RFQ27007135 SR-26-2180 RAL.pdf

PDF 198 KB Posted

Attached to
DEM Legacy High School Remedial Action Work
Solicitation number
RFQ27007135
Issued by
Providence County, Rhode Island

About this file

This is a Remedial Approval Letter (RAL) issued by the Rhode Island Department of Environmental Management's Office of Land Revitalization and Sustainable Materials Management, approving remedial actions for a contaminated site located at 1070 & 1080 Main Street in Pawtucket, Rhode Island (Plat Map 63A / Lot 305), which is designated for a proposed school facility. The document approves the Remedial Action Work Plan (RAWP) prepared by NV5 for the Segue Institute for Learning and specifies that all remedial work must be initiated within sixty (60) days of the RAL issuance dated November 13, 2024. The remedial action involves encapsulation of site soils exceeding the Department's Method 1 Residential Direct Exposure Criteria through engineered controls such as a minimum of two feet of clean fill, one foot of clean fill with geotextile fabric, or four inches of pavement above six inches of clean subgrade, supplemented by building foundations. No formal bidder's conference or site visit requirements are specified in this approval document.

The remedial work carries no specific pricing terms or budget constraints within this approval letter, as the RAL serves as authorization for the performing party rather than a procurement solicitation. Segue Institute for Learning bears primary responsibility for construction, operation, maintenance, and monitoring of the approved remedial action plan. Key obligations include submitting a list of all contractors and their contact information prior to work commencement, employing dust suppression techniques during soil disturbance activities, properly managing and storing excavated materials, completing work within thirty (30) to sixty (60) days depending on the deliverable, submitting a Closure Report and an Environmental Land Usage Restriction (ELUR) for Department review and recording, and conducting annual inspections with evaluation reports to ensure ongoing compliance. The Department reserves the right to sample fill materials to verify compliance with regulatory standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RHODE ISLAND

DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

OFFICE OF LAND REVITALIZATION & SUSTAINABLE MATERIALS MANAGEMENT

235 Promenade Street, Providence, Rhode Island 02908

1070 & 1080 Main Street – Proposed School, Pawtucket, RI November 13, 2024

Remedial Approval Letter Page 1 of 5

REMEDIAL APPROVAL LETTER November 13, 2024

File No. SR-26-2180

Josh Laboissonniere

Segue Institute for Learning

325 Cowden Street

Central Falls, Rhode Island 02863

RE: 1070 & 1080 Main Street – Proposed School

1070 & 1080 Main Street

Pawtucket, Rhode Island

Plat Map 63A / Lot 305

Dear Mr. Laboissonniere:

On April 22, 2020, the Rhode Island Department of Environmental Management's (the

Department) Office of Land Revitalization and Sustainable Materials Management (LRSMM) enacted the codified 250-RICR-140-30-1, Rules and Regulations for the Investigation and

Remediation of Hazardous Material Releases (the Remediation Regulations). Following periodic refiling, the active Rule became effective on January 4, 2022. The purpose of these regulations is to create an integrated program requiring reporting, investigation, and remediation of contaminated sites in order to eliminate and/or control threats to human health and the environment. A Remedial

Approval Letter (RAL) is a document used by the Department to approve remedial actions at contaminated sites that do not involve the use of complex engineered systems or techniques (e.g.

groundwater pump and treat systems, soil vapor extraction systems, etc.).

In the matter of the above-referenced property (the Site), the Department’s Office of LRSMM is in receipt of the following documentation submitted pursuant to the Remediation Regulations in response to the reported release at the Site:

1. Phase I Environmental Site Assessment, received by the Department on November 30, 2023, and prepared by NV5;

2. Limited Phase II Proposal and Proposed Borings, received by the Department on December

5, 2023, and prepared by NV5;

3. Limited Phase II Environmental Site Assessment, received by the Department on January 21, 2024, and prepared by NV5;

4. Hazardous Material Release Notification Form, received by the Department on March 7, 2024, and prepared by NV5;

Remedial Approval Letter Page 2 of 5

5. Pre-Site Investigation Public Notice, received by the Department on April 17, 2024, and prepared by NV5;

6. Public Meeting Presentation, received by the Department on April 23, 2024, and prepared by

NV5;

7. Site Investigation Report (SIR), received by the Department on June 6, 2024, and prepared by

NV5;

8. Revised Site Investigation Report, received by the Department on June 25, 2024, and prepared by NV5;

9. Post-Site Investigation Public Notice, received by the Department on August 5, 2024, and prepared by NV5;

10. Remedial Action Work Plan (RAWP), received by the Department on October 10, 2024, and prepared by NV5; and

11. Remedial Action Work Plan Response to Comments, received by the Department on

November 7, 2024, and prepared by NV5.

Together these documents fulfill the requirements of Section 1.9 (Risk Management) and Section

1.10 (Remedial Action Work Plan (RAWP)) of the Remediation Regulations.

The preferred remedial alternative involves:

• The encapsulation of site soils that exceed the Department’s Method 1 Residential Direct

Exposure Criteria (R-DEC) with Department approved engineered controls consisting of either a minimum of two (2) feet of clean fill, one (1) foot of clean fill underlain with a geotextile fabric, four (4) inches of pavement (asphalt or concrete) above six (6) inches of clean subgrade, or equivalent, and/or building foundations. Existing pavement may serve as a “cap-in-place” provided that all cracked and damaged areas are repaired and sealed as part of the remedial work; and

• The integrity of the cap shall be preserved through the recording of an Environmental Land

Usage Restriction (ELUR) on the deed for the entire property (Plat Map 63A / Lot 305).

The ELUR shall require the performance of annual inspections to document the status of the ELUR and the condition of the engineered controls at the Site. The ELUR shall include a soil management plan (SMP), which will address post remediation activities that disturb onsite soils. The ELUR, once approved by the Department, shall be recorded for the property in the Land Evidence Records for the City of Pawtucket and a recorded copy forwarded back to the Department within fifteen (15) days of recording.

Based upon review and consideration of the above referenced documents, the Department approves the Remedial Action Work Plan (RAWP) through this RAL provided that:

Remedial Approval Letter Page 3 of 5

1. All work must be performed in accordance with all applicable regulations and the Department approved RAWP.

2. Start of the work described in the Department approved RAWP must be initiated within sixty (60) days of issuance of this RAL.

3. Prior to initiating any remedial activities, the Department shall be provided with a list of all contractors, and their respective contact information, that will be used on Site to complete the remedial work described in the Department approved RAWP. The Department shall be notified, when feasible, a minimum of five (5) working days in advance of any changes in contractors and/or consultants involved with the remedial work on this Site. The notification must be promptly supplied in writing with complete contact information for each new contractor or consultant (including but not limited to company name and address, contact name and address, contact telephone number and e-mail address).

4. All excavated regulated soil, if not approved for encapsulation onsite, shall be disposed of off-site at an appropriately licensed disposal facility in accordance with all local, State, and Federal laws.

Copies of the material shipping records and manifests associated with the disposal of the material shall be included along with the Closure Report.

5. Areas of the site where contaminated soils are to be excavated must be staged and temporarily stored in a designated area, as proposed in the RAWP, of the site with proper polyethylene covers.

Any stockpiled materials, including clean fill, must be underlain and covered with polyethylene sheeting and be secured at the end of each day with all appropriate erosion and sediment controls to limit the loss of the cover and protect against storm-water and wind erosion (i.e. hay bales, rocks, silt fencing). These appropriate sedimentation and erosion controls must be in place and in proper working order at all times until all disturbed areas are stabilized and capped as proposed.

Within reason, the storage location will be selected to limit the unauthorized access to the materials (i.e. away from public roadways/walkways). No regulated soil will be stockpiled on-site for greater than thirty (30) days. In the event that stockpiled soils pose a risk or threat of leaching hazardous materials, a proper leak-proof container (i.e. drum or lined roll-off) or secondary containment will be required and utilized.

6. The Office of LRSMM no longer requires the submittal of analytical data prior to clean fill being brought to a Site. It is the sole responsibility of the Performing Party and their consultant to analyze the material, certify that the material meets the Department's Residential Direct Exposure

Criteria (RDEC), as defined by the Remediation Regulations, for all constituents, and is suitable for use on the Site. The Office of LRSMM strongly suggests that enough representative samples of the clean fill are collected prior to moving the material to the Site to satisfy the Performing

Party and their consultant that the material meets the RDEC. Please note that the Office of

LRSMM reserves its rights to sample the fill, if suspect, to confirm compliance with the RDEC.

7. All regulated soil remaining onsite shall be encapsulated by an engineered control consistent with those described in the Department approved RAWP.

8. Dust suppression techniques (i.e. watering) must be employed at all times during all soil

Remedial Approval Letter Page 4 of 5 disturbing/handling activities at the site in order to minimize the generation of fugitive dust.

9. Within sixty (60) days of completion of the work described in the Department approved RAWP, a Closure Report detailing the remedial action and including any disposal documentation shall be submitted to the Office of LRSMM.

10. Within thirty (30) days of completion of the work described in the Department approved RAWP, submit an electronic version of the draft ELUR and the post-construction SMP in red line / strikeout format for Department review and approval. The draft ELUR and SMP shall be reviewed and approved by the Department prior to recording the ELUR.

11. Within sixty (60) days of completion of the work described in the Department approved RAWP, the final Department approved ELUR shall be recorded in the City of Pawtucket Land Evidence

Records for the property and a stamped, certified copy returned to the Department within fifteen

(15) days of recording. Upon receipt of a copy of the recorded (stamped) ELUR, the Office of

LRSMM will issue a Letter of Compliance.

12. Following recording of the ELUR, the site shall be maintained and annually inspected to evaluate the compliance status of the site with the ELUR. Within thirty (30) days of each annual inspection, an evaluation report shall be prepared and submitted to the Office of LRSMM detailing the findings of the inspection and noting any compliance violations at the site.

13. Any changes in the activities detailed in the RAWP shall be reported to the Office of LRSMM by telephone within one (1) working day and in writing within five (5) business days.

14. The Office of LRSMM shall be notified forty-eight (48) hours prior to initiating the remedial activities at the site associated with the Department approved RAWP.

15. The Office of LRSMM shall be immediately notified of any site or operation condition that results in non-compliance with this RAL.

At this time, the Office of LRSMM offers its concurrence with the proposed remedial action for the property. The Department approves the RAWP provided that all activities and procedures detailed in the RAWP and RAWP Addendum are strictly adhered to. Furthermore, this letter continues to place primary responsibility for the construction, operation, maintenance, and monitoring of the approved

RAWP and its associated implementation on Segue Institute for Learning. As the Voluntary Party and Performing Party, Segue Institute for Learning is expected to implement the RAWP in an expeditious and professional manner that prevents non-compliance with this RAL and said RAWP, and is protective of human health and the environment.

This RAL does not remove your obligation to obtain any other necessary permits from other local, State, or Federal agencies.

If you have any questions regarding this letter or would like the opportunity to meet with

Department personnel, please contact me by telephone at (401) 537-4343, or by E-mail at reilly.cusick@dem.ri.gov.

Remedial Approval Letter Page 5 of 5

Sincerely, Authorized by, Reilly Cusick Michelle McLarney

Environmental Scientist I Environmental Engineer II

Office of Land Revitalization & Office of Land Revitalization &

Sustainable Materials Management Sustainable Materials Management

Cc: Kelly Owens, RIDEM/LRSMM

Ashley Blauvelt, RIDEM/LRSMM

Vincent L. Jacques, NV5

File details come from the government source that posted it. Updated .