RFQ Solicitation No.480664 - Draft BSA PO#480664 - Attachment (A) BSA SOW (6-26-26).pdf
PDF 440 KB Posted
- Solicitation number
- 480664
- Issued by
-
Department of Energy Office of Science
About this file
This is a Statement of Work for custom fabricated stainless steel components issued by Brookhaven Science Associates, LLC (managed for the U.S. Department of Energy) dated June 26, 2026.
BSA requires a qualified contractor to fabricate and deliver three stainless steel items for the Production Division at Brookhaven National Laboratory in Upton, New York: one Stainless Steel Type 206 CSX End Station Tube, Theta (Part No. PD-CSX-ES-1411); one Stainless Steel Type 304 CSX End Station Body Housing (Part No. PD-CSX-ES-1422); and one Stainless Steel Type 304 CSX End Station Tube, Delta, Rotary (Part No. PD-CSX-ES-1431). The contractor must supply all personnel, labor, and equipment necessary to fabricate, machine, finish, inspect, and deliver these components in accordance with attached drawings and step files. Parts 1411 and 1431 require chromium plating. All work must include tight tolerance features for bearing mounting and alignment. The contractor shall deliver a full inspection report for each part. All services and deliverables must be completed and received by BSA by August 31, 2026.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment (A)
P.O. Box 5000
Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy
Brookhaven Science Associates, LLC
Statement of Work
Title: Custom Fabricated Stainless Steel End Tubes and Body Housing
Date: June 26, 2026
Overview:
BSA requires a qualified Contractor to fabricate and deliver one (1) stainless steel cylindrical weldment and two (2) custom stainless steel tubes for the Production Division at Brookhaven National Laboratory, Upton, New York. Each part requires tight tolerance features for bearing mounting and alignment.
Scope of Work:
Contractor shall furnish all personnel, labor, and equipment to fabricate, machine, finish, inspect and deliver the following:
Item Part Number Description Qty
1 PD-CSX-ES-1411 Stainless Steet Type 206 CSX End Station Tube, Theta 1
2 PD-CSX-ES-1422 Stainless Steel Type 304 CSX End Station Body Housing 1
3 PD-CSX-ES-1431 Stainless Steel Type 304 CSX End Station Tube, Delta, Rotary 1
All work herein shall be in accordance with the attached Drawings and Step Files incorporated herein, respectively.
Deliverables:
1) Contractor will fabricate and deliver the following to Brookhaven National Laboratory, Upton, New York in accordance with this Statement of Work.:
One (1) Item No. PD-CSX-ES-1411, Stainless Steet Type 206 CSX End Station Tube, Theta* One (1) Item No. PD-CSX-ES-1422, Stainless Steel Type 304 CSX End Station Body Housing One (1) Item No. PD-CSX-ES-1431, Stainless Steel Type 304 CSX End Station Tube, Delta, Rotary *
*Part No’s.1411 and 1431 require chromium plating as stated on their respective drawings.
2) Contractor will deliver a full inspection report for each part specified herein.
Schedule:
All services and deliverables herein shall be completed and/or received by BSA by August 31, 2026