RICHMOND ARMORY RTA SET 7-16-20.pdf
PDF 9 MB Posted
- Solicitation number
- RFP-785-2100000267-1
- Issued by
- Elliott County, Kentucky
About this file
This is a comprehensive set of architectural drawings and specifications for the Richmond Armory (DMA - Richmond Readiness Center) Interior Modernization project located in Richmond, Kentucky, prepared for the Kentucky National Guard. The project encompasses selective demolition and interior improvements to an existing armory facility, including removal of existing building components such as windows, doors, partitions, flooring systems, and acoustic ceilings, followed by installation of new architectural elements. The scope of work includes providing and installing new aluminum windows and storefront systems meeting blast-resistant standards (GSA Performance Condition 2, ASTM F 1642-4), new light-gauge metal framing and gypsum board partitions, concrete masonry partitions, new flooring systems (carpet tile, polished concrete, porcelain tile, and broadcast epoxy), acoustic tile ceilings, new doors and frames, painting, casework, lockers, and bath accessories. The project also encompasses mechanical, electrical, and plumbing system upgrades including HVAC modifications, new lighting fixtures with occupancy sensors, communications infrastructure, and plumbing fixture replacements. The drawings indicate multiple improvement zones with detailed floor plans, wall sections, window details, restroom elevations, and mechanical/electrical/plumbing schematics.
The project documentation includes detailed specifications referencing project manual sections for materials and installation requirements, with windows and storefronts required to meet DOD Unified Facilities Criteria UFC 4-010-01 and AAMA standards for blast hazard mitigation. Base bid work includes broadcast epoxy flooring systems in specified areas, with alternate bids identified for painting walls and ceilings and acoustic panel treatments in the assembly hall. The documentation shows coordination requirements among multiple trades, including temporary protection of occupied areas at the building's northwest corner where shower and latrine facilities must remain operational during construction, with adjacent entrance and parking areas to remain in continuous use. Contractor responsibilities include photographing existing conditions prior to work commencement, managing hazardous material discoveries (asbestos, PCB), and ensuring all interior and exterior work is coordinated with mechanical, electrical, and plumbing improvements. The project also requires field verification of all dimensions and conditions before material ordering, with no adjustments permitted for contractor failure to properly measure existing site conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D-1
DEMOLITION PLAN
DEMOLITION PLAN
S C A L E: 3/32" = 1'-0"
26'-0"
146'-4"
40'-4" 59'-0" 21'-0"
1'-0"
1'-0"
5'-8"
1'-0"
1'-0"
1'-0"
10'-8" 5'-4" 10'-8" 5'-4" 10'-8" 5'-4" 10'-8" 5'-4" 6'-8" 5'-4" 10'-8" 5'-4" 10'-8" 5'-4" 10'-8" 5'-4" 10'-8"
1'-0"
9'-0"
216'-8"
20'-0"
1'-0"
4'-0"3'-0"14'-0"
1'-11"
15'-7"
6"
4'-8"
8"
17'-0"
6"
15'-6"14'-2"
6"
4'-8"
6"
15'-6"
6"
13'-2" 9'-0"
1'-0"
OFFICE SPACE
BRIGADE
COMMANDER
OFFICE
OFFICE SPACE
OFFICE
OFFICE
OFFICE
CORRIDOR
LOBBY
VAULT
6"
19'-4"
4'-8"
1'-0"
1'-0"
10'-7" 5'-0" 7'-7" 5'-4" 4'-8" 5'-4" 35'-4" 3'-4" 13'-4" 5'-4"
2'-6"
18'-4"
8"
13'-0"
8"
36'-0"
8"
16'-4"
8"
5'-0"
8"
8'-0"
1'-0"
7'-6"
6"
3'-6"
6"
8'-9"
1 2
12'-4"
8"
3'-8"
8"
33'-0" 19'-4"
6"
33'-0"
VAULT
WOMEN
JANITOR
SHOWER
MEN
DRY
OFFICE
OFFICE
OFFICE
MECH. ROOM
OPEN AREA
OPEN AREA
OFFICE
UNIT STORAGE
IT
COMPUTER
ROOM
CONFERENCE
ROOM
ASSEMBLY HALL
CLASSROOM
1'-0"
12'-0"
8"
8'-0"
6" 8"
3'-4" 4'-8" 4'-0" 4'-7"
1'-9"
8'-8"
8"
7'-6"
31'-2" 3'-4" 4'-8" 16'-0" 11'-2"
2'-8"
3'-4" 5'-4" 12'-0" 3'-10" 31'-10"
FOOD
STOR
FOOD PREP
SCULLERY
FLAM
STOR
4'-0"
1 4
5 8
R A
M P
D
O W
N
RAMP DOWN
CLASSROOM
STORAGE
D N
D N
RECRUITING
OFFICE
MECHANICAL
WAITING
AREA
OFFICE
5'-4"10'-8"5'-4"10'-8"5'-4"10'-8"5'-4"
OFFICE
OFFICE
ADMINISTRATION
OFFICE SPACE
CORRIDOR
1'-2"
25'-0"
8"
26'-6"
8"
3'-4"
6"
17'-4"
6"
4"
UNIT STORAGE
SPACE
SUPPLY SGT.
OFFICE
ARMS VAULT
MECHANICAL
MEN'S
RESTROOM
WOMEN'S
SHOWER
D N
R A
M P
D O
W N
3 4
6"
4'-0" 5'-4"
6"6"
7'-4"
6"
12'-0"
28'-10" 14'-4"
LEARNING
CENTER
STORAGE
CORRIDOR
L O
C K
E R
S
OFFICE
L O
C K
E R
S
LOCKERS
LOCKERS
WALL TO BE REMOVED
NO ARCHITECTURAL IMPROVEMENTS IN THIS AREA
INDICATES REMOVAL OF FINISH OR MATERIAL
GENERAL: WORK DESCRIBED HEREIN INCLUDES THE SELECTIVE REMOVAL AND SUBSEQUENT OFF-SITE DISPOSAL OF EXISTING BUILDING IMPROVEMENTS. THE
FOLLOWING DESCRIBED ITEMS REPRESENT THE GENERAL SCOPE OF WORK TO BE PERFORMED, BUT SHOULD NOT BE CONSTRUED AS ALL-INCLUSIVE.
CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL IMPROVEMENTS REQUIRED FOR COMPLETE INSTALLATION OF ALL NEW IMPROVEMENTS CALLED OUT IN THE
CONTRACT DOCUMENTS. NO WORK SHALL PROCEED UNTIL CONTRACTOR HAS MET ALL PRE-CONSTRUCTION REQUIREMENTS. WHERE REMOVING EXTERIOR DOORS
OR STOREFRONTS, CONTRACTOR SHALL REMOVE ONLY THOSE DOORS AND FRAMING THAT CAN BE REPLACED OR OPENINGS SECURED AT THE END OF EACH WORK
DAY.
§ REFER TO ARCHITECTURAL DRAWING SHEETS D-1FOR ADDITIONAL INFORMATION.
§ REFER TO SPECIFICATION SECTION 01550 FOR ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS.
§ REFER TO PROJECT MANUAL SECTION 03350 FOR CLEANING AND GRINDING CONCRETE FLOOR TO RECEIVE SPECIALTY CONCRETE FINISHING.
§ REFER TO PROJECT MANUAL SECTION 04200 FOR MASONRY TUCK POINTING AND REPAIR.
§ REFER TO PROJECT MANUAL SECTION 09760 FOR CLEANING, SHOT BLASTING AND GRINDING CONCRETE FLOOR TO RECEIVE BROADCAST EPOXY FINISHING
SYSTEM.
PHOTOGRAPH EXISTING CONDITIONS OF STRUCTURE, SURFACES AND EQUIPMENT INCLUDING ADJOINING FINISHED AREAS, WINDOWS, GLASS AND GLAZING AND
IMPROVEMENTS NOT CALLED OUT TO BE REMOVED THAT MAY BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL OPERATIONS. FILE WITH ARCHITECT AND
OWNER'S REPRESENTATIVE PRIOR TO START OF WORK.
SHOWER AND LATRINE AT NORTHWEST CORNER OF THE BUILDING WILL REMAIN IN CONTINUOUS OPERATION DURING CONSTRUCTION. ADJACENT ENTRANCE AND
PARKING AREAS OTHER THAN THOSE SPECIFICALLY SET ASIDE FOR CONTRACTOR'S USE WILL REMAIN IN CONTINUOUS USE. CONTRACTOR SHALL PROVIDE
PROTECTED ACCESS TO THE OCCUPIED AREA AND SHALL PRESERVE AND PROTECT ALL EXISTING BUILDING IMPROVEMENTS, ALL COMPLETED WORK AND ALL
MILITARY AND PRIVATELY OWNED EQUIPMENT.
UTILITIES TO THE OCCUPIED AREAS SHALL NOT BE INTERRUPTED WITHOUT EXPRESSED APPROVAL OF THE OWNER.
THE OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF THOSE ITEMS OR STRUCTURES TO BE DEMOLISHED. SELECTIVE DEMOLITION GENERALLY
INCLUDES THE FOLLOWING:
1. REMOVE AND DISPOSE OF EXISTING FIXED AND OPERABLE ALUMINUM WINDOWS AND FRAMING, GLASS, WINDOW BLINDS, BRACKETS, ANCHORS, CLIPS, AND
RETAINERS AT ALL LOCATIONS SHOWN. REMOVE SEALANTS THAT WOULD BE EXPOSED TO VIEW UPON INSTALLATION OF NEW WINDOWS. THOROUGHLY CLEAN
SURROUNDING BRICK AND CONCRETE MASONRY. DO NOT REMOVE WINDOWS EXCEPT WHERE NEW WINDOWS OR SECURE ENCLOSURES CAN BE INSTALLED THE
SAME DAY.
2. REMOVE AND DISPOSE OF EXISTING STOREFRONT FRAMING, GLASS, DOORS, DOOR HARDWARE, ANCHORS & BRACKETS. REMOVE CAULKING AND THOROUGHLY
CLEAN SURROUNDING BRICK AND CONCRETE MASONRY SURFACES. DO NOT REMOVE STOREFRONT EXCEPT WHERE NEW SYSTEM OR SECURE ENCLOSURE CAN
BE INSTALLED THE SAME DAY.
3. REMOVE AND DISPOSE OF EXISTING ACOUSTIC TILE CEILING INCLUDING ALL CEILING PANELS, SUSPENSION SYSTEM, EDGE MOLDING AND SUPPORT WIRES. TIE
UP AND TEMPORARILY SUPPORT EXISTING LIGHT FIXTURES, DUCTWORK, COMMUNICATIONS AND DATA CABLING. REFER TO MECHANICAL AND ELECTRICAL
DRAWINGS.
4. TEMPORARILY REMOVE AND PRESERVE EXISTING ACOUSTIC CEILING PANELS AT ALL LOCATIONS WHERE ABOVE CEILING WORK IS PERFORMED . PANELS ARE TO
BE SET ASIDE FOR REINSTALLATION UPON COMPLETION OF ABOVE CEILING WORK. COORDINATE WORK WITH AFFECTED TRADES.
5. REMOVE OF AND PROPERLY DISPOSE OF VINYL TILE FLOORING AND VINYL OR RUBBER WALL BASE INCLUDING FLOOR AND BASE MASTIC.
6. REMOVE FLOORING INSTALLED OVER VINYL TILE FLOORING. REFER TO ITEM 5 ABOVE FOR REMOVAL OF TILE SUBSTRATE.
7. REMOVE EXISTING CERAMIC TILE FLOORING AND MUD COAT ON TOP OF EXISTING FLOOR SLAB.
8. SELECTIVE CUTTING, REMOVAL AND DISPOSAL OF EXISTING CONCRETE FLOOR SLAB WHERE SHOWN OR AS
OTHERWISE REQUIRED TO ACCOMMODATE NEW IMPROVEMENTS. REFER TO SECTION 03300 FOR CONCRETE SLAB MATERIAL AND PLACEMENT. REFER TO
PLUMBING DRAWINGS FOR NEW UNDER-SLAB PIPING INSTALLATIONS.
9. REMOVE AND DISPOSE OF TOILET PARTITIONS, TOILET ACCESSORIES, SHOWER FLOORS, CURBS, BENCHES AND
ASSOCIATED HARDWARE. SHOWER FLOORS SHALL BE REMOVED TO LEVEL OF EXISTING CONCRETE FLOOR WHERE
SLAB IS NOT CALLED OUT TO BE REMOVED. ALL FLOOR FINISHES SHALL BE REMOVED.
10.CLEAN AND GRIND CONCRETE FLOORS TO RECEIVE STAIN FINISH UNDER SECTION 03350.
11.SHOTBLASTING AND GRINDING OF EXISTING CONCRETE SURFACES SCHEDULED TO RECEIVE BROADCAST EPOXY
FINISHING SYSTEM UNDER SECTION 09760.
12.REMOVE AND DISPOSE OF HOLLOW METAL DOORS AND FRAMES. REMOVE DOOR HARDWARE AND TURN OVER TO OWNER.
13.REMOVE AND DISPOSE OF CMU MATERIAL TO PROVIDE NEW OPENINGS IN EXISTING CMU PARTITION. REMOVAL INCLUDES GROUTING, POINTING AND REPAIR OF
EXISTING CMU PARTITIONS DAMAGED OR DISTURBED BY DEMOLITION OPERATIONS. REFER TO SECTION 01045 CUTTING AND PATCHING, SECTION 04200 MASONRY
FOR ADDITIONAL REQUIREMENTS.
14.REMOVAL AND DISPOSE OF CMU PARTITION WALLS INCLUDING REMOVAL OF ALL IMBEDDED STRUCTURAL COMPONENTS, MECHANICAL AND ELECTRICAL DEVICES
AND CONDUIT IMBEDDED IN OR ATTACHED TO THE PARTITION WALL SURFACES. WALL SHALL BE REMOVED DOWN TO THE FLOOR SLAB. REINFORCING, GROUT
AND MORTARS SHALL BE GROUND OFF AND FILLED AS REQUIRED TO LEAVE A UNIFORM FLOOR SURFACE SUITABLE TO ACCEPT INSTALLATION OF NEW FINISHES.
WHERE MECHANICAL OR ELECTRICAL COMPONENTS SUPPORTED BY THE PARTITION WALL ARE TO REMAIN IN PLACE, TIE UP OR OTHERWISE SECURE UNTIL
PERMANENT SUPPORTS ARE INSTALLED. REFER TO ELECTRICAL DEMOLITION DRAWINGS FOR DISCONNECTING ELECTRIC CIRCUITS, COMMUNICATIONS AND
DATA CABLING PRIOR TO WALL REMOVAL. , POINT AND REPAIR EXISTING ADJOINING CMU PARTITIONS DAMAGED OR DISTURBED BY DEMOLITION OPERATIONS.
15.REMOVE AND DISPOSE OF METAL FRAME AND GYPSUM BOARD PARTITIONS INCLUDING REMOVAL OF ALL MECHANICAL AND ELECTRICAL DEVICES AND CONDUIT
IMBEDDED IN OR ATTACHED TO THE WALL SURFACES. WALL SHALL BE REMOVED DOWN TO THE FLOOR SLAB. BASE PLATE FASTENERS SHALL BE GROUND OFF
AND FILLED AS REQUIRED TO LEAVE A UNIFORM FLOOR SURFACE SUITABLE TO ACCEPT INSTALLATION OF NEW FINISHES. WHERE MECHANICAL OR ELECTRICAL
COMPONENTS SUPPORTED BY THE PARTITION ARE TO REMAIN IN PLACE, TIE UP OR OTHERWISE SECURE UNTIL PERMANENT SUPPORTS ARE INSTALLED. REFER
TO ELECTRICAL DEMOLITION DRAWINGS FOR DISCONNECTING ELECTRIC CIRCUITS, COMMUNICATIONS AND DATA CABLING PRIOR TO WALL REMOVAL.
16.COMPLETE CLEANING AND REMOVAL OF ALL SURFACE CONTAMINANTS, OILS AND WAXES ON ALL SLAB
AREAS TO RECEIVE NEW FLOORING SYSTEMS. REMOVAL SHALL BE THROUGH APPLICATION OF CLEANING AGENTS, STEAM OR OTHER APPROPRIATE CLEANING
METHODS. POWER WASHING AS PART OF THE CLEANING PROCESS MAY BE EMPLOYED AS LONG AS PROVISIONS ARE MADE TO PROTECT ELECTRICAL DEVICES, OPENINGS AND DOORWAYS INTO AREAS NOT SCHEDULED TO RECEIVE WORK.
REMOVAL OF ASBESTOS CONTAINING MATERIALS:
1. SHOULD THE CONTRACTOR ENCOUNTER MATERIALS IN THE WORK AREA OTHER THAN THOSE SPECIFICALLY IDENTIFIED UNDER SECTION 01550, THAT ARE
REASONABLY BELIEVED TO BE ASBESTOS, POLYCHLORINATED BIPHENYL (PCB), OR OTHER CLASSIFIED HAZARDOUS SUBSTANCES/MATERIALS WHICH HAVE NOT
BEEN RENDERED HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND
ARCHITECT IN WRITING. THE CONTRACTOR SHALL ADJUST HIS SEQUENCE OF DEMOLITION TO PROCEED WITH WORK IN UNAFFECTED AREAS. WORK IN THE
AFFECTED AREA SHALL NOT RESUME UNTIL THE CONDITION IS FULLY INVESTIGATED, AND A DETERMINATION IS MADE AS TO THE NATURE OF THE
SUBSTANCE/MATERIAL. WORK IN THE AFFECTED AREA SHALL BE RESUMED ONLY IN THE ABSENCE OF CLASSIFIED HAZARDOUS SUBSTANCES/MATERIALS OR
WHEN IT (OR THEY) HAVE BEEN RENDERED HARMLESS, AND THEN BY WRITTEN AGREEMENT OF THE OWNER AND CONTRACTOR. REFER TO GENERAL
CONDITIONS, ARTICLE 11 - PROTECTION OF WORK, PROPERTY, EMPLOYEES AND PUBLIC.
LEGEND
DMA - RICHMOND READINESS CENTER INTERIOR MODERNIZATION
RICHMOND, KENTUCKY
35'-0"18'-10"12'-8"46'-11" 19'-0"
16'-0"
17'-0" 16'-0"
5"
17'-3"
24'-0"
20'-0"
OFFICE
OFFICE
DEMOLITION NOTES:
N
ABOVE
ABOVE
ABOVE
ABOVE
ABOVE
ABOVE
CUT SLAB 1-6"
WIDE TO
RECEIVE
TRENCH DUCT
REMOVE PANEL &
TRACK TURN OVER TO
OWNER
REMOVE TOP SOIL
& PREPARE AREA
TO RECEIVE
EQUIPMENT PAD
EXISTING
PAD
DISCONNECT AND
DISMOUNT EXISTING
MOTORIZED SCREEN
RETAIN SCREEN AND
REINSTALL
A1C-7783
D-2
NORTH ELEVATION
SOUTH ELEVATION
WEST ELEVATION
S C A L E: 3/32" = 1'-0"
S C A L E: 3/32" = 1'-0"
S C A L E: 3/32" = 1'-0"
DMA - RICHMOND READINESS CENTER INTERIOR MODERNIZATION
RICHMOND, KENTUCKY
DEMOLITION EXTERIOR ELEVATIONS
EAST ELEVATION
S C A L E: 3/32" = 1'-0"
162'-0"
3'-0" 18'-10"3'-0"
2'-8"
1'-0"
12'-0"7'-4"9'-10"68'-10"28'-8"
9'-0"
216'-8"
10'-8"
1'-0"
5'-4"10'-8" 10'-8"5'-4" 10'-8"5'-4" 6'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 18'-8"5'-4"
K E N T U C K Y
N A T I O N A L
G U A R D
A R M O R Y
19'-0"
216'-8"
25'-0"6'-0" 45'-4" 5'-4"6'-4" 3'-0" 4'-10" 16'-0" 11'-2" 6'-0" 12'-2" 3'-8" 31'-10" 20'-0"
162'-0"
1'-2"
19'-0" 65'-0"3'-0"
2'-4"
7'-3"12'-9"
1'-10"
32'-8" 17'-0"
DEMOLITION NOTES:
1'-0"
RECRUITING
OFFICE
LADDER LADDER
5'-10
6'-7
'6'-7
'6'-7
'6'-7
4'-0"12'-0"4'-2"7'-5" 4'-2" 3'-0"
3'-11
GENERAL: WORK DESCRIBED HEREIN INCLUDES THE SELECTIVE REMOVAL AND SUBSEQUENT OFF-SITE DISPOSAL OF EXISTING BUILDING IMPROVEMENTS. THE
FOLLOWING DESCRIBED ITEMS REPRESENT THE GENERAL SCOPE OF WORK TO BE PERFORMED, BUT SHOULD NOT BE CONSTRUED AS ALL-INCLUSIVE.
CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL IMPROVEMENTS REQUIRED FOR COMPLETE INSTALLATION OF ALL NEW IMPROVEMENTS CALLED OUT IN THE
CONTRACT DOCUMENTS. NO WORK SHALL PROCEED UNTIL CONTRACTOR HAS MET ALL PRE-CONSTRUCTION REQUIREMENTS. WHERE REMOVING EXTERIOR DOORS
OR STOREFRONTS, CONTRACTOR SHALL REMOVE ONLY THOSE DOORS AND FRAMING THAT CAN BE REPLACED OR OPENINGS SECURED AT THE END OF EACH WORK
DAY.
§ REFER TO ARCHITECTURAL DRAWING SHEETS D-1FOR ADDITIONAL INFORMATION.
§ REFER TO SPECIFICATION SECTION 01550 FOR ADDITIONAL SELECTIVE DEMOLITION REQUIREMENTS.
§ REFER TO PROJECT MANUAL SECTION 03350 FOR CLEANING AND GRINDING CONCRETE FLOOR TO RECEIVE SPECIALTY CONCRETE FINISHING.
§ REFER TO PROJECT MANUAL SECTION 04200 FOR MASONRY TUCK POINTING AND REPAIR.
§ REFER TO PROJECT MANUAL SECTION 09760 FOR CLEANING, SHOT BLASTING AND GRINDING CONCRETE FLOOR TO RECEIVE BROADCAST EPOXY FINISHING
SYSTEM.
PHOTOGRAPH EXISTING CONDITIONS OF STRUCTURE, SURFACES AND EQUIPMENT INCLUDING ADJOINING FINISHED AREAS, WINDOWS, GLASS AND GLAZING AND
IMPROVEMENTS NOT CALLED OUT TO BE REMOVED THAT MAY BE MISCONSTRUED AS DAMAGE RELATED TO REMOVAL OPERATIONS. FILE WITH ARCHITECT AND
OWNER'S REPRESENTATIVE PRIOR TO START OF WORK.
SHOWER AND LATRINE AT NORTHWEST CORNER OF THE BUILDING WILL REMAIN IN CONTINUOUS OPERATION DURING CONSTRUCTION. ADJACENT ENTRANCE AND
PARKING AREAS OTHER THAN THOSE SPECIFICALLY SET ASIDE FOR CONTRACTOR'S USE WILL REMAIN IN CONTINUOUS USE. CONTRACTOR SHALL PROVIDE
PROTECTED ACCESS TO THE OCCUPIED AREA AND SHALL PRESERVE AND PROTECT ALL EXISTING BUILDING IMPROVEMENTS, ALL COMPLETED WORK AND ALL
MILITARY AND PRIVATELY OWNED EQUIPMENT.
UTILITIES TO THE OCCUPIED AREAS SHALL NOT BE INTERRUPTED WITHOUT EXPRESSED APPROVAL OF THE OWNER.
THE OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF THOSE ITEMS OR STRUCTURES TO BE DEMOLISHED. SELECTIVE DEMOLITION GENERALLY
INCLUDES THE FOLLOWING:
1. REMOVE AND DISPOSE OF EXISTING FIXED AND OPERABLE ALUMINUM WINDOWS AND FRAMING, GLASS, WINDOW BLINDS, BRACKETS, ANCHORS, CLIPS, AND
RETAINERS AT ALL LOCATIONS SHOWN. REMOVE SEALANTS THAT WOULD BE EXPOSED TO VIEW UPON INSTALLATION OF NEW WINDOWS. THOROUGHLY CLEAN
SURROUNDING BRICK AND CONCRETE MASONRY. DO NOT REMOVE WINDOWS EXCEPT WHERE NEW WINDOWS OR SECURE ENCLOSURES CAN BE INSTALLED THE
SAME DAY.
2. REMOVE AND DISPOSE OF EXISTING STOREFRONT FRAMING, GLASS, DOORS, DOOR HARDWARE, ANCHORS & BRACKETS. REMOVE CAULKING AND THOROUGHLY
CLEAN SURROUNDING BRICK AND CONCRETE MASONRY SURFACES. DO NOT REMOVE STOREFRONT EXCEPT WHERE NEW SYSTEM OR SECURE ENCLOSURE CAN
BE INSTALLED THE SAME DAY.
3. REMOVE AND DISPOSE OF EXISTING ACOUSTIC TILE CEILING INCLUDING ALL CEILING PANELS, SUSPENSION SYSTEM, EDGE MOLDING AND SUPPORT WIRES. TIE
UP AND TEMPORARILY SUPPORT EXISTING LIGHT FIXTURES, DUCTWORK, COMMUNICATIONS AND DATA CABLING. REFER TO MECHANICAL AND ELECTRICAL
DRAWINGS.
4. TEMPORARILY REMOVE AND PRESERVE EXISTING ACOUSTIC CEILING PANELS AT ALL LOCATIONS WHERE ABOVE CEILING WORK IS PERFORMED . PANELS ARE TO
BE SET ASIDE FOR REINSTALLATION UPON COMPLETION OF ABOVE CEILING WORK. COORDINATE WORK WITH AFFECTED TRADES.
5. REMOVE OF AND PROPERLY DISPOSE OF VINYL TILE FLOORING AND VINYL OR RUBBER WALL BASE INCLUDING FLOOR AND BASE MASTIC.
6. REMOVE FLOORING INSTALLED OVER VINYL TILE FLOORING. REFER TO ITEM 5 ABOVE FOR REMOVAL OF TILE SUBSTRATE.
7. REMOVE EXISTING CERAMIC TILE FLOORING AND MUD COAT ON TOP OF EXISTING FLOOR SLAB.
8. SELECTIVE CUTTING, REMOVAL AND DISPOSAL OF EXISTING CONCRETE FLOOR SLAB WHERE SHOWN OR AS
OTHERWISE REQUIRED TO ACCOMMODATE NEW IMPROVEMENTS. REFER TO SECTION 03300 FOR CONCRETE SLAB MATERIAL AND PLACEMENT. REFER TO
PLUMBING DRAWINGS FOR NEW UNDER-SLAB PIPING INSTALLATIONS.
9. REMOVE AND DISPOSE OF TOILET PARTITIONS, TOILET ACCESSORIES, SHOWER FLOORS, CURBS, BENCHES AND
ASSOCIATED HARDWARE. SHOWER FLOORS SHALL BE REMOVED TO LEVEL OF EXISTING CONCRETE FLOOR WHERE
SLAB IS NOT CALLED OUT TO BE REMOVED. ALL FLOOR FINISHES SHALL BE REMOVED.
10.CLEAN AND GRIND CONCRETE FLOORS TO RECEIVE STAIN FINISH UNDER SECTION 03350.
11.SHOTBLASTING AND GRINDING OF EXISTING CONCRETE SURFACES SCHEDULED TO RECEIVE BROADCAST EPOXY
FINISHING SYSTEM UNDER SECTION 09760.
12.REMOVE AND DISPOSE OF HOLLOW METAL DOORS AND FRAMES. REMOVE DOOR HARDWARE AND TURN OVER TO OWNER.
13.REMOVE AND DISPOSE OF CMU MATERIAL TO PROVIDE NEW OPENINGS IN EXISTING CMU PARTITION. REMOVAL INCLUDES GROUTING, POINTING AND REPAIR OF
EXISTING CMU PARTITIONS DAMAGED OR DISTURBED BY DEMOLITION OPERATIONS. REFER TO SECTION 01045 CUTTING AND PATCHING, SECTION 04200 MASONRY
FOR ADDITIONAL REQUIREMENTS.
14.REMOVAL AND DISPOSE OF CMU PARTITION WALLS INCLUDING REMOVAL OF ALL IMBEDDED STRUCTURAL COMPONENTS, MECHANICAL AND ELECTRICAL DEVICES
AND CONDUIT IMBEDDED IN OR ATTACHED TO THE PARTITION WALL SURFACES. WALL SHALL BE REMOVED DOWN TO THE FLOOR SLAB. REINFORCING, GROUT
AND MORTARS SHALL BE GROUND OFF AND FILLED AS REQUIRED TO LEAVE A UNIFORM FLOOR SURFACE SUITABLE TO ACCEPT INSTALLATION OF NEW FINISHES.
WHERE MECHANICAL OR ELECTRICAL COMPONENTS SUPPORTED BY THE PARTITION WALL ARE TO REMAIN IN PLACE, TIE UP OR OTHERWISE SECURE UNTIL
PERMANENT SUPPORTS ARE INSTALLED. REFER TO ELECTRICAL DEMOLITION DRAWINGS FOR DISCONNECTING ELECTRIC CIRCUITS, COMMUNICATIONS AND
DATA CABLING PRIOR TO WALL REMOVAL. , POINT AND REPAIR EXISTING ADJOINING CMU PARTITIONS DAMAGED OR DISTURBED BY DEMOLITION OPERATIONS.
15.REMOVE AND DISPOSE OF METAL FRAME AND GYPSUM BOARD PARTITIONS INCLUDING REMOVAL OF ALL MECHANICAL AND ELECTRICAL DEVICES AND CONDUIT
IMBEDDED IN OR ATTACHED TO THE WALL SURFACES. WALL SHALL BE REMOVED DOWN TO THE FLOOR SLAB. BASE PLATE FASTENERS SHALL BE GROUND OFF
AND FILLED AS REQUIRED TO LEAVE A UNIFORM FLOOR SURFACE SUITABLE TO ACCEPT INSTALLATION OF NEW FINISHES. WHERE MECHANICAL OR ELECTRICAL
COMPONENTS SUPPORTED BY THE PARTITION ARE TO REMAIN IN PLACE, TIE UP OR OTHERWISE SECURE UNTIL PERMANENT SUPPORTS ARE INSTALLED. REFER
TO ELECTRICAL DEMOLITION DRAWINGS FOR DISCONNECTING ELECTRIC CIRCUITS, COMMUNICATIONS AND DATA CABLING PRIOR TO WALL REMOVAL.
16.COMPLETE CLEANING AND REMOVAL OF ALL SURFACE CONTAMINANTS, OILS AND WAXES ON ALL SLAB
AREAS TO RECEIVE NEW FLOORING SYSTEMS. REMOVAL SHALL BE THROUGH APPLICATION OF CLEANING AGENTS, STEAM OR OTHER APPROPRIATE CLEANING
METHODS. POWER WASHING AS PART OF THE CLEANING PROCESS MAY BE EMPLOYED AS LONG AS PROVISIONS ARE MADE TO PROTECT ELECTRICAL DEVICES, OPENINGS AND DOORWAYS INTO AREAS NOT SCHEDULED TO RECEIVE WORK.
REMOVAL OF ASBESTOS CONTAINING MATERIALS:
1. SHOULD THE CONTRACTOR ENCOUNTER MATERIALS IN THE WORK AREA OTHER THAN THOSE SPECIFICALLY IDENTIFIED UNDER SECTION 01550, THAT ARE
REASONABLY BELIEVED TO BE ASBESTOS, POLYCHLORINATED BIPHENYL (PCB), OR OTHER CLASSIFIED HAZARDOUS SUBSTANCES/MATERIALS WHICH HAVE NOT
BEEN RENDERED HARMLESS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK IN THE AREA AFFECTED AND REPORT THE CONDITION TO THE OWNER AND
ARCHITECT IN WRITING. THE CONTRACTOR SHALL ADJUST HIS SEQUENCE OF DEMOLITION TO PROCEED WITH WORK IN UNAFFECTED AREAS. WORK IN THE
AFFECTED AREA SHALL NOT RESUME UNTIL THE CONDITION IS FULLY INVESTIGATED, AND A DETERMINATION IS MADE AS TO THE NATURE OF THE
SUBSTANCE/MATERIAL. WORK IN THE AFFECTED AREA SHALL BE RESUMED ONLY IN THE ABSENCE OF CLASSIFIED HAZARDOUS SUBSTANCES/MATERIALS OR
WHEN IT (OR THEY) HAVE BEEN RENDERED HARMLESS, AND THEN BY WRITTEN AGREEMENT OF THE OWNER AND CONTRACTOR. REFER TO GENERAL
CONDITIONS, ARTICLE 11 - PROTECTION OF WORK, PROPERTY, EMPLOYEES AND PUBLIC.
A1C-7784
IMPROVEMENTS PLAN
IMPROVEMENTS PLAN
A-1
S C A L E: 3/32" = 1'-0"
26'-0"
146'-4"
40'-4" 59'-0" 21'-0"
1'-0"
1'-0"
5'-8"
1'-0"
1'-0"
1'-0"
10'-8" 5'-4" 10'-8" 5'-4" 10'-8" 5'-4" 10'-8" 5'-4" 6'-8" 5'-4" 10'-8" 5'-4" 10'-8" 5'-4" 10'-8" 5'-4" 10'-8"
1'-0"
9'-0"
216'-8"
20'-0"
1'-0"
4'-0"3'-0"14'-0"
1'-11"
15'-7"
6"
4'-8"
8"
17'-0"
6"
15'-6"14'-2"
6"
4'-8"
6"
15'-6"
6"
13'-2"
9'-0"
1'-0"
6"
4'-8"
1'-0"
1'-0"
7'-7" 5'-4" 4'-8" 5'-4" 35'-4" 3'-4" 13'-4" 5'-4"
2'-6"
28'-10"
8"
13'-0"
8"
23'-8"
8"
16'-4"
8"
5'-0"
8"
8'-0"
1'-0"
12'-4"
8"
3'-8"
8"
33'-0" 19'-4"
6"
33'-0"
1'-0"
12'-0"
8"
8'-0"
6" 8"
3'-4" 4'-8" 4'-0" 4'-7"
1'-9"
8'-8"
8"
7'-6"
31'-2" 3'-4" 4'-8" 16'-0" 11'-2"
2'-8"
3'-2" 3'-10" 13'-8" 3'-10" 31'-10"
4'-0"
R A
W
N
RAMP DOWN
D N
5'-4"10'-8"5'-4"10'-8"5'-4"10'-8"5'-4"
1'-2"
25'-0"
8"
26'-6"
8"
3'-4"
6"
17'-4"
6"
4"
D N
R A
M P
D O
W N
6"
4'-0" 5'-4"
6"6"
7'-4"
6"
12'-0"
28'-10" 14'-4"
L O
C K
E R
S
NEW WALL - SEE TAG NOTES
NO ARCHITECTURAL IMPROVEMENTS IN THIS AREA
INDICATES NEW WINDOW TYPES. SEE DRAWINGS, SHEET A-2 & A-3 FOR WINDOW
ELEVATIONS AN DETAILS.
INDICATES NEW DOORS AND FRAMES
INDICATES EXISTING DOORS TO RECEIVE NEW HARDWARE
6"
6'-8"
DMA - RICHMOND READINESS CENTER INTERIOR MODERNIZATION
RICHMOND, KENTUCKY
10'-8
7'-8"
BRIGADE
COMMANDER
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
LOBBY
VAULT
LACTATION
OFFICE
OFFICE
OFFICE
MECH. ROOM
S4
OPEN AREA
CPOF
S6
IT
PLANS AND
PROTECTION
ASSEMBLY
HALL
CLASSROOM
MECHANICAL
ROOM
FOOD
STOR
FOOD PREP
SCULLERY
FLAM.
STOR.
CLASSROOM
STORAGE
OPEN OFFICE
MECHANICAL
WAITING
AREA
OFFICE
OFFICE
OFFICE
ADMINISTRATION
OFFICE SPACE
CORRIDOR
ARMS VAULT
MECHANICAL
MEN'S
RESTROOM
WOMEN'S
SHOWER
S-3/DCO
CORRIDOR
CORRIDOR
S1
OPEN AREA
OFFICE
S3
OFFICE SPACE
CONFERENCE
ROOM
DOCKING
STATION
UNIT STORAGE
SPACE
OFFICE
OFFICE
SUPPLY SGT.
OFFICE
INTEL/S2
BRIGADE
SURGEON
OFFICE
MEDICAL
OFFICE
MEDICAL
OFFICE
MEDICAL
OFFICE
CHAPLAIN
SPECIAL
STAFF
NBC
SGA
19'-4"35'-0"18'-10"
19'-0"16'-0"
D N
17'-0" 16'-0"
IMPROVEMENT NOTES:
LEGEND
4'-4"3'-4"4'-4"
10'-7" 5'-0"
L O
C K
E R
S
MEN
WOMEN
12'-4"
20'-9"
3'-7"
C
L
8'-5
3'-7"
C
L
9'-3"
6'-5"
9'-6"
JANITOR
GENERAL: WORK DESCRIBED HEREIN INCLUDES THE GENERAL SCOPE OF PROJECT IMPROVEMENTS TO BE PERFORMED. THESE DRAWINGS AND ACCOMPANYING SPECIFICATIONS
AND PROJECT MANUAL DETERMINE THE GENERAL DESIGN AND LAYOUT OF MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT TO BE INSTALLED IS SUBJECT TO THE
REQUIREMENTS OF THE MANUFACTURER, BUT THE GENERAL LOCATION AND GENERAL DESIGN SHALL CORRESPOND TO THAT INDICATED BY THE DRAWINGS AND SPECIFICATIONS.
THE CONTRACT DRAWINGS, SPECIFICATIONS AND PROJECT MANUAL ARE INTENDED TO ADDRESS ALL WORK ENUMERATED UNDER THE RESPECTIVE HEADINGS. THE CONTRACTOR
SHALL NOT TAKE ADVANTAGE OF CONFLICT BETWEEN, OR ERROR IN, THE DOCUMENTS. SHOULD ANY CONFLICT BE DISCOVERED, THE CONTRACTOR SHALL IMMEDIATELY REQUEST
CLARIFICATION OF SUCH CONDITION PRIOR PROCEEDING WITH THE AFFECTED WORK.
THE TERMS “PROVIDE”, “FURNISH”, “FURNISH AND INSTALL”, AND SIMILAR TERMS SHALL BE INTERPRETED TO MEAN: FURNISH AND INSTALL COMPLETE, IN PLACE, AND READY FOR
USE.
PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS WHICH MAY AFFECT INSTALLATION, LOCATION, OR PROVISION OF MATERIALS, EQUIPMENT, ETC., OR CONSTRUCTION METHODS, AT THE PROJECT SITE. NO ADJUSTMENT IN THE CONTRACT WILL BE MADE DUE TO THE CONTRACTOR'S FAILURE TO PROPERLY
FIELD MEASURE CONDITIONS EFFECTING ITS WORK PRIOR TO ORDERING OF MATERIALS.
THE CONTRACTOR SHALL NOT, UNDER ANY CIRCUMSTANCES, SCALE DRAWINGS FOR MATERIAL QUANTITIES, THE LOCATION OF EQUIPMENT AND/OR OTHER WORK.
THE OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF THOSE ITEMS OR STRUCTURES UPON WHICH WORK IS TO BE PERFORMED. THE GENERAL SCOPE OF
IMPROVEMENTS INCLUDES THE FOLLOWING:
A. PROVIDE AND INSTALL NEW ALUMINUM WINDOWS, GLASS AND ASSOCIATED TRIM. REFER TO PROJECT MANUAL SECTION 08520. SEE DRAWINGS FOR WINDOW TYPES.
B. PROVIDE AND INSTALL NEW STOREFRONT FRAMING, DOORS AND GLASS. REFER TO PROJECT MANUAL SECTION 8410.
C. PROVIDE AND INSTALL NEW LIGHT GAGE METAL FRAMING AND GYPSUM BOARD PARTITIONS. REFER TO DRAWING SHEETS A-6, A-7 & A-8 FOR WALL TYPES AND LOCATIONS.
D. PROVIDE AND INSTALL NEW CONCRETE MASONRY PARTITIONS. REFER TO DRAWING SHEET A-7 FOR TYPE AND LOCATION.
E. PROVIDE AND INSTALL NEW LIGHT GAGE METAL STUD FURRING AND GYPSUM BOARD PARTITIONS. REFER TO DRAWING SHEETS A-6 & A-8 FOR WALL TYPES AND LOCATIONS.
F. PROVIDE AND INSTALL NEW CARPET TILE. REFER TO PROJECT MANUAL SECTION 09680 FOR CARPETING.
G. PROVIDE AND INSTALL NEW 4” VINYL WALL BASE AT ALL LOCATIONS WHERE NEW CARPET TILE OR POLISHED CONCRETE FLOORING IS INSTALLED. REFER TO PROJECT MANUAL
SECTION 09650.
H. PROVIDE AND INSTALL POLISHED CONCRETE FLOORING. REFER TO PROJECT MANUAL SECTION 03350.
I. PROVIDE AND INSTALL NEW PORCELAIN FLOOR AND WALL TILE. REFER TO PROJECT MANUAL SECTION 09300.
J. PROVIDE AND INSTALL NEW ACOUSTIC TILE CEILING INCLUDING ALL CEILING PANELS, SUSPENSION SYSTEMS AND EDGE MOLDINGS. REFER TO PROJECT MANUAL SECTION 09510.
K. PROVIDE AND INSTALL NEW SOLID SURFACE WALL CLADDING. REFER TO PROJECT MANUAL SECTION 09751.
L. PROVIDE AND INSTALL NEW SYNTHETIC SHOWER RECEPTORS. REFER TO PROJECT MANUAL SECTION 09752.
M. PROVIDE AND INSTALL BROADCAST EPOXY FLOORING SYSTEM. REFER TO PROJECT MANUAL SECTION 09760.
N. GROUT AND TOOTH IN NEW CONCRETE MASONRY UNITS AS REQUIRED TO ACHIEVE A UNIFORM OPENING OR WALL TERMINATION WHERE CONCRETE MASONRY UNITS ARE CUT
OUT OR REMOVED UNDER OTHER SECTIONS. REFER TO PROJECT MANUAL SECTION 04200.
O. PAINT ALL NEW AND EXISTING PARTITION WALLS AND GYPSUM BOARD / PLASTER CEILINGS AND SOFFITS IN ALL AREAS CALLED OUT TO RECEIVE PAINT. PRIME AND PAINT
MINIMUM 2-COATS ON ALL NEW GYPSUM BOARD. APPLY BLOCK FILLER AND MINIMUM 2-COATS PAINT ON ALL NEW CONCRETE MASONRY SURFACES. PRIME AND PAINT 2-COATS ON
ALL NEW METAL SURFACES. PAINT 2-COATS ON ALL EXISTING PAINTED SURFACES. REFER TO PROJECT MANUAL SECTION 09900.
P. PROVIDE AND INSTALL NEW SOLID SURFACE CASEWORK. REFER TO PROJECT MANUAL 06410.
Q. PROVIDE AND INSTALL NEW LOCKERS, BENCHES TOILET AND BATH ACCESSORIES. REFER TO PROJECT MANUAL SECTIONS 10500 AND 10800 RESPECTIVELY.
R. PROVIDE AND INSTALL DOOR FRAMES, DOORS AND HARDWARE AT NEW OPENINGS WHERE SCHEDULED. WHERE EXISTING DOORS AND/OR FRAMES ARE TO BE RETAINED, EVALUATE CONDITION OF EXISTING AND REPORT ANY UNSUITABLE MATERIAL TO THE OWNER. REFER TO SCHEDULE OF DOORS AND FRAMES FOR OPENING CONDITIONS. REFER
TO PROJECT MANUAL SECTION 08120 FOR HOLLOW METAL DOORS AND FRAMES. REFER TO PROJECT MANUAL SECTION 08700 FOR FINISH HARDWARE.
REFER TO PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS AND ASSOCIATED PROJECT MANUAL SECTIONS FOR PLUMBING, MECHANICAL AND ELECTRICAL IMPROVMENTS.
IMPROVEMENT NOTES - WINDOWS AND STOREFRONT:
ALUMINUM WINDOWS:
WINDOW OPENINGS SHALL BE PROVIDED WITH SUPPLEMENTAL TRIM INCLUDING CLOSURE TRIM AND PRE-FORMED SNAP-ON SILLS PROVIDED BY THE WINDOW MANUFACTURER AS
PART OF THE WINDOW SYSTEM AND SHALL CLOSELY MATCH THOSE PROFILES AND CONFIGURATIONS SHOWN.
WINDOWS SHALL MEET REQUIREMENTS OF GSA-TS01 - LATEST EDITION, DOD UNIFIED FACILITIES CRITERIA UFC 4-010-01 - LATEST EDITION, AND SHALL IN ACCORDANCE WITH GSA/ISC
GLAZING PROTECTION LEVELS BASED UPON FRAGMENT IMPACT LOCATIONS, AT MINIMUM ACHIEVE PERFORMANCE CONDITION 2. CONTRACTOR SHALL PROVIDE AND INSTALL ALL
REQUIRED CLIPS, ANGLES, FASTENERS, BRACKETS AND SUPPORTS NECESSARY FOR WINDOW INSTALLATION IN THE SUBSTRATES SHOWN.
PROVIDE INSECT SCREEN UNIT FOR ALL OPERABLE EXTERIOR SASH.
WINDOWS SHALL ACHIEVE THE FOLLOWING MINIMUM BLAST TEST RESULTS WHEN TESTED IN ACCORDANCE WITH ASTM F 1642-4.
ACHIEVED GSA PERFORMANCE CONDITION 2
HAZARD RATING - VERY LOW
PEAK BLAST PRESSURE-6.0
POSITIVE PHASE IMPULSE-42 PSI MSEC
AVERAGE DURATION-14 MSEC
OTHER CRITERIA SHALL BE AS CALLED OUT IN SECTION 08520 OF THE PROJECT MANUAL.
ALUMINUM ENTRANCES AND STOREFRONTS
ALUMINUM ENTRANCE & STOREFRONT FRAMING SHALL BE NOMINAL 2-1/2” X 5” STOREFRONT SYSTEM, CENTER PLANE FOR 1-5/16” IMPACT RESISTANT GLAZING. SCREW SPLINE
FABRICATION.
EXTERIOR ENTRANCE DOORS, 3-1/2” SIDE STILES, 3-1/2” TOP RAIL, 6-1/2” BOTTOM RAIL X 1-3/4” DEEP.
GLAZING REQUIREMENTS FOR ALUMINUM ENTRANCES AND STOREFRONT, ARE INCLUDED IN SECTION 08800 OF THE PROJECT MANUAL.
LOCK CYLINDERS AND HARDWARE ARE INCLUDED IN SECTION 08700 OF THE PROJECT MANUAL.
ENTRANCE AND STOREFRONT SYSTEMS SHALL MEET THE FOLLOWING STANDARDS:
AAMA 510-06, VOLUNTARY GUIDE SPECIFICATIONS FOR BLAST HAZARD MITIGATION FOR FENESTRATION SYSTEMS.
ASTM F 1642 STANDARD TEST METHOD FOR GLAZING AND GLAZING SYSTEMS SUBJECT TO AIRBLAST LOADING.
ASTM F 2248 STANDARD PRACTICE FOR SPECIFYING AND EQUIVALENT 3-SECOND DURATION DESIGN LEADING FOR BLAST RESISTANT GLAZING FABRICATED WITH LAMINATED GLASS, AS ADJUSTED BY UFC 4-010-01.
ASTM F 2927 STANDARD TEST METHOD FOR DOOR SYSTEMS SUBJECT TO AIRBLAST LOADINGS.
ASTM E 1300 STANDARD PRACTICE FOR DETERMINING LOAD RESISTANCE OF BLASTS IN BUILDINGS, AS ADJUSTED BY UFC 4-010-01.
DOD UNIFIED FACILITIES CRITERIA UFC 4-010-01, LATEST EDITION.
OTHER CRITERIA SHALL BE AS CALLED OUT IN SECTION 08410 OF THE PROJECT MANUAL.
SHEET NOTES:
1. WINDOW DIMENSIONS AS CALLED OUT UNLESS OTHERWISE STIPULATED ARE BASED UPON EXTERIOR ROUGH OPENING DIMENSIONS. COMBINED WINDOW WIDTH IN MULLED UNIT
APPLICATION IS REDUCED ¼” AT EACH INTERSECTING WALL OR METAL COLUMN. NO ADJUSTMENT IS MADE AT VERTICAL MULLIONS. NO ADDITIONAL DIMENSIONAL ALLOWANCES
FOR RECEPTORS, SPACERS, SHIMS, ETC. ARE INCLUDED. CONTRACTOR SHALL FIELD MEASURE ALL OPENINGS, BOTH INTERIOR AND EXTERIOR, AND MAKE NECESSARY
ADJUSTMENTS TO ACCOMMODATE ADDITIONAL COMPONENTS THAT MAY BE PROVIDED AS PART OF THE MANUFACTURER'S SYSTEM OR INSTALLATION PROCEDURE.
2. PROVIDE AND INSTALL NEW STOREFRONT ASSEMBLY AS SHOWN ON DRAWING SHEET A-6. PATCH AND REPAIR ALL SURROUNDING WALLS EXPOSED TO VIEW UPON INSTALLATION
OF THE NEW UNIT. GROUT OR OTHERWISE PATCH CONCRETE SLAB WHERE UNFINISHED SURFACE ALONG STOREFRONT IS EXPOSED.
3. SAND, FILL, PATCH AND PAINT INSIDE AND OUTSIDE FACES OF METAL DOORS AND FRAMES. CAULK AROUND PERIMETER OF ALL FRAMES. PAINT FACE.
4.
5. INSTALL NEW ACOUSTIC PANEL CEILING INCLUDING ALL RUNNERS, “T'S” AND EDGE MOLDING.
6. INSALL NEW CERAMIC FACED LAY-IN PANELS AND RUST RESISTANT GRID SYSTEM INCLUDING ALL RUNNERS, “T'S” AND EDGE MOLDING.
7. REINSTALL EXISTING ACOUSTIC PANELS AND CROSS “T's” WERE REMOVED TO ACCOMMODATE NEW WORK.
8. INSTALL NEW POLISHED CONCRETE FLOOR FINISH AND NEW VINYL WALL BASE.
9. FILL HOLES AND DEPRESSIONS AND PAINT LOBBY WALLS.
10.INSTALL NEW DOOR, FRAME AND HARDWARE.
11.INSTALL NEW MASONRY INFILL TO MATCH EXISTING WALL.
INSTALL NEW CONCRETE STOOP, STAIRS, RAMP, WALK AND HANDRAILS
C C C A A A A B A A A
A
E
15'-1"
F G O
F G O
F
30 32 33
F G O
F G O
F G O
F G O
F G O
F G O
F G O
F G O
F G O
F G O
J
J
J
J
J
34 35 36 41
F G O
F G O
F G O
F G O J
F G O J
G
G
G
G
F G O
F G O
F G O
O
G H O G H O
F G O
F G O
F G O
F G O
F G O
G H O
F G O
F G O
F G O
F G O
G H O
G H O
O
G H O
G H O
G O JF
G O JF
G O JF
G H O
G H O
G H O
D O G
O
OO
O
O
J
H
M
I
I KJ OL P Q
I J O P Q
M - BASE BID - BROADCAST EPOXY FLOORING
REFER TO ALT NO. 1 FOR PAINTING WALLS & CEILINGS
REFER TO ALT NO. 2 FOR ACOUSTIC PANELS WALL AND CEILING
NOTE: BOTH FACES OF ALL DOORS AND FRAMES TO BE PAINTED
UNDER BASE BID
G H O
K
H
H
G H O
G H O
6" WIDE
CHAIR RAIL
RACEWAY
SEE ELECT.
TRENCH DUCT
SEE DETAIL
B/A-1
X
X
X
N
D
ABOVE
ABOVE
ABOVE
ABOVE
ABOVE
ABOVE
REPAIR WALLS
AND SOFFIT
E
8'-8"
SLOPE
EXISTING
PAD
C
C
C
6" WIDE
CHAIR RAIL
RACEWAY
SEE ELECT.
C
NEW CONCRETE EQUIPMENT PADS SHALL BE MINIMUM 4" THICK
11' LENGTH AND 8'-8" WIDTH SHOWN. SUBBASE SHALL BE
COMPACTED CRUSHED STONE, MINIMUM 4" THICK. PADS SHALL
BE REINFORCED WITH 6X6 W X 1.4 X W1.4 WWF. SLOPE PAD
MINIMUM 1/8" PER FOOT AWAY FROM BUILDING WALL. REFER TO
PROJECT MANUAL SECTION 02515 FOR ADDITIONAL
REQUIREMENTS.
3-5/8"
NEW CONC.
PAD
FLOORING
TERMINATION SEE
DETAIL E-A-7
TYPICAL FLOOR
TRANSITION AT CARPET.
SEE DETAIL F/A-7
AT EXISTING CONTROL
JOINTS GROUT JOINT &
FILL WITH SEALANT. SEE
DETAIL D/A-7
TERMINATE
EPOXY UNDER
THRESHOLD AT
EXTERIOR DOORS
TYPICAL FLOOR TRANSITION
AT POLISHED CONCRETE. SEE
DETAIL E/A-7
TYPICAL FLOOR TRANSITION
AT POLISHED CONCRETE. SEE
DETAIL E/A-7
12" TRENCH DUCT
S C A L E: NTS
EXISTING
FOLDING PANEL.
REMOVE, CLEAN
AND REINSTALL
24"D X48"W X 34" H CASEWORK WITH
DOUBLE DOORS AND LOCKS.
VENTILATED MESH PANELS ON THE
SIDES AND PLASTIC LAMINATE TOP WITH
NO BACKSPLASH
A1C-7785
A-2
WINDOW A
S C A L E: 1/4" = 1'-0"
NORTH ELEVATION
EAST ELEVATION
S C A L E: 3/32" = 1'-0"
S C A L E: 3/32" = 1'-0"
WINDOW B
S C A L E: 1/4" = 1'-0"
WINDOW C WINDOW D WINDOW E
WINDOW DIMENSIONS
DIMENSIONS CALLED OUT UNLESS OTHERWISE
STIPULATED ARE BASED UPON EXISTING
EXTERIOR ROUGH OPENING DIMENSIONS. COMBINED
WINDOW WIDTH IN MULLED UNIT APPLICATIONS IS
REDUCED ¼” AT EACH INTERSECTING WALL OR
METAL COLUMN. NO ADJUSTMENT IS MADE AT VERTICAL
MULLIONS. NO ADDITIONAL DIMENSIONAL ALLOWANCES
FOR RECEPTORS, SPACERS, SHIMS, ETC. ARE INCLUDED.
CONTRACTOR SHALL FIELD MEASURE ALL
OPENINGS AND MAKE NECESSARY ADJUSTMENTS
TO ACCOMMODATE ADDITIONAL COMPONENTS
THAT MAY BE PROVIDED AS PART OF THE
MANUFACTURER'S SYSTEM OR INSTALLATION
PROCEDURE.
DISCLAIMER:
DRAWINGS ARE BASED UPON ARCHIVAL DRAWINGS PROVIDED BY THE OWNER, ENTITLED
NATIONAL GUARD ARMORY, RICHMOND, KENTUCKY. THE ARCHITECT MAKES NO
REPRESENTATIONS AS TO THE ACCURACY OF THE DOCUMENTS PROVIDED HIM OR TO
BUILDING MODIFICATIONS SUBSEQUENTLY MADE BY OTHERS WHICH MAY OR MAY NOT BE
DOCUMENTED IN DRAWING FORM. SHOULD THE CONTRACTOR ENCOUNTER EXISTING
CONDITIONS DIFFERING MATERIALLY FROM THOSE REPRESENTED ON THE DRAWINGS, WHICH
WOULD CAUSE MATERIAL CHANGES IN THE PERFORMANCE OF THE WORK, THE CONTRACTOR
SHALL CEASE WORK IN THAT AREA, SHALL NOTIFY THE ARCHITECT DESCRIBING THE NATURE
AND EXTEND OF THE DEVIATION ENCOUNTERED AND ITS RECOMMENDED COURSE OF ACTION.
THE CONTRACTOR IS TO PROCEED WITH OTHER WORK NOT AFFECTED BY THE CONDITION
ENCOUNTERED.
IMPROVEMENTS EXTERIOR ELEVATONS & DETAILS
DMA - RICHMOND READINESS CENTER INTERIOR MODERNIZATION
RICHMOND, KENTUCKY
K E N T U C K Y
N A T I O N A L
G U A R D
A R M O R Y
A
B
D
E
IMPROVEMENT NOTES:
I H J
A B C D E
S C A L E: 1/4" = 1'-0" S C A L E: 1/4" = 1'-0" S C A L E: 1/4" = 1'-0"
WINDOW F
S C A L E: 1/4" = 1'-0"
F
RECRUITING
OFFICE
LADDER LADDER
WINDOW G
S C A L E: 1/4" = 1'-0"
G
A A
A
A A A A C C C
10'-8"
3'-7" 3'-6" 3'-7"
6'-8"
3'-4" 3'-4"
3'-7" 3'-6" 3'-7"
10'-8"
7'-2"
6'-7 3/4"
5'-10 3/4"
2'-8"
9'-0"
216'-8"
10'-8"
1'-0"
5'-4"10'-8" 10'-8"5'-4" 10'-8"5'-4" 6'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 10'-8"5'-4" 18'-8"5'-4"
162'-0"
3'-0" 18'-10"3'-0"
2'-8"
1'-0"
12'-0"7'-4"9'-10"68'-10"28'-8"
5'-10
GENERAL: WORK DESCRIBED HEREIN INCLUDES THE GENERAL SCOPE OF PROJECT IMPROVEMENTS TO BE PERFORMED. THESE DRAWINGS AND ACCOMPANYING SPECIFICATIONS
AND PROJECT MANUAL DETERMINE THE GENERAL DESIGN AND LAYOUT OF MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT TO BE INSTALLED IS SUBJECT TO THE
REQUIREMENTS OF THE MANUFACTURER, BUT THE GENERAL LOCATION AND GENERAL DESIGN SHALL CORRESPOND TO THAT INDICATED BY THE DRAWINGS AND SPECIFICATIONS.
THE CONTRACT DRAWINGS, SPECIFICATIONS AND PROJECT MANUAL ARE INTENDED TO ADDRESS ALL WORK ENUMERATED UNDER THE RESPECTIVE HEADINGS. THE CONTRACTOR
SHALL NOT TAKE ADVANTAGE OF CONFLICT BETWEEN, OR ERROR IN, THE DOCUMENTS. SHOULD ANY CONFLICT BE DISCOVERED, THE CONTRACTOR SHALL IMMEDIATELY REQUEST
CLARIFICATION OF SUCH CONDITION PRIOR PROCEEDING WITH THE AFFECTED WORK.
THE TERMS “PROVIDE”, “FURNISH”, “FURNISH AND INSTALL”, AND SIMILAR TERMS SHALL BE INTERPRETED TO MEAN: FURNISH AND INSTALL COMPLETE, IN PLACE, AND READY FOR
USE.
PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS WHICH MAY AFFECT INSTALLATION, LOCATION, OR PROVISION OF MATERIALS, EQUIPMENT, ETC., OR CONSTRUCTION METHODS, AT THE PROJECT SITE. NO ADJUSTMENT IN THE CONTRACT WILL BE MADE DUE TO THE CONTRACTOR'S FAILURE TO PROPERLY
FIELD MEASURE CONDITIONS EFFECTING ITS WORK PRIOR TO ORDERING OF MATERIALS.
THE CONTRACTOR SHALL NOT, UNDER ANY CIRCUMSTANCES, SCALE DRAWINGS FOR MATERIAL QUANTITIES, THE LOCATION OF EQUIPMENT AND/OR OTHER WORK.
THE OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF THOSE ITEMS OR STRUCTURES UPON WHICH WORK IS TO BE PERFORMED. THE GENERAL SCOPE OF
IMPROVEMENTS INCLUDES THE FOLLOWING:
A. PROVIDE AND INSTALL NEW ALUMINUM WINDOWS, GLASS AND ASSOCIATED TRIM. REFER TO PROJECT MANUAL SECTION 08520. SEE DRAWINGS FOR WINDOW TYPES.
B. PROVIDE AND INSTALL NEW STOREFRONT FRAMING, DOORS AND GLASS. REFER TO PROJECT MANUAL SECTION 8410.
C. PROVIDE AND INSTALL NEW LIGHT GAGE METAL FRAMING AND GYPSUM BOARD PARTITIONS. REFER TO DRAWING SHEETS A-6, A-7 & A-8 FOR WALL TYPES AND LOCATIONS.
D. PROVIDE AND INSTALL NEW CONCRETE MASONRY PARTITIONS. REFER TO DRAWING SHEET A-7 FOR TYPE AND LOCATION.
E. PROVIDE AND INSTALL NEW LIGHT GAGE METAL STUD FURRING AND GYPSUM BOARD PARTITIONS. REFER TO DRAWING SHEETS A-6 & A-8 FOR WALL TYPES AND LOCATIONS.
F. PROVIDE AND INSTALL NEW CARPET TILE. REFER TO PROJECT MANUAL SECTION 09680 FOR CARPETING.
G. PROVIDE AND INSTALL NEW 4” VINYL WALL BASE AT ALL LOCATIONS WHERE NEW CARPET TILE OR POLISHED CONCRETE FLOORING IS INSTALLED. REFER TO PROJECT MANUAL
SECTION 09650.
H. PROVIDE AND INSTALL POLISHED CONCRETE FLOORING. REFER TO PROJECT MANUAL SECTION 03350.
I. PROVIDE AND INSTALL NEW PORCELAIN FLOOR AND WALL TILE. REFER TO PROJECT MANUAL SECTION 09300.
J. PROVIDE AND INSTALL NEW ACOUSTIC TILE CEILING INCLUDING ALL CEILING PANELS, SUSPENSION SYSTEMS AND EDGE MOLDINGS. REFER TO PROJECT MANUAL SECTION 09510.
K. PROVIDE AND INSTALL NEW SOLID SURFACE WALL CLADDING. REFER TO PROJECT MANUAL SECTION 09751.
L. PROVIDE AND INSTALL NEW SYNTHETIC SHOWER RECEPTORS. REFER TO PROJECT MANUAL SECTION 09752.
M. PROVIDE AND INSTALL BROADCAST EPOXY FLOORING SYSTEM. REFER TO PROJECT MANUAL SECTION 09760.
N. GROUT AND TOOTH IN NEW CONCRETE MASONRY UNITS AS REQUIRED TO ACHIEVE A UNIFORM OPENING OR WALL TERMINATION WHERE CONCRETE MASONRY UNITS ARE CUT
OUT OR REMOVED UNDER OTHER SECTIONS. REFER TO PROJECT MANUAL SECTION 04200.
O. PAINT ALL NEW AND EXISTING PARTITION WALLS AND GYPSUM BOARD / PLASTER CEILINGS AND SOFFITS IN ALL AREAS CALLED OUT TO RECEIVE PAINT. PRIME AND PAINT
MINIMUM 2-COATS ON ALL NEW GYPSUM BOARD. APPLY BLOCK FILLER AND MINIMUM 2-COATS PAINT ON ALL NEW CONCRETE MASONRY SURFACES. PRIME AND PAINT 2-COATS ON
ALL NEW METAL SURFACES. PAINT 2-COATS ON ALL EXISTING PAINTED SURFACES. REFER TO PROJECT MANUAL SECTION 09900.
P. PROVIDE AND INSTALL NEW SOLID SURFACE CASEWORK. REFER TO PROJECT MANUAL 06410.
Q. PROVIDE AND INSTALL NEW LOCKERS, BENCHES TOILET AND BATH ACCESSORIES. REFER TO PROJECT MANUAL SECTIONS 10500 AND 10800 RESPECTIVELY.
R. PROVIDE AND INSTALL DOOR FRAMES, DOORS AND HARDWARE AT NEW OPENINGS WHERE SCHEDULED. WHERE EXISTING DOORS AND/OR FRAMES ARE TO BE RETAINED, EVALUATE CONDITION OF EXISTING AND REPORT ANY UNSUITABLE MATERIAL TO THE OWNER. REFER TO SCHEDULE OF DOORS AND FRAMES FOR OPENING CONDITIONS. REFER
TO PROJECT MANUAL SECTION 08120 FOR HOLLOW METAL DOORS AND FRAMES. REFER TO PROJECT MANUAL SECTION 08700 FOR FINISH HARDWARE.
REFER TO PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS AND ASSOCIATED PROJECT MANUAL SECTIONS FOR PLUMBING, MECHANICAL AND ELECTRICAL IMPROVMENTS.
IMPROVEMENT NOTES - WINDOWS AND STOREFRONT:
ALUMINUM WINDOWS:
WINDOW OPENINGS SHALL BE PROVIDED WITH SUPPLEMENTAL TRIM INCLUDING CLOSURE TRIM AND PRE-FORMED SNAP-ON SILLS PROVIDED BY THE WINDOW MANUFACTURER AS
PART OF THE WINDOW SYSTEM AND SHALL CLOSELY MATCH THOSE PROFILES AND CONFIGURATIONS SHOWN.
WINDOWS SHALL MEET REQUIREMENTS OF GSA-TS01 - LATEST EDITION, DOD UNIFIED FACILITIES CRITERIA UFC 4-010-01 - LATEST EDITION, AND SHALL IN ACCORDANCE WITH GSA/ISC
GLAZING PROTECTION LEVELS BASED UPON FRAGMENT IMPACT LOCATIONS, AT MINIMUM ACHIEVE PERFORMANCE CONDITION 2. CONTRACTOR SHALL PROVIDE AND INSTALL ALL
REQUIRED CLIPS, ANGLES, FASTENERS, BRACKETS AND SUPPORTS NECESSARY FOR WINDOW INSTALLATION IN THE SUBSTRATES SHOWN.
PROVIDE INSECT SCREEN UNIT FOR ALL OPERABLE EXTERIOR SASH.
WINDOWS SHALL ACHIEVE THE FOLLOWING MINIMUM BLAST TEST RESULTS WHEN TESTED IN ACCORDANCE WITH ASTM F 1642-4.
ACHIEVED GSA PERFORMANCE CONDITION 2
HAZARD RATING - VERY LOW
PEAK BLAST PRESSURE-6.0
POSITIVE PHASE IMPULSE-42 PSI MSEC
AVERAGE DURATION-14 MSEC
OTHER CRITERIA SHALL BE AS CALLED OUT IN SECTION 08520 OF THE PROJECT MANUAL.
ALUMINUM ENTRANCES AND STOREFRONTS
ALUMINUM ENTRANCE & STOREFRONT FRAMING SHALL BE NOMINAL 2-1/2” X 5” STOREFRONT SYSTEM, CENTER PLANE FOR 1-5/16” IMPACT RESISTANT GLAZING. SCREW SPLINE
FABRICATION.
EXTERIOR ENTRANCE DOORS, 3-1/2” SIDE STILES, 3-1/2” TOP RAIL, 6-1/2” BOTTOM RAIL X 1-3/4” DEEP.
GLAZING REQUIREMENTS FOR ALUMINUM ENTRANCES AND STOREFRONT, ARE INCLUDED IN SECTION 08800 OF THE PROJECT MANUAL.
LOCK CYLINDERS AND HARDWARE ARE INCLUDED IN SECTION 08700 OF THE PROJECT MANUAL.
ENTRANCE AND STOREFRONT SYSTEMS SHALL MEET THE FOLLOWING STANDARDS:
AAMA 510-06, VOLUNTARY GUIDE SPECIFICATIONS FOR BLAST HAZARD MITIGATION FOR FENESTRATION SYSTEMS.
ASTM F 1642 STANDARD TEST METHOD FOR GLAZING AND GLAZING SYSTEMS SUBJECT TO AIRBLAST LOADING.
ASTM F 2248 STANDARD PRACTICE FOR SPECIFYING AND EQUIVALENT 3-SECOND DURATION DESIGN LEADING FOR BLAST RESISTANT GLAZING FABRICATED WITH LAMINATED GLASS, AS ADJUSTED BY UFC 4-010-01.
ASTM F 2927 STANDARD TEST METHOD FOR DOOR SYSTEMS SUBJECT TO AIRBLAST LOADINGS.
ASTM E 1300 STANDARD PRACTICE FOR DETERMINING LOAD RESISTANCE OF BLASTS IN BUILDINGS, AS ADJUSTED BY UFC 4-010-01.
DOD UNIFIED FACILITIES CRITERIA UFC 4-010-01, LATEST EDITION.
OTHER CRITERIA SHALL BE AS CALLED OUT IN SECTION 08410 OF THE PROJECT MANUAL.
SHEET NOTES:
1. WINDOW DIMENSIONS AS CALLED OUT UNLESS OTHERWISE STIPULATED ARE BASED UPON EXTERIOR ROUGH OPENING DIMENSIONS. COMBINED WINDOW WIDTH IN MULLED UNIT
APPLICATION IS REDUCED ¼” AT EACH INTERSECTING WALL OR METAL COLUMN. NO ADJUSTMENT IS MADE AT VERTICAL MULLIONS. NO ADDITIONAL DIMENSIONAL ALLOWANCES
FOR RECEPTORS, SPACERS, SHIMS, ETC. ARE INCLUDED. CONTRACTOR SHALL FIELD MEASURE ALL OPENINGS, BOTH INTERIOR AND EXTERIOR, AND MAKE NECESSARY
ADJUSTMENTS TO ACCOMMODATE ADDITIONAL COMPONENTS THAT MAY BE PROVIDED AS PART OF THE MANUFACTURER'S SYSTEM OR INSTALLATION PROCEDURE.
2. PROVIDE AND INSTALL NEW STOREFRONT ASSEMBLY AS SHOWN ON DRAWING SHEET A-6. PATCH AND REPAIR ALL SURROUNDING WALLS EXPOSED TO VIEW UPON INSTALLATION
OF THE NEW UNIT. GROUT OR OTHERWISE PATCH CONCRETE SLAB WHERE UNFINISHED SURFACE ALONG STOREFRONT IS EXPOSED.
3. SAND, FILL, PATCH AND PAINT INSIDE AND OUTSIDE FACES OF METAL DOORS AND FRAMES. CAULK AROUND PERIMETER OF ALL FRAMES. PAINT FACE.
4.
5. INSTALL NEW ACOUSTIC PANEL CEILING INCLUDING ALL RUNNERS, “T'S” AND EDGE MOLDING.
6. INSALL NEW CERAMIC FACED LAY-IN PANELS AND RUST RESISTANT GRID SYSTEM INCLUDING ALL RUNNERS, “T'S” AND EDGE MOLDING.
7. REINSTALL EXISTING ACOUSTIC PANELS AND CROSS “T's” WERE REMOVED TO ACCOMMODATE NEW WORK.
8. INSTALL NEW POLISHED CONCRETE FLOOR FINISH AND NEW VINYL WALL BASE.
9. FILL HOLES AND DEPRESSIONS AND PAINT LOBBY WALLS.
10.INSTALL NEW DOOR, FRAME AND HARDWARE.
11.INSTALL NEW MASONRY INFILL TO MATCH EXISTING WALL.
INSTALL NEW CONCRETE STOOP, STAIRS, RAMP, WALK AND HANDRAILS
A1C-7786
A-3
SOUTH ELEVATION
WEST ELEVATION
S C A L E: 3/32" = 1'-0"
S C A L E: 3/32" = 1'-0"
DMA - RICHMOND READINESS CENTER INTERIOR MODERNIZATION
RICHMOND, KENTUCKY
IMPROVEMENTS EXTERIOR ELEVATONS & DETAILS
F
IMPROVEMENT NOTES:
G G G
G
K H H
31 53 67
WINDOW H
S C A L E: 3/8" = 1'-0"
WINDOW K
S C A L E: 3/8" = 1'-0"
WINDOW I
S C A L E: 3/8" = 1'-0"
WINDOW J
S C A L E: 3/8" = 1'-0"
H
I
J
K
16'-0"
2 1/4"
3'-9 3/8"
2"
3'-9 3/8"
2"
3'-9 3/8"
2"
3'-9 3/8"
2 1/4"
16'-0"
7'-11"
2"
3'-9 3/8"
2"
3'-9 3/8"
2 1/4"
16'-0"
2 1/4"
3'-9 3/8"
2"
3'-9 3/8"
2"
3'-9 3/8"
2"
3'-9 3/8"
2 1/4"
16'-0"
7'-11"
2"
3'-9 3/8"
2"
3'-9 3/8"
2 1/4"
19'-0"
216'-8"
25'-0"6'-0" 45'-4" 5'-4"6'-4" 3'-0" 4'-10" 16'-0" 11'-2" 6'-0" 12'-2" 3'-8" 31'-10" 20'-0"
1'-0"
162'-0"
1'-2"
19'-0"3'-0"
2'-4"
7'-3"12'-9"
1'-10"
32'-8" 17'-0"
6'-7
'6'-7
'6'-7
'6'-7
4'-0"12'-0"4'-2"7'-5" 4'-2" 3'-0"
3'-11
65'-0"
GENERAL: WORK DESCRIBED HEREIN INCLUDES THE GENERAL SCOPE OF PROJECT IMPROVEMENTS TO BE PERFORMED. THESE DRAWINGS AND ACCOMPANYING SPECIFICATIONS
AND PROJECT MANUAL DETERMINE THE GENERAL DESIGN AND LAYOUT OF MATERIALS AND EQUIPMENT. THE MATERIAL AND EQUIPMENT TO BE INSTALLED IS SUBJECT TO THE
REQUIREMENTS OF THE MANUFACTURER, BUT THE GENERAL LOCATION AND GENERAL DESIGN SHALL CORRESPOND TO THAT INDICATED BY THE DRAWINGS AND SPECIFICATIONS.
THE CONTRACT DRAWINGS, SPECIFICATIONS AND PROJECT MANUAL ARE INTENDED TO ADDRESS ALL WORK ENUMERATED UNDER THE RESPECTIVE HEADINGS. THE CONTRACTOR
SHALL NOT TAKE ADVANTAGE OF CONFLICT BETWEEN, OR ERROR IN, THE DOCUMENTS. SHOULD ANY CONFLICT BE DISCOVERED, THE CONTRACTOR SHALL IMMEDIATELY REQUEST
CLARIFICATION OF SUCH CONDITION PRIOR PROCEEDING WITH THE AFFECTED WORK.
THE TERMS “PROVIDE”, “FURNISH”, “FURNISH AND INSTALL”, AND SIMILAR TERMS SHALL BE INTERPRETED TO MEAN: FURNISH AND INSTALL COMPLETE, IN PLACE, AND READY FOR
USE.
PRIOR TO THE START OF WORK, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS WHICH MAY AFFECT INSTALLATION, LOCATION, OR PROVISION OF MATERIALS, EQUIPMENT, ETC., OR CONSTRUCTION METHODS, AT THE PROJECT SITE. NO ADJUSTMENT IN THE CONTRACT WILL BE MADE DUE TO THE CONTRACTOR'S FAILURE TO PROPERLY
FIELD MEASURE CONDITIONS EFFECTING ITS WORK PRIOR TO ORDERING OF MATERIALS.
THE CONTRACTOR SHALL NOT, UNDER ANY CIRCUMSTANCES, SCALE DRAWINGS FOR MATERIAL QUANTITIES, THE LOCATION OF EQUIPMENT AND/OR OTHER WORK.
THE OWNER ASSUMES NO RESPONSIBILITY FOR ACTUAL CONDITION OF THOSE ITEMS OR STRUCTURES UPON WHICH WORK IS TO BE PERFORMED. THE GENERAL SCOPE OF
IMPROVEMENTS INCLUDES THE FOLLOWING:
A. PROVIDE AND INSTALL NEW ALUMINUM WINDOWS, GLASS AND ASSOCIATED TRIM. REFER TO PROJECT MANUAL SECTION 08520. SEE DRAWINGS FOR WINDOW TYPES.
B. PROVIDE AND INSTALL NEW STOREFRONT FRAMING, DOORS AND GLASS. REFER TO PROJECT MANUAL SECTION 8410.
C. PROVIDE AND INSTALL NEW LIGHT GAGE METAL FRAMING AND GYPSUM BOARD PARTITIONS. REFER TO DRAWING SHEETS A-6, A-7 & A-8 FOR WALL TYPES AND LOCATIONS.
D. PROVIDE AND INSTALL NEW CONCRETE MASONRY PARTITIONS. REFER TO DRAWING SHEET A-7 FOR TYPE AND LOCATION.
E. PROVIDE AND INSTALL NEW LIGHT GAGE METAL STUD FURRING AND GYPSUM BOARD PARTITIONS. REFER TO DRAWING SHEETS A-6 & A-8 FOR WALL TYPES AND LOCATIONS.
F. PROVIDE AND INSTALL NEW CARPET TILE. REFER TO PROJECT MANUAL SECTION 09680 FOR CARPETING.
G. PROVIDE AND INSTALL NEW 4” VINYL WALL BASE AT ALL LOCATIONS WHERE NEW CARPET TILE OR POLISHED CONCRETE FLOORING IS INSTALLED. REFER TO PROJECT MANUAL
SECTION 09650.
H. PROVIDE AND INSTALL POLISHED CONCRETE FLOORING. REFER TO PROJECT MANUAL SECTION 03350.
I. PROVIDE AND INSTALL NEW PORCELAIN FLOOR AND WALL TILE. REFER TO PROJECT MANUAL SECTION 09300.
J. PROVIDE AND INSTALL NEW ACOUSTIC TILE CEILING INCLUDING ALL CEILING PANELS, SUSPENSION SYSTEMS AND EDGE MOLDINGS. REFER TO PROJECT MANUAL SECTION 09510.
K. PROVIDE AND INSTALL NEW SOLID SURFACE WALL CLADDING. REFER TO PROJECT MANUAL SECTION 09751.
L. PROVIDE AND INSTALL NEW SYNTHETIC SHOWER RECEPTORS. REFER TO PROJECT MANUAL SECTION 09752.
M. PROVIDE AND INSTALL BROADCAST EPOXY FLOORING SYSTEM. REFER TO PROJECT MANUAL SECTION 09760.
N. GROUT AND TOOTH IN NEW CONCRETE MASONRY UNITS AS REQUIRED TO ACHIEVE A UNIFORM OPENING OR WALL TERMINATION WHERE CONCRETE MASONRY UNITS ARE CUT
OUT OR REMOVED UNDER OTHER SECTIONS. REFER TO PROJECT MANUAL SECTION 04200.
O. PAINT ALL NEW AND EXISTING PARTITION WALLS AND GYPSUM BOARD / PLASTER CEILINGS AND SOFFITS IN ALL AREAS CALLED OUT TO RECEIVE PAINT. PRIME AND PAINT
MINIMUM 2-COATS ON ALL NEW GYPSUM BOARD. APPLY BLOCK FILLER AND MINIMUM 2-COATS PAINT ON ALL NEW CONCRETE MASONRY SURFACES. PRIME AND PAINT 2-COATS ON
ALL NEW METAL SURFACES. PAINT 2-COATS ON ALL EXISTING PAINTED SURFACES. REFER TO PROJECT MANUAL SECTION 09900.
P. PROVIDE AND INSTALL NEW SOLID SURFACE CASEWORK. REFER TO PROJECT MANUAL 06410.
Q. PROVIDE AND INSTALL NEW LOCKERS, BENCHES TOILET AND BATH ACCESSORIES. REFER TO PROJECT MANUAL SECTIONS 10500 AND 10800 RESPECTIVELY.
R. PROVIDE AND INSTALL DOOR FRAMES, DOORS AND HARDWARE AT NEW OPENINGS WHERE SCHEDULED. WHERE EXISTING DOORS AND/OR FRAMES ARE TO BE RETAINED, EVALUATE CONDITION OF EXISTING AND REPORT ANY UNSUITABLE MATERIAL TO THE OWNER. REFER TO SCHEDULE OF DOORS AND FRAMES FOR OPENING CONDITIONS. REFER
TO PROJECT MANUAL SECTION 08120 FOR HOLLOW METAL DOORS AND FRAMES. REFER TO PROJECT MANUAL SECTION 08700 FOR FINISH HARDWARE.
REFER TO PLUMBING, MECHANICAL AND ELECTRICAL DRAWINGS AND ASSOCIATED PROJECT MANUAL SECTIONS FOR PLUMBING, MECHANICAL AND ELECTRICAL IMPROVMENTS.
IMPROVEMENT NOTES - WINDOWS AND STOREFRONT:
ALUMINUM WINDOWS:
WINDOW OPENINGS SHALL BE PROVIDED WITH SUPPLEMENTAL TRIM INCLUDING CLOSURE TRIM AND PRE-FORMED SNAP-ON SILLS PROVIDED BY THE WINDOW MANUFACTURER AS
PART OF THE WINDOW SYSTEM AND SHALL CLOSELY MATCH THOSE PROFILES AND CONFIGURATIONS SHOWN.
WINDOWS SHALL MEET REQUIREMENTS OF GSA-TS01 - LATEST EDITION, DOD UNIFIED FACILITIES CRITERIA UFC 4-010-01 - LATEST EDITION, AND SHALL IN ACCORDANCE WITH GSA/ISC
GLAZING PROTECTION LEVELS BASED UPON FRAGMENT IMPACT LOCATIONS, AT MINIMUM ACHIEVE PERFORMANCE CONDITION 2. CONTRACTOR SHALL PROVIDE AND INSTALL ALL
REQUIRED CLIPS, ANGLES, FASTENERS, BRACKETS AND SUPPORTS NECESSARY FOR WINDOW INSTALLATION IN THE SUBSTRATES SHOWN.
PROVIDE INSECT SCREEN UNIT FOR ALL OPERABLE EXTERIOR SASH.
WINDOWS SHALL ACHIEVE THE FOLLOWING MINIMUM BLAST TEST RESULTS WHEN TESTED IN ACCORDANCE WITH ASTM F 1642-4.
ACHIEVED GSA PERFORMANCE CONDITION 2
HAZARD RATING - VERY LOW
PEAK BLAST PRESSURE-6.0
POSITIVE PHASE IMPULSE-42 PSI MSEC
AVERAGE DURATION-14 MSEC
OTHER CRITERIA SHALL BE AS CALLED OUT IN SECTION 08520 OF THE PROJECT MANUAL.
ALUMINUM ENTRANCES AND STOREFRONTS
ALUMINUM ENTRANCE & STOREFRONT FRAMING SHALL BE NOMINAL 2-1/2” X 5” STOREFRONT SYSTEM, CENTER PLANE FOR 1-5/16” IMPACT RESISTANT GLAZING. SCREW SPLINE
FABRICATION.
EXTERIOR ENTRANCE DOORS, 3-1/2” SIDE STILES, 3-1/2” TOP RAIL, 6-1/2” BOTTOM RAIL X 1-3/4” DEEP.
GLAZING REQUIREMENTS FOR ALUMINUM ENTRANCES AND STOREFRONT, ARE INCLUDED IN SECTION 08800 OF THE PROJECT MANUAL.
LOCK CYLINDERS AND HARDWARE ARE INCLUDED IN SECTION 08700 OF THE PROJECT MANUAL.
ENTRANCE AND STOREFRONT SYSTEMS SHALL MEET THE FOLLOWING STANDARDS:
AAMA 510-06, VOLUNTARY GUIDE SPECIFICATIONS FOR BLAST HAZARD MITIGATION FOR FENESTRATION SYSTEMS.
ASTM F 1642 STANDARD TEST METHOD FOR GLAZING AND GLAZING SYSTEMS SUBJECT TO AIRBLAST LOADING.
ASTM F 2248 STANDARD PRACTICE FOR SPECIFYING AND EQUIVALENT 3-SECOND DURATION DESIGN LEADING FOR BLAST RESISTANT GLAZING FABRICATED WITH LAMINATED GLASS, AS ADJUSTED BY UFC 4-010-01.
ASTM F 2927 STANDARD TEST METHOD FOR DOOR SYSTEMS SUBJECT TO AIRBLAST LOADINGS.
ASTM E 1300 STANDARD PRACTICE FOR DETERMINING LOAD RESISTANCE OF BLASTS IN BUILDINGS, AS ADJUSTED BY UFC 4-010-01.
DOD UNIFIED FACILITIES CRITERIA UFC 4-010-01, LATEST EDITION.
OTHER CRITERIA SHALL BE AS CALLED OUT IN SECTION 08410 OF THE PROJECT MANUAL.
SHEET NOTES:
1. WINDOW DIMENSIONS AS CALLED OUT UNLESS OTHERWISE STIPULATED ARE BASED UPON EXTERIOR ROUGH OPENING DIMENSIONS. COMBINED WINDOW WIDTH IN MULLED UNIT
APPLICATION IS REDUCED ¼” AT EACH INTERSECTING WALL OR METAL COLUMN. NO ADJUSTMENT IS MADE AT VERTICAL MULLIONS. NO ADDITIONAL DIMENSIONAL ALLOWANCES
FOR RECEPTORS, SPACERS, SHIMS, ETC. ARE INCLUDED. CONTRACTOR SHALL FIELD MEASURE ALL OPENINGS, BOTH INTERIOR AND EXTERIOR, AND MAKE NECESSARY
ADJUSTMENTS TO ACCOMMODATE ADDITIONAL COMPONENTS THAT MAY BE PROVIDED AS PART OF THE MANUFACTURER'S SYSTEM OR INSTALLATION PROCEDURE.
2. PROVIDE AND INSTALL NEW STOREFRONT ASSEMBLY AS SHOWN ON DRAWING SHEET A-6. PATCH AND REPAIR ALL SURROUNDING WALLS EXPOSED TO VIEW UPON INSTALLATION
OF THE NEW UNIT. GROUT OR OTHERWISE PATCH CONCRETE SLAB WHERE UNFINISHED SURFACE ALONG STOREFRONT IS EXPOSED.
3. SAND, FILL, PATCH AND PAINT INSIDE AND OUTSIDE FACES OF METAL DOORS AND FRAMES. CAULK AROUND PERIMETER OF ALL FRAMES. PAINT FACE.
4.
5. INSTALL NEW ACOUSTIC PANEL CEILING INCLUDING ALL RUNNERS, “T'S” AND EDGE MOLDING.
6. INSALL NEW CERAMIC FACED LAY-IN PANELS AND RUST RESISTANT GRID SYSTEM INCLUDING ALL RUNNERS, “T'S” AND EDGE MOLDING.
7. REINSTALL EXISTING ACOUSTIC PANELS AND CROSS “T's” WERE REMOVED TO ACCOMMODATE NEW WORK.
8. INSTALL NEW POLISHED CONCRETE FLOOR FINISH AND NEW VINYL WALL BASE.
9. FILL HOLES AND DEPRESSIONS AND PAINT LOBBY WALLS.
10.INSTALL NEW DOOR, FRAME AND HARDWARE.
11.INSTALL NEW MASONRY INFILL TO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .