdays for any damage to government property less than $600,000.00 during the execution of the contract. There shall be no more than one (1) instance of late mishap notification per contract year. (CDRL A/B/C/D/E002, Mishap Notification, DI-MGMT-80368A/T). Reference in paragraph 4.2, DI-SAFT- 81563, Accident/Incident Report]. The Contractor shall ensure the following are notified:
a. PCO
b. MFT (COR, if available, or another MFT member),
c. Robins Air Force base command post (478-327-2612).
Mishap notifications shall contain, as a minimum, the following information:
a. Contract, contract number, name, and title of person(s) reporting
b. Date, time, and exact location of accident/incident
c. Brief narrative of accident/incident (events leading to accident/incident)
d. Cause of accident/incident, if known
e. Estimated cost of accident/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective actions (taken or proposed)
h. Other pertinent information
The Contractor shall immediately secure the mishap scene (and damaged property) and impound pertinent maintenance and training records until released by the Government’s safety office. Such a release shall be accomplished through the Contracting Officer. The Contractor shall cooperate and assist Government personnel in the investigation of the mishap and submit an Accident/Incident Report within 48 hours of the mishap [CDRL A/B/C/D/E002, Reference in paragraph 4.2, Accident/Incident Report, DI- SAFT-81563].
4.6 Statement of Facts
4.6.1 Circuit Delivery: Contractor Shall deliver two SIP circuits and Vendor’s Customer Premise Equipment (CPE) to Robins AFB Demarcation Buildings, configured, and convert SIP circuits to Primary Rate Interface ISDN circuits.
Connection handoff to the government shall be RJ45 (Female).
4.6.2. SIP Circuits minimum bandwidth:
Base Main Switch = 100MB, BETS = 5MB.
1 SIP circuit shall handoff 20 PRIs to the Base Main Switch 1 SIP circuit shall handoff 1 PRI to the Base Emergency Telephone Switch (BETS)
4.6.3. Addresses:
Base Main Switch: Building 214, 150, Richard Ray Blvd, Robins AFB, GA 31098 BETS Switch: Building 2320, 331 East Peach Ave, Robins AFB Georgia 31098
4.6.4 PIC/Ported NPA and Prefix Range
BETS Switch: NPA 478-602-0050 to 0099 Base Main Switch: NPA 478-327-0000 to 9999, NPA 478-926-0000 to 9999
NPA 478-222-0000 to 9999, NPA 478-201-1000 to 5999
5. APPENDICES
APPENDIX 1 – SITE SPECIFIC REQUIREMENTS
5.1. Required Services and Features
The Contractor shall provide the Government Local, Long-Distance, and International commercial communications services for Robins AFB at cutover.
Innovative technical solutions are encouraged but must be compatible with the current requirement that is listed in the remainder of this Appendix. The quantity of these initial service requirements will be incorporated into the Pricing Schedule.
The installation service requirement will be identified here in Appendix 1 and in the Pricing Schedule.
The Government telephone switching system is identified as an Avaya S8800 with Communications Manager Aura 8.1 software version.
The Government Communication Services Officer (CSO) and Technical Representative shall be identified at the post award conference and updates provided to the contractor as required by the CO.
5.2. Special Services
Examples of vendor circuit/trunk routing supporting Appendix 1 requirements are provided in the below diagrams 1. These examples apply to Government sites with switches and/or PBX configuration for SIP Trunking delivery. The Carrier, if providing a CPE installed digital loop carrier system or other IP based CPE gateway system, will provide the customer with IP, VLAN, routing protocols or other pertinent information to allow the customer to logically interface with the carrier system. The Carrier shall deliver IP/SIP base service than convert the service to ISDN Primary rate Interface. Customer owned demarcation device will in most cases consist of an Edge Boundary Controller gateway providing isolation and firewall services. The vendor shall provide a 24/7 capability to monitor the IP connection to the customer gateway equipment and alert the customer to a link failure; the customer must have the ability to reach the vendor’s network operations center on a 24/7 basis.
5.3. Service Routing.
The contractor shall submit a service routing diagram (reference Appendix Diagrams 1 example) and/or service routing description in their technical quote.
Contractor may provide the requested diagram and legend using these formats or a similar format to comply with paragraph 4.3.1. Submission of a generic diagram or not explaining the service routing may be determined to be technically unacceptable.
VENDOR/LEC/ILEC
NETWORK
PRI
LEC Provided SIP BRI
CPE (SIP)
GIG
Ether
Govt Provided
Unified
Communications
IP Network
Note: The shall provide vendor-controlled Customer Premise Equipment (CPE).
The Government will provide Edge Boundary Controller (EBC), if available.
Legacy Services & Equipment
Diagram 1
UTILIZING SIP TRUNKING
Multifunction Edge Router
SIP/ISDN
Edge Boundary Controller (if available)
APPENDIX 2 - DEFINITIONS & ACRONYMS
Table A Definitions
TERM DEFINITION
Appendix 1 Defines the Robins AFB, Georgia requirements detailing locations on circuit delivery.
Call Setup Success Rate (CSSR)
The fractionalized number of calls that make a successful connection to a dialed number, this is divided by the total number of calls placed. (As defined by International Telecommunication Union).
Circuit Termination Circuit termination at the Government installation includes the Main Distribution Frame (MDF) for analog signals, metallic cable pairs, Digital Signal Cross-Connect (DSX)-1 patch, cross connect panel(s) for T-1 and/or T-3 circuits, fiber optic patch and cross connect panels for optical interface equipment such as the optical carrier or SONET or MPLS systems, optical multiplexer equipment, and may extend to Cat 3/5/6 RJ-45 jack fields if directed by the Government POC to ensure adequate hand off of the circuit to the Government. Other wall-mounted, punch-down, terminal blocks are used for isolation and termination of Contractor metallic facilities.
Communications Focal Point (CFP)
A 24/7 Focal Point located on an Air Force Facility that provides one stop notification services and provides reporting and tracking of communications outages to Government users of the communication systems.
Commercial Subscriber lines
(CSL)
A CSL is defined by Government standards as a voice grade subscriber line serving directly from the Contractor’s central office switch to customer’s location.
Competitive Local Exchange Carrier
(CLEC)
A telephone company that competes with the already established local telephone business by providing its own network and switching.
Contractor A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
TERM DEFINITION
Customer Premise Equipment (CPE)
Also known as Customer-Provided Equipment is any equipment located at a subscriber's premises and connected with a carrier's telecommunication network at the contractually established demarcation point. The demarcation point contractually separates the customer equipment from the equipment located in either the distribution infrastructure or central office of the communications service provider. Vendor installed CPE devices are fully vendor owned, maintained, and monitored by the Vendor’s management platform. CPE equipment can be powered from the customer source electrical system, but a sufficient emergency power source must be available during periods of customer power interruption for any services contractually requiring a high level of reliability.
Customer Service Record (CSR)
Report that details the fixed monthly charges billed by the local telephone company. The CSR is composed of computer codes called USOCs, which in turn correspond to a particular tariffed service.
Defective Service A service output that does not meet the standard of performance associated with the PWS.
Deliverable Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Dropped Call Rate
(DCR)
The fractionalized number of calls that experience a lost connection after a successful initial call establishment. (As defined by International Telecommunication Union).
DS-1 A DS level and framing specification for synchronous digital streams, over circuits in the North American digital transmission hierarchy, at the DS1 transmission rate of 1,544,000 bits per second. DS1 is commonly used to multiplex 24 DS0 channels.
Each DS0 channel, originally a digitized voice-grade telephone signal, carries 8000 bytes per second (64,000 bits per second). A DS1 frame includes one byte from each of the 24 DS0 channels and adds one framing bit, making a total of 193 bits per frame at 8000 frames per second. The result is 193*8000 = 1,544,000 bits per second.
Edge Boundary Controller gateway(EBC)
A customer provided network node device that provides firewall, intrusion detection, routing, QoS, and packet equalization between the Vendors IP Wide Area Network and the interior customer IP network. The EBC will provide the logical demarcation point between IP SIP delivered services when applicable and will physically interface to the vendor’s CPE Gateway Router device.
Extended Area Calling Service
A geographic area beyond the local service area to which traffic is classified as local for selected customers, i.e., telephone service that allows subscribers in one exchange to call subscribers of another exchange without a toll charge or for a negotiated fixed rate.
Flat Rate A non-fluctuating monthly rate for telephone service in which an unlimited number of local calls can be made without further charge the extent of the contract. The monthly rate is established in the contract.
Government Emergency Telecommunications Service (GETS)
A White House-directed emergency phone service provided by the National Communications System (NCS) in the Cyber Security & Communications Division, National Protection and Programs of the Department of Homeland Security. GETS supports Federal, State, local, and tribal Government, industry, and non- Governmental organization (NGO) personnel in performing their National Security and Emergency Preparedness (NS/EP) missions. GETS provides emergency access and priority processing in the local and long distance segments of the Public Switched Telephone Network (PSTN). It is used in an emergency or crisis situation when the PSTN is congested and the probability of completing a call over normal or other alternate tele-communication means has significantly decreased. The servicing LEC must have NPA (710) in the switch to allow access to the GETS line assigned to a specific site. Dialing 0/1+710-NXX-XXXX provides access to an emergency service for authorized users.
The 710 NPA provides access to a tariffed service of the GETS interexchange carriers (AT&T, MCI WorldCom, and Sprint) and the call is billed to the U.S. Government. Web link:
http://gets.ncs.gov/
Incumbent Local Exchange Carrier
(ILEC)
The dominant phone carrier within a geographic area as determined by the FCC Section 252 of the Telecommunications Act of 1996 provided local exchange service to specific area.
Interconnection Agreement
A business contract between telecommunication organizations for interconnecting their networks and exchanging telecommunication traffic. These agreements are present in both public switched telephone networks and the Internet.
Intra LATA Local toll service (also called intra-Local Access and Transport Area (LATA), local long distance, or regional toll service) provides calling within a geographic area known as a LATA. Per-minute toll charges usually apply to these calls.
Local Exchange Access and Service Areas
Areas shall include the areas/zones coverage as currently defined by the incumbent local service provider(s) and/or the State PUC for the Site and shall be applied under the scope of this contract and provide a list of these local exchange access service areas and any updates as they accrue. When the Contractor provides services to a Government installation, the LATA boundary shall not be limited or restricted to a Contractor’s service area.
Connection to intra-LATA exchange areas and with inter-LATA exchange carriers is required.
Measured Rate A message rate structure in which the monthly phone line rental includes a fixed rate on calls within a defined area. Measured services are often charged on the number of calls, the time of day, the distance traveled and/or the length of the call.
Non-Recurring Charges
A one-time fee IAW the established tariff rates at time of award that is associated with adding a local exchange service, including installment, activation and/or equipment.
Physical Security Actions that prevent the loss or damage of Government property.
Quality Assurance The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Control All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Reliability The probability that a system will not fail during a specified period of time.
Resilience The ability of a system to recover to its normal operating form after a failure or an outage.
Session Initiation Protocol (SIP)
A communications protocol for signaling, call setup/teardown, and communication of telephone and Video Real-Time Systems over an IP Based Unified Communication System. (As defined by Internet Assigned Numbers Authority & Request for Comments).
Session Initiation Protocol (SIP) Trunking
A Voice over Internet Protocol (VoIP) and streaming media service Based on the SIP by which Internet telephone service providers (ITSPs).
SIP Trunk An IP Based virtual connector between Unified Communication Systems designed to transport high-density unicast & multicast telephone/video traffic channels.
Traffic Analysis Inference of information from observable characteristics of data flow(s), such as the identities and locations of the source(s) and destinations(s), and the presence, amount, frequency and duration of occurrence.
TABLE B ACRONYMS:
ACRONYM EXTENDED
AF Air Force AFI Air Force Instruction BRI Basic Rate Interface BS Basic Services BTN Billing Telephone Number CSSR Call Setup Success Rate CFP Communications Focal Point CLEC Competitive Local Exchange Carrier CO Contracting Officer CPE Customer Premise Equipment CSL Commercial Subscriber Lines CSO Communications Services Officer DCO Dial Central Office DCR Dropped Call Rate DFARS Defense Federal Acquisition Regulation Supplement DID Direct In Dial DOD Department of Defense DP Dial Pulse
DSN Defense Switching Network DSX Digital Signal Cross-Connect DTMF Dual Tone Multi-Frequency EBC Edge Boundary Controller FCC Federal Communications Commission FD Full Duplex FR Flat Rate FX Foreign Exchange GETS Government Emergency Telecommunications Service GS Ground Start HD Half Duplex IAW In Accordance With IC Incoming ILEC Incumbent Local Exchange Carrier ISDN Integrated Services Digital Network IT Information Technology LATA Local Access Transport Area LS Loop Start LTS Local Telecommunications Services MF Multi-Frequency MDF Main Distribution Frame MR Measured Rate NCS National Communications System NS/EP National Security and Emergency Preparedness NGO Non-Governmental Organization NLT No Later Than OEM Original Equipment Manufacturer OG Outgoing POC Point of Contact PRI Primary Rate Interface PUC Public Utility Commission
PWS Performance Based Work Statement PSTN Public Switched Telephone Network RPL Restoration Priority List SIP Session Initiation Protocol SS Services Summary TS Telecommunication Services TSP Telecommunications Services Priority WS Wink Start
File details come from the government source that posted it. Updated .