RFQ27007135 SOW.pdf

PDF 158 KB Posted

Attached to
DEM Legacy High School Remedial Action Work
Solicitation number
RFQ27007135
Issued by
Providence County, Rhode Island

About this file

This Scope of Work (SOW) document is issued by the Rhode Island Department of Environmental Management (RIDEM) for Request for Quotes (RFQ) 27007135, addressing site remediation at the Legacy High School property located at 1080 Main Street in Pawtucket, Rhode Island. The project involves the construction of a remedial cap, environmental oversight, and closure documentation for a 0.8394-acre site (Plat 63A, Lot 305) owned by Cowden Street Collaborative, Inc. d/b/a Segue Institute for Learning, which will serve as an outdoor classroom and recreational area. The scope of work includes installation of a protective fence prior to earthwork, coordination meetings with RIDEM and the site owner (minimum three meetings anticipated), and construction of various remedial features including hot mix asphalt courtyard and plaza areas, raised planting beds, synthetic turf, cement concrete walkways, stairs, and an ADA ramp. All construction items must be manufactured in the United States. Environmental oversight shall include completion of operating logs during remedial activities and submission of a closure report compliant with Section 1.12 of the Remediation Regulations, including a draft Environmental Land Usage Restriction and associated Post-Soil Management Plan.

The site historically contained webbing and jewelry manufacturers and is contaminated with polycyclic aromatic hydrocarbons (PAHs), arsenic, lead, and total petroleum hydrocarbons (TPH). Remediation consists of encapsulating contaminated soils exceeding the Department's Method 1 Residential Direct Exposure Criteria with Department-approved engineered controls such as minimum two feet of clean fill, one foot of clean fill with geotextile fabric, or four inches of pavement above six inches of clean subgrade. An Environmental Land Usage Restriction shall be recorded on the deed and require annual inspections to maintain cap integrity and document engineered control conditions; the restriction shall include a soil management plan addressing post-remediation soil disturbance activities. The ELUR must be approved by RIDEM and recorded in the Land Evidence Records for the City of Pawtucket within fifteen days of recording. This project is funded by the Bipartisan Infrastructure Law.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AGENCY SOLICITATION SPECIFICATIONS

RFQ27007135

DEM SITE REMEDIATION LEGACY HIGH SCHOOL, PAWTUCKET, RI

SECTION A. BACKGROUND

The site consists of 0.8394 acres of land referred to as Plat 63A, Lot 305, with an address of 1080 Main Street. The site is owned by Cowden Street Collaborative, Inc. d/b/a Segue Institute for Learning. The Segue Institute for Learning will be using this space as an outdoor classroom for instructional purposes as well as some recreational area (pickleball, soccer, and basketball). The space will also be used as part of their ongoing beautification projects.

The site has a site remediation code of SR-26-2180. Historically, the site was owned by Smith Webbing and Everlastik, Inc., both webbing manufacturers; Standard Mill Supply Co.; and Ronnie Jewelry Inc., Da Vinci Creations, Inc., and Jewelry Crafts Co., all jewelry manufacturers.

Contamination at the site includes polycyclic aromatic hydrocarbons (PAHs), arsenic and lead, and total petroleum hydrocarbons (TPH).

This Request for Quotes (RFQ) is for the construction of a remedial cap, environmental oversight, and closure documentation.

The Remedial Action Work Plan and Addendum associated with this project have been provided for your reference, as well as the Remedial Approval Letter (RAL) describing the approved remedial actions. The RAL describes remediation at this site to consist of the following:

• The encapsulation of site soils that exceed the Department’s Method 1 Residential Direct Exposure Criteria (RDEC) with Department-approved engineered controls consisting of either a minimum of two (2) feet of clean fill, one (1) foot of clean fill underlain with a geotextile fabric, four (4) inches of pavement (asphalt or concrete) above six (6) inches of clean subgrade, or equivalent, and/or building foundations. Existing pavement may serve as a “cap-in-place” provided that all crack and damage areas are repaired and sealed as part of the remedial work; and

• The integrity of the cap shall be preserved through the recording of an Environmental Land

Usage Restriction (ELUR) on the deed for the entire property (Plat Map 63A / Lot 305).

The ELUR shall require the performance of annual inspections to document the status of the ELUR and the condition of the engineered controls at the Site. The ELUR shall include a soil management plan (SMP), which will address post remediation activities that disturb onsite soils. The ELUR, once approved by the Department, shall be recorded for the property in the Land Evidence Records for the City of Pawtucket and a recorded copy forwarded back to the Department within fifteen (15) days of recording.

This project will be funded by the Bipartisan Infrastructure Law.

SECTION B: SCOPE OF WORK AND REQUIREMENTS

Meetings: A meeting shall be held with RIDEM and the Owner to coordinate all aspects of constructing the remedial cap. Meetings shall be conducted via Teams or in-person. It should be expected that additional meetings may be required for coordination. Anticipate a minimum of three

(3) meetings.

Fence: A fence shall be installed prior to any earthwork activities.

Earthwork: Earthwork shall include the following:

Plan Sheet & Title Tasks

4 – SESC/Site Prep. Plan

Misc. SESC Measures (Conc. Washouts, Stockpile Management)

5 – Site Layout Plan

North Hot Mix Asphalt Outdoor Courtyard North Raised Planting Bed North Synthetic Turf Area East Cement Concrete Walkway East Cement Concrete Stairs & Walkway South Cement Concrete ADA Ramp South Hot Mix Asphalt Plaza South Cement Concrete Walkway

Note: All construction items must be made in the USA.

Please refer to the 100% Construction Documents provided with this RFQ.

Environmental Oversight: Operating logs shall be completed as remedial actions are conducted.

Closure Report in accordance with Section 1.12 of the Remediation Regulations shall be submitted to the Department for review and approval. The Closure Report shall include a draft Environmental Land Usage Restriction and associated Post-Soil Management Plan.