RO Test Ports to Add.pdf

PDF 402 KB Posted

Attached to
Reverse Osmosis System Modifications
Solicitation number
36C26327Q0053
Issued by

About this file

This is a technical drawing depicting the locations of Space Power System (SPS) Reverse Osmosis (RO) test ports to be installed at twelve designated locations throughout a facility. The drawing shows a floor plan with twelve test port locations marked with red boxes and labeled #1 through #12, distributed across multiple areas including mechanical rooms and various system zones. The test ports are indicated on the architectural layout at specific coordinates referenced by grid lines (AA, BB, Z, Y, X) and floor levels (16-20). Location BA-101 is identified as a mechanical room on the drawing. The test ports appear to be integrated into the SPS flashing and testing infrastructure, with blue schematic lines indicating the piping or ducting connections throughout the facility. This drawing would serve as a reference document for installation contractors to accurately position the RO test ports at the specified twelve locations.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BB AA XY

Z

Drawing - 5 SPS flashing and testing ports

VHAMINKaediC Text Box SPS RO Test Ports to add at each of the 12 location labeled below.

VHAMINKaediC Callout #12

VHAMINKaediC Callout #11

VHAMINKaediC Callout #10

VHAMINKaediC Callout #9

VHAMINKaediC Callout #7

VHAMINKaediC Callout #6

VHAMINKaediC Callout #1

VHAMINKaediC Callout #2

VHAMINKaediC Callout #5

VHAMINKaediC Callout #8

VHAMINKaediC Callout #4

VHAMINKaediC Callout #3

VHAMINKaediC Ellipse

VHAMINKaediC Ellipse

VHAMINKaediC Text Box BA-101 Mechanical room

Floor Plans
0- Level Existing Demo Plan Phasing

File details come from the government source that posted it. Updated .