DI Sinks to Remove from DI Loop.pdf

PDF 6 MB Posted

Attached to
Reverse Osmosis System Modifications
Solicitation number
36C26327Q0053
Issued by

About this file

This is a facility planning diagram depicting Lab DI sinks that require removal from the DI Loop within a laboratory facility. The drawing illustrates a detailed floor plan layout with color-coded room designations and piping systems, identifying multiple sample locations and decontamination areas throughout the building.

The document identifies 10 lab sinks (Lab Sink 1 through Lab Sink 10) located in various rooms including BB-145, BB-125, BB-141, BB-142, BB-134, BB-110, BB-110, BD-111, BD-124, and BD-135, each assigned corresponding sign labels (DI #1 through DI #10). Additionally, the diagram shows three decontamination sinks (Decontam Sink 1, 2, and 3) and three scope room sinks (Scope Room Sink 1, 2, and 3) with their respective location designations and sign labels. A red-outlined callout box provides technical guidance indicating that DI loop disconnections must be made in the interstitial space above the ceiling to maintain DI loop integrity, with instructions that disconnected sinks may be left in place or removed as part of project scope. The diagram also identifies rough sink locations, equipment designations, and the DI generation system loop-out and loop-return connections necessary for proper facility operation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

HJKLMNPQRSTUVWXYAABB

Drawing - 4 , Lab DI sinks

VHAMINFahM Polygon

VHAMINFahM Polygon

VHAMINFahM Line

VHAMINFahM Line

VHAMINFahM Rectangle

VHAMINFahM Text Box DI to Machine

VHAMINFahM Text Box DI to potential Machine

VHAMINFahM Text Box Rough sink location

VHAMINKaediC Cloud

VHAMINKaediC Text Box

SPS

VHAMINKaediC Text Box Lab DI Sinks to remove from the DI Loop

VHAMINKaediC Cloud

VHAMINKaediC Callout

DI #1

VHAMINKaediC Callout

DI #2

VHAMINKaediC Callout

DI #3

VHAMINKaediC Callout

DI #4

VHAMINKaediC Callout

DI #5

VHAMINKaediC Callout

DI #6

VHAMINKaediC Callout

DI #7

VHAMINKaediC Callout

DI #8

VHAMINKaediC Callout

DI #9

VHAMINKaediC Callout

DI #10

VHAMINKaediC Callout

DI #11

VHAMINKaediC Callout

DI #12

VHAMINKaediC Rectangle

VHAMINKaediC Polygon

VHAMINKaediC Polygon

VHAMINKaediC Polygon

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Cloud

VHAMINKaediC Cloud

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Rectangle

VHAMINKaediC Text Box Disconnect the DI loop to these sinks in the interstitial space and tie main supply line back into together and the return lines back together at each location in the interstitial space so the integrity of the DI loop stays intact. The DI lines to the disconnected sinks can be left as is and not demoed or removed as a part of this project.

VHAMINKaediC Image

VHAMINKaediC Image

VHAMINKaediC Arrow

VHAMINKaediC Arrow

File details come from the government source that posted it. Updated .