Remedial Action Work Plan Summary
This document is a Remedial Action Work Plan (RAWP) prepared by NV5 for the Rhode Island Department of Environmental Management (RIDEM) on behalf of the Segue Institute for Learning, addressing environmental remediation of a proposed school site at 1070 & 1080 Main Street, Pawtucket, Rhode Island (Plat 63A, Lot 305). The project involves the conversion of an existing mill office building into a school with utility upgrades and exterior site improvements. The RAWP was submitted on October 10, 2024, following a Remedial Decision Letter issued by RIDEM on August 20, 2024 (File No. SR-26-2180). Site investigations identified soil contamination including polycyclic aromatic hydrocarbons (PAHs), arsenic, lead, and total petroleum hydrocarbons exceeding RIDEM's Residential Direct Exposure Criteria. The proposed construction timeline is February 2025 through Fall 2025, with groundwater and soil vapor investigations completed and no significant groundwater contamination detected. The general contractor will be selected through a bidding process in October 2024, with environmental consultant Vincent L. Jacques, P.E. of NV5 providing oversight and monthly status reports to RIDEM.
The remedy consists of soil encapsulation through engineered controls including two feet of clean fill, one foot of clean fill with geotextile fabric, four inches of pavement over six inches of clean subgrade, or equivalent building foundations, with existing pavement serving as "cap-in-place" if properly repaired and sealed. An Environmental Land Use Restriction (ELUR) will be recorded on the property deed requiring annual compliance inspections and a Soil Management Plan for any future soil disturbances. The ELUR encompasses the entire Property (Plat 63A, Lot 305) and will address direct exposure risks and prevent soil migration. RIDEM has approved the second floor building use before remediation completion contingent upon proper fencing of contaminated areas and dust/erosion controls. No pricing information is provided in this planning document, as it establishes the remedial framework and requirements rather than a procurement opportunity. The document includes detailed contingency procedures, emergency contact information, decontamination protocols, and post-closure reporting requirements, with all impacted soils to be managed in accordance with state and federal environmental regulations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
October 10, 2024
Rhode Island Department of Environmental Management Office of Land Revitalization & Sustainable Materials Management Attention: Ms. Reilly Cusick, Environmental Scientist I 235 Promenade Street Providence, RI 02908-5767
RE: Remedial Action Work Plan Proposed School
Plat 63A, Lot 305 1070 & 1080 Main Street Pawtucket, RI
Dear Ms. Cusick:
In accordance with the Remedial Decision Letter issued by the Rhode Island Department of Environmental Management (RIDEM) to the Segue Institute for Learning, dated August 20, 2024 (File No. SR-26-2180), please find the enclosed Remedial Action Work Plan, which describes the technical details associated with the implementation of the remedy.
If you have any questions or comments regarding any of the revisions of the RAWP, or if you require any additional information, please contact me at (401) 465-2801.
Sincerely, NV5
Vincent L. Jacques, P.E.
Northeast Branch Manager
202301141-03 October 10, 2024
Remedial Action Workplan
Proposed School Plat 63A, Lot 305
1070-1080 Main Street Pawtucket, Rhode Island
Prepared For:
Segue Institute for Learning Attn: Josh Laboissonniere
325 Cowden Street Central Falls, RI 02863
Prepared By:
NV5 Transaction Services 3550 W. Market Street, Suite 200
Akron, Ohio 44333 800-787-8397 bockandclark.com
Table of Contents
REMEDIAL ACTION WORK PLAN
1.0 INTRODUCTION
2.0 BACKGROUND
3.0 REMEDIAL OBJECTIVES
3.1 Groundwater
3.2 Surface Water
3.3 Soils
3.4 Soil Vapor
3.5 Air
3.6 Sediments
4.0 PROPOSED REMEDY
4.1 Environmental Land Use Restriction
4.2 Groundwater Monitoring Plan
4.3 Soils Management Plan
5.0 REMEDIATION OF IMPACTED GROUNDWATER
6.0 LIMITED DESIGN INVESTIGATION
7.0 POINTS OF COMPLIANCE
8.0 PROPOSED SCHEDULE
9.0 CONTRACTORS AND/OR CONSULTANTS
10.0 SITE PLAN
11.0 DESIGN STANDARDS AND TECHNICAL SPECIFICATIONS
12.0 SET-UP PLANS
13.0 EFFLUENT DISPOSAL
14.0 CONTINGENCY PLAN
15.0 OPERATING LOG
16.0 SECURITY PROCEDURES
17.0 SHUT-DOWN, CLOSURE AND POST-CLOSURE REQUIREMENTS
18.0 INSTITUTIONAL CONTROLS AND NOTICES
19.0 COMPLIANCE DETERMINATION
20.0 CERTIFICATION
List of Figures
Figure 1 Site Location Plan
Figure 2 Property Aerial Plat Map (Existing Conditions)
Figure 3 Topographic Map
Figure 4 Proposed ELUR Boundaries
Figure 5 Proposed Construction Plan
List of Appendices
APPENDIX A Proposed Environmental Land Use Restriction APPENDIX B Soil Management Plan APPENDIX C Contingency Plan APPENDIX D Geomembrane Spec
Remedial Action Work Plan
Plat 63A/Lot 305 1070 & 1080 Main Street, Pawtucket, RI
© 2024 NV5 1 202301141
1.0 INTRODUCTION
NV5 has completed this Remedial Action Work Plan (RAWP) to address the requirements of a Remedial Decision Letter issued to the Segue Institute for Learning, by the Rhode Island Department of Environmental Management (RIDEM), dated August 20, 2024, regarding the proposed school at the property located at 1070 & 1080 Main Street in Pawtucket, RI, also known as Plat 6A3, Lot 305, hereinafter referred to as the Site. A Site Location Plan identifying the Site’s specific location on the Providence, Rhode Island USGS Quadrangle map is included as Figure 1.
This report has been prepared for the exclusive use of the Segue Institute for Learning (the Client) and RIDEM, by the authority of the Client, solely for the purpose of establishing an appropriate RAWP to address contaminants encountered in subsurface soils at the Site that are above the Rhode Island Department of Environmental Management’s Method 1 Residential Direct Exposure Criteria (R-DEC).
This RAWP has been developed in accordance with Section 9.0 of the Rules and Regulations for the Investigation of Hazardous Material Releases (Remediation Regulations).
As required, this RAWP presents a remedial action addressing remedial objectives for all impacted media at the Site. Environmental media at the Site have been characterized through a series of environmental investigations and actions, which included the following:
1. Phase I Environmental Site Assessment, received by the Department on November 30, 2023, and prepared by NV5;
2. Limited Phase II Proposal and Proposed Borings, received by the Department on December 5, 2023, and prepared by NV5;
3. Limited Phase II Environmental Site Assessment, received by the Department on January 21, 2024, and prepared by NV5;
4. Hazardous Material Release Notification Form, received by the Department on March 7, 2024, and prepared by NV5;
5. Pre-Site Investigation Public Notice, received by the Department on April 17, 2024, and prepared by NV5;
6. Public Meeting Presentation, received by the Department on April 23, 2024, and prepared by
NV5;
7. Site Investigation Report (SIR), received by the Department on June 6, 2024, and prepared by
NV5;
8. Revised Site Investigation Report, received by the Department on June 25, 2024, and prepared by NV5; and
9. Post-Site Investigation Public Notice, received by the Department on August 5, 2024, and prepared by NV5.
© 2024 NV5 2 202301141
2.0 BACKGROUND
On November 29, 2023, NV5 completed a Phase I Environmental Site Assessment (ESA) on the subject property, which identified Recognized Environmental Conditions (RECs) associated with the subject property. Specifically, the previous use of the subject property, as summarized in the Phase I ESA, coupled with previous fuel oil storage and razed buildings at the subject property was collectively considered a REC and a Limited Phase II Subsurface Investigation was recommended and completed and documented in a report dated January 19, 2024.
Based on the results of the above referenced Limited Phase II Subsurface Investigation and in accordance with Sections 1.6 and 1.8.3(A)(2) of the RIDEM’s Remediation Regulations, a Release Notification Form was completed by NV5 and submitted to the RIDEM on March 7, 2024 for soils found to have contaminants above the Method 1 R-DEC. This resulted in a Voluntary Procedure Letter issued by the RIDEM to Segue Institute for Learning, dated March 8, 2024, File No. SR-26-2180, requiring the completion of a Site Investigation Report.
NV5 completed an SIR dated May 30, 2024 and after comments issued by the RIDEM, additional investigation was completed and a revised SIR, dated June 24, 2024. In summary, soils at the Site have been impacted by the presence of fill materials at the Site and/or from historical operations. Specific compounds that were found to exceed RIDEM's Residential and/or Industrial/Commercial Direct Exposure Criteria (R-DEC and/or I/C-DEC) in soil include the following Polycyclic Aromatic Hydrocarbons (PAHs): Benzo[a]anthracene, Benzo[a]pyrene, Benzo[b]fluoranthene, Benzo[g,h,i]perylene, Benzo[k]fluoranthene, Chrysene, Dibenz(a,h)anthracene, Indeno[1,2,3-cd]pyrene; Metals in the form of Arsenic and Lead; and Total Petroleum Hydrocarbons.
Laboratory analysis of groundwater samples collected to date indicates that groundwater is compliant with RIDEM GB Groundwater Objectives. The listed contaminants were only identified on Plat 63A / Lot 305. Plat 62B / Lot 339 was investigated and no contamination was identified.
As required, the SIR included three remedial alternatives, with an identified preferred alternative, which were developed in order to achieve compliance with RIDEM’s Remediation Regulations.
The preferred alternative identified in the SIR is summarized in the following bulleted paragraphs:
The encapsulation of site soils that exceed the Department’s Method 1 R-DEC with Department approved engineered controls consisting of either a minimum of two (2) feet of clean fill, one (1) foot of clean fill underlain with a geotextile fabric, four (4) inches of pavement (asphalt or concrete) above six (6) inches of clean subgrade, or equivalent, and/or building foundations; Existing pavement may serve as a “cap-in-place” provided that all cracked and damaged areas are repaired and sealed as part of the remedial work;
and
The integrity of the cap shall be preserved through the recording of an Environmental Land Usage Restriction (ELUR) on the deed for the entire property (Plat Map 63A / Lot 305). The ELUR shall require the performance of annual inspections to document the status of the ELUR and the condition of the engineered controls at the Site. The ELUR shall include a soil management plan (SMP), which will address post remediation activities that disturb onsite soils. The ELUR, once approved by the Department, shall be recorded for the property in the Land Evidence Records for the City of Pawtucket and a recorded copy forwarded back to the Department.
© 2024 NV5 3 202301141
This remedial alternative would eliminate direct exposure to surface soils containing contaminants at concentrations greater than the RIDEM’s Method 1 R-DEC. The proposed remedial alternative will control the direct exposure risks associated with the potential contaminants and is therefore protective of human health and the environment. Therefore, this remedial alternative is considered viable based on the proposed future use.
Upon review of the submitted SIR and associated documentation, the RIDEM issued a Remedial Decision Letter to the Segue Institute for Learning, dated August 20, 2024.
The Proposed Remedy has been developed to address the remedial objectives for all impacted media at the Site in a manner consistent with Rule 8.01 of the Remediation Regulations, and as discussed in the following Section 3.0.
3.0 REMEDIAL OBJECTIVES
As required, this RAWP presents a remedial action addressing remedial objectives for impacted media at the Site.
3.1 Groundwater
The remedial objective for groundwater is the GB Groundwater Objective. Based on sampling completed during the SIR, no groundwater contaminants were encountered at the Site.
As no groundwater monitoring is proposed or required, closing the existing groundwater monitoring wells in accordance with Section 3.22 (H) of 250-RICR-150-05-03, the Groundwater Quality Rules, should be completed as part of the remedial actions.
3.2 Surface Water
The Remedial Objective for surface water is to minimize erosion of soils during construction.
Stormwater runoff could carry soils into surface waters downgradient of the Site. Providing erosion and sediment control during construction and remediation activities will control erosion during construction. Covering the Site with buildings, pavement, two feet of clean soil, or one foot of clean soil and a geomembrane will prevent future erosion of impacted soils.
3.3 Soils
The Remedial Objective for soil is the Residential Direct Exposure Criteria. Implementing a RIDEM approved RAWP, Construction Soil Management Plan, ELUR, and Post Construction Soil Management Plan will mitigate potential impacts to human health and the environment during construction and after construction. Also, safely managing and documenting the excavation, handling, grading, and tracking of any removed contaminated soil will ensure successful implementation of the remedy.
3.4 Soil Vapor Gas
The Remedial Objective for Soil Vapor Gas is to prevent any soil vapor gas intrusion into any existing buildings on or near the Site. Based on the completed sampling and field screening of soils, no volatile organic compounds above established RIDEM standards were encountered during characterization sampling events at the Site. As such, there are no known issues regarding soil vapor gas and therefore there are no proposed remedial efforts for soil vapor gas.
© 2024 NV5 4 202301141
3.5 Air
The Remedial Objective for air is to limit the generation of dust during construction activities.
Although most of the contaminants found in the soil at the Site are not volatile nor are they anticipated to have actual or potential impacts on air quality, during site remediation and construction activities, dust control measures will be implemented at as needed to limit exposure to airborne dust.
3.6 Sediments
The Remedial Objective for sediments is to minimize erosion of soils during construction.
Stormwater runoff could carry soils into surface waters downgradient of the site which can be deposited as sediments. Providing erosion and sediment control during construction and remediation activities will control erosion during construction. Covering the Site with building, pavement, two feet of clean soil, or one foot of clean soil and a geomembrane will prevent future erosion of impacted soils.
4.0 PROPOSED REMEDY
Consistent with Section 8.09 of RIDEM’s Remediation Regulations, the following remedy has been proposed and approved:
The encapsulation of site soils that exceed the Department’s Method 1 R-DEC with Department approved engineered controls consisting of either a minimum of two (2) feet of clean fill, one (1) foot of clean fill underlain with a geotextile fabric, four (4) inches of pavement (asphalt or concrete) above six (6) inches of clean subgrade, or equivalent, and/or building foundations;
Existing pavement may serve as a “cap-in-place” provided that all cracked and damaged areas are repaired and sealed as part of the remedial work; and
The integrity of the cap shall be preserved through the recording of an Environmental Land Usage Restriction (ELUR) on the deed for the entire property (Plat Map 63A / Lot 305). The ELUR shall require the performance of annual inspections to document the status of the ELUR and the condition of the engineered controls at the Site. The ELUR shall include a soil management plan (SMP), which will address post remediation activities that disturb onsite soils.
The ELUR, once approved by the Department, shall be recorded for the property in the Land Evidence Records for the City of Pawtucket and a recorded copy forwarded back to the Department.
The ELUR is proposed to be applied across the entire Site. Attached to this RAWP are Figures, which include a Site Plan depicting existing and proposed development.
Due to the complexity of removing soils around mature trees situated in the green area courtyard on the northeastern side of the Site. It has been decided to only try and save four tress along the outside fencing. For the impacted soils situated around these trees and associated root systems, it is proposed to remove the top six inches of soil with an air spade, replace with clean soils and capped with an additional six inches of washed stone.
This proposed remedy is intended to satisfy Section 9.00 of the Remediation Regulations. To this end, the proposed ELUR and installation/maintenance of an effective barrier will not:
result in exceedances of applicable remedial objectives as described in Section 8.00 of the Remedial Regulations beyond the control of the performing party;
© 2024 NV5 5 202301141
endanger the public health and safety;
significantly interfere with the public use and enjoyment of any recreational resource;
significantly adversely impact any surface water or any groundwater, or cause contamination of any drinking water supply or tributary; and/or violate any provisions of any pertinent federal or state statutes, rules or regulations regarding air, land or water resources.
4.1 Environmental Land Use Restriction
As indicated above, an ELUR is proposed as part of the remedy for this Site. A copy of the proposed ELUR is attached as Appendix A.
4.2 Groundwater Monitoring Plan
As groundwater sampled at the Site as part of the SIR did not reveal any contaminants above applicable standards, there is no proposed groundwater monitoring plan.
4.3 Soil Management Plan
This Soil Management Plan has been prepared by NV5 to address any Site activities that could potentially disturb on-site soils, and includes information regarding excavation, characterization, stockpiling, and appropriate transport and disposal of any impacted soils above Method 1 RIDEC.
The objectives of this Soil Management Plan are to minimize the impacts and potential exposure to elevated contaminant concentrations in soil during remediation activities at the Site, and to provide for safe and cost effective disposal of excavated soil, if necessary.
As indicated therein, the Department has approved the use of the second floor of the building before remediation is complete, so long as all areas of the Site not covered by existing pavement or building foundations, such as the courtyard and grass areas where contamination was found, are properly fenced off, and the appropriate dust and erosion controls are employed (i.e. hay bales) prior to student occupancy. The Department is requiring the submittal of monthly status updates of the Site, including an update after the engineered controls are implemented. The Department has stressed the importance that these areas remain closed off to staff and students before the remedial work is completed.
4.3.1 General Information
Based on information provided to NV5, the Segue Institute for Learning is proposing the conversion of the existing mill office building into a school. Utility upgrades will take place and exterior areas will be slightly regraded and paved in accordance with a RIDEM approved engineered cap. Proposed activities will likely disturb surficial soils at the Site. As such, the appended Soil Management Plan has been written to deal with both the planned construction and implementation of this RAWP, as well as any future soil excavations at the Site.
Areas of the Site that are to be disturbed for any reason in the future must be managed in accordance with the appended Soil Management Plan. All surfaces shall be maintained to prevent erosion and best management practices with respect to soil erosion control, dust control, and general worker protection, shall be implemented at the Site during any activities that could potentially disturb the surficial or subsurface soils.
© 2024 NV5 6 202301141
After the engineered cap has been installed and construction work completed, no soils shall be disturbed on the Site without the approval of the RIDEM. An Environmental Consultant/Engineer shall have the overall responsibility for ensuring that activities conducted at the Site are in accordance with best management practices, as well as this Plan. The Contractor conducting future excavations/soil disturbances shall be responsible for the general health and safety of all their employees.
Contractors associated with planned construction, RAWP implementation and any future soil disturbances, shall provide measures for erosion control, including the installation of hay bales around all soil stockpiles, the installation of silt fences where appropriate, and the covering of all soil stockpiles. Hay bales shall also be installed around all critical construction areas to minimize soil entrainment in storm water runoff. Disturbed soil stockpiles shall be covered with polyethylene sheeting at the end of each workday to reduce erosion and surface water runoff.
4.3.2 Soil Excavation and Removal
Any soils on the Site that need to be excavated and removed from the Site, for any reason, shall be appropriately characterized in accordance with the permit requirements of the facility receiving said excavated soil. If there are any soils requiring off-Site disposal, for any reason, they shall be tested, at a minimum, for PAHs and Priority Pollutant 13 Metals for which the RIDEM has a promulgated regulatory standards, as listed in the Direct Exposure Criteria, Table 1, Section 8 of the Remediation Regulations. Potential off-site uses for the soils include landfill cover and recycling into an asphalt batching process. Excavated soil requiring disposal will be transported to an appropriate facility, which will be determined through contaminant concentrations, and transportation/disposal costs incurred.
Any stockpiled soil during construction shall be placed on 6-mil polyethylene sheeting and shall be covered by the same when the stockpile is not in use, including at the end of the workday.
Containerized soil shall be stored in either hazardous waste compatible drums and covered when not in use or shall be stored in overpack containers. All stored soil on-site shall be appropriately labeled and secured.
All equipment utilized during excavation shall be decontaminated using the decontamination plan discussed in Section 4.3.5
All soils shall be managed in a manner sufficient to insure health and safety of people and the environment. All impacted soil to be disposed or transported off-site shall be transported via bills of lading and/or hazardous waste manifests in accordance with the RIDEM, USEPA, and DOT regulations. Any soil materials that exhibit hazardous characteristics, as defined in 40 CFR Part 262, shall be disposed off-site within 90 days.
The frequency of analysis for off-site disposal will also be based on the requirements of the proposed disposal facility. The Contractor shall be required to notify the RIDEM for approval of the disposal facilities and method if soils need to be disposed of off-Site for some reason.
4.3.3 Contaminated Debris Disposal
Contaminated debris, including cobbles and/or miscellaneous fill material may be encountered.
All impacted debris will be stockpiled in designated Soil Management Areas, prior to applicable disposal. These materials shall be placed on 6-mil polyethylene sheeting and shall be covered by the same.
© 2024 NV5 7 202301141
If encountered, the debris will be steam-cleaned in a 6-mil plastic double lined decontamination zone prior to off-site disposal as solid waste. All wash water will be captured and containerized in labeled RIDOT approved 55-gallon drums, until appropriate characterization and off-site disposal.
4.3.4 Backfill and Compaction
Soil brought to the Site as backfill must analyzed by a Rhode Island certified analytical laboratory. A sample of the proposed backfill material from each supplier shall be analyzed and the results compared with the RIDEM Residential Direct Exposure Criteria to ensure that the backfill soil is suitable for use at the Site. Laboratory analysis should include volatile organic compounds (VOCs) by EPA Method 8260, RCRA 8 Metals, Total Petroleum Hydrocarbons (TPH) by SW846 8100 by GC, Polychlorinated bi-phenyls (PCBs) by EPA Method 8082 and poly aromatic hydrocarbons (PAHs) by EPA Method 8270c. The off-site soil fill must also meet gradation, classification, and compaction specifications, which will be determined by others.
Sampling should be completed for every 100 cubic yards of soil brought onto the Site. It should be noted that much less than that will be required and therefore, only one set of sampling is expected to be required.
4.3.5 Decontamination Area
As part of construction/remedial activities, a decontamination area shall be established. The decontamination liner shall consist of two layers of 6 mil thick high-density polyethylene (HDPE) liner, anchored such that the membrane does not slip, tear, or puncture under anticipated traffic.
The decontamination area shall be prepared and equipped in such a manner as to allow the Contractor to retain and collect decontamination water, sediment, and debris for proper containerization and to protect the subgrade from contamination. The decontamination area shall consist of a lined shallow surface depression properly anchored with all seams sealed. The area shall be graded and sloped to a sump pit at the low end. The area shall be bound on all three sides with a concrete curb block or with timber railroad ties. Excavation buckets utilized to excavated impacted soils shall be decontaminated in this area.
Decontamination materials may include high pressure wash cleaners, electric generators, water collection troughs and buckets, brushes, personal water spray nozzles, and other miscellaneous equipment that may be required. All decontamination supplies and equipment must be utilized so that the materials provide adequate service in restricting the migration of contamination beyond the work area and provide protection of human health and the environment.
4.3.6 Odor Control
While odor is not expected to be a problem at the Site, potential odors at the Site will be controlled in one of three acceptable methods, if necessary:
Apply granular activated carbon (GAC) to surface of open excavation and/or soil stockpiles
Apply foam of “hard cover” system to surface of open excavation and/or soil stockpiles
Shutdown excavation operations until odors dissipate.
Application of odor control measures will be determined in the field by the Environmental Consultant/Engineer.
© 2024 NV5 8 202301141
Bulk GAC applied in the excavation or on the surface of stockpiled impacted soils will be disposed of with the impacted soil, if encountered.
The application of a foam and/or “hard cover” system odor suppressant can be applied to the excavation areas not currently being excavated and to the surface stockpiled soils. This material will be water resistant and non-flammable.
In the event that either of the two previous methods does not suppress the encountered odors, excavation activities will be temporarily shut-down until odors dissipate.
4.3.7 Erosion Control
The Contractor shall provide measures for erosion control during construction, including the installation of hay bales around all soil stockpiles, the installation of silt fences where appropriate, and the covering of all soil stockpiles. Hay bales shall also be installed around all critical construction areas to minimize soil entrainment in storm water runoff. Disturbed soil stockpiles shall be covered with polyethylene sheeting at the end of each workday to reduce erosion and surface water runoff.
The following general tasks should be undertaken when appropriate:
Plan and execute construction/remedial activities by methods to control surface drainage from cuts and fills and from borrow areas. Prevent erosion and sedimentation.
Minimize amount of bare soil exposed at one time.
Provide temporary measures such as berms, dikes, and drains, to prevent water flow.
Construct fill and waste areas by selective placement to avoid erosive surface silts or clays.
Periodically inspect earthwork to detect evidence of erosion and sedimentation.
4.3.8 Dust Control
All construction/remedial activities shall be undertaken to minimize the generation of dust.
During the progress of the work, the activity area shall be maintained by sprinkling of water on the Site’s gravel areas and within the open excavations, to minimize the creation and dispersion of dust.
4.3.9 Unidentified Waste Materials
If unidentified waste materials, such as buried drums or other waste materials, are encountered, all activities in the area shall immediately be halted, and the area should be secured. The Environmental Consultant/Engineer shall don the appropriate personal protective equipment and field characterize the waste materials. If for any reason, the Environmental Consultant/Engineer suspects that the unidentified waste materials could be potentially hazardous, the RIDEM shall be notified as soon as possible. If the unidentified waste materials are judged to represent an imminent threat to the environment of the public, a licensed hazardous waste contractor shall be immediately notified to respond to the Site.
If the general contractor is not a licensed hazardous waste contractor, the general contractor shall be required to maintain a list of at least three potential subcontractors who are licensed hazardous waste contractors who could immediately respond to a release. The general contractor shall be
© 2024 NV5 9 202301141
required to maintain spill response equipment on the Site, including absorbent materials, personal protective equipment and overpack containers.
If the waste material encountered is containerized, it shall be overpacked for disposal off-site. If non-aqueous liquid is encountered, a hazardous waste contractor shall pump the liquid into appropriate containers. Any soil that may have been impacted by the waste materials shall be excavated and stockpiled in accordance with Section 3.3.2 of this RAWP.
4.3.10 Post-Construction Soil Management
Based on proposed renovations, all on-site soils will either be covered with an impervious material (i.e. building or pavement) or for areas where landscaping and/or drainage swale is proposed, two feet of clean fill or a geotextile and one foot of clean fill will be required. This will prohibit any direct soil contact after proposed improvements have been constructed. Appended is a Soil Management Plan, which will be applicable to all future excavations at the Site.
5.0 REMEDIATION OF IMPACTED GROUNDWATER
As groundwater sampled at the Site as part of the SIR did not reveal any contaminants above applicable standards, there is no proposed groundwater remediation.
6.0 LIMITED DESIGN INVESTIGATION
There is currently no apparent requirement for the Segue Institute for Learning, to incorporate a Limited Design Investigation into this RAWP, and as such, none has been incorporated.
7.0 POINTS OF COMPLIANCE
Appropriate soil samples must be collected from all on-site future excavations in accordance with the Soil Management Plan, in order to show compliance with the Remediation Regulations. This includes confirmatory soil sampling in areas where any impacted soil is to be removed for appropriate disposal.
8.0 PROPOSED SCHEDULE
This RAWP and the installation of required RIDEM approved engineered cap, will be implemented after RIDEM approval and in conjunction with planned construction at the Site.
The proposed schedule is to begin construction in February 2025, with completion anticipated for Fall 2025. The ELUR will be filed with the City of Pawtucket shortly after the approval of ELUR language from the RIDEM’s legal department.
9.0 CONTRACTORS AND/OR CONSULTANTS
The general contractor for proposed renovations at the Site, including the implementation of the Remedial Action Work Plan, is expected to be determined this October 2024..
Vincent L. Jacques, P.E., of NV5 will act as the environmental consultant and will provide services related to soil sampling and characterization and any impacted soil removal oversight.
Photographic documentation will be gathered and provided to the RIDEM for review and record.
During Site visits, the consultant will evaluate the condition of the exterior encapsulating layers and will make appropriate maintenance recommendations if necessary. Status reports documenting sampling activities and analytical results will be prepared for submittal to the
© 2024 NV5 10 202301141
RIDEM on a monthly basis. Additional communications with the RIDEM will be made as necessary if conditions change in a manner that may affect the ELUR or Soil Management Plan.
An environmental consultant will also be required to be on-site in accordance with the Soil Management Plan, during construction excavation activities and/or if there is a planned future disturbance to surficial or subsurface soil at the Site.
10.0 SITE PLAN
Attached to this RAWP is Figure 5, a Site Plan depicting the Site and proposed future construction. The area of the ELUR is depicted in Exhibit A, which is attached to the ELUR in Appendix A, and encompasses the entire property on Plat 63A, Lot 305. As can be seen, the proposed ELUR includes the entirety of the Site.
11.0 DESIGN STANDARDS AND TECHNICAL SPECIFICATIONS
Paving of the exterior portions of the ELUR area are planned to be conducted by a contractor to be chosen after a bidding process, after the approval of this RAWP. These activities will consist of the application of a two-inch thick binder course over a portion of the ELUR area. This ELUR area will then be sealed with a perpendicular two-inch thick Class I surface course.
12.0 SET-UP PLANS
Plans required prior to the installation of the binder course and exterior surface sealing asphalt coat include a general level grading of the Site, as well as utility upgrades.
13.0 EFFLUENT DISPOSAL
The proposed remedial action will not likely generate any products or bi-products, which will require management and/or disposal. If a decontamination area is required, pursuant to Section
3.3.7 of this Plan, the decontamination area shall be prepared and equipped in such a manner as to allow the Contractor to retain and collect decontamination water, sediment, and debris for proper containerization and to protect the subgrade from contamination. Any decontamination liquids generated will be containerized in labeled RIDOT approved 55-gallon steel drums, until appropriate characterization and off-site disposal. Impacted groundwater pumped from excavation areas during potential dewatering activities will be placed in frac tanks for temporary storage during required characterization sampling and analysis, in accordance with the permit requirements of the facility receiving the impacted groundwater. However, based on the completed investigations and depth to groundwater, dewatering activities are not anticipated.
All impacted groundwater to be disposed or transported off-site shall be transported via bills of lading and/or hazardous waste manifests in accordance with the RIDEM, USEPA, and DOT regulations. Any groundwater generated during dewatering activities shall be disposed off-site within 90 days.
14.0 CONTINGENCY PLAN
The remedial contractor is responsible for providing a project Contingency Plan, as required and outlined in Section 9.13 of the Rhode Island Department of Environmental Management, Division of Site Remediation, Rules and Regulations for the Investigation and Remediation of Hazardous Material Releases” (DEM-DSR-01-93), dated March 31, 1993, last amended
© 2024 NV5 11 202301141
November 2011. This Contingency Plan must be available at the Site at all times during the implementation and operation or the remedial action.
The plan must include at a minimum, the following information:
1. The names and telephone numbers of all emergency coordinators (refer to Section 13.1 of this Plan).
2. All emergency response procedures and arrangements (refer to Section 13.1 of this Plan)
3. A description of the procedures necessary for the prevention of ignition and/or reaction of any flammable material or reactive materials, where appropriate.
No open flames and/or compounds which may ignite or react with any volatile organic compounds or PAHs in a harmful or violent nature will be allowed on the Site.
In the event of an emergency, on-site personnel will signal distress with three blasts of a horn (a vehicle horn will be sufficient). Communication signals, such as hand signals, need to be established where communication equipment is not feasible, such as in a pit.
It is the Site Safety Officer's duty to evaluate the seriousness of the situation and to notify appropriate authorities. Section 13.1 of this Plan contains emergency telephone numbers.
Nearby telephone access must be identified and available to communicate with local authorities.
If a nearby telephone is not available, a cellular telephone will be maintained on Site during work activities. Dial 911 in the event of an emergency.
In the event that an underground conduit is damaged during excavation, all mechanized equipment will immediately be shut off until the nature of the piping can be determined.
Depending on the nature of the broken conduit (e.g., natural gas, water, or electricity), the appropriate local utility will be contacted.
A daily morning briefing to cover safety procedures and contingency plans in the event of an emergency is to be included with a discussion of the day’s activities. These daily meetings will be recorded on the Daily Tailgate Safety Meeting Forms. A debriefing to cover the activities is to be held upon completion of the work.
14.1 Communication and Emergency Procedures
The following items should be located and discussed with all field personnel prior to project initiation:
1. Remedial Action Health & Safety Plan
2. Personal protective equipment
3. On-site client and/or Resident Engineer contact
4. Location of the nearest telephone
5. Emergency method of equipment shutdown
6. Hand signals
In the event of an emergency, development of hazardous site conditions, or significant changes in the work plan, communication will be established as soon as is practicable with the on-site client contact.
Several emergency response procedures are provided below for guidance, as follows:
© 2024 NV5 12 202301141
1. Worker Injury – Call for ambulance service. Apply first aid as appropriate and applicable.
Call Emergency Coordinators and/or Contacts listed.
2. Measured VOC excavation emissions equal or greater than threshold concentrations – Shut down project. Evacuate impacted area. Continue air monitoring and evaluate situation.
Apply surface coating to excavation. Apprise Emergency Coordinator and/or Contacts listed.
3. Fire – Evacuate area surrounding fire. Call Fire Department. Call Emergency Coordinator and/or Contacts listed.
Emergency services are available as follows:
Ambulance: 911
Police: 911
Fire Department: 911
Hospital: 911
National Response Center: (800) 424-8802
Poison Control Center: (800) 682-9211
TOXLINE: (301) 496-1131
RIDEM Hotline: (800) 498-1336
Digsafe (888) 344-7233
National Grid (800) 867-5222
Pawtucket Public Works (401) 728-0500
Pawtucket Water Supply Board (401) 729-5000
Narragansett Bay Commission (401) 222-6680
15.0 OPERATING LOG
Documentation of Site activities related to the installation and maintenance of the RIDEM approved engineered cap discussed in this RAWP and ELUR will be provided in status reports submitted to the RIDEM upon installation of the effective barrier, as well as after any maintenance of such in the future. The consultant will maintain field logs for all on-site activities performed and status reports will be submitted to the RIDEM. At a minimum, monthly status reports should be submitted to the RIDEM for their review and record during construction activities.
16.0 SECURITY PROCEDURES
As the impacted area within the proposed ELUR is located on private property and will be beneath a RIDEM an approved engineered cap, as described herein, it is unlikely that unauthorized access to impacted media will occur. In the event that soils are excavated at the Site that are subject to the Soil Management Plan (see Section 3.3 of this Plan), appropriate measures should be taken to secure any impacted soil that is stockpiled at the Site. This shall be accomplished by the lining and covering of the stockpiled with 6-mil polyethylene sheeting and the temporary placement of construction fencing with yellow caution tape surrounding the
© 2024 NV5 13 202301141
stockpiles. Dust, odor, and erosion controls may also be required at the Site, as per the Soil Management Plan discussed in Section 3.3 of this Plan.
17.0 SHUT-DOWN, CLOSURE AND POST-CLOSURE REQUIREMENTS
As indicated in Section 3.1 of this Plan, an approved ELUR will be entered in the Land Evidence Records of the City of Pawtucket, Rhode Island in accordance with Rule 8.09 of the Remediation Regulations. This ELUR requires the development and implementation of a Soil Management Plan and requires the installation and maintenance of the effective barrier. A copy of the proposed ELUR can be found in Appendix A. Activities will be closely monitored and documented and status reports with photographic documentation will be submitted at least monthly to the RIDEM for their review and record, during construction.
18.0 INSTITUTIONAL CONTROLS AND NOTICES
The approved ELUR will be entered in the Land Evidence Records of the City of Pawtucket, Rhode Island in accordance with Rule 8.09 of the Remediation Regulations, after revisions/clarifications by the RIDEM Legal Services had been made and implemented. Upon entering the ELUR in said records, a copy of the ELUR stamped by the City will be forwarded to RIDEM. A copy of the proposed ELUR is included in Appendix A.
19.0 COMPLIANCE DETERMINATION
Once the engineered cap has been fully installed in accordance with the Remedial Decision Letter and this Remedial Action Work Plan, installation confirmation through photographic documentation shall be completed and the filing of the ELUR confirmed. This photographic documentation and ELUR confirmation shall be filed with the RIDEM for their review and record.
Plat 63A/Lot 305 1070 & 1080 Main Street, Pawtucket, RI
© 2024 NV5 14 202301141
20.0 CERTIFICATION
To the best of my knowledge, the information contained within this Remedial Action Work Plan is accurate based upon current information available for the Site.
Vincent L. Jacques, P.E.
NV5
To the best of my knowledge, this Remedial Action Work Plan is a complete and accurate representation of the site and the release and contains all known facts surrounding the release.
Mr. Josh Laboissonniere, Director of Facilities & School Safety Owner Representative for the Segue Institute for Learning
FIGURES
Figure 1
SITE LOCATION MAP
Map 63A, Lot 305
NV5 Project No. 202301141
North
Bing Maps
Figure 2 PROPERTY AERIAL PLAT MAP (Existing Conditions)
Figure 3
TOPOGRAPHIC MAP
USGS Quad
Figure 4 – Proposed ELUR Boundaries
E
SN
W
S H E E T N U M B E R
NOT FOR CONSTRUCTION
© Copyright 2024 Any reproduction, possession, or use of this drawing, by other than those intended, parties without the written permission of Litman Architecture is prohibited.
SCALE:
REV. DATEISSUE:
DRAWN BY CHECKED BY
CURRENT ISSUE
1080 Main Street Pawtucket, RI, 02860
LITMAN
Architecture Educational Consulting Group, LLC.
SCHEMATIC
DESIGN SET
ISSUED FOR :
RIDE STAGE III SUBMISSION
THIS DRAWING SET IS FOR
REVIEW AND COORDINATION
AND SHOULD NOT BE USED
FOR CONSTRUCTION OR
PERMITTING.
NOT FOR
CONSTRUCTION
Architect Litman Architecture, P.O. Box 349 Barrington, RI, 02806 USA 401-474-0780
Drafting Consultant Pacific-Visions Studio, LLC.
495 Hope Street, Suite 5 Bristol, RI, 02809, USA 401-203-3191
EXISTING
DEMOLITION
NEW CONSTRUCTION
WALL LEGEND
Educational Consulting Group, LLC.
Structural Engineers Odeh Engineers 1223 Mineral Springs Avenue North Providence, RI 02904 +1 401-724-1771
MEP Engineers Creative LLC.
195 Frances Avenue Bldg #2 Cranston, RI 02910 USA +1 401-438-7733
Food Service Design Consultant Crabtree McGrath Associates,Inc.
161 West Main Street Georgetown, MA 01833 USA +1 978-352-8500
Fire & Life Safety Consultant Jensen Hughes 117 Metro Center Blvd, Suite 1002 Warwick, RI 02886 USA +1 401-736-8992
Telecom & Security Consultant Communication Design Services, LLC.
PO Box 414 Seekonk, MA 02771 USA +1 401-749-6909
Cost Estimator TCi Tortora Consulting, Inc.
P.O. Box 1988 North Falmouth, MA
02556-1988 USA
+1 781-275-5511
Landscape Architect Principe Company 27 Sakonnet Ridge Drive Tiverton, RI 02878 USA +1 401-816-5385
Civil / Site Engineers Commonwealth Engineers & Consultants, Inc.
400 Smith Street Providence, RI 02908 USA +1 401-273-6600
A1.03
Legacy High School
TM JL
GENERAL - ALTA
SURVEY
09/26/2024
Figure 5 – Proposed Construction Plan
S
S
S
S
S
S
S S
S
S
S H E E T N U M B E R
LEGACY HIGH
SCHOOL
NOT FOR CONSTRUCTION
© Copyright 2024 Any reproduction, possession, or use of this drawing, by other than those intended, parties without the written permission of Litman Architecture is prohibited.
SCALE:
REV. DATEISSUE:
DRAWN BY CHECKED BY
MCZ TJB
CURRENT ISSUE
LITMAN
Architecture Educational Consulting Group, LLC.
Architect Litman Architecture, P.O. Box 349 Barrington, RI, 02806 USA 401-474-0780
Drafting Consultant Pacific-Visions Studio, LLC.
495 Hope Street, Suite 5 Bristol, RI, 02809, USA 401-203-3191
Educational Consulting Group, LLC.
Structural Engineers Odeh Engineers 1223 Mineral Springs Avenue North Providence, RI 02904 +1 401-724-1771
MEP Engineers Creative LLC.
195 Frances Avenue Bldg #2 Cranston, RI 02910 USA +1 401-438-7733
Food Service Design Consultant Crabtree McGrath Associates,Inc.
161 West Main Street Georgetown, MA 01833 USA +1 978-352-8500
Fire & Life Safety Consultant Jensen Hughes 117 Metro Center Blvd, Suite 1002 Warwick, RI 02886 USA +1 401-736-8992
Telecom & Security Consultant Communication Design Services, LLC.
PO Box 414 Seekonk, MA 02771 USA +1 401-749-6909
Cost Estimator TCi Tortora Consulting, Inc.
P.O. Box 1988 North Falmouth, MA
02556-1988 USA
+1 781-275-5511
Landscape Architect Principe Company 27 Sakonnet Ridge Drive Tiverton, RI 02878 USA +1 401-816-5385
Civil/Site Engineers Commonwealth Engineers & Consultants, Inc.
400 Smith Street Providence, RI 02908 USA +1 401-273-6600
THIS DRAWING SET IS FOR
REVIEW AND COORDINATION
AND SHOULD NOT BE USED
FOR CONSTRUCTION OR
PERMITTING.
NOT FOR
CONSTRUCTION
ISSUED FOR :
RIDE STAGE III SUBMISSION
SCHEMATIC
DESIGN SET
1080 Main Street Pawtucket, RI, 02860
SITE LAYOUT PLAN
PARKING SUMMARY:PARCEL/ZONING DATA
1 inch = ft.
( IN FEET )
GRAPHIC SCALE
C101
1"=20'
OWNER:
ALPHONSE A.J. D'AMICO, SR.
5 MILANO DRIVE
SAUGUS, MA 01906
APPLICANT:
COWDEN ST COLLABORATIVE
D/B/A
SEGUE INSTITUTE
OF LEARNING
325 COWDEN STREET
CENTRAL FALLS, RI 02863
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
WV
AutoCAD SHX Text
GV
AutoCAD SHX Text
WV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
GV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
GV
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text
SIG
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MW
AutoCAD SHX Text
MAIN STREET (RI ROUTE 122)
AutoCAD SHX Text
(PUBLIC (STATE) ~ 49.50' WIDTH)
AutoCAD SHX Text
CAMPBELL TERRACE
AutoCAD SHX Text
(PUBLIC ~ 40' WIDTH)
AutoCAD SHX Text
WEST AVENUE (US ROUTE 1)
AutoCAD SHX Text
(PUBLIC (STATE) ~ 60' WIDTH)
AutoCAD SHX Text
TRENTON STREET
AutoCAD SHX Text
(PUBLIC (CITY) ~ 50' WIDTH)
AutoCAD SHX Text
CEM CONC SIDEWALK
AutoCAD SHX Text
TIMBER GUARDRAIL (TYP)
AutoCAD SHX Text
YARD DRAIN (TYP.)
AutoCAD SHX Text
ELEC. PAD
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
CONC. PAD
AutoCAD SHX Text
TIMBER RAMP
AutoCAD SHX Text
CEM CONC RAMP
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
CEM CONC SIDEWALK
AutoCAD SHX Text
CEM CONC SIDEWALK
AutoCAD SHX Text
LAWN
AutoCAD SHX Text
LAWN
AutoCAD SHX Text
LAWN
AutoCAD SHX Text
GATE
AutoCAD SHX Text
METAL FENCE (TYP.)
AutoCAD SHX Text
GUY
AutoCAD SHX Text
CEM CONC SIDEWALK
AutoCAD SHX Text
CEM CONC SIDEWALK
AutoCAD SHX Text
CEM CONC SIDEWALK
AutoCAD SHX Text 30"
AutoCAD SHX Text 18"
AutoCAD SHX Text 10"
AutoCAD SHX Text
CURB (TYP.)
AutoCAD SHX Text
GRANITE CURBING (TYP.)
AutoCAD SHX Text
3-STORY BRICK OFFICE BUILDING #1080 MAIN STREET 17,108 SF FOOTPRINT
AutoCAD SHX Text 1 STORY RESTAURANT No. 1091 MAIN STREET
AutoCAD SHX Text
GLENWOOD AVENUE
AutoCAD SHX Text
(PUBLIC ~ 40' WIDTH)
AutoCAD SHX Text
LOWDEN STREET
AutoCAD SHX Text
(PUBLIC ~ 40' WIDTH)
AutoCAD SHX Text
WV
AutoCAD SHX Text
SIG
AutoCAD SHX Text 15"
AutoCAD SHX Text 15"
AutoCAD SHX Text
ELEC. PAD
AutoCAD SHX Text
BOLLARD
AutoCAD SHX Text
GAS METER
AutoCAD SHX Text
ELEC. PAD
AutoCAD SHX Text
CONC. STEPS
AutoCAD SHX Text 15"
AutoCAD SHX Text 15"
AutoCAD SHX Text 15"
AutoCAD SHX Text 15"
AutoCAD SHX Text
OVERHANG
AutoCAD SHX Text
STONE COLUMN
AutoCAD SHX Text
GRANITE CURBING (TYP.)
AutoCAD SHX Text
GATE
AutoCAD SHX Text
GATE
AutoCAD SHX Text
BOX
AutoCAD SHX Text
CHAIN LINK FENCE (TYP)
AutoCAD SHX Text
GUY
AutoCAD SHX Text 1.3'
AutoCAD SHX Text
N 34°05'26" E 98.13' (TIE)
AutoCAD SHX Text 78.97'
AutoCAD SHX Text S 04°43'24" E 40.00'
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
N/F A.P. 62B, LOT 340 MICROFIBRES, INC. VOLUME 917, PAGE 261
AutoCAD SHX Text
N/F A.P. 62B, LOT 204 PAUL PISTACCHIO, III VOLUME 3369, PAGE 148
AutoCAD SHX Text
N/F A.P. 62B, LOT 205 PAUL PISTACCHIO, III VOLUME 3369, PAGE 148
AutoCAD SHX Text
N/F A.P. 62B, LOT 206 KRISTEN VALE VOLUME 3074, PAGE 229
AutoCAD SHX Text
N/F A.P. 62B, LOT 207 MAHMOUD MERHI VOLUME 3623, PAGE 278
AutoCAD SHX Text
N/F A.P. 62B, LOT 230 CLAUDIO MOREIRA VOLUME 3955, PAGE 58
AutoCAD SHX Text
N/F A.P. 62B, LOT 208 TIMOTHY R. & RILEY D. WHITE VOLUME 4034, PAGE 63
AutoCAD SHX Text
N/F A.P. 62B, LOT 209 EDILBERTO CONTRERAS VOLUME 4043, PAGE 1
AutoCAD SHX Text
BUILDING HEIGHT=47.0'±
AutoCAD SHX Text X
AutoCAD SHX Text
BUILDING HEIGHT=18.0'±
AutoCAD SHX Text X
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text APPROXIMATE LOCATION OF GAS LINE & EASEMENT AS DESCRIBED IN VOLUME 378, PAGE 353 AND DELINEATED ON PLAN REF. 1
AutoCAD SHX Text APPROX LOCATION OF WATER LINE & EASEMENT AS DESCRIBED IN VOLUME 674, PAGE 547 AND DELINEATED ON PLAN REF. 1
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
ELEC. BOXES
AutoCAD SHX Text
A.P. 62B LOT 339 AREA: 41,610 SF/0.955 AC
AutoCAD SHX Text
BIT CONC PAVEMENT
AutoCAD SHX Text
A.P. 63A LOT 305 AREA: 36,558 SF/0.839 AC
AutoCAD SHX Text
UP 62
AutoCAD SHX Text
UP 63
AutoCAD SHX Text
UP 64
AutoCAD SHX Text
UP 65
AutoCAD SHX Text
UP 195
AutoCAD SHX Text
UP 190-2
AutoCAD SHX Text
UP 190-1
AutoCAD SHX Text
UP 190
AutoCAD SHX Text
UP 191-1
AutoCAD SHX Text
UP 193
AutoCAD SHX Text
WV
AutoCAD SHX Text
UP 61
AutoCAD SHX Text
UP 188
AutoCAD SHX Text
UP 20
AutoCAD SHX Text
UP 19
AutoCAD SHX Text
UP 60
AutoCAD SHX Text
PAWTUCKET HIGHWAY BOUND (FND) 2.00' ON TRENTON ST. 2.05' ON MAIN STREET
AutoCAD SHX Text
PAWTUCKET HIGHWAY BOUND (FND) 2.00' ON BOTH STREETS
AutoCAD SHX Text
ACCESS BOX
AutoCAD SHX Text
BOLLARDS
AutoCAD SHX Text
WOOD STAIRS
AutoCAD SHX Text 2"
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text
DRYWELL N2 RIM=77.0±NO INV VISIBLE
AutoCAD SHX Text
ELEC HH COVER
AutoCAD SHX Text
CB W2A RIM=76.7±INV OUT (6"E)=73.5±
AutoCAD SHX Text
DRYWELL W2 RIM=75.9±INV IN (6"W)=BURIED INV OUT (6"E)=BURIED
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
6" PVC
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text
8" PVC
AutoCAD SHX Text
CB W1A RIM=74.0±INV OUT (8"N)=70.5±
AutoCAD SHX Text
CB W1B RIM=74.0±INV OUT (8"S)=70.4±
AutoCAD SHX Text
DRYWELL W1 RIM=74.0±INV IN (8"S)=70.1±INV IN (8"N)=BURIED
AutoCAD SHX Text
DRYWELL N1 RIM=76.7±INV IN (8"W)=73.7±
AutoCAD SHX Text
WEST AVENUE (US ROUTE 1)
AutoCAD SHX Text
(PUBLIC (STATE) ~ 60' WIDTH)
AutoCAD SHX Text
MAIN STREET (RI ROUTE 122)
AutoCAD SHX Text
(PUBLIC (STATE) ~ 49.50' WIDTH)
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
USE CATEGORIES/AREAS
AutoCAD SHX Text PER CITY OF PAWTUCKET ZONING ORDINANCE, §410-76 - 'PARKING SPACE REQUIREMENTS' §410-76 - 'PARKING SPACE REQUIREMENTS' - 'PARKING SPACE REQUIREMENTS' PROPOSED BUILDING USES: PUBLIC ELEMENTARY SCHOOL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .