RFQ27007135 RAWP Comment Letter Addendum.pdf

PDF 10 MB Posted

Attached to
DEM Legacy High School Remedial Action Work
Solicitation number
RFQ27007135
Issued by
Providence County, Rhode Island

About this file

This document is a Response to Comments letter dated November 7, 2024, from NV5 to the Rhode Island Department of Environmental Management (RIDEM), Office of Land Revitalization and Sustainable Materials Management, regarding a Remedial Action Work Plan (RAWP) for a proposed school development at 1070 & 1080 Main Street in Pawtucket, Rhode Island. The project, sponsored by Segue Institute for Learning, involves environmental remediation and site redevelopment of two parcels (A.P. 62 Lot 339 and A.P. 63 Lot 305) totaling approximately 1.788 acres. The initial redevelopment proposes 20 classrooms on floors one and two of the existing building, with temporary commercial office space on floor three, ultimately expanding to 36 classrooms. The document addresses 14 specific departmental comments regarding outdated regulatory citations, stormwater management and exfiltration plans, capping specifications for engineered controls, geotextile fabric requirements, security measures for school occupant access during remediation, and submission procedures. RIDEM approved unrestricted stormwater exfiltration in the courtyard area via email on September 4, 2024, and approved second-floor building occupancy by school faculty and students before remedial work completion on October 1, 2024, contingent upon proper security measures.

The RAWP proposes multiple cap types including the existing approximately 17,108-square-foot building structure as engineered cap, new hardscape area caps consisting of minimum four inches of bituminous asphalt or concrete over six inches of structural sub-base fill, and landscaped area caps of either two feet or one foot of imported clean soil with geotextile fabric. The response clarifies that the geotextile fabric will meet puncture strength requirements per RIDEM Remediation Regulations Section 1.13, with specific product specifications to be submitted after contractor selection. NV5 commits to completing all remedial work during off-school hours and implementing security measures including multi-lingual signage, tenant notification, and temporary fencing to restrict access to exposed soils while maintaining fire code compliance. The project will incorporate detailed site drawings displaying proposed caps and cross-sectional areas, an Operation and Maintenance Plan for the drainage system, and a Remedial Action Closure Report following completion of all remedial activities. While RIDEM did not require resubmission of a revised RAWP, all responses have been incorporated into a revised plan available for stakeholder distribution upon approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Response to Comments

November 7, 2024

Rhode Island Department of Environmental Management Office of Land Revitalization & Sustainable Materials Management Attention: Ms. Reilly Cusick, Environmental Scientist I 235 Promenade Street Providence, RI 02908-5767

RE: Remedial Action Work Plan Response to Comments 1070 & 1080 Main Street - Proposed School

Plat 63A, Lot 305 1070 & 1080 Main Street, Pawtucket, RI

Dear Ms. Cusick:

On behalf of Segue Institute for Learning, NV5 has prepared this Response to Comments document in response to the RAWP Comment Letter from the Rhode Island Department of Environmental Management’s (the Department) Office of Land Revitalization and Sustainable Materials Management (LRSMM), dated October 17, 2024. These comments were associated with the Remedial Action Work Plan (RAWP) for the above referenced property (the Site), which was submitted on October 10, 2024, by NV5 in accordance with 250-RICR-140-30-1, Section

1.10 of the Department’s Rules and Regulations for the Investigation and Remediation of Hazardous Material Releases (the Remediation Regulations).

The following paragraphs include the RIDEM’s comment, following by a response. It should be noted that while the RIDEM is not requiring resubmission of a revised RAWP, all of the following responses have been incorporated into a revised RAWP that can be provided to all necessary parties involved in the project, once approved.

1. Section 1.0: Please note that “Section 9.0” of the Remediation Regulations is an outdated citation. The correct reference should read Section 1.10.

NV5 has amended the plan to reflect the correct citation.

2. Section 2.0: Please note that “Rule 8.01” of the Remediation Regulations is an outdated citation. The correct reference should read Section 1.9.1.

NV5 has amended the plan to reflect the correct citation.

3. Section 3.2: On September 4, 2024, the Department approved unrestricted exfiltration of stormwater in the courtyard area via email correspondence. Please discuss in detail the plans for exfiltration in this area, and whether any areas of infiltration or other stormwater management is proposed on the Site.

Please find attached a copy of the Draft Stormwater & Utility Plan, which provides the details for all of the proposed stormwater management to occur at the site. Please note that this is subject to change, as Segue Institute for Learning works with the Narragansett Bay Commission and RIDEM Groundwater and Injection Control personnel to finalize these details. Currently, the system is designed to handle the entire roof runoff, although that may not be feasible. Segue Institute for Learning will keep the RIDEM’s LRSMM informed of any proposed changes to this submission.

889 BOSTON NECK ROAD, SUITE 200 | NARRAGANSETT, RI 02882 | WWW.NV5.COM | OFFICE 401.465.2801 | FAX 330.666.3608

TRANSACTION SERVICES - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMENTAL

4. Section 4.0: Please note that “Sections 8.09, 9.00, and 8.00” of the Remediation Regulations are outdated citations. The correct references should read Section 1.9.9, 1.10, and 1.9, respectively.

NV5 has amended the plan to reflect the correct citation.

5. Section 4.1: It should be noted that the Department does not review or approve the draft Environmental Land Usage Restriction (ELUR) until the proposed remediation work is completed. Please resubmit the draft ELUR, Post-Closure Soil Management Plan (SMP), and all other required Exhibits in redline / strikeout format for Department review with the Remedial Action Closure Report (RACR) following the completion of all remedial work.

On behalf of Segue Institute for Learning, NV5 will resubmit the draft ELUR, Post- Closure Soil Management Plan (SMP), and all other required Exhibits in redline / strikeout format for Department review with the Remedial Action Closure Report (RACR) following the completion of all remedial work

6. Section 4.3.2: Please note that “Table 1, Section 8” of the Remediation Regulations is an outdated citation. The correct reference should read Section 1.9.2(C)(2), Table 1.

NV5 has amended the plan to reflect the correct citation.

7. Section 9.0: Please note that once a contractor is selected, the Department must be notified via email and provided with the contractor’s contact information.

Segue Institute for Learning will notify the Department of the contractor’s contact information once selected

8. Section 11.0: Discuss, in detail, the capping specifications for the Site, including the exact compositions and layouts of all proposed engineered controls. If more than one type of cap is being used on the property, please provide the details of each cap type. With that, please provide a more detailed Site Figure that shows the capping layout and cross-sectional areas of the proposed caps.

The engineered remediation cap at the Site will be constructed in accordance with federal, state and local regulations and with the approved RAWP associated with this Site. Compliance with this RAWP will be documented in a Remedial Action Closure Report, which will be prepared upon completion of remediation activities at the Site.

The following cap types are proposed to be implemented at the Site and are considered the minimum requirements for capping in accordance with the Remediation Regulations.

As requested, attached are detailed drawings displaying the proposed caps and associated details.

Building Footprint – An existing approximately 17,108 SF building exist on the Site and will serve as part of the engineered cap.

New Hardscape Area Cap: The cap type that will be constructed at hardscaped areas within the Site boundary will consist of a minimum of four inches of bituminous asphalt or concrete overlying a minimum of six inches of structural sub-base fill meeting the definition of Clean Soil, overlying existing soil. As indicated in the attached drawings, some areas will have a top cover of synthetic turf, the specifications for which have not yet been decided. It should be noted

889 BOSTON NECK ROAD, SUITE 200 | NARRAGANSETT, RI 02882 | WWW.NV5.COM | OFFICE 401.465.2801 | FAX 330.666.3608 that none of the existing hardscape areas will remain and all are proposed to be replaced, although not in kind.

Landscaped Area Cap: The cap types that will be used at landscaped areas within the Site boundary will consist of either two feet of imported Clean Soil overlying existing soil, or a minimum of 12 inches of imported Clean Soil, overlying geotextile fabric, overlying existing soil. At areas of the Site to be landscaped with a one-foot cap, geotextile fabric will be applied to the prepared ground surface. Imported Clean Soil material will then be applied across the capping area and compacted until the appropriate thickness is achieved. The thickness requirements referenced in the above cap type descriptions will apply to the final compacted cap layers. Grass, trees, and other plantings will be planted concurrent with or just after construction of the landscaped cap.

Coordination with the project landscape architect will be conducted to select plant types and sizes to facilitate planting in a manner which minimizes disturbance of existing soil beneath the cap. Most of all existing landscaping will be replaced, with the exception of four mature trees on the north side of the Site.

Surface soil in the new trees/shrub locations will be excavated to a minimum depth of two (2) feet below the planned grade and replaced with a minimum of 24-inches of clean fill placed over a non-woven geotextile fabric. In the area of the four existing trees proposed to remain, an air-spade will be utilized to remove any impacted soils in the top 12 inches around the trees and root systems. In order to protect these existing four trees, it is proposed to place on top of the excavated grade six (6) inches of washed stone over a non-woven geotextile with minimum CBR puncture strengthen of 220 (consistent with current RIDEM policy) surrounding the existing tree trunk and exposed root structure with a radially tapered excavation of up to a depth of twelve (12) inches below the existing grade and added to /replaced with a minimum of twelve (12) inches of washed stone placed over a non-woven geotextile.

9. Section 14.0:

a) Please note that the “’Rules and Regulations for the Investigation and Remediation of Hazardous Material Releases' (DEM-DSR-01-93), dated March 31, 1993, last amended November 2011" is the incorrect version of the Remediation Regulations. As mentioned in the Department’s June 12, 2024, SIR Comment Letter, the Department re-codified the Remediation Regulations on January 8, 2019.

Following periodic refiling, the active Rule became effective on January 4, 2022. The active Rule, 250-RICR-140-30-1, can be referenced at the following link:

https://rules.sos.ri.gov/Regulations/part/250-140-30-1. Please refer to this version in all reports moving forward.

889 BOSTON NECK ROAD, SUITE 200 | NARRAGANSETT, RI 02882 | WWW.NV5.COM | OFFICE 401.465.2801 | FAX 330.666.3608

NV5 has amended the plan to reflect the correct citation and will ensure all reports going forward have the same

b) Please note that “Section 9.13” of the Remediation Regulations is an outdated citation.

The correct reference should read Section 1.10.13.

NV5 has amended the plan to reflect the correct citation

c) It was stated several times in this Section to “refer to Section 13.1 of this Plan”; however, Section 13.1 is not included in the report. Please clarify which Section should be referenced regarding emergency contact information.

Section 14.1 of the Plan is the correct citation, which should be referenced regarding emergency contact information

10. Section 16.0: On October 1, 2024, the Department approved, via email correspondence, the occupancy of the second floor of the building by school faculty and students before remedial work is completed, provided that the proper security measures are employed to restrict access to any areas of exposed soils. With that being said, please discuss, in detail, the security measures that are going to be taken to ensure that school occupants cannot access the restricted areas or exposed soils, as well as any other measures that will be taken to mitigate exposure during the remedy implementation, e.g., scheduling remedial work outside of school hours.

Segue Institute for Learning will be implementing several security measures to restrict access to any areas of exposed soils by several means, including, but not limited to the following: notifying all tenants of the building, staff and students of the strict restricted access to these areas; installing multi-lingual signage inside of the building informing of the same; by completing all remedial work during off-school hours; and by installing temporary fencing that restricts access to the areas subject to remediation (fire code does not allow for the closure of ingress/egress points into and out of the building, so fencing will be utilized to direct pedestrian traffic away from areas subject to remediation).

11. Section 17.0: Please note that “Rule 8.09” of the Remediation Regulations is an outdated citation. The correct reference should read Section 1.9.9.

NV5 has amended the plan to reflect the correct citation

12. Section 18.0: Please note that “Rule 8.09” of the Remediation Regulations is an outdated citation. The correct reference should read Section 1.9.9.

NV5 has amended the plan to reflect the correct citation

13. Appendix D: As part of the proposed remedy, landscaped areas of the Site are to be encapsulated with one (1) foot of clean fill underlain by a geotextile fabric or geomembrane.

A specification sheet for the “geomembrane” was provided in Appendix D, however, this type of barrier is not a geotextile or a geomembrane. The proposed Tenax Guardian visual barrier may serve as a visual demarcation between imported clean fill material and underlying native soils but will not provide any additional protection or prevention from exposure to underlying soils. Given the Site’s intended use as a school, the Department does not approve of the use of the Tenax Guardian visual barrier in place of a geotextile fabric or geomembrane. Please propose a different product to use as part of the engineered controls in the landscaped areas.

889 BOSTON NECK ROAD, SUITE 200 | NARRAGANSETT, RI 02882 | WWW.NV5.COM | OFFICE 401.465.2801 | FAX 330.666.3608

Disregard the specification for the Tenax Guardian visual barrier. The geotextile fabric will be certified by the manufacturer to meet the puncture strength (i.e., 120 pounds) requirements documented in Section 1.13 of the RIDEM Remediation Regulations. An Environmental Professional will perform routine inspections of capping activities to confirm and document that the cap is installed in accordance with the specifications described in the RAWP. These inspections will include confirmation that geotextile fabric is placed throughout the applicable capped areas. Segue Institute for Learning will submit a more detailed specification for the proposed geotextile, once a contractor has been chosen and the preferred geotextile is confirmed.

14. Please submit a RAWP addendum or response to comments by November 18, 2024.

Please do not submit a revised RAWP.

As previously indicated, while the RIDEM is not requiring resubmission of a revised RAWP, all of the following responses have been incorporated into a revised RAWP that can be provided to all necessary parties involved in the project, once approved.

Should you have any questions or comments relating to any of these responses or any other matter, please do not hesitate to contact me at (401) 465-2801. Thank you again for your assistance in this matter.

Sincerely, Vincent L. Jacques, P.E.

NV5/Bock and Clark

AutoCAD SHX Text

PROJECT NO. 24053.00

AutoCAD SHX Text

%%USHEET INDEX

AutoCAD SHX Text

1. TITLE SHEET TITLE SHEET 2. LEGEND, NOTES & ABBREVIATIONS LEGEND, NOTES & ABBREVIATIONS 3. EXISTING CONDITIONS PLAN EXISTING CONDITIONS PLAN 4. SESC/SITE PREPARATION PLAN SESC/SITE PREPARATION PLAN 5. SITE LAYOUT PLAN SITE LAYOUT PLAN 6. GRADING DETAILS GRADING DETAILS 7. STORMWATER & UTILITY PLAN STORMWATER & UTILITY PLAN 8. STORMWATER & UTILITY PROFILE STORMWATER & UTILITY PROFILE 9. LANDSCAPE PLAN LANDSCAPE PLAN 10. CONSTRUCTION DETAILS 1 CONSTRUCTION DETAILS 1 11. CONSTRUCTION DETAILS 2 CONSTRUCTION DETAILS 2 12. CONSTRUCTION DETAILS 3 CONSTRUCTION DETAILS 3 13. CONSTRUCTION DETAILS 4CONSTRUCTION DETAILS 4

AutoCAD SHX Text

%%UPARCEL/ZONING DATA

AutoCAD SHX Text CITY FINAL SUBMISSION FOR THE "LEGACY HIGH SCHOOL - SEGUE INSTITUTE FOR LEARNING" A.P. 62 LOT 339/A.P. 63 LOT 305 1080 MAIN STREET IN PAWTUCKET, RHODE ISLAND

AutoCAD SHX Text

NAD-83

AutoCAD SHX Text

SITE

AutoCAD SHX Text NOTE: 1. THESE PLANS HAVE BEEN ISSUED FOR LOCAL AND/OR STATE AGENCY REVIEW. ONLY THESE PLANS HAVE BEEN ISSUED FOR LOCAL AND/OR STATE AGENCY REVIEW. ONLY PLANS STAMPED 'ISSUED FOR CONSTRUCTION' AFTER RECEIPT OF LOCAL/STATE APPROVALS SHALL BE USED FOR CONSTRUCTION.

AutoCAD SHX Text

LOCUS MAP SCALE: 1"=300'

AutoCAD SHX Text

TELEPHONE: (401) 273-6600

AutoCAD SHX Text

DATE: DECEMBER 2024

AutoCAD SHX Text GRANTED ZONING VARIANCES: WAIVERS FROM THE FOLLOWING REGULATIONS/STANDARDS WERE GRANTED BY THE CITY OF PAWTUCKET PLANNING COMMISSION AT THEIR PUBLIC HEARING ON AUGUST 22, 2024: LAND DEVELOPMENT & SUBDIVISION REGULATIONS, SECTION XV, ARTICLE A TOTAL PARKING AREA=27,721 SF XV(A)(7)(I): REQUIRED MINIMUM INTERIOR LANDSCAPING: 10%; EXISTING: 0%; PROVIDED: 1.9%. VARIANCE: 8.1% XV(A)(7)(V): REQUIRED MINIMUM TREE CANOPY: 30%; EXISTING: 0%; PROVIDED: 23% VARIANCE: 7% NOTE: THERE ARE EXISTING DIMENSIONAL NON-CONFORMANCES ON THE SITE; THESE SHALL NOT BE ALTERED FROM CURRENT CONDITIONS AS PART OF THE PROJECT.

AutoCAD SHX Text

MAIN STREET

AutoCAD SHX Text

TRENTON STREET

AutoCAD SHX Text

MOSSHASSUCK STREET

AutoCAD SHX Text

A.P. 62A LOT 339 A.P. 63A LOT 305 1080 MAIN STREET

AutoCAD SHX Text

LOT 305

AutoCAD SHX Text

LOT 339

AutoCAD SHX Text

WEST AVENUE

AutoCAD SHX Text

MAIN STREET

AutoCAD SHX Text

CAMPBELL TRCE

AutoCAD SHX Text OWNER/APPLICANT: COWDEN ST COLLABORATIVE D/B/A SEGUE INSTITUTE FOR LEARNING 325 COWDEN STREET CENTRAL FALLS, RI 02863

ASSESSORS REFERENCE: A.P. 63 LOT 305 36,558 SF/0.839 AC (BUILDING LOT) 36,558 SF/0.839 AC (BUILDING LOT) A.P. 62 LOT 339 41,354 SF/0.949 AC (PARKING LOT) 41,354 SF/0.949 AC (PARKING LOT) ZONING REFERENCE: ZONE: INDUSTRIAL OPEN (MO) DIMENSIONAL REQUIREMENTS REQUIRED EXISTING (LOT 305*) REQUIRED EXISTING (LOT 305*) EXISTING (LOT 305*) MINIMUM LOT AREA (SF): 20,000 36,558 20,000 36,558 20,000 36,558 36,558 MINIMUM LOT FRONTAGE (FT): 100 282.47 100 282.47 282.47 MINIMUM BUILDING SETBACKS: FRONT YARD (FT) 20 3.8** (MAIN ST) 20 3.8** (MAIN ST) 3.8** (MAIN ST) REAR YARD (FT) 20 0.2** (WEST AVE) 20 0.2** (WEST AVE) 0.2** (WEST AVE) SIDE YARD (FT) 20 4.0** (TRENTON ST) 20 4.0** (TRENTON ST) 4.0** (TRENTON ST) MAXIMUM STRUCTURE HEIGHT (FT): 40 47** 40 47** 47** MAXIMUM LOT COVERAGE (%): 60 (21,935 SF) 46.8 (17,108 SF) 60 (21,935 SF) 46.8 (17,108 SF) 46.8 (17,108 SF) * NO STRUCTURES ON A.P. 62B LOT 339 NO STRUCTURES ON A.P. 62B LOT 339 ** EXISTING NON-CONFORMANCEEXISTING NON-CONFORMANCE

COMMONWEALTH

No.

AutoCAD SHX Text

CHKD

AutoCAD SHX Text

DATE

AutoCAD SHX Text

REVISIONS

AutoCAD SHX Text

DRWN

AutoCAD SHX Text

ENGINEERS & CONSULTANTS, INC.

AutoCAD SHX Text

400 SMITH STREET

AutoCAD SHX Text

PROVIDENCE, RHODE ISLAND 02908

AutoCAD SHX Text

DESIGN BY: MCZ

AutoCAD SHX Text

PROJECT NO.:

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

SHEET NO:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DRAWN BY: MCZ

AutoCAD SHX Text 24053.00

AutoCAD SHX Text

DECEMBER 2024

AutoCAD SHX Text

TJB

AutoCAD SHX Text LEGACY HIGH SCHOOL SEGUE IFL A.P. 62 LOT 339/A.P. 63 LOT 305 1080 MAIN STREET PAWTUCKET, RHODE ISLAND

AutoCAD SHX Text

OF 13

AutoCAD SHX Text

(401) 273-6600

AutoCAD SHX Text

%%UDRAWING ISSUE:

AutoCAD SHX Text

CONCEPT CUSTOMER APPROVAL PERMITTING CONSTRUCTION AS-BUILT OTHER

AutoCAD SHX Text

ONLY PLANS ISSUED FOR CONTRUCTION SHALL BE USED FOR CONSTRUCTION

AutoCAD SHX Text X

AutoCAD SHX Text CONSTRUCTION NOTES: 1. DEVELOPER SHALL RETAIN THE SERVICES OF A RHODE ISLAND PROFESSIONAL ENGINEER TO REVIEW AND APPROVE DEVELOPER SHALL RETAIN THE SERVICES OF A RHODE ISLAND PROFESSIONAL ENGINEER TO REVIEW AND APPROVE SHOP DRAWINGS, SAMPLES, AND OTHER SUBMITTALS OF THE CONTRACTOR FOR CONFORMANCE WITH THE DESIGN CONCEPT (THIS PLAN SET) AND CITY REGULATIONS, WHICH INCLUDE (BUT ARE NOT LIMITED TO) THE FOLLOWING: A. DRAINAGE SYSTEM SHOP DRAWINGS/SKETCHES FOR PIPE, PIPE JOINTS, PIPE BEDDING/BACKFILL MATERIALS DRAINAGE SYSTEM SHOP DRAWINGS/SKETCHES FOR PIPE, PIPE JOINTS, PIPE BEDDING/BACKFILL MATERIALS SHOP DRAWINGS/SKETCHES FOR PIPE, PIPE JOINTS, PIPE BEDDING/BACKFILL MATERIALS (SIEVE ANALYSIS, ETC.), COMPACTION METHODS, MANHOLE STRUCTURES, FRAME & COVERS, FRAME & GRATES, FRAME & COVER ADJUSTMENT METHODS TO FINISH GRADE, PROPOSED RIM ELEVATIONS, PIPE INVERTS AND PIPE DIAMETERS. ANY SUBSTANTIAL CHANGES TO THE DESIGN CONCEPT SHALL BE BROUGHT TO THE CITY'S ATTENTION. B. ROADWAY CONSTRUCTION SHOP DRAWINGS/SKETCHES FOR GRAVEL BASE MATERIALS, BITUMINOUS CONCRETE ROADWAY CONSTRUCTION SHOP DRAWINGS/SKETCHES FOR GRAVEL BASE MATERIALS, BITUMINOUS CONCRETE SHOP DRAWINGS/SKETCHES FOR GRAVEL BASE MATERIALS, BITUMINOUS CONCRETE COURSES, SIGNAGE/STRIPING, UNDERDRAINS, GUARDRAILS, RETAINING WALLS AND CURBING/BERMS. C. SOIL EROSION CONTROL AND DEWATERING METHODS. SOIL EROSION CONTROL AND DEWATERING METHODS. AND DEWATERING METHODS. D. COMPACTION METHODS FOR INSTALLING PIPE/MANHOLES, GRAVEL ROAD BASE AND BITUMINOUS CONCRETE COMPACTION METHODS FOR INSTALLING PIPE/MANHOLES, GRAVEL ROAD BASE AND BITUMINOUS CONCRETE FOR INSTALLING PIPE/MANHOLES, GRAVEL ROAD BASE AND BITUMINOUS CONCRETE COURSES. E. TESTING METHODS AND TESTING FREQUENCY FOR DRAINAGE AND ROAD SYSTEMS. TESTING FREQUENCY SHALL TESTING METHODS AND TESTING FREQUENCY FOR DRAINAGE AND ROAD SYSTEMS. TESTING FREQUENCY SHALL AND TESTING FREQUENCY FOR DRAINAGE AND ROAD SYSTEMS. TESTING FREQUENCY SHALL BE IN ACCORDANCE WITH RIDOT AND TYPICAL ENGINEERING STANDARDS. 2. THE SHOP DRAWING SUBMITTAL PACKAGE SHALL BE STAMPED BY A RHODE ISLAND PROFESSIONAL ENGINEER AND THE SHOP DRAWING SUBMITTAL PACKAGE SHALL BE STAMPED BY A RHODE ISLAND PROFESSIONAL ENGINEER AND SUBMITTED TO THE ENGINEER FOR REVIEW AND APPROVAL. SHOP DRAWING RECORDS SHALL BE MAINTAINED FOR THE DURATION OF THE PROJECT, INCLUDING THE WARRANTY PERIOD. 3. MARKED-UP CONSTRUCTION DRAWINGS SHALL BE MAINTAINED AND KEPT AT THE JOB SITE FOR THE DURATION OF MARKED-UP CONSTRUCTION DRAWINGS SHALL BE MAINTAINED AND KEPT AT THE JOB SITE FOR THE DURATION OF THE PROJECT. 4. CONTRACTOR SHALL PREPARE AND SUBMIT AS-BUILT DRAWINGS IN ACCORDANCE WITH CITY REGULATIONS; CONTRACTOR SHALL PREPARE AND SUBMIT AS-BUILT DRAWINGS IN ACCORDANCE WITH CITY REGULATIONS; AS-BUILTS SHALL BE STAMPED BY A R.I. PROFESSIONAL LAND SURVEYOR AND/OR R.I. PROFESSIONAL ENGINEER. 5. PRIOR TO ACCEPTANCE OF INFRASTRUCTURE, A RI P.E. SHALL CERTIFY THE INFRASTRUCTURE WAS INSTALLED IN PRIOR TO ACCEPTANCE OF INFRASTRUCTURE, A RI P.E. SHALL CERTIFY THE INFRASTRUCTURE WAS INSTALLED IN ACCORDANCE WITH THE DESIGN INTENT AND MEETS RIDOT/CITY STANDARDS & PERMIT STIPULATIONS, AND IS READY FOR USE.

AutoCAD SHX Text SITE NOTES: 1. REFERENCE IS MADE TO THE PLAN ENTITLED "ALTA/NSPS LAND TITLE SURVEY PLAN A.P. 63A LOT 305 & 62B LOT REFERENCE IS MADE TO THE PLAN ENTITLED "ALTA/NSPS LAND TITLE SURVEY PLAN A.P. 63A LOT 305 & 62B LOT 339, MAIN STREET, WEST AVENUE & TRENTON STREET, PAWTUCKET, RHODE ISLAND,' PREPARED FOR DUFFY & SWEENEY, LTD, 1800 FINANCIAL PLAZA, PROVIDENCE, RHODE ISLAND, 02903, PREPARED BY WATERMAN ENGINEERING COMPANY, DATED 04/10/17, CERTIFIED 4/25/2017. 2. THE PROPERTY IS LOCATED WITHIN ZONE X: AREA OF MINIMAL FLOOD HAZARD AS SHOWN ON FLOOD INSURANCE THE PROPERTY IS LOCATED WITHIN ZONE X: AREA OF MINIMAL FLOOD HAZARD AS SHOWN ON FLOOD INSURANCE RATE MAP FOR THE CITY OF PAWTUCKET, PANEL 44007C0307J, DATED 10/2/2015. NO PORTION OF THE SITE IS LOCATED WITHIN A FLOOD HAZARD AREA. 3. VERTICAL DATUM IS NAVD 88 (MSL). VERTICAL DATUM IS NAVD 88 (MSL). 4. THERE ARE NO FRESHWATER WETLANDS ON OR NEAR THE PARCEL. THERE ARE NO FRESHWATER WETLANDS ON OR NEAR THE PARCEL. 5. SITE IS AND SHALL CONTINUE TO BE SERVED BY PUBLIC WATER AND SANITARY SEWER.SITE IS AND SHALL CONTINUE TO BE SERVED BY PUBLIC WATER AND SANITARY SEWER.

AutoCAD SHX Text GENERAL NOTES: 1. THESE PLANS HAVE BEEN ISSUED FOR LOCAL AND/OR STATE AGENCY REVIEW. ONLY PLANS STAMPED 'ISSUED FOR THESE PLANS HAVE BEEN ISSUED FOR LOCAL AND/OR STATE AGENCY REVIEW. ONLY PLANS STAMPED 'ISSUED FOR CONSTRUCTION' AFTER RECEIPT OF ALL LOCAL AND STATE APPROVALS SHALL BE USED FOR CONSTRUCTION. 2. SPECIFICATIONS & DETAILS GOVERNING THIS PROJECT ARE THE RHODE ISLAND STANDARD SPECIFICATIONS FOR ROAD SPECIFICATIONS & DETAILS GOVERNING THIS PROJECT ARE THE RHODE ISLAND STANDARD SPECIFICATIONS FOR ROAD & BRIDGE CONSTRUCTION, 2022 EDITION & CITY OF PAWTUCKET LAND DEVELOPMENT & SUBDIVISION REGULATIONS. THE CITY'S STANDARDS SHALL OVERRIDE RIDOT STANDARDS OUTSIDE OF STATE R.O.W.'S. 3. THE CONTRACTOR SHALL READ AND FAMILIARIZE ITSELF WITH THE CITY'S SUBDIVISION & LAND DEVELOPMENT THE CONTRACTOR SHALL READ AND FAMILIARIZE ITSELF WITH THE CITY'S SUBDIVISION & LAND DEVELOPMENT REGULATIONS (AS THEY PERTAIN TO CONSTRUCTION) PRIOR TO CONSTRUCTION. 4. THE CONTRACTOR SHALL CONSTRUCT THE PROPOSED DRIVEWAYS AND DRAINAGE SYSTEM IN ACCORDANCE WITH THE THE CONTRACTOR SHALL CONSTRUCT THE PROPOSED DRIVEWAYS AND DRAINAGE SYSTEM IN ACCORDANCE WITH THE CITY'S SPECIFICATIONS FOR CONSTRUCTION OF REQUIRED IMPROVEMENTS, AS SPECIFIED IN THE CITY'S SUBDIVISION & LAND DEVELOPMENT REGULATIONS. 5. ANY REQUIRED AUTHORIZATION/PERMITS TO PERFORM WORK NOT PREVIOUSLY SECURED & PROVIDED BY THE ANY REQUIRED AUTHORIZATION/PERMITS TO PERFORM WORK NOT PREVIOUSLY SECURED & PROVIDED BY THE OWNER SHALL BE OBTAINED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION; THE CONTRACTOR SHALL ADHERE TO THE TERMS, CONDITIONS AND REQUIREMENTS OF ALL STATE & LOCAL PERMITS ISSUED FOR THE PROJECT. 6. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY CONSTRUCTION OPERATIONS, INCLUDING ALL ACTIONS THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ANY CONSTRUCTION OPERATIONS, INCLUDING ALL ACTIONS OR OMISSIONS OF ANY SUBCONTRACTORS, AGENTS OR EMPLOYEES. THE CONTRACTOR IS ALSO RESPONSIBLE FOR ALL ASPECTS OF ON-SITE SAFETY, INCLUDING ANY DAMAGE TO EXISTING STRUCTURES. 7. ALL DEPCITED ELEVATIONS ARE BASED ON NAVD88 DATUM, AND HAVE A POTENTIAL VERTICAL VARIANCE OF 0.5 ALL DEPCITED ELEVATIONS ARE BASED ON NAVD88 DATUM, AND HAVE A POTENTIAL VERTICAL VARIANCE OF 0.5±FEET. 8. NO EXISTING DRAINAGE STRUCTURE OR FACILITY SHALL BE ALTERED OR DISTURBED UNLESS SPECIFICALLY INDICATED NO EXISTING DRAINAGE STRUCTURE OR FACILITY SHALL BE ALTERED OR DISTURBED UNLESS SPECIFICALLY INDICATED ON THESE DRAWINGS. ANY DAMAGE TO EXISTING UTILITIES SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO REPAIR. 9. ALL DISTURBED AREAS/STRUCTURES SHALL BE REPLACED IN-KIND, UNLESS OTHERWISE SHOWN OR AUTHORIZED BY ALL DISTURBED AREAS/STRUCTURES SHALL BE REPLACED IN-KIND, UNLESS OTHERWISE SHOWN OR AUTHORIZED BY THE CITY. 10. THE CONTRACTOR SHALL THOROUGHLY EXAMINE THE CONTRACT DOCUMENTS AND PLANS, AND SHALL INSPECT THE THE CONTRACTOR SHALL THOROUGHLY EXAMINE THE CONTRACT DOCUMENTS AND PLANS, AND SHALL INSPECT THE SITE. ANY CHANGES TO THE PROJECT, OR THE INSTALLATION OF AN ITEM FOR WHICH NO PARTICULAR DETAIL OR SPECIFICATION WAS PROVIDED, SHALL BE REVIEWED BY, AND MUST BE ACCEPTABLE TO, THE ENGINEER. 11. THE ABSENCE OF PARTICULAR DETAILS OR SPECIFICATIONS FOR WORK CALLED FOR ON THE PLANS SHALL NOT THE ABSENCE OF PARTICULAR DETAILS OR SPECIFICATIONS FOR WORK CALLED FOR ON THE PLANS SHALL NOT RELIEVE THE CONTRACTOR FROM FURNISHING AND INSTALLING THE PROPOSED WORK. 12. ALL CONSTRUCTION IS SUBJECT TO THE INSPECTION OF AND APPROVAL BY THE CITY. PROPER NOTIFICATION SHALL ALL CONSTRUCTION IS SUBJECT TO THE INSPECTION OF AND APPROVAL BY THE CITY. PROPER NOTIFICATION SHALL BE GIVEN PRIOR TO THE COMMENCEMENT OF ANY WORK, AND NO WORK SHALL PROCEED WITHOUT THE AUTHORIZATION OF THE CITY. 13. PRIOR TO THE START OF CONSTRUCTION, THE APPROVED LIMIT OF DISTURBANCE SHALL BE LOCATED AND PRIOR TO THE START OF CONSTRUCTION, THE APPROVED LIMIT OF DISTURBANCE SHALL BE LOCATED AND FIELD-DELINEATED BY A RI PLS; NO CLEARING OR DISTURBANCE SHALL TAKE PLACE OUTSIDE THE ESTABLISHED LIMIT AT ANY POINT DURING CONSTRUCTION, UNLESS EXPLICITLY AUTHORIZED BY THE CITY. 14. PRIOR TO THE START OF EARTH-DISTURBING ACTIVITIES, THE CONTRACTOR SHALL INSTALL ALL SEDIMENT & SOIL PRIOR TO THE START OF EARTH-DISTURBING ACTIVITIES, THE CONTRACTOR SHALL INSTALL ALL SEDIMENT & SOIL EROSION CONTROL (SESC) DEVICES IN ACCORDANCE WITH RIDEM & CITY STANDARDS. 15. ALL ROOT SYSTEMS, TREES, STUMPS, BUSHES, BOULDERS AND OTHER UNSUITABLE MATERIAL SHALL BE REMOVED ALL ROOT SYSTEMS, TREES, STUMPS, BUSHES, BOULDERS AND OTHER UNSUITABLE MATERIAL SHALL BE REMOVED AND TRANSPORTED AWAY FROM THE PROJECT SITE. 16. MANHOLE AND CATCH BASIN FRAMES & COVERS SHALL BE ADJUSTED TO FINISH GRADE WITH RED BRICK AND MANHOLE AND CATCH BASIN FRAMES & COVERS SHALL BE ADJUSTED TO FINISH GRADE WITH RED BRICK AND MORTAR. OTHER TYPES OF BRICK AND/OR PRECAST CONCRETE RINGS ARE NOT ACCEPTABLE. GRATES SHALL BE SET 0.1 FEET BELOW ADJACENT SURFACE GRADE. RIM ELEVATIONS SHOWN ON PROFILES ARE APPROXIMATE; CONTRACTOR TO SPECIFY FINAL RIM ELEVATIONS ON SHOP DRAWINGS. MANHOLES SHALL TYPICALLY BE CONSTRUCTED SO AT LEAST TWO COURSES OF BRICKS ARE BENEATH THE FRAME, UNLESS OTHERWISE DIRECTED/AUTHORIZED. 17. IN PAVED AREAS, ALL MANHOLE AND CATCH BASIN FRAMES & COVERS SHALL BE ADJUSTED TO THE FIRST COURSE IN PAVED AREAS, ALL MANHOLE AND CATCH BASIN FRAMES & COVERS SHALL BE ADJUSTED TO THE FIRST COURSE OF PAVEMENT. THE FRAMES AND COVERS SHALL BE RE-ADJUSTED IMMEDIATELY PRIOR TO PLACEMENT OF THE SECOND COURSE OF PAVEMENT. 18. ANY SLOPES GREATER THAN 2H:1V SHALL BE STABILIZED WITH RIDOT CLASS R-4 RIP RAP LAID ON TOP OF FILTER ANY SLOPES GREATER THAN 2H:1V SHALL BE STABILIZED WITH RIDOT CLASS R-4 RIP RAP LAID ON TOP OF FILTER FABRIC (MIRAFI 180N OR APPROVED EQUAL). DEPTH OF RIP RAP TO BE 1.5 TIMES MAXIMUM STONE SIZE. 19. ALL HDPE CORRUGATED PLASTIC PIPE (CPP) SHALL BE ADS N-12 INTEGRAL BELL WATER-TIGHT PIPE OR ALL HDPE CORRUGATED PLASTIC PIPE (CPP) SHALL BE ADS N-12 INTEGRAL BELL WATER-TIGHT PIPE OR APPROVED EQUAL.

AutoCAD SHX Text MAINTENANCE AND PROTECTION OF TRAFFIC NOTES: 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND PROTECTION OF PEDESTRIAN AND VEHICULAR THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTENANCE AND PROTECTION OF PEDESTRIAN AND VEHICULAR TRAFFIC DURING CONSTRUCTION, INCLUDING POLICE PROTECTION. ALL TEMPORARY AND VEHICULAR SIGNS, BARRICADES AND LANE CLOSURES SHALL BE IN CONFORMANCE WITH THE MAY 2012 MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), INCLUDING ALL SUBSEQUENT REVISIONS. 2. TEMPORARY CONSTRUCTION SIGNS AND ALL APPLICABLE TRAFFIC CONTROL DEVICES SHALL BE IN PLACE PRIOR TO TEMPORARY CONSTRUCTION SIGNS AND ALL APPLICABLE TRAFFIC CONTROL DEVICES SHALL BE IN PLACE PRIOR TO THE START OF WORK IN ANY AREA OPEN TO TRAFFIC. 3. THE PRIVATE VEHICLES OF CONSTRUCTION WORKERS WILL NOT BE PARKED IN THE STREET RIGHT-OF-WAYS. THE PRIVATE VEHICLES OF CONSTRUCTION WORKERS WILL NOT BE PARKED IN THE STREET RIGHT-OF-WAYS. 4. SIGN MOUNTINGS SHALL BE IN ACCORDANCE WITH R.I.D.O.T. SPECIFICATIONS FOR TEMPORARY CONSTRUCTION SIGN MOUNTINGS SHALL BE IN ACCORDANCE WITH R.I.D.O.T. SPECIFICATIONS FOR TEMPORARY CONSTRUCTION SIGNS.

AutoCAD SHX Text EXISTING CONDITIONS/UTILITIES NOTES: 1. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING DRAINAGE AND UTILITIES, BOTH UNDERGROUND THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING DRAINAGE AND UTILITIES, BOTH UNDERGROUND AND OVERHEAD BEFORE EXCAVATION BEGINS IN ACCORDANCE WITH 'DIG SAFE'. NO DRAINAGE STRUCTURE OR FACILITY SHALL BE DISTURBED WITHOUT PROPER PERMITS UNLESS SPECIFICALLY INDICATED ON THESE DRAWINGS. ANY DAMAGE TO EXISTING UTILITIES SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 2. ALL EXISTING UTILITIES HAVE BEEN PLOTTED BASED UPON THE BEST INFORMATION AVAILABLE AT THE TIME OF PLAN ALL EXISTING UTILITIES HAVE BEEN PLOTTED BASED UPON THE BEST INFORMATION AVAILABLE AT THE TIME OF PLAN PREPARATION AND REPRESENT APPROXIMATE LOCATIONS. SOME OBSTRUCTIONS, OBSTACLES, OR DIFFICULTIES IN THE PATH OF THE WORK, EITHER ANTICIPATED OR DISCOVERED IN THE PERFORMANCE OF THE WORK, MAY NOT HAVE BEEN INDICATED BY DRAWINGS. THE CONTRACTOR SHALL BE UNDERSTOOD TO HAVE ENTERED INTO THE CONTRACT WITH FULL KNOWLEDGE THAT IN ANY WORK INVOLVING EXCAVATION OPERATIONS IN PUBLIC HIGHWAYS OR ADJACENT TO OTHER DEVELOPMENTS, SOME UNFORESEEN OBSTACLES, DIFFICULTIES, SOIL OR GROUND WATER CONDITIONS, ETC., MAY BE ENCOUNTERED, AND THAT THE CONTRACTOR HAS INCLUDED IN THEIR BID AND CONTRACT OBLIGATIONS THE ASSUMPTIONS OF THE RISKS AND COSTS TO WHICH SUCH OBSTACLES, ETC. MAY SUBJECT THEM. 3. THE LOCATION OF EXISTING UNDERGROUND PIPES, CONDUITS, AND STRUCTURES AS SHOWN HAS BEEN COLLECTED THE LOCATION OF EXISTING UNDERGROUND PIPES, CONDUITS, AND STRUCTURES AS SHOWN HAS BEEN COLLECTED FROM THE BEST AVAILABLE SOURCES, AND THE OWNER, TOGETHER WITH HIS AGENTS, DOES NOT IMPLY OR GUARANTEE THE DATA AND INFORMATION IN CONNECTION WITH UNDERGROUND PIPES, CONDUITS, STRUCTURES, AND SUCH OTHER PARTS, AS TO THEIR COMPLETENESS, NOR THEIR LOCATIONS AS INDICATED. THE CONTRACTOR SHALL ASSUME THAT THERE MAY BE EXISTING WATER, GAS AND OTHER UTILITY CONNECTIONS IN ROUTE, WHETHER THEY APPEAR ON THE DRAWINGS OR NOT. ANY EXPENSE AND/OR DELAY OCCASIONED BY UTILITIES AND STRUCTURES OR DAMAGE THERETO, INCLUDING THOSE NOT SHOWN, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, AT NO ADDITIONAL EXPENSE TO THE OWNER. 4. BEFORE PROCEEDING WITH CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL MAKE SUCH SUPPLEMENTAL BEFORE PROCEEDING WITH CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL MAKE SUCH SUPPLEMENTAL INVESTIGATIONS, INCLUDING EXPLORATORY EXCAVATIONS BY HAND DIGGING, AS HE DEEMS NECESSARY TO UNCOVER AND DETERMINE THE EXACT LOCATIONS OF UTILITIES AND STRUCTURES AND SHALL HAVE NO CLAIMS FOR DAMAGES DUE TO ENCOUNTERING SUBSURFACE STRUCTURES OR UTILITIES IN LOCATIONS OTHER THAN THOSE SHOWN ON THE DRAWINGS, OR WHICH ARE MADE KNOWN TO THE CONTRACTOR PRIOR TO CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL BE RESPONSIBLE AND LIABLE FOR ALL DAMAGES TO EXISTING UTILITIES AND STRUCTURES. 5. PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL ENGAGE A RI PROFESSIONAL LAND SURVEYOR TO SET AND PRIOR TO CONSTRUCTION THE CONTRACTOR SHALL ENGAGE A RI PROFESSIONAL LAND SURVEYOR TO SET AND VERIFY ALL LINES AND GRADES. ALL EXISTING AND PROPOSED UTIILITY LOCATIONS AND ELEVATIONS ARE TO BE CONFIRMED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. ANY ITEM FOUND WHICH DOES NOT MATCH THE PLANS MUST BE BROUGHT TO THE ENGINEER'S ATTENTION PRIOR TO CONSTRUCTION FOR REVIEW. 6. ANY DAMAGE TO EXISTING PAVEMENT, BRIDGES, CONDUIT, SIDEWALK, FENCES, ETC., CAUSED BY THE CONTRACTOR ANY DAMAGE TO EXISTING PAVEMENT, BRIDGES, CONDUIT, SIDEWALK, FENCES, ETC., CAUSED BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER/STATE/CITY. 7. WHENEVER IT MAY BE NECESSARY TO CROSS OR INTERFERE WITH EXISTING CULVERTS, DRAINS, SEWERS, WATER WHENEVER IT MAY BE NECESSARY TO CROSS OR INTERFERE WITH EXISTING CULVERTS, DRAINS, SEWERS, WATER PIPES, FIXTURES, GUARDRAILS, FENCES, GAS PIPES, OR OTHER STRUCTURES NEEDING SPECIAL CARE, DUE NOTICE SHALL BE GIVEN TO THE OWNER. WHENEVER REQUIRED, ALL OBJECTS SHALL BE STRENGTHENED TO MEET ANY ADDITIONAL STRESS THAT THE WORK HEREIN SPECIFIED MAY IMPOSE UPON IT, AND ANY DAMAGE CAUSED SHALL BE THOROUGHLY REPAIRED. THE ENTIRE WORK SHALL BE PERFORMED AT NO EXPENSE TO THE OWNER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL BROKEN MAINS OR UTILITIES ENCOUNTERED DURING THE PROGRESS OF THE WORK AND SHALL REPAIR AND BE RESPONSIBLE FOR CORRECTING ALL DAMAGES TO EXISTING UTILITIES, STRUCTURES AND PERSONAL "PROPERTY" WHICH MAY HAVE BEEN CAUSED BY BROKEN LINES AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL CONTACT THE PROPER UTILITY OR AUTHORITY TO CORRECT OR MAKE ANY CHANGES DUE TO UTILITIES OR OTHER OBSTRUCTIONS DURING CONSTRUCTION, BUT THE ENTIRE RESPONSIBILITY AND EXPENSE SHALL BE WITH THE CONTRACTOR. ALL DAMAGED ITEMS OF WORK OR ITEMS REQUIRED TO BE REMOVED AND REPLACED DUE TO CONSTRUCTION SHALL BE REPLACED OR REPAIRED BY THE CONTRACTOR TO THE COMPLETE SATISFACTION OF THE OWNER, AND AT NO ADDITIONAL EXPENSE TO THE OWNER.

AutoCAD SHX Text SUBSURFACE CONDITIONS NOTES: 1. ALL SOIL AND TEST HOLE DATA, WATER TABLE ELEVATIONS, AND SOIL ANALYSIS SHOWN/REFERENCED ON THE ALL SOIL AND TEST HOLE DATA, WATER TABLE ELEVATIONS, AND SOIL ANALYSIS SHOWN/REFERENCED ON THE DRAWINGS OR INCLUDED IN THE SPECIFICATIONS APPLY ONLY AT THE LOCATION OF THE TEST HOLES AND TO THE DEPTHS INDICATED. SOIL TEST REPORTS ARE AVAILABLE FOR INSPECTION AT THE OFFICE OF THE DESIGN ENGINEER. ANY ADDITIONAL SUBSURFACE EXPLORATION SHALL BE DONE BY THE CONTRACTOR AT THEIR OWN EXPENSE. IT IS UNDERSTOOD THAT THE MAKING OF THE DEDUCTIONS, INTERPRETATIONS AND CONCLUSIONS FROM ALL THE ACCESSIBLE FACTUAL INFORMATION, INCLUDING THE NATURE OF THE MATERIALS TO BE EXCAVATED, THE DIFFICULTIES OF MAKING AND MAINTAINING THE REQUIRED EXCAVATIONS, AND THE DIFFICULTIES OF DOING OTHER WORK AFFECTED BY THE GEOLOGY AND OTHER SUBSURFACE CONDITIONS AT THE SITE OF THE WORK, ARE THE CONTRACTOR'S SOLE RESPONSIBILITY. 2. THE INDICATED ELEVATION OF THE WATER TABLE IS THAT EXISTING AT THE DATE THE TEST HOLE DATA WAS THE INDICATED ELEVATION OF THE WATER TABLE IS THAT EXISTING AT THE DATE THE TEST HOLE DATA WAS DETERMINED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE AND ALLOW FOR THE ELEVATION OF GROUNDWATER AT THE DATE OF PROJECT CONSTRUCTION. A DIFFERENCE IN ELEVATION BETWEEN GROUNDWATER SHOWN IN SOIL LOGS AND GROUNDWATER ACTUALLY ENCOUNTERED DURING CONSTRUCTION WILL NOT BE CONSIDERED AS A BASIS FOR EXTRA WORK.

AutoCAD SHX Text GROUNDWATER REMOVAL & PROTECTION FROM FLOODING: 1. SOME EXCAVATIONS FOR PIPELINES, STRUCTURES, AND APPURTENANT WORK REQUIRED MAY OCCUR BELOW SOME EXCAVATIONS FOR PIPELINES, STRUCTURES, AND APPURTENANT WORK REQUIRED MAY OCCUR BELOW EXISTING GROUNDWATER LEVELS. 2. THE CONTRACTOR SHALL CONSTRUCT AND MAINTAIN ALL PUMPS, DRAINS, WELL POINTS AND/OR ANY OTHER THE CONTRACTOR SHALL CONSTRUCT AND MAINTAIN ALL PUMPS, DRAINS, WELL POINTS AND/OR ANY OTHER FACILITIES FOR THE CONTROL, COLLECTION, AND DISPOSAL OF GROUNDWATER OR SURFACE AND SUBSURFACE WATER ENCOUNTERED IN THE PERFORMANCE OF THE WORK, AND SHALL PROVIDE ALL PUMPS, PIPING, AND DITCHING FOR THE REMOVAL OF WATER FROM THE TRENCHES AND EXCAVATIONS SO THAT ALL TRENCHES AND EXCAVATIONS MAY BE KEPT FREE FROM WATER AT ALL TIMES, AND SO THAT THE WORK MAY BE PERFORMED IN THE DRY. 3. DEWATERING OF EXCAVATIONS SHALL BE ACCOMPLISHED BY METHODS THAT HAVE BEEN APPROVED PRIOR TO DEWATERING OF EXCAVATIONS SHALL BE ACCOMPLISHED BY METHODS THAT HAVE BEEN APPROVED PRIOR TO COMMENCEMENT OF WORK BY THE ENGINEER, AND WHICH HAVE A BACKGROUND OF SUCCESSFUL DEWATERING OF EXCAVATIONS OF THE TYPE TO BE EMPLOYED FOR THE WORK. 4. PUMPING SHALL BE CONTINUOUS WHERE DIRECTED AND/OR AS NECESSARY TO PROTECT THE WORK, AND TO PUMPING SHALL BE CONTINUOUS WHERE DIRECTED AND/OR AS NECESSARY TO PROTECT THE WORK, AND TO MAINTAIN SATISFACTORY PROGRESS OF SAME. 5. THE CONTRACTOR'S DEWATERING AND PUMPING OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT THE CONTRACTOR'S DEWATERING AND PUMPING OPERATIONS SHALL BE CARRIED OUT IN SUCH A MANNER THAT NO LOSS OF GROUND WILL RESULT FROM THESE OPERATIONS. ANY DAMAGE TO EXISTING FEATURES OR TO THE CONTRACT WORK RESULTING FROM THE CONTRACTOR'S DEWATERING OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR, AS DIRECTED BY THE OWNER, AT NO ADDITIONAL EXPENSE TO THE OWNER. PRECAUTIONS SHALL BE TAKEN TO PROTECT NEW AND EXISTING WORK FROM FLOODING OR DAMAGE DURING STORMS OR OTHER CAUSES. 6. ALL PIPELINES OR STRUCTURES NOT STABLE AGAINST UPLIFT DURING CONSTRUCTION OR PRIOR TO COMPLETION ALL PIPELINES OR STRUCTURES NOT STABLE AGAINST UPLIFT DURING CONSTRUCTION OR PRIOR TO COMPLETION SHALL BE THOROUGHLY BRACED OR OTHERWISE PROTECTED. 7. WATER FROM THE TRENCHES, EXCAVATIONS, AND DRAINAGE OPERATIONS SHALL BE DISPOSED OF IN SUCH A WATER FROM THE TRENCHES, EXCAVATIONS, AND DRAINAGE OPERATIONS SHALL BE DISPOSED OF IN SUCH A MANNER AS WILL CAUSE NEITHER INJURY TO PUBLIC HEALTH OR PRIVATE PROPERTY, NOR DAMAGE TO THE WORK COMPLETED OR IN PROGRESS. 8. THE CONTRACTOR SHALL CONSTRUCT DITCHES, ESTABLISH GRADING, AND PERFORM ANY AND ALL OTHER WORK THE CONTRACTOR SHALL CONSTRUCT DITCHES, ESTABLISH GRADING, AND PERFORM ANY AND ALL OTHER WORK AS MAY BE NECESSARY TO DIVERT AND PREVENT SURFACE WATER AND WATER FROM DEWATERING OPERATIONS FROM ENTERING EXCAVATION AND WORK AREAS.

AutoCAD SHX Text EARTHWORK NOTES: 1. SPECIFICATIONS & DETAILS TO GOVERN THIS PROJECT ARE THE RHODE ISLAND STANDARD SPECIFICATIONS FOR SPECIFICATIONS & DETAILS TO GOVERN THIS PROJECT ARE THE RHODE ISLAND STANDARD SPECIFICATIONS FOR ROAD & BRIDGE CONSTRUCTION - DECEMBER 2022 EDITION (INCLUDING ALL SUBSEQUENT ADDENDA) AS WELL AS CITY STANDARDS; WHERE APPLICABLE, THE CITY'S STANDARDS SHALL OVERRIDE RIDOT STANDARDS. 2. RIDOT STANDARDS ARE AVAILABLE FOR DOWNLOAD FROM THE RIDOT WEBSITE UNDER 'STANDARDS AND RIDOT STANDARDS ARE AVAILABLE FOR DOWNLOAD FROM THE RIDOT WEBSITE UNDER 'STANDARDS AND SPECIFICATIONS' (WWW.DOT.STATE.RI.US/ENGINEERING/STANDARDS/INDEX.ASP). CITY STANDARDS ARE AVAILABLE FOR DOWNLOAD FROM THE CITY OF PAWTUCKET WEBSITE. 3. EMBANKMENT SLOPES AND ALL DISTURBED AREAS ARE TO RECEIVE 4" OF TOPSOIL AND GRASS SEED UNLESS EMBANKMENT SLOPES AND ALL DISTURBED AREAS ARE TO RECEIVE 4" OF TOPSOIL AND GRASS SEED UNLESS OTHERWISE NOTED. 4. ALL EXCAVATION AND PLACEMENT OF FILL SHALL BE IN ACCORDANCE WITH R.I.D.O.T. STANDARD SPECIFICATIONS ALL EXCAVATION AND PLACEMENT OF FILL SHALL BE IN ACCORDANCE WITH R.I.D.O.T. STANDARD SPECIFICATIONS SECTION 202 AND CITY SUBDIVISION AND LAND DEVELOPMENT REGULATIONS. ALL MATERIALS AND METHODS SHALL BE PERFORMED IN ACCORDANCE WITH THESE STANDARDS AND SPECIFICATIONS. ALL FILL BENEATH PAVEMENTS SHALL BE GRAVEL AS DEFINED IN THE RIDOT SPECIFICATIONS. 5. ALL AREAS COMPACTED BY CONSTRUCTION ACTIVITIES (OTHER THAN ROADWAYS AND BENEATH STRUCTURES) SHALL ALL AREAS COMPACTED BY CONSTRUCTION ACTIVITIES (OTHER THAN ROADWAYS AND BENEATH STRUCTURES) SHALL BE RESTORED TO PROMOTE INFILTRATION BY TILLING THE TOP 12 INCHES OF SOIL PRIOR TO FINAL STABILIZATION. 6. ALL UNSUITABLE MATERIAL (LOAM, SUBSOIL, ROOTS, TREE TRUNKS, CLAY, SILT, ORGANIC MATTER, LARGE STONES, ALL UNSUITABLE MATERIAL (LOAM, SUBSOIL, ROOTS, TREE TRUNKS, CLAY, SILT, ORGANIC MATTER, LARGE STONES, ETC.) SHALL BE REMOVED FROM THE ROADWAY SUBGRADE AND EMBANKMENT AREAS PRIOR TO THE PLACEMENT OF THE GRAVEL SUBBASE/BERM MATERIAL AS DIRECTED AND APPROVED. 7. SUITABLE SURPLUS MATERIAL GENERATED BY EXCAVATIONS WITHIN THE PROJECT AREA (SAND, GRAVEL, LOAM, SUITABLE SURPLUS MATERIAL GENERATED BY EXCAVATIONS WITHIN THE PROJECT AREA (SAND, GRAVEL, LOAM, ETC.) SHALL BE RE-USED, TO THE EXTENT POSSIBLE, IN OTHER LOCATIONS WITHIN THE PROJECT AREA; MINING OF SITE MATERIALS (I.E. REMOVAL OF SUITABLE IN-SITU MATERIALS FROM THE SITE AND REPLACEMENT WITH IMPORTED BORROW MATERIALS) SHALL NOT BE PERMITTED.

AutoCAD SHX Text STORMWATER SYSTEM OPERATION & MAINTENANCE NOTES: 1. INSPECTIONS AND PROPER MAINTENANCE ARE ESSENTIAL FOR THE LONGEVITY OF THE DRAINAGE SYSTEMS. THE INSPECTIONS AND PROPER MAINTENANCE ARE ESSENTIAL FOR THE LONGEVITY OF THE DRAINAGE SYSTEMS. THE DRAINAGE SYSTEM SHALL BE INSPECTED IN ACCORDANCE WITH THE OPERATION AND MAINTENANCE (O&M) PLAN PREPARED SPECIFICALLY FOR THIS DEVELOPMENT. 2. THE PROPERTY OWNER, ITS HEIRS AND ASSIGNS SHALL MAINTAIN ALL ELEMENTS OF THE PROPOSED DRAINAGE THE PROPERTY OWNER, ITS HEIRS AND ASSIGNS SHALL MAINTAIN ALL ELEMENTS OF THE PROPOSED DRAINAGE SYSTEM (PIPES, CATCH BASINS, DRAIN MANHOLES, SAND FILTERS AND UNDERGROUND CHAMBER SYSTEMS). A LEGALLY BINDING AND ENFORCEABLE MAINTENANCE AGREEMENT SHALL BE EXECUTED BETWEEN THE OWNER AND A MAINTENANCE COMPANY TRAINED AND EXPERIENCED WITH THE MAINTENANCE REQUIREMENTS DETAILED IN THE O&M PLAN FOR THIS DEVELOPMENT, AS WELL AS THE 'RHODE ISLAND STORMWATER DESIGN AND INSTALLATION STANDARDS MANUAL,' LATEST EDITION (KNOWN AS THE 'MANUAL').

AutoCAD SHX Text

LEGEND, NOTES & ABBREVIATIONS

AutoCAD SHX Text N/A

AutoCAD SHX Text

AutoCAD SHX Text x##.#

AutoCAD SHX Text %%uLEGEND

AutoCAD SHX Text PROPERTY LINE ABUTTER LINE ZONING SETBACK LINE SAWCUT LIMIT LIMIT OF DISTURBANCE EDGE OF PAVEMENT BACK OF BERM BUILDING FENCELINE STONE WALL RETAINING WALL TREELINE CONTOUR LINE SPOT GRADE UTILITY POLE OVERHEAD WIRE LUMINAIRE SIGN WATER MAIN/SERVICE WATER GATE VALVE WATER CURB STOP HYDRANT SEWER MAIN/SERVICE SEWER MANHOLE DRAIN PIPE DRAIN MANHOLE DRAIN INLET (CATCH BASIN)

AutoCAD SHX Text

AutoCAD SHX Text

%%UEXISTING

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text x##.#

AutoCAD SHX Text

AutoCAD SHX Text

%%UPROPOSED

AutoCAD SHX Text D

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text S

AutoCAD SHX Text

%%UABBREVIATIONS

AutoCAD SHX Text APPROX APPROXIMATE APPROXIMATE BIT BITUMINOUS BITUMINOUS BOT BOTTOM BOTTOM BOW BOTTOM OF WALL REVEAL FINISH GRADE BOTTOM OF WALL REVEAL FINISH GRADE (ACTUAL BASE OF WALL WILL BE LOWER THAN SURFACE ELEVATION) CB CATCH BASIN CATCH BASIN CEM CEMENT CEMENT CF CUBIC FEET CUBIC FEET CFS CUBIC FEET PER SECOND CUBIC FEET PER SECOND CL CENTERLINE CENTERLINE CL## PRESSURE RATING CLASS PRESSURE RATING CLASS CLDI CEMENT-LINED DUCTILE IRON CEMENT-LINED DUCTILE IRON CONC CONCRETE CONCRETE CPP CORRUGATED PLASTIC PIPE CORRUGATED PLASTIC PIPE CY CUBIC YARD CUBIC YARD DG DOUBLE-GRATE DOUBLE-GRATE DMH DRAIN MANHOLE DRAIN MANHOLE DVWY DRIVEWAY DRIVEWAY ELEV ELEVATION ELEVATION EX EXISTING EXISTING ESHGWT ESTIMATED SEASONAL HIGH GROUNDWATER TABLE ESTIMATED SEASONAL HIGH GROUNDWATER TABLE GWT GROUNDWATER TABLE GROUNDWATER TABLE HDPE HIGH-DENSITY POLYETHYLENE HIGH-DENSITY POLYETHYLENE HMA HOT MIX ASPHALT HOT MIX ASPHALT INV INVERT INVERT L LENGTH LENGTH LOD LIMIT OF DISTURBANCE LIMIT OF DISTURBANCE LT LEFT LEFT MAX MAXIMUM MAXIMUM MCU MODULAR CONCRETE UNIT MODULAR CONCRETE UNIT MIN MINIMUM MINIMUM PROP PROPOSED PROPOSED PVC POLY-VINYL CHLORIDE POLY-VINYL CHLORIDE PSI POUNDS PER SQUARE INCH (PRESSURE RATING) POUNDS PER SQUARE INCH (PRESSURE RATING) PC POINT OF CURVATURE POINT OF CURVATURE PT POINT/POINT OF TANGENCY POINT/POINT OF TANGENCY PVI POINT OF VERTICAL INFLECTION POINT OF VERTICAL INFLECTION R&D REMOVE & DISPOSE REMOVE & DISPOSE R&R REMOVE & RESET REMOVE & RESET R&S REMOVE & STOCKPILE REMOVE & STOCKPILE RCP REINFORCED CONCRETE PIPE REINFORCED CONCRETE PIPE RT RIGHT RIGHT SCH SCHEDULE (PIPES) SCHEDULE (PIPES) SDR STANDARD DIMENSION RATIO (PIPES) STANDARD DIMENSION RATIO (PIPES) SDWK SIDEWALK SIDEWALK SESC SOIL EROSION & SEDIMENTATION CONTROL SOIL EROSION & SEDIMENTATION CONTROL SEV SOIL EVALUATION SOIL EVALUATION SF SQUARE FEET SQUARE FEET SG SINGLE-GRATE SINGLE-GRATE SMH SEWER MANHOLE SEWER MANHOLE SS STAINLESS STEEL STAINLESS STEEL STA STATION STATION SY SQUARE YARD SQUARE YARD TH TEST HOLE TEST HOLE TOW TOP OF WALL TOP OF WALL VERT VERTICAL VERTICAL W WIDTH WIDTH WF WETLAND FLAG WETLAND FLAG WLKWY WALKWAY WALKWAY WQ WATER QUALITY WATER QUALITY YR YEAR YEAR ' FEET FEET " INCHES INCHES '/' VERTICAL FEET/HORIZONTAL FOOTVERTICAL FEET/HORIZONTAL FOOT

OWNER/APPLICANT: COWDEN ST COLLABORATIVE D/B/A SEGUE INSTITUTE FOR LEARNING 325 COWDEN STREET CENTRAL FALLS, RI 02863

S

S

S

S

S

S S

S

S

COMMONWEALTH

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

WV

AutoCAD SHX Text

GV

AutoCAD SHX Text

WV

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

GV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

GV

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text D

AutoCAD SHX Text

SIG

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MW

AutoCAD SHX Text

MAIN STREET (RI ROUTE 122)

AutoCAD SHX Text

(PUBLIC (STATE) ~ 49.50' WIDTH)

AutoCAD SHX Text

CAMPBELL TERRACE

AutoCAD SHX Text

(PUBLIC ~ 40' WIDTH)

AutoCAD SHX Text

WEST AVENUE (US ROUTE 1)

AutoCAD SHX Text

(PUBLIC (STATE) ~ 60' WIDTH)

AutoCAD SHX Text

TRENTON STREET

AutoCAD SHX Text

(PUBLIC (CITY) ~ 50' WIDTH)

AutoCAD SHX Text

CEM CONC SIDEWALK

AutoCAD SHX Text

BRICK WALK

AutoCAD SHX Text

BRICK WALK

AutoCAD SHX Text

BRICK WALK

AutoCAD SHX Text

GUARDRAIL

AutoCAD SHX Text

A.C. UNIT

AutoCAD SHX Text

TIMBER GUARDRAIL (TYP)

AutoCAD SHX Text

YARD DRAIN (TYP.)

AutoCAD SHX Text

SLATE

AutoCAD SHX Text

LANDSCAPE LIGHTS

AutoCAD SHX Text

ELEC. PAD

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

CONC. PAD

AutoCAD SHX Text

TIMBER RAMP

AutoCAD SHX Text

CEM CONC RAMP

AutoCAD SHX Text

STEPS

AutoCAD SHX Text

CEM CONC SIDEWALK

AutoCAD SHX Text

CEM CONC SIDEWALK

AutoCAD SHX Text

LAWN

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LAWN

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

LAWN

AutoCAD SHX Text

LAWN

AutoCAD SHX Text

LAWN

AutoCAD SHX Text

GATE

AutoCAD SHX Text

METAL FENCE (TYP.)

AutoCAD SHX Text

GUY

AutoCAD SHX Text

CEM CONC SIDEWALK

AutoCAD SHX Text

CEM CONC SIDEWALK

AutoCAD SHX Text

CEM CONC SIDEWALK

AutoCAD SHX Text 30"

AutoCAD SHX Text 18"

AutoCAD SHX Text 30"

AutoCAD SHX Text 6"

AutoCAD SHX Text

CLUSTER OF TREES

AutoCAD SHX Text 10"

AutoCAD SHX Text

CURB (TYP.)

AutoCAD SHX Text

GRANITE CURBING (TYP.)

AutoCAD SHX Text

WOOD FENCE (TYP.)

AutoCAD SHX Text

LANDSCAPING

AutoCAD SHX Text

3-STORY BRICK OFFICE BUILDING #1080 MAIN STREET 17,108 SF FOOTPRINT

AutoCAD SHX Text 1 STORY RESTAURANT No. 1091 MAIN STREET

AutoCAD SHX Text

GLENWOOD AVENUE

AutoCAD SHX Text

(PUBLIC ~ 40' WIDTH)

AutoCAD SHX Text

LOWDEN STREET

AutoCAD SHX Text

(PUBLIC ~ 40' WIDTH)

AutoCAD SHX Text

WV

AutoCAD SHX Text

SLATE

AutoCAD SHX Text

SLATE

AutoCAD SHX Text

SIG

AutoCAD SHX Text 15"

AutoCAD SHX Text 15"

AutoCAD SHX Text 15"

AutoCAD SHX Text 15"

AutoCAD SHX Text 15"

AutoCAD SHX Text 15"

AutoCAD SHX Text

ELEC. PAD

AutoCAD SHX Text

BOLLARD

AutoCAD SHX Text

GAS METER

AutoCAD SHX Text 15"

AutoCAD SHX Text 18"

AutoCAD SHX Text

ELEC. PAD

AutoCAD SHX Text

CONC. STEPS

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 3"

AutoCAD SHX Text 15"

AutoCAD SHX Text 15"

AutoCAD SHX Text 15"

AutoCAD SHX Text 12"

AutoCAD SHX Text 15"

AutoCAD SHX Text

CLUSTER OF TREES

AutoCAD SHX Text

CLUSTER OF TREES

AutoCAD SHX Text

CLUSTER OF TREES

AutoCAD SHX Text 18"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

A.C. UNIT

AutoCAD SHX Text

OVERHANG

AutoCAD SHX Text

STONE COLUMN

AutoCAD SHX Text

GRANITE CURBING (TYP.)

AutoCAD SHX Text

GATE

AutoCAD SHX Text

GATE

AutoCAD SHX Text

BOX

AutoCAD SHX Text

CHAIN LINK FENCE (TYP)

AutoCAD SHX Text

GUY

AutoCAD SHX Text 1.3'

AutoCAD SHX Text

N 85°12'06" E 242.89' (FIELD)

AutoCAD SHX Text

(242.89' ~ CITY LAYOUT)

AutoCAD SHX Text

(242.87' ~ PLAN REF. 1(E) )

AutoCAD SHX Text

S 34°05'26" W 368.35' (FIELD)

AutoCAD SHX Text

(368.45' ~ CITY LAYOUT)

AutoCAD SHX Text

(368.44' ~ PLAN REF. 1(E) )

AutoCAD SHX Text =141°11'10"

AutoCAD SHX Text R=6.75'

AutoCAD SHX Text L=16.63'

AutoCAD SHX Text

BRG=N 75°18'59" W

AutoCAD SHX Text

CH=12.73'

AutoCAD SHX Text T=19.16'

AutoCAD SHX Text

(282.30' ~ CITY LAYOUT)

AutoCAD SHX Text

N 04°43'24" W 282.47' (FIELD)

AutoCAD SHX Text

(282.39' ~ PLAN REF. 1(E) )

AutoCAD SHX Text

N 34°05'26" E 98.13' (TIE)

AutoCAD…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .